LEED 2009 for Neighborhood Development SLL CREDIT 4

Report 3 Downloads 79 Views
LEED 2009 for Neighborhood Development SLL CREDIT 4: BICYCLE NETWORK AND STORAGE Stage 1: LEED-ND Conditional Approval

All fields and uploads are required unless otherwise noted.

BICYCLE NETWORK This static sample form has been modified for offline access. All sections of the form are visible. Sample forms are for reference only. Select one of the following: a. Five mile bicycle network within 1/4-mile of project boundary Connections Tool

b. 100% residential project within 1/4-mile of bicycle network connecting to school or employment center c. Project within 1/4-mile of bicycle network connecting to 10 diverse uses

FIVE MILE BICYCLE NETWORK Upload SLLc4-1. The project team has uploaded a map with the following: · project boundary · bicycle route from the boundary to existing bicycle network · a bicycle network of at least 5 miles in length (label each segment of network according to bicycle network definition) Note: Map may be a special non-base map.

100% RESIDENTIAL PROJECT Residential percentage of total square footage (from PI Form 1: Development Program and Site Type, under the Existing Buildings Remaining/Constructed label):

%

Upload SLLc4-2. The project team has uploaded a map with the following: · project boundary · bicycle route from the boundary to existing bicycle network, and existing network routes to school and/or an employment center (label each segment of network according to bicycle network definition) Note: Map may be a special non-base map.

CONNECTING TO 10 DIVERSE USES Upload SLLc4-3. The project team has uploaded a map with the following: · project boundary · bicycle route from the boundary to existing bicycle network · routes to at least 10 diverse uses, including use identification (label each segment of network according to bicycle network definition and show distances to each use) Note: Map may be a special non-base map.

Copyright © 2010 U.S. Green Building Council. All Rights Reserved.

LEED 2009 for Neighborhood Development SLL Credit 4: Bicycle Network and Storage Form Version 1.0

Page 1 of 4

BICYCLE STORAGE Note: The Bicycle Storage section of this form also appears under NPD Credit 5: Reduced Parking Footprint. If attempting both credits, enter identical information.

Does the project include multiunit residential, retail, and/or other nonresidential buildings? Select all that apply: Multiunit residential Retail Nonresidential other than retail None of the above Upload SLLc4-4. The project team has uploaded a map with the following: · site base · project boundary · multiunit residential, retail, and nonresidential other-than-retail buildings labeled · bicycle parking locations by user type with distances to building entries · on-site shower locations

MULTIUNIT RESIDENTIAL Multiunit Residential Occupants Multiunit residential planned occupancy: Number of multiunit residential dwelling units: Minimum number of secure, enclosed bicycle storage spaces required:

0

Number of secure, enclosed bicycle storage spaces provided: Visitor Bicycle Racks Minimum number of visitor bicycle racks required:

0

Number of visitor bicycle racks provided:

RETAIL Retail Workers Retail worker planned occupancy: Minimum number of secure, enclosed bicycle storage spaces required:

0

Number of secure, enclosed bicycle storage spaces provided: Visitor or Customer Bicycle Racks

Copyright © 2010 U.S. Green Building Council. All Rights Reserved.

LEED 2009 for Neighborhood Development SLL Credit 4: Bicycle Network and Storage Form Version 1.0

Page 2 of 4

Total retail square footage:

sf

Number of businesses: Minimum number of visitor or customer bicycle racks required:

0

Number of visitor or customer bicycle racks provided:

NONRESIDENTIAL OTHER THAN RETAIL Nonresidential, Nonretail Occupants Nonresidential, nonretail planned occupancy: Minimum number of secure, enclosed bicycle storage spaces required:

0

Number of secure, enclosed bicycle storage spaces provided: Visitor Bicycle Racks Total nonresidential, nonretail square footage:

sf

Number of nonresidential, nonretail buildings: Minimum number of visitor bicycle racks required:

0

Number of visitor bicycle racks provided: Are on-site health club showers used to comply with on-site shower and changing facility requirements? Yes

No On-site health club showers which contribute to this credit are indoor, available to project employees for free, and indicated with installed signage.

Confirm that all bicycle parking and storage complies with the following: Enclosed storage secured by key access Installation of parking access signage Clearly visible from primary entrance of building served Night lighting Protected from damage from motor vehicles Located within 100 ft of building served, including proportionate distribution of spaces within 100 ft of multiple entries to a single building

Copyright © 2010 U.S. Green Building Council. All Rights Reserved.

LEED 2009 for Neighborhood Development SLL Credit 4: Bicycle Network and Storage Form Version 1.0

Page 3 of 4

ADDITIONAL DETAILS Special circumstances preclude documentation of credit compliance with the submittal requirements outlined in this form.

SUMMARY CREDIT COMPLIANCE SLL Credit 4: Bicycle Network and Storage Stage 1 Points Documented:

of 1

Copyright © 2010 U.S. Green Building Council. All Rights Reserved.

LEED 2009 for Neighborhood Development SLL Credit 4: Bicycle Network and Storage Form Version 1.0

0

Page 4 of 4