MA SREC Update

Report 2 Downloads 119 Views
MA SREC Update August 21, 2014

©2014 SRECTrade, Inc.

Speakers Steven Eisenberg CEO

Alex Sheets Director Environmental Markets

Sam Rust Director Business Development

Agenda • Company Overview Steven Eisenberg

• SREC Program Overview Steven Eisenberg

• Net metering caps and H.4185 Sam Rust

• SREC-I Pricing Alex Sheets

• Q and A 3

Overview

Online SREC transaction & management platform • • • • •

Since 2008 9,000+ clients 135+ MW under management 100% SREC focused Brokerage model

4

Services Corporate Electricity suppliers and institutional clients with systems above 250 kW

Residential and Small Commercial Home owners and commercial systems smaller than 250 kW

Installers Turn-key SREC solutions for solar installers and developers 5

Two SREC Programs in MA SREC-I • Started in 2010, “capped” June 30, 2014

SREC-II • Started April 25, 2014 Both programs utilize Solar Credit Clearinghouse Auctions (SCCA) and a reactive demand formula.

6

SREC-I vs. SREC-II Features

SREC-I

SREC-II

Program start

January 1, 2010

April 25, 2014

Adjustable Minimum Standard

Yes

Yes

Decreasing ACP Rate Schedule

Yes

Yes

Solar Credit Clearinghouse Auction Opt-in Schedule

Yes

Yes, all projects get 40 quarters from qualification date

Decreasing Solar Credit Clearinghouse Auction Schedule

No (fixed at $285/SREC)

Starts at $285/SREC and decreases over time

Program Cap

< 100 kW = 4/25/2014 PTO or > 1,600 MW less final SREC100 kW with ISA from 6/7/2013 I qualified capacity = 6/30/2014 PTO

Market Sectors

No

Yes

SREC Factors

No

Yes

Project Size Maximum

Yes, 6 MW DC

Yes, 6 MW DC 7

SREC-I Status • As of 8/08/14, 659.1 MW of Qualified Capacity • 548.3 MW operational / 110.8 MW not operational • No new capacity is eligible

• 2014 SCCA Cleared in 3rd Round • Preliminary 2015 compliance requirement set at 1,054,933 SRECs (as of 7/30/2014)

Source: DOER and RPS Solar Carve-Out Qualified Renewable Generation Units Report 8

SREC-I SCCA • SREC-I qualified projects have up to 40 Quarters of production eligibility for the SCCA • SREC-I SCCA set at $285/SREC • 142,786 MA 2013 SRECs for sale in SCCA • SCCA cleared 8/1/2014 during the 3rd round; 232,060 bids • SREC-I 2015 obligation increased • Payments issued in September by DOER

9

SREC-II Status • CY2014 estimated requirement of 41,279 SRECs / 85 MW • 124.0 MW currently qualified (109.7 MW not operational)

• 14.3 MW operational • • • •

Market Sector A - 7.2 MW operational Market Sector B - 7.1 MW operational Market Sector C - 0 MW operational Managed Growth - 0 MW operational* *27.5 MW qualified for CY2014, 81.8 MW for CY2015, 35.0 MW on waiting list

Source: DOER and RPS Solar Carve-Out II Qualified Renewable Generation Units Report and Managed Growth Annual Capacity Block Allocations 10

SREC-II Market Sectors Market Sector

SREC Factor

Generation Units with a capacity 25 kW with 67% or B more of the electric output on an annual basis used by an on-site load. Generation Units on Landfills or Brownfields, or Generation Units with a capacity of