WBS-RAC
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012) PROJECT DESIGN & AWARD
Orig Dur
Rem Dur
Start
398
243
02-Dec-11 A
13-Jun-13
182
28
02-Dec-11 A
16-Aug-12
0
0
02-Dec-11 A
180
28
06-Dec-11 A
DOC PKG #1 - FOUNDATIONS AREA 1&2
DES010
PROJECT DESIGN
DES020
GMP SUBMITTAL
0
0
31-Jan-12 A
DES030
OWNER REVIEW OF GMP PROPOSAL
16
0
31-Jan-12 A
DES040
RELEASED FOR BUYOUT
0
0
13-Feb-12 A
DES050
RECEIVE NOTICE TO PROCEED
0
0
13-Feb-12 A
DES2020
DOC PKG #2 - CIVIL, UTILITIES, AREA 1&2 STEEL & CONCRETE
0
0
13-Feb-12 A
DES5020
DOC PKG #2A - AREA 3&4 STEEL & CONCRETE
0
0
13-Feb-12 A
DES1040
RELEASED FOR TEST PILE PROGRAM
0
0
01-Mar-12 A
DES6020
RECEIVE WET LAND PERMIT
0
0
09-Mar-12 A
DES3020
DOC PKG #3 - 100% CORE & SHELL
0
0
23-Mar-12 A
DES4020
DOC PKG #4 - 100% INTERIORS
0
0
10-Jul-12*
DES2040
DOC PKG #5 - FF&E
SITE INFRASTRUCTURE SITE EXCAVATION
16-Aug-12
13-Feb-12 A
0
0
10-Jul-12*
307
152
06-Dec-11 A
194
39
06-Dec-11 A
31-Aug-12
15
0
06-Dec-11 A
20-Feb-12 A
06-Feb-13
BUY1860
BID / AWARD SITE EXCAVATION
10
0
06-Dec-11 A
10-Feb-12 A
BUY1890
MOBILIZE STRUCTURAL EXCAVATION EQUIPMENT
5
0
10-Feb-12 A
20-Feb-12 A
79
5
13-Feb-12 A
16-Jul-12
SITE UTILITIES (STORM DRAIN)
2012 Jun
DES1020
BUYOUT & PROCUREMENT
Finish
BUY2760
BID / AWARD UTILITY SUBCONTRACTORS (RE-BID DUE TO DRAWING CHANGES)
15
0
13-Feb-12 A
22-Mar-12 A
BUY2770
UNDERGROUND PIPING / DECK SLEEVING SHOP DRAWINGS
15
0
18-Apr-12 A
08-May-12 A
BUY2780
REVIEW PIPING & SLEEVING SHOP DRAWINGS
15
1
09-May-12 A
10-Jul-12
BUY2870
PROCURE PIPING & SLEEVE MATERIALS FOR INSTALL
10
5
16-May-12 A
16-Jul-12
97
39
09-Jul-12 A
31-Aug-12 20-Jul-12
SITE UTILITIES (SEWER/WATER) BUY2920
BID / AWARD SEWER/WATER SUBCONTRACTORS
10
9
09-Jul-12 A
DES0100
WATER & SEWER FINAL DRAWINGS ISSUED
0
0
09-Jul-12 A
BUY2930
UNDERGROUND PIPING / DECK SLEEVING SHOP DRAWINGS
15
15
23-Jul-12
10-Aug-12
BUY2940
REVIEW PIPING & SLEEVING SHOP DRAWINGS
15
15
13-Aug-12
31-Aug-12
BUY2950
PROCURE PIPING & SLEEVE MATERIALS FOR INSTALL
10
10
20-Aug-12
31-Aug-12
99
0
13-Feb-12 A
08-May-12 A
BUY1870
BID / AWARD SITE ELECTRICAL SUBCONTRACTOR
20
0
13-Feb-12 A
28-Mar-12 A
BUY1880
UNDERGROUND DUCTBANK SHOP DRAWINGS
15
0
29-Mar-12 A
06-Apr-12 A
BUY2740
REVIEW UNDERGROUND DUCTBANK SHOP DRAWINGS
15
0
06-Apr-12 A
24-Apr-12 A
BUY2750
PROCURE ELECTRICAL MATERIALS FOR UG INSTALL
10
0
25-Apr-12 A
08-May-12 A
205
50
13-Feb-12 A
17-Sep-12
201
27
13-Feb-12 A
15-Aug-12
15
0
13-Feb-12 A
07-Mar-12 A
SITE UTILITIES (ELECTRICAL)
FOUNDATIONS & STRUCTURE STRUCTURAL STEEL BUY1170
BID / AWARD STRUCTURAL STEEL
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
Page 1 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
BUY1180
RELEASE STRUCTURAL STEEL MILL ORDER
0
0
BUY1190
STRUCTURAL STEEL SHOP DRAWINGS
50
0
14-Mar-12 A
10-Jul-12
BUY1200
STRUCTURAL STEEL SHOP DRAWING REVIEW
50
0
04-Apr-12 A
10-Jul-12
BUY1210
FABRICATE / DELIVER STRUCTURAL STEEL
80
27
25-Apr-12 A
15-Aug-12
BUY1220
DELIVER FIRST ERECTION SEQUENCE TO JOBSITE
WATERPROOFING & SUBSURFACE DRAINAGE
13-Mar-12 A
0
0
39
0
12-Apr-12 A
30-Apr-12 A
09-Jul-12 A
BUY1390
BID / AWARD WATERPROOFING & SUBSURFACE DRAINAGE
10
0
12-Apr-12 A
18-Apr-12 A
BUY1400
CREATE SUBGRADE / PRODUCT SUBMITTALS
5
0
18-Apr-12 A
24-Apr-12 A
BUY1410
WATERPROOFING & DRAINAGE MATERIAL REVIEW
5
0
24-Apr-12 A
30-Apr-12 A
BUY1420
PROCURE WATERPROOFING & SUBSURFACE DRAIN MATERIALS
MASONRY
5
0
24-Apr-12 A
30-Apr-12 A
50
50
10-Jul-12
17-Sep-12
BUY1430
BID / AWARD MASONRY
10
10
10-Jul-12
23-Jul-12
BUY1440
CREATE MASONRY SHOP DRAWINGS
15
15
24-Jul-12
13-Aug-12
BUY1450
MASONRY SHOP DRAWING REVIEW
10
10
14-Aug-12
27-Aug-12
BUY1460
PROCURE MASONRY MATERIALS
15
15
28-Aug-12
17-Sep-12
79
0
13-Feb-12 A
23-Mar-12 A
STRUCTURAL FOUNDATIONS BUY1340
BID / AWARD STRUCTURAL FOUNDATIONS
15
0
13-Feb-12 A
21-Mar-12 A
BUY1350
MOBILIZE STRUCTURAL FOUNDATIONS EQUIPMENT
2
0
22-Mar-12 A
23-Mar-12 A
40
0
13-Feb-12 A
30-Apr-12 A
CONCRETE (FORM, PLACE & FINISH) BUY1310
BID / AWARD CONCRETE FORM / PLACE / FINISH
15
0
13-Feb-12 A
07-Mar-12 A
BUY1320
ENGINEER DECK, COLUMN & WALL SHOP DRAWINGS
15
0
08-Mar-12 A
18-Apr-12 A
BUY1330
PROCURE & FAB DECK, COLUMN & WALL FORMWORK
20
0
29-Mar-12 A
30-Apr-12 A
15
0
13-Feb-12 A
21-Mar-12 A
CONCRETE (MATERIALS) BUY1355
BID / AWARD CONCRETE SUPPLY VENDOR
10
0
13-Feb-12 A
07-Mar-12 A
BUY1360
CREATE FOUNDATION CONCRETE MIX DESIGNS
5
0
08-Mar-12 A
14-Mar-12 A
BUY1370
FOUNDATION CONCRETE MIX DESIGN REVIEW
5
0
15-Mar-12 A
21-Mar-12 A
BUY1380
APPROVED MIX DESIGNS
REBAR (SUPPLY & INSTALL)
2012 Jun
0
0
74
0
13-Feb-12 A
21-Mar-12 A 12-Jun-12 A
BUY1230
BID / AWARD FOUNDATION REBAR
10
0
13-Feb-12 A
20-Feb-12 A
BUY1240
FOUNDATION REBAR SHOP DRAWINGS
25
0
21-Feb-12 A
28-Mar-12 A
BUY1250
FOUNDATION REBAR SHOP DRAWING REVIEW
25
0
01-Mar-12 A
04-Apr-12 A
BUY1260
PROCURE / FABRICATE / DELIVER FOUNDATION REBAR
30
0
08-Mar-12 A
18-Apr-12 A
BUY1270
BALANCE OF STRUCTURE SHOP DRAWINGS
30
0
19-Mar-12 A
01-May-12 A
BUY1280
PROPERTY REBAR SHOP DRAWING REVIEW
30
0
02-Apr-12 A
15-May-12 A
BUY1290
PROCURE / FABRICATE / DELIVER BALANCE OF REBAR
40
0
18-Apr-12 A
12-Jun-12 A
BUY1300
DELIVER FIRST VERTICAL / DECK PACKAGE TO JOBSITE
0
0
203
110
13-Feb-12 A
10-Dec-12
110
110
10-Jul-12
10-Dec-12
MEPS DISTRIBUTION & EQUIPMENT FOOD SERVICE EQUIPMENT (BY OWNER)
30-Apr-12 A
BUY1950
BID / AWARD FOOD SERVICE EQUIPMENT CONTRACT
15
15
10-Jul-12
30-Jul-12
BUY1960
FOOD SERVICE EQUIPMENT CUT SHEETS & SHOP DRAWING
40
40
31-Jul-12
24-Sep-12
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
Page 2 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
BUY1970
REVIEW CUT SHEETS & SHOP DRAWINGS
BUY1980
FABRICATE & DELIVER FOOD SERVICE EQUIPMENT
PLUMBING & MECHANICAL
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
30
30
04-Sep-12
15-Oct-12
2012 Jun
60
60
18-Sep-12
10-Dec-12
121
39
13-Feb-12 A
31-Aug-12
BUY1470
BID / AWARD PLUMBING & MECHANICAL SUBCONTRACTORS
20
0
13-Feb-12 A
15-Mar-12 A
BUY1480
UNDERGROUND PIPING / DECK SLEEVING SHOP DRAWINGS
15
0
16-Mar-12 A
05-Apr-12 A
BUY1540
INTERIOR FAN COIL SHOP DRAWING / SUBMITTAL
15
0
16-Mar-12 A
26-Apr-12 A
BUY1570
ROOF TOP AIR HANDLER SHOP DRAWING / SUBMITTAL
15
0
16-Mar-12 A
26-Apr-12 A
BUY1600
PUMPS SUBMITTALS & CUT SHEETS
15
0
16-Mar-12 A
26-Apr-12 A
BUY1630
PLUMBING FIXTURE SUBMITTALS & CUT SHEETS
15
0
16-Mar-12 A
26-Apr-12 A
BUY1490
REVIEW PIPING & SLEEVING SHOP DRAWINGS
5
0
06-Apr-12 A
26-Apr-12 A
BUY1500
PROCURE PIPING & SLEEVE MATERIALS FOR INSTALL
10
0
27-Apr-12 A
10-May-12 A
BUY1550
REVIEW INTERIOR FAN COIL SHOP DRAWING
10
0
27-Apr-12 A
10-May-12 A
BUY1580
REVIEW ROOF TOP AIR HANDLER SHOP DRAWINGS
10
0
27-Apr-12 A
10-May-12 A
BUY1610
REVIEW PUMP SUBMITTALS & CUT SHEETS
10
0
27-Apr-12 A
10-May-12 A
BUY1640
PLUMBING FIXTURE SHOP DRAWING REVIEW
10
0
27-Apr-12 A
10-May-12 A
BUY1560
INTERIOR FAN COIL UNIT FABRICATION & DELIVERY
50
9
11-May-12 A
20-Jul-12
BUY1590
ROOF TOP AIR HANDLER FABRICATION & DELIVERY
80
39
11-May-12 A
31-Aug-12
BUY1620
PUMP FABRICATION & DELIVERY
50
9
11-May-12 A
20-Jul-12
BUY1650
PROCURE PLUMBING FIXTURES
40
2
11-May-12 A
11-Jul-12
121
39
13-Feb-12 A
31-Aug-12
BUY1660
BID / AWARD ELECTRICAL SUBCONTRACTOR
20
0
13-Feb-12 A
15-Mar-12 A
BUY1670
UNDERGROUND CONDUIT / DECK PIPING SHOP DRAWINGS
15
0
16-Mar-12 A
05-Apr-12 A
BUY1700
GENERATOR SHOP DRAWINGS
15
0
16-Mar-12 A
26-Apr-12 A
BUY1730
SWITCH GEAR CUT SHEETS & SUBMITTALS
15
0
16-Mar-12 A
26-Apr-12 A
BUY1760
MCC SHOP DRAWINGS
15
0
16-Mar-12 A
26-Apr-12 A
BUY1790
ELECTRICAL DISTRIBUTION SHOP DRWNGS & SUBMITTALS
15
0
16-Mar-12 A
26-Apr-12 A
BUY1680
REVIEW CONDUIT & SLEEVING SHOP DRAWINGS
5
0
06-Apr-12 A
26-Apr-12 A
BUY1690
PROCURE CONDUIT & SLEEVE MATERIALS FOR INSTALL
10
0
27-Apr-12 A
10-May-12 A
BUY1710
REVIEW GENERATOR SHOP DRAWINGS
10
0
27-Apr-12 A
10-May-12 A
BUY1740
REVIEW SWITCH GEAR CUT SHEETS & SUBMITTALS
10
0
27-Apr-12 A
10-May-12 A
BUY1770
REVIEW MCC SHOP DRAWINGS
10
0
27-Apr-12 A
10-May-12 A
BUY1800
REVIEW ELECTRICAL DISTRIBUTION SHOP DRAWINGS
10
0
27-Apr-12 A
10-May-12 A
BUY1720
GENERATOR FABRICATION & DELIVERY
80
39
11-May-12 A
31-Aug-12
BUY1750
SWITCH GEAR FABRICATION & DELIVERY
65
24
11-May-12 A
10-Aug-12
BUY1780
MCC FABRICATION & DELIVERY
65
24
11-May-12 A
10-Aug-12
BUY1810
PROCURE ELECTRICAL DISTRIBUTION MATERIALS
40
2
11-May-12 A
11-Jul-12
ELECTRICAL
119
60
18-Apr-12 A
01-Oct-12
BUY1900
BID / AWARD MISC. METAL (STAIRS, SUPPORTS, RAIL)
15
0
18-Apr-12 A
08-May-12 A
BUY1910
MISC. METAL SHOP DRAWINGS
50
7
09-May-12 A
18-Jul-12
BUY1920
REVIEW MISC. METAL SHOP DRAWINGS
50
50
10-Jul-12
17-Sep-12
MISCELLANEOUS METALS
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
Page 3 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
BUY1930
PROCURE MATERIALS / FABRICATE MISC. METAL
BUY1940
DELIVER STAIRS, RAILS, ETC.
ELEVATORS
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
50
50
24-Jul-12
Finish 01-Oct-12
0
0
116
23
13-Feb-12 A
04-Sep-12 09-Aug-12
BUY1820
BID / AWARD ELEVATORS
15
0
13-Feb-12 A
05-Mar-12 A
BUY1830
ELEVATOR SHOP DRAWINGS
20
0
06-Mar-12 A
02-Apr-12 A
BUY1840
REVIEW SHOP DRAWINGS
10
0
03-Apr-12 A
18-Apr-12 A
BUY1850
PROCURE ELEV.MACHINE ROOM EQUIP, RAILS, FRONTS
ARCHITECTURAL DEVELOPMENT EXTERIOR SKIN
2012 Jun
80
23
19-Apr-12 A
09-Aug-12
198
105
20-Feb-12 A
03-Dec-12
88
0
30-Mar-12 A
02-Jul-12 A
BUY2230
BID / AWARD EXTERIOR SKIN CONTRACTOR
20
0
30-Mar-12 A
20-Apr-12 A
BUY2240
EXTERIOR ENCLOSURE SHOP DRAWINGS
40
0
23-Apr-12 A
21-May-12 A
BUY2250
REVIEW EXTERIOR FACADE DESIGN BUILD DRAWINGS
15
0
22-May-12 A
11-Jun-12 A
BUY2260
PROCURE MATERIALS FOR EXTERIOR ENCLOSURE
20
0
05-Jun-12 A
02-Jul-12 A
140
47
30-Mar-12 A
12-Sep-12
ROOFING BUY2190
BID / AWARD ROOFING
15
2
30-Mar-12 A
11-Jul-12
BUY2200
ROOFING SHOP DRAWINGS & MATERIAL SAMPLES
15
15
12-Jul-12
01-Aug-12
BUY2210
REVIEW ROOFING SHOP DRAWINGS & MATERIALS
15
15
02-Aug-12
22-Aug-12
BUY2220
PROCURE ROOFING MATERIALS
15
15
23-Aug-12
12-Sep-12
137
105
25-Jun-12 A
03-Dec-12
DOORS & HARDWARE BUY2350
BID / AWARD DOORS & HARDWARE PACKAGES
15
5
25-Jun-12 A
16-Jul-12
BUY2360
CREATE DOOR & HARDWARE SCHEDULE SUBMITTAL
25
25
17-Jul-12
20-Aug-12
BUY2370
REVIEW DOOR & HARDWARE SCHEDULE
15
15
21-Aug-12
10-Sep-12
BUY2380
PROCURE DOORS & HARDWARE
60
60
11-Sep-12
03-Dec-12
BUY2390
DELIVER FRAMES TO JOBSITE FOR FRAMING MILESTONE
0
0
09-Oct-12
62
30
25-Jun-12 A
20-Aug-12
BUY2470
BID / AWARD INTERIOR FRAMING & DRYWALL
15
5
25-Jun-12 A
16-Jul-12
BUY2480
CREATE FRAMING MATERIAL SUBMITTALS & SHOP DRWNGS
10
10
17-Jul-12
30-Jul-12
BUY2490
FRAMING MATERIAL & SHOP DRAWING REVIEW
5
5
31-Jul-12
06-Aug-12
BUY2500
PROCURE FRAMING MATERIALS & DRYWALL
10
10
07-Aug-12
20-Aug-12
INTERIOR FRAMING & DRYWALL
119
10
23-Mar-12 A
23-Jul-12
BUY2310
BID / AWARD EXPANSION JOINT INSTALLATION
15
0
23-Mar-12 A
09-Apr-12 A
BUY2320
SUBMIT EXPANSION JOINT SHOP DRAWINGS & CUT SHEET
15
0
18-Apr-12 A
08-May-12 A
BUY2330
REVIEW SHOP DRAWINGS & CUT SHEETS
10
0
09-May-12 A
15-Jun-12 A
BUY2340
PROCURE EXPANSION JOINT MATERIAL
25
10
15-Jun-12 A
23-Jul-12
EXPANSION JOINTS
34
34
25-Jun-12 A
24-Aug-12
BUY2270
BID / AWARD BUILDING INSULATION & FIRE STOP
15
4
25-Jun-12 A
13-Jul-12
BUY2280
SUBMIT INSULATION & FIRE STOP CUT SHEETS
10
10
16-Jul-12
27-Jul-12
BUY2290
REVIEW INSULATION & FIRE STOP CUT SHEETS
10
10
30-Jul-12
10-Aug-12
BUY2300
PROCURE MATERIALS FOR INSULATING BUILDING
10
10
13-Aug-12
24-Aug-12
178
85
23-Mar-12 A
05-Nov-12
INSULATION
GLASS & GLAZING Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
Page 4 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
23-Mar-12 A
18-Apr-12 A
2012 Jun
BUY2400
BID / AWARD GLASS & GLAZING
15
0
BUY2410
GLASS & GLAZING / CURTAIN WALL SHOP DRAWINGS
20
0
19-Apr-12 A
16-May-12 A
BUY2420
REVIEW GLASS & GLAZING / CURTAIN WALL SHOPS
15
0
17-May-12 A
06-Jun-12 A
BUY2430
PROCURE / FABRICATE PUNCH WINDOWS
60
40
06-Jun-12 A
03-Sep-12
BUY2440
INTERIOR GLASS / MIRROR SHOP DRAWINGS
15
15
04-Sep-12
24-Sep-12
BUY2450
REVIEW INTERIOR GLASS / MIRROR SHOP DRAWINGS
10
10
25-Sep-12
08-Oct-12
BUY2460
PROCURE / FABRICATE GLASS & MIRROR MATERIALS
20
20
09-Oct-12
05-Nov-12
97
20
20-Feb-12 A
06-Aug-12
15
0
20-Feb-12 A
15-Mar-12 A
FIREPROOFING BUY2150
BID / AWARD FIREPROOFING
DES6030
RECEIVE REVISED DRAWINGS
0
0
22-May-12 A
BUY2155
RE-BID FIREPROOFING
15
0
22-May-12 A
11-Jun-12 A
BUY2160
CREATE FIREPROOFING SHOP DRAWINGS
15
0
12-Jun-12 A
02-Jul-12 A
BUY2170
FIREPROOFING SHOP DRAWING REVIEW
10
5
03-Jul-12 A
16-Jul-12
BUY2180
PROCURE FIREPROOFING MATERIALS
15
15
17-Jul-12
06-Aug-12
123
30
13-Feb-12 A
20-Aug-12
89
30
18-Apr-12 A
20-Aug-12
DESIGN/BUILD DISCIPLINES LOW VOLTAGE/AUDIO VISUAL (BY OWNER) BUY2070
BID / AWARD LOW VOLTAGE & AV SYSTEMS
15
0
18-Apr-12 A
08-May-12 A
BUY2080
LOW VOLTAGE & AV DESIGN DRAWINGS
30
1
09-May-12 A
10-Jul-12
BUY2090
REVIEW LOW VOLTAGE & AV DESIGN DRAWINGS W/ OPS
30
10
11-Jun-12 A
23-Jul-12
BUY2100
PROCURE MATERIALS FOR LOW VOLTAGE & AV
30
30
10-Jul-12
20-Aug-12
66
5
13-Feb-12 A
16-Jul-12
FIRE ALARM BUY2030
BID / AWARD FIRE ALARM CONTRACTOR
20
0
13-Feb-12 A
15-Mar-12 A
BUY2040
FIRE ALARM DESIGN DRAWINGS & CUT SHEETS
30
0
16-Mar-12 A
26-Apr-12 A
BUY2050
REVIEW FIRE ALARM DESIGN DRAWINGS
15
0
27-Apr-12 A
17-May-12 A
BUY2060
PROCURE FIRE ALARM CONSTRUCTION MATERIALS
10
5
18-May-12 A
16-Jul-12
65
10
18-Apr-12 A
23-Jul-12
SECURITY/SURVEILLANCE (BY OWNER) BUY2110
BID, AWARD SECURITY & SURVEILLANCE SYSTEM DESIGN
15
0
18-Apr-12 A
08-May-12 A
BUY2120
SECURITY & SURVEILLANCE DESIGN DRAWINGS
30
0
09-May-12 A
18-Jun-12 A
BUY2130
REVIEW SECURITY & SURVEILLANCE DRAWINGS W/ OPS
30
1
22-May-12 A
10-Jul-12
BUY2140
PROCURE SECURITY & SURVEILLANCE EQUIPMENT
30
10
05-Jun-12 A
23-Jul-12
58
0
20-Feb-12 A
05-Jun-12 A
FIRE SPRINKLERS BUY1990
BID / AWARD FIRE SPRINKLER DESIGN BUILD
20
0
20-Feb-12 A
15-Mar-12 A
BUY2000
DESIGN SYSTEMS & FIRE SPRINKLER SHOP DRAWINGS
30
0
16-Mar-12 A
26-Apr-12 A
BUY2010
FIRE DEPARTMENT REVIEW FIRE SPRINKLER SHOP DRWGS
15
0
27-Apr-12 A
22-May-12 A
BUY2020
PROCURE FIRE SPRINKLER MATERIALS
FINISHES/THEMING DEVELOPMENT
10
0
23-May-12 A
05-Jun-12 A
152
152
10-Jul-12
06-Feb-13
85
85
10-Jul-12
05-Nov-12
BUY2650
BID / AWARD OPERABLE PARTITIONS / COILING DOORS
15
15
10-Jul-12
30-Jul-12
BUY2660
OPERABLE PARTITIIONS / COILING DOOR SHOP DRAWING
20
20
31-Jul-12
27-Aug-12
BUY2670
COORDINATE W/ MISC. STEEL SUB FOR SUPPORT STEEL
15
15
07-Aug-12
27-Aug-12
OPERABLE PARTITIONS/COILING DOORS
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
Page 5 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
BUY2680
REVIEW SHOP DRAWINGS / CUT SHEETS
10
10
28-Aug-12
10-Sep-12
BUY2690
PROCURE OPERABLE PARTITIONS / COILING DOORS
40
40
11-Sep-12
05-Nov-12
75
75
10-Jul-12
22-Oct-12
10-Jul-12
30-Jul-12
STONE/TILE/COUNTERTOPS BUY2600
BID / AWARD STONE, TILE & SOLID SURFACE TOPS
15
15
BUY2610
SUBMIT TILE, STONE & GRANITE SAMPLES
30
30
31-Jul-12
10-Sep-12
BUY2620
REVIEW / APPROVE TILE, STONE & GRANITE SAMPLES
30
30
14-Aug-12
24-Sep-12
BUY2630
PROCURE STONE / TILE MATERIALS (DOMESTIC)
30
30
28-Aug-12
08-Oct-12
BUY2640
SOLID SURFACE TOP FABRICATION
25
25
18-Sep-12
22-Oct-12
152
152
10-Jul-12
06-Feb-13
MILLWORK BUY2510
BID / AWARD MILLWORK / THEMING PACKAGES
20
20
10-Jul-12
06-Aug-12
BUY2520
MILLWORK / THEMING SHOP DRAWINGS
75
75
07-Aug-12
19-Nov-12
BUY2530
REVIEW MILLWORK, THEMING & CAST PRODUCT SUBMITAL
75
75
28-Aug-12
10-Dec-12
BUY2540
MILLWORK, THEMING, CAST PIECE FABRICATION
80
80
16-Oct-12
06-Feb-13
90
90
10-Jul-12
12-Nov-12
TOILET PARTITIONS/ACCESSORIES BUY2700
BID / AWARD TOILET PARTITIONS / ACCESSORIES
15
15
10-Jul-12
30-Jul-12
BUY2710
SUBMIT LP SAMPLES, CUT SHEETS & SPECS
15
15
31-Jul-12
20-Aug-12
BUY2720
REVIEW / APPROVE SAMPLES, CUT SHEETS & SPECS
10
10
21-Aug-12
03-Sep-12
BUY2730
PROCURE / FABRICATE PARTITIONS & ACCESSORIES
50
50
04-Sep-12
12-Nov-12
50
50
10-Jul-12
17-Sep-12
PAINTING & VWC BUY2550
BID / AWARD PAINTING & VWC
15
15
10-Jul-12
30-Jul-12
BUY2560
SUBMIT PAINT KNOCK DOWN SAMPLES
15
15
31-Jul-12
20-Aug-12
BUY2590
QUANTIFY VWC AMOUNTS FOR PURCHASING AGENT
25
25
31-Jul-12
03-Sep-12
BUY2570
REVIEW / APPROVE PAINT COLOR SAMPLES
10
10
21-Aug-12
03-Sep-12
BUY2580
PROCURE PAINT COLOR MATERIALS
10
10
04-Sep-12
17-Sep-12
80
80
10-Jul-12
29-Oct-12
50
50
10-Jul-12
17-Sep-12
SITEWORK DEVELOPMENT SITE PAVING BUY2880
BID / AWARD SITE PAVING
10
10
10-Jul-12*
23-Jul-12
BUY2890
SUBMIT ASPHALT MIX DESIGNS & SHOP DRAWINGS
15
15
24-Jul-12
13-Aug-12
BUY2900
REVIEW / APPROVE MIX DESIGNS & SHOP DRAWINGS
10
10
14-Aug-12
27-Aug-12
BUY2910
PROCUREMENT
15
15
28-Aug-12
17-Sep-12
50
50
10-Jul-12
17-Sep-12
SITE CONCRETE BUY2830
BID / AWARD SITE CONCRETE
10
10
10-Jul-12*
23-Jul-12
BUY2840
SUBMIT CONCRETE MIX DESIGNS & REBAR SHOP DRAWING
15
15
24-Jul-12
13-Aug-12
BUY2850
REVIEW / APPROVE MIX DESIGNS & SHOP DRAWINGS
10
10
14-Aug-12
27-Aug-12
BUY2860
PROCURE / FAB REBAR AS NEEDED
15
15
28-Aug-12
17-Sep-12
80
80
10-Jul-12
29-Oct-12
LANDSCAPING (BY OWNER) BUY2790
BID / AWARD LANDSCPAING
15
15
10-Jul-12
30-Jul-12
BUY2800
SELECT / TAG MAJOR LANDSCAPING ITEMS
30
30
31-Jul-12
10-Sep-12
BUY2810
OWNER REVIEW / APPROVE MAJOR LANDSCAPE ITEMS
30
30
21-Aug-12
01-Oct-12
BUY2820
PROCURE / DELIVER SOD, TREES, DG, IRRIGATION
20
20
02-Oct-12
29-Oct-12
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 6 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
TASK filter: All Activities Activity ID
Activity Name
PILE DRIVING PILE FAB/ DELIVER & MOB
Orig Dur
Rem Dur
Start
Finish
44
0
13-Feb-12 A
23-Apr-12 A
44
0
13-Feb-12 A
23-Apr-12 A
DES1060
RECEIVE STRUCTURAL DOCUMENTS & SPECS FOR FRICTION PILES
1
0
13-Feb-12 A
13-Feb-12 A
FPY4200
PILE SHOP DRAWING & SUBMITTAL
10
0
14-Feb-12 A
24-Feb-12 A
FPY2170
DRILL TEST PILES
2
0
09-Mar-12 A
12-Mar-12 A
FPY4210
MSA WALKED OFF THE JOB
1
0
15-Mar-12 A
15-Mar-12 A
FPY4220
NEW SUBCONTRACTOR HIRED - BERKEL
1
0
21-Mar-12 A
21-Mar-12 A
FPY4230
PILES WERE CHANGED TO CFA
1
0
21-Mar-12 A
22-Mar-12 A
FPY2230
DELIVER CFA PILE MATERIAL
10
0
22-Mar-12 A
27-Mar-12 A
FPY4190
LOAD TEST PILES
9
0
23-Mar-12 A
26-Mar-12 A
FPY5280
ADDITIONAL LOAD TEST REQUIRED DUE TO POOR RESULTS
2
0
18-Apr-12 A
19-Apr-12 A
FPY3190
REVIEW & APPROVE TEST PILE DATA
2
0
20-Apr-12 A
23-Apr-12 A
9
0
15-Mar-12 A
12-Apr-12 A
SHEETPILE FAB/ DELIVER & MOB FPY4240
MSA WALKED OFF THE JOB
1
0
15-Mar-12 A
15-Mar-12 A
FPY4250
NEW SUBCONTRACTOR HIRED - BERKEL
1
0
21-Mar-12 A
21-Mar-12 A
FPY1200
PROCURE SHEET PILE MATERIAL
7
0
26-Mar-12 A
28-Mar-12 A
FPY2200
PILE SHOP DRAWING & SUBMITTAL
5
0
29-Mar-12 A
06-Apr-12 A
FPY1210
MOBILIZE EQUIPMENT TO INSTALL SHEET PILES
5
0
08-Apr-12 A
12-Apr-12 A
11
0
13-Feb-12 A
20-Feb-12 A
11
0
13-Feb-12 A
20-Feb-12 A 20-Feb-12 A
PROJECT START UP MOBILIZATION, SURVEY AND LAYOUT
2012 Jun
MOB2000
MOBILIZE/SITE FENCING/SECURITY/SET-UP SITE OFFICES
10
0
13-Feb-12 A
MOB1000
CONSTRUCTION START
0
0
20-Feb-12 A
54
0
20-Feb-12 A
29-May-12 A
54
0
20-Feb-12 A
29-May-12 A
SITE PREP / EXCAVATION TOWER EXC1000
LAYOUT/EXCAVATION OF TOWER FOUNDATIONS / REMOVAL OF UNSUITABLE SOIL
15
0
20-Feb-12 A
23-Mar-12 A
EXC1010
BACKFILL TO TOP OF PILE - PHASE 1 ONLY
5
0
28-Feb-12 A
05-Mar-12 A
EXC1050
BACKFILL TO TOP OF TOWER PILE CAPS
8
0
07-May-12 A
29-May-12 A
25
0
20-Feb-12 A
30-Mar-12 A
20
0
20-Feb-12 A
30-Mar-12 A
CASINO EXC1080
REMOVE UNSUITABLE FILL
EXC2080
CRANE PATH FOR LOWER RETAINING WALL
LOW RISE
5
0
01-Mar-12 A
07-Mar-12 A
13
0
20-Feb-12 A
09-Apr-12 A
20-Feb-12 A
30-Mar-12 A
EXC1090
EXCAVATE MARGARITAVILLE RESTAURANT
5
0
EXC1110
BACKFILL TO BOTTOM OF LOWRISE FOOTINGS
6
0
02-Apr-12 A
09-Apr-12 A
4
0
20-Feb-12 A
23-Mar-12 A
EVENT CENTER & PORTE COCHERE EXC1100
EXCAVATE EVENT CENTER
FOUNDATIONS / BACKFILL & PREP FOR STRUCTURE
4
0
20-Feb-12 A
23-Mar-12 A
142
49
15-Mar-12 A
15-Sep-12
50
0
15-Mar-12 A
21-May-12 A
FPY4260
MSA WALKED OFF THE JOB
1
0
15-Mar-12 A
15-Mar-12 A
FPY4270
NEW SUBCONTRACTOR HIRED - BERKEL
1
0
21-Mar-12 A
21-Mar-12 A
TOWER
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
Page 7 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
TASK filter: All Activities Activity ID
Activity Name
Orig Dur
Rem Dur
Start
Finish
2012 Jun
HTFFND1010
PILES AT NORTH END ARE BEING REDESIGNED DUE TO LOAD TEST
17
0
22-Mar-12 A
HTFFND1000
DRILL TOWER PILES
17
0
29-Mar-12 A
27-Apr-12 A
HTFND1100
FORM/REBAR/POUR - TOWER PILE CAPS & GRADE BEAMS
22
0
16-Apr-12 A
21-May-12 A
HTFND9060
FORM/REBAR/POUR CRANE FOUNDATIONS
5
0
16-Apr-12 A
20-Apr-12 A
HTS02500
F/R/P ELEVATOR PITS
CASINO / BARGE
23-Apr-12 A
10
0
01-May-12 A
11-May-12 A
142
49
21-Mar-12 A
15-Sep-12
46
0
21-Mar-12 A
25-May-12 A
CAFFND0200
NEW SUBCONTRACTOR HIRED - BERKEL
1
0
21-Mar-12 A
21-Mar-12 A
CAFFND0500
CFA PILES UNDER REDESIGN
17
0
22-Mar-12 A
10-Apr-12 A
CAFFND1000
DRIVE SHEETPILING (250 LF)
15
0
12-Apr-12 A
11-May-12 A
CAFFND2000
DRILL BASIN PILES E TO W (CFA PILES)
15
0
14-Apr-12 A
25-May-12 A
CAFFND1100
DRIVE DEADMEN & INSTALL TIEBACKS
10
0
19-Apr-12 A
18-May-12 A
CAFFND1200
BACKFILL AT SHEET PILING
10
0
17-May-12 A
21-May-12 A
20
0
07-May-12 A
13-Jun-12 A
SHEET PILES & CFA PILES / PILE CAPS
BASIN SLABS CAFND02200
FORM/REBAR/POUR BASIN SLAB 3
8
0
07-May-12 A
11-May-12 A
CAFND02222
FORM/REBAR/POUR BASIN SLAB 4
8
0
18-May-12 A
24-May-12 A
CAFND02228
FORM/REBAR/POUR BASIN SLAB 2
10
0
21-May-12 A
01-Jun-12 A
CAFND03222
FORM/REBAR/POUR BASIN SLAB 1
9
0
05-Jun-12 A
13-Jun-12 A
45
45
17-May-12 A
10-Sep-12
BASIN WALLS CAFND10070
FORM/REBAR/POUR BASIN WALLS 3
10
0
17-May-12 A
05-Jun-12 A
CAFND11070
FORM/REBAR/POUR BASIN WALLS 4
14
0
25-May-12 A
15-Jun-12 A
CAFND12070
FORM/REBAR/POUR BASIN WALLS 2
13
0
05-Jun-12 A
22-Jun-12 A
CAFND13070
FORM/REBAR/POUR BASIN WALLS 1
13
0
19-Jun-12 A
09-Jul-12 A
CAFND18070
BACKFILL BASIN WALLS (North Wall backfill will follow Seq. 10 Steel on 9/10/12)
10
43
02-Jul-12 A
10-Sep-12
45
24
14-Jun-12 A
10-Aug-12
CAFND5070
INSTALL CONCRETE EYEBROW
10
6
14-Jun-12 A
17-Jul-12
CAFND1070
PRECAST LAYOUT - AREA 1/2
5
0
18-Jun-12 A
26-Jun-12 A
CAFND1072
PRECAST LAYOUT - AREA 2/3
5
4
29-Jun-12 A
13-Jul-12
CAFND7070
REINFORCED VISQUEEN / REBAR
4
8
03-Jul-12 A
20-Jul-12
CAFND9070
INSTALL PRECAST AT BARGE - AREA 1
8
8
16-Jul-12
25-Jul-12
CAFND9080
INSTALL PRECAST AT BARGE - AREA 2
6
6
26-Jul-12
02-Aug-12
CAFND9090
INSTALL PRECAST AT BARGE - AREA 3
PRECAST
PILLASTERS / KEEL SLAB / CEL DECK
6
6
03-Aug-12
10-Aug-12
35
35
28-Jul-12
15-Sep-12
28-Jul-12
28-Jul-12
CAFND10130
POUR KEEL SLAB AREA 1
1
1
CAFND10160
FORM/REBAR/POUR PILASTERS
17
17
30-Jul-12
23-Aug-12
CAFND10170
MEP IN BARGE
15
15
01-Aug-12
23-Aug-12
CAFND10140
POUR KEEL SLAB AREA 2
1
1
04-Aug-12
04-Aug-12
CAFND10150
POUR KEEL SLAB AREA 3
1
1
11-Aug-12
11-Aug-12
CAFND11080
INSTALL CEL DECK / TRENCH HEADERS / PRESETS
15
15
13-Aug-12
31-Aug-12
CAFND12080
FORM / REBAR / POUR CEL DECK - POUR 1
4
4
27-Aug-12
31-Aug-12
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
Page 8 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
TASK filter: All Activities Activity ID
Activity Name
Orig Dur
Rem Dur
Start
Finish
CAFND13080
FORM / REBAR / MEP / POUR CEL DECK- POUR 2
4
4
31-Aug-12
06-Sep-12
CAFND14080
FORM/REBAR/POUR CEL DECK- POUR 3
4
4
06-Sep-12
13-Sep-12
CAFND14090
FILL BASIN & FLOAT BARGE
2
2
13-Sep-12
15-Sep-12
56
14
21-May-12 A
27-Jul-12
LOW RISE - SOUTH RSFFND1000
EXCAVATE - FOOTINGS (DELAYED DUE TO SHEET PILE & STORM DRAIN)
5
0
21-May-12 A
09-Jul-12 A
RSFFND1100
FORM/REBAR/POUR - FOOTINGS
5
4
23-May-12 A
13-Jul-12
RSFFND1200
FORM/REBAR/POUR PEDESTALS IN BACKFILL ZONE
10
4
23-May-12 A
13-Jul-12
RSFFND1300
BACKFILL REMAINING TO BASIN WALLS (BASED ON 28 DAY CURE TIME ON BASIN WALLS)
10
3
15-Jun-12 A
27-Jul-12
28
28
10-Jul-12
16-Aug-12
LOW RISE - NORTH RSFFND2000
EXCAVATE - FOOTINGS (AFTER CRANE IS REMOVED AND BACKFILLED)
5
5
10-Jul-12*
16-Jul-12
RSFFND2100
FORM/REBAR/POUR - FOOTINGS
5
5
12-Jul-12
19-Jul-12
RSFFND2200
BACKFILL 12' OFF BASIN WALLS
10
10
19-Jul-12
01-Aug-12
RSFFND2300
BACKFILL REMAINING TO BASIN WALLS
10
10
02-Aug-12
16-Aug-12
45
10
22-May-12 A
23-Jul-12
EVENT CENTER & PORTE COCHERE
2012 Jun
THFFND1000
DRILL EVENT CENTER PILES
2
0
22-May-12 A
23-May-12 A
THFND1100
FORM/REBAR/POUR - PILE CAPS & GRADE BEAMS
5
8
06-Jul-12 A
20-Jul-12
THFND9060
BACKFILL TO TOP OF FOUNDATIONS
HOTEL TOWER CONSTRUCTION SLAB ON GRADE SOG68000
MEP UG/SUBGRADE/BASE
SOG69000
F/R/P LEVEL 1 SOG
TOWER STRUCTURE
4
4
17-Jul-12
23-Jul-12
276
225
30-Apr-12 A
20-May-13
16
16
17-Jul-12
07-Aug-12
10
10
17-Jul-12
31-Jul-12
10
10
25-Jul-12
07-Aug-12
151
100
30-Apr-12 A
26-Nov-12
HTS01500
F/R/P - VERTICAL LVL 1
5
0
30-Apr-12 A
04-May-12 A
HTS01600
F/R/P - MEZZ LEVEL DECK & VERTICAL
10
0
04-May-12 A
19-May-12 A
HTS02000
F/R/P DECK AND VERTICAL LVL 2 (`15,000 SF)
10
0
21-May-12 A
08-Jun-12 A
HTS03000
F/R/P DECK AND VERTICAL LVL 3 (`15,000 SF)
10
0
09-Jun-12 A
28-Jun-12 A
HTS04000
F/R/P DECK AND VERTICAL LVL 4 (`15,000 SF)
8
3
29-Jun-12 A
12-Jul-12
HTS05000
F/R/P DECK AND VERTICAL LVL 5
5
5
11-Jul-12 A
19-Jul-12
HTS06000
F/R/P DECK AND VERTICAL LVL 6
5
5
20-Jul-12
25-Jul-12
HTS07000
F/R/P DECK AND VERTICAL LVL 7
5
5
26-Jul-12
01-Aug-12
HTS08000
F/R/P DECK AND VERTICAL LVL 8
5
5
02-Aug-12
07-Aug-12
HTS09000
F/R/P DECK AND VERTICAL LVL 9
5
5
09-Aug-12
14-Aug-12
HTS10000
F/R/P DECK AND VERTICAL LVL 10
5
5
15-Aug-12
20-Aug-12
HTS11000
F/R/P DECK AND VERTICAL LVL 11
5
5
21-Aug-12
25-Aug-12
HTS12000
F/R/P DECK AND VERTICAL LVL 12
5
5
27-Aug-12
01-Sep-12
HTS14000
F/R/P DECK AND VERTICAL LVL 14
5
5
04-Sep-12
08-Sep-12
HTS15000
F/R/P DECK AND VERTICAL LVL 15
5
5
10-Sep-12
15-Sep-12
HTS16000
F/R/P DECK AND VERTICAL LVL 16
5
5
17-Sep-12
21-Sep-12
HTS17000
F/R/P DECK AND VERTICAL LVL 17
5
5
22-Sep-12
28-Sep-12
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
Page 9 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
HTS18000
F/R/P DECK AND VERTICAL LVL 18
5
5
29-Sep-12
HTS19000
F/R/P DECK AND VERTICAL LVL 19
5
5
05-Oct-12
11-Oct-12
HTS20000
F/R/P DECK - ROOF STRUCTURE
5
5
12-Oct-12
17-Oct-12
HTS21000
INSTALL TOWER TRELLIS
25
25
18-Oct-12
26-Nov-12
04-Oct-12
76
76
04-Sep-12
19-Dec-12
HTBTS1000
LEVELS 1/2 STAIRS
15
15
04-Sep-12
26-Sep-12
HTBTS3000
LEVEL 3/4 STAIRS
15
15
26-Sep-12
18-Oct-12
HTBTS5000
LEVEL 5/6 STAIRS
7
7
18-Oct-12
29-Oct-12
HTBTS7000
LEVEL 7/8 STAIRS
6
6
29-Oct-12
06-Nov-12
HTBTS9000
LEVEL 9/10 STAIRS
6
6
06-Nov-12
15-Nov-12
HTBTS9010
LEVEL 11/12 STAIRS
6
6
15-Nov-12
27-Nov-12
HTBTS9020
LEVEL 14/15 STAIRS
5
5
27-Nov-12
04-Dec-12
HTBTS9030
LEVEL 16/17 STAIRS
5
5
04-Dec-12
11-Dec-12
HTBTS9040
LEVEL 18/19 STAIRS
5
5
11-Dec-12
19-Dec-12
174
144
19-May-12 A
28-Jan-13
174
144
19-May-12 A
28-Jan-13
TOWER - STAIRS
TOWER - CRANES & MANLIFTS TOWER CRANE
2012 Jun
HTTC1007
TOWER CRANE (PEINER SK 575) - DURATION
157
133
19-May-12 A
28-Jan-13
HTTC1005
ERECT TOWER CRANE (PEINER SK 575)
3
0
19-May-12 A
22-May-12 A
HTTC1010
DISMANTLE TOWER CRANE (PEINER SK 575)
5
5
21-Jan-13
28-Jan-13
130
130
10-Jul-12
07-Jan-13
120
120
10-Jul-12
07-Jan-13
MANLIFT (1-DUAL ML) HTML2000
MANLIFT - DURATION
HLML1000
INSTALL DUAL MANLIFT - STRUCT. LVL. 3
5
5
10-Jul-12
16-Jul-12
HTML3000
MANLIFT DOWN
5
5
28-Dec-12
07-Jan-13
127
127
04-Sep-12
27-Feb-13
84
84
04-Sep-12
28-Dec-12
45
45
04-Sep-12
05-Nov-12
TOWER ELEVATORS SERVICE ELEVATORS - HS1 & HS2 ELEVATOR RAILS & ENTRANCES HTSFE1000
LEVEL 12 - WALLS & DECK POURED & STRIPPED
5
5
04-Sep-12
10-Sep-12
HTSFE1010
INSTALL RAILS & ENTRANCES FROM BASEMENT TO ROOF
40
40
11-Sep-12
05-Nov-12
52
52
18-Oct-12
28-Dec-12
ELEVATOR ROOF HTSFE1130
ELEVATOR MACHINE ROOM DRY-IN
12
12
18-Oct-12
02-Nov-12
HTSFE1135
INSTALL ELEVATOR MACHINE ROOM EQUIPMENT
8
8
05-Nov-12
14-Nov-12
HTSFE1140
POWER AVAILABLE TO ELEV. EQUIPMENT
0
0
HTSFE1150
COMPLETE ELEVATOR INSTALLATION
30
30
06-Nov-12
19-Dec-12
HTSFE1160
INSTALL CAB FINISHES & PROTECTION
5
5
20-Dec-12
28-Dec-12
HTSFE1170
SERVICE ELEVATOR COMPLETE
PASSENGER ELEVATORS - HP1, HP2, HP3 & HP4
05-Nov-12
0
0
127
127
04-Sep-12
28-Dec-12 27-Feb-13
50
50
04-Sep-12
12-Nov-12
HTSMRP1000
LEVEL 12 - WALLS & DECK POURED & STRIPPED
5
5
04-Sep-12
10-Sep-12
HTSMRP1010
INSTALL RAILS & ENTRANCES FROM BASEMENT TO ROOF
40
40
18-Sep-12
12-Nov-12
95
95
18-Oct-12
27-Feb-13
ELEVATOR RAILS & ENTRANCES
ELEVATOR ROOF Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
Page 10 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
HTSFE2130
ELEVATOR MACHINE ROOM DRY-IN
12
12
18-Oct-12
02-Nov-12
HTSFE2135
INSTALL ELEVATOR MACHINE ROOM EQUIPMENT
8
8
05-Nov-12
14-Nov-12
HTSMRP1110
POWER AVAILABLE TO ELEV. EQUIPMENT
0
0
HTSMRP1120
COMPLETE ELEVATORS INSTALLATION
60
60
15-Nov-12
13-Feb-13
HTSMRP1130
INSTALL CAB FINISHES
10
10
14-Feb-13
27-Feb-13
HTSMRP1170
PASSENGER ELEVATORS COMPLETE
0
0
140
140
25-Jul-12
05-Feb-13
84
84
25-Jul-12
19-Nov-12
TOWER - ENCLOSURE FRAMING & SHEATHING
14-Nov-12
27-Feb-13
HTE03000
FRAME EXTERIOR ENCLOSURE - LVL 3
5
5
25-Jul-12
31-Jul-12
HTE03005
FRAME EXTERIOR ENCLOSURE - LVL 4
5
5
01-Aug-12
07-Aug-12
HTE03006
FRAME EXTERIOR ENCLOSURE - LVL 5
5
5
08-Aug-12
14-Aug-12
HTE03010
FRAME EXTERIOR ENCLOSURE - LVL 6
5
5
16-Aug-12
22-Aug-12
HTE04005
FRAME EXTERIOR ENCLOSURE - LVL 7
5
5
23-Aug-12
29-Aug-12
HTE04010
FRAME EXTERIOR ENCLOSURE - LVL 8
5
5
30-Aug-12
05-Sep-12
HTE06005
FRAME EXTERIOR ENCLOSURE - LVL 9
5
5
06-Sep-12
13-Sep-12
HTE06010
FRAME EXTERIOR ENCLOSURE - LVL 10
5
5
14-Sep-12
20-Sep-12
HTE10000
FRAME EXTERIOR ENCLOSURE - LVL 11
5
5
21-Sep-12
27-Sep-12
HTE10010
FRAME EXTERIOR ENCLOSURE - LVL 12
5
5
28-Sep-12
04-Oct-12
HTE11010
FRAME EXTERIOR ENCLOSURE - LVL 14
5
5
05-Oct-12
11-Oct-12
HTE12001
FRAME EXTERIOR ENCLOSURE - LVL 15
5
5
12-Oct-12
19-Oct-12
HTE12010
FRAME EXTERIOR ENCLOSURE - LVL 16
5
5
22-Oct-12
26-Oct-12
HTE13010
FRAME EXTERIOR ENCLOSURE - LVL 17
5
5
29-Oct-12
02-Nov-12
HTE14010
FRAME EXTERIOR ENCLOSURE - LVL 18
5
5
05-Nov-12
09-Nov-12
HTE15010
FRAME EXTERIOR ENCLOSURE - LVL 19
5
5
13-Nov-12
19-Nov-12
101
101
27-Aug-12
14-Jan-13
HTE010000
SHEATH/LATH/SCRATCH/FINISH EAST/NORTH FACADE
85
85
27-Aug-12
02-Jan-13
HTE011000
SHEATH/LATH/SCRATCH/FINISH WEST/SOUTH FACADE
85
85
30-Aug-12
07-Jan-13
HTE35000
DEMOBILIZE STAGING
5
5
08-Jan-13
14-Jan-13
91
91
02-Oct-12
05-Feb-13
FOAM & FINISH
PUNCH WINDOWS HTE08000
INSTALL WINDOWS & CAULKING EAST/NORTH FACADE
75
75
02-Oct-12
24-Jan-13
HTE09000
INSTALL WINDOWS & CAULKING WEST/SOUTH FACADE
75
75
05-Oct-12
29-Jan-13
HTE33000
DEMOBILIZE STAGING
TOWER - ROOFING TOWER - ROOF
5
5
30-Jan-13
05-Feb-13
86
86
05-Oct-12
04-Feb-13
86
86
05-Oct-12
04-Feb-13
HTRF1205
TEMP. WATERPROOF DECK - LEVEL 12
5
5
05-Oct-12
11-Oct-12
HTRF1220
INSTALL ROOF DRAINS / POUR EQUIPMENT PADS
10
10
18-Oct-12
31-Oct-12
HTRF1270
BLOCKING AT PARAPETS
10
10
20-Nov-12
05-Dec-12
HTRF1280
INSTALL ROOFING SYSTEM & COMPONENTS
15
15
19-Dec-12
11-Jan-13
HTRF1290
SET MECHANICAL EQUIPMENT & CONNECT PIPING
10
10
04-Jan-13
21-Jan-13
HTRF1300
DETAIL FLASHING / INSTALL ROOFTOP WALK PADS
15
15
11-Jan-13
04-Feb-13
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 11 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
TOWER PHASE 1 FINISHES
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
131
131
20-Jul-12
18-Jan-13
59
59
20-Jul-12
10-Oct-12
HTF03010
POINT & PATCH / GRIND CEILING
5
5
20-Jul-12
26-Jul-12
HTF03020
PRIME & BOX EXPOSED CEILINGS
5
5
25-Jul-12
31-Jul-12
HTF03030
LAYOUT WALLS
5
5
27-Jul-12
02-Aug-12
HTF03040
MEP OVERHEAD ROUGH-IN AND RISERS
10
10
07-Aug-12
21-Aug-12
HTF03060
FRAME WALLS / SET DOOR FRAMES
10
10
21-Aug-12
04-Sep-12
HTF03080
MEPS WALL ROUGH-IN
10
10
28-Aug-12
11-Sep-12
HTF03070
DRYWALL RIPPER & CEILING FRAMING
5
5
30-Aug-12
06-Sep-12
HTF03090
MEPS CEILING ROUGH-IN
10
10
04-Sep-12
17-Sep-12
HTF03100
DURAROCK / BLUE BOARD AT BATHROOMS
5
5
13-Sep-12
19-Sep-12
HTF03110
WATERPROOF & TEST SHOWER DECKS
5
5
20-Sep-12
26-Sep-12
HTF03120
INSTALL BATHROOM & SHOWER TILE
10
10
27-Sep-12
10-Oct-12
51
51
27-Jul-12
05-Oct-12
LEVEL 3
LEVEL 4 HTF04010
POINT & PATCH / GRIND CEILING
5
5
27-Jul-12
02-Aug-12
HTF04020
PRIME & BOX EXPOSED CEILINGS
5
5
01-Aug-12
07-Aug-12
HTF04030
LAYOUT WALLS
5
5
03-Aug-12
09-Aug-12
HTF04040
MEP OVERHEAD ROUGH-IN AND RISERS
10
10
07-Aug-12
20-Aug-12
HTF04060
FRAME WALLS / SET DOOR FRAMES
10
10
16-Aug-12
29-Aug-12
HTF04080
MEPS WALL ROUGH-IN
10
10
23-Aug-12
06-Sep-12
HTF04070
DRYWALL RIPPER & CEILING FRAMING
5
5
27-Aug-12
31-Aug-12
HTF04090
MEPS CEILING ROUGH-IN
10
10
29-Aug-12
12-Sep-12
HTF04100
DURAROCK / BLUE BOARD AT BATHROOMS
5
5
10-Sep-12
14-Sep-12
HTF04110
WATERPROOF & TEST SHOWER DECKS
5
5
17-Sep-12
21-Sep-12
HTF04120
INSTALL BATHROOM & SHOWER TILE
10
10
24-Sep-12
05-Oct-12
51
51
03-Aug-12
12-Oct-12
LEVEL 5 HTF05010
POINT & PATCH / GRIND CEILING
5
5
03-Aug-12
09-Aug-12
HTF05020
PRIME & BOX EXPOSED CEILINGS
5
5
08-Aug-12
14-Aug-12
HTF05030
LAYOUT WALLS
5
5
10-Aug-12
16-Aug-12
HTF05040
MEP OVERHEAD ROUGH-IN AND RISERS
10
10
14-Aug-12
27-Aug-12
HTF05060
FRAME WALLS / SET DOOR FRAMES
10
10
23-Aug-12
06-Sep-12
HTF05080
MEPS WALL ROUGH-IN
10
10
30-Aug-12
13-Sep-12
HTF05070
DRYWALL RIPPER & CEILING FRAMING
5
5
04-Sep-12
10-Sep-12
HTF05090
MEPS CEILING ROUGH-IN
10
10
06-Sep-12
19-Sep-12
HTF05100
DURAROCK / BLUE BOARD AT BATHROOMS
5
5
17-Sep-12
21-Sep-12
HTF05110
WATERPROOF & TEST SHOWER DECKS
5
5
24-Sep-12
28-Sep-12
HTF05120
INSTALL BATHROOM & SHOWER TILE
10
10
01-Oct-12
12-Oct-12
51
51
10-Aug-12
19-Oct-12
LEVEL 6 HTF06010
POINT & PATCH / GRIND CEILING
5
5
10-Aug-12
16-Aug-12
HTF06020
PRIME & BOX EXPOSED CEILINGS
5
5
15-Aug-12
21-Aug-12
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 12 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
HTF06030
LAYOUT WALLS
5
5
17-Aug-12
23-Aug-12
HTF06040
MEP OVERHEAD ROUGH-IN AND RISERS
10
10
21-Aug-12
04-Sep-12
HTF06060
FRAME WALLS / SET DOOR FRAMES
10
10
30-Aug-12
13-Sep-12
HTF06080
MEPS WALL ROUGH-IN
10
10
07-Sep-12
20-Sep-12
HTF06070
DRYWALL RIPPER & CEILING FRAMING
5
5
11-Sep-12
17-Sep-12
HTF06090
MEPS CEILING ROUGH-IN
10
10
13-Sep-12
26-Sep-12
HTF06100
DURAROCK / BLUE BOARD AT BATHROOMS
5
5
24-Sep-12
28-Sep-12
HTF06110
WATERPROOF & TEST SHOWER DECKS
5
5
01-Oct-12
05-Oct-12
HTF06120
INSTALL BATHROOM & SHOWER TILE
10
10
08-Oct-12
19-Oct-12
51
51
17-Aug-12
26-Oct-12
HTF07010
POINT & PATCH / GRIND CEILING
5
5
17-Aug-12
23-Aug-12
HTF07020
PRIME & BOX EXPOSED CEILINGS
5
5
22-Aug-12
28-Aug-12
HTF07030
LAYOUT WALLS
5
5
24-Aug-12
30-Aug-12
HTF07040
MEP OVERHEAD ROUGH-IN AND RISERS
10
10
28-Aug-12
11-Sep-12
HTF07060
FRAME WALLS / SET DOOR FRAMES
10
10
07-Sep-12
20-Sep-12
HTF07080
MEPS WALL ROUGH-IN
10
10
14-Sep-12
27-Sep-12
HTF07070
DRYWALL RIPPER & CEILING FRAMING
5
5
18-Sep-12
24-Sep-12
HTF07090
MEPS CEILING ROUGH-IN
10
10
20-Sep-12
03-Oct-12
HTF07100
DURAROCK / BLUE BOARD AT BATHROOMS
5
5
01-Oct-12
05-Oct-12
HTF07110
WATERPROOF & TEST SHOWER DECKS
5
5
08-Oct-12
12-Oct-12
HTF07120
INSTALL BATHROOM & SHOWER TILE
10
10
15-Oct-12
26-Oct-12
LEVEL 7
51
51
24-Aug-12
02-Nov-12
HTF08010
POINT & PATCH / GRIND CEILING
5
5
24-Aug-12
30-Aug-12
HTF08020
PRIME & BOX EXPOSED CEILINGS
5
5
29-Aug-12
05-Sep-12
HTF08030
LAYOUT WALLS
5
5
31-Aug-12
07-Sep-12
HTF08040
MEP OVERHEAD ROUGH-IN AND RISERS
10
10
05-Sep-12
18-Sep-12
HTF08060
FRAME WALLS / SET DOOR FRAMES
10
10
14-Sep-12
27-Sep-12
HTF08080
MEPS WALL ROUGH-IN
10
10
21-Sep-12
04-Oct-12
HTF08070
DRYWALL RIPPER & CEILING FRAMING
5
5
25-Sep-12
01-Oct-12
HTF08090
MEPS CEILING ROUGH-IN
10
10
27-Sep-12
10-Oct-12
HTF08100
DURAROCK / BLUE BOARD AT BATHROOMS
5
5
08-Oct-12
12-Oct-12
HTF08110
WATERPROOF & TEST SHOWER DECKS
5
5
15-Oct-12
19-Oct-12
HTF08120
INSTALL BATHROOM & SHOWER TILE
10
10
22-Oct-12
02-Nov-12
51
51
31-Aug-12
09-Nov-12
LEVEL 8
LEVEL 9 HTF09010
POINT & PATCH / GRIND CEILING
5
5
31-Aug-12
07-Sep-12
HTF09020
PRIME & BOX EXPOSED CEILINGS
5
5
06-Sep-12
12-Sep-12
HTF09030
LAYOUT WALLS
5
5
10-Sep-12
14-Sep-12
HTF09040
MEP OVERHEAD ROUGH-IN AND RISERS
10
10
12-Sep-12
25-Sep-12
HTF09060
FRAME WALLS / SET DOOR FRAMES
10
10
21-Sep-12
04-Oct-12
HTF09080
MEPS WALL ROUGH-IN
10
10
28-Sep-12
11-Oct-12
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 13 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
HTF09070
DRYWALL RIPPER & CEILING FRAMING
5
5
02-Oct-12
08-Oct-12
HTF09090
MEPS CEILING ROUGH-IN
10
10
04-Oct-12
17-Oct-12
HTF09100
DURAROCK / BLUE BOARD AT BATHROOMS
5
5
15-Oct-12
19-Oct-12
HTF09110
WATERPROOF & TEST SHOWER DECKS
5
5
22-Oct-12
26-Oct-12
HTF09120
INSTALL BATHROOM & SHOWER TILE
10
10
29-Oct-12
09-Nov-12
50
50
10-Sep-12
16-Nov-12
LEVEL 10 HTF10010
POINT & PATCH / GRIND CEILING
5
5
10-Sep-12
14-Sep-12
HTF10020
PRIME & BOX EXPOSED CEILINGS
5
5
13-Sep-12
19-Sep-12
HTF10030
LAYOUT WALLS
5
5
17-Sep-12
21-Sep-12
HTF10040
MEP OVERHEAD ROUGH-IN AND RISERS
10
10
19-Sep-12
02-Oct-12
HTF10060
FRAME WALLS / SET DOOR FRAMES
10
10
28-Sep-12
11-Oct-12
HTF10080
MEPS WALL ROUGH-IN
10
10
05-Oct-12
18-Oct-12
HTF10070
DRYWALL RIPPER & CEILING FRAMING
5
5
09-Oct-12
15-Oct-12
HTF10090
MEPS CEILING ROUGH-IN
10
10
11-Oct-12
24-Oct-12
HTF10100
DURAROCK / BLUE BOARD AT BATHROOMS
5
5
22-Oct-12
26-Oct-12
HTF10110
WATERPROOF & TEST SHOWER DECKS
5
5
29-Oct-12
02-Nov-12
HTF10120
INSTALL BATHROOM & SHOWER TILE
10
10
05-Nov-12
16-Nov-12
52
52
17-Sep-12
27-Nov-12
LEVEL 11 HTF11010
POINT & PATCH / GRIND CEILING
5
5
17-Sep-12
21-Sep-12
HTF11020
PRIME & BOX EXPOSED CEILINGS
5
5
20-Sep-12
26-Sep-12
HTF11030
LAYOUT WALLS
5
5
24-Sep-12
28-Sep-12
HTF11040
MEP OVERHEAD ROUGH-IN AND RISERS
10
10
26-Sep-12
09-Oct-12
HTF11060
FRAME WALLS / SET DOOR FRAMES
10
10
05-Oct-12
18-Oct-12
HTF11080
MEPS WALL ROUGH-IN
10
10
12-Oct-12
25-Oct-12
HTF11070
DRYWALL RIPPER & CEILING FRAMING
5
5
16-Oct-12
22-Oct-12
HTF11090
MEPS CEILING ROUGH-IN
10
10
18-Oct-12
31-Oct-12
HTF11085
SET BATH TUBS IN SUITES
5
5
23-Oct-12
29-Oct-12
HTF11100
DURAROCK / BLUE BOARD AT BATHROOMS
5
5
29-Oct-12
02-Nov-12
HTF11110
WATERPROOF & TEST SHOWER DECKS
5
5
05-Nov-12
09-Nov-12
HTF11120
INSTALL BATHROOM & SHOWER TILE
10
10
12-Nov-12
27-Nov-12
52
52
24-Sep-12
04-Dec-12
LEVEL 12 HTF12010
POINT & PATCH / GRIND CEILING
5
5
24-Sep-12
28-Sep-12
HTF12020
PRIME & BOX EXPOSED CEILINGS
5
5
27-Sep-12
03-Oct-12
HTF12030
LAYOUT WALLS
5
5
01-Oct-12
05-Oct-12
HTF12040
MEP OVERHEAD ROUGH-IN AND RISERS
10
10
03-Oct-12
16-Oct-12
HTF12060
FRAME WALLS / SET DOOR FRAMES
10
10
12-Oct-12
25-Oct-12
HTF12080
MEPS WALL ROUGH-IN
10
10
19-Oct-12
01-Nov-12
HTF12070
DRYWALL RIPPER & CEILING FRAMING
5
5
23-Oct-12
29-Oct-12
HTF12090
MEPS CEILING ROUGH-IN
10
10
25-Oct-12
07-Nov-12
HTF12085
SET BATH TUBS IN SUITES
5
5
30-Oct-12
05-Nov-12
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 14 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
5
5
05-Nov-12
09-Nov-12
HTF12100
DURAROCK / BLUE BOARD AT BATHROOMS
HTF12110
WATERPROOF & TEST SHOWER DECKS
5
5
12-Nov-12
16-Nov-12
HTF12120
INSTALL BATHROOM & SHOWER TILE
10
10
19-Nov-12
04-Dec-12
52
52
01-Oct-12
11-Dec-12
LEVEL 14 HTF14010
POINT & PATCH / GRIND CEILING
5
5
01-Oct-12
05-Oct-12
HTF14020
PRIME & BOX EXPOSED CEILINGS
5
5
04-Oct-12
10-Oct-12
HTF14030
LAYOUT WALLS
5
5
08-Oct-12
12-Oct-12
HTF14040
MEP OVERHEAD ROUGH-IN AND RISERS
10
10
10-Oct-12
23-Oct-12
HTF14060
FRAME WALLS / SET DOOR FRAMES
10
10
19-Oct-12
01-Nov-12
HTF14080
MEPS WALL ROUGH-IN
10
10
26-Oct-12
08-Nov-12
HTF14070
DRYWALL RIPPER & CEILING FRAMING
5
5
30-Oct-12
05-Nov-12
HTF14090
MEPS CEILING ROUGH-IN
10
10
01-Nov-12
14-Nov-12
HTF14085
SET BATH TUBS IN SUITES
5
5
06-Nov-12
12-Nov-12
HTF14100
DURAROCK / BLUE BOARD AT BATHROOMS
5
5
12-Nov-12
16-Nov-12
HTF14110
WATERPROOF & TEST SHOWER DECKS
5
5
19-Nov-12
27-Nov-12
HTF14120
INSTALL BATHROOM & SHOWER TILE
10
10
28-Nov-12
11-Dec-12
52
52
08-Oct-12
18-Dec-12
HTF15010
POINT & PATCH / GRIND CEILING
5
5
08-Oct-12
12-Oct-12
HTF15020
PRIME & BOX EXPOSED CEILINGS
5
5
11-Oct-12
17-Oct-12
HTF15030
LAYOUT WALLS
5
5
15-Oct-12
19-Oct-12
HTF15040
MEP OVERHEAD ROUGH-IN AND RISERS
10
10
17-Oct-12
30-Oct-12
HTF15060
FRAME WALLS / SET DOOR FRAMES
10
10
26-Oct-12
08-Nov-12
HTF15080
MEPS WALL ROUGH-IN
10
10
02-Nov-12
15-Nov-12
HTF15070
DRYWALL RIPPER & CEILING FRAMING
5
5
06-Nov-12
12-Nov-12
HTF15090
MEPS CEILING ROUGH-IN
10
10
08-Nov-12
21-Nov-12
HTF15085
SET BATH TUBS IN SUITES
5
5
13-Nov-12
19-Nov-12
HTF15100
DURAROCK / BLUE BOARD AT BATHROOMS
5
5
19-Nov-12
27-Nov-12
HTF15110
WATERPROOF & TEST SHOWER DECKS
5
5
28-Nov-12
04-Dec-12
HTF15120
INSTALL BATHROOM & SHOWER TILE
10
10
05-Dec-12
18-Dec-12
LEVEL 15
54
54
15-Oct-12
27-Dec-12
HTF16010
POINT & PATCH / GRIND CEILING
5
5
15-Oct-12
19-Oct-12
HTF16020
PRIME & BOX EXPOSED CEILINGS
5
5
18-Oct-12
24-Oct-12
HTF16030
LAYOUT WALLS
5
5
22-Oct-12
26-Oct-12
HTF16040
MEP OVERHEAD ROUGH-IN AND RISERS
10
10
24-Oct-12
06-Nov-12
HTF16060
FRAME WALLS / SET DOOR FRAMES
10
10
02-Nov-12
15-Nov-12
HTF16080
MEPS WALL ROUGH-IN
10
10
09-Nov-12
26-Nov-12
HTF16070
DRYWALL RIPPER & CEILING FRAMING
5
5
13-Nov-12
19-Nov-12
HTF16090
MEPS CEILING ROUGH-IN
10
10
15-Nov-12
30-Nov-12
HTF16085
SET BATH TUBS IN SUITES
5
5
20-Nov-12
28-Nov-12
HTF16100
DURAROCK / BLUE BOARD AT BATHROOMS
5
5
28-Nov-12
04-Dec-12
LEVEL 16
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 15 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
HTF16110
WATERPROOF & TEST SHOWER DECKS
5
5
05-Dec-12
11-Dec-12
HTF16120
INSTALL BATHROOM & SHOWER TILE
10
10
12-Dec-12
27-Dec-12
55
55
22-Oct-12
04-Jan-13 26-Oct-12
LEVEL 17 HTF17010
POINT & PATCH / GRIND CEILING
5
5
22-Oct-12
HTF17020
PRIME & BOX EXPOSED CEILINGS
5
5
25-Oct-12
31-Oct-12
HTF17030
LAYOUT WALLS
5
5
29-Oct-12
02-Nov-12
HTF17040
MEP OVERHEAD ROUGH-IN AND RISERS
10
10
31-Oct-12
13-Nov-12
HTF17060
FRAME WALLS / SET DOOR FRAMES
10
10
09-Nov-12
26-Nov-12
HTF17080
MEPS WALL ROUGH-IN
10
10
16-Nov-12
03-Dec-12
HTF17070
DRYWALL RIPPER & CEILING FRAMING
5
5
20-Nov-12
28-Nov-12
HTF17090
MEPS CEILING ROUGH-IN
10
10
26-Nov-12
07-Dec-12
HTF17085
SET BATH TUBS IN SUITES
5
5
29-Nov-12
05-Dec-12
HTF17100
DURAROCK / BLUE BOARD AT BATHROOMS
5
5
05-Dec-12
11-Dec-12
HTF17110
WATERPROOF & TEST SHOWER DECKS
5
5
12-Dec-12
18-Dec-12
HTF17120
INSTALL BATHROOM & SHOWER TILE
10
10
19-Dec-12
04-Jan-13
55
55
29-Oct-12
11-Jan-13
LEVEL 18 HTF18010
POINT & PATCH / GRIND CEILING
5
5
29-Oct-12
02-Nov-12
HTF18020
PRIME & BOX EXPOSED CEILINGS
5
5
01-Nov-12
07-Nov-12
HTF18030
LAYOUT WALLS
5
5
05-Nov-12
09-Nov-12
HTF18040
MEP OVERHEAD ROUGH-IN AND RISERS
10
10
07-Nov-12
20-Nov-12
HTF18060
FRAME WALLS / SET DOOR FRAMES
10
10
16-Nov-12
03-Dec-12
HTF18080
MEPS WALL ROUGH-IN
10
10
27-Nov-12
10-Dec-12
HTF18070
DRYWALL RIPPER & CEILING FRAMING
5
5
29-Nov-12
05-Dec-12
HTF18090
MEPS CEILING ROUGH-IN
10
10
03-Dec-12
14-Dec-12
HTF18085
SET BATH TUBS IN SUITES
5
5
06-Dec-12
12-Dec-12
HTF18100
DURAROCK / BLUE BOARD AT BATHROOMS
5
5
12-Dec-12
18-Dec-12
HTF18110
WATERPROOF & TEST SHOWER DECKS
5
5
19-Dec-12
27-Dec-12
HTF18120
INSTALL BATHROOM & SHOWER TILE
10
10
28-Dec-12
11-Jan-13
55
55
05-Nov-12
18-Jan-13
LEVEL 19 HTF19010
POINT & PATCH / GRIND CEILING
5
5
05-Nov-12
09-Nov-12
HTF19020
PRIME & BOX EXPOSED CEILINGS
5
5
08-Nov-12
14-Nov-12
HTF19030
LAYOUT WALLS
5
5
12-Nov-12
16-Nov-12
HTF19040
MEP OVERHEAD ROUGH-IN AND RISERS
10
10
14-Nov-12
29-Nov-12
HTF19060
FRAME WALLS / SET DOOR FRAMES
10
10
27-Nov-12
10-Dec-12
HTF19080
MEPS WALL ROUGH-IN
10
10
04-Dec-12
17-Dec-12
HTF19070
DRYWALL RIPPER & CEILING FRAMING
5
5
06-Dec-12
12-Dec-12
HTF19090
MEPS CEILING ROUGH-IN
10
10
10-Dec-12
21-Dec-12
HTF19085
SET BATH TUBS IN SUITES
5
5
13-Dec-12
19-Dec-12
HTF19100
DURAROCK / BLUE BOARD AT BATHROOMS
5
5
19-Dec-12
27-Dec-12
HTF19110
WATERPROOF & TEST SHOWER DECKS
5
5
28-Dec-12
04-Jan-13
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 16 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
HTF19120
INSTALL BATHROOM & SHOWER TILE
TOWER PHASE 2 FINISHES LEVEL 3
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
10
10
07-Jan-13
18-Jan-13
155
155
16-Oct-12
20-May-13
80
80
16-Oct-12
04-Feb-13 22-Oct-12
HTF03510
DRYWALL 1 SIDE / INSULATE
5
5
16-Oct-12
HTF03520
DRYWALL 2ND SIDE
5
5
23-Oct-12
29-Oct-12
HTF03530
TAPE & TEXTURE WALLS & CEILINGS
6
6
29-Oct-12
05-Nov-12
HTF03540
PAINT CEILINGS & WALLS
5
5
05-Nov-12
09-Nov-12
HTF03550
INSTALL WALL PAPER
5
5
08-Nov-12
14-Nov-12
HTF03560
INSTALL MILLWORK / GLASS WALL AT BAR
5
5
12-Nov-12
16-Nov-12
HTF03570
INSTALL VANITIES WITH STONE TOPS
5
5
14-Nov-12
20-Nov-12
HTF03580
INSTALL TOILETS / SINKS
5
5
21-Nov-12
29-Nov-12
HTF03590
INSTALL BATH ACCESSORIES
5
5
21-Nov-12
29-Nov-12
HTF03600
INSTALL ROOM TILE
5
5
30-Nov-12
06-Dec-12
HTF03610
INSTALL PAD & CARPET IN ROOMS
5
5
06-Dec-12
12-Dec-12
HTF03620
MEP TRIM IN ROOMS
5
5
07-Dec-12
13-Dec-12
HTF03630
INSTALL SHOWER ENCLOSURES
5
5
07-Dec-12
13-Dec-12
HTF03640
INSTALL DOORS & HARDWARE
5
5
12-Dec-12
18-Dec-12
HTF03650
CONTRACTOR ROOM PUNCH & CLEAN-UP
5
5
19-Dec-12
27-Dec-12
HTF03660
OWNERS ROOM PUNCH & FINAL
5
5
28-Dec-12
04-Jan-13
HTF03670
INSTALL ROOM FF&E
5
5
07-Jan-13
11-Jan-13
HTF03680
INSTALL CORRIDOR PAD & CARPET
5
5
14-Jan-13
18-Jan-13
HTF03690
CORRIDOR WALL FINISH & TRIM
5
5
18-Jan-13
25-Jan-13
HTF03700
MEP TRIM CORRIDORS
5
5
22-Jan-13
28-Jan-13
HTF03710
CORRIDOR PUNCH & FINAL
5
5
29-Jan-13
04-Feb-13
80
80
23-Oct-12
11-Feb-13
HTF04510
DRYWALL 1 SIDE / INSULATE
5
5
23-Oct-12
29-Oct-12
HTF04520
DRYWALL 2ND SIDE
5
5
30-Oct-12
05-Nov-12
HTF04530
TAPE & TEXTURE WALLS & CEILINGS
6
6
05-Nov-12
12-Nov-12
HTF04540
PAINT CEILINGS & WALLS
5
5
12-Nov-12
16-Nov-12
HTF04550
INSTALL WALL PAPER
5
5
15-Nov-12
21-Nov-12
HTF04560
INSTALL MILLWORK / GLASS WALL AT BAR
5
5
19-Nov-12
27-Nov-12
HTF04570
INSTALL VANITIES WITH STONE TOPS
5
5
21-Nov-12
29-Nov-12
HTF04580
INSTALL TOILETS / SINKS
5
5
30-Nov-12
06-Dec-12
HTF04590
INSTALL BATH ACCESSORIES
5
5
30-Nov-12
06-Dec-12
HTF04600
INSTALL ROOM TILE
5
5
07-Dec-12
13-Dec-12
HTF04610
INSTALL PAD & CARPET IN ROOMS
5
5
13-Dec-12
19-Dec-12
HTF04620
MEP TRIM IN ROOMS
5
5
14-Dec-12
20-Dec-12
HTF04630
INSTALL SHOWER ENCLOSURES
5
5
14-Dec-12
20-Dec-12
HTF04640
INSTALL DOORS & HARDWARE
5
5
19-Dec-12
27-Dec-12
HTF04650
CONTRACTOR ROOM PUNCH & CLEAN-UP
5
5
28-Dec-12
04-Jan-13
LEVEL 4
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 17 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
HTF04660
OWNERS ROOM PUNCH & FINAL
5
5
07-Jan-13
11-Jan-13
HTF04670
INSTALL ROOM FF&E
5
5
14-Jan-13
18-Jan-13
HTF04680
INSTALL CORRIDOR PAD & CARPET
5
5
21-Jan-13
25-Jan-13
HTF04690
CORRIDOR WALL FINISH & TRIM
5
5
25-Jan-13
01-Feb-13
HTF04700
MEP TRIM CORRIDORS
5
5
29-Jan-13
04-Feb-13
HTF04710
CORRIDOR PUNCH & FINAL
5
5
05-Feb-13
11-Feb-13
80
80
30-Oct-12
18-Feb-13
HTF05510
DRYWALL 1 SIDE / INSULATE
5
5
30-Oct-12
05-Nov-12
HTF05520
DRYWALL 2ND SIDE
5
5
06-Nov-12
12-Nov-12
HTF05530
TAPE & TEXTURE WALLS & CEILINGS
6
6
12-Nov-12
19-Nov-12
HTF05540
PAINT CEILINGS & WALLS
5
5
19-Nov-12
27-Nov-12
HTF05550
INSTALL WALL PAPER
5
5
26-Nov-12
30-Nov-12
HTF05560
INSTALL MILLWORK / GLASS WALL AT BAR
5
5
28-Nov-12
04-Dec-12
HTF05570
INSTALL VANITIES WITH STONE TOPS
5
5
30-Nov-12
06-Dec-12
HTF05580
INSTALL TOILETS / SINKS
5
5
07-Dec-12
13-Dec-12
HTF05590
INSTALL BATH ACCESSORIES
5
5
07-Dec-12
13-Dec-12
HTF05600
INSTALL ROOM TILE
5
5
14-Dec-12
20-Dec-12
HTF05610
INSTALL PAD & CARPET IN ROOMS
5
5
20-Dec-12
28-Dec-12
HTF05620
MEP TRIM IN ROOMS
5
5
21-Dec-12
31-Dec-12
HTF05630
INSTALL SHOWER ENCLOSURES
5
5
21-Dec-12
31-Dec-12
HTF05640
INSTALL DOORS & HARDWARE
5
5
28-Dec-12
04-Jan-13
HTF05650
CONTRACTOR ROOM PUNCH & CLEAN-UP
5
5
07-Jan-13
11-Jan-13
HTF05660
OWNERS ROOM PUNCH & FINAL
5
5
14-Jan-13
18-Jan-13
HTF05670
INSTALL ROOM FF&E
5
5
21-Jan-13
25-Jan-13
HTF05680
INSTALL CORRIDOR PAD & CARPET
5
5
28-Jan-13
01-Feb-13
HTF05690
CORRIDOR WALL FINISH & TRIM
5
5
01-Feb-13
08-Feb-13
HTF05700
MEP TRIM CORRIDORS
5
5
05-Feb-13
11-Feb-13
HTF05710
CORRIDOR PUNCH & FINAL
5
5
12-Feb-13
18-Feb-13
81
81
06-Nov-12
26-Feb-13
LEVEL 5
LEVEL 6 HTF06510
DRYWALL 1 SIDE / INSULATE
5
5
06-Nov-12
12-Nov-12
HTF06520
DRYWALL 2ND SIDE
5
5
13-Nov-12
19-Nov-12
HTF06530
TAPE & TEXTURE WALLS & CEILINGS
6
6
19-Nov-12
28-Nov-12
HTF06540
PAINT CEILINGS & WALLS
5
5
28-Nov-12
04-Dec-12
HTF06550
INSTALL WALL PAPER
5
5
03-Dec-12
07-Dec-12
HTF06560
INSTALL MILLWORK / GLASS WALL AT BAR
5
5
05-Dec-12
11-Dec-12
HTF06570
INSTALL VANITIES WITH STONE TOPS
5
5
07-Dec-12
13-Dec-12
HTF06580
INSTALL TOILETS / SINKS
5
5
14-Dec-12
20-Dec-12
HTF06590
INSTALL BATH ACCESSORIES
5
5
14-Dec-12
20-Dec-12
HTF06600
INSTALL ROOM TILE
5
5
21-Dec-12
31-Dec-12
HTF06610
INSTALL PAD & CARPET IN ROOMS
5
5
31-Dec-12
07-Jan-13
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 18 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
HTF06620
MEP TRIM IN ROOMS
5
5
02-Jan-13
08-Jan-13
HTF06630
INSTALL SHOWER ENCLOSURES
5
5
02-Jan-13
08-Jan-13
HTF06640
INSTALL DOORS & HARDWARE
5
5
07-Jan-13
11-Jan-13
HTF06650
CONTRACTOR ROOM PUNCH & CLEAN-UP
5
5
14-Jan-13
18-Jan-13
HTF06660
OWNERS ROOM PUNCH & FINAL
5
5
21-Jan-13
25-Jan-13
HTF06670
INSTALL ROOM FF&E
5
5
28-Jan-13
01-Feb-13
HTF06680
INSTALL CORRIDOR PAD & CARPET
5
5
04-Feb-13
08-Feb-13
HTF06690
CORRIDOR WALL FINISH & TRIM
5
5
08-Feb-13
18-Feb-13
HTF06700
MEP TRIM CORRIDORS
5
5
13-Feb-13
19-Feb-13
HTF06710
CORRIDOR PUNCH & FINAL
LEVEL 7
5
5
20-Feb-13
26-Feb-13
80
80
13-Nov-12
04-Mar-13
HTF07510
DRYWALL 1 SIDE / INSULATE
5
5
13-Nov-12
19-Nov-12
HTF07520
DRYWALL 2ND SIDE
5
5
20-Nov-12
28-Nov-12
HTF07530
TAPE & TEXTURE WALLS & CEILINGS
6
6
28-Nov-12
05-Dec-12
HTF07540
PAINT CEILINGS & WALLS
5
5
05-Dec-12
11-Dec-12
HTF07550
INSTALL WALL PAPER
5
5
10-Dec-12
14-Dec-12
HTF07560
INSTALL MILLWORK / GLASS WALL AT BAR
5
5
12-Dec-12
18-Dec-12
HTF07570
INSTALL VANITIES WITH STONE TOPS
5
5
14-Dec-12
20-Dec-12
HTF07580
INSTALL TOILETS / SINKS
5
5
21-Dec-12
31-Dec-12
HTF07590
INSTALL BATH ACCESSORIES
5
5
21-Dec-12
31-Dec-12
HTF07600
INSTALL ROOM TILE
5
5
02-Jan-13
08-Jan-13
HTF07610
INSTALL PAD & CARPET IN ROOMS
5
5
08-Jan-13
14-Jan-13
HTF07620
MEP TRIM IN ROOMS
5
5
09-Jan-13
15-Jan-13
HTF07630
INSTALL SHOWER ENCLOSURES
5
5
09-Jan-13
15-Jan-13
HTF07640
INSTALL DOORS & HARDWARE
5
5
14-Jan-13
18-Jan-13
HTF07650
CONTRACTOR ROOM PUNCH & CLEAN-UP
5
5
21-Jan-13
25-Jan-13
HTF07660
OWNERS ROOM PUNCH & FINAL
5
5
28-Jan-13
01-Feb-13
HTF07670
INSTALL ROOM FF&E
5
5
04-Feb-13
08-Feb-13
HTF07680
INSTALL CORRIDOR PAD & CARPET
5
5
11-Feb-13
15-Feb-13
HTF07690
CORRIDOR WALL FINISH & TRIM
5
5
15-Feb-13
22-Feb-13
HTF07700
MEP TRIM CORRIDORS
5
5
19-Feb-13
25-Feb-13
HTF07710
CORRIDOR PUNCH & FINAL
LEVEL 8
5
5
26-Feb-13
04-Mar-13
80
80
20-Nov-12
11-Mar-13
HTF08510
DRYWALL 1 SIDE / INSULATE
5
5
20-Nov-12
28-Nov-12
HTF08520
DRYWALL 2ND SIDE
5
5
29-Nov-12
05-Dec-12
HTF08530
TAPE & TEXTURE WALLS & CEILINGS
6
6
05-Dec-12
12-Dec-12
HTF08540
PAINT CEILINGS & WALLS
5
5
12-Dec-12
18-Dec-12
HTF08550
INSTALL WALL PAPER
5
5
17-Dec-12
21-Dec-12
HTF08560
INSTALL MILLWORK / GLASS WALL AT BAR
5
5
19-Dec-12
27-Dec-12
HTF08570
INSTALL VANITIES WITH STONE TOPS
5
5
21-Dec-12
31-Dec-12
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 19 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
HTF08580
INSTALL TOILETS / SINKS
5
5
02-Jan-13
08-Jan-13
HTF08590
INSTALL BATH ACCESSORIES
5
5
02-Jan-13
08-Jan-13
HTF08600
INSTALL ROOM TILE
5
5
09-Jan-13
15-Jan-13
HTF08610
INSTALL PAD & CARPET IN ROOMS
5
5
15-Jan-13
21-Jan-13
HTF08620
MEP TRIM IN ROOMS
5
5
16-Jan-13
22-Jan-13
HTF08630
INSTALL SHOWER ENCLOSURES
5
5
16-Jan-13
22-Jan-13
HTF08640
INSTALL DOORS & HARDWARE
5
5
21-Jan-13
25-Jan-13
HTF08650
CONTRACTOR ROOM PUNCH & CLEAN-UP
5
5
28-Jan-13
01-Feb-13
HTF08660
OWNERS ROOM PUNCH & FINAL
5
5
04-Feb-13
08-Feb-13
HTF08670
INSTALL ROOM FF&E
5
5
11-Feb-13
15-Feb-13
HTF08680
INSTALL CORRIDOR PAD & CARPET
5
5
18-Feb-13
22-Feb-13
HTF08690
CORRIDOR WALL FINISH & TRIM
5
5
22-Feb-13
01-Mar-13
HTF08700
MEP TRIM CORRIDORS
5
5
26-Feb-13
04-Mar-13
HTF08710
CORRIDOR PUNCH & FINAL
5
5
05-Mar-13
11-Mar-13
78
78
29-Nov-12
18-Mar-13
HTF09510
DRYWALL 1 SIDE / INSULATE
5
5
29-Nov-12
05-Dec-12
HTF09520
DRYWALL 2ND SIDE
5
5
06-Dec-12
12-Dec-12
HTF09530
TAPE & TEXTURE WALLS & CEILINGS
6
6
12-Dec-12
19-Dec-12
HTF09540
PAINT CEILINGS & WALLS
5
5
19-Dec-12
27-Dec-12
HTF09550
INSTALL WALL PAPER
5
5
26-Dec-12
02-Jan-13
HTF09560
INSTALL MILLWORK / GLASS WALL AT BAR
5
5
28-Dec-12
04-Jan-13
HTF09570
INSTALL VANITIES WITH STONE TOPS
5
5
02-Jan-13
08-Jan-13
HTF09580
INSTALL TOILETS / SINKS
5
5
09-Jan-13
15-Jan-13
HTF09590
INSTALL BATH ACCESSORIES
5
5
09-Jan-13
15-Jan-13
HTF09600
INSTALL ROOM TILE
5
5
16-Jan-13
22-Jan-13
HTF09610
INSTALL PAD & CARPET IN ROOMS
5
5
22-Jan-13
28-Jan-13
HTF09620
MEP TRIM IN ROOMS
5
5
23-Jan-13
29-Jan-13
HTF09630
INSTALL SHOWER ENCLOSURES
5
5
23-Jan-13
29-Jan-13
HTF09640
INSTALL DOORS & HARDWARE
5
5
28-Jan-13
01-Feb-13
HTF09650
CONTRACTOR ROOM PUNCH & CLEAN-UP
5
5
04-Feb-13
08-Feb-13
HTF09660
OWNERS ROOM PUNCH & FINAL
5
5
11-Feb-13
15-Feb-13
HTF09670
INSTALL ROOM FF&E
5
5
18-Feb-13
22-Feb-13
HTF09680
INSTALL CORRIDOR PAD & CARPET
5
5
25-Feb-13
01-Mar-13
HTF09690
CORRIDOR WALL FINISH & TRIM
5
5
01-Mar-13
08-Mar-13
HTF09700
MEP TRIM CORRIDORS
5
5
05-Mar-13
11-Mar-13
HTF09710
CORRIDOR PUNCH & FINAL
5
5
12-Mar-13
18-Mar-13
LEVEL 9
79
79
06-Dec-12
26-Mar-13
HTF10510
DRYWALL 1 SIDE / INSULATE
5
5
06-Dec-12
12-Dec-12
HTF10520
DRYWALL 2ND SIDE
5
5
13-Dec-12
19-Dec-12
HTF10530
TAPE & TEXTURE WALLS & CEILINGS
6
6
19-Dec-12
28-Dec-12
LEVEL 10
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 20 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
HTF10540
PAINT CEILINGS & WALLS
5
5
28-Dec-12
04-Jan-13
HTF10550
INSTALL WALL PAPER
5
5
03-Jan-13
09-Jan-13
HTF10560
INSTALL MILLWORK / GLASS WALL AT BAR
5
5
07-Jan-13
11-Jan-13
HTF10570
INSTALL VANITIES WITH STONE TOPS
5
5
09-Jan-13
15-Jan-13
HTF10580
INSTALL TOILETS / SINKS
5
5
16-Jan-13
22-Jan-13
HTF10590
INSTALL BATH ACCESSORIES
5
5
16-Jan-13
22-Jan-13
HTF10600
INSTALL ROOM TILE
5
5
23-Jan-13
29-Jan-13
HTF10610
INSTALL PAD & CARPET IN ROOMS
5
5
29-Jan-13
04-Feb-13
HTF10620
MEP TRIM IN ROOMS
5
5
30-Jan-13
05-Feb-13
HTF10630
INSTALL SHOWER ENCLOSURES
5
5
30-Jan-13
05-Feb-13
HTF10640
INSTALL DOORS & HARDWARE
5
5
04-Feb-13
08-Feb-13
HTF10650
CONTRACTOR ROOM PUNCH & CLEAN-UP
5
5
11-Feb-13
15-Feb-13
HTF10660
OWNERS ROOM PUNCH & FINAL
5
5
18-Feb-13
22-Feb-13
HTF10670
INSTALL ROOM FF&E
5
5
25-Feb-13
01-Mar-13
HTF10680
INSTALL CORRIDOR PAD & CARPET
5
5
04-Mar-13
08-Mar-13
HTF10690
CORRIDOR WALL FINISH & TRIM
5
5
08-Mar-13
18-Mar-13
HTF10700
MEP TRIM CORRIDORS
5
5
13-Mar-13
19-Mar-13
HTF10710
CORRIDOR PUNCH & FINAL
5
5
20-Mar-13
26-Mar-13
78
78
13-Dec-12
01-Apr-13
LEVEL 11 HTF11510
DRYWALL 1 SIDE / INSULATE
5
5
13-Dec-12
19-Dec-12
HTF11520
DRYWALL 2ND SIDE
5
5
20-Dec-12
28-Dec-12
HTF11530
TAPE & TEXTURE WALLS & CEILINGS
6
6
28-Dec-12
07-Jan-13
HTF11540
PAINT CEILINGS & WALLS
5
5
07-Jan-13
11-Jan-13
HTF11550
INSTALL WALL PAPER
5
5
10-Jan-13
16-Jan-13
HTF11560
INSTALL MILLWORK / GLASS WALL AT BAR
5
5
14-Jan-13
18-Jan-13
HTF11570
INSTALL VANITIES WITH STONE TOPS
5
5
16-Jan-13
22-Jan-13
HTF11580
INSTALL TOILETS / SINKS
5
5
23-Jan-13
29-Jan-13
HTF11590
INSTALL BATH ACCESSORIES
5
5
23-Jan-13
29-Jan-13
HTF11600
INSTALL ROOM TILE
5
5
30-Jan-13
05-Feb-13
HTF11610
INSTALL PAD & CARPET IN ROOMS
5
5
05-Feb-13
11-Feb-13
HTF11620
MEP TRIM IN ROOMS
5
5
06-Feb-13
12-Feb-13
HTF11630
INSTALL SHOWER ENCLOSURES
5
5
06-Feb-13
12-Feb-13
HTF11640
INSTALL DOORS & HARDWARE
5
5
11-Feb-13
15-Feb-13
HTF11650
CONTRACTOR ROOM PUNCH & CLEAN-UP
5
5
18-Feb-13
22-Feb-13
HTF11660
OWNERS ROOM PUNCH & FINAL
5
5
25-Feb-13
01-Mar-13
HTF11670
INSTALL ROOM FF&E
5
5
04-Mar-13
08-Mar-13
HTF11680
INSTALL CORRIDOR PAD & CARPET
5
5
11-Mar-13
15-Mar-13
HTF11690
CORRIDOR WALL FINISH & TRIM
5
5
15-Mar-13
22-Mar-13
HTF11700
MEP TRIM CORRIDORS
5
5
19-Mar-13
25-Mar-13
HTF11710
CORRIDOR PUNCH & FINAL
5
5
26-Mar-13
01-Apr-13
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 21 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
LEVEL 12
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
78
78
20-Dec-12
08-Apr-13
HTF12510
DRYWALL 1 SIDE / INSULATE
5
5
20-Dec-12
28-Dec-12
HTF12520
DRYWALL 2ND SIDE
5
5
31-Dec-12
07-Jan-13
HTF12530
TAPE & TEXTURE WALLS & CEILINGS
6
6
07-Jan-13
14-Jan-13
HTF12540
PAINT CEILINGS & WALLS
5
5
14-Jan-13
18-Jan-13
HTF12550
INSTALL WALL PAPER
5
5
17-Jan-13
23-Jan-13
HTF12560
INSTALL MILLWORK / GLASS WALL AT BAR
5
5
21-Jan-13
25-Jan-13
HTF12570
INSTALL VANITIES WITH STONE TOPS
5
5
23-Jan-13
29-Jan-13
HTF12580
INSTALL TOILETS / SINKS
5
5
30-Jan-13
05-Feb-13
HTF12590
INSTALL BATH ACCESSORIES
5
5
30-Jan-13
05-Feb-13
HTF12600
INSTALL ROOM TILE
5
5
06-Feb-13
12-Feb-13
HTF12610
INSTALL PAD & CARPET IN ROOMS
5
5
12-Feb-13
18-Feb-13
HTF12620
MEP TRIM IN ROOMS
5
5
13-Feb-13
19-Feb-13
HTF12630
INSTALL SHOWER ENCLOSURES
5
5
13-Feb-13
19-Feb-13
HTF12640
INSTALL DOORS & HARDWARE
5
5
18-Feb-13
22-Feb-13
HTF12650
CONTRACTOR ROOM PUNCH & CLEAN-UP
5
5
25-Feb-13
01-Mar-13
HTF12660
OWNERS ROOM PUNCH & FINAL
5
5
04-Mar-13
08-Mar-13
HTF12670
INSTALL ROOM FF&E
5
5
11-Mar-13
15-Mar-13
HTF12680
INSTALL CORRIDOR PAD & CARPET
5
5
18-Mar-13
22-Mar-13
HTF12690
CORRIDOR WALL FINISH & TRIM
5
5
22-Mar-13
29-Mar-13
HTF12700
MEP TRIM CORRIDORS
5
5
26-Mar-13
01-Apr-13
HTF12710
CORRIDOR PUNCH & FINAL
LEVEL 14
5
5
02-Apr-13
08-Apr-13
76
76
31-Dec-12
15-Apr-13
HTF14510
DRYWALL 1 SIDE / INSULATE
5
5
31-Dec-12
07-Jan-13
HTF14520
DRYWALL 2ND SIDE
5
5
08-Jan-13
14-Jan-13
HTF14530
TAPE & TEXTURE WALLS & CEILINGS
6
6
14-Jan-13
21-Jan-13
HTF14540
PAINT CEILINGS & WALLS
5
5
21-Jan-13
25-Jan-13
HTF14550
INSTALL WALL PAPER
5
5
24-Jan-13
30-Jan-13
HTF14560
INSTALL MILLWORK / GLASS WALL AT BAR
5
5
28-Jan-13
01-Feb-13
HTF14570
INSTALL VANITIES WITH STONE TOPS
5
5
30-Jan-13
05-Feb-13
HTF14580
INSTALL TOILETS / SINKS
5
5
06-Feb-13
12-Feb-13
HTF14590
INSTALL BATH ACCESSORIES
5
5
06-Feb-13
12-Feb-13
HTF14600
INSTALL ROOM TILE
5
5
13-Feb-13
19-Feb-13
HTF14610
INSTALL PAD & CARPET IN ROOMS
5
5
19-Feb-13
25-Feb-13
HTF14620
MEP TRIM IN ROOMS
5
5
20-Feb-13
26-Feb-13
HTF14630
INSTALL SHOWER ENCLOSURES
5
5
20-Feb-13
26-Feb-13
HTF14640
INSTALL DOORS & HARDWARE
5
5
25-Feb-13
01-Mar-13
HTF14650
CONTRACTOR ROOM PUNCH & CLEAN-UP
5
5
04-Mar-13
08-Mar-13
HTF14660
OWNERS ROOM PUNCH & FINAL
5
5
11-Mar-13
15-Mar-13
HTF14670
INSTALL ROOM FF&E
5
5
18-Mar-13
22-Mar-13
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 22 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
HTF14680
INSTALL CORRIDOR PAD & CARPET
5
5
25-Mar-13
29-Mar-13
HTF14690
CORRIDOR WALL FINISH & TRIM
5
5
29-Mar-13
05-Apr-13
HTF14700
MEP TRIM CORRIDORS
5
5
02-Apr-13
08-Apr-13
HTF14710
CORRIDOR PUNCH & FINAL
5
5
09-Apr-13
15-Apr-13
75
75
08-Jan-13
22-Apr-13
HTF15510
DRYWALL 1 SIDE / INSULATE
5
5
08-Jan-13
14-Jan-13
HTF15520
DRYWALL 2ND SIDE
5
5
15-Jan-13
21-Jan-13
HTF15530
TAPE & TEXTURE WALLS & CEILINGS
6
6
21-Jan-13
28-Jan-13
HTF15540
PAINT CEILINGS & WALLS
5
5
28-Jan-13
01-Feb-13
HTF15550
INSTALL WALL PAPER
5
5
31-Jan-13
06-Feb-13
HTF15560
INSTALL MILLWORK / GLASS WALL AT BAR
5
5
04-Feb-13
08-Feb-13
HTF15570
INSTALL VANITIES WITH STONE TOPS
5
5
06-Feb-13
12-Feb-13
HTF15580
INSTALL TOILETS / SINKS
5
5
13-Feb-13
19-Feb-13
HTF15590
INSTALL BATH ACCESSORIES
5
5
13-Feb-13
19-Feb-13
HTF15600
INSTALL ROOM TILE
5
5
20-Feb-13
26-Feb-13
HTF15610
INSTALL PAD & CARPET IN ROOMS
5
5
26-Feb-13
04-Mar-13
HTF15620
MEP TRIM IN ROOMS
5
5
27-Feb-13
05-Mar-13
HTF15630
INSTALL SHOWER ENCLOSURES
5
5
27-Feb-13
05-Mar-13
HTF15640
INSTALL DOORS & HARDWARE
5
5
04-Mar-13
08-Mar-13
HTF15650
CONTRACTOR ROOM PUNCH & CLEAN-UP
5
5
11-Mar-13
15-Mar-13
HTF15660
OWNERS ROOM PUNCH & FINAL
5
5
18-Mar-13
22-Mar-13
HTF15670
INSTALL ROOM FF&E
5
5
25-Mar-13
29-Mar-13
HTF15680
INSTALL CORRIDOR PAD & CARPET
5
5
01-Apr-13
05-Apr-13
HTF15690
CORRIDOR WALL FINISH & TRIM
5
5
05-Apr-13
12-Apr-13
HTF15700
MEP TRIM CORRIDORS
5
5
09-Apr-13
15-Apr-13
HTF15710
CORRIDOR PUNCH & FINAL
5
5
16-Apr-13
22-Apr-13
LEVEL 15
76
76
15-Jan-13
30-Apr-13
HTF16510
DRYWALL 1 SIDE / INSULATE
5
5
15-Jan-13
21-Jan-13
HTF16520
DRYWALL 2ND SIDE
5
5
22-Jan-13
28-Jan-13
HTF16530
TAPE & TEXTURE WALLS & CEILINGS
6
6
28-Jan-13
04-Feb-13
HTF16540
PAINT CEILINGS & WALLS
5
5
04-Feb-13
08-Feb-13
HTF16550
INSTALL WALL PAPER
5
5
07-Feb-13
13-Feb-13
HTF16560
INSTALL MILLWORK / GLASS WALL AT BAR
5
5
11-Feb-13
15-Feb-13
HTF16570
INSTALL VANITIES WITH STONE TOPS
5
5
13-Feb-13
19-Feb-13
HTF16580
INSTALL TOILETS / SINKS
5
5
20-Feb-13
26-Feb-13
HTF16590
INSTALL BATH ACCESSORIES
5
5
20-Feb-13
26-Feb-13
HTF16600
INSTALL ROOM TILE
5
5
27-Feb-13
05-Mar-13
HTF16610
INSTALL PAD & CARPET IN ROOMS
5
5
05-Mar-13
11-Mar-13
HTF16620
MEP TRIM IN ROOMS
5
5
06-Mar-13
12-Mar-13
HTF16630
INSTALL SHOWER ENCLOSURES
5
5
06-Mar-13
12-Mar-13
LEVEL 16
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 23 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
HTF16640
INSTALL DOORS & HARDWARE
5
5
11-Mar-13
15-Mar-13
HTF16650
CONTRACTOR ROOM PUNCH & CLEAN-UP
5
5
18-Mar-13
22-Mar-13
HTF16660
OWNERS ROOM PUNCH & FINAL
5
5
25-Mar-13
29-Mar-13
HTF16670
INSTALL ROOM FF&E
5
5
01-Apr-13
05-Apr-13
HTF16680
INSTALL CORRIDOR PAD & CARPET
5
5
08-Apr-13
12-Apr-13
HTF16690
CORRIDOR WALL FINISH & TRIM
5
5
12-Apr-13
22-Apr-13
HTF16700
MEP TRIM CORRIDORS
5
5
17-Apr-13
23-Apr-13
HTF16710
CORRIDOR PUNCH & FINAL
5
5
24-Apr-13
30-Apr-13
75
75
22-Jan-13
06-May-13
LEVEL 17 HTF17510
DRYWALL 1 SIDE / INSULATE
5
5
22-Jan-13
28-Jan-13
HTF17520
DRYWALL 2ND SIDE
5
5
29-Jan-13
04-Feb-13
HTF17530
TAPE & TEXTURE WALLS & CEILINGS
6
6
04-Feb-13
11-Feb-13
HTF17540
PAINT CEILINGS & WALLS
5
5
11-Feb-13
15-Feb-13
HTF17550
INSTALL WALL PAPER
5
5
14-Feb-13
20-Feb-13
HTF17560
INSTALL MILLWORK / GLASS WALL AT BAR
5
5
18-Feb-13
22-Feb-13
HTF17570
INSTALL VANITIES WITH STONE TOPS
5
5
20-Feb-13
26-Feb-13
HTF17580
INSTALL TOILETS / SINKS
5
5
27-Feb-13
05-Mar-13
HTF17590
INSTALL BATH ACCESSORIES
5
5
27-Feb-13
05-Mar-13
HTF17600
INSTALL ROOM TILE
5
5
06-Mar-13
12-Mar-13
HTF17610
INSTALL PAD & CARPET IN ROOMS
5
5
12-Mar-13
18-Mar-13
HTF17620
MEP TRIM IN ROOMS
5
5
13-Mar-13
19-Mar-13
HTF17630
INSTALL SHOWER ENCLOSURES
5
5
13-Mar-13
19-Mar-13
HTF17640
INSTALL DOORS & HARDWARE
5
5
18-Mar-13
22-Mar-13
HTF17650
CONTRACTOR ROOM PUNCH & CLEAN-UP
5
5
25-Mar-13
29-Mar-13
HTF17660
OWNERS ROOM PUNCH & FINAL
5
5
01-Apr-13
05-Apr-13
HTF17670
INSTALL ROOM FF&E
5
5
08-Apr-13
12-Apr-13
HTF17680
INSTALL CORRIDOR PAD & CARPET
5
5
15-Apr-13
19-Apr-13
HTF17690
CORRIDOR WALL FINISH & TRIM
5
5
19-Apr-13
26-Apr-13
HTF17700
MEP TRIM CORRIDORS
5
5
23-Apr-13
29-Apr-13
HTF17710
CORRIDOR PUNCH & FINAL
LEVEL 18
5
5
30-Apr-13
06-May-13
75
75
29-Jan-13
13-May-13
HTF18510
DRYWALL 1 SIDE / INSULATE
5
5
29-Jan-13
04-Feb-13
HTF18520
DRYWALL 2ND SIDE
5
5
05-Feb-13
11-Feb-13
HTF18530
TAPE & TEXTURE WALLS & CEILINGS
6
6
11-Feb-13
18-Feb-13
HTF18540
PAINT CEILINGS & WALLS
5
5
18-Feb-13
22-Feb-13
HTF18550
INSTALL WALL PAPER
5
5
21-Feb-13
27-Feb-13
HTF18560
INSTALL MILLWORK / GLASS WALL AT BAR
5
5
25-Feb-13
01-Mar-13
HTF18570
INSTALL VANITIES WITH STONE TOPS
5
5
27-Feb-13
05-Mar-13
HTF18580
INSTALL TOILETS / SINKS
5
5
06-Mar-13
12-Mar-13
HTF18590
INSTALL BATH ACCESSORIES
5
5
06-Mar-13
12-Mar-13
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 24 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
HTF18600
INSTALL ROOM TILE
5
5
13-Mar-13
19-Mar-13
HTF18610
INSTALL PAD & CARPET IN ROOMS
5
5
19-Mar-13
25-Mar-13
HTF18620
MEP TRIM IN ROOMS
5
5
20-Mar-13
26-Mar-13
HTF18630
INSTALL SHOWER ENCLOSURES
5
5
20-Mar-13
26-Mar-13
HTF18640
INSTALL DOORS & HARDWARE
5
5
25-Mar-13
29-Mar-13
HTF18650
CONTRACTOR ROOM PUNCH & CLEAN-UP
5
5
01-Apr-13
05-Apr-13
HTF18660
OWNERS ROOM PUNCH & FINAL
5
5
08-Apr-13
12-Apr-13
HTF18670
INSTALL ROOM FF&E
5
5
15-Apr-13
19-Apr-13
HTF18680
INSTALL CORRIDOR PAD & CARPET
5
5
22-Apr-13
26-Apr-13
HTF18690
CORRIDOR WALL FINISH & TRIM
5
5
26-Apr-13
03-May-13
HTF18700
MEP TRIM CORRIDORS
5
5
30-Apr-13
06-May-13
HTF18710
CORRIDOR PUNCH & FINAL
LEVEL 19
5
5
07-May-13
13-May-13
75
75
05-Feb-13
20-May-13
HTF19510
DRYWALL 1 SIDE / INSULATE
5
5
05-Feb-13
11-Feb-13
HTF19520
DRYWALL 2ND SIDE
5
5
12-Feb-13
18-Feb-13
HTF19530
TAPE & TEXTURE WALLS & CEILINGS
6
6
18-Feb-13
25-Feb-13
HTF19540
PAINT CEILINGS & WALLS
5
5
25-Feb-13
01-Mar-13
HTF19550
INSTALL WALL PAPER
5
5
28-Feb-13
06-Mar-13
HTF19560
INSTALL MILLWORK / GLASS WALL AT BAR
5
5
04-Mar-13
08-Mar-13
HTF19570
INSTALL VANITIES WITH STONE TOPS
5
5
06-Mar-13
12-Mar-13
HTF19580
INSTALL TOILETS / SINKS
5
5
13-Mar-13
19-Mar-13
HTF19590
INSTALL BATH ACCESSORIES
5
5
13-Mar-13
19-Mar-13
HTF19600
INSTALL ROOM TILE
5
5
20-Mar-13
26-Mar-13
HTF19610
INSTALL PAD & CARPET IN ROOMS
5
5
26-Mar-13
01-Apr-13
HTF19620
MEP TRIM IN ROOMS
5
5
27-Mar-13
02-Apr-13
HTF19630
INSTALL SHOWER ENCLOSURES
5
5
27-Mar-13
02-Apr-13
HTF19640
INSTALL DOORS & HARDWARE
5
5
01-Apr-13
05-Apr-13
HTF19650
CONTRACTOR ROOM PUNCH & CLEAN-UP
5
5
08-Apr-13
12-Apr-13
HTF19660
OWNERS ROOM PUNCH & FINAL
5
5
15-Apr-13
19-Apr-13
HTF19670
INSTALL ROOM FF&E
5
5
22-Apr-13
26-Apr-13
HTF19680
INSTALL CORRIDOR PAD & CARPET
5
5
29-Apr-13
03-May-13
HTF19690
CORRIDOR WALL FINISH & TRIM
5
5
03-May-13
10-May-13
HTF19700
MEP TRIM CORRIDORS
5
5
07-May-13
13-May-13
HTF19710
CORRIDOR PUNCH & FINAL
5
5
14-May-13
20-May-13
45
45
08-Jan-13
11-Mar-13
45
45
08-Jan-13
11-Mar-13
MANLIFT ROOM FINISHES MANLIFT ROOMS HTMLRNC100
MANLIFT ROOM FINISHES
SLAB ON GRADE SOUTH LOW RISE - SOG Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
45
45
08-Jan-13
11-Mar-13
121
81
29-May-12 A
13-Nov-12
71
10
29-May-12 A
04-Sep-12
Page 25 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
TASK filter: All Activities Activity ID
Activity Name
Orig Dur
Rem Dur
Start
Finish
0
29-May-12 A
19-Jun-12 A
PDSOG72000
MEP UG/SUBGRADE/BASE
15
PDSOG73000
FORM/REBAR/POUR - SOG (MINUS BACKFILL ZONE)
10
0
07-Jun-12 A
30-Jun-12 A
PDSOG76000
FORM/REBAR/POUR SOG BACKFILL ZONE
10
10
22-Aug-12
04-Sep-12
27
27
08-Oct-12
13-Nov-12
NORTH LOW RISE - SOG PDSOG79000
FORM/REBAR/POUR SPREAD FOOTINGS (crane pad)
5
5
08-Oct-12
12-Oct-12
PDSOG71000
MEP UG/SUBGRADE/BASE
10
10
15-Oct-12
29-Oct-12
PDSOG78000
FORM/REBAR/POUR - SOG
10
10
30-Oct-12
13-Nov-12
26
26
24-Jul-12
28-Aug-12
24-Jul-12
06-Aug-12
EVENT CENTER & PORTE COCHERE - SOG PDSOG74000
MEP UG/SUBGRADE/BASE
10
10
PDSOG75000
FORM/REBAR/POUR - SOG
10
10
31-Jul-12
13-Aug-12
PDSOG77000
PORTE COCHERE SPREAD FOOTINGS
10
10
14-Aug-12
28-Aug-12
93
78
09-Jul-12 A
31-Oct-12
66
51
09-Jul-12 A
24-Sep-12
STEEL STRUCTURE SOUTH LOWRISE STEEL PSTR1500
ERECT STRUCTURAL STEEL
31
29
09-Jul-12 A
27-Aug-12
PSTR1600
PLUMB, BOLT & WELD STRUCT STEEL
30
30
10-Jul-12 A
29-Aug-12
PSTR1700
METAL DECK, SHEAR STUDS & PUDDLE WELD - SOUTH
15
15
13-Aug-12
03-Sep-12
PSTR1800
EDGE FORM & MEPS ROUGH IN
8
8
29-Aug-12
07-Sep-12
PSTR1900
REBAR & POUR SOMD (RESTAURANT / POOL DECK)
10
10
10-Sep-12
24-Sep-12
38
38
28-Aug-12
18-Oct-12
PSTR2000
ERECT STRUCTURAL STEEL
15
15
28-Aug-12
18-Sep-12
PSTR2100
PLUMB, BOLT & WELD STRUCT STEEL
8
8
11-Sep-12
21-Sep-12
PSTR2200
METAL DECK, SHEAR STUDS & PUDDLE WELD
8
8
18-Sep-12
27-Sep-12
PSTR2210
METAL DECK / REBAR / POUR AT RISERS / RAKERS
15
15
18-Sep-12
08-Oct-12
PSTR2300
EDGE FORM & MEPS ROUGH IN
10
10
02-Oct-12
15-Oct-12
PSTR2400
REBAR & POUR SOMD (EVENT CENTER)
6
6
10-Oct-12
18-Oct-12
EVENT CENTER & PORTE COCHERE STEEL
26
26
19-Sep-12
24-Oct-12
PSTR1000
ERECT STRUCTURAL STEEL (55,512 SF) (FOLLOWS ACTIVITY - FILL BASIN / FLOAT BARGE)
18
18
19-Sep-12
12-Oct-12
PSTR1100
PLUMB, BOLT & WELD STRUCT STEEL
10
10
03-Oct-12
16-Oct-12
PSTR1200
METAL ROOF DECK (CASINO / BARGE)
10
10
10-Oct-12
24-Oct-12
PSTR1210
INSTALL CURBS & AHUs
5
5
18-Oct-12
24-Oct-12
CASINO STEEL (BARGE AREA)
13
13
15-Oct-12
31-Oct-12
PSTR3000
ERECT STRUCTURAL STEEL NORTH
4
4
15-Oct-12
19-Oct-12
PSTR4000
PLUMB, BOLT & WELD STRUCT STEEL
5
5
19-Oct-12
25-Oct-12
PSTR5000
METAL DECK
5
5
25-Oct-12
31-Oct-12
FIRE PROOFING / OVERHEAD MEPS
115
115
08-Aug-12
15-Jan-13
46
46
08-Aug-12
10-Oct-12
21
21
08-Aug-12
05-Sep-12
20
20
08-Aug-12
05-Sep-12
16
16
29-Aug-12
19-Sep-12
NORTH LOWRISE STEEL
TOWER FOOTPRINT / OVERHEAD MEPS TOWER LEVEL 1 PFPB3120
OH MEPS ROUGH-IN
TOWER MEZZ LEVEL Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 26 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
TASK filter: All Activities Activity ID
Activity Name
PFPB4120
OH MEPS ROUGH-IN
TOWER LEVEL 2 PFPB5120
OH MEPS ROUGH-IN
SOUTH LOW RISE LEVEL1 - FP/OH MEPS
Orig Dur
Rem Dur
Start
Finish
15
15
29-Aug-12
19-Sep-12
20
20
13-Sep-12
10-Oct-12
20
20
13-Sep-12
10-Oct-12
35
35
21-Sep-12
08-Nov-12
PFPB2110
FP STRUCTURAL STEEL
15
15
21-Sep-12
11-Oct-12
PFPB2120
OH MEPS ROUGH-IN
25
25
05-Oct-12
08-Nov-12
PPD4000
POOL PIPING FROM POOL EQUIP. ROOM TO POOL/JACUZZI
10
10
26-Oct-12
08-Nov-12
25
25
21-Sep-12
25-Oct-12
SOUTH LOW RISE LEVEL 2 - FP/OH MEPS PFPB8120
FP STRUCTURAL STEEL
5
5
21-Sep-12
27-Sep-12
PFPB9120
OH MEPS ROUGH-IN
15
15
28-Sep-12
18-Oct-12
PFPB9130
INSTALL SUPPORT BEAMS FOR PARTITION WALLS
5
5
19-Oct-12
25-Oct-12
37
37
19-Oct-12
10-Dec-12
PFPB2010
FP STRUCTURAL STEEL - EVENT CENTER
10
10
19-Oct-12
01-Nov-12
PFPB2015
PIN-ON SOUND BAT INSULATION AT METAL DECK
10
10
02-Nov-12
15-Nov-12
PFPB2020
OH MEPS ROUGH-IN AT EVENT CENTER
20
20
09-Nov-12
10-Dec-12
33
33
30-Nov-12
15-Jan-13
EVENT CENTER - FP/OH MEPS
CASINO - FP/OH MEPS PFPB2050
FP STRUCTURAL STEEL
15
15
30-Nov-12
20-Dec-12
PFPB2060
OH MEPS ROUGH-IN
30
30
30-Nov-12
15-Jan-13
NORTH LOW RISE - FP/OH MEPS
16
16
20-Dec-12
11-Jan-13
PFPB2040
FP STRUCTURAL STEEL
4
4
20-Dec-12
27-Dec-12
PFPB3040
OH MEPS ROUGH-IN
10
10
27-Dec-12
11-Jan-13
159
159
23-Aug-12
02-Apr-13
159
159
23-Aug-12
02-Apr-13
LOW RISE EXTERIOR ENCLOSURE / ROOF & PORTE COCHERE SOUTH ELEVATION (CASINO / MARGARITAVILLE)
81
81
23-Aug-12
13-Dec-12
SEN6460
FRAME EXT. WALLS / INSTALL CANOPY SUPPORTS
10
10
23-Aug-12
05-Sep-12
SEN6470
INSTALL SCAFFOLDING
8
8
23-Aug-12
03-Sep-12
SEN6490
INSTALL PARAPET ROOF BACKING/SHEATHING
5
5
30-Aug-12
05-Sep-12
SEN6510
INSTALL SHEATHING
5
5
30-Aug-12
05-Sep-12
SEN6495
SET MTL STUD ROOF TRUSSES
10
10
30-Aug-12
13-Sep-12
SEN6520
INSTALL WINDOWS & ENTRY DOORS
15
15
06-Sep-12
27-Sep-12
SEN6540
INSTALL FLAT ROOFS
20
20
06-Sep-12
04-Oct-12
SEN6497
INSTALL MTL/DENS DECK
10
10
06-Sep-12
20-Sep-12
SEN6500
EXTERIOR STUCCO FINISH
10
10
06-Sep-12
20-Sep-12
SEN6530
INSTALL METAL & WOOD SIDING
20
20
14-Sep-12
11-Oct-12
SEN7540
INSTALL STANDING SEAM METAL ROOFS
20
20
14-Sep-12
11-Oct-12
SEN6550
INSTALL EXT. LIGHTING/SIGNAGE
15
15
05-Oct-12
26-Oct-12
SEN6535
REMOVE SCAFFOLDING
5
5
12-Oct-12
19-Oct-12
SEN6532
EXTERIOR THEMING & DETAIL
30
30
12-Oct-12
28-Nov-12
SEN6710
INSTALL CAULKING & SEALANTS
15
15
22-Oct-12
09-Nov-12
SEAFOOD RESTAURANT & CASINO ENTRY
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 27 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
SEN6740
CONTRACTOR CLEAN & PUNCHLIST
SEN6780
OWNER PUNCH AND FINAL
MARGARITAVILLE & POOL AREA
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
10
10
13-Nov-12
28-Nov-12
10
10
29-Nov-12
13-Dec-12
133
133
27-Sep-12
02-Apr-13
MPEN6460
FRAME EXTERIOR WALLS
15
15
27-Sep-12
19-Oct-12
MPEN6470
INSTALL SCAFFOLDING
10
10
11-Oct-12
26-Oct-12
MPEN6490
INSTALL PARAPET ROOF BACKING/SHEATHING
8
8
19-Oct-12
31-Oct-12
MPEN6510
INSTALL SHEATHING
15
15
19-Oct-12
09-Nov-12
MPEN7490
INSTALL MTL STUD TRUSSES
15
15
19-Oct-12
09-Nov-12
MPEN6550
INSTALL FLAT ROOFS
20
20
26-Oct-12
28-Nov-12
MPEN6520
INSTALL WINDOWS & ENTRY DOORS
20
20
31-Oct-12
03-Dec-12
MPEN8490
INSTALL STUCCO FINISH
10
10
02-Nov-12
19-Nov-12
MPEN9490
INSTALL MTL/DENS DECK
10
10
02-Nov-12
19-Nov-12
MPEN7550
INSTALL STANDING SEAM METAL ROOFS
30
30
19-Nov-12
07-Jan-13
MPEN6540
INSTALL METAL & WOOD SIDING
20
20
26-Nov-12
26-Dec-12
MPEN7460
EXTERIOR THEMING & DETAIL
40
40
03-Dec-12
01-Feb-13
MPEN7560
ELEVATED DECKS & CANOPIES
20
20
18-Dec-12
18-Jan-13
MPEN6580
INSTALL EXT. LIGHTING/SIGNAGE
20
20
26-Dec-12
25-Jan-13
MPEN6720
REMOVE SCAFFOLDING
10
10
26-Dec-12
10-Jan-13
MPEN6560
INSTALL STAIRS & HANDRAILS
30
30
10-Jan-13
25-Feb-13
MPEN6710
INSTALL CAULKING & SEALANTS
30
30
18-Jan-13
04-Mar-13
MPEN6740
CONTRACTOR CLEAN & PUNCHLIST
10
10
04-Mar-13
19-Mar-13
MPEN6780
OWNER PUNCH AND FINAL
10
10
19-Mar-13
02-Apr-13
91
91
12-Oct-12
15-Feb-13
NORTH ELEVATION PEN6440
LAYOUT & SURVEY
8
8
12-Oct-12
24-Oct-12
PEN6450
INSTALL SPLIT FACE MASONRY
10
10
24-Oct-12
06-Nov-12
PEN6430
METAL DECK COMPLETE
0
0
PEN6460
FRAME EXT. WALLS / INSTALL CANOPY SUPPORTS
10
10
31-Oct-12
14-Nov-12
PEN6490
INSTALL PARAPET ROOF BACKING/SHEATHING
5
5
31-Oct-12
06-Nov-12
PEN6470
INSTALL SCAFFOLDING
5
5
31-Oct-12
06-Nov-12
PEN6510
INSTALL SHEATHING & STUCCO FINISH
15
15
07-Nov-12
30-Nov-12
PEN6520
INSTALL WINDOWS & ENTRY DOORS
10
10
26-Nov-12
07-Dec-12
PEN6530
INSTALL METAL SIDING
15
15
03-Dec-12
24-Dec-12
PEN6540
INSTALL ROOFING
15
15
18-Dec-12
09-Jan-13
PEN6550
INSTALL EXT. LIGHTING/SIGNAGE
10
10
26-Dec-12
09-Jan-13
PEN6710
INSTALL CAULKING & SEALANTS
10
10
26-Dec-12
09-Jan-13
PEN6720
REMOVE SCAFFOLDING
5
5
10-Jan-13
17-Jan-13
PEN6740
CONTRACTOR CLEAN & PUNCHLIST
10
10
18-Jan-13
31-Jan-13
PEN6780
OWNER PUNCH AND FINAL
10
10
01-Feb-13
15-Feb-13
72
72
25-Oct-12
01-Feb-13
15
15
25-Oct-12
15-Nov-12
WEST ELEVATION (CASINO) WEN6460
FRAME EXT. WALLS
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
24-Oct-12
Page 28 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
WEN6470
INSTALL SWING STAGES
5
5
25-Oct-12
31-Oct-12
WEN6490
INSTALL PARAPET ROOF BACKING/SHEATHING
10
10
01-Nov-12
15-Nov-12
WEN6510
INSTALL SHEATHING & STUCCO FINISH
25
25
01-Nov-12
10-Dec-12
WEN6540
INSTALL CASINO ROOFING
20
20
16-Nov-12
18-Dec-12
WEN6520
INSTALL WINDOWS
10
10
04-Dec-12
18-Dec-12
WEN6550
INSTALL EXT. LIGHTING/SIGNAGE
15
15
04-Dec-12
26-Dec-12
WEN6710
INSTALL CAULKING & SEALANTS
15
15
04-Dec-12
26-Dec-12
WEN6530
INSTALL METAL SIDING
20
20
19-Dec-12
18-Jan-13
WEN6720
REMOVE SCAFFOLDING
5
5
27-Dec-12
03-Jan-13
WEN6740
CONTRACTOR CLEAN & PUNCHLIST
10
10
04-Jan-13
18-Jan-13
WEN6780
OWNER PUNCH AND FINAL
10
10
21-Jan-13
01-Feb-13
93
93
26-Oct-12
05-Mar-13
EVN6440
FRAME EXT. WALLS - EVENT CENTER
10
10
26-Oct-12
08-Nov-12
EVN6450
INSTALL PARAPET ROOF BACKING/SHEATHING
10
10
26-Oct-12
08-Nov-12
EVN6455
INSTALL FLAT ROOFS
15
15
02-Nov-12
27-Nov-12
EVN6500
INSTALL SCAFFOLDING
15
15
02-Nov-12
27-Nov-12
EVN6510
INSTALL SHEATHING
15
15
09-Nov-12
04-Dec-12
EVN6520
INSTALL STUCCO FINISH
20
20
28-Nov-12
27-Dec-12
EVN6530
INSTALL SPECIAL EXTERIOR FINISH
25
25
13-Dec-12
21-Jan-13
EVN6550
INSTALL EXT. LIGHTING/SIGNAGE
15
15
07-Jan-13
28-Jan-13
EVN6570
REMOVE SCAFFOLDING
5
5
22-Jan-13
28-Jan-13
EVN6580
INSTALL CAULKING & SEALANTS
15
15
29-Jan-13
19-Feb-13
EVN6740
CONTRACTOR CLEAN & PUNCHLIST
5
5
20-Feb-13
26-Feb-13
EVN6780
OWNER PUNCH AND FINAL
5
5
27-Feb-13
05-Mar-13
EAST ELEVATION / EVENT CENTER
85
85
15-Oct-12
08-Feb-13
A1000
INSTALL PORTE COCHERE STRUCTURE
12
12
15-Oct-12
31-Oct-12
A1200
INFILL FRAMING
10
10
01-Nov-12
15-Nov-12
A2000
MEPS ROUGH-IN
10
10
08-Nov-12
26-Nov-12
A3000
INSTALL SHEATHING & STUCCO
20
20
16-Nov-12
18-Dec-12
A4000
FORM/REBAR/POUR DRIVEWAY
15
15
19-Dec-12
10-Jan-13
A5000
INSTALL COLUMN ENCLOSURES
10
10
11-Jan-13
25-Jan-13
A6000
MEPS TRIM
10
10
11-Jan-13
25-Jan-13
A7000
CONTRACTOR CLEAN & PUNCHLIST
5
5
28-Jan-13
01-Feb-13
A8000
OWNER PUNCH AND FINAL
5
5
04-Feb-13
08-Feb-13
187
187
04-Sep-12
22-May-13
184
184
04-Sep-12
17-May-13
119
119
02-Nov-12
17-Apr-13
PORTE COCHERE
FINISHES (LOW RISE) LEVEL 1 - FINISHES - LOWRISE SOUTH SEAFOOD DINING (1310) TFS188900
FRAME METAL STUD WALLS/DOOR FRAMES
10
10
02-Nov-12
15-Nov-12
TFS188910
FRAME HARDLID CEILING/SOFFITS
10
10
13-Nov-12
28-Nov-12
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 29 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
TFS188920
MEPS ROUGH-IN WALLS & CEILINGS
10
10
20-Nov-12
05-Dec-12
TFS188930
DRYWALL,TAPE & PAINT WALLS & CEILINGS
15
15
06-Dec-12
28-Dec-12
TFS188940
INSTALL BAR DIE
3
3
31-Dec-12
03-Jan-13
TFS188950
INSTALL MILLWORK
20
20
31-Dec-12
28-Jan-13
TFS188945
QUARRY TILE @ BAR
3
3
03-Jan-13
08-Jan-13
TFS189970
PULL SODA/BEER/LIQUOR LINES (OWNER)
3
3
08-Jan-13
11-Jan-13
TFS188970
INSTALL & HOOK-UP BAR EQUIPMENT
15
15
09-Jan-13
29-Jan-13
TFS188960
INSTALL STONE FLOORING / BAR TOPS
10
10
22-Jan-13
04-Feb-13
TFS188955
THEMED INTERIOR FINISHES
15
15
28-Jan-13
19-Feb-13
TFS188980
MEPS WALL/CEILING TRIM/DL FIXTURES
10
10
12-Feb-13
25-Feb-13
TFS188990
INSTALL DOORS & HARDWARE
2
2
26-Feb-13
27-Feb-13
TFS189000
INSTALL BANQUET SEATING
10
10
26-Feb-13
11-Mar-13
TFS189010
INSTALL CARPET FLOOR INSERTS
5
5
12-Mar-13
18-Mar-13
TFS189020
INSTALL OWNER SIGNAGE
5
5
19-Mar-13
25-Mar-13
TFS189030
CONTRACTOR CLEAN & PUNCHLIST
5
5
26-Mar-13
01-Apr-13
TFS189035
OWNER PUNCH AND FINAL
10
10
02-Apr-13
15-Apr-13
TFS189040
HEALTH DEPARTMENT INSPECTION
SEAFOOD KITCHEN (1305)
2
2
16-Apr-13
17-Apr-13
100
100
26-Oct-12
14-Mar-13
10
10
26-Oct-12
08-Nov-12
SKRB2901530
INSTALL / WRAP GREASE DUCT
SKRB2901540
FRAME WALLS/DOOR FRAMES
5
5
02-Nov-12
08-Nov-12
SKRB2901550
MEPS ROUGH-IN WALLS/BACKING
15
15
09-Nov-12
03-Dec-12
SKRB2901570
DRYWALL & TAPE WALLS
5
5
04-Dec-12
10-Dec-12
SKRB2901560
INSTALL HOODS & WALK-IN COOLERS
5
5
11-Dec-12
17-Dec-12
SKRB2901580
TERMINATE HOOD TO GREASE DUCT/WRAP
8
8
11-Dec-12
20-Dec-12
SKRB2901600
FRP / STAINLESS WALL COVERING
10
10
11-Dec-12
26-Dec-12
SKRB2901610
INSTALL CEILING GRID
3
3
27-Dec-12
31-Dec-12
SKRB2901620
MEPS DROPS TO GRID
10
10
02-Jan-13
15-Jan-13
SKRB2901590
INSTALL QUARRY TILE FLOOR
5
5
16-Jan-13
22-Jan-13
SKRB2901630
INSTALL & HOOK-UP FOOD SERVICE EQUIPMENT
20
20
23-Jan-13
19-Feb-13
SKRB2901650
MEPS WALL/CEILING TRIM - KITCHEN
10
10
13-Feb-13
26-Feb-13
SKRB2902650
ANSUL TEST
2
2
19-Feb-13
21-Feb-13
SKRB2901640
INSTALL CEILING TILE
2
2
25-Feb-13
26-Feb-13
SKRB3000004
INSTALL OWNER SIGNAGE
2
2
27-Feb-13
28-Feb-13
SKRB3000006
CONTRACTOR CLEAN & PUNCHLIST
5
5
27-Feb-13
05-Mar-13
SKRB3000007
OWNER PUNCH & FINAL
5
5
06-Mar-13
12-Mar-13
SKRB3000008
HEALTH DEPARTMENT INSPECTION
2
2
13-Mar-13
14-Mar-13
74
74
02-Nov-12
13-Feb-13
CARB1993520
FRAME METAL STUD WALLS/DOOR FRAMES
5
5
02-Nov-12
08-Nov-12
CARB1993670
MEPS WALL ROUGH-IN/BACKING
10
10
09-Nov-12
26-Nov-12
CARB1993680
DRYWALL RIPPER
2
2
16-Nov-12
19-Nov-12
PUBLIC RESTROOMS (1301) / (1302) / (1311)
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 30 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
TASK filter: All Activities Activity ID
Activity Name
Orig Dur
Rem Dur
Start
Finish
5
5
20-Nov-12
28-Nov-12
CARB1993690
FRAME CEILINGS & SOFFITS
CARB1993700
MEPS DROPS TO CEILING & SOFFITS
5
5
29-Nov-12
05-Dec-12
CARB1993710
DRYWALL/TAPE/PAINT-WALLS/CEILINGS
10
10
06-Dec-12
19-Dec-12
CARB1993720
INSTALL MILLWORK/SPECIAL FINISHES
5
5
20-Dec-12
28-Dec-12
CARB1993730
INSTALL TILE FLOORING/WALLS/COUNTERTOPS IN RESTROOMS
10
10
20-Dec-12
07-Jan-13
CARB1993740
INSTALL PLUMBING FIXTURES
10
10
08-Jan-13
21-Jan-13
CARB1993750
INSTALL TOILET PARTITIONS & ACCESSORIES
5
5
22-Jan-13
28-Jan-13
CARB1993760
MEPS TRIM WALLS/CEILING
5
5
22-Jan-13
28-Jan-13
CARB1993770
HANG DOORS & HARDWARE
1
1
29-Jan-13
29-Jan-13
CARB1993780
OWNER SIGNAGE
2
2
29-Jan-13
30-Jan-13
CARB1993790
CONTRACTOR CLEAN & PUNCHLIST
5
5
31-Jan-13
06-Feb-13
CARB1993792
OWNER PUNCH & FINAL
RETAIL (1315)
5
5
07-Feb-13
13-Feb-13
72
72
16-Nov-12
25-Feb-13
PRB188340
FRAME METAL STUD WALLS/DOOR FRAMES
5
5
16-Nov-12
26-Nov-12
PRB188690
MEPS WALL ROUGH-IN/BACKING
10
10
27-Nov-12
10-Dec-12
PRB188710
FRAME CEILINGS & SOFFITS
10
10
11-Dec-12
26-Dec-12
PRB188720
MEPS DROPS TO CEILING & SOFFITS
7
7
27-Dec-12
07-Jan-13
PRB188730
DRYWALL/TAPE/PAINT WALLS/CEILINGS
10
10
08-Jan-13
21-Jan-13
PRB188740
INSTALL RETAIL STORE FINISHES
15
15
22-Jan-13
11-Feb-13
PRB188745
CONTRACTOR CLEAN & PUNCHLIST
5
5
12-Feb-13
18-Feb-13
PRB188755
OWNER PUNCH AND FINAL
5
5
19-Feb-13
25-Feb-13
MARGARITAVILLE DINING (1403) / PORCH DINING (1404)
104
104
16-Nov-12
10-Apr-13
PRB292230
FRAME WALLS/DOOR FRAMES
7
7
16-Nov-12
28-Nov-12
PRB292240
MEPS ROUGH-IN WALLS/BACKING
10
10
29-Nov-12
12-Dec-12
PRB292250
DRYWALL RIPPER AT CEILING
5
5
13-Dec-12
19-Dec-12
PRB292260
FRAME HARDLID CEILING/SOFFITS / MISC. STEEL SUPPORTS FOR THEMING
10
10
13-Dec-12
28-Dec-12
PRB292270
MEPS DROP TO HARDLID/SOFFITS
10
10
20-Dec-12
07-Jan-13
PRB292280
DRYWALL WALLS & CEILINGS
5
5
08-Jan-13
14-Jan-13
PRB292282
TAPE & PAINT WALLS & CEILINGS
10
10
15-Jan-13
28-Jan-13
PRB292300
INSTALL MILLWORK
15
15
29-Jan-13
18-Feb-13
PRB292310
INSTALL STONE FLOORING
5
5
19-Feb-13
25-Feb-13
PRB292320
MEPS WALL/CEILING TRIM/DL FIXTURES
10
10
26-Feb-13
11-Mar-13
PRB292340
INSTALL BANQUET SEATING
10
10
26-Feb-13
11-Mar-13
PRB292302
THEMED INTERIOR FINISHES
20
20
26-Feb-13
25-Mar-13
PRB292350
INSTALL CARPET FLOOR INSERTS
5
5
12-Mar-13
18-Mar-13
PRB292330
INSTALL DOORS & HARDWARE
5
5
19-Mar-13
25-Mar-13
PRB292360
INSTALL OWNER SIGNAGE
5
5
26-Mar-13
01-Apr-13
PRB292370
CONTRACTOR CLEAN & PUNCHLIST
5
5
26-Mar-13
01-Apr-13
PRB292390
OWNER PUNCH AND FINAL
5
5
02-Apr-13
08-Apr-13
PRB292380
HEALTH DEPARTMENT INSPECTION
2
2
09-Apr-13
10-Apr-13
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 31 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE BAR
Orig Dur
Rem Dur
Start
Finish
68
68
29-Jan-13
02-May-13
CBF630
SET BAR DIE WALL
4
4
29-Jan-13
01-Feb-13
CBF640
INSTALL UMBRELLA STRUCTURES
4
4
04-Feb-13
07-Feb-13
CBF650
QUARRY TILE BEHIND DIE WALL
3
3
08-Feb-13
12-Feb-13
CBF660
PULL SODA / BEVERAGE LINES (OWNER)
2
2
13-Feb-13
14-Feb-13
CBF665
INSTALL FRP BEHIND DIE WALL
2
2
14-Feb-13
15-Feb-13
CBF670
MILLWORK / FRONT & BACK BARS
15
15
18-Feb-13
08-Mar-13
CBF690
SET & HOOK UP BAR EQUIPMENT
15
15
11-Mar-13
29-Mar-13
CBF710
INSTALL STONE TOP AT BAR
2
2
01-Apr-13
02-Apr-13
CBF720
INSTALL SPECIAL FINISHES
10
10
03-Apr-13
16-Apr-13
CBF740
MEPS TRIM
5
5
10-Apr-13
16-Apr-13
CBF750
CONTRACTOR CLEAN & PUNCHLIST
5
5
17-Apr-13
23-Apr-13
CBF770
OWNER PUNCH & FINAL
5
5
24-Apr-13
30-Apr-13
CBF780
HEALTH DEPARTMENT INSPECTION
2
2
01-May-13
02-May-13
129
129
20-Nov-12
17-May-13
CF2060
FRAME WALLS, CEILINGS & SOFFITS / DOOR FRAMES
15
15
20-Nov-12
12-Dec-12
CF2070
MEP ROUGH IN WALLS, CEILINGS & SOFFITS
15
15
06-Dec-12
28-Dec-12
CF2080
DRYWALL WALLS. CEILINGS & SOFFITS
10
10
20-Dec-12
07-Jan-13
CF2090
TAPE / PAINT
12
12
31-Dec-12
16-Jan-13
CF2100
INSTALL & HOOK-UP SERVICE LINE EQUIPMENT
20
20
15-Jan-13
11-Feb-13
CF2110
WALL COVERING & MURALS
10
10
17-Jan-13
30-Jan-13
CF2120
SET SERVING LINE DIE WALL
10
10
17-Jan-13
30-Jan-13
CF2130
MILLWORK TRIM AND BOOTH BASES
25
25
24-Jan-13
27-Feb-13
CF3140
WATERPROOF / QUARRY TILE AT SERVICE LINE
10
10
31-Jan-13
13-Feb-13
CF2160
SET & HOOK UP SERVING LINE KITCHEN EQUIPMENT
25
25
14-Feb-13
20-Mar-13
CF2170
SET STONE TOP / TRAY RAILS
10
10
28-Feb-13
13-Mar-13
CF3120
INSTALL TILE AT FLOOR
10
10
14-Mar-13
27-Mar-13
CF2190
INSTALL WOOD & CARPET FLOORING
10
10
28-Mar-13
10-Apr-13
CF2180
INSTALL SNEEZE GUARDS
10
10
11-Apr-13
24-Apr-13
CF2200
OWNER LIGHT FIXTURES & MEPS TRIM
10
10
11-Apr-13
24-Apr-13
CF2210
HEALTH DEPARTMENT INSPECTION
5
5
25-Apr-13
01-May-13
CF2220
PUNCH LIST & FINAL CLEAN
10
10
02-May-13
15-May-13
CF2230
OWNER FF&E
5
5
13-May-13
17-May-13
131
131
02-Nov-12
03-May-13
BUFFET DINING (1401) / BUFFET SERVERY (1402)
MARGARITAVILLE COOKING (1406) / WASH (1407) / COOLER FREEZER (1409) / DRY STORAGE (1408) CARB2901530
GREASE DUCT & DUCT WRAP
10
10
02-Nov-12
15-Nov-12
CARB2901540
FRAME WALLS/DOOR FRAMES
10
10
20-Nov-12
05-Dec-12
CARB2901550
MEPS ROUGH-IN WALLS/BACKING
20
20
29-Nov-12
28-Dec-12
CARB2901560
DRYWALL & TAPE WALLS
10
10
20-Dec-12
07-Jan-13
CARB2901570
INSTALL HOODS & WALK-IN COOLERS
7
7
31-Dec-12
09-Jan-13
CARB2901600
FRP/STAINLESS WALL COVERING
10
10
08-Jan-13
21-Jan-13
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 32 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
TASK filter: All Activities Activity ID
Activity Name
Orig Dur
Rem Dur
Start
8
8
10-Jan-13
Finish
CARB2901580
TERMINATE HOOD TO GREASE DUCT/WRAP
CARB2901610
INSTALL CEILING GRID
5
5
22-Jan-13
28-Jan-13
CARB2901620
MEPS DROPS TO GRID
10
10
25-Jan-13
07-Feb-13
CARB2901590
INSTALL QUARRY TILE FLOOR
10
10
08-Feb-13
21-Feb-13
CARB2901630
INSTALL / HOOK-UP FOOD SERVICE EQUIPMENT
25
25
22-Feb-13
28-Mar-13
CARB2901640
INSTALL CEILING TILE
10
10
22-Mar-13
04-Apr-13
CARB2901650
MEPS WALL/CEILING TRIM - KITCHEN
10
10
22-Mar-13
04-Apr-13
CARB3000009
ANSUL / FIRE DEPT. TEST
2
2
04-Apr-13
08-Apr-13
CARB3000004
INSTALL OWNER SIGNAGE
2
2
05-Apr-13
08-Apr-13
CARB3000006
CONTRACTOR CLEAN & PUNCHLIST
10
10
09-Apr-13
22-Apr-13
CARB3000007
OWNER PUNCH & FINAL
5
5
23-Apr-13
29-Apr-13
CARB3000008
HEALTH DEPARTMENT INSPECTION
2
2
30-Apr-13
01-May-13
CARB3001008
DROP TEST / KITCHEN BURN-IN
2
2
02-May-13
03-May-13
122
122
20-Nov-12
08-May-13
CENTRAL KITCHEN (1405) / DRY STOR (1410) / COOLERS/FREEZERS (1411/1412/1413/1414) / MEAT(1415/1416)
21-Jan-13
CF2250
GREASE DUCT & DUCT WRAP
10
10
20-Nov-12
05-Dec-12
CF2260
FRAME WALLS / DOOR FRAMES
10
10
29-Nov-12
12-Dec-12
CF2270
MEPS ROUGH IN WALLS
20
20
06-Dec-12
07-Jan-13
CF2280
DRYWALL / TAPE
10
10
31-Dec-12
14-Jan-13
CF2290
PAINT
5
5
15-Jan-13
21-Jan-13
CF2300
INSTALL HOODS / FREEZERS & COOLERS
20
20
22-Jan-13
18-Feb-13
CF2310
FRP WALLS
10
10
22-Jan-13
04-Feb-13
CF2320
STAINLESS WALL COVERING
10
10
05-Feb-13
18-Feb-13
CF2330
INSTALL ACOUSTICAL GRID
5
5
19-Feb-13
25-Feb-13
CF2350
QUARRY TILE
10
10
19-Feb-13
04-Mar-13
CF2340
MEPS DROPS TO GRID
5
5
26-Feb-13
04-Mar-13
CF2360
INSTALL FOOD SERVICE EQUIPMENT
10
10
05-Mar-13
18-Mar-13
CF2380
HOOK UP FOOD SERVICE EQUIPMENT
25
25
12-Mar-13
15-Apr-13
CF2370
DOORS + HARDWARE / DROP CEILING TILE
5
5
16-Apr-13
22-Apr-13
CF2375
MEPS WALL/CEILING TRIM - KITCHEN
10
10
16-Apr-13
29-Apr-13
CF2390
CONTRACTOR CLEAN & PUNCHLIST
10
10
23-Apr-13
06-May-13
CF2395
ANSUL / FIRE DEPT. TEST
2
2
29-Apr-13
01-May-13
CF2400
HEALTH DEPARTMENT INSPECTION
2
2
07-May-13
08-May-13
CF2410
DROP TEST / KITCHEN BURN-IN
2
2
07-May-13
08-May-13
78
78
13-Dec-12
01-Apr-13
ASSOCIATE DINING (1420) CCRBB85570
FRAME WALLS / DOOR FRAMES
5
5
13-Dec-12
19-Dec-12
CCRBB85580
MEPS ROUGH-IN WALLS/BACKING
5
5
20-Dec-12
28-Dec-12
CCRBB85590
DRYWALL & TAPE WALLS
5
5
31-Dec-12
07-Jan-13
CCRBB85595
FRP WALL FINISH
5
5
08-Jan-13
14-Jan-13
CCRBB85600
INSTALL TILE FLOORING / COUTERTOPS
10
10
15-Jan-13
28-Jan-13
CCRBB85610
INSTALL CEILING GRID
5
5
29-Jan-13
04-Feb-13
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 33 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
CCRBB85620
MEPS DROP TO GRID
5
5
05-Feb-13
11-Feb-13
CCRBB85630
INSTALL & HOOK-UP FOOD SERVICE EQUIPMENT
15
15
12-Feb-13
04-Mar-13
CCRBB85640
INSTALL CEILING TILE
2
2
05-Mar-13
06-Mar-13
CCRBB85650
MEPS WALL/CEILING TRIM/DL FIXTURES
5
5
07-Mar-13
13-Mar-13
CCRBB85660
INSTALL DOORS & HARDWARE
5
5
14-Mar-13
20-Mar-13
CCRBB85670
INSTALL OWNER SIGNAGE
3
3
21-Mar-13
25-Mar-13
CCRBB85680
CONTRACTOR CLEAN & PUNCHLIST
ELECTRICAL ROOM (1423) / (1422)
5
5
26-Mar-13
01-Apr-13
78
78
04-Sep-12
20-Dec-12
PERS81650
FRAME METAL STUD WALLS/DOOR FRAMES
3
3
04-Sep-12
06-Sep-12
PERS81660
MEP WALL ROUGH-IN / BACKING
5
5
06-Sep-12
12-Sep-12
PERS81690
FORM/REBAR/POUR HOUSEKEEPING PADS
2
2
07-Sep-12
10-Sep-12
PERS83700
SET TEMP TRANSFORMER/PANELS 1422
5
5
10-Sep-12
18-Sep-12
PERS84670
TEMP. ELECTRICAL SERVICE
20
20
10-Sep-12
09-Oct-12
PERS81700
SET ELECTRICAL GEAR & PANELS
10
10
11-Sep-12
24-Sep-12
PERS81670
DRYWALL/TAPE
3
3
13-Sep-12
17-Sep-12
PERS81680
INSTALL FAN COIL
5
5
18-Sep-12
24-Sep-12
PERS81710
DOORS & HARDWARE
2
2
25-Sep-12
26-Sep-12
PERS81720
PULL FEEDERS & TERMINATE TO PANELS
40
40
27-Sep-12
21-Nov-12
PERS83670
ENERGIZE TEMP ELECTRICAL SERVICE
0
0
09-Oct-12
PERS83680
ENERGIZE MAIN ELECTRIC GEAR
1
1
21-Nov-12
26-Nov-12
PERS81730
PERMANENT LIGHTING/MEPS TRIM
5
5
26-Nov-12
30-Nov-12
PERS81740
TOUCH-UP PAINT WALL
2
2
03-Dec-12
04-Dec-12
PERS81750
CLEAN & SEAL FLOOR
5
5
05-Dec-12
11-Dec-12
PERS81760
OWNER SIGNAGE
2
2
12-Dec-12
13-Dec-12
PERS82250
CONTRACTOR CLEAN & PUNCHLIST
MEZZANINE - FINISHES - LOWRISE SOUTH
5
5
14-Dec-12
20-Dec-12
165
165
25-Sep-12
13-May-13
67
67
19-Oct-12
21-Jan-13
PRBS82140
FRAME METAL STUD WALLS/DOOR FRAMES
3
3
19-Oct-12
23-Oct-12
PRBS82230
MEPS WALL ROUGH-IN/BACKING
5
5
24-Oct-12
30-Oct-12
PRBS82240
DRYWALL
5
5
31-Oct-12
06-Nov-12
PRBS82245
TAPE & PAINT
8
8
07-Nov-12
16-Nov-12
PRBS82246
INSTALL FRP AT LIQUOR STORAGE
2
2
19-Nov-12
20-Nov-12
PRBS82250
INSTALL CEILING GRID
2
2
21-Nov-12
26-Nov-12
PRBS82260
MEPS DROPS TO GRID
5
5
27-Nov-12
03-Dec-12
PRBS82270
INSTALL MILLWORK
5
5
04-Dec-12
10-Dec-12
PRBS82280
INSTALL CEILING TILE
2
2
11-Dec-12
12-Dec-12
PRBS82290
MEPS TRIM WALLS/CEILING
5
5
13-Dec-12
19-Dec-12
PRBS82310
CARPET FLOORING & BASE
5
5
20-Dec-12
28-Dec-12
PRBS82330
INSTALL DOORS & HARDWARE
3
3
31-Dec-12
03-Jan-13
PRBS82340
OWNER SIGNAGE
2
2
04-Jan-13
07-Jan-13
MANAGER / GM / ADMIN OFFICES / LIQUOR STORAGE
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 34 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
TASK filter: All Activities Activity ID
Activity Name
Orig Dur
Rem Dur
Start
5
5
08-Jan-13
Finish
PRBS82350
CONTRACTOR CLEAN & PUNCHLIST
PRBS82360
OWNER PUNCH AND FINAL
5
5
15-Jan-13
21-Jan-13
ELEC. ROOM / A/V DATA ROOM / ELEV. EQUIPMENT ROOM
75
75
24-Oct-12
05-Feb-13
14-Jan-13
24-Oct-12
26-Oct-12
PERS82740
FRAME METAL STUD WALLS/DOOR FRAMES
3
3
PERS82770
MEP WALL ROUGH-IN / BACKING
5
5
26-Oct-12
01-Nov-12
PERS82780
DRYWALL
3
3
02-Nov-12
06-Nov-12
PERS82781
FORM/REBAR/POUR HOUSEKEEPING PADS
3
3
07-Nov-12
09-Nov-12
PERS82782
TAPE / PAINT WALL
5
5
12-Nov-12
16-Nov-12
PERS82790
INSTALL FAN COILS
3
3
19-Nov-12
21-Nov-12
PERS82810
SET ELECTRICAL EQUIPMENT
5
5
26-Nov-12
30-Nov-12
PERS82812
INSTALL OWNER RACKS / EQUIP. AT AV/DATA ROOM
5
5
26-Nov-12
30-Nov-12
PERS82814
INSTALL ELEVATOR MACHINE ROOM EQUIP.
10
10
26-Nov-12
07-Dec-12
PERS82820
DOORS & HARDWARE
2
2
10-Dec-12
11-Dec-12
PERS82830
PULL & TERMINATE FEEDERS
5
5
12-Dec-12
18-Dec-12
PERS82835
HOOK-UP ELEC. EQUIPMENT / TAGGING / LABELING
25
25
12-Dec-12
18-Jan-13
PERS82838
PUNCH DOWN / PROGRAMMING AV EQUIPMENT
25
25
12-Dec-12
18-Jan-13
PERS82840
MEPS TRIM
3
3
21-Jan-13
23-Jan-13
PERS82850
CLEAN & SEAL FLOOR
2
2
24-Jan-13
25-Jan-13
PERS82860
OWNER SIGNAGE
2
2
28-Jan-13
29-Jan-13
PERS83260
CONTRACTOR CLEAN & PUNCHLIST
BOH CIRCULATION / ELEVATOR LOBBY / ENTERTAINMENT CHANGING ROOMS
5
5
30-Jan-13
05-Feb-13
65
65
29-Oct-12
25-Jan-13
PRBS84420
FRAME METAL STUD WALLS/DOOR FRAMES
3
3
29-Oct-12
31-Oct-12
PRBS84480
MEPS WALL ROUGH-IN/BACKING
5
5
01-Nov-12
07-Nov-12
PRBS84510
DRYWALL
3
3
08-Nov-12
12-Nov-12
PRBS84515
TAPE & PAINT
7
7
13-Nov-12
21-Nov-12
PRBS84520
INSTALL CEILING GRID
2
2
26-Nov-12
27-Nov-12
PRBS84530
MEPS DROPS TO GRID
5
5
28-Nov-12
04-Dec-12
PRBS84550
INSTALL MILLWORK
5
5
05-Dec-12
11-Dec-12
PRBS84560
INSTALL CEILING TILE
3
3
12-Dec-12
14-Dec-12
PRBS84570
MEPS TRIM WALLS/CEILING
5
5
17-Dec-12
21-Dec-12
PRBS84580
VCT/CARPET FLOORING & BASE
5
5
26-Dec-12
02-Jan-13
PRBS84590
INSTALL DOORS & HARDWARE
2
2
03-Jan-13
04-Jan-13
PRBS84600
OWNER SIGNAGE
5
5
07-Jan-13
11-Jan-13
PRBS84610
CONTRACTOR CLEAN & PUNCHLIST
5
5
14-Jan-13
18-Jan-13
PRBS84810
OWNER PUNCH AND FINAL
SECURITY / HOLDING / HOUSEKEEPING / UNASSIGNED ROOMS
5
5
21-Jan-13
25-Jan-13
59
59
01-Nov-12
22-Jan-13
PERS84260
FRAME METAL STUD WALLS/DOOR FRAMES
5
5
01-Nov-12
07-Nov-12
PERS85260
MEP WALL ROUGH-IN / BACKING
7
7
08-Nov-12
16-Nov-12
PERS86260
DRYWALL
3
3
19-Nov-12
21-Nov-12
PERS86290
TAPE / PAINT
7
7
26-Nov-12
04-Dec-12
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 35 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
PERS87260
INSTALL CEILING GRID
3
3
05-Dec-12
07-Dec-12
PERS88260
MEPS DROPS TO GRID
5
5
10-Dec-12
14-Dec-12
PERS90260
DOORS & HARDWARE
2
2
17-Dec-12
18-Dec-12
PERS91260
INSTALL CEILING TILE
5
5
19-Dec-12
27-Dec-12
PERS92260
MEPS TRIM
5
5
28-Dec-12
04-Jan-13
PERS94260
VCT / SEAL FLOOR
5
5
07-Jan-13
11-Jan-13
PERS95260
OWNER SIGNAGE
2
2
14-Jan-13
15-Jan-13
PERS96260
CONTRACTOR CLEAN & PUNCHLIST
5
5
16-Jan-13
22-Jan-13
88
88
08-Nov-12
11-Mar-13
POOL EQUIPMENT ROOM (M413) / POOL STORAGE (M407) PPS83830
FRAME WALLS/DOOR FRAMES
2
2
08-Nov-12
09-Nov-12
PPS83840
MEPS ROUGH-IN WALLS
5
5
12-Nov-12
16-Nov-12
PPS83842
DRYWALL
3
3
19-Nov-12
21-Nov-12
PPS83843
FORM/REBAR/POUR CURBS & PADS
2
2
26-Nov-12
27-Nov-12
PPS83860
PREP & INSTALL EPOXY FLOORING / SEALER
5
5
28-Nov-12
04-Dec-12
PPS83844
TAPE & PAINT WALL
7
7
28-Nov-12
06-Dec-12
PPS83870
SET POOL EQUIPMENT
5
5
05-Dec-12
11-Dec-12
PPS83880
DOORS & HARDWARE
1
1
12-Dec-12
12-Dec-12
PPS83890
HOOK-UP POOL EQUIPMENT
25
25
13-Dec-12
21-Jan-13
PPS83910
MEPS TRIM
5
5
22-Jan-13
28-Jan-13
PPS83930
EQUIPMENT START-UP
20
20
29-Jan-13
25-Feb-13
PPS83940
OWNER SIGNAGE
5
5
26-Feb-13
04-Mar-13
PPS83950
CONTRACTOR CLEAN & PUNCHLIST
MECHANICAL ROOM (M443)
5
5
05-Mar-13
11-Mar-13
94
94
08-Nov-12
19-Mar-13
PERS110260
FRAME METAL STUD WALLS/DOOR FRAMES
2
2
08-Nov-12
09-Nov-12
PERS111260
MEP WALL ROUGH-IN / BACKING
5
5
12-Nov-12
16-Nov-12
PERS112260
DRYWALL
2
2
19-Nov-12
20-Nov-12
PERS114260
FORM/REBAR/POUR HOUSEKEEPING PADS
5
5
21-Nov-12
29-Nov-12
PERS114265
TAPE / PAINT
5
5
30-Nov-12
06-Dec-12
PERS115260
SET EQUIPMENT / PUMPS
10
10
07-Dec-12
20-Dec-12
PERS116260
DOORS & HARDWARE
1
1
21-Dec-12
21-Dec-12
PERS117260
HOOK-UP EQUIPMENT / INSULTATE & LABEL
45
45
26-Dec-12
27-Feb-13
PERS118260
MEPS TRIM
3
3
28-Feb-13
04-Mar-13
PERS120260
PREP, CLEAN & SEAL FLOOR
5
5
05-Mar-13
11-Mar-13
PERS121260
OWNER SIGNAGE
1
1
12-Mar-13
12-Mar-13
PERS122260
CONTRACTOR CLEAN & PUNCHLIST
RESTROOMS (M438) / (M439)
5
5
13-Mar-13
19-Mar-13
76
76
12-Nov-12
25-Feb-13
CARB192390
FRAME METAL STUD WALLS/DOOR FRAMES
3
3
12-Nov-12
14-Nov-12
CARB192400
MEPS WALL ROUGH-IN/BACKING
8
8
13-Nov-12
26-Nov-12
CARB192520
FRAME CEILINGS & SOFFITS
5
5
27-Nov-12
03-Dec-12
CARB192530
MEPS DROPS TO CEILING & SOFFITS
5
5
04-Dec-12
10-Dec-12
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 36 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
TASK filter: All Activities Activity ID
Activity Name
Orig Dur
Rem Dur
Start
Finish
CARB192540
DRYWALL-WALLS/CEILINGS
5
5
11-Dec-12
17-Dec-12
CARB192550
TAPE/PAINT-WALLS/CEILINGS
7
7
18-Dec-12
28-Dec-12
CARB192560
INSTALL SUB-TOPS
2
2
31-Dec-12
02-Jan-13
CARB192570
INSTALL TILE FLOORING/WALLS/COUNTERTOPS IN RESTROOMS
10
10
03-Jan-13
16-Jan-13
CARB192580
INSTALL PLUMBING FIXTURES
5
5
17-Jan-13
23-Jan-13
CARB192590
INSTALL TOILET PARTITIONS & ACCESSORIES
5
5
24-Jan-13
30-Jan-13
CARB192600
MEPS TRIM WALLS/CEILING
5
5
31-Jan-13
06-Feb-13
CARB192610
HANG DOORS & HARDWARE
2
2
07-Feb-13
08-Feb-13
CARB192620
OWNER SIGNAGE
1
1
11-Feb-13
11-Feb-13
PERS121270
CONTRACTOR CLEAN & PUNCHLIST
5
5
12-Feb-13
18-Feb-13
PERS122270
OWNER PUNCHLIST
5
5
19-Feb-13
25-Feb-13
150
150
25-Sep-12
22-Apr-13
PPD3025
FORM & POUR STAIRS, PLANTERS AND RAMP WALLS
15
15
25-Sep-12
15-Oct-12
PPD4030
WATERPROOFING/WATER TEST
10
10
16-Oct-12
29-Oct-12
PPD4040
POOL & JACUZZI - GUNNITE / PLASTER / TILE
60
60
30-Oct-12
28-Jan-13
PPD4060
INSTALL PRECAST COPING
10
10
29-Jan-13
11-Feb-13
PPD4072
INSTALL DECORATIVE RAILINGS
15
15
29-Jan-13
18-Feb-13
PPD4074
INSTALL FLAGSTONE AT POOL DECK
20
20
12-Feb-13
11-Mar-13
PPD4080
INSTALL CABANAS
5
5
12-Mar-13
18-Mar-13
PPD4084
INSTALL TREES & PLANTS
10
10
12-Mar-13
25-Mar-13
PPD4090
FILL, CLEAN & COMMISSION POOL/JACUZZI
10
10
19-Mar-13
01-Apr-13
PPD4100
INSTALL POOL/JACUZZI ACCESSORIES
5
5
19-Mar-13
25-Mar-13
PRB325400
INSTALL OWNER SIGNAGE
5
5
19-Mar-13
25-Mar-13
PRB326400
CONTRACTOR CLEAN & PUNCHLIST
5
5
26-Mar-13
01-Apr-13
PRB328400
OWNER PUNCH AND FINAL
5
5
02-Apr-13
08-Apr-13
PRB328500
HEALTH DEPARTMENT INSPECTION
5
5
09-Apr-13
15-Apr-13
PRB328510
INSTALL OWNER FF&E
POOL / POOL DECK (M415)
MARGARITAVILLE BALCONY DINING / PORCH DINING / POOL DECK BAR / SERVICE BAR
5
5
16-Apr-13
22-Apr-13
150
150
16-Oct-12
13-May-13
16-Oct-12
29-Oct-12
PRB311390
SET BAR CANOPY STRUCTURE / ROOF
10
10
PRB312390
SET DIE WALL
3
3
30-Oct-12
01-Nov-12
PRB313390
MEPS ROUGH-IN AT DIE WALL
5
5
02-Nov-12
08-Nov-12
PRB317390
WATERPROOFING / INSTALL QUARRY TILE AT BAR
5
5
09-Nov-12
15-Nov-12
PRB318390
INSTALL & HOOK-UP BAR EQUIPMENT & SERVICE BAR EQUIPMENT
10
10
29-Jan-13
11-Feb-13
PRB319390
INSTALL MILLWORK / BACK BAR / SPECIAL FINISHES / COLUMN WRAPS
20
20
12-Feb-13
11-Mar-13
PRB321390
MEPS TRIM AT CANOPY
10
10
05-Mar-13
18-Mar-13
PRB321400
INSTALL WATERPROOFING AT SEATING AREA / WATER TEST
5
5
19-Mar-13
25-Mar-13
PRB324390
INSTALL MMA DECK COATING AT PORCH & BALCONY SEATING AREAS
10
10
26-Mar-13
08-Apr-13
PRB325390
INSTALL OWNER SIGNAGE
5
5
09-Apr-13
15-Apr-13
PRB326390
CONTRACTOR CLEAN & PUNCHLIST
5
5
16-Apr-13
22-Apr-13
PRB328390
OWNER PUNCH AND FINAL
5
5
23-Apr-13
29-Apr-13
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 37 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
PRB328395
HEALTH DEPARTMENT INSPECTION
PRB328520
INSTALL OWNER FF&E
LEVEL 2 - FINISHES - LOWRISE SOUTH MECHANICAL ROOM (2412)
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
5
5
30-Apr-13
06-May-13
5
5
07-May-13
13-May-13
154
154
19-Oct-12
22-May-13
89
89
19-Oct-12
20-Feb-13
PERS110250
FRAME METAL STUD WALLS/DOOR FRAMES
2
2
19-Oct-12
22-Oct-12
PERS111250
MEP WALL ROUGH-IN / BACKING
5
5
23-Oct-12
29-Oct-12
PERS112250
DRYWALL/TAPE
7
7
30-Oct-12
07-Nov-12
PERS114250
FORM/REBAR/POUR HOUSEKEEPING PADS
2
2
08-Nov-12
09-Nov-12
PERS115250
SET EQUIPMENT
10
10
19-Nov-12
04-Dec-12
PERS117250
HOOK-UP EQUIPMENT/TAGGING
30
30
05-Dec-12
18-Jan-13
PERS118250
PERMANENT LIGHTING/MEPS TRIM
5
5
21-Jan-13
25-Jan-13
PERS120250
CLEAN & SEAL FLOOR
10
10
28-Jan-13
08-Feb-13
PERS120255
DOORS & HARDWARE
1
1
11-Feb-13
11-Feb-13
PERS121250
OWNER SIGNAGE
2
2
12-Feb-13
13-Feb-13
PERS122250
CONTRACTOR CLEAN & PUNCHLIST
SPA / SALON / MASSAGE ROOMS / LOCKER ROOMS / SUPPORT AREAS
5
5
14-Feb-13
20-Feb-13
152
152
23-Oct-12
22-May-13
PRB290112
FRAME METAL STUD WALLS/DOOR FRAMES
5
5
23-Oct-12
29-Oct-12
PRB292290
DRYALL RIPPER
5
5
30-Oct-12
05-Nov-12
PRB292400
FRAME CEILINGS & SOFFITS
10
10
30-Oct-12
12-Nov-12
PRB292410
MEPS WALL & CEILING ROUGH-IN/BACKING
20
20
06-Nov-12
05-Dec-12
PRB292420
DRYWALL - WALLS/CEILING
10
10
29-Nov-12
12-Dec-12
PRB292425
TAPE & PAINT / VWC
10
10
13-Dec-12
28-Dec-12
PRB292426
INSTALL GRID CEILINGS
5
5
31-Dec-12
07-Jan-13
PRB292427
MEPS DROPS TO GRID CEILINGS
5
5
08-Jan-13
14-Jan-13
PRB292430
INSTALL MILLWORK/SPECIAL FINISHES
20
20
15-Jan-13
11-Feb-13
PRB292435
INSTALL STONE FLOOR / WALL / COUNTERTOPS
15
15
05-Feb-13
25-Feb-13
PRB292440
INSTALL PLUMBING FIXTURES / DISHWASHER
15
15
26-Feb-13
18-Mar-13
PRB292450
INSTALL TOILET ACCESSORIES
5
5
12-Mar-13
18-Mar-13
PRB292460
INSTALL CARPET FLOORING
5
5
19-Mar-13
25-Mar-13
PRB292470
INSTALL MEN'S / WOMEN'S LOCKERS
10
10
26-Mar-13
08-Apr-13
PRB292480
INSTALL SPECIALITY LIGHTING
10
10
09-Apr-13
22-Apr-13
PRB292485
INSTALL CEILING TILE
5
5
09-Apr-13
15-Apr-13
PRB292490
MEPS TRIM WALLS/CEILING
10
10
16-Apr-13
29-Apr-13
PRB292500
ROUGH-IN FOR EQUIPMENT DATA STATIONS
5
5
16-Apr-13
22-Apr-13
PRB292510
HANG DOORS & HARDWARE
5
5
23-Apr-13
29-Apr-13
PRB292530
OWNER SIGNAGE
5
5
30-Apr-13
06-May-13
PRB292540
CONTRACTOR CLEAN & PUNCHLIST
5
5
30-Apr-13
06-May-13
PRB292550
OWNER PUNCHLIST
5
5
07-May-13
13-May-13
PRB292560
OWNER FF&E
5
5
14-May-13
20-May-13
PRB292570
HEALTH DEPT. INSPECTION
2
2
21-May-13
22-May-13
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 38 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
TASK filter: All Activities Activity ID
Activity Name
FITNESS CENTER (2410)
Orig Dur
Rem Dur
Start
Finish
89
89
30-Oct-12
01-Mar-13
PRB290102
FRAME METAL STUD WALLS/DOOR FRAMES
3
3
30-Oct-12
01-Nov-12
PRB290122
INSTALL STOREFRONT MULLIONS & GLASS
10
10
02-Nov-12
15-Nov-12
PRB292050
MEPS WALL ROUGH-IN/BACKING
5
5
16-Nov-12
26-Nov-12
PRB292070
FRAME CEILINGS & SOFFITS
3
3
27-Nov-12
29-Nov-12
PRB292080
MEPS DROPS TO CEILING & SOFFITS
5
5
30-Nov-12
06-Dec-12
PRB292090
DRYWALL - WALLS / SOFFITS
3
3
07-Dec-12
11-Dec-12
PRB292095
TAPE/PAINT - WALLS / SOFFITS
7
7
12-Dec-12
20-Dec-12
PRB292096
INSTALL CEILING GRID
2
2
21-Dec-12
26-Dec-12
PRB292097
MEPS DROPS TO GRID
5
5
27-Dec-12
03-Jan-13
PRB292140
INSTALL EXERCISE FLOORING
5
5
04-Jan-13
10-Jan-13
PRB292150
INSTALL MIRROR WALLS IN FITNESS ROOM
10
10
11-Jan-13
24-Jan-13
PRB292160
INSTALL SPECIALITY LIGHTING
5
5
25-Jan-13
31-Jan-13
PRB292170
MEPS TRIM WALLS/CEILING
5
5
25-Jan-13
31-Jan-13
PRB292190
HANG DOORS & HARDWARE
1
1
01-Feb-13
01-Feb-13
PRB292200
OWNER SIGNAGE
5
5
04-Feb-13
08-Feb-13
PRB292210
CONTRACTOR CLEAN & PUNCHLIST
5
5
11-Feb-13
15-Feb-13
PRB292220
OWNER PUNCHLIST
5
5
11-Feb-13
15-Feb-13
PRB292520
INSTALL OWNER FITNESS EQUIP.
10
10
18-Feb-13
01-Mar-13
92
92
14-Jan-13
21-May-13
66
66
14-Jan-13
15-Apr-13
LEVEL 1 - FINISHES - LOWRISE NORTH SLOT REPAIR (1112) / PARTS STORAGE (1111) / STORAGE (1110) / REPAIR SUPERVISOR (1113) PRB188350
FRAME METAL STUD WALLS/DOOR FRAMES
5
5
14-Jan-13
18-Jan-13
PRB188570
MEPS WALL ROUGH-IN/BACKING
5
5
21-Jan-13
25-Jan-13
PRB188580
DRYWALL
5
5
28-Jan-13
01-Feb-13
PRB188582
TAPE & PAINT
8
8
04-Feb-13
13-Feb-13
PRB188590
INSTALL CEILING GRID
3
3
14-Feb-13
18-Feb-13
PRB188600
MEPS DROPS TO GRID
5
5
19-Feb-13
25-Feb-13
PRB188610
INSTALL MILLWORK
5
5
19-Feb-13
25-Feb-13
PRB188620
INSTALL CEILING TILE
2
2
26-Feb-13
27-Feb-13
PRB188630
MEPS TRIM WALLS/CEILINGS
5
5
28-Feb-13
06-Mar-13
PRB188640
PREP/CLEAN/SEAL FLOORS
5
5
07-Mar-13
13-Mar-13
PRB188650
VCT/CARPET FLOORING & BASE
3
3
14-Mar-13
18-Mar-13
PRB188660
INSTALL DOORS & HARDWARE
5
5
19-Mar-13
25-Mar-13
PRB188670
OWNER SIGNAGE
5
5
26-Mar-13
01-Apr-13
PRB188680
CONTRACTOR CLEAN & PUNCHLIST
5
5
02-Apr-13
08-Apr-13
PRB190380
OWNER PUNCH AND FINAL
5
5
09-Apr-13
15-Apr-13
SELF-SERVE BEVERAGE CENTER (1114)
36
36
14-Jan-13
04-Mar-13
WPRB291410
FRAME WALLS/DOOR FRAMES
2
2
14-Jan-13
15-Jan-13
WPRB291420
MEPS ROUGH-IN WALLS/BACKING
5
5
16-Jan-13
22-Jan-13
WPRB291430
DRYWALL & TAPE WALLS
6
6
23-Jan-13
30-Jan-13
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 39 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
WPRB291450
FRP/STAINLESS STEEL WALL COVERING
1
1
31-Jan-13
31-Jan-13
WPRB291440
INSTALL QUARRY TILE FLOOR
3
3
01-Feb-13
05-Feb-13
WPRB291460
INSTALL CEILING GRID
1
1
06-Feb-13
06-Feb-13
WPRB291470
MEPS DROP TO GRID
2
2
07-Feb-13
08-Feb-13
WPRB291480
INSTALL FOOD SERVICE EQUIPMENT
5
5
11-Feb-13
15-Feb-13
WPRB291500
MEPS WALL/CEILING TRIM
2
2
12-Feb-13
13-Feb-13
WPRB291520
INSTALL FLOORING
2
2
14-Feb-13
15-Feb-13
WPRB291490
INSTALL CEILING TILE
1
1
18-Feb-13
18-Feb-13
WPRB291530
INSTALL OWNER SIGNAGE
5
5
18-Feb-13
22-Feb-13
WPRB291540
CONTRACTOR CLEAN & PUNCHLIST
5
5
18-Feb-13
22-Feb-13
WPRB291545
OWNER PUNCH AND FINAL
5
5
25-Feb-13
01-Mar-13
WPRB291550
HEALTH DEPARTMENT INSPECTION
PUBLIC RESTROOMS (1120) / (1121) / JANITOR (1122)
1
1
04-Mar-13
04-Mar-13
70
70
14-Jan-13
19-Apr-13
CARB1993240
FRAME METAL STUD WALLS/DOOR FRAMES
5
5
14-Jan-13
18-Jan-13
CARB1993250
MEPS WALL ROUGH-IN/BACKING
15
15
16-Jan-13
05-Feb-13
CARB1993260
DRYWALL RIPPER
1
1
21-Jan-13
21-Jan-13
CARB1993270
FRAME CEILINGS & SOFFITS
5
5
21-Jan-13
25-Jan-13
CARB1993280
MEPS DROPS TO CEILING & SOFFITS
5
5
24-Jan-13
30-Jan-13
CARB1993290
DRYWALL WALLS/CEILINGS
5
5
31-Jan-13
06-Feb-13
CARB1993292
TAPE / PAINT WALLS/CEILINGS
10
10
07-Feb-13
20-Feb-13
CARB1993293
INSTALL SUB-TOPS
5
5
21-Feb-13
27-Feb-13
CARB1993294
INSTALL TILE FLOORING/WALLS/COUNTERTOPS
15
15
28-Feb-13
20-Mar-13
CARB1993320
INSTALL PLUMBING FIXTURES
10
10
14-Mar-13
27-Mar-13
CARB1993330
INSTALL TOILET PARTITIONS & ACCESSORIES
5
5
28-Mar-13
03-Apr-13
CARB1993340
MEPS TRIM WALLS/CEILING
5
5
04-Apr-13
10-Apr-13
CARB1993360
HANG DOORS & HARDWARE
2
2
04-Apr-13
05-Apr-13
CARB1993380
OWNER SIGNAGE
5
5
08-Apr-13
12-Apr-13
CARB1993390
CONTRACTOR CLEAN & PUNCHLIST
5
5
08-Apr-13
12-Apr-13
CARB1993395
OWNER PUNCH & FINAL
5
5
15-Apr-13
19-Apr-13
71
71
21-Jan-13
29-Apr-13
5
5
21-Jan-13
25-Jan-13
NORTH ENTRY VESTIBULE (1125) CARB1988340
FRAME METAL STUD WALLS / CEILINGS
CARB1988350
MEPS WALL ROUGH-IN/BACKING
7
7
24-Jan-13
01-Feb-13
CARB1989101
DRYWALL WALLS & CEILINGS
10
10
04-Feb-13
15-Feb-13
CARB1989102
TAPE/PAINT WALLS & CEILINGS
6
6
18-Feb-13
25-Feb-13
CARB1989103
INSTALL STOREFRONT MULLIONS & GLASS
10
10
26-Feb-13
11-Mar-13
CARB1989190
MEPS DROPS TO CEILING & SOFFITS
5
5
12-Mar-13
18-Mar-13
CARB1989210
INSTALL MILLWORK/SPECIAL FINISHES
5
5
19-Mar-13
25-Mar-13
CARB1989220
INSTALL FLOORING
5
5
26-Mar-13
01-Apr-13
CARB1989230
MEPS TRIM WALLS/CEILING/SURVEILANCE
5
5
02-Apr-13
08-Apr-13
CARB1989270
OWNER SIGNAGE
5
5
09-Apr-13
15-Apr-13
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 40 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
TASK filter: All Activities Activity ID
Activity Name
CARB1989280
CONTRACTOR CLEAN & PUNCHLIST
CARB1989285
OWNER PUNCH & FINAL
MAIN BANK (1128)/(1130) / CASHIERS (1131)/ CAGE (1127)/COUNT ROOM (1202) / MAN TRAPS (1203) & (1129)
Orig Dur
Rem Dur
Start
5
5
16-Apr-13
Finish 22-Apr-13
5
5
23-Apr-13
29-Apr-13
87
87
21-Jan-13
21-May-13
CARB1988320
FRAME METAL STUD WALLS/DOOR FRAMES
10
10
21-Jan-13
01-Feb-13
CARB1988330
MEPS WALL ROUGH-IN/BACKING
15
15
28-Jan-13
15-Feb-13
CARB1989070
FRAME/SECURITY MESH - CEILINGS & SOFFITS
7
7
11-Feb-13
19-Feb-13
CARB1989080
MEPS DROPS TO CEILING & SOFFITS
10
10
20-Feb-13
05-Mar-13
CARB1989090
DRYWALL WALLS & CEILINGS
10
10
27-Feb-13
12-Mar-13
CARB1989092
TAPE/PAINT WALLS & CEILINGS
10
10
06-Mar-13
19-Mar-13
CARB1989100
INSTALL MILLWORK/SPECIAL FINISHES
10
10
13-Mar-13
26-Mar-13
CARB1989110
INSTALL FLOORING
10
10
27-Mar-13
09-Apr-13
CARB1989120
MEPS TRIM WALLS/CEILING/SURVEILANCE
10
10
03-Apr-13
16-Apr-13
CARB1989130
ROUGH-IN FOR OWNER DATA STATIONS
10
10
03-Apr-13
16-Apr-13
CARB1989140
HANG DOORS & HARDWARE
5
5
03-Apr-13
09-Apr-13
CARB1989150
INSTALL CARPET
5
5
10-Apr-13
16-Apr-13
CARB1989160
OWNER SIGNAGE
5
5
17-Apr-13
23-Apr-13
CARB1989165
INSTALL AND TEST OWNER DATA EQUIPMENT
15
15
17-Apr-13
07-May-13
CARB1989170
CONTRACTOR CLEAN & PUNCHLIST
10
10
24-Apr-13
07-May-13
CARB1989175
OWNER PUNCH & FINAL
10
10
08-May-13
21-May-13
65
65
28-Jan-13
26-Apr-13
PERS82650
FRAME METAL STUD WALLS/DOOR FRAMES
5
5
28-Jan-13
01-Feb-13
PERS82660
MEP WALL ROUGH-IN / BACKING
3
3
01-Feb-13
05-Feb-13
PERS82670
DRYWALL
3
3
06-Feb-13
08-Feb-13
PERS82672
TAPE / PAINT WALL
5
5
11-Feb-13
15-Feb-13
PERS82680
INSTALL FAN COIL
2
2
18-Feb-13
19-Feb-13
PERS82690
FORM/REBAR/POUR HOUSEKEEPING PADS
2
2
20-Feb-13
21-Feb-13
PERS82700
SET MAJOR EQUIPMENT
5
5
22-Feb-13
28-Feb-13
PERS82710
DOORS & HARDWARE
2
2
01-Mar-13
04-Mar-13
PERS82720
PULL & TERMINATE FEEDERS
10
10
05-Mar-13
18-Mar-13
PERS82725
HOOK-UP EQUIPMENT / TAGGING / LABELING
25
25
12-Mar-13
15-Apr-13
PERS82730
MEPS TRIM
3
3
11-Apr-13
15-Apr-13
PERS82750
CLEAN & SEAL FLOOR
2
2
16-Apr-13
17-Apr-13
PERS82760
OWNER SIGNAGE
2
2
18-Apr-13
19-Apr-13
PERS83250
CONTRACTOR CLEAN & PUNCHLIST
5
5
22-Apr-13
26-Apr-13
ELEC. NORTH (1204) / SECURITY DISPATCH (1205)
76
76
28-Jan-13
13-May-13
PRB188270
FRAME METAL STUDS WALLS/DOOR FRAMES
3
3
28-Jan-13
30-Jan-13
PRB188380
MEPS WALL ROUGH-IN/BACKING
7
7
31-Jan-13
08-Feb-13
PRB188400
FRAME CEILINGS & SOFFITS
5
5
11-Feb-13
15-Feb-13
PRB188410
MEPS DROPS TO CEILING & SOFFITS
8
8
14-Feb-13
25-Feb-13
PRB188420
DRYWALL WALLS/CEILINGS
5
5
22-Feb-13
28-Feb-13
PLAYER'S CLUB (1206) / CLUB STO (1208) / MARKETING MANAGER/IDF/ CARD & DICE (1209)
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 41 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
8
8
01-Mar-13
12-Mar-13
PRB188422
TAPE/PAINT WALLS/CEILINGS
PRB188424
INSTALL FAN COIL
2
2
13-Mar-13
14-Mar-13
PRB188430
INSTALL MILLWORK/SPECIAL FINISHES
10
10
15-Mar-13
28-Mar-13
PRB188442
INSTALL OWNER RACKS / EQUIPMENT (IDF)
2
2
15-Mar-13
18-Mar-13
PRB188444
PUNCH DOWN / PROGRAMMING - EQUIPMENT (IDF)
20
20
19-Mar-13
15-Apr-13
PRB188440
INSTALL STONE TOPS
2
2
29-Mar-13
01-Apr-13
PRB188450
MEPS TRIM WALLS/CEILING
5
5
09-Apr-13
15-Apr-13
PRB188460
ROUGH-IN FOR OWNER DATA STATIONS
5
5
09-Apr-13
15-Apr-13
PRB188470
HANG DOORS & HARDWARE
5
5
09-Apr-13
15-Apr-13
PRB188480
INSTALL CARPET
5
5
16-Apr-13
22-Apr-13
PRB188490
OWNER SIGNAGE
5
5
23-Apr-13
29-Apr-13
PRB188500
CONTRACTOR CLEAN & PUNCHLIST
5
5
30-Apr-13
06-May-13
PRB190400
OWNER PUNCH AND FINAL
5
5
07-May-13
13-May-13
FINISHES (CASINO BARGE)
150
150
16-Nov-12
13-Jun-13
CASINO GAMING FLOOR (1100)
150
150
16-Nov-12
13-Jun-13
CARB190040
MEPS ROUGH-IN WALLS/BACKING
10
10
16-Nov-12
03-Dec-12
CARB190050
DRYWALL RIPPER AT CEILINGS AND SOFFITS
5
5
14-Dec-12
20-Dec-12
CARB190060
FRAME HARD LID SOFFITS AND CEILINGS
15
15
14-Dec-12
08-Jan-13
CARB190062
MEPS / SECURITY / SURVEILLANCE DROPS
20
20
21-Dec-12
22-Jan-13
CARB190070
DRYWALL WALLS, SOFFITS AND CEILINGS
10
10
09-Jan-13
22-Jan-13
CARB190080
TAPE/PAINT WALLS, SOFFITS AND CEILINGS
15
15
16-Jan-13
05-Feb-13
CARB190090
INSTALL MILLWORK / RAILING / THEMING / PIT CANOPIES
40
40
23-Jan-13
19-Mar-13
CARB190100
INSTALL CEILING GRID
15
15
30-Jan-13
19-Feb-13
CARB190110
MEPS DROPS TO CEILING
15
15
06-Feb-13
26-Feb-13
CARB190120
PULL ELECTRICAL / LOW VOLTAGE TO SLOT BASES
15
15
06-Feb-13
26-Feb-13
CARB190130
INSTALL CEILING TILE
10
10
20-Feb-13
05-Mar-13
CARB190140
MEPS TRIM/DL FIXTURES AND OWNER SIGNAGE - CASINO
15
15
27-Feb-13
19-Mar-13
CARB190150
INSTALL CARPET FLOORING
10
10
14-Mar-13
27-Mar-13
CARB190160
INSTALL SLOT BASES/TERMINATE DATA AND POWER
15
15
21-Mar-13
10-Apr-13
CARB190170
INSTALL SLOTS AND SLOT SIGNAGE / PROGRAMMING
30
30
04-Apr-13
15-May-13
CARB190180
CONTRACTOR CLEAN & PUNCHLIST
10
10
16-May-13
30-May-13
CARB190175
TEST & BALANCE
15
15
16-May-13
06-Jun-13
CARB190190
OWNER PUNCH & FINAL - CASINO
10
10
31-May-13
13-Jun-13
86
86
02-Jan-13
01-May-13
CBF400
FRAME RAISED FLOOR @ CENTER BAR
5
5
02-Jan-13
08-Jan-13
CBF410
METAL DECK / MEP ROUGH-IN RAISED FLOOR @ CENTER BAR
5
5
09-Jan-13
15-Jan-13
CBF420
REBAR & POUR RAISED FLOOR SLAB @ CENTER BAR
2
2
16-Jan-13
17-Jan-13
CBF430
FRAME WALLS & CEILINGS
3
3
18-Jan-13
22-Jan-13
CBF470
SET BAR DIE WALL
3
3
18-Jan-13
22-Jan-13
CASINO BAR (1102) / SERVER STATIONS (1103) / (1104)
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 42 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
10
10
23-Jan-13
Finish
CBF440
MEPS ROUGH-IN - WALLS & CEILINGS
CBF480
WATERPROOF / QUARRY TILE BEHIND DIE WALL
5
5
23-Jan-13
29-Jan-13
CBF490
SEATING AREA MILLWORK / FRONT & BACK BARS
15
15
30-Jan-13
19-Feb-13
CBF450
DRYWALL & TAPE WALLS
8
8
05-Feb-13
14-Feb-13
CBF460
PAINT WALLS / INSTALL FRP
5
5
15-Feb-13
21-Feb-13
CBF500
INSTALL FRP BEHIND DIE WALL
2
2
22-Feb-13
25-Feb-13
CBF510
SET & HOOK UP BAR/SERVICE BARS EQUIPMENT
15
15
26-Feb-13
18-Mar-13
CBF520
SEATING AREA SPECIAL FINISHES
15
15
26-Feb-13
18-Mar-13
CBF530
INSTALL STONE TOP AT BAR
2
2
19-Mar-13
20-Mar-13
CBF540
SEATING AREA CARPET & STONE FLOORING
10
10
19-Mar-13
01-Apr-13
CBF550
SEATING AREA MISC. METALS & HANDRAILS
10
10
26-Mar-13
08-Apr-13
CBF560
MEPS WALL/CEILING TRIM
5
5
09-Apr-13
15-Apr-13
CBF570
CONTRACTOR CLEAN & PUNCHLIST
5
5
16-Apr-13
22-Apr-13
CBF580
OWNER PUNCH & FINAL
5
5
23-Apr-13
29-Apr-13
CBF590
HEALTH DEPARTMENT INSPECTION
FINISHES (TOWER FOOTPRINT) TOWER LEVEL 1 FRONT DESK (1212) / CHECK IN / HOTEL ADMIN. (1211) / FIRE COMMAND
05-Feb-13
2
2
30-Apr-13
01-May-13
174
174
20-Sep-12
22-May-13
161
161
09-Oct-12
22-May-13
150
150
09-Oct-12
06-May-13
CARB194890
FRAME METAL STUD WALLS/COLUMNS/DOOR FRAMES
7
7
09-Oct-12
18-Oct-12
CARB194900
MEPS WALL ROUGH-IN/BACKING
15
15
11-Oct-12
01-Nov-12
CARB194910
DRYWALL RIPPER
2
2
22-Oct-12
24-Oct-12
CARB194920
FRAME CEILINGS / SOFFITS / COFFERS
15
15
22-Oct-12
12-Nov-12
CARB194930
MEPS DROPS TO CEILINGS / SOFFITS / COFFERS
15
15
05-Nov-12
28-Nov-12
CARB194933
DRYWALL-WALLS/CEILINGS
10
10
28-Nov-12
11-Dec-12
CARB194934
INSTALL TEMP. ENTRY DOORS
5
5
12-Dec-12
18-Dec-12
CARB194936
TAPE/PAINT/VWC -WALLS/CEILING
15
15
19-Dec-12
11-Jan-13
CARB194937
INSTALL FIRE COMMAND PANELS
2
2
14-Jan-13
15-Jan-13
CARB194942
INSTALL DIE WALL AT REGISTRATION COUNTER
5
5
16-Jan-13
22-Jan-13
CARB194938
TERMINATE & HOOK-UP FIRE COMMAND PANELS
10
10
16-Jan-13
29-Jan-13
CARB194943
INSTALL CEILING GRID
3
3
23-Jan-13
25-Jan-13
CARB194944
MEPS DROPS TO CEILING GRID
5
5
28-Jan-13
01-Feb-13
CARB194946
PROGRAMMING AT FIRE COMMAND PANELS
30
30
28-Jan-13
08-Mar-13
CARB194948
INSTALL STONE FLOORING
15
15
04-Feb-13
22-Feb-13
CARB194950
INSTALL MILLWORK / COLUMN WRAPS / REGISTRATION DESK
20
20
25-Feb-13
22-Mar-13
CARB194949
INSTALL VESTIBULE GLASS & DOORS / AUTOMATIC CLOSERS
15
15
25-Feb-13
15-Mar-13
CARB194952
INSTALL SPECIAL FINISHES
30
30
11-Mar-13
19-Apr-13
CARB194960
MEPS TRIM WALLS/CEILING
15
15
25-Mar-13
12-Apr-13
CARB194955
ROUGH-IN DATA STATIONS AT REGISTRATION DESK
10
10
25-Mar-13
05-Apr-13
CARB194970
INSTALL CARPET & BASE
5
5
12-Apr-13
18-Apr-13
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 43 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
TASK filter: All Activities Activity ID
Activity Name
Orig Dur
Rem Dur
Start
Finish
CARB194980
HANG DOORS & HARDWARE
5
5
16-Apr-13
22-Apr-13
CARB194990
OWNER SIGNAGE
5
5
16-Apr-13
22-Apr-13
CARB194995
CONTRACTOR CLEAN & PUNCHLIST
5
5
23-Apr-13
29-Apr-13
PRB189045
OWNER PUNCH AND FINAL
5
5
30-Apr-13
06-May-13
137
137
18-Oct-12
29-Apr-13
7
7
18-Oct-12
29-Oct-12
EVENT CENTER PREFUNCTION (1220) /PASS. ELEVATOR LOBBY / VESTIBULE (1200) CARB194935
FRAME METAL STUD WALLS/COLUMNS/DOOR FRAMES
CARB194940
INSTALL ELEVATOR FRONTS
7
7
29-Oct-12
07-Nov-12
CARB194941
MEPS WALL ROUGH-IN/BACKING
10
10
07-Nov-12
21-Nov-12
CARB194945
FRAME CEILINGS / SOFFITS / COFFERS
10
10
19-Nov-12
05-Dec-12
CARB194947
MEPS DROPS TO CEILINGS / SOFFITS / COFFERS
15
15
28-Nov-12
19-Dec-12
CARB194953
DRYWALL-WALLS/CEILINGS
8
8
17-Dec-12
31-Dec-12
CARB194956
TAPE/PAINT/VWC -WALLS/CEILING
15
15
31-Dec-12
22-Jan-13
CARB194963
INSTALL CEILING GRID
3
3
22-Jan-13
25-Jan-13
CARB194964
MEPS DROPS TO CEILING GRID
5
5
25-Jan-13
01-Feb-13
CARB194968
INSTALL STONE FLOORING
10
10
01-Feb-13
15-Feb-13
CARB195040
INSTALL MILLWORK / COLUMN WRAPS
20
20
15-Feb-13
15-Mar-13
CARB195042
INSTALL SPECIAL FINISHES
30
30
15-Feb-13
29-Mar-13
CARB195050
MEPS TRIM WALLS/CEILING
15
15
15-Mar-13
05-Apr-13
CARB195060
INSTALL CARPET & BASE
5
5
04-Apr-13
11-Apr-13
CARB195070
HANG DOORS & HARDWARE
5
5
08-Apr-13
15-Apr-13
CARB195080
OWNER SIGNAGE
5
5
08-Apr-13
15-Apr-13
CARB195082
CONTRACTOR CLEAN & PUNCHLIST
5
5
15-Apr-13
22-Apr-13
PRB189055
OWNER PUNCH AND FINAL
5
5
22-Apr-13
29-Apr-13
147
147
29-Oct-12
22-May-13
EVENT CENTER BUS BAR CARB194965
FRAME METAL STUD WALLS/COLUMNS/CEILINGS
4
4
29-Oct-12
02-Nov-12
CARB194966
MEPS WALL ROUGH-IN/BACKING
10
10
02-Nov-12
16-Nov-12
CARB194973
DRYWALL-WALLS/COLUMNS
8
8
16-Nov-12
30-Nov-12
CARB194976
TAPE/PAINT
7
7
30-Nov-12
11-Dec-12
CBF680
SET BAR DIE WALL
4
4
11-Dec-12
17-Dec-12
CBF682
INSTALL EVENT CENTER ENTRY - STOREFRONT GLASS
20
20
17-Dec-12
17-Jan-13
CBF685
INSTALL BUS FACADE
10
10
10-Jan-13
24-Jan-13
CBF700
QUARRY TILE BEHIND DIE WALL
4
4
24-Jan-13
30-Jan-13
CBF705
PULL SODA / BEVERAGE LINES (OWNER)
2
2
30-Jan-13
01-Feb-13
CBF715
INSTALL FRP BEHIND DIE WALL
2
2
31-Jan-13
04-Feb-13
CBF730
MILLWORK / FRONT & BACK BARS
15
15
04-Feb-13
25-Feb-13
CBF760
SET & HOOK UP BAR EQUIPMENT
20
20
25-Feb-13
25-Mar-13
CBF790
INSTALL STONE TOPS AT BAR
5
5
25-Mar-13
01-Apr-13
CBF795
INSTALL SPECIAL FINISHES
30
30
25-Mar-13
06-May-13
CBF800
MEPS TRIM
5
5
29-Apr-13
06-May-13
CBF810
CONTRACTOR CLEAN & PUNCHLIST
5
5
06-May-13
13-May-13
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 44 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
TASK filter: All Activities Activity ID
Activity Name
CBF830
OWNER PUNCH & FINAL
CBF840
HEALTH DEPARTMENT INSPECTION
PUBLIC RESTROOMS (1237) / (1239) / (1241)
Orig Dur
Rem Dur
Start
Finish
5
5
13-May-13
20-May-13
2
2
20-May-13
22-May-13
89
89
29-Oct-12
01-Mar-13
CARB192240
FRAME METAL STUD WALLS/DOOR FRAMES
5
5
29-Oct-12
05-Nov-12
CARB192250
MEPS WALL ROUGH-IN/BACKING
10
10
01-Nov-12
15-Nov-12
CARB192260
DRYWALL RIPPER
2
2
15-Nov-12
19-Nov-12
CARB192270
FRAME CEILINGS & SOFFITS
5
5
19-Nov-12
28-Nov-12
CARB192280
MEPS DROPS TO CEILING & SOFFITS
5
5
28-Nov-12
05-Dec-12
CARB192290
DRYWALL-WALLS/CEILINGS
5
5
05-Dec-12
12-Dec-12
CARB192295
TAPE/PAINT-WALLS/CEILINGS
7
7
12-Dec-12
21-Dec-12
CARB192300
INSTALL MILLWORK SUB-TOPS
3
3
21-Dec-12
28-Dec-12
CARB192310
INSTALL TILE FLOORING/WALLS/COUNTERTOPS
12
12
26-Dec-12
14-Jan-13
CARB192320
INSTALL PLUMBING FIXTURES
10
10
14-Jan-13
28-Jan-13
CARB192330
INSTALL TOILET PARTITIONS & ACCESSORIES
5
5
28-Jan-13
04-Feb-13
CARB192340
MEPS TRIM WALLS/CEILING
5
5
04-Feb-13
11-Feb-13
CARB192360
HANG DOORS & HARDWARE
2
2
11-Feb-13
13-Feb-13
CARB192380
OWNER SIGNAGE
2
2
13-Feb-13
15-Feb-13
PRB189050
CONTRACTOR CLEAN & PUNCHLIST
5
5
15-Feb-13
22-Feb-13
PRB189065
OWNER PUNCH AND FINAL
5
5
22-Feb-13
01-Mar-13
72
72
29-Oct-12
06-Feb-13
PRB188520
FRAME WALLS/DOOR FRAMES
2
2
29-Oct-12
31-Oct-12
PRB188890
MEPS ROUGH-IN WALLS/BACKING
5
5
31-Oct-12
07-Nov-12
PRB188930
DRYWALL
5
5
07-Nov-12
14-Nov-12
PRB188935
TAPE & PAINT
7
7
14-Nov-12
27-Nov-12
PRB188940
INSTALL DIE WALL
2
2
27-Nov-12
29-Nov-12
PRB188945
INSTALL QUARRY TILE
3
3
29-Nov-12
04-Dec-12
PRB188950
INSTALL MILLWORK
5
5
04-Dec-12
11-Dec-12
PRB188960
INSTALL STONE FLOORING
3
3
11-Dec-12
14-Dec-12
PRB188965
INSTALL REFRIGERATED DISPLAY CASES
5
5
14-Dec-12
21-Dec-12
PRB188970
INSTALL FOOD SERVICE EQUIPMENT
12
12
21-Dec-12
11-Jan-13
PRB188980
MEPS TRIM
3
3
04-Jan-13
09-Jan-13
PRB189010
INSTALL CARPET
5
5
09-Jan-13
16-Jan-13
PRB189020
INSTALL OWNER SIGNAGE
5
5
09-Jan-13
16-Jan-13
PRB189030
CONTRACTOR CLEAN & PUNCHLIST
5
5
16-Jan-13
23-Jan-13
PRB189035
OWNER PUNCH AND FINAL
5
5
23-Jan-13
30-Jan-13
PRB189040
HEALTH DEPARTMENT INSPECTION
5
5
30-Jan-13
06-Feb-13
CAFE (1242) / CAFE BOH (1243)
58
58
05-Nov-12
24-Jan-13
PRBS84350
FRAME METAL STUD WALLS/DOOR FRAMES
3
3
05-Nov-12
08-Nov-12
PRBS84360
MEPS WALL ROUGH-IN/BACKING
7
7
08-Nov-12
19-Nov-12
PRBS84370
DRYWALL
5
5
19-Nov-12
28-Nov-12
BOH CIRCULATION (1245) / EMPLOYEE ENTRY / SERVICE ELEVATOR LOBBY
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 45 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
TASK filter: All Activities Activity ID
Activity Name
Orig Dur
Rem Dur
Start
Finish
PRBS84380
TAPE & PAINT
7
7
19-Nov-12
30-Nov-12
PRBS84390
INSTALL CEILING GRID
3
3
29-Nov-12
04-Dec-12
PRBS84400
MEPS DROPS TO GRID
5
5
04-Dec-12
11-Dec-12
PRBS84440
INSTALL CEILING TILE
3
3
11-Dec-12
14-Dec-12
PRBS84450
MEPS TRIM WALLS/CEILING
5
5
14-Dec-12
21-Dec-12
PRBS84460
VCT FLOORING & BASE
3
3
21-Dec-12
28-Dec-12
PRBS84470
INSTALL DOORS & HARDWARE
3
3
28-Dec-12
03-Jan-13
PRBS84490
OWNER SIGNAGE
5
5
03-Jan-13
10-Jan-13
PRBS84500
CONTRACTOR CLEAN & PUNCHLIST
5
5
10-Jan-13
17-Jan-13
PRBS84800
OWNER PUNCH AND FINAL
TRASH RECYCLING (1247) RECEIVING (1430) / REC. OFFICE(1429)/LIQ.STORAGE (1428)
5
5
17-Jan-13
24-Jan-13
112
112
08-Nov-12
15-Apr-13
PRBB88690
FRAME METAL STUD WALLS/DOOR FRAMES / TUBE STEEL SUPPORTS
5
5
08-Nov-12
15-Nov-12
PRBB89050
MEPS WALL ROUGH-IN/BACKING
10
10
14-Nov-12
30-Nov-12
PRBB89060
DRYWALL
7
7
21-Nov-12
04-Dec-12
PRBB89070
TAPE & PAINT
10
10
04-Dec-12
18-Dec-12
PRBB89072
INSTALL ROLL-UP DOORS
7
7
18-Dec-12
31-Dec-12
PRBB89074
INSTALL DOCK LEVELERS
5
5
31-Dec-12
08-Jan-13
PRBB89075
INSTALL TRASH COMPACTOR AT TRASH RECYCLING
10
10
08-Jan-13
22-Jan-13
PRBB89076
INSTALL FRP AT LIQUOR STORAGE / SODA ROOM / JANITOR CLOSET
10
10
15-Jan-13
29-Jan-13
PRBB89077
INSTALL MOP SINK / RACK AT JANITOR CLOSET
5
5
29-Jan-13
05-Feb-13
PRBB89080
INSTALL CEILING GRID
7
7
05-Feb-13
14-Feb-13
PRBB89090
MEPS DROPS TO GRID
10
10
07-Feb-13
21-Feb-13
PRBB89100
INSTALL CEILING TILE
5
5
21-Feb-13
28-Feb-13
PRBB89110
MEPS TRIM WALLS/CEILING
10
10
21-Feb-13
07-Mar-13
PRBB89120
VCT FLOORING & BASE
5
5
07-Mar-13
14-Mar-13
PRBB89130
PREP / CLEAN / SEAL CONCRETE FLOORS
2
2
14-Mar-13
18-Mar-13
PRBB89140
INSTALL DOORS & HARDWARE
5
5
18-Mar-13
25-Mar-13
PRBS84540
OWNER SIGNAGE
5
5
25-Mar-13
01-Apr-13
PRBS84620
CONTRACTOR CLEAN & PUNCHLIST
5
5
01-Apr-13
08-Apr-13
PRBS84820
OWNER PUNCH AND FINAL
TOWER MEZZ LEVEL
5
5
08-Apr-13
15-Apr-13
81
81
20-Sep-12
10-Jan-13
60
60
20-Sep-12
12-Dec-12
PRBS81090
FRAME METAL STUD WALLS/DOOR FRAMES
3
3
20-Sep-12
24-Sep-12
PRBS81100
MEPS WALL ROUGH-IN/BACKING
5
5
25-Sep-12
01-Oct-12
PRBS81110
DRYWALL
3
3
02-Oct-12
04-Oct-12
PRBS81115
TAPE & PAINT
7
7
05-Oct-12
15-Oct-12
PRBS81120
INSTALL CEILING GRID
5
5
16-Oct-12
22-Oct-12
PRBS81130
MEPS DROPS TO GRID
5
5
19-Oct-12
25-Oct-12
PRBS81160
INSTALL CEILING TILE
2
2
26-Oct-12
29-Oct-12
PRBS81170
MEPS TRIM WALLS/CEILING
5
5
30-Oct-12
05-Nov-12
WAREHOUSE & EVENT CENTER STORAGE / MAINTENANCE / SERVICE ELEVATOR LOBBY
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 46 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
PRBS81180
PREP/CLEAN/SEAL FLOORS
5
5
06-Nov-12
12-Nov-12
PRBS81190
VCT/ FLOORING & BASE
5
5
13-Nov-12
19-Nov-12
PRBS81200
INSTALL DOORS & HARDWARE
3
3
20-Nov-12
26-Nov-12
PRBS81210
OWNER SIGNAGE
2
2
27-Nov-12
28-Nov-12
PRBS81220
CONTRACTOR CLEAN & PUNCHLIST
5
5
29-Nov-12
05-Dec-12
PRBS81320
OWNER PUNCH AND FINAL
5
5
06-Dec-12
12-Dec-12
58
58
25-Sep-12
13-Dec-12
PRBS81140
FRAME METAL STUD WALLS
2
2
25-Sep-12
26-Sep-12
PRBS81150
MEPS WALL ROUGH-IN/BACKING
5
5
27-Sep-12
03-Oct-12
PRBS81230
INSTALL WALK-IN COOLERS
10
10
04-Oct-12
17-Oct-12
PRBS81235
INSTALL QUARRY TILE AT WALK-IN COOLERS
7
7
18-Oct-12
26-Oct-12
PRBS81240
INSTALL CEILING GRID
5
5
29-Oct-12
02-Nov-12
PRBS81250
MEPS DROPS TO GRID
5
5
05-Nov-12
09-Nov-12
PRBS81260
INSTALL CEILING TILE
2
2
12-Nov-12
13-Nov-12
PRBS81270
MEPS TRIM WALLS/CEILING
5
5
14-Nov-12
20-Nov-12
PRBS81280
CONTRACTOR CLEAN & PUNCHLIST
5
5
21-Nov-12
29-Nov-12
PRBS81330
OWNER PUNCH AND FINAL
5
5
30-Nov-12
06-Dec-12
PRBS81340
HEALTH DEPT. INSPECTION
5
5
07-Dec-12
13-Dec-12
76
76
27-Sep-12
10-Jan-13
WALK-IN COOLER #1 & #2
BOH RESTROOMS (M451) / (M452) CARB192630
FRAME METAL STUD WALLS/DOOR FRAMES
3
3
27-Sep-12
01-Oct-12
CARB192640
MEPS WALL ROUGH-IN/BACKING
8
8
28-Sep-12
09-Oct-12
CARB192650
FRAME CEILINGS & SOFFITS
5
5
10-Oct-12
16-Oct-12
CARB192660
MEPS DROPS TO CEILING & SOFFITS
5
5
17-Oct-12
23-Oct-12
CARB192670
DRYWALL-WALLS/CEILINGS
5
5
24-Oct-12
30-Oct-12
CARB192680
TAPE/PAINT-WALLS/CEILINGS
7
7
31-Oct-12
08-Nov-12
CARB192690
INSTALL SUB-TOPS
2
2
09-Nov-12
12-Nov-12
CARB192700
INSTALL TILE FLOORING/WALLS/COUNTERTOPS IN RESTROOMS
10
10
13-Nov-12
28-Nov-12
CARB192710
INSTALL PLUMBING FIXTURES
5
5
29-Nov-12
05-Dec-12
CARB192720
INSTALL TOILET PARTITIONS & ACCESSORIES
5
5
06-Dec-12
12-Dec-12
CARB192730
MEPS TRIM WALLS/CEILING
5
5
13-Dec-12
19-Dec-12
CARB192740
HANG DOORS & HARDWARE
2
2
20-Dec-12
21-Dec-12
CARB192750
OWNER SIGNAGE
1
1
26-Dec-12
26-Dec-12
PERS121280
CONTRACTOR CLEAN & PUNCHLIST
5
5
27-Dec-12
03-Jan-13
PERS122280
OWNER PUNCHLIST
5
5
04-Jan-13
10-Jan-13
139
139
11-Oct-12
23-Apr-13
82
82
11-Oct-12
01-Feb-13
TOWER LEVEL 2 ELECTRICAL ROOM (2209) ELES110250
FRAME METAL STUD WALLS/DOOR FRAMES
1
1
11-Oct-12
11-Oct-12
ELES111250
MEP WALL ROUGH-IN / BACKING
2
2
12-Oct-12
15-Oct-12
ELES112250
DRYWALL
5
5
16-Oct-12
22-Oct-12
ELES112260
TAPE
5
5
23-Oct-12
29-Oct-12
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 47 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
ELES113250
INSTALL / HOOK-UP FAN COIL
5
5
30-Oct-12
05-Nov-12
ELES114250
FORM/REBAR/POUR HOUSEKEEPING PADS
2
2
06-Nov-12
07-Nov-12
ELES115250
SET EQUIPMENT
2
2
15-Nov-12
16-Nov-12
ELES116250
DOORS & HARDWARE
1
1
19-Nov-12
19-Nov-12
ELES117250
PULL FEEDERS / HOOK-UP EQUIPMENT/TAGGING
30
30
20-Nov-12
07-Jan-13
ELES118250
PERMANENT LIGHTING/MEPS TRIM
3
3
08-Jan-13
10-Jan-13
ELES119250
CLEAN & SEAL FLOOR
5
5
11-Jan-13
17-Jan-13
ELES120250
OWNER SIGNAGE
1
1
18-Jan-13
18-Jan-13
ELES121250
CONTRACTOR CLEAN & PUNCHLIST
5
5
21-Jan-13
25-Jan-13
ELES122250
OWNER PUNCH AND FINAL
SERVER ROOM/SOUND ROOMS/IT SUPERVISOR/MIS
5
5
28-Jan-13
01-Feb-13
102
102
12-Oct-12
04-Mar-13
PERS84250
FRAME METAL STUD WALLS/DOOR FRAMES
3
3
12-Oct-12
16-Oct-12
PERS85250
MEP WALL ROUGH-IN / BACKING
7
7
17-Oct-12
25-Oct-12
PERS86250
DRYWALL
5
5
26-Oct-12
01-Nov-12
PERS86300
TAPE
3
3
02-Nov-12
06-Nov-12
PERS87250
INSTALL / HOOK-UP FAN COIL
5
5
07-Nov-12
13-Nov-12
PERS88250
FORM/REBAR/POUR HOUSEKEEPING PADS
2
2
14-Nov-12
15-Nov-12
PERS88253
PAINT
3
3
16-Nov-12
20-Nov-12
PERS89250
SET EQUIPMENT / RACKS
10
10
21-Nov-12
06-Dec-12
PERS90250
DOORS & HARDWARE
2
2
07-Dec-12
10-Dec-12
PERS91250
PUNCH DOWN & PROGRAMMING
30
30
11-Dec-12
24-Jan-13
PERS92250
MEPS TRIM
5
5
25-Jan-13
31-Jan-13
PERS94250
CLEAN & SEAL FLOOR
10
10
01-Feb-13
14-Feb-13
PERS95250
OWNER SIGNAGE
2
2
15-Feb-13
18-Feb-13
PERS96250
CONTRACTOR CLEAN & PUNCHLIST
5
5
19-Feb-13
25-Feb-13
PRBS82370
OWNER PUNCH AND FINAL
5
5
26-Feb-13
04-Mar-13
SLOT MANAGER/TABLE MANGER / GAMING OPERATIONS
45
45
17-Oct-12
18-Dec-12
PRBS82090
FRAME METAL STUD WALLS/DOOR FRAMES
2
2
17-Oct-12
18-Oct-12
PRBS82100
MEPS WALL ROUGH-IN/BACKING
5
5
19-Oct-12
25-Oct-12
PRBS82110
DRYWALL
3
3
26-Oct-12
30-Oct-12
PRBS82115
TAPE & PAINT
7
7
31-Oct-12
08-Nov-12
PRBS82120
INSTALL CEILING GRID
1
1
09-Nov-12
09-Nov-12
PRBS82130
MEPS DROPS TO GRID
3
3
12-Nov-12
14-Nov-12
PRBS82160
INSTALL CEILING TILE
2
2
15-Nov-12
16-Nov-12
PRBS82170
MEPS TRIM WALLS/CEILING
5
5
19-Nov-12
27-Nov-12
PRBS82190
CARPET FLOORING & BASE
2
2
28-Nov-12
29-Nov-12
PRBS82200
INSTALL DOORS & HARDWARE
1
1
30-Nov-12
30-Nov-12
PRBS82210
OWNER SIGNAGE
2
2
03-Dec-12
04-Dec-12
PRBS82220
CONTRACTOR CLEAN & PUNCHLIST
5
5
05-Dec-12
11-Dec-12
PRBS82320
OWNER PUNCH AND FINAL
5
5
12-Dec-12
18-Dec-12
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 48 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
TASK filter: All Activities Activity ID
Activity Name
SURV STORAGE / SURV. ROOM / SERVER ROOM / SUPERVISOR OFFICE / STATE POLICE
Orig Dur
Rem Dur
Start
Finish
104
104
19-Oct-12
13-Mar-13
PERS84270
FRAME METAL STUD WALLS/DOOR FRAMES
2
2
19-Oct-12
22-Oct-12
PERS85270
MEP WALL ROUGH-IN / BACKING
7
7
23-Oct-12
31-Oct-12
PERS86270
DRYWALL
2
2
01-Nov-12
02-Nov-12
PERS86310
TAPE & PAINT
7
7
05-Nov-12
13-Nov-12
PERS86320
INSTALL CARPET & BASE
2
2
14-Nov-12
15-Nov-12
PERS87270
INSTALL/HOOK-UP FAN COILS
5
5
16-Nov-12
26-Nov-12
PERS89270
SET EQUIPMENT / RACKS
10
10
27-Nov-12
10-Dec-12
PERS90270
DOORS & HARDWARE
2
2
11-Dec-12
12-Dec-12
PERS91270
PUNCH DOWN & PROGRAMMING
40
40
13-Dec-12
11-Feb-13
PERS92270
MEPS TRIM
5
5
12-Feb-13
18-Feb-13
PERS93270
CLEAN & SEAL FLOOR
5
5
19-Feb-13
25-Feb-13
PERS94270
OWNER SIGNAGE
2
2
26-Feb-13
27-Feb-13
PERS95270
CONTRACTOR CLEAN & PUNCHLIST
5
5
28-Feb-13
06-Mar-13
PERS96270
OWNER PUNCH AND FINAL
MEN'S / WOMEN'S RESTROOMS
5
5
07-Mar-13
13-Mar-13
83
83
23-Oct-12
14-Feb-13
CARB192350
FRAME METAL STUD WALLS/DOOR FRAMES
3
3
23-Oct-12
25-Oct-12
CARB192370
MEPS WALL ROUGH-IN/BACKING
7
7
26-Oct-12
05-Nov-12
CARB192410
FRAME CEILINGS & SOFFITS
3
3
06-Nov-12
08-Nov-12
CARB192420
MEPS DROPS TO CEILING & SOFFITS
3
3
09-Nov-12
13-Nov-12
CARB192430
DRYWALL-WALLS/CEILINGS
5
5
14-Nov-12
20-Nov-12
CARB192440
TAPE/PAINT-WALLS/CEILINGS
10
10
21-Nov-12
06-Dec-12
CARB192450
INSTALL MILLWORK/SUB-TOPS
4
4
07-Dec-12
12-Dec-12
CARB192460
INSTALL TILE FLOORING/WALLS/COUNTERTOPS
10
10
13-Dec-12
28-Dec-12
CARB192470
INSTALL PLUMBING FIXTURES
7
7
31-Dec-12
09-Jan-13
CARB192480
INSTALL TOILET PARTITIONS & ACCESSORIES
5
5
10-Jan-13
16-Jan-13
CARB192485
INSTALL MIRRORS
5
5
17-Jan-13
23-Jan-13
CARB192490
MEPS TRIM WALLS/CEILING
5
5
24-Jan-13
30-Jan-13
CARB192500
HANG DOORS & HARDWARE
1
1
31-Jan-13
31-Jan-13
CARB192510
OWNER SIGNAGE
1
1
31-Jan-13
31-Jan-13
CARB192515
CONTRACTOR CLEAN & PUNCHLIST
5
5
01-Feb-13
07-Feb-13
CARB192518
OWNER PUNCH AND FINAL
EVENT CENTER VIP LOUNGE / VIP RESTROOM
5
5
08-Feb-13
14-Feb-13
100
100
26-Oct-12
14-Mar-13
4
4
26-Oct-12
31-Oct-12
TFS189900
FRAME METAL STUD WALLS/DOOR FRAMES/PONY WALLS
TFS189910
FRAME HARDLID CEILING/SOFFITS
3
3
01-Nov-12
05-Nov-12
TFS189920
MEPS ROUGH-IN WALLS & CEILINGS
10
10
06-Nov-12
19-Nov-12
TFS189930
DRYWALL - WALLS & CEILINGS
5
5
20-Nov-12
28-Nov-12
TFS189935
TAPE & PAINT WALLS & CEILINGS
5
5
29-Nov-12
05-Dec-12
TFS189940
INSTALL BAR DIE
3
3
06-Dec-12
10-Dec-12
TFS189936
RESTROOM FLOOR & WALL TILE
5
5
06-Dec-12
12-Dec-12
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 49 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start 10-Dec-12
Finish
TFS189941
QUARRY TILE @ BAR
3
3
TFS189942
INSTALL MILLWORK / SPECIAL FINISHES
15
15
11-Dec-12
03-Jan-13
TFS189937
RESTROOM PLUMBING FIXTURES / ACCESORIES
5
5
13-Dec-12
19-Dec-12
TFS189946
PULL SODA/BEER/LIQUOR LINES (OWNER)
2
2
14-Dec-12
18-Dec-12
TFS189947
INSTALL & HOOK-UP BAR EQUIPMENT
15
15
19-Dec-12
11-Jan-13
TFS189943
INSTALL STONE FLOORING / BAR TOPS
5
5
27-Dec-12
03-Jan-13
TFS189955
THEMED INTERIOR FINISHES
15
15
03-Jan-13
25-Jan-13
TFS189980
MEPS WALL/CEILING TRIM/DL FIXTURES
7
7
24-Jan-13
01-Feb-13
TFS189990
INSTALL DOORS & HARDWARE
2
2
04-Feb-13
05-Feb-13
TFS190000
INSTALL CARPET
3
3
06-Feb-13
08-Feb-13
TFS190010
INSTALL SEATING
5
5
11-Feb-13
15-Feb-13
TFS190020
INSTALL OWNER SIGNAGE
5
5
18-Feb-13
22-Feb-13
TFS190030
CONTRACTOR CLEAN & PUNCHLIST
5
5
25-Feb-13
01-Mar-13
TFS190035
OWNER PUNCH AND FINAL
5
5
04-Mar-13
08-Mar-13
TFS190040
INSTALL OWNER FF&E
2
2
11-Mar-13
12-Mar-13
TFS191040
HEALTH DEPARTMENT INSPECTION
2
2
13-Mar-13
14-Mar-13
14-Dec-12
124
124
01-Nov-12
23-Apr-13
PERS84290
FRAME METAL STUD WALLS/DOOR FRAMES
3
3
01-Nov-12
05-Nov-12
PERS85290
MEP WALL ROUGH-IN / BACKING
7
7
06-Nov-12
14-Nov-12
PERS86330
DRYWALL
2
2
15-Nov-12
16-Nov-12
PERS86340
TAPE
3
3
19-Nov-12
21-Nov-12
PERS87290
INSTALL / HOOK-UP FAN COIL
5
5
26-Nov-12
30-Nov-12
PERS88262
FORM/REBAR/POUR HOUSEKEEPING PADS
2
2
03-Dec-12
04-Dec-12
PERS88263
PAINT
3
3
05-Dec-12
07-Dec-12
PERS89260
SET EQUIPMENT / RACKS
15
15
10-Dec-12
02-Jan-13
PERS90290
DOORS & HARDWARE
2
2
03-Jan-13
04-Jan-13
PERS90300
PULL FEEDERS & TERMINATE
30
30
07-Jan-13
15-Feb-13
PERS91290
PUNCH DOWN & PROGRAMMING
30
30
04-Feb-13
15-Mar-13
PERS92290
MEPS TRIM
5
5
18-Mar-13
22-Mar-13
PERS94290
CLEAN & SEAL FLOOR
10
10
25-Mar-13
05-Apr-13
PERS95290
OWNER SIGNAGE
2
2
08-Apr-13
09-Apr-13
PERS96300
CONTRACTOR CLEAN & PUNCHLIST
5
5
10-Apr-13
16-Apr-13
PRBS82390
OWNER PUNCH AND FINAL
5
5
17-Apr-13
23-Apr-13
136
136
11-Oct-12
18-Apr-13
DATA / ELECTRICAL (2228)
ELECTRICAL (2428) PERS100255
FRAME METAL STUD WALLS/DOOR FRAMES
3
3
11-Oct-12
15-Oct-12
PERS100256
MEP WALL ROUGH-IN / BACKING
10
10
16-Oct-12
29-Oct-12
PERS100257
DRYWALL/TAPE
6
6
30-Oct-12
06-Nov-12
PERS100260
INSTALL / HOOK-UP FAN COIL
5
5
07-Nov-12
13-Nov-12
PERS101260
FORM/REBAR/POUR HOUSEKEEPING PADS
5
5
07-Nov-12
13-Nov-12
PERS102260
SET EQUIPMENT
20
20
14-Nov-12
13-Dec-12
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 50 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
TASK filter: All Activities Activity ID
Activity Name
Orig Dur
Rem Dur
Start
Finish
PERS103260
DOORS & HARDWARE
1
1
30-Nov-12
30-Nov-12
PERS104260
PULL FEEDERS / HOOK-UP EQUIPMENT/TAGGING
75
75
03-Dec-12
20-Mar-13
PERS105260
PERMANENT LIGHTING/MEPS TRIM
5
5
21-Mar-13
27-Mar-13
PERS106260
CLEAN & SEAL FLOOR
5
5
28-Mar-13
03-Apr-13
PERS107260
OWNER SIGNAGE
1
1
04-Apr-13
04-Apr-13
PERS108260
CONTRACTOR CLEAN & PUNCHLIST
5
5
05-Apr-13
11-Apr-13
PERS109260
OWNER PUNCHLIST
FACILITIES / SERVICE ELEVATOR LOBBY
5
5
12-Apr-13
18-Apr-13
55
55
06-Nov-12
21-Jan-13
PERS84280
FRAME METAL STUD WALLS/DOOR FRAMES
3
3
06-Nov-12
08-Nov-12
PERS85280
MEP WALL ROUGH-IN / BACKING
5
5
09-Nov-12
15-Nov-12
PERS86280
DRYWALL
2
2
16-Nov-12
19-Nov-12
PERS87280
TAPE & PAINT
7
7
20-Nov-12
30-Nov-12
PERS88280
INSTALL CEILING GRID
2
2
03-Dec-12
04-Dec-12
PERS89280
MEPS DROPS TO GRID
5
5
05-Dec-12
11-Dec-12
PERS90280
DOORS & HARDWARE
2
2
12-Dec-12
13-Dec-12
PERS91280
INSTALL CEILING TILE
2
2
14-Dec-12
17-Dec-12
PERS92280
MEPS TRIM
5
5
18-Dec-12
26-Dec-12
PERS93280
CLEAN & SEAL FLOOR / VCT / CARPET
5
5
27-Dec-12
03-Jan-13
PERS94280
OWNER SIGNAGE
2
2
04-Jan-13
07-Jan-13
PERS95280
CONTRACTOR CLEAN & PUNCHLIST
5
5
08-Jan-13
14-Jan-13
PERS96280
OWNER PUNCH AND FINAL
5
5
15-Jan-13
21-Jan-13
122
122
23-Oct-12
10-Apr-13
CCRBB91240
FRAME METAL STUD WALLS/DOOR FRAMES/PARTITION POCKETS
5
5
23-Oct-12
29-Oct-12
CCRBB91250
MEPS WALL ROUGH-IN/BACKING
10
10
26-Oct-12
08-Nov-12
CCRBB91255
INSTALL RODS FOR PARTTION WALLS
5
5
02-Nov-12
08-Nov-12
CCRBB91256
INSTALL A/V SUPPORT SYSTEM (PROJECTORS)
5
5
09-Nov-12
15-Nov-12
CCRBB91260
DRYWALL RIPPER
2
2
16-Nov-12
19-Nov-12
CCRBB91265
FRAME CEILINGS & SOFFITS
5
5
20-Nov-12
28-Nov-12
CCRBB91280
MEPS DROPS TO CEILING & SOFFITS
10
10
29-Nov-12
12-Dec-12
CCRBB91290
DRYWALL
4
4
13-Dec-12
18-Dec-12
CCRBB91295
TAPE/PAINT/VWC
10
10
19-Dec-12
04-Jan-13
CCRBB91296
INSTALL CEILINGS GRID
3
3
07-Jan-13
09-Jan-13
CCRBB91297
INSTALL MEPS DROPS TO GRID
5
5
10-Jan-13
16-Jan-13
CCRBB91300
INSTALL MILLWORK/SPECIAL FINISHES
15
15
17-Jan-13
06-Feb-13
CCRBB91310
INSTALL PROJECTORS / PROJECTOR SCREENS / A/V & DIMMER PANELS
15
15
07-Feb-13
27-Feb-13
CCRBB91340
INSTALL CEILING TILE
3
3
28-Feb-13
04-Mar-13
CCRBB91350
MEPS TRIM WALLS/CEILING
7
7
05-Mar-13
13-Mar-13
CCRBB91360
INSTALL CARPET
3
3
07-Mar-13
11-Mar-13
CCRBB91370
HANG DOORS & HARDWARE
5
5
12-Mar-13
18-Mar-13
CCRBB91365
INSTALL PARTITION WALLS
5
5
12-Mar-13
18-Mar-13
MEETING ROOM A, B & BOARD ROOM
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 51 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
CCRBB91380
OWNER SIGNAGE
5
5
19-Mar-13
25-Mar-13
CCRBB91385
ADJUST PARTITION WALLS
2
2
19-Mar-13
20-Mar-13
CCRBB91390
CONTRACTOR CLEAN & PUNCHLIST
5
5
21-Mar-13
27-Mar-13
CCRBB91395
OWNER PUNCH & FINAL
5
5
28-Mar-13
03-Apr-13
CCRBB91398
INSTALL MEETING ROOMS / BOARD ROOM FF&E
FINISHES (EVENT CENTER) EVENT CENTER LEVEL 1 ELECTRICAL ROOM
5
5
04-Apr-13
10-Apr-13
143
143
09-Nov-12
28-May-13
125
125
09-Nov-12
02-May-13
67
67
09-Nov-12
11-Feb-13
PERS82800
FRAME METAL STUD WALLS/DOOR FRAMES
2
2
09-Nov-12
12-Nov-12
PERS82870
MEP WALL ROUGH-IN / BACKING
3
3
12-Nov-12
14-Nov-12
PERS82880
DRYWALL
3
3
15-Nov-12
19-Nov-12
PERS82882
TAPE / PAINT WALL
5
5
20-Nov-12
28-Nov-12
PERS82890
INSTALL FAN COIL
2
2
29-Nov-12
30-Nov-12
PERS82900
FORM/REBAR/POUR HOUSEKEEPING PADS
2
2
03-Dec-12
04-Dec-12
PERS82910
SET EQUIPMENT
5
5
05-Dec-12
11-Dec-12
PERS82920
DOORS & HARDWARE
2
2
12-Dec-12
13-Dec-12
PERS82930
PULL & TERMINATE FEEDERS
10
10
14-Dec-12
31-Dec-12
PERS82932
HOOK-UP EQUIPMENT / TAGGING / LABELING
25
25
21-Dec-12
29-Jan-13
PERS82940
MEPS TRIM
3
3
25-Jan-13
29-Jan-13
PERS82950
CLEAN & SEAL FLOOR
2
2
30-Jan-13
31-Jan-13
PERS82960
OWNER SIGNAGE
2
2
01-Feb-13
04-Feb-13
PERS83270
CONTRACTOR CLEAN & PUNCHLIST
5
5
05-Feb-13
11-Feb-13
46
46
12-Nov-12
15-Jan-13
ELEVATOR / MACHINE ROOM PELS11010
INSTALL SHAFT WALLS / ELEV. FRONTS
5
5
12-Nov-12
19-Nov-12
PELS21010
INSTALL ELEVATOR
30
30
28-Nov-12
10-Jan-13
PELS71016
STATE ELEVATOR INSPECTION
1
1
11-Jan-13
11-Jan-13
PELS81010
CONTRACTOR CLEAN & PUNCHLIST
2
2
14-Jan-13
15-Jan-13
DRESSING ROOMS / BATHROOMS / WORK ROOM
59
59
13-Nov-12
01-Feb-13
CARB1993530
FRAME METAL STUD WALLS/DOOR FRAMES
2
2
13-Nov-12
14-Nov-12
CARB1993800
MEPS WALL ROUGH-IN/BACKING
5
5
15-Nov-12
21-Nov-12
CARB1993810
DRYWALL RIPPER
1
1
26-Nov-12
26-Nov-12
CARB1993820
FRAME CEILINGS & SOFFITS
2
2
27-Nov-12
28-Nov-12
CARB1993830
MEPS DROPS TO CEILING & SOFFITS
2
2
29-Nov-12
30-Nov-12
CARB1993840
DRYWALL-WALLS/CEILINGS
3
3
03-Dec-12
05-Dec-12
CARB1993841
TAPE/PAINT-WALLS/CEILINGS
7
7
06-Dec-12
14-Dec-12
CARB1993842
INSTALL CEILING GRID
1
1
17-Dec-12
17-Dec-12
CARB1993844
MEPS DROPS TO CEILING GRID
3
3
18-Dec-12
20-Dec-12
CARB1993850
INSTALL MILLWORK/SPECIAL FINISHES
5
5
21-Dec-12
31-Dec-12
CARB1993860
INSTALL TILE FLOORING/WALLS/COUNTERTOPS IN RESTROOMS
5
5
21-Dec-12
31-Dec-12
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 52 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
CARB1993870
INSTALL PLUMBING FIXTURES
4
4
02-Jan-13
07-Jan-13
CARB1993880
INSTALL TOILET ACCESSORIES
1
1
08-Jan-13
08-Jan-13
CARB1993882
INSTALL CEILING TILE
1
1
09-Jan-13
09-Jan-13
CARB1993890
MEPS TRIM WALLS/CEILING
5
5
10-Jan-13
16-Jan-13
CARB1993900
HANG DOORS & HARDWARE
1
1
17-Jan-13
17-Jan-13
CARB1993910
OWNER SIGNAGE
2
2
17-Jan-13
18-Jan-13
CARB1993920
CONTRACTOR CLEAN & PUNCHLIST
5
5
21-Jan-13
25-Jan-13
CARB1993922
OWNER PUNCH & FINAL
5
5
28-Jan-13
01-Feb-13
103
103
11-Dec-12
02-May-13
MAIN FLOOR - SEATING AREA THE1020
FRAME WALLS & SOFFITS
5
5
11-Dec-12
17-Dec-12
THE1030
MEPS ROUGH-IN WALLS & SOFFITS
5
5
18-Dec-12
26-Dec-12
THE1040
DRYWALL WALLS & SOFFITS
10
10
27-Dec-12
10-Jan-13
THE1050
TAPE WALLS & SOFFITS
10
10
11-Jan-13
24-Jan-13
THE1060
PAINT WALLS & SOFFITS
10
10
25-Jan-13
07-Feb-13
THE1080
INSTALL SOUND PROOFING PANELS ON WALLS / MILLWORK
20
20
08-Feb-13
07-Mar-13
THE1140
PERMANENT LIGHTING/MEPS TRIM
10
10
08-Mar-13
21-Mar-13
THE1200
INSTALL DOORS & HARDWARE
5
5
22-Mar-13
28-Mar-13
THE1210
INSTALL FLOORING
10
10
29-Mar-13
11-Apr-13
THE1220
OWNER SIGNAGE
5
5
12-Apr-13
18-Apr-13
THE1230
CONTRACTOR CLEAN & PUNCHLIST
10
10
19-Apr-13
02-May-13
33
33
18-Dec-12
31-Jan-13
STAIRS #3 & #4 STE1240
INSTALL STAIRS / STAIR FINISHES
MEZZ LEVEL EVENT CENTER SERVICE BAR
30
30
18-Dec-12
31-Jan-13
116
116
18-Dec-12
28-May-13
34
34
18-Dec-12
01-Feb-13
THE1250
FRAME WALLS
1
1
18-Dec-12
18-Dec-12
THE1260
MEPS ROUGH-IN WALLS
3
3
19-Dec-12
21-Dec-12
THE1270
DRYWALL
1
1
26-Dec-12
26-Dec-12
THE1280
TAPE/PAINT/FRP
5
5
27-Dec-12
03-Jan-13
THE1282
INSTALL CEILING GRID
1
1
04-Jan-13
04-Jan-13
THE1284
MEPS DROPS GRID
1
1
07-Jan-13
07-Jan-13
THE1294
INSTALL CEILING TILE
1
1
08-Jan-13
08-Jan-13
THE1300
PULL BEVERAGE LINES
2
2
09-Jan-13
10-Jan-13
THE1305
QUARRY TILE
3
3
11-Jan-13
15-Jan-13
THE1310
INSTALL/HOOK-UP FOOD SERVICE EQUIPMENT
7
7
16-Jan-13
24-Jan-13
THE1320
CLEAN & PUNCH
5
5
25-Jan-13
31-Jan-13
THE1330
HEALTH DEPT. INSPECTION
1
1
01-Feb-13
01-Feb-13
60
60
19-Dec-12
12-Mar-13
PERS83080
FRAME METAL STUD WALLS/DOOR FRAMES
2
2
19-Dec-12
20-Dec-12
PERS83090
MEP WALL ROUGH-IN / BACKING
3
3
20-Dec-12
26-Dec-12
PERS83100
DRYWALL
2
2
27-Dec-12
28-Dec-12
SOUND / AUDIO BOOTH
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 53 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
PERS83105
TAPE / PAINT WALL
5
5
31-Dec-12
07-Jan-13
PERS83125
INSTALL GRID CEILING
1
1
08-Jan-13
08-Jan-13
PERS83126
MEPS DROPS TO GRID
2
2
09-Jan-13
10-Jan-13
PERS83129
INSTAL GLASS WALL
5
5
11-Jan-13
17-Jan-13
PERS83130
SET A/V EQUIPMENT
5
5
18-Jan-13
24-Jan-13
PERS83131
DOORS & HARDWARE
1
1
25-Jan-13
25-Jan-13
PERS83135
HOOK-UP EQUIPMENT / PROGRAMMING
20
20
28-Jan-13
22-Feb-13
PERS83160
MEPS TRIM
3
3
25-Feb-13
27-Feb-13
PERS83170
CARPET FLOORING
2
2
28-Feb-13
01-Mar-13
PERS83180
OWNER SIGNAGE
2
2
04-Mar-13
05-Mar-13
PERS83290
CONTRACTOR CLEAN & PUNCHLIST
5
5
06-Mar-13
12-Mar-13
30
30
21-Dec-12
31-Jan-13
PRBS81290
FRAME METAL STUD WALLS/DOOR FRAMES
1
1
21-Dec-12
21-Dec-12
PRBS81300
MEPS WALL ROUGH-IN/BACKING
3
3
26-Dec-12
28-Dec-12
PRBS81310
DRYWALL
1
1
31-Dec-12
31-Dec-12
PRBS81315
TAPE & PAINT
5
5
02-Jan-13
08-Jan-13
PRBS81350
INSTALL CEILING GRID
1
1
09-Jan-13
09-Jan-13
PRBS81360
MEPS DROPS TO GRID
2
2
10-Jan-13
11-Jan-13
PRBS81370
INSTALL CEILING TILE
1
1
14-Jan-13
14-Jan-13
PRBS81380
MEPS TRIM WALLS/CEILING
2
2
15-Jan-13
16-Jan-13
PRBS81390
PREP/CLEAN/SEAL FLOORS
2
2
17-Jan-13
18-Jan-13
PRBS81410
INSTALL DOORS & HARDWARE
1
1
21-Jan-13
21-Jan-13
PRBS81420
OWNER SIGNAGE
1
1
22-Jan-13
22-Jan-13
PRBS81430
CONTRACTOR CLEAN & PUNCHLIST
2
2
23-Jan-13
24-Jan-13
PRBS81440
OWNER PUNCH AND FINAL
SOUND BALCONY STORAGE
CATWALK ACCESS PRBS81450
INSTALL CATWALKS / CATWALK FINISHES
BALCONY - SEATING AREA
5
5
25-Jan-13
31-Jan-13
61
61
26-Dec-12
20-Mar-13
60
60
26-Dec-12
20-Mar-13
115
115
19-Dec-12
28-May-13
THE1070
FRAME WALLS & SOFFITS
7
7
19-Dec-12
31-Dec-12
THE1090
MEPS ROUGH-IN WALLS & SOFFITS
10
10
28-Dec-12
11-Jan-13
THE1100
DRYWALL WALLS & SOFFITS
5
5
14-Jan-13
18-Jan-13
THE1110
TAPE WALLS & SOFFITS
6
6
21-Jan-13
28-Jan-13
THE1120
PAINT WALLS & SOFFITS / BLACK-OUT AT EXPOSED STRUCTURE
5
5
29-Jan-13
04-Feb-13
THE1130
INSTALL SOUND PROOFING PANELS ON WALLS / MILLWORK
20
20
05-Feb-13
04-Mar-13
THE1150
PERMANENT LIGHTING/MEPS TRIM
10
10
26-Feb-13
11-Mar-13
THE1160
THEATRICAL RIGGING & LIGHTING (BY OWNER)
15
15
26-Feb-13
18-Mar-13
THE1240
INSTALL DOORS & HARDWARE
5
5
12-Mar-13
18-Mar-13
THE1290
INSTALL FLOORING
10
10
19-Mar-13
01-Apr-13
THE1295
INSTALL SEATING
30
30
02-Apr-13
13-May-13
THE1340
OWNER SIGNAGE
5
5
14-May-13
20-May-13
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 54 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
WBS-RAC TASK filter: All Activities Activity ID
Activity Name
THE1350
CONTRACTOR CLEAN & PUNCHLIST
EVENT CENTER LEVEL 2 ELECTRICAL ROOM
MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)
Run Date: 26-Jul-12
ROY ANDERSON CORP.
Data Date: 10-Jul-12
Orig Dur
Rem Dur
Start
Finish
5
5
21-May-13
28-May-13
65
65
02-Jan-13
02-Apr-13
65
65
02-Jan-13
02-Apr-13
PERS82970
FRAME METAL STUD WALLS/DOOR FRAMES
5
5
02-Jan-13
08-Jan-13
PERS82980
MEP WALL ROUGH-IN / BACKING
3
3
08-Jan-13
10-Jan-13
PERS82990
DRYWALL
3
3
11-Jan-13
15-Jan-13
PERS82992
TAPE / PAINT WALL
5
5
16-Jan-13
22-Jan-13
PERS83000
INSTALL FAN COIL
2
2
23-Jan-13
24-Jan-13
PERS83010
FORM/REBAR/POUR HOUSEKEEPING PADS
2
2
25-Jan-13
28-Jan-13
PERS83020
SET EQUIPMENT
5
5
29-Jan-13
04-Feb-13
PERS83021
DOORS & HARDWARE
2
2
05-Feb-13
06-Feb-13
PERS83022
PULL & TERMINATE FEEDERS
10
10
07-Feb-13
20-Feb-13
PERS83023
HOOK-UP EQUIPMENT / TAGGING / LABELING
25
25
14-Feb-13
20-Mar-13
PERS83050
MEPS TRIM
3
3
18-Mar-13
20-Mar-13
PERS83060
CLEAN & SEAL FLOOR
2
2
21-Mar-13
22-Mar-13
PERS83070
OWNER SIGNAGE
2
2
25-Mar-13
26-Mar-13
PERS83280
CONTRACTOR CLEAN & PUNCHLIST
5
5
27-Mar-13
02-Apr-13
SITE WORK/HARDSCAPE/LANDSCAPE
83
83
18-Jan-13
14-May-13
83
83
18-Jan-13
14-May-13
PN67370
BACKFILL TO SUBGRADE
10
10
18-Jan-13
31-Jan-13
PN67380
FRP CURB & SIDE WALKS
10
10
25-Jan-13
07-Feb-13
PN67390
LIGHTING POLE BASES/BOLLARDS
10
10
01-Feb-13
15-Feb-13
PN67400
FINAL GRADE FOR ASPHALT
10
10
08-Feb-13
22-Feb-13
PN67410
LAY 1ST COURSE OF ASPHALT
5
5
25-Feb-13
01-Mar-13
PN67420
INSTALL IRRIGATION FOR LANDSCAPING
15
15
04-Mar-13
25-Mar-13
PN67430
INSTALL LARGE TREES
10
10
19-Mar-13
01-Apr-13
PN67440
FINAL LAYER OF ASPHALT AND STRIPPING
5
5
02-Apr-13
08-Apr-13
PN67450
GRASS COVER LANDSCAPING
10
10
09-Apr-13
23-Apr-13
PN67460
CLEAN UP
5
5
24-Apr-13
30-Apr-13
PN67470
CONTRACTOR / OWNER PUNCHLIST
10
10
01-May-13
14-May-13
37
37
24-Apr-13
13-Jun-13
37
37
24-Apr-13
13-Jun-13
ROADWAY/LANDSCAPING/PAVING
LIFE SAFETY, TESTING & OCCUPANCY LIFE SAFETY, TESTING & OCCUPANCY HTLS210
FLS PRE-TESTING (CONTRACTORS)
15
15
24-Apr-13
14-May-13
HTLS230
3RD PARTY SCENARIO / DEVICE VERIFICATION
10
10
15-May-13
29-May-13
HTLS235
3RD PARTY REPORT
5
5
30-May-13
05-Jun-13
HTLS255
SITE SIGN OFF / CLEARANCES
10
10
31-May-13
13-Jun-13
HTLS250
CITY / COUNTY / 3RD PARTY FINAL
10
10
31-May-13
13-Jun-13
HTLS280
FINAL PROJECT COMPLETION
0
0
13-Jun-13
HTLS270
TCO & SUBSTANTIAL COMPLETION
0
0
13-Jun-13
Remaining Level of Effort
Critical Remaining Work
Actual Level of Effort
Milestone
Actual Work Remaining Work
2012 Jun
Page 55 of 55 Project Schedule
2013 Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun