WBS-RAC

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012) PROJECT DESIGN & AWARD

Orig Dur

Rem Dur

Start

398

243

02-Dec-11 A

13-Jun-13

182

28

02-Dec-11 A

16-Aug-12

0

0

02-Dec-11 A

180

28

06-Dec-11 A

DOC PKG #1 - FOUNDATIONS AREA 1&2

DES010

PROJECT DESIGN

DES020

GMP SUBMITTAL

0

0

31-Jan-12 A

DES030

OWNER REVIEW OF GMP PROPOSAL

16

0

31-Jan-12 A

DES040

RELEASED FOR BUYOUT

0

0

13-Feb-12 A

DES050

RECEIVE NOTICE TO PROCEED

0

0

13-Feb-12 A

DES2020

DOC PKG #2 - CIVIL, UTILITIES, AREA 1&2 STEEL & CONCRETE

0

0

13-Feb-12 A

DES5020

DOC PKG #2A - AREA 3&4 STEEL & CONCRETE

0

0

13-Feb-12 A

DES1040

RELEASED FOR TEST PILE PROGRAM

0

0

01-Mar-12 A

DES6020

RECEIVE WET LAND PERMIT

0

0

09-Mar-12 A

DES3020

DOC PKG #3 - 100% CORE & SHELL

0

0

23-Mar-12 A

DES4020

DOC PKG #4 - 100% INTERIORS

0

0

10-Jul-12*

DES2040

DOC PKG #5 - FF&E

SITE INFRASTRUCTURE SITE EXCAVATION

16-Aug-12

13-Feb-12 A

0

0

10-Jul-12*

307

152

06-Dec-11 A

194

39

06-Dec-11 A

31-Aug-12

15

0

06-Dec-11 A

20-Feb-12 A

06-Feb-13

BUY1860

BID / AWARD SITE EXCAVATION

10

0

06-Dec-11 A

10-Feb-12 A

BUY1890

MOBILIZE STRUCTURAL EXCAVATION EQUIPMENT

5

0

10-Feb-12 A

20-Feb-12 A

79

5

13-Feb-12 A

16-Jul-12

SITE UTILITIES (STORM DRAIN)

2012 Jun

DES1020

BUYOUT & PROCUREMENT

Finish

BUY2760

BID / AWARD UTILITY SUBCONTRACTORS (RE-BID DUE TO DRAWING CHANGES)

15

0

13-Feb-12 A

22-Mar-12 A

BUY2770

UNDERGROUND PIPING / DECK SLEEVING SHOP DRAWINGS

15

0

18-Apr-12 A

08-May-12 A

BUY2780

REVIEW PIPING & SLEEVING SHOP DRAWINGS

15

1

09-May-12 A

10-Jul-12

BUY2870

PROCURE PIPING & SLEEVE MATERIALS FOR INSTALL

10

5

16-May-12 A

16-Jul-12

97

39

09-Jul-12 A

31-Aug-12 20-Jul-12

SITE UTILITIES (SEWER/WATER) BUY2920

BID / AWARD SEWER/WATER SUBCONTRACTORS

10

9

09-Jul-12 A

DES0100

WATER & SEWER FINAL DRAWINGS ISSUED

0

0

09-Jul-12 A

BUY2930

UNDERGROUND PIPING / DECK SLEEVING SHOP DRAWINGS

15

15

23-Jul-12

10-Aug-12

BUY2940

REVIEW PIPING & SLEEVING SHOP DRAWINGS

15

15

13-Aug-12

31-Aug-12

BUY2950

PROCURE PIPING & SLEEVE MATERIALS FOR INSTALL

10

10

20-Aug-12

31-Aug-12

99

0

13-Feb-12 A

08-May-12 A

BUY1870

BID / AWARD SITE ELECTRICAL SUBCONTRACTOR

20

0

13-Feb-12 A

28-Mar-12 A

BUY1880

UNDERGROUND DUCTBANK SHOP DRAWINGS

15

0

29-Mar-12 A

06-Apr-12 A

BUY2740

REVIEW UNDERGROUND DUCTBANK SHOP DRAWINGS

15

0

06-Apr-12 A

24-Apr-12 A

BUY2750

PROCURE ELECTRICAL MATERIALS FOR UG INSTALL

10

0

25-Apr-12 A

08-May-12 A

205

50

13-Feb-12 A

17-Sep-12

201

27

13-Feb-12 A

15-Aug-12

15

0

13-Feb-12 A

07-Mar-12 A

SITE UTILITIES (ELECTRICAL)

FOUNDATIONS & STRUCTURE STRUCTURAL STEEL BUY1170

BID / AWARD STRUCTURAL STEEL

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

Page 1 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

BUY1180

RELEASE STRUCTURAL STEEL MILL ORDER

0

0

BUY1190

STRUCTURAL STEEL SHOP DRAWINGS

50

0

14-Mar-12 A

10-Jul-12

BUY1200

STRUCTURAL STEEL SHOP DRAWING REVIEW

50

0

04-Apr-12 A

10-Jul-12

BUY1210

FABRICATE / DELIVER STRUCTURAL STEEL

80

27

25-Apr-12 A

15-Aug-12

BUY1220

DELIVER FIRST ERECTION SEQUENCE TO JOBSITE

WATERPROOFING & SUBSURFACE DRAINAGE

13-Mar-12 A

0

0

39

0

12-Apr-12 A

30-Apr-12 A

09-Jul-12 A

BUY1390

BID / AWARD WATERPROOFING & SUBSURFACE DRAINAGE

10

0

12-Apr-12 A

18-Apr-12 A

BUY1400

CREATE SUBGRADE / PRODUCT SUBMITTALS

5

0

18-Apr-12 A

24-Apr-12 A

BUY1410

WATERPROOFING & DRAINAGE MATERIAL REVIEW

5

0

24-Apr-12 A

30-Apr-12 A

BUY1420

PROCURE WATERPROOFING & SUBSURFACE DRAIN MATERIALS

MASONRY

5

0

24-Apr-12 A

30-Apr-12 A

50

50

10-Jul-12

17-Sep-12

BUY1430

BID / AWARD MASONRY

10

10

10-Jul-12

23-Jul-12

BUY1440

CREATE MASONRY SHOP DRAWINGS

15

15

24-Jul-12

13-Aug-12

BUY1450

MASONRY SHOP DRAWING REVIEW

10

10

14-Aug-12

27-Aug-12

BUY1460

PROCURE MASONRY MATERIALS

15

15

28-Aug-12

17-Sep-12

79

0

13-Feb-12 A

23-Mar-12 A

STRUCTURAL FOUNDATIONS BUY1340

BID / AWARD STRUCTURAL FOUNDATIONS

15

0

13-Feb-12 A

21-Mar-12 A

BUY1350

MOBILIZE STRUCTURAL FOUNDATIONS EQUIPMENT

2

0

22-Mar-12 A

23-Mar-12 A

40

0

13-Feb-12 A

30-Apr-12 A

CONCRETE (FORM, PLACE & FINISH) BUY1310

BID / AWARD CONCRETE FORM / PLACE / FINISH

15

0

13-Feb-12 A

07-Mar-12 A

BUY1320

ENGINEER DECK, COLUMN & WALL SHOP DRAWINGS

15

0

08-Mar-12 A

18-Apr-12 A

BUY1330

PROCURE & FAB DECK, COLUMN & WALL FORMWORK

20

0

29-Mar-12 A

30-Apr-12 A

15

0

13-Feb-12 A

21-Mar-12 A

CONCRETE (MATERIALS) BUY1355

BID / AWARD CONCRETE SUPPLY VENDOR

10

0

13-Feb-12 A

07-Mar-12 A

BUY1360

CREATE FOUNDATION CONCRETE MIX DESIGNS

5

0

08-Mar-12 A

14-Mar-12 A

BUY1370

FOUNDATION CONCRETE MIX DESIGN REVIEW

5

0

15-Mar-12 A

21-Mar-12 A

BUY1380

APPROVED MIX DESIGNS

REBAR (SUPPLY & INSTALL)

2012 Jun

0

0

74

0

13-Feb-12 A

21-Mar-12 A 12-Jun-12 A

BUY1230

BID / AWARD FOUNDATION REBAR

10

0

13-Feb-12 A

20-Feb-12 A

BUY1240

FOUNDATION REBAR SHOP DRAWINGS

25

0

21-Feb-12 A

28-Mar-12 A

BUY1250

FOUNDATION REBAR SHOP DRAWING REVIEW

25

0

01-Mar-12 A

04-Apr-12 A

BUY1260

PROCURE / FABRICATE / DELIVER FOUNDATION REBAR

30

0

08-Mar-12 A

18-Apr-12 A

BUY1270

BALANCE OF STRUCTURE SHOP DRAWINGS

30

0

19-Mar-12 A

01-May-12 A

BUY1280

PROPERTY REBAR SHOP DRAWING REVIEW

30

0

02-Apr-12 A

15-May-12 A

BUY1290

PROCURE / FABRICATE / DELIVER BALANCE OF REBAR

40

0

18-Apr-12 A

12-Jun-12 A

BUY1300

DELIVER FIRST VERTICAL / DECK PACKAGE TO JOBSITE

0

0

203

110

13-Feb-12 A

10-Dec-12

110

110

10-Jul-12

10-Dec-12

MEPS DISTRIBUTION & EQUIPMENT FOOD SERVICE EQUIPMENT (BY OWNER)

30-Apr-12 A

BUY1950

BID / AWARD FOOD SERVICE EQUIPMENT CONTRACT

15

15

10-Jul-12

30-Jul-12

BUY1960

FOOD SERVICE EQUIPMENT CUT SHEETS & SHOP DRAWING

40

40

31-Jul-12

24-Sep-12

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

Page 2 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

BUY1970

REVIEW CUT SHEETS & SHOP DRAWINGS

BUY1980

FABRICATE & DELIVER FOOD SERVICE EQUIPMENT

PLUMBING & MECHANICAL

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

30

30

04-Sep-12

15-Oct-12

2012 Jun

60

60

18-Sep-12

10-Dec-12

121

39

13-Feb-12 A

31-Aug-12

BUY1470

BID / AWARD PLUMBING & MECHANICAL SUBCONTRACTORS

20

0

13-Feb-12 A

15-Mar-12 A

BUY1480

UNDERGROUND PIPING / DECK SLEEVING SHOP DRAWINGS

15

0

16-Mar-12 A

05-Apr-12 A

BUY1540

INTERIOR FAN COIL SHOP DRAWING / SUBMITTAL

15

0

16-Mar-12 A

26-Apr-12 A

BUY1570

ROOF TOP AIR HANDLER SHOP DRAWING / SUBMITTAL

15

0

16-Mar-12 A

26-Apr-12 A

BUY1600

PUMPS SUBMITTALS & CUT SHEETS

15

0

16-Mar-12 A

26-Apr-12 A

BUY1630

PLUMBING FIXTURE SUBMITTALS & CUT SHEETS

15

0

16-Mar-12 A

26-Apr-12 A

BUY1490

REVIEW PIPING & SLEEVING SHOP DRAWINGS

5

0

06-Apr-12 A

26-Apr-12 A

BUY1500

PROCURE PIPING & SLEEVE MATERIALS FOR INSTALL

10

0

27-Apr-12 A

10-May-12 A

BUY1550

REVIEW INTERIOR FAN COIL SHOP DRAWING

10

0

27-Apr-12 A

10-May-12 A

BUY1580

REVIEW ROOF TOP AIR HANDLER SHOP DRAWINGS

10

0

27-Apr-12 A

10-May-12 A

BUY1610

REVIEW PUMP SUBMITTALS & CUT SHEETS

10

0

27-Apr-12 A

10-May-12 A

BUY1640

PLUMBING FIXTURE SHOP DRAWING REVIEW

10

0

27-Apr-12 A

10-May-12 A

BUY1560

INTERIOR FAN COIL UNIT FABRICATION & DELIVERY

50

9

11-May-12 A

20-Jul-12

BUY1590

ROOF TOP AIR HANDLER FABRICATION & DELIVERY

80

39

11-May-12 A

31-Aug-12

BUY1620

PUMP FABRICATION & DELIVERY

50

9

11-May-12 A

20-Jul-12

BUY1650

PROCURE PLUMBING FIXTURES

40

2

11-May-12 A

11-Jul-12

121

39

13-Feb-12 A

31-Aug-12

BUY1660

BID / AWARD ELECTRICAL SUBCONTRACTOR

20

0

13-Feb-12 A

15-Mar-12 A

BUY1670

UNDERGROUND CONDUIT / DECK PIPING SHOP DRAWINGS

15

0

16-Mar-12 A

05-Apr-12 A

BUY1700

GENERATOR SHOP DRAWINGS

15

0

16-Mar-12 A

26-Apr-12 A

BUY1730

SWITCH GEAR CUT SHEETS & SUBMITTALS

15

0

16-Mar-12 A

26-Apr-12 A

BUY1760

MCC SHOP DRAWINGS

15

0

16-Mar-12 A

26-Apr-12 A

BUY1790

ELECTRICAL DISTRIBUTION SHOP DRWNGS & SUBMITTALS

15

0

16-Mar-12 A

26-Apr-12 A

BUY1680

REVIEW CONDUIT & SLEEVING SHOP DRAWINGS

5

0

06-Apr-12 A

26-Apr-12 A

BUY1690

PROCURE CONDUIT & SLEEVE MATERIALS FOR INSTALL

10

0

27-Apr-12 A

10-May-12 A

BUY1710

REVIEW GENERATOR SHOP DRAWINGS

10

0

27-Apr-12 A

10-May-12 A

BUY1740

REVIEW SWITCH GEAR CUT SHEETS & SUBMITTALS

10

0

27-Apr-12 A

10-May-12 A

BUY1770

REVIEW MCC SHOP DRAWINGS

10

0

27-Apr-12 A

10-May-12 A

BUY1800

REVIEW ELECTRICAL DISTRIBUTION SHOP DRAWINGS

10

0

27-Apr-12 A

10-May-12 A

BUY1720

GENERATOR FABRICATION & DELIVERY

80

39

11-May-12 A

31-Aug-12

BUY1750

SWITCH GEAR FABRICATION & DELIVERY

65

24

11-May-12 A

10-Aug-12

BUY1780

MCC FABRICATION & DELIVERY

65

24

11-May-12 A

10-Aug-12

BUY1810

PROCURE ELECTRICAL DISTRIBUTION MATERIALS

40

2

11-May-12 A

11-Jul-12

ELECTRICAL

119

60

18-Apr-12 A

01-Oct-12

BUY1900

BID / AWARD MISC. METAL (STAIRS, SUPPORTS, RAIL)

15

0

18-Apr-12 A

08-May-12 A

BUY1910

MISC. METAL SHOP DRAWINGS

50

7

09-May-12 A

18-Jul-12

BUY1920

REVIEW MISC. METAL SHOP DRAWINGS

50

50

10-Jul-12

17-Sep-12

MISCELLANEOUS METALS

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

Page 3 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

BUY1930

PROCURE MATERIALS / FABRICATE MISC. METAL

BUY1940

DELIVER STAIRS, RAILS, ETC.

ELEVATORS

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

50

50

24-Jul-12

Finish 01-Oct-12

0

0

116

23

13-Feb-12 A

04-Sep-12 09-Aug-12

BUY1820

BID / AWARD ELEVATORS

15

0

13-Feb-12 A

05-Mar-12 A

BUY1830

ELEVATOR SHOP DRAWINGS

20

0

06-Mar-12 A

02-Apr-12 A

BUY1840

REVIEW SHOP DRAWINGS

10

0

03-Apr-12 A

18-Apr-12 A

BUY1850

PROCURE ELEV.MACHINE ROOM EQUIP, RAILS, FRONTS

ARCHITECTURAL DEVELOPMENT EXTERIOR SKIN

2012 Jun

80

23

19-Apr-12 A

09-Aug-12

198

105

20-Feb-12 A

03-Dec-12

88

0

30-Mar-12 A

02-Jul-12 A

BUY2230

BID / AWARD EXTERIOR SKIN CONTRACTOR

20

0

30-Mar-12 A

20-Apr-12 A

BUY2240

EXTERIOR ENCLOSURE SHOP DRAWINGS

40

0

23-Apr-12 A

21-May-12 A

BUY2250

REVIEW EXTERIOR FACADE DESIGN BUILD DRAWINGS

15

0

22-May-12 A

11-Jun-12 A

BUY2260

PROCURE MATERIALS FOR EXTERIOR ENCLOSURE

20

0

05-Jun-12 A

02-Jul-12 A

140

47

30-Mar-12 A

12-Sep-12

ROOFING BUY2190

BID / AWARD ROOFING

15

2

30-Mar-12 A

11-Jul-12

BUY2200

ROOFING SHOP DRAWINGS & MATERIAL SAMPLES

15

15

12-Jul-12

01-Aug-12

BUY2210

REVIEW ROOFING SHOP DRAWINGS & MATERIALS

15

15

02-Aug-12

22-Aug-12

BUY2220

PROCURE ROOFING MATERIALS

15

15

23-Aug-12

12-Sep-12

137

105

25-Jun-12 A

03-Dec-12

DOORS & HARDWARE BUY2350

BID / AWARD DOORS & HARDWARE PACKAGES

15

5

25-Jun-12 A

16-Jul-12

BUY2360

CREATE DOOR & HARDWARE SCHEDULE SUBMITTAL

25

25

17-Jul-12

20-Aug-12

BUY2370

REVIEW DOOR & HARDWARE SCHEDULE

15

15

21-Aug-12

10-Sep-12

BUY2380

PROCURE DOORS & HARDWARE

60

60

11-Sep-12

03-Dec-12

BUY2390

DELIVER FRAMES TO JOBSITE FOR FRAMING MILESTONE

0

0

09-Oct-12

62

30

25-Jun-12 A

20-Aug-12

BUY2470

BID / AWARD INTERIOR FRAMING & DRYWALL

15

5

25-Jun-12 A

16-Jul-12

BUY2480

CREATE FRAMING MATERIAL SUBMITTALS & SHOP DRWNGS

10

10

17-Jul-12

30-Jul-12

BUY2490

FRAMING MATERIAL & SHOP DRAWING REVIEW

5

5

31-Jul-12

06-Aug-12

BUY2500

PROCURE FRAMING MATERIALS & DRYWALL

10

10

07-Aug-12

20-Aug-12

INTERIOR FRAMING & DRYWALL

119

10

23-Mar-12 A

23-Jul-12

BUY2310

BID / AWARD EXPANSION JOINT INSTALLATION

15

0

23-Mar-12 A

09-Apr-12 A

BUY2320

SUBMIT EXPANSION JOINT SHOP DRAWINGS & CUT SHEET

15

0

18-Apr-12 A

08-May-12 A

BUY2330

REVIEW SHOP DRAWINGS & CUT SHEETS

10

0

09-May-12 A

15-Jun-12 A

BUY2340

PROCURE EXPANSION JOINT MATERIAL

25

10

15-Jun-12 A

23-Jul-12

EXPANSION JOINTS

34

34

25-Jun-12 A

24-Aug-12

BUY2270

BID / AWARD BUILDING INSULATION & FIRE STOP

15

4

25-Jun-12 A

13-Jul-12

BUY2280

SUBMIT INSULATION & FIRE STOP CUT SHEETS

10

10

16-Jul-12

27-Jul-12

BUY2290

REVIEW INSULATION & FIRE STOP CUT SHEETS

10

10

30-Jul-12

10-Aug-12

BUY2300

PROCURE MATERIALS FOR INSULATING BUILDING

10

10

13-Aug-12

24-Aug-12

178

85

23-Mar-12 A

05-Nov-12

INSULATION

GLASS & GLAZING Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

Page 4 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

23-Mar-12 A

18-Apr-12 A

2012 Jun

BUY2400

BID / AWARD GLASS & GLAZING

15

0

BUY2410

GLASS & GLAZING / CURTAIN WALL SHOP DRAWINGS

20

0

19-Apr-12 A

16-May-12 A

BUY2420

REVIEW GLASS & GLAZING / CURTAIN WALL SHOPS

15

0

17-May-12 A

06-Jun-12 A

BUY2430

PROCURE / FABRICATE PUNCH WINDOWS

60

40

06-Jun-12 A

03-Sep-12

BUY2440

INTERIOR GLASS / MIRROR SHOP DRAWINGS

15

15

04-Sep-12

24-Sep-12

BUY2450

REVIEW INTERIOR GLASS / MIRROR SHOP DRAWINGS

10

10

25-Sep-12

08-Oct-12

BUY2460

PROCURE / FABRICATE GLASS & MIRROR MATERIALS

20

20

09-Oct-12

05-Nov-12

97

20

20-Feb-12 A

06-Aug-12

15

0

20-Feb-12 A

15-Mar-12 A

FIREPROOFING BUY2150

BID / AWARD FIREPROOFING

DES6030

RECEIVE REVISED DRAWINGS

0

0

22-May-12 A

BUY2155

RE-BID FIREPROOFING

15

0

22-May-12 A

11-Jun-12 A

BUY2160

CREATE FIREPROOFING SHOP DRAWINGS

15

0

12-Jun-12 A

02-Jul-12 A

BUY2170

FIREPROOFING SHOP DRAWING REVIEW

10

5

03-Jul-12 A

16-Jul-12

BUY2180

PROCURE FIREPROOFING MATERIALS

15

15

17-Jul-12

06-Aug-12

123

30

13-Feb-12 A

20-Aug-12

89

30

18-Apr-12 A

20-Aug-12

DESIGN/BUILD DISCIPLINES LOW VOLTAGE/AUDIO VISUAL (BY OWNER) BUY2070

BID / AWARD LOW VOLTAGE & AV SYSTEMS

15

0

18-Apr-12 A

08-May-12 A

BUY2080

LOW VOLTAGE & AV DESIGN DRAWINGS

30

1

09-May-12 A

10-Jul-12

BUY2090

REVIEW LOW VOLTAGE & AV DESIGN DRAWINGS W/ OPS

30

10

11-Jun-12 A

23-Jul-12

BUY2100

PROCURE MATERIALS FOR LOW VOLTAGE & AV

30

30

10-Jul-12

20-Aug-12

66

5

13-Feb-12 A

16-Jul-12

FIRE ALARM BUY2030

BID / AWARD FIRE ALARM CONTRACTOR

20

0

13-Feb-12 A

15-Mar-12 A

BUY2040

FIRE ALARM DESIGN DRAWINGS & CUT SHEETS

30

0

16-Mar-12 A

26-Apr-12 A

BUY2050

REVIEW FIRE ALARM DESIGN DRAWINGS

15

0

27-Apr-12 A

17-May-12 A

BUY2060

PROCURE FIRE ALARM CONSTRUCTION MATERIALS

10

5

18-May-12 A

16-Jul-12

65

10

18-Apr-12 A

23-Jul-12

SECURITY/SURVEILLANCE (BY OWNER) BUY2110

BID, AWARD SECURITY & SURVEILLANCE SYSTEM DESIGN

15

0

18-Apr-12 A

08-May-12 A

BUY2120

SECURITY & SURVEILLANCE DESIGN DRAWINGS

30

0

09-May-12 A

18-Jun-12 A

BUY2130

REVIEW SECURITY & SURVEILLANCE DRAWINGS W/ OPS

30

1

22-May-12 A

10-Jul-12

BUY2140

PROCURE SECURITY & SURVEILLANCE EQUIPMENT

30

10

05-Jun-12 A

23-Jul-12

58

0

20-Feb-12 A

05-Jun-12 A

FIRE SPRINKLERS BUY1990

BID / AWARD FIRE SPRINKLER DESIGN BUILD

20

0

20-Feb-12 A

15-Mar-12 A

BUY2000

DESIGN SYSTEMS & FIRE SPRINKLER SHOP DRAWINGS

30

0

16-Mar-12 A

26-Apr-12 A

BUY2010

FIRE DEPARTMENT REVIEW FIRE SPRINKLER SHOP DRWGS

15

0

27-Apr-12 A

22-May-12 A

BUY2020

PROCURE FIRE SPRINKLER MATERIALS

FINISHES/THEMING DEVELOPMENT

10

0

23-May-12 A

05-Jun-12 A

152

152

10-Jul-12

06-Feb-13

85

85

10-Jul-12

05-Nov-12

BUY2650

BID / AWARD OPERABLE PARTITIONS / COILING DOORS

15

15

10-Jul-12

30-Jul-12

BUY2660

OPERABLE PARTITIIONS / COILING DOOR SHOP DRAWING

20

20

31-Jul-12

27-Aug-12

BUY2670

COORDINATE W/ MISC. STEEL SUB FOR SUPPORT STEEL

15

15

07-Aug-12

27-Aug-12

OPERABLE PARTITIONS/COILING DOORS

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

Page 5 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

BUY2680

REVIEW SHOP DRAWINGS / CUT SHEETS

10

10

28-Aug-12

10-Sep-12

BUY2690

PROCURE OPERABLE PARTITIONS / COILING DOORS

40

40

11-Sep-12

05-Nov-12

75

75

10-Jul-12

22-Oct-12

10-Jul-12

30-Jul-12

STONE/TILE/COUNTERTOPS BUY2600

BID / AWARD STONE, TILE & SOLID SURFACE TOPS

15

15

BUY2610

SUBMIT TILE, STONE & GRANITE SAMPLES

30

30

31-Jul-12

10-Sep-12

BUY2620

REVIEW / APPROVE TILE, STONE & GRANITE SAMPLES

30

30

14-Aug-12

24-Sep-12

BUY2630

PROCURE STONE / TILE MATERIALS (DOMESTIC)

30

30

28-Aug-12

08-Oct-12

BUY2640

SOLID SURFACE TOP FABRICATION

25

25

18-Sep-12

22-Oct-12

152

152

10-Jul-12

06-Feb-13

MILLWORK BUY2510

BID / AWARD MILLWORK / THEMING PACKAGES

20

20

10-Jul-12

06-Aug-12

BUY2520

MILLWORK / THEMING SHOP DRAWINGS

75

75

07-Aug-12

19-Nov-12

BUY2530

REVIEW MILLWORK, THEMING & CAST PRODUCT SUBMITAL

75

75

28-Aug-12

10-Dec-12

BUY2540

MILLWORK, THEMING, CAST PIECE FABRICATION

80

80

16-Oct-12

06-Feb-13

90

90

10-Jul-12

12-Nov-12

TOILET PARTITIONS/ACCESSORIES BUY2700

BID / AWARD TOILET PARTITIONS / ACCESSORIES

15

15

10-Jul-12

30-Jul-12

BUY2710

SUBMIT LP SAMPLES, CUT SHEETS & SPECS

15

15

31-Jul-12

20-Aug-12

BUY2720

REVIEW / APPROVE SAMPLES, CUT SHEETS & SPECS

10

10

21-Aug-12

03-Sep-12

BUY2730

PROCURE / FABRICATE PARTITIONS & ACCESSORIES

50

50

04-Sep-12

12-Nov-12

50

50

10-Jul-12

17-Sep-12

PAINTING & VWC BUY2550

BID / AWARD PAINTING & VWC

15

15

10-Jul-12

30-Jul-12

BUY2560

SUBMIT PAINT KNOCK DOWN SAMPLES

15

15

31-Jul-12

20-Aug-12

BUY2590

QUANTIFY VWC AMOUNTS FOR PURCHASING AGENT

25

25

31-Jul-12

03-Sep-12

BUY2570

REVIEW / APPROVE PAINT COLOR SAMPLES

10

10

21-Aug-12

03-Sep-12

BUY2580

PROCURE PAINT COLOR MATERIALS

10

10

04-Sep-12

17-Sep-12

80

80

10-Jul-12

29-Oct-12

50

50

10-Jul-12

17-Sep-12

SITEWORK DEVELOPMENT SITE PAVING BUY2880

BID / AWARD SITE PAVING

10

10

10-Jul-12*

23-Jul-12

BUY2890

SUBMIT ASPHALT MIX DESIGNS & SHOP DRAWINGS

15

15

24-Jul-12

13-Aug-12

BUY2900

REVIEW / APPROVE MIX DESIGNS & SHOP DRAWINGS

10

10

14-Aug-12

27-Aug-12

BUY2910

PROCUREMENT

15

15

28-Aug-12

17-Sep-12

50

50

10-Jul-12

17-Sep-12

SITE CONCRETE BUY2830

BID / AWARD SITE CONCRETE

10

10

10-Jul-12*

23-Jul-12

BUY2840

SUBMIT CONCRETE MIX DESIGNS & REBAR SHOP DRAWING

15

15

24-Jul-12

13-Aug-12

BUY2850

REVIEW / APPROVE MIX DESIGNS & SHOP DRAWINGS

10

10

14-Aug-12

27-Aug-12

BUY2860

PROCURE / FAB REBAR AS NEEDED

15

15

28-Aug-12

17-Sep-12

80

80

10-Jul-12

29-Oct-12

LANDSCAPING (BY OWNER) BUY2790

BID / AWARD LANDSCPAING

15

15

10-Jul-12

30-Jul-12

BUY2800

SELECT / TAG MAJOR LANDSCAPING ITEMS

30

30

31-Jul-12

10-Sep-12

BUY2810

OWNER REVIEW / APPROVE MAJOR LANDSCAPE ITEMS

30

30

21-Aug-12

01-Oct-12

BUY2820

PROCURE / DELIVER SOD, TREES, DG, IRRIGATION

20

20

02-Oct-12

29-Oct-12

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 6 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

TASK filter: All Activities Activity ID

Activity Name

PILE DRIVING PILE FAB/ DELIVER & MOB

Orig Dur

Rem Dur

Start

Finish

44

0

13-Feb-12 A

23-Apr-12 A

44

0

13-Feb-12 A

23-Apr-12 A

DES1060

RECEIVE STRUCTURAL DOCUMENTS & SPECS FOR FRICTION PILES

1

0

13-Feb-12 A

13-Feb-12 A

FPY4200

PILE SHOP DRAWING & SUBMITTAL

10

0

14-Feb-12 A

24-Feb-12 A

FPY2170

DRILL TEST PILES

2

0

09-Mar-12 A

12-Mar-12 A

FPY4210

MSA WALKED OFF THE JOB

1

0

15-Mar-12 A

15-Mar-12 A

FPY4220

NEW SUBCONTRACTOR HIRED - BERKEL

1

0

21-Mar-12 A

21-Mar-12 A

FPY4230

PILES WERE CHANGED TO CFA

1

0

21-Mar-12 A

22-Mar-12 A

FPY2230

DELIVER CFA PILE MATERIAL

10

0

22-Mar-12 A

27-Mar-12 A

FPY4190

LOAD TEST PILES

9

0

23-Mar-12 A

26-Mar-12 A

FPY5280

ADDITIONAL LOAD TEST REQUIRED DUE TO POOR RESULTS

2

0

18-Apr-12 A

19-Apr-12 A

FPY3190

REVIEW & APPROVE TEST PILE DATA

2

0

20-Apr-12 A

23-Apr-12 A

9

0

15-Mar-12 A

12-Apr-12 A

SHEETPILE FAB/ DELIVER & MOB FPY4240

MSA WALKED OFF THE JOB

1

0

15-Mar-12 A

15-Mar-12 A

FPY4250

NEW SUBCONTRACTOR HIRED - BERKEL

1

0

21-Mar-12 A

21-Mar-12 A

FPY1200

PROCURE SHEET PILE MATERIAL

7

0

26-Mar-12 A

28-Mar-12 A

FPY2200

PILE SHOP DRAWING & SUBMITTAL

5

0

29-Mar-12 A

06-Apr-12 A

FPY1210

MOBILIZE EQUIPMENT TO INSTALL SHEET PILES

5

0

08-Apr-12 A

12-Apr-12 A

11

0

13-Feb-12 A

20-Feb-12 A

11

0

13-Feb-12 A

20-Feb-12 A 20-Feb-12 A

PROJECT START UP MOBILIZATION, SURVEY AND LAYOUT

2012 Jun

MOB2000

MOBILIZE/SITE FENCING/SECURITY/SET-UP SITE OFFICES

10

0

13-Feb-12 A

MOB1000

CONSTRUCTION START

0

0

20-Feb-12 A

54

0

20-Feb-12 A

29-May-12 A

54

0

20-Feb-12 A

29-May-12 A

SITE PREP / EXCAVATION TOWER EXC1000

LAYOUT/EXCAVATION OF TOWER FOUNDATIONS / REMOVAL OF UNSUITABLE SOIL

15

0

20-Feb-12 A

23-Mar-12 A

EXC1010

BACKFILL TO TOP OF PILE - PHASE 1 ONLY

5

0

28-Feb-12 A

05-Mar-12 A

EXC1050

BACKFILL TO TOP OF TOWER PILE CAPS

8

0

07-May-12 A

29-May-12 A

25

0

20-Feb-12 A

30-Mar-12 A

20

0

20-Feb-12 A

30-Mar-12 A

CASINO EXC1080

REMOVE UNSUITABLE FILL

EXC2080

CRANE PATH FOR LOWER RETAINING WALL

LOW RISE

5

0

01-Mar-12 A

07-Mar-12 A

13

0

20-Feb-12 A

09-Apr-12 A

20-Feb-12 A

30-Mar-12 A

EXC1090

EXCAVATE MARGARITAVILLE RESTAURANT

5

0

EXC1110

BACKFILL TO BOTTOM OF LOWRISE FOOTINGS

6

0

02-Apr-12 A

09-Apr-12 A

4

0

20-Feb-12 A

23-Mar-12 A

EVENT CENTER & PORTE COCHERE EXC1100

EXCAVATE EVENT CENTER

FOUNDATIONS / BACKFILL & PREP FOR STRUCTURE

4

0

20-Feb-12 A

23-Mar-12 A

142

49

15-Mar-12 A

15-Sep-12

50

0

15-Mar-12 A

21-May-12 A

FPY4260

MSA WALKED OFF THE JOB

1

0

15-Mar-12 A

15-Mar-12 A

FPY4270

NEW SUBCONTRACTOR HIRED - BERKEL

1

0

21-Mar-12 A

21-Mar-12 A

TOWER

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

Page 7 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

TASK filter: All Activities Activity ID

Activity Name

Orig Dur

Rem Dur

Start

Finish

2012 Jun

HTFFND1010

PILES AT NORTH END ARE BEING REDESIGNED DUE TO LOAD TEST

17

0

22-Mar-12 A

HTFFND1000

DRILL TOWER PILES

17

0

29-Mar-12 A

27-Apr-12 A

HTFND1100

FORM/REBAR/POUR - TOWER PILE CAPS & GRADE BEAMS

22

0

16-Apr-12 A

21-May-12 A

HTFND9060

FORM/REBAR/POUR CRANE FOUNDATIONS

5

0

16-Apr-12 A

20-Apr-12 A

HTS02500

F/R/P ELEVATOR PITS

CASINO / BARGE

23-Apr-12 A

10

0

01-May-12 A

11-May-12 A

142

49

21-Mar-12 A

15-Sep-12

46

0

21-Mar-12 A

25-May-12 A

CAFFND0200

NEW SUBCONTRACTOR HIRED - BERKEL

1

0

21-Mar-12 A

21-Mar-12 A

CAFFND0500

CFA PILES UNDER REDESIGN

17

0

22-Mar-12 A

10-Apr-12 A

CAFFND1000

DRIVE SHEETPILING (250 LF)

15

0

12-Apr-12 A

11-May-12 A

CAFFND2000

DRILL BASIN PILES E TO W (CFA PILES)

15

0

14-Apr-12 A

25-May-12 A

CAFFND1100

DRIVE DEADMEN & INSTALL TIEBACKS

10

0

19-Apr-12 A

18-May-12 A

CAFFND1200

BACKFILL AT SHEET PILING

10

0

17-May-12 A

21-May-12 A

20

0

07-May-12 A

13-Jun-12 A

SHEET PILES & CFA PILES / PILE CAPS

BASIN SLABS CAFND02200

FORM/REBAR/POUR BASIN SLAB 3

8

0

07-May-12 A

11-May-12 A

CAFND02222

FORM/REBAR/POUR BASIN SLAB 4

8

0

18-May-12 A

24-May-12 A

CAFND02228

FORM/REBAR/POUR BASIN SLAB 2

10

0

21-May-12 A

01-Jun-12 A

CAFND03222

FORM/REBAR/POUR BASIN SLAB 1

9

0

05-Jun-12 A

13-Jun-12 A

45

45

17-May-12 A

10-Sep-12

BASIN WALLS CAFND10070

FORM/REBAR/POUR BASIN WALLS 3

10

0

17-May-12 A

05-Jun-12 A

CAFND11070

FORM/REBAR/POUR BASIN WALLS 4

14

0

25-May-12 A

15-Jun-12 A

CAFND12070

FORM/REBAR/POUR BASIN WALLS 2

13

0

05-Jun-12 A

22-Jun-12 A

CAFND13070

FORM/REBAR/POUR BASIN WALLS 1

13

0

19-Jun-12 A

09-Jul-12 A

CAFND18070

BACKFILL BASIN WALLS (North Wall backfill will follow Seq. 10 Steel on 9/10/12)

10

43

02-Jul-12 A

10-Sep-12

45

24

14-Jun-12 A

10-Aug-12

CAFND5070

INSTALL CONCRETE EYEBROW

10

6

14-Jun-12 A

17-Jul-12

CAFND1070

PRECAST LAYOUT - AREA 1/2

5

0

18-Jun-12 A

26-Jun-12 A

CAFND1072

PRECAST LAYOUT - AREA 2/3

5

4

29-Jun-12 A

13-Jul-12

CAFND7070

REINFORCED VISQUEEN / REBAR

4

8

03-Jul-12 A

20-Jul-12

CAFND9070

INSTALL PRECAST AT BARGE - AREA 1

8

8

16-Jul-12

25-Jul-12

CAFND9080

INSTALL PRECAST AT BARGE - AREA 2

6

6

26-Jul-12

02-Aug-12

CAFND9090

INSTALL PRECAST AT BARGE - AREA 3

PRECAST

PILLASTERS / KEEL SLAB / CEL DECK

6

6

03-Aug-12

10-Aug-12

35

35

28-Jul-12

15-Sep-12

28-Jul-12

28-Jul-12

CAFND10130

POUR KEEL SLAB AREA 1

1

1

CAFND10160

FORM/REBAR/POUR PILASTERS

17

17

30-Jul-12

23-Aug-12

CAFND10170

MEP IN BARGE

15

15

01-Aug-12

23-Aug-12

CAFND10140

POUR KEEL SLAB AREA 2

1

1

04-Aug-12

04-Aug-12

CAFND10150

POUR KEEL SLAB AREA 3

1

1

11-Aug-12

11-Aug-12

CAFND11080

INSTALL CEL DECK / TRENCH HEADERS / PRESETS

15

15

13-Aug-12

31-Aug-12

CAFND12080

FORM / REBAR / POUR CEL DECK - POUR 1

4

4

27-Aug-12

31-Aug-12

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

Page 8 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

TASK filter: All Activities Activity ID

Activity Name

Orig Dur

Rem Dur

Start

Finish

CAFND13080

FORM / REBAR / MEP / POUR CEL DECK- POUR 2

4

4

31-Aug-12

06-Sep-12

CAFND14080

FORM/REBAR/POUR CEL DECK- POUR 3

4

4

06-Sep-12

13-Sep-12

CAFND14090

FILL BASIN & FLOAT BARGE

2

2

13-Sep-12

15-Sep-12

56

14

21-May-12 A

27-Jul-12

LOW RISE - SOUTH RSFFND1000

EXCAVATE - FOOTINGS (DELAYED DUE TO SHEET PILE & STORM DRAIN)

5

0

21-May-12 A

09-Jul-12 A

RSFFND1100

FORM/REBAR/POUR - FOOTINGS

5

4

23-May-12 A

13-Jul-12

RSFFND1200

FORM/REBAR/POUR PEDESTALS IN BACKFILL ZONE

10

4

23-May-12 A

13-Jul-12

RSFFND1300

BACKFILL REMAINING TO BASIN WALLS (BASED ON 28 DAY CURE TIME ON BASIN WALLS)

10

3

15-Jun-12 A

27-Jul-12

28

28

10-Jul-12

16-Aug-12

LOW RISE - NORTH RSFFND2000

EXCAVATE - FOOTINGS (AFTER CRANE IS REMOVED AND BACKFILLED)

5

5

10-Jul-12*

16-Jul-12

RSFFND2100

FORM/REBAR/POUR - FOOTINGS

5

5

12-Jul-12

19-Jul-12

RSFFND2200

BACKFILL 12' OFF BASIN WALLS

10

10

19-Jul-12

01-Aug-12

RSFFND2300

BACKFILL REMAINING TO BASIN WALLS

10

10

02-Aug-12

16-Aug-12

45

10

22-May-12 A

23-Jul-12

EVENT CENTER & PORTE COCHERE

2012 Jun

THFFND1000

DRILL EVENT CENTER PILES

2

0

22-May-12 A

23-May-12 A

THFND1100

FORM/REBAR/POUR - PILE CAPS & GRADE BEAMS

5

8

06-Jul-12 A

20-Jul-12

THFND9060

BACKFILL TO TOP OF FOUNDATIONS

HOTEL TOWER CONSTRUCTION SLAB ON GRADE SOG68000

MEP UG/SUBGRADE/BASE

SOG69000

F/R/P LEVEL 1 SOG

TOWER STRUCTURE

4

4

17-Jul-12

23-Jul-12

276

225

30-Apr-12 A

20-May-13

16

16

17-Jul-12

07-Aug-12

10

10

17-Jul-12

31-Jul-12

10

10

25-Jul-12

07-Aug-12

151

100

30-Apr-12 A

26-Nov-12

HTS01500

F/R/P - VERTICAL LVL 1

5

0

30-Apr-12 A

04-May-12 A

HTS01600

F/R/P - MEZZ LEVEL DECK & VERTICAL

10

0

04-May-12 A

19-May-12 A

HTS02000

F/R/P DECK AND VERTICAL LVL 2 (`15,000 SF)

10

0

21-May-12 A

08-Jun-12 A

HTS03000

F/R/P DECK AND VERTICAL LVL 3 (`15,000 SF)

10

0

09-Jun-12 A

28-Jun-12 A

HTS04000

F/R/P DECK AND VERTICAL LVL 4 (`15,000 SF)

8

3

29-Jun-12 A

12-Jul-12

HTS05000

F/R/P DECK AND VERTICAL LVL 5

5

5

11-Jul-12 A

19-Jul-12

HTS06000

F/R/P DECK AND VERTICAL LVL 6

5

5

20-Jul-12

25-Jul-12

HTS07000

F/R/P DECK AND VERTICAL LVL 7

5

5

26-Jul-12

01-Aug-12

HTS08000

F/R/P DECK AND VERTICAL LVL 8

5

5

02-Aug-12

07-Aug-12

HTS09000

F/R/P DECK AND VERTICAL LVL 9

5

5

09-Aug-12

14-Aug-12

HTS10000

F/R/P DECK AND VERTICAL LVL 10

5

5

15-Aug-12

20-Aug-12

HTS11000

F/R/P DECK AND VERTICAL LVL 11

5

5

21-Aug-12

25-Aug-12

HTS12000

F/R/P DECK AND VERTICAL LVL 12

5

5

27-Aug-12

01-Sep-12

HTS14000

F/R/P DECK AND VERTICAL LVL 14

5

5

04-Sep-12

08-Sep-12

HTS15000

F/R/P DECK AND VERTICAL LVL 15

5

5

10-Sep-12

15-Sep-12

HTS16000

F/R/P DECK AND VERTICAL LVL 16

5

5

17-Sep-12

21-Sep-12

HTS17000

F/R/P DECK AND VERTICAL LVL 17

5

5

22-Sep-12

28-Sep-12

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

Page 9 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

HTS18000

F/R/P DECK AND VERTICAL LVL 18

5

5

29-Sep-12

HTS19000

F/R/P DECK AND VERTICAL LVL 19

5

5

05-Oct-12

11-Oct-12

HTS20000

F/R/P DECK - ROOF STRUCTURE

5

5

12-Oct-12

17-Oct-12

HTS21000

INSTALL TOWER TRELLIS

25

25

18-Oct-12

26-Nov-12

04-Oct-12

76

76

04-Sep-12

19-Dec-12

HTBTS1000

LEVELS 1/2 STAIRS

15

15

04-Sep-12

26-Sep-12

HTBTS3000

LEVEL 3/4 STAIRS

15

15

26-Sep-12

18-Oct-12

HTBTS5000

LEVEL 5/6 STAIRS

7

7

18-Oct-12

29-Oct-12

HTBTS7000

LEVEL 7/8 STAIRS

6

6

29-Oct-12

06-Nov-12

HTBTS9000

LEVEL 9/10 STAIRS

6

6

06-Nov-12

15-Nov-12

HTBTS9010

LEVEL 11/12 STAIRS

6

6

15-Nov-12

27-Nov-12

HTBTS9020

LEVEL 14/15 STAIRS

5

5

27-Nov-12

04-Dec-12

HTBTS9030

LEVEL 16/17 STAIRS

5

5

04-Dec-12

11-Dec-12

HTBTS9040

LEVEL 18/19 STAIRS

5

5

11-Dec-12

19-Dec-12

174

144

19-May-12 A

28-Jan-13

174

144

19-May-12 A

28-Jan-13

TOWER - STAIRS

TOWER - CRANES & MANLIFTS TOWER CRANE

2012 Jun

HTTC1007

TOWER CRANE (PEINER SK 575) - DURATION

157

133

19-May-12 A

28-Jan-13

HTTC1005

ERECT TOWER CRANE (PEINER SK 575)

3

0

19-May-12 A

22-May-12 A

HTTC1010

DISMANTLE TOWER CRANE (PEINER SK 575)

5

5

21-Jan-13

28-Jan-13

130

130

10-Jul-12

07-Jan-13

120

120

10-Jul-12

07-Jan-13

MANLIFT (1-DUAL ML) HTML2000

MANLIFT - DURATION

HLML1000

INSTALL DUAL MANLIFT - STRUCT. LVL. 3

5

5

10-Jul-12

16-Jul-12

HTML3000

MANLIFT DOWN

5

5

28-Dec-12

07-Jan-13

127

127

04-Sep-12

27-Feb-13

84

84

04-Sep-12

28-Dec-12

45

45

04-Sep-12

05-Nov-12

TOWER ELEVATORS SERVICE ELEVATORS - HS1 & HS2 ELEVATOR RAILS & ENTRANCES HTSFE1000

LEVEL 12 - WALLS & DECK POURED & STRIPPED

5

5

04-Sep-12

10-Sep-12

HTSFE1010

INSTALL RAILS & ENTRANCES FROM BASEMENT TO ROOF

40

40

11-Sep-12

05-Nov-12

52

52

18-Oct-12

28-Dec-12

ELEVATOR ROOF HTSFE1130

ELEVATOR MACHINE ROOM DRY-IN

12

12

18-Oct-12

02-Nov-12

HTSFE1135

INSTALL ELEVATOR MACHINE ROOM EQUIPMENT

8

8

05-Nov-12

14-Nov-12

HTSFE1140

POWER AVAILABLE TO ELEV. EQUIPMENT

0

0

HTSFE1150

COMPLETE ELEVATOR INSTALLATION

30

30

06-Nov-12

19-Dec-12

HTSFE1160

INSTALL CAB FINISHES & PROTECTION

5

5

20-Dec-12

28-Dec-12

HTSFE1170

SERVICE ELEVATOR COMPLETE

PASSENGER ELEVATORS - HP1, HP2, HP3 & HP4

05-Nov-12

0

0

127

127

04-Sep-12

28-Dec-12 27-Feb-13

50

50

04-Sep-12

12-Nov-12

HTSMRP1000

LEVEL 12 - WALLS & DECK POURED & STRIPPED

5

5

04-Sep-12

10-Sep-12

HTSMRP1010

INSTALL RAILS & ENTRANCES FROM BASEMENT TO ROOF

40

40

18-Sep-12

12-Nov-12

95

95

18-Oct-12

27-Feb-13

ELEVATOR RAILS & ENTRANCES

ELEVATOR ROOF Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

Page 10 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

HTSFE2130

ELEVATOR MACHINE ROOM DRY-IN

12

12

18-Oct-12

02-Nov-12

HTSFE2135

INSTALL ELEVATOR MACHINE ROOM EQUIPMENT

8

8

05-Nov-12

14-Nov-12

HTSMRP1110

POWER AVAILABLE TO ELEV. EQUIPMENT

0

0

HTSMRP1120

COMPLETE ELEVATORS INSTALLATION

60

60

15-Nov-12

13-Feb-13

HTSMRP1130

INSTALL CAB FINISHES

10

10

14-Feb-13

27-Feb-13

HTSMRP1170

PASSENGER ELEVATORS COMPLETE

0

0

140

140

25-Jul-12

05-Feb-13

84

84

25-Jul-12

19-Nov-12

TOWER - ENCLOSURE FRAMING & SHEATHING

14-Nov-12

27-Feb-13

HTE03000

FRAME EXTERIOR ENCLOSURE - LVL 3

5

5

25-Jul-12

31-Jul-12

HTE03005

FRAME EXTERIOR ENCLOSURE - LVL 4

5

5

01-Aug-12

07-Aug-12

HTE03006

FRAME EXTERIOR ENCLOSURE - LVL 5

5

5

08-Aug-12

14-Aug-12

HTE03010

FRAME EXTERIOR ENCLOSURE - LVL 6

5

5

16-Aug-12

22-Aug-12

HTE04005

FRAME EXTERIOR ENCLOSURE - LVL 7

5

5

23-Aug-12

29-Aug-12

HTE04010

FRAME EXTERIOR ENCLOSURE - LVL 8

5

5

30-Aug-12

05-Sep-12

HTE06005

FRAME EXTERIOR ENCLOSURE - LVL 9

5

5

06-Sep-12

13-Sep-12

HTE06010

FRAME EXTERIOR ENCLOSURE - LVL 10

5

5

14-Sep-12

20-Sep-12

HTE10000

FRAME EXTERIOR ENCLOSURE - LVL 11

5

5

21-Sep-12

27-Sep-12

HTE10010

FRAME EXTERIOR ENCLOSURE - LVL 12

5

5

28-Sep-12

04-Oct-12

HTE11010

FRAME EXTERIOR ENCLOSURE - LVL 14

5

5

05-Oct-12

11-Oct-12

HTE12001

FRAME EXTERIOR ENCLOSURE - LVL 15

5

5

12-Oct-12

19-Oct-12

HTE12010

FRAME EXTERIOR ENCLOSURE - LVL 16

5

5

22-Oct-12

26-Oct-12

HTE13010

FRAME EXTERIOR ENCLOSURE - LVL 17

5

5

29-Oct-12

02-Nov-12

HTE14010

FRAME EXTERIOR ENCLOSURE - LVL 18

5

5

05-Nov-12

09-Nov-12

HTE15010

FRAME EXTERIOR ENCLOSURE - LVL 19

5

5

13-Nov-12

19-Nov-12

101

101

27-Aug-12

14-Jan-13

HTE010000

SHEATH/LATH/SCRATCH/FINISH EAST/NORTH FACADE

85

85

27-Aug-12

02-Jan-13

HTE011000

SHEATH/LATH/SCRATCH/FINISH WEST/SOUTH FACADE

85

85

30-Aug-12

07-Jan-13

HTE35000

DEMOBILIZE STAGING

5

5

08-Jan-13

14-Jan-13

91

91

02-Oct-12

05-Feb-13

FOAM & FINISH

PUNCH WINDOWS HTE08000

INSTALL WINDOWS & CAULKING EAST/NORTH FACADE

75

75

02-Oct-12

24-Jan-13

HTE09000

INSTALL WINDOWS & CAULKING WEST/SOUTH FACADE

75

75

05-Oct-12

29-Jan-13

HTE33000

DEMOBILIZE STAGING

TOWER - ROOFING TOWER - ROOF

5

5

30-Jan-13

05-Feb-13

86

86

05-Oct-12

04-Feb-13

86

86

05-Oct-12

04-Feb-13

HTRF1205

TEMP. WATERPROOF DECK - LEVEL 12

5

5

05-Oct-12

11-Oct-12

HTRF1220

INSTALL ROOF DRAINS / POUR EQUIPMENT PADS

10

10

18-Oct-12

31-Oct-12

HTRF1270

BLOCKING AT PARAPETS

10

10

20-Nov-12

05-Dec-12

HTRF1280

INSTALL ROOFING SYSTEM & COMPONENTS

15

15

19-Dec-12

11-Jan-13

HTRF1290

SET MECHANICAL EQUIPMENT & CONNECT PIPING

10

10

04-Jan-13

21-Jan-13

HTRF1300

DETAIL FLASHING / INSTALL ROOFTOP WALK PADS

15

15

11-Jan-13

04-Feb-13

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 11 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

TOWER PHASE 1 FINISHES

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

131

131

20-Jul-12

18-Jan-13

59

59

20-Jul-12

10-Oct-12

HTF03010

POINT & PATCH / GRIND CEILING

5

5

20-Jul-12

26-Jul-12

HTF03020

PRIME & BOX EXPOSED CEILINGS

5

5

25-Jul-12

31-Jul-12

HTF03030

LAYOUT WALLS

5

5

27-Jul-12

02-Aug-12

HTF03040

MEP OVERHEAD ROUGH-IN AND RISERS

10

10

07-Aug-12

21-Aug-12

HTF03060

FRAME WALLS / SET DOOR FRAMES

10

10

21-Aug-12

04-Sep-12

HTF03080

MEPS WALL ROUGH-IN

10

10

28-Aug-12

11-Sep-12

HTF03070

DRYWALL RIPPER & CEILING FRAMING

5

5

30-Aug-12

06-Sep-12

HTF03090

MEPS CEILING ROUGH-IN

10

10

04-Sep-12

17-Sep-12

HTF03100

DURAROCK / BLUE BOARD AT BATHROOMS

5

5

13-Sep-12

19-Sep-12

HTF03110

WATERPROOF & TEST SHOWER DECKS

5

5

20-Sep-12

26-Sep-12

HTF03120

INSTALL BATHROOM & SHOWER TILE

10

10

27-Sep-12

10-Oct-12

51

51

27-Jul-12

05-Oct-12

LEVEL 3

LEVEL 4 HTF04010

POINT & PATCH / GRIND CEILING

5

5

27-Jul-12

02-Aug-12

HTF04020

PRIME & BOX EXPOSED CEILINGS

5

5

01-Aug-12

07-Aug-12

HTF04030

LAYOUT WALLS

5

5

03-Aug-12

09-Aug-12

HTF04040

MEP OVERHEAD ROUGH-IN AND RISERS

10

10

07-Aug-12

20-Aug-12

HTF04060

FRAME WALLS / SET DOOR FRAMES

10

10

16-Aug-12

29-Aug-12

HTF04080

MEPS WALL ROUGH-IN

10

10

23-Aug-12

06-Sep-12

HTF04070

DRYWALL RIPPER & CEILING FRAMING

5

5

27-Aug-12

31-Aug-12

HTF04090

MEPS CEILING ROUGH-IN

10

10

29-Aug-12

12-Sep-12

HTF04100

DURAROCK / BLUE BOARD AT BATHROOMS

5

5

10-Sep-12

14-Sep-12

HTF04110

WATERPROOF & TEST SHOWER DECKS

5

5

17-Sep-12

21-Sep-12

HTF04120

INSTALL BATHROOM & SHOWER TILE

10

10

24-Sep-12

05-Oct-12

51

51

03-Aug-12

12-Oct-12

LEVEL 5 HTF05010

POINT & PATCH / GRIND CEILING

5

5

03-Aug-12

09-Aug-12

HTF05020

PRIME & BOX EXPOSED CEILINGS

5

5

08-Aug-12

14-Aug-12

HTF05030

LAYOUT WALLS

5

5

10-Aug-12

16-Aug-12

HTF05040

MEP OVERHEAD ROUGH-IN AND RISERS

10

10

14-Aug-12

27-Aug-12

HTF05060

FRAME WALLS / SET DOOR FRAMES

10

10

23-Aug-12

06-Sep-12

HTF05080

MEPS WALL ROUGH-IN

10

10

30-Aug-12

13-Sep-12

HTF05070

DRYWALL RIPPER & CEILING FRAMING

5

5

04-Sep-12

10-Sep-12

HTF05090

MEPS CEILING ROUGH-IN

10

10

06-Sep-12

19-Sep-12

HTF05100

DURAROCK / BLUE BOARD AT BATHROOMS

5

5

17-Sep-12

21-Sep-12

HTF05110

WATERPROOF & TEST SHOWER DECKS

5

5

24-Sep-12

28-Sep-12

HTF05120

INSTALL BATHROOM & SHOWER TILE

10

10

01-Oct-12

12-Oct-12

51

51

10-Aug-12

19-Oct-12

LEVEL 6 HTF06010

POINT & PATCH / GRIND CEILING

5

5

10-Aug-12

16-Aug-12

HTF06020

PRIME & BOX EXPOSED CEILINGS

5

5

15-Aug-12

21-Aug-12

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 12 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

HTF06030

LAYOUT WALLS

5

5

17-Aug-12

23-Aug-12

HTF06040

MEP OVERHEAD ROUGH-IN AND RISERS

10

10

21-Aug-12

04-Sep-12

HTF06060

FRAME WALLS / SET DOOR FRAMES

10

10

30-Aug-12

13-Sep-12

HTF06080

MEPS WALL ROUGH-IN

10

10

07-Sep-12

20-Sep-12

HTF06070

DRYWALL RIPPER & CEILING FRAMING

5

5

11-Sep-12

17-Sep-12

HTF06090

MEPS CEILING ROUGH-IN

10

10

13-Sep-12

26-Sep-12

HTF06100

DURAROCK / BLUE BOARD AT BATHROOMS

5

5

24-Sep-12

28-Sep-12

HTF06110

WATERPROOF & TEST SHOWER DECKS

5

5

01-Oct-12

05-Oct-12

HTF06120

INSTALL BATHROOM & SHOWER TILE

10

10

08-Oct-12

19-Oct-12

51

51

17-Aug-12

26-Oct-12

HTF07010

POINT & PATCH / GRIND CEILING

5

5

17-Aug-12

23-Aug-12

HTF07020

PRIME & BOX EXPOSED CEILINGS

5

5

22-Aug-12

28-Aug-12

HTF07030

LAYOUT WALLS

5

5

24-Aug-12

30-Aug-12

HTF07040

MEP OVERHEAD ROUGH-IN AND RISERS

10

10

28-Aug-12

11-Sep-12

HTF07060

FRAME WALLS / SET DOOR FRAMES

10

10

07-Sep-12

20-Sep-12

HTF07080

MEPS WALL ROUGH-IN

10

10

14-Sep-12

27-Sep-12

HTF07070

DRYWALL RIPPER & CEILING FRAMING

5

5

18-Sep-12

24-Sep-12

HTF07090

MEPS CEILING ROUGH-IN

10

10

20-Sep-12

03-Oct-12

HTF07100

DURAROCK / BLUE BOARD AT BATHROOMS

5

5

01-Oct-12

05-Oct-12

HTF07110

WATERPROOF & TEST SHOWER DECKS

5

5

08-Oct-12

12-Oct-12

HTF07120

INSTALL BATHROOM & SHOWER TILE

10

10

15-Oct-12

26-Oct-12

LEVEL 7

51

51

24-Aug-12

02-Nov-12

HTF08010

POINT & PATCH / GRIND CEILING

5

5

24-Aug-12

30-Aug-12

HTF08020

PRIME & BOX EXPOSED CEILINGS

5

5

29-Aug-12

05-Sep-12

HTF08030

LAYOUT WALLS

5

5

31-Aug-12

07-Sep-12

HTF08040

MEP OVERHEAD ROUGH-IN AND RISERS

10

10

05-Sep-12

18-Sep-12

HTF08060

FRAME WALLS / SET DOOR FRAMES

10

10

14-Sep-12

27-Sep-12

HTF08080

MEPS WALL ROUGH-IN

10

10

21-Sep-12

04-Oct-12

HTF08070

DRYWALL RIPPER & CEILING FRAMING

5

5

25-Sep-12

01-Oct-12

HTF08090

MEPS CEILING ROUGH-IN

10

10

27-Sep-12

10-Oct-12

HTF08100

DURAROCK / BLUE BOARD AT BATHROOMS

5

5

08-Oct-12

12-Oct-12

HTF08110

WATERPROOF & TEST SHOWER DECKS

5

5

15-Oct-12

19-Oct-12

HTF08120

INSTALL BATHROOM & SHOWER TILE

10

10

22-Oct-12

02-Nov-12

51

51

31-Aug-12

09-Nov-12

LEVEL 8

LEVEL 9 HTF09010

POINT & PATCH / GRIND CEILING

5

5

31-Aug-12

07-Sep-12

HTF09020

PRIME & BOX EXPOSED CEILINGS

5

5

06-Sep-12

12-Sep-12

HTF09030

LAYOUT WALLS

5

5

10-Sep-12

14-Sep-12

HTF09040

MEP OVERHEAD ROUGH-IN AND RISERS

10

10

12-Sep-12

25-Sep-12

HTF09060

FRAME WALLS / SET DOOR FRAMES

10

10

21-Sep-12

04-Oct-12

HTF09080

MEPS WALL ROUGH-IN

10

10

28-Sep-12

11-Oct-12

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 13 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

HTF09070

DRYWALL RIPPER & CEILING FRAMING

5

5

02-Oct-12

08-Oct-12

HTF09090

MEPS CEILING ROUGH-IN

10

10

04-Oct-12

17-Oct-12

HTF09100

DURAROCK / BLUE BOARD AT BATHROOMS

5

5

15-Oct-12

19-Oct-12

HTF09110

WATERPROOF & TEST SHOWER DECKS

5

5

22-Oct-12

26-Oct-12

HTF09120

INSTALL BATHROOM & SHOWER TILE

10

10

29-Oct-12

09-Nov-12

50

50

10-Sep-12

16-Nov-12

LEVEL 10 HTF10010

POINT & PATCH / GRIND CEILING

5

5

10-Sep-12

14-Sep-12

HTF10020

PRIME & BOX EXPOSED CEILINGS

5

5

13-Sep-12

19-Sep-12

HTF10030

LAYOUT WALLS

5

5

17-Sep-12

21-Sep-12

HTF10040

MEP OVERHEAD ROUGH-IN AND RISERS

10

10

19-Sep-12

02-Oct-12

HTF10060

FRAME WALLS / SET DOOR FRAMES

10

10

28-Sep-12

11-Oct-12

HTF10080

MEPS WALL ROUGH-IN

10

10

05-Oct-12

18-Oct-12

HTF10070

DRYWALL RIPPER & CEILING FRAMING

5

5

09-Oct-12

15-Oct-12

HTF10090

MEPS CEILING ROUGH-IN

10

10

11-Oct-12

24-Oct-12

HTF10100

DURAROCK / BLUE BOARD AT BATHROOMS

5

5

22-Oct-12

26-Oct-12

HTF10110

WATERPROOF & TEST SHOWER DECKS

5

5

29-Oct-12

02-Nov-12

HTF10120

INSTALL BATHROOM & SHOWER TILE

10

10

05-Nov-12

16-Nov-12

52

52

17-Sep-12

27-Nov-12

LEVEL 11 HTF11010

POINT & PATCH / GRIND CEILING

5

5

17-Sep-12

21-Sep-12

HTF11020

PRIME & BOX EXPOSED CEILINGS

5

5

20-Sep-12

26-Sep-12

HTF11030

LAYOUT WALLS

5

5

24-Sep-12

28-Sep-12

HTF11040

MEP OVERHEAD ROUGH-IN AND RISERS

10

10

26-Sep-12

09-Oct-12

HTF11060

FRAME WALLS / SET DOOR FRAMES

10

10

05-Oct-12

18-Oct-12

HTF11080

MEPS WALL ROUGH-IN

10

10

12-Oct-12

25-Oct-12

HTF11070

DRYWALL RIPPER & CEILING FRAMING

5

5

16-Oct-12

22-Oct-12

HTF11090

MEPS CEILING ROUGH-IN

10

10

18-Oct-12

31-Oct-12

HTF11085

SET BATH TUBS IN SUITES

5

5

23-Oct-12

29-Oct-12

HTF11100

DURAROCK / BLUE BOARD AT BATHROOMS

5

5

29-Oct-12

02-Nov-12

HTF11110

WATERPROOF & TEST SHOWER DECKS

5

5

05-Nov-12

09-Nov-12

HTF11120

INSTALL BATHROOM & SHOWER TILE

10

10

12-Nov-12

27-Nov-12

52

52

24-Sep-12

04-Dec-12

LEVEL 12 HTF12010

POINT & PATCH / GRIND CEILING

5

5

24-Sep-12

28-Sep-12

HTF12020

PRIME & BOX EXPOSED CEILINGS

5

5

27-Sep-12

03-Oct-12

HTF12030

LAYOUT WALLS

5

5

01-Oct-12

05-Oct-12

HTF12040

MEP OVERHEAD ROUGH-IN AND RISERS

10

10

03-Oct-12

16-Oct-12

HTF12060

FRAME WALLS / SET DOOR FRAMES

10

10

12-Oct-12

25-Oct-12

HTF12080

MEPS WALL ROUGH-IN

10

10

19-Oct-12

01-Nov-12

HTF12070

DRYWALL RIPPER & CEILING FRAMING

5

5

23-Oct-12

29-Oct-12

HTF12090

MEPS CEILING ROUGH-IN

10

10

25-Oct-12

07-Nov-12

HTF12085

SET BATH TUBS IN SUITES

5

5

30-Oct-12

05-Nov-12

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 14 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

5

5

05-Nov-12

09-Nov-12

HTF12100

DURAROCK / BLUE BOARD AT BATHROOMS

HTF12110

WATERPROOF & TEST SHOWER DECKS

5

5

12-Nov-12

16-Nov-12

HTF12120

INSTALL BATHROOM & SHOWER TILE

10

10

19-Nov-12

04-Dec-12

52

52

01-Oct-12

11-Dec-12

LEVEL 14 HTF14010

POINT & PATCH / GRIND CEILING

5

5

01-Oct-12

05-Oct-12

HTF14020

PRIME & BOX EXPOSED CEILINGS

5

5

04-Oct-12

10-Oct-12

HTF14030

LAYOUT WALLS

5

5

08-Oct-12

12-Oct-12

HTF14040

MEP OVERHEAD ROUGH-IN AND RISERS

10

10

10-Oct-12

23-Oct-12

HTF14060

FRAME WALLS / SET DOOR FRAMES

10

10

19-Oct-12

01-Nov-12

HTF14080

MEPS WALL ROUGH-IN

10

10

26-Oct-12

08-Nov-12

HTF14070

DRYWALL RIPPER & CEILING FRAMING

5

5

30-Oct-12

05-Nov-12

HTF14090

MEPS CEILING ROUGH-IN

10

10

01-Nov-12

14-Nov-12

HTF14085

SET BATH TUBS IN SUITES

5

5

06-Nov-12

12-Nov-12

HTF14100

DURAROCK / BLUE BOARD AT BATHROOMS

5

5

12-Nov-12

16-Nov-12

HTF14110

WATERPROOF & TEST SHOWER DECKS

5

5

19-Nov-12

27-Nov-12

HTF14120

INSTALL BATHROOM & SHOWER TILE

10

10

28-Nov-12

11-Dec-12

52

52

08-Oct-12

18-Dec-12

HTF15010

POINT & PATCH / GRIND CEILING

5

5

08-Oct-12

12-Oct-12

HTF15020

PRIME & BOX EXPOSED CEILINGS

5

5

11-Oct-12

17-Oct-12

HTF15030

LAYOUT WALLS

5

5

15-Oct-12

19-Oct-12

HTF15040

MEP OVERHEAD ROUGH-IN AND RISERS

10

10

17-Oct-12

30-Oct-12

HTF15060

FRAME WALLS / SET DOOR FRAMES

10

10

26-Oct-12

08-Nov-12

HTF15080

MEPS WALL ROUGH-IN

10

10

02-Nov-12

15-Nov-12

HTF15070

DRYWALL RIPPER & CEILING FRAMING

5

5

06-Nov-12

12-Nov-12

HTF15090

MEPS CEILING ROUGH-IN

10

10

08-Nov-12

21-Nov-12

HTF15085

SET BATH TUBS IN SUITES

5

5

13-Nov-12

19-Nov-12

HTF15100

DURAROCK / BLUE BOARD AT BATHROOMS

5

5

19-Nov-12

27-Nov-12

HTF15110

WATERPROOF & TEST SHOWER DECKS

5

5

28-Nov-12

04-Dec-12

HTF15120

INSTALL BATHROOM & SHOWER TILE

10

10

05-Dec-12

18-Dec-12

LEVEL 15

54

54

15-Oct-12

27-Dec-12

HTF16010

POINT & PATCH / GRIND CEILING

5

5

15-Oct-12

19-Oct-12

HTF16020

PRIME & BOX EXPOSED CEILINGS

5

5

18-Oct-12

24-Oct-12

HTF16030

LAYOUT WALLS

5

5

22-Oct-12

26-Oct-12

HTF16040

MEP OVERHEAD ROUGH-IN AND RISERS

10

10

24-Oct-12

06-Nov-12

HTF16060

FRAME WALLS / SET DOOR FRAMES

10

10

02-Nov-12

15-Nov-12

HTF16080

MEPS WALL ROUGH-IN

10

10

09-Nov-12

26-Nov-12

HTF16070

DRYWALL RIPPER & CEILING FRAMING

5

5

13-Nov-12

19-Nov-12

HTF16090

MEPS CEILING ROUGH-IN

10

10

15-Nov-12

30-Nov-12

HTF16085

SET BATH TUBS IN SUITES

5

5

20-Nov-12

28-Nov-12

HTF16100

DURAROCK / BLUE BOARD AT BATHROOMS

5

5

28-Nov-12

04-Dec-12

LEVEL 16

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 15 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

HTF16110

WATERPROOF & TEST SHOWER DECKS

5

5

05-Dec-12

11-Dec-12

HTF16120

INSTALL BATHROOM & SHOWER TILE

10

10

12-Dec-12

27-Dec-12

55

55

22-Oct-12

04-Jan-13 26-Oct-12

LEVEL 17 HTF17010

POINT & PATCH / GRIND CEILING

5

5

22-Oct-12

HTF17020

PRIME & BOX EXPOSED CEILINGS

5

5

25-Oct-12

31-Oct-12

HTF17030

LAYOUT WALLS

5

5

29-Oct-12

02-Nov-12

HTF17040

MEP OVERHEAD ROUGH-IN AND RISERS

10

10

31-Oct-12

13-Nov-12

HTF17060

FRAME WALLS / SET DOOR FRAMES

10

10

09-Nov-12

26-Nov-12

HTF17080

MEPS WALL ROUGH-IN

10

10

16-Nov-12

03-Dec-12

HTF17070

DRYWALL RIPPER & CEILING FRAMING

5

5

20-Nov-12

28-Nov-12

HTF17090

MEPS CEILING ROUGH-IN

10

10

26-Nov-12

07-Dec-12

HTF17085

SET BATH TUBS IN SUITES

5

5

29-Nov-12

05-Dec-12

HTF17100

DURAROCK / BLUE BOARD AT BATHROOMS

5

5

05-Dec-12

11-Dec-12

HTF17110

WATERPROOF & TEST SHOWER DECKS

5

5

12-Dec-12

18-Dec-12

HTF17120

INSTALL BATHROOM & SHOWER TILE

10

10

19-Dec-12

04-Jan-13

55

55

29-Oct-12

11-Jan-13

LEVEL 18 HTF18010

POINT & PATCH / GRIND CEILING

5

5

29-Oct-12

02-Nov-12

HTF18020

PRIME & BOX EXPOSED CEILINGS

5

5

01-Nov-12

07-Nov-12

HTF18030

LAYOUT WALLS

5

5

05-Nov-12

09-Nov-12

HTF18040

MEP OVERHEAD ROUGH-IN AND RISERS

10

10

07-Nov-12

20-Nov-12

HTF18060

FRAME WALLS / SET DOOR FRAMES

10

10

16-Nov-12

03-Dec-12

HTF18080

MEPS WALL ROUGH-IN

10

10

27-Nov-12

10-Dec-12

HTF18070

DRYWALL RIPPER & CEILING FRAMING

5

5

29-Nov-12

05-Dec-12

HTF18090

MEPS CEILING ROUGH-IN

10

10

03-Dec-12

14-Dec-12

HTF18085

SET BATH TUBS IN SUITES

5

5

06-Dec-12

12-Dec-12

HTF18100

DURAROCK / BLUE BOARD AT BATHROOMS

5

5

12-Dec-12

18-Dec-12

HTF18110

WATERPROOF & TEST SHOWER DECKS

5

5

19-Dec-12

27-Dec-12

HTF18120

INSTALL BATHROOM & SHOWER TILE

10

10

28-Dec-12

11-Jan-13

55

55

05-Nov-12

18-Jan-13

LEVEL 19 HTF19010

POINT & PATCH / GRIND CEILING

5

5

05-Nov-12

09-Nov-12

HTF19020

PRIME & BOX EXPOSED CEILINGS

5

5

08-Nov-12

14-Nov-12

HTF19030

LAYOUT WALLS

5

5

12-Nov-12

16-Nov-12

HTF19040

MEP OVERHEAD ROUGH-IN AND RISERS

10

10

14-Nov-12

29-Nov-12

HTF19060

FRAME WALLS / SET DOOR FRAMES

10

10

27-Nov-12

10-Dec-12

HTF19080

MEPS WALL ROUGH-IN

10

10

04-Dec-12

17-Dec-12

HTF19070

DRYWALL RIPPER & CEILING FRAMING

5

5

06-Dec-12

12-Dec-12

HTF19090

MEPS CEILING ROUGH-IN

10

10

10-Dec-12

21-Dec-12

HTF19085

SET BATH TUBS IN SUITES

5

5

13-Dec-12

19-Dec-12

HTF19100

DURAROCK / BLUE BOARD AT BATHROOMS

5

5

19-Dec-12

27-Dec-12

HTF19110

WATERPROOF & TEST SHOWER DECKS

5

5

28-Dec-12

04-Jan-13

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 16 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

HTF19120

INSTALL BATHROOM & SHOWER TILE

TOWER PHASE 2 FINISHES LEVEL 3

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

10

10

07-Jan-13

18-Jan-13

155

155

16-Oct-12

20-May-13

80

80

16-Oct-12

04-Feb-13 22-Oct-12

HTF03510

DRYWALL 1 SIDE / INSULATE

5

5

16-Oct-12

HTF03520

DRYWALL 2ND SIDE

5

5

23-Oct-12

29-Oct-12

HTF03530

TAPE & TEXTURE WALLS & CEILINGS

6

6

29-Oct-12

05-Nov-12

HTF03540

PAINT CEILINGS & WALLS

5

5

05-Nov-12

09-Nov-12

HTF03550

INSTALL WALL PAPER

5

5

08-Nov-12

14-Nov-12

HTF03560

INSTALL MILLWORK / GLASS WALL AT BAR

5

5

12-Nov-12

16-Nov-12

HTF03570

INSTALL VANITIES WITH STONE TOPS

5

5

14-Nov-12

20-Nov-12

HTF03580

INSTALL TOILETS / SINKS

5

5

21-Nov-12

29-Nov-12

HTF03590

INSTALL BATH ACCESSORIES

5

5

21-Nov-12

29-Nov-12

HTF03600

INSTALL ROOM TILE

5

5

30-Nov-12

06-Dec-12

HTF03610

INSTALL PAD & CARPET IN ROOMS

5

5

06-Dec-12

12-Dec-12

HTF03620

MEP TRIM IN ROOMS

5

5

07-Dec-12

13-Dec-12

HTF03630

INSTALL SHOWER ENCLOSURES

5

5

07-Dec-12

13-Dec-12

HTF03640

INSTALL DOORS & HARDWARE

5

5

12-Dec-12

18-Dec-12

HTF03650

CONTRACTOR ROOM PUNCH & CLEAN-UP

5

5

19-Dec-12

27-Dec-12

HTF03660

OWNERS ROOM PUNCH & FINAL

5

5

28-Dec-12

04-Jan-13

HTF03670

INSTALL ROOM FF&E

5

5

07-Jan-13

11-Jan-13

HTF03680

INSTALL CORRIDOR PAD & CARPET

5

5

14-Jan-13

18-Jan-13

HTF03690

CORRIDOR WALL FINISH & TRIM

5

5

18-Jan-13

25-Jan-13

HTF03700

MEP TRIM CORRIDORS

5

5

22-Jan-13

28-Jan-13

HTF03710

CORRIDOR PUNCH & FINAL

5

5

29-Jan-13

04-Feb-13

80

80

23-Oct-12

11-Feb-13

HTF04510

DRYWALL 1 SIDE / INSULATE

5

5

23-Oct-12

29-Oct-12

HTF04520

DRYWALL 2ND SIDE

5

5

30-Oct-12

05-Nov-12

HTF04530

TAPE & TEXTURE WALLS & CEILINGS

6

6

05-Nov-12

12-Nov-12

HTF04540

PAINT CEILINGS & WALLS

5

5

12-Nov-12

16-Nov-12

HTF04550

INSTALL WALL PAPER

5

5

15-Nov-12

21-Nov-12

HTF04560

INSTALL MILLWORK / GLASS WALL AT BAR

5

5

19-Nov-12

27-Nov-12

HTF04570

INSTALL VANITIES WITH STONE TOPS

5

5

21-Nov-12

29-Nov-12

HTF04580

INSTALL TOILETS / SINKS

5

5

30-Nov-12

06-Dec-12

HTF04590

INSTALL BATH ACCESSORIES

5

5

30-Nov-12

06-Dec-12

HTF04600

INSTALL ROOM TILE

5

5

07-Dec-12

13-Dec-12

HTF04610

INSTALL PAD & CARPET IN ROOMS

5

5

13-Dec-12

19-Dec-12

HTF04620

MEP TRIM IN ROOMS

5

5

14-Dec-12

20-Dec-12

HTF04630

INSTALL SHOWER ENCLOSURES

5

5

14-Dec-12

20-Dec-12

HTF04640

INSTALL DOORS & HARDWARE

5

5

19-Dec-12

27-Dec-12

HTF04650

CONTRACTOR ROOM PUNCH & CLEAN-UP

5

5

28-Dec-12

04-Jan-13

LEVEL 4

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 17 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

HTF04660

OWNERS ROOM PUNCH & FINAL

5

5

07-Jan-13

11-Jan-13

HTF04670

INSTALL ROOM FF&E

5

5

14-Jan-13

18-Jan-13

HTF04680

INSTALL CORRIDOR PAD & CARPET

5

5

21-Jan-13

25-Jan-13

HTF04690

CORRIDOR WALL FINISH & TRIM

5

5

25-Jan-13

01-Feb-13

HTF04700

MEP TRIM CORRIDORS

5

5

29-Jan-13

04-Feb-13

HTF04710

CORRIDOR PUNCH & FINAL

5

5

05-Feb-13

11-Feb-13

80

80

30-Oct-12

18-Feb-13

HTF05510

DRYWALL 1 SIDE / INSULATE

5

5

30-Oct-12

05-Nov-12

HTF05520

DRYWALL 2ND SIDE

5

5

06-Nov-12

12-Nov-12

HTF05530

TAPE & TEXTURE WALLS & CEILINGS

6

6

12-Nov-12

19-Nov-12

HTF05540

PAINT CEILINGS & WALLS

5

5

19-Nov-12

27-Nov-12

HTF05550

INSTALL WALL PAPER

5

5

26-Nov-12

30-Nov-12

HTF05560

INSTALL MILLWORK / GLASS WALL AT BAR

5

5

28-Nov-12

04-Dec-12

HTF05570

INSTALL VANITIES WITH STONE TOPS

5

5

30-Nov-12

06-Dec-12

HTF05580

INSTALL TOILETS / SINKS

5

5

07-Dec-12

13-Dec-12

HTF05590

INSTALL BATH ACCESSORIES

5

5

07-Dec-12

13-Dec-12

HTF05600

INSTALL ROOM TILE

5

5

14-Dec-12

20-Dec-12

HTF05610

INSTALL PAD & CARPET IN ROOMS

5

5

20-Dec-12

28-Dec-12

HTF05620

MEP TRIM IN ROOMS

5

5

21-Dec-12

31-Dec-12

HTF05630

INSTALL SHOWER ENCLOSURES

5

5

21-Dec-12

31-Dec-12

HTF05640

INSTALL DOORS & HARDWARE

5

5

28-Dec-12

04-Jan-13

HTF05650

CONTRACTOR ROOM PUNCH & CLEAN-UP

5

5

07-Jan-13

11-Jan-13

HTF05660

OWNERS ROOM PUNCH & FINAL

5

5

14-Jan-13

18-Jan-13

HTF05670

INSTALL ROOM FF&E

5

5

21-Jan-13

25-Jan-13

HTF05680

INSTALL CORRIDOR PAD & CARPET

5

5

28-Jan-13

01-Feb-13

HTF05690

CORRIDOR WALL FINISH & TRIM

5

5

01-Feb-13

08-Feb-13

HTF05700

MEP TRIM CORRIDORS

5

5

05-Feb-13

11-Feb-13

HTF05710

CORRIDOR PUNCH & FINAL

5

5

12-Feb-13

18-Feb-13

81

81

06-Nov-12

26-Feb-13

LEVEL 5

LEVEL 6 HTF06510

DRYWALL 1 SIDE / INSULATE

5

5

06-Nov-12

12-Nov-12

HTF06520

DRYWALL 2ND SIDE

5

5

13-Nov-12

19-Nov-12

HTF06530

TAPE & TEXTURE WALLS & CEILINGS

6

6

19-Nov-12

28-Nov-12

HTF06540

PAINT CEILINGS & WALLS

5

5

28-Nov-12

04-Dec-12

HTF06550

INSTALL WALL PAPER

5

5

03-Dec-12

07-Dec-12

HTF06560

INSTALL MILLWORK / GLASS WALL AT BAR

5

5

05-Dec-12

11-Dec-12

HTF06570

INSTALL VANITIES WITH STONE TOPS

5

5

07-Dec-12

13-Dec-12

HTF06580

INSTALL TOILETS / SINKS

5

5

14-Dec-12

20-Dec-12

HTF06590

INSTALL BATH ACCESSORIES

5

5

14-Dec-12

20-Dec-12

HTF06600

INSTALL ROOM TILE

5

5

21-Dec-12

31-Dec-12

HTF06610

INSTALL PAD & CARPET IN ROOMS

5

5

31-Dec-12

07-Jan-13

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 18 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

HTF06620

MEP TRIM IN ROOMS

5

5

02-Jan-13

08-Jan-13

HTF06630

INSTALL SHOWER ENCLOSURES

5

5

02-Jan-13

08-Jan-13

HTF06640

INSTALL DOORS & HARDWARE

5

5

07-Jan-13

11-Jan-13

HTF06650

CONTRACTOR ROOM PUNCH & CLEAN-UP

5

5

14-Jan-13

18-Jan-13

HTF06660

OWNERS ROOM PUNCH & FINAL

5

5

21-Jan-13

25-Jan-13

HTF06670

INSTALL ROOM FF&E

5

5

28-Jan-13

01-Feb-13

HTF06680

INSTALL CORRIDOR PAD & CARPET

5

5

04-Feb-13

08-Feb-13

HTF06690

CORRIDOR WALL FINISH & TRIM

5

5

08-Feb-13

18-Feb-13

HTF06700

MEP TRIM CORRIDORS

5

5

13-Feb-13

19-Feb-13

HTF06710

CORRIDOR PUNCH & FINAL

LEVEL 7

5

5

20-Feb-13

26-Feb-13

80

80

13-Nov-12

04-Mar-13

HTF07510

DRYWALL 1 SIDE / INSULATE

5

5

13-Nov-12

19-Nov-12

HTF07520

DRYWALL 2ND SIDE

5

5

20-Nov-12

28-Nov-12

HTF07530

TAPE & TEXTURE WALLS & CEILINGS

6

6

28-Nov-12

05-Dec-12

HTF07540

PAINT CEILINGS & WALLS

5

5

05-Dec-12

11-Dec-12

HTF07550

INSTALL WALL PAPER

5

5

10-Dec-12

14-Dec-12

HTF07560

INSTALL MILLWORK / GLASS WALL AT BAR

5

5

12-Dec-12

18-Dec-12

HTF07570

INSTALL VANITIES WITH STONE TOPS

5

5

14-Dec-12

20-Dec-12

HTF07580

INSTALL TOILETS / SINKS

5

5

21-Dec-12

31-Dec-12

HTF07590

INSTALL BATH ACCESSORIES

5

5

21-Dec-12

31-Dec-12

HTF07600

INSTALL ROOM TILE

5

5

02-Jan-13

08-Jan-13

HTF07610

INSTALL PAD & CARPET IN ROOMS

5

5

08-Jan-13

14-Jan-13

HTF07620

MEP TRIM IN ROOMS

5

5

09-Jan-13

15-Jan-13

HTF07630

INSTALL SHOWER ENCLOSURES

5

5

09-Jan-13

15-Jan-13

HTF07640

INSTALL DOORS & HARDWARE

5

5

14-Jan-13

18-Jan-13

HTF07650

CONTRACTOR ROOM PUNCH & CLEAN-UP

5

5

21-Jan-13

25-Jan-13

HTF07660

OWNERS ROOM PUNCH & FINAL

5

5

28-Jan-13

01-Feb-13

HTF07670

INSTALL ROOM FF&E

5

5

04-Feb-13

08-Feb-13

HTF07680

INSTALL CORRIDOR PAD & CARPET

5

5

11-Feb-13

15-Feb-13

HTF07690

CORRIDOR WALL FINISH & TRIM

5

5

15-Feb-13

22-Feb-13

HTF07700

MEP TRIM CORRIDORS

5

5

19-Feb-13

25-Feb-13

HTF07710

CORRIDOR PUNCH & FINAL

LEVEL 8

5

5

26-Feb-13

04-Mar-13

80

80

20-Nov-12

11-Mar-13

HTF08510

DRYWALL 1 SIDE / INSULATE

5

5

20-Nov-12

28-Nov-12

HTF08520

DRYWALL 2ND SIDE

5

5

29-Nov-12

05-Dec-12

HTF08530

TAPE & TEXTURE WALLS & CEILINGS

6

6

05-Dec-12

12-Dec-12

HTF08540

PAINT CEILINGS & WALLS

5

5

12-Dec-12

18-Dec-12

HTF08550

INSTALL WALL PAPER

5

5

17-Dec-12

21-Dec-12

HTF08560

INSTALL MILLWORK / GLASS WALL AT BAR

5

5

19-Dec-12

27-Dec-12

HTF08570

INSTALL VANITIES WITH STONE TOPS

5

5

21-Dec-12

31-Dec-12

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 19 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

HTF08580

INSTALL TOILETS / SINKS

5

5

02-Jan-13

08-Jan-13

HTF08590

INSTALL BATH ACCESSORIES

5

5

02-Jan-13

08-Jan-13

HTF08600

INSTALL ROOM TILE

5

5

09-Jan-13

15-Jan-13

HTF08610

INSTALL PAD & CARPET IN ROOMS

5

5

15-Jan-13

21-Jan-13

HTF08620

MEP TRIM IN ROOMS

5

5

16-Jan-13

22-Jan-13

HTF08630

INSTALL SHOWER ENCLOSURES

5

5

16-Jan-13

22-Jan-13

HTF08640

INSTALL DOORS & HARDWARE

5

5

21-Jan-13

25-Jan-13

HTF08650

CONTRACTOR ROOM PUNCH & CLEAN-UP

5

5

28-Jan-13

01-Feb-13

HTF08660

OWNERS ROOM PUNCH & FINAL

5

5

04-Feb-13

08-Feb-13

HTF08670

INSTALL ROOM FF&E

5

5

11-Feb-13

15-Feb-13

HTF08680

INSTALL CORRIDOR PAD & CARPET

5

5

18-Feb-13

22-Feb-13

HTF08690

CORRIDOR WALL FINISH & TRIM

5

5

22-Feb-13

01-Mar-13

HTF08700

MEP TRIM CORRIDORS

5

5

26-Feb-13

04-Mar-13

HTF08710

CORRIDOR PUNCH & FINAL

5

5

05-Mar-13

11-Mar-13

78

78

29-Nov-12

18-Mar-13

HTF09510

DRYWALL 1 SIDE / INSULATE

5

5

29-Nov-12

05-Dec-12

HTF09520

DRYWALL 2ND SIDE

5

5

06-Dec-12

12-Dec-12

HTF09530

TAPE & TEXTURE WALLS & CEILINGS

6

6

12-Dec-12

19-Dec-12

HTF09540

PAINT CEILINGS & WALLS

5

5

19-Dec-12

27-Dec-12

HTF09550

INSTALL WALL PAPER

5

5

26-Dec-12

02-Jan-13

HTF09560

INSTALL MILLWORK / GLASS WALL AT BAR

5

5

28-Dec-12

04-Jan-13

HTF09570

INSTALL VANITIES WITH STONE TOPS

5

5

02-Jan-13

08-Jan-13

HTF09580

INSTALL TOILETS / SINKS

5

5

09-Jan-13

15-Jan-13

HTF09590

INSTALL BATH ACCESSORIES

5

5

09-Jan-13

15-Jan-13

HTF09600

INSTALL ROOM TILE

5

5

16-Jan-13

22-Jan-13

HTF09610

INSTALL PAD & CARPET IN ROOMS

5

5

22-Jan-13

28-Jan-13

HTF09620

MEP TRIM IN ROOMS

5

5

23-Jan-13

29-Jan-13

HTF09630

INSTALL SHOWER ENCLOSURES

5

5

23-Jan-13

29-Jan-13

HTF09640

INSTALL DOORS & HARDWARE

5

5

28-Jan-13

01-Feb-13

HTF09650

CONTRACTOR ROOM PUNCH & CLEAN-UP

5

5

04-Feb-13

08-Feb-13

HTF09660

OWNERS ROOM PUNCH & FINAL

5

5

11-Feb-13

15-Feb-13

HTF09670

INSTALL ROOM FF&E

5

5

18-Feb-13

22-Feb-13

HTF09680

INSTALL CORRIDOR PAD & CARPET

5

5

25-Feb-13

01-Mar-13

HTF09690

CORRIDOR WALL FINISH & TRIM

5

5

01-Mar-13

08-Mar-13

HTF09700

MEP TRIM CORRIDORS

5

5

05-Mar-13

11-Mar-13

HTF09710

CORRIDOR PUNCH & FINAL

5

5

12-Mar-13

18-Mar-13

LEVEL 9

79

79

06-Dec-12

26-Mar-13

HTF10510

DRYWALL 1 SIDE / INSULATE

5

5

06-Dec-12

12-Dec-12

HTF10520

DRYWALL 2ND SIDE

5

5

13-Dec-12

19-Dec-12

HTF10530

TAPE & TEXTURE WALLS & CEILINGS

6

6

19-Dec-12

28-Dec-12

LEVEL 10

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 20 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

HTF10540

PAINT CEILINGS & WALLS

5

5

28-Dec-12

04-Jan-13

HTF10550

INSTALL WALL PAPER

5

5

03-Jan-13

09-Jan-13

HTF10560

INSTALL MILLWORK / GLASS WALL AT BAR

5

5

07-Jan-13

11-Jan-13

HTF10570

INSTALL VANITIES WITH STONE TOPS

5

5

09-Jan-13

15-Jan-13

HTF10580

INSTALL TOILETS / SINKS

5

5

16-Jan-13

22-Jan-13

HTF10590

INSTALL BATH ACCESSORIES

5

5

16-Jan-13

22-Jan-13

HTF10600

INSTALL ROOM TILE

5

5

23-Jan-13

29-Jan-13

HTF10610

INSTALL PAD & CARPET IN ROOMS

5

5

29-Jan-13

04-Feb-13

HTF10620

MEP TRIM IN ROOMS

5

5

30-Jan-13

05-Feb-13

HTF10630

INSTALL SHOWER ENCLOSURES

5

5

30-Jan-13

05-Feb-13

HTF10640

INSTALL DOORS & HARDWARE

5

5

04-Feb-13

08-Feb-13

HTF10650

CONTRACTOR ROOM PUNCH & CLEAN-UP

5

5

11-Feb-13

15-Feb-13

HTF10660

OWNERS ROOM PUNCH & FINAL

5

5

18-Feb-13

22-Feb-13

HTF10670

INSTALL ROOM FF&E

5

5

25-Feb-13

01-Mar-13

HTF10680

INSTALL CORRIDOR PAD & CARPET

5

5

04-Mar-13

08-Mar-13

HTF10690

CORRIDOR WALL FINISH & TRIM

5

5

08-Mar-13

18-Mar-13

HTF10700

MEP TRIM CORRIDORS

5

5

13-Mar-13

19-Mar-13

HTF10710

CORRIDOR PUNCH & FINAL

5

5

20-Mar-13

26-Mar-13

78

78

13-Dec-12

01-Apr-13

LEVEL 11 HTF11510

DRYWALL 1 SIDE / INSULATE

5

5

13-Dec-12

19-Dec-12

HTF11520

DRYWALL 2ND SIDE

5

5

20-Dec-12

28-Dec-12

HTF11530

TAPE & TEXTURE WALLS & CEILINGS

6

6

28-Dec-12

07-Jan-13

HTF11540

PAINT CEILINGS & WALLS

5

5

07-Jan-13

11-Jan-13

HTF11550

INSTALL WALL PAPER

5

5

10-Jan-13

16-Jan-13

HTF11560

INSTALL MILLWORK / GLASS WALL AT BAR

5

5

14-Jan-13

18-Jan-13

HTF11570

INSTALL VANITIES WITH STONE TOPS

5

5

16-Jan-13

22-Jan-13

HTF11580

INSTALL TOILETS / SINKS

5

5

23-Jan-13

29-Jan-13

HTF11590

INSTALL BATH ACCESSORIES

5

5

23-Jan-13

29-Jan-13

HTF11600

INSTALL ROOM TILE

5

5

30-Jan-13

05-Feb-13

HTF11610

INSTALL PAD & CARPET IN ROOMS

5

5

05-Feb-13

11-Feb-13

HTF11620

MEP TRIM IN ROOMS

5

5

06-Feb-13

12-Feb-13

HTF11630

INSTALL SHOWER ENCLOSURES

5

5

06-Feb-13

12-Feb-13

HTF11640

INSTALL DOORS & HARDWARE

5

5

11-Feb-13

15-Feb-13

HTF11650

CONTRACTOR ROOM PUNCH & CLEAN-UP

5

5

18-Feb-13

22-Feb-13

HTF11660

OWNERS ROOM PUNCH & FINAL

5

5

25-Feb-13

01-Mar-13

HTF11670

INSTALL ROOM FF&E

5

5

04-Mar-13

08-Mar-13

HTF11680

INSTALL CORRIDOR PAD & CARPET

5

5

11-Mar-13

15-Mar-13

HTF11690

CORRIDOR WALL FINISH & TRIM

5

5

15-Mar-13

22-Mar-13

HTF11700

MEP TRIM CORRIDORS

5

5

19-Mar-13

25-Mar-13

HTF11710

CORRIDOR PUNCH & FINAL

5

5

26-Mar-13

01-Apr-13

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 21 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

LEVEL 12

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

78

78

20-Dec-12

08-Apr-13

HTF12510

DRYWALL 1 SIDE / INSULATE

5

5

20-Dec-12

28-Dec-12

HTF12520

DRYWALL 2ND SIDE

5

5

31-Dec-12

07-Jan-13

HTF12530

TAPE & TEXTURE WALLS & CEILINGS

6

6

07-Jan-13

14-Jan-13

HTF12540

PAINT CEILINGS & WALLS

5

5

14-Jan-13

18-Jan-13

HTF12550

INSTALL WALL PAPER

5

5

17-Jan-13

23-Jan-13

HTF12560

INSTALL MILLWORK / GLASS WALL AT BAR

5

5

21-Jan-13

25-Jan-13

HTF12570

INSTALL VANITIES WITH STONE TOPS

5

5

23-Jan-13

29-Jan-13

HTF12580

INSTALL TOILETS / SINKS

5

5

30-Jan-13

05-Feb-13

HTF12590

INSTALL BATH ACCESSORIES

5

5

30-Jan-13

05-Feb-13

HTF12600

INSTALL ROOM TILE

5

5

06-Feb-13

12-Feb-13

HTF12610

INSTALL PAD & CARPET IN ROOMS

5

5

12-Feb-13

18-Feb-13

HTF12620

MEP TRIM IN ROOMS

5

5

13-Feb-13

19-Feb-13

HTF12630

INSTALL SHOWER ENCLOSURES

5

5

13-Feb-13

19-Feb-13

HTF12640

INSTALL DOORS & HARDWARE

5

5

18-Feb-13

22-Feb-13

HTF12650

CONTRACTOR ROOM PUNCH & CLEAN-UP

5

5

25-Feb-13

01-Mar-13

HTF12660

OWNERS ROOM PUNCH & FINAL

5

5

04-Mar-13

08-Mar-13

HTF12670

INSTALL ROOM FF&E

5

5

11-Mar-13

15-Mar-13

HTF12680

INSTALL CORRIDOR PAD & CARPET

5

5

18-Mar-13

22-Mar-13

HTF12690

CORRIDOR WALL FINISH & TRIM

5

5

22-Mar-13

29-Mar-13

HTF12700

MEP TRIM CORRIDORS

5

5

26-Mar-13

01-Apr-13

HTF12710

CORRIDOR PUNCH & FINAL

LEVEL 14

5

5

02-Apr-13

08-Apr-13

76

76

31-Dec-12

15-Apr-13

HTF14510

DRYWALL 1 SIDE / INSULATE

5

5

31-Dec-12

07-Jan-13

HTF14520

DRYWALL 2ND SIDE

5

5

08-Jan-13

14-Jan-13

HTF14530

TAPE & TEXTURE WALLS & CEILINGS

6

6

14-Jan-13

21-Jan-13

HTF14540

PAINT CEILINGS & WALLS

5

5

21-Jan-13

25-Jan-13

HTF14550

INSTALL WALL PAPER

5

5

24-Jan-13

30-Jan-13

HTF14560

INSTALL MILLWORK / GLASS WALL AT BAR

5

5

28-Jan-13

01-Feb-13

HTF14570

INSTALL VANITIES WITH STONE TOPS

5

5

30-Jan-13

05-Feb-13

HTF14580

INSTALL TOILETS / SINKS

5

5

06-Feb-13

12-Feb-13

HTF14590

INSTALL BATH ACCESSORIES

5

5

06-Feb-13

12-Feb-13

HTF14600

INSTALL ROOM TILE

5

5

13-Feb-13

19-Feb-13

HTF14610

INSTALL PAD & CARPET IN ROOMS

5

5

19-Feb-13

25-Feb-13

HTF14620

MEP TRIM IN ROOMS

5

5

20-Feb-13

26-Feb-13

HTF14630

INSTALL SHOWER ENCLOSURES

5

5

20-Feb-13

26-Feb-13

HTF14640

INSTALL DOORS & HARDWARE

5

5

25-Feb-13

01-Mar-13

HTF14650

CONTRACTOR ROOM PUNCH & CLEAN-UP

5

5

04-Mar-13

08-Mar-13

HTF14660

OWNERS ROOM PUNCH & FINAL

5

5

11-Mar-13

15-Mar-13

HTF14670

INSTALL ROOM FF&E

5

5

18-Mar-13

22-Mar-13

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 22 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

HTF14680

INSTALL CORRIDOR PAD & CARPET

5

5

25-Mar-13

29-Mar-13

HTF14690

CORRIDOR WALL FINISH & TRIM

5

5

29-Mar-13

05-Apr-13

HTF14700

MEP TRIM CORRIDORS

5

5

02-Apr-13

08-Apr-13

HTF14710

CORRIDOR PUNCH & FINAL

5

5

09-Apr-13

15-Apr-13

75

75

08-Jan-13

22-Apr-13

HTF15510

DRYWALL 1 SIDE / INSULATE

5

5

08-Jan-13

14-Jan-13

HTF15520

DRYWALL 2ND SIDE

5

5

15-Jan-13

21-Jan-13

HTF15530

TAPE & TEXTURE WALLS & CEILINGS

6

6

21-Jan-13

28-Jan-13

HTF15540

PAINT CEILINGS & WALLS

5

5

28-Jan-13

01-Feb-13

HTF15550

INSTALL WALL PAPER

5

5

31-Jan-13

06-Feb-13

HTF15560

INSTALL MILLWORK / GLASS WALL AT BAR

5

5

04-Feb-13

08-Feb-13

HTF15570

INSTALL VANITIES WITH STONE TOPS

5

5

06-Feb-13

12-Feb-13

HTF15580

INSTALL TOILETS / SINKS

5

5

13-Feb-13

19-Feb-13

HTF15590

INSTALL BATH ACCESSORIES

5

5

13-Feb-13

19-Feb-13

HTF15600

INSTALL ROOM TILE

5

5

20-Feb-13

26-Feb-13

HTF15610

INSTALL PAD & CARPET IN ROOMS

5

5

26-Feb-13

04-Mar-13

HTF15620

MEP TRIM IN ROOMS

5

5

27-Feb-13

05-Mar-13

HTF15630

INSTALL SHOWER ENCLOSURES

5

5

27-Feb-13

05-Mar-13

HTF15640

INSTALL DOORS & HARDWARE

5

5

04-Mar-13

08-Mar-13

HTF15650

CONTRACTOR ROOM PUNCH & CLEAN-UP

5

5

11-Mar-13

15-Mar-13

HTF15660

OWNERS ROOM PUNCH & FINAL

5

5

18-Mar-13

22-Mar-13

HTF15670

INSTALL ROOM FF&E

5

5

25-Mar-13

29-Mar-13

HTF15680

INSTALL CORRIDOR PAD & CARPET

5

5

01-Apr-13

05-Apr-13

HTF15690

CORRIDOR WALL FINISH & TRIM

5

5

05-Apr-13

12-Apr-13

HTF15700

MEP TRIM CORRIDORS

5

5

09-Apr-13

15-Apr-13

HTF15710

CORRIDOR PUNCH & FINAL

5

5

16-Apr-13

22-Apr-13

LEVEL 15

76

76

15-Jan-13

30-Apr-13

HTF16510

DRYWALL 1 SIDE / INSULATE

5

5

15-Jan-13

21-Jan-13

HTF16520

DRYWALL 2ND SIDE

5

5

22-Jan-13

28-Jan-13

HTF16530

TAPE & TEXTURE WALLS & CEILINGS

6

6

28-Jan-13

04-Feb-13

HTF16540

PAINT CEILINGS & WALLS

5

5

04-Feb-13

08-Feb-13

HTF16550

INSTALL WALL PAPER

5

5

07-Feb-13

13-Feb-13

HTF16560

INSTALL MILLWORK / GLASS WALL AT BAR

5

5

11-Feb-13

15-Feb-13

HTF16570

INSTALL VANITIES WITH STONE TOPS

5

5

13-Feb-13

19-Feb-13

HTF16580

INSTALL TOILETS / SINKS

5

5

20-Feb-13

26-Feb-13

HTF16590

INSTALL BATH ACCESSORIES

5

5

20-Feb-13

26-Feb-13

HTF16600

INSTALL ROOM TILE

5

5

27-Feb-13

05-Mar-13

HTF16610

INSTALL PAD & CARPET IN ROOMS

5

5

05-Mar-13

11-Mar-13

HTF16620

MEP TRIM IN ROOMS

5

5

06-Mar-13

12-Mar-13

HTF16630

INSTALL SHOWER ENCLOSURES

5

5

06-Mar-13

12-Mar-13

LEVEL 16

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 23 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

HTF16640

INSTALL DOORS & HARDWARE

5

5

11-Mar-13

15-Mar-13

HTF16650

CONTRACTOR ROOM PUNCH & CLEAN-UP

5

5

18-Mar-13

22-Mar-13

HTF16660

OWNERS ROOM PUNCH & FINAL

5

5

25-Mar-13

29-Mar-13

HTF16670

INSTALL ROOM FF&E

5

5

01-Apr-13

05-Apr-13

HTF16680

INSTALL CORRIDOR PAD & CARPET

5

5

08-Apr-13

12-Apr-13

HTF16690

CORRIDOR WALL FINISH & TRIM

5

5

12-Apr-13

22-Apr-13

HTF16700

MEP TRIM CORRIDORS

5

5

17-Apr-13

23-Apr-13

HTF16710

CORRIDOR PUNCH & FINAL

5

5

24-Apr-13

30-Apr-13

75

75

22-Jan-13

06-May-13

LEVEL 17 HTF17510

DRYWALL 1 SIDE / INSULATE

5

5

22-Jan-13

28-Jan-13

HTF17520

DRYWALL 2ND SIDE

5

5

29-Jan-13

04-Feb-13

HTF17530

TAPE & TEXTURE WALLS & CEILINGS

6

6

04-Feb-13

11-Feb-13

HTF17540

PAINT CEILINGS & WALLS

5

5

11-Feb-13

15-Feb-13

HTF17550

INSTALL WALL PAPER

5

5

14-Feb-13

20-Feb-13

HTF17560

INSTALL MILLWORK / GLASS WALL AT BAR

5

5

18-Feb-13

22-Feb-13

HTF17570

INSTALL VANITIES WITH STONE TOPS

5

5

20-Feb-13

26-Feb-13

HTF17580

INSTALL TOILETS / SINKS

5

5

27-Feb-13

05-Mar-13

HTF17590

INSTALL BATH ACCESSORIES

5

5

27-Feb-13

05-Mar-13

HTF17600

INSTALL ROOM TILE

5

5

06-Mar-13

12-Mar-13

HTF17610

INSTALL PAD & CARPET IN ROOMS

5

5

12-Mar-13

18-Mar-13

HTF17620

MEP TRIM IN ROOMS

5

5

13-Mar-13

19-Mar-13

HTF17630

INSTALL SHOWER ENCLOSURES

5

5

13-Mar-13

19-Mar-13

HTF17640

INSTALL DOORS & HARDWARE

5

5

18-Mar-13

22-Mar-13

HTF17650

CONTRACTOR ROOM PUNCH & CLEAN-UP

5

5

25-Mar-13

29-Mar-13

HTF17660

OWNERS ROOM PUNCH & FINAL

5

5

01-Apr-13

05-Apr-13

HTF17670

INSTALL ROOM FF&E

5

5

08-Apr-13

12-Apr-13

HTF17680

INSTALL CORRIDOR PAD & CARPET

5

5

15-Apr-13

19-Apr-13

HTF17690

CORRIDOR WALL FINISH & TRIM

5

5

19-Apr-13

26-Apr-13

HTF17700

MEP TRIM CORRIDORS

5

5

23-Apr-13

29-Apr-13

HTF17710

CORRIDOR PUNCH & FINAL

LEVEL 18

5

5

30-Apr-13

06-May-13

75

75

29-Jan-13

13-May-13

HTF18510

DRYWALL 1 SIDE / INSULATE

5

5

29-Jan-13

04-Feb-13

HTF18520

DRYWALL 2ND SIDE

5

5

05-Feb-13

11-Feb-13

HTF18530

TAPE & TEXTURE WALLS & CEILINGS

6

6

11-Feb-13

18-Feb-13

HTF18540

PAINT CEILINGS & WALLS

5

5

18-Feb-13

22-Feb-13

HTF18550

INSTALL WALL PAPER

5

5

21-Feb-13

27-Feb-13

HTF18560

INSTALL MILLWORK / GLASS WALL AT BAR

5

5

25-Feb-13

01-Mar-13

HTF18570

INSTALL VANITIES WITH STONE TOPS

5

5

27-Feb-13

05-Mar-13

HTF18580

INSTALL TOILETS / SINKS

5

5

06-Mar-13

12-Mar-13

HTF18590

INSTALL BATH ACCESSORIES

5

5

06-Mar-13

12-Mar-13

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 24 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

HTF18600

INSTALL ROOM TILE

5

5

13-Mar-13

19-Mar-13

HTF18610

INSTALL PAD & CARPET IN ROOMS

5

5

19-Mar-13

25-Mar-13

HTF18620

MEP TRIM IN ROOMS

5

5

20-Mar-13

26-Mar-13

HTF18630

INSTALL SHOWER ENCLOSURES

5

5

20-Mar-13

26-Mar-13

HTF18640

INSTALL DOORS & HARDWARE

5

5

25-Mar-13

29-Mar-13

HTF18650

CONTRACTOR ROOM PUNCH & CLEAN-UP

5

5

01-Apr-13

05-Apr-13

HTF18660

OWNERS ROOM PUNCH & FINAL

5

5

08-Apr-13

12-Apr-13

HTF18670

INSTALL ROOM FF&E

5

5

15-Apr-13

19-Apr-13

HTF18680

INSTALL CORRIDOR PAD & CARPET

5

5

22-Apr-13

26-Apr-13

HTF18690

CORRIDOR WALL FINISH & TRIM

5

5

26-Apr-13

03-May-13

HTF18700

MEP TRIM CORRIDORS

5

5

30-Apr-13

06-May-13

HTF18710

CORRIDOR PUNCH & FINAL

LEVEL 19

5

5

07-May-13

13-May-13

75

75

05-Feb-13

20-May-13

HTF19510

DRYWALL 1 SIDE / INSULATE

5

5

05-Feb-13

11-Feb-13

HTF19520

DRYWALL 2ND SIDE

5

5

12-Feb-13

18-Feb-13

HTF19530

TAPE & TEXTURE WALLS & CEILINGS

6

6

18-Feb-13

25-Feb-13

HTF19540

PAINT CEILINGS & WALLS

5

5

25-Feb-13

01-Mar-13

HTF19550

INSTALL WALL PAPER

5

5

28-Feb-13

06-Mar-13

HTF19560

INSTALL MILLWORK / GLASS WALL AT BAR

5

5

04-Mar-13

08-Mar-13

HTF19570

INSTALL VANITIES WITH STONE TOPS

5

5

06-Mar-13

12-Mar-13

HTF19580

INSTALL TOILETS / SINKS

5

5

13-Mar-13

19-Mar-13

HTF19590

INSTALL BATH ACCESSORIES

5

5

13-Mar-13

19-Mar-13

HTF19600

INSTALL ROOM TILE

5

5

20-Mar-13

26-Mar-13

HTF19610

INSTALL PAD & CARPET IN ROOMS

5

5

26-Mar-13

01-Apr-13

HTF19620

MEP TRIM IN ROOMS

5

5

27-Mar-13

02-Apr-13

HTF19630

INSTALL SHOWER ENCLOSURES

5

5

27-Mar-13

02-Apr-13

HTF19640

INSTALL DOORS & HARDWARE

5

5

01-Apr-13

05-Apr-13

HTF19650

CONTRACTOR ROOM PUNCH & CLEAN-UP

5

5

08-Apr-13

12-Apr-13

HTF19660

OWNERS ROOM PUNCH & FINAL

5

5

15-Apr-13

19-Apr-13

HTF19670

INSTALL ROOM FF&E

5

5

22-Apr-13

26-Apr-13

HTF19680

INSTALL CORRIDOR PAD & CARPET

5

5

29-Apr-13

03-May-13

HTF19690

CORRIDOR WALL FINISH & TRIM

5

5

03-May-13

10-May-13

HTF19700

MEP TRIM CORRIDORS

5

5

07-May-13

13-May-13

HTF19710

CORRIDOR PUNCH & FINAL

5

5

14-May-13

20-May-13

45

45

08-Jan-13

11-Mar-13

45

45

08-Jan-13

11-Mar-13

MANLIFT ROOM FINISHES MANLIFT ROOMS HTMLRNC100

MANLIFT ROOM FINISHES

SLAB ON GRADE SOUTH LOW RISE - SOG Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

45

45

08-Jan-13

11-Mar-13

121

81

29-May-12 A

13-Nov-12

71

10

29-May-12 A

04-Sep-12

Page 25 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

TASK filter: All Activities Activity ID

Activity Name

Orig Dur

Rem Dur

Start

Finish

0

29-May-12 A

19-Jun-12 A

PDSOG72000

MEP UG/SUBGRADE/BASE

15

PDSOG73000

FORM/REBAR/POUR - SOG (MINUS BACKFILL ZONE)

10

0

07-Jun-12 A

30-Jun-12 A

PDSOG76000

FORM/REBAR/POUR SOG BACKFILL ZONE

10

10

22-Aug-12

04-Sep-12

27

27

08-Oct-12

13-Nov-12

NORTH LOW RISE - SOG PDSOG79000

FORM/REBAR/POUR SPREAD FOOTINGS (crane pad)

5

5

08-Oct-12

12-Oct-12

PDSOG71000

MEP UG/SUBGRADE/BASE

10

10

15-Oct-12

29-Oct-12

PDSOG78000

FORM/REBAR/POUR - SOG

10

10

30-Oct-12

13-Nov-12

26

26

24-Jul-12

28-Aug-12

24-Jul-12

06-Aug-12

EVENT CENTER & PORTE COCHERE - SOG PDSOG74000

MEP UG/SUBGRADE/BASE

10

10

PDSOG75000

FORM/REBAR/POUR - SOG

10

10

31-Jul-12

13-Aug-12

PDSOG77000

PORTE COCHERE SPREAD FOOTINGS

10

10

14-Aug-12

28-Aug-12

93

78

09-Jul-12 A

31-Oct-12

66

51

09-Jul-12 A

24-Sep-12

STEEL STRUCTURE SOUTH LOWRISE STEEL PSTR1500

ERECT STRUCTURAL STEEL

31

29

09-Jul-12 A

27-Aug-12

PSTR1600

PLUMB, BOLT & WELD STRUCT STEEL

30

30

10-Jul-12 A

29-Aug-12

PSTR1700

METAL DECK, SHEAR STUDS & PUDDLE WELD - SOUTH

15

15

13-Aug-12

03-Sep-12

PSTR1800

EDGE FORM & MEPS ROUGH IN

8

8

29-Aug-12

07-Sep-12

PSTR1900

REBAR & POUR SOMD (RESTAURANT / POOL DECK)

10

10

10-Sep-12

24-Sep-12

38

38

28-Aug-12

18-Oct-12

PSTR2000

ERECT STRUCTURAL STEEL

15

15

28-Aug-12

18-Sep-12

PSTR2100

PLUMB, BOLT & WELD STRUCT STEEL

8

8

11-Sep-12

21-Sep-12

PSTR2200

METAL DECK, SHEAR STUDS & PUDDLE WELD

8

8

18-Sep-12

27-Sep-12

PSTR2210

METAL DECK / REBAR / POUR AT RISERS / RAKERS

15

15

18-Sep-12

08-Oct-12

PSTR2300

EDGE FORM & MEPS ROUGH IN

10

10

02-Oct-12

15-Oct-12

PSTR2400

REBAR & POUR SOMD (EVENT CENTER)

6

6

10-Oct-12

18-Oct-12

EVENT CENTER & PORTE COCHERE STEEL

26

26

19-Sep-12

24-Oct-12

PSTR1000

ERECT STRUCTURAL STEEL (55,512 SF) (FOLLOWS ACTIVITY - FILL BASIN / FLOAT BARGE)

18

18

19-Sep-12

12-Oct-12

PSTR1100

PLUMB, BOLT & WELD STRUCT STEEL

10

10

03-Oct-12

16-Oct-12

PSTR1200

METAL ROOF DECK (CASINO / BARGE)

10

10

10-Oct-12

24-Oct-12

PSTR1210

INSTALL CURBS & AHUs

5

5

18-Oct-12

24-Oct-12

CASINO STEEL (BARGE AREA)

13

13

15-Oct-12

31-Oct-12

PSTR3000

ERECT STRUCTURAL STEEL NORTH

4

4

15-Oct-12

19-Oct-12

PSTR4000

PLUMB, BOLT & WELD STRUCT STEEL

5

5

19-Oct-12

25-Oct-12

PSTR5000

METAL DECK

5

5

25-Oct-12

31-Oct-12

FIRE PROOFING / OVERHEAD MEPS

115

115

08-Aug-12

15-Jan-13

46

46

08-Aug-12

10-Oct-12

21

21

08-Aug-12

05-Sep-12

20

20

08-Aug-12

05-Sep-12

16

16

29-Aug-12

19-Sep-12

NORTH LOWRISE STEEL

TOWER FOOTPRINT / OVERHEAD MEPS TOWER LEVEL 1 PFPB3120

OH MEPS ROUGH-IN

TOWER MEZZ LEVEL Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 26 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

TASK filter: All Activities Activity ID

Activity Name

PFPB4120

OH MEPS ROUGH-IN

TOWER LEVEL 2 PFPB5120

OH MEPS ROUGH-IN

SOUTH LOW RISE LEVEL1 - FP/OH MEPS

Orig Dur

Rem Dur

Start

Finish

15

15

29-Aug-12

19-Sep-12

20

20

13-Sep-12

10-Oct-12

20

20

13-Sep-12

10-Oct-12

35

35

21-Sep-12

08-Nov-12

PFPB2110

FP STRUCTURAL STEEL

15

15

21-Sep-12

11-Oct-12

PFPB2120

OH MEPS ROUGH-IN

25

25

05-Oct-12

08-Nov-12

PPD4000

POOL PIPING FROM POOL EQUIP. ROOM TO POOL/JACUZZI

10

10

26-Oct-12

08-Nov-12

25

25

21-Sep-12

25-Oct-12

SOUTH LOW RISE LEVEL 2 - FP/OH MEPS PFPB8120

FP STRUCTURAL STEEL

5

5

21-Sep-12

27-Sep-12

PFPB9120

OH MEPS ROUGH-IN

15

15

28-Sep-12

18-Oct-12

PFPB9130

INSTALL SUPPORT BEAMS FOR PARTITION WALLS

5

5

19-Oct-12

25-Oct-12

37

37

19-Oct-12

10-Dec-12

PFPB2010

FP STRUCTURAL STEEL - EVENT CENTER

10

10

19-Oct-12

01-Nov-12

PFPB2015

PIN-ON SOUND BAT INSULATION AT METAL DECK

10

10

02-Nov-12

15-Nov-12

PFPB2020

OH MEPS ROUGH-IN AT EVENT CENTER

20

20

09-Nov-12

10-Dec-12

33

33

30-Nov-12

15-Jan-13

EVENT CENTER - FP/OH MEPS

CASINO - FP/OH MEPS PFPB2050

FP STRUCTURAL STEEL

15

15

30-Nov-12

20-Dec-12

PFPB2060

OH MEPS ROUGH-IN

30

30

30-Nov-12

15-Jan-13

NORTH LOW RISE - FP/OH MEPS

16

16

20-Dec-12

11-Jan-13

PFPB2040

FP STRUCTURAL STEEL

4

4

20-Dec-12

27-Dec-12

PFPB3040

OH MEPS ROUGH-IN

10

10

27-Dec-12

11-Jan-13

159

159

23-Aug-12

02-Apr-13

159

159

23-Aug-12

02-Apr-13

LOW RISE EXTERIOR ENCLOSURE / ROOF & PORTE COCHERE SOUTH ELEVATION (CASINO / MARGARITAVILLE)

81

81

23-Aug-12

13-Dec-12

SEN6460

FRAME EXT. WALLS / INSTALL CANOPY SUPPORTS

10

10

23-Aug-12

05-Sep-12

SEN6470

INSTALL SCAFFOLDING

8

8

23-Aug-12

03-Sep-12

SEN6490

INSTALL PARAPET ROOF BACKING/SHEATHING

5

5

30-Aug-12

05-Sep-12

SEN6510

INSTALL SHEATHING

5

5

30-Aug-12

05-Sep-12

SEN6495

SET MTL STUD ROOF TRUSSES

10

10

30-Aug-12

13-Sep-12

SEN6520

INSTALL WINDOWS & ENTRY DOORS

15

15

06-Sep-12

27-Sep-12

SEN6540

INSTALL FLAT ROOFS

20

20

06-Sep-12

04-Oct-12

SEN6497

INSTALL MTL/DENS DECK

10

10

06-Sep-12

20-Sep-12

SEN6500

EXTERIOR STUCCO FINISH

10

10

06-Sep-12

20-Sep-12

SEN6530

INSTALL METAL & WOOD SIDING

20

20

14-Sep-12

11-Oct-12

SEN7540

INSTALL STANDING SEAM METAL ROOFS

20

20

14-Sep-12

11-Oct-12

SEN6550

INSTALL EXT. LIGHTING/SIGNAGE

15

15

05-Oct-12

26-Oct-12

SEN6535

REMOVE SCAFFOLDING

5

5

12-Oct-12

19-Oct-12

SEN6532

EXTERIOR THEMING & DETAIL

30

30

12-Oct-12

28-Nov-12

SEN6710

INSTALL CAULKING & SEALANTS

15

15

22-Oct-12

09-Nov-12

SEAFOOD RESTAURANT & CASINO ENTRY

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 27 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

SEN6740

CONTRACTOR CLEAN & PUNCHLIST

SEN6780

OWNER PUNCH AND FINAL

MARGARITAVILLE & POOL AREA

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

10

10

13-Nov-12

28-Nov-12

10

10

29-Nov-12

13-Dec-12

133

133

27-Sep-12

02-Apr-13

MPEN6460

FRAME EXTERIOR WALLS

15

15

27-Sep-12

19-Oct-12

MPEN6470

INSTALL SCAFFOLDING

10

10

11-Oct-12

26-Oct-12

MPEN6490

INSTALL PARAPET ROOF BACKING/SHEATHING

8

8

19-Oct-12

31-Oct-12

MPEN6510

INSTALL SHEATHING

15

15

19-Oct-12

09-Nov-12

MPEN7490

INSTALL MTL STUD TRUSSES

15

15

19-Oct-12

09-Nov-12

MPEN6550

INSTALL FLAT ROOFS

20

20

26-Oct-12

28-Nov-12

MPEN6520

INSTALL WINDOWS & ENTRY DOORS

20

20

31-Oct-12

03-Dec-12

MPEN8490

INSTALL STUCCO FINISH

10

10

02-Nov-12

19-Nov-12

MPEN9490

INSTALL MTL/DENS DECK

10

10

02-Nov-12

19-Nov-12

MPEN7550

INSTALL STANDING SEAM METAL ROOFS

30

30

19-Nov-12

07-Jan-13

MPEN6540

INSTALL METAL & WOOD SIDING

20

20

26-Nov-12

26-Dec-12

MPEN7460

EXTERIOR THEMING & DETAIL

40

40

03-Dec-12

01-Feb-13

MPEN7560

ELEVATED DECKS & CANOPIES

20

20

18-Dec-12

18-Jan-13

MPEN6580

INSTALL EXT. LIGHTING/SIGNAGE

20

20

26-Dec-12

25-Jan-13

MPEN6720

REMOVE SCAFFOLDING

10

10

26-Dec-12

10-Jan-13

MPEN6560

INSTALL STAIRS & HANDRAILS

30

30

10-Jan-13

25-Feb-13

MPEN6710

INSTALL CAULKING & SEALANTS

30

30

18-Jan-13

04-Mar-13

MPEN6740

CONTRACTOR CLEAN & PUNCHLIST

10

10

04-Mar-13

19-Mar-13

MPEN6780

OWNER PUNCH AND FINAL

10

10

19-Mar-13

02-Apr-13

91

91

12-Oct-12

15-Feb-13

NORTH ELEVATION PEN6440

LAYOUT & SURVEY

8

8

12-Oct-12

24-Oct-12

PEN6450

INSTALL SPLIT FACE MASONRY

10

10

24-Oct-12

06-Nov-12

PEN6430

METAL DECK COMPLETE

0

0

PEN6460

FRAME EXT. WALLS / INSTALL CANOPY SUPPORTS

10

10

31-Oct-12

14-Nov-12

PEN6490

INSTALL PARAPET ROOF BACKING/SHEATHING

5

5

31-Oct-12

06-Nov-12

PEN6470

INSTALL SCAFFOLDING

5

5

31-Oct-12

06-Nov-12

PEN6510

INSTALL SHEATHING & STUCCO FINISH

15

15

07-Nov-12

30-Nov-12

PEN6520

INSTALL WINDOWS & ENTRY DOORS

10

10

26-Nov-12

07-Dec-12

PEN6530

INSTALL METAL SIDING

15

15

03-Dec-12

24-Dec-12

PEN6540

INSTALL ROOFING

15

15

18-Dec-12

09-Jan-13

PEN6550

INSTALL EXT. LIGHTING/SIGNAGE

10

10

26-Dec-12

09-Jan-13

PEN6710

INSTALL CAULKING & SEALANTS

10

10

26-Dec-12

09-Jan-13

PEN6720

REMOVE SCAFFOLDING

5

5

10-Jan-13

17-Jan-13

PEN6740

CONTRACTOR CLEAN & PUNCHLIST

10

10

18-Jan-13

31-Jan-13

PEN6780

OWNER PUNCH AND FINAL

10

10

01-Feb-13

15-Feb-13

72

72

25-Oct-12

01-Feb-13

15

15

25-Oct-12

15-Nov-12

WEST ELEVATION (CASINO) WEN6460

FRAME EXT. WALLS

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

24-Oct-12

Page 28 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

WEN6470

INSTALL SWING STAGES

5

5

25-Oct-12

31-Oct-12

WEN6490

INSTALL PARAPET ROOF BACKING/SHEATHING

10

10

01-Nov-12

15-Nov-12

WEN6510

INSTALL SHEATHING & STUCCO FINISH

25

25

01-Nov-12

10-Dec-12

WEN6540

INSTALL CASINO ROOFING

20

20

16-Nov-12

18-Dec-12

WEN6520

INSTALL WINDOWS

10

10

04-Dec-12

18-Dec-12

WEN6550

INSTALL EXT. LIGHTING/SIGNAGE

15

15

04-Dec-12

26-Dec-12

WEN6710

INSTALL CAULKING & SEALANTS

15

15

04-Dec-12

26-Dec-12

WEN6530

INSTALL METAL SIDING

20

20

19-Dec-12

18-Jan-13

WEN6720

REMOVE SCAFFOLDING

5

5

27-Dec-12

03-Jan-13

WEN6740

CONTRACTOR CLEAN & PUNCHLIST

10

10

04-Jan-13

18-Jan-13

WEN6780

OWNER PUNCH AND FINAL

10

10

21-Jan-13

01-Feb-13

93

93

26-Oct-12

05-Mar-13

EVN6440

FRAME EXT. WALLS - EVENT CENTER

10

10

26-Oct-12

08-Nov-12

EVN6450

INSTALL PARAPET ROOF BACKING/SHEATHING

10

10

26-Oct-12

08-Nov-12

EVN6455

INSTALL FLAT ROOFS

15

15

02-Nov-12

27-Nov-12

EVN6500

INSTALL SCAFFOLDING

15

15

02-Nov-12

27-Nov-12

EVN6510

INSTALL SHEATHING

15

15

09-Nov-12

04-Dec-12

EVN6520

INSTALL STUCCO FINISH

20

20

28-Nov-12

27-Dec-12

EVN6530

INSTALL SPECIAL EXTERIOR FINISH

25

25

13-Dec-12

21-Jan-13

EVN6550

INSTALL EXT. LIGHTING/SIGNAGE

15

15

07-Jan-13

28-Jan-13

EVN6570

REMOVE SCAFFOLDING

5

5

22-Jan-13

28-Jan-13

EVN6580

INSTALL CAULKING & SEALANTS

15

15

29-Jan-13

19-Feb-13

EVN6740

CONTRACTOR CLEAN & PUNCHLIST

5

5

20-Feb-13

26-Feb-13

EVN6780

OWNER PUNCH AND FINAL

5

5

27-Feb-13

05-Mar-13

EAST ELEVATION / EVENT CENTER

85

85

15-Oct-12

08-Feb-13

A1000

INSTALL PORTE COCHERE STRUCTURE

12

12

15-Oct-12

31-Oct-12

A1200

INFILL FRAMING

10

10

01-Nov-12

15-Nov-12

A2000

MEPS ROUGH-IN

10

10

08-Nov-12

26-Nov-12

A3000

INSTALL SHEATHING & STUCCO

20

20

16-Nov-12

18-Dec-12

A4000

FORM/REBAR/POUR DRIVEWAY

15

15

19-Dec-12

10-Jan-13

A5000

INSTALL COLUMN ENCLOSURES

10

10

11-Jan-13

25-Jan-13

A6000

MEPS TRIM

10

10

11-Jan-13

25-Jan-13

A7000

CONTRACTOR CLEAN & PUNCHLIST

5

5

28-Jan-13

01-Feb-13

A8000

OWNER PUNCH AND FINAL

5

5

04-Feb-13

08-Feb-13

187

187

04-Sep-12

22-May-13

184

184

04-Sep-12

17-May-13

119

119

02-Nov-12

17-Apr-13

PORTE COCHERE

FINISHES (LOW RISE) LEVEL 1 - FINISHES - LOWRISE SOUTH SEAFOOD DINING (1310) TFS188900

FRAME METAL STUD WALLS/DOOR FRAMES

10

10

02-Nov-12

15-Nov-12

TFS188910

FRAME HARDLID CEILING/SOFFITS

10

10

13-Nov-12

28-Nov-12

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 29 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

TFS188920

MEPS ROUGH-IN WALLS & CEILINGS

10

10

20-Nov-12

05-Dec-12

TFS188930

DRYWALL,TAPE & PAINT WALLS & CEILINGS

15

15

06-Dec-12

28-Dec-12

TFS188940

INSTALL BAR DIE

3

3

31-Dec-12

03-Jan-13

TFS188950

INSTALL MILLWORK

20

20

31-Dec-12

28-Jan-13

TFS188945

QUARRY TILE @ BAR

3

3

03-Jan-13

08-Jan-13

TFS189970

PULL SODA/BEER/LIQUOR LINES (OWNER)

3

3

08-Jan-13

11-Jan-13

TFS188970

INSTALL & HOOK-UP BAR EQUIPMENT

15

15

09-Jan-13

29-Jan-13

TFS188960

INSTALL STONE FLOORING / BAR TOPS

10

10

22-Jan-13

04-Feb-13

TFS188955

THEMED INTERIOR FINISHES

15

15

28-Jan-13

19-Feb-13

TFS188980

MEPS WALL/CEILING TRIM/DL FIXTURES

10

10

12-Feb-13

25-Feb-13

TFS188990

INSTALL DOORS & HARDWARE

2

2

26-Feb-13

27-Feb-13

TFS189000

INSTALL BANQUET SEATING

10

10

26-Feb-13

11-Mar-13

TFS189010

INSTALL CARPET FLOOR INSERTS

5

5

12-Mar-13

18-Mar-13

TFS189020

INSTALL OWNER SIGNAGE

5

5

19-Mar-13

25-Mar-13

TFS189030

CONTRACTOR CLEAN & PUNCHLIST

5

5

26-Mar-13

01-Apr-13

TFS189035

OWNER PUNCH AND FINAL

10

10

02-Apr-13

15-Apr-13

TFS189040

HEALTH DEPARTMENT INSPECTION

SEAFOOD KITCHEN (1305)

2

2

16-Apr-13

17-Apr-13

100

100

26-Oct-12

14-Mar-13

10

10

26-Oct-12

08-Nov-12

SKRB2901530

INSTALL / WRAP GREASE DUCT

SKRB2901540

FRAME WALLS/DOOR FRAMES

5

5

02-Nov-12

08-Nov-12

SKRB2901550

MEPS ROUGH-IN WALLS/BACKING

15

15

09-Nov-12

03-Dec-12

SKRB2901570

DRYWALL & TAPE WALLS

5

5

04-Dec-12

10-Dec-12

SKRB2901560

INSTALL HOODS & WALK-IN COOLERS

5

5

11-Dec-12

17-Dec-12

SKRB2901580

TERMINATE HOOD TO GREASE DUCT/WRAP

8

8

11-Dec-12

20-Dec-12

SKRB2901600

FRP / STAINLESS WALL COVERING

10

10

11-Dec-12

26-Dec-12

SKRB2901610

INSTALL CEILING GRID

3

3

27-Dec-12

31-Dec-12

SKRB2901620

MEPS DROPS TO GRID

10

10

02-Jan-13

15-Jan-13

SKRB2901590

INSTALL QUARRY TILE FLOOR

5

5

16-Jan-13

22-Jan-13

SKRB2901630

INSTALL & HOOK-UP FOOD SERVICE EQUIPMENT

20

20

23-Jan-13

19-Feb-13

SKRB2901650

MEPS WALL/CEILING TRIM - KITCHEN

10

10

13-Feb-13

26-Feb-13

SKRB2902650

ANSUL TEST

2

2

19-Feb-13

21-Feb-13

SKRB2901640

INSTALL CEILING TILE

2

2

25-Feb-13

26-Feb-13

SKRB3000004

INSTALL OWNER SIGNAGE

2

2

27-Feb-13

28-Feb-13

SKRB3000006

CONTRACTOR CLEAN & PUNCHLIST

5

5

27-Feb-13

05-Mar-13

SKRB3000007

OWNER PUNCH & FINAL

5

5

06-Mar-13

12-Mar-13

SKRB3000008

HEALTH DEPARTMENT INSPECTION

2

2

13-Mar-13

14-Mar-13

74

74

02-Nov-12

13-Feb-13

CARB1993520

FRAME METAL STUD WALLS/DOOR FRAMES

5

5

02-Nov-12

08-Nov-12

CARB1993670

MEPS WALL ROUGH-IN/BACKING

10

10

09-Nov-12

26-Nov-12

CARB1993680

DRYWALL RIPPER

2

2

16-Nov-12

19-Nov-12

PUBLIC RESTROOMS (1301) / (1302) / (1311)

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 30 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

TASK filter: All Activities Activity ID

Activity Name

Orig Dur

Rem Dur

Start

Finish

5

5

20-Nov-12

28-Nov-12

CARB1993690

FRAME CEILINGS & SOFFITS

CARB1993700

MEPS DROPS TO CEILING & SOFFITS

5

5

29-Nov-12

05-Dec-12

CARB1993710

DRYWALL/TAPE/PAINT-WALLS/CEILINGS

10

10

06-Dec-12

19-Dec-12

CARB1993720

INSTALL MILLWORK/SPECIAL FINISHES

5

5

20-Dec-12

28-Dec-12

CARB1993730

INSTALL TILE FLOORING/WALLS/COUNTERTOPS IN RESTROOMS

10

10

20-Dec-12

07-Jan-13

CARB1993740

INSTALL PLUMBING FIXTURES

10

10

08-Jan-13

21-Jan-13

CARB1993750

INSTALL TOILET PARTITIONS & ACCESSORIES

5

5

22-Jan-13

28-Jan-13

CARB1993760

MEPS TRIM WALLS/CEILING

5

5

22-Jan-13

28-Jan-13

CARB1993770

HANG DOORS & HARDWARE

1

1

29-Jan-13

29-Jan-13

CARB1993780

OWNER SIGNAGE

2

2

29-Jan-13

30-Jan-13

CARB1993790

CONTRACTOR CLEAN & PUNCHLIST

5

5

31-Jan-13

06-Feb-13

CARB1993792

OWNER PUNCH & FINAL

RETAIL (1315)

5

5

07-Feb-13

13-Feb-13

72

72

16-Nov-12

25-Feb-13

PRB188340

FRAME METAL STUD WALLS/DOOR FRAMES

5

5

16-Nov-12

26-Nov-12

PRB188690

MEPS WALL ROUGH-IN/BACKING

10

10

27-Nov-12

10-Dec-12

PRB188710

FRAME CEILINGS & SOFFITS

10

10

11-Dec-12

26-Dec-12

PRB188720

MEPS DROPS TO CEILING & SOFFITS

7

7

27-Dec-12

07-Jan-13

PRB188730

DRYWALL/TAPE/PAINT WALLS/CEILINGS

10

10

08-Jan-13

21-Jan-13

PRB188740

INSTALL RETAIL STORE FINISHES

15

15

22-Jan-13

11-Feb-13

PRB188745

CONTRACTOR CLEAN & PUNCHLIST

5

5

12-Feb-13

18-Feb-13

PRB188755

OWNER PUNCH AND FINAL

5

5

19-Feb-13

25-Feb-13

MARGARITAVILLE DINING (1403) / PORCH DINING (1404)

104

104

16-Nov-12

10-Apr-13

PRB292230

FRAME WALLS/DOOR FRAMES

7

7

16-Nov-12

28-Nov-12

PRB292240

MEPS ROUGH-IN WALLS/BACKING

10

10

29-Nov-12

12-Dec-12

PRB292250

DRYWALL RIPPER AT CEILING

5

5

13-Dec-12

19-Dec-12

PRB292260

FRAME HARDLID CEILING/SOFFITS / MISC. STEEL SUPPORTS FOR THEMING

10

10

13-Dec-12

28-Dec-12

PRB292270

MEPS DROP TO HARDLID/SOFFITS

10

10

20-Dec-12

07-Jan-13

PRB292280

DRYWALL WALLS & CEILINGS

5

5

08-Jan-13

14-Jan-13

PRB292282

TAPE & PAINT WALLS & CEILINGS

10

10

15-Jan-13

28-Jan-13

PRB292300

INSTALL MILLWORK

15

15

29-Jan-13

18-Feb-13

PRB292310

INSTALL STONE FLOORING

5

5

19-Feb-13

25-Feb-13

PRB292320

MEPS WALL/CEILING TRIM/DL FIXTURES

10

10

26-Feb-13

11-Mar-13

PRB292340

INSTALL BANQUET SEATING

10

10

26-Feb-13

11-Mar-13

PRB292302

THEMED INTERIOR FINISHES

20

20

26-Feb-13

25-Mar-13

PRB292350

INSTALL CARPET FLOOR INSERTS

5

5

12-Mar-13

18-Mar-13

PRB292330

INSTALL DOORS & HARDWARE

5

5

19-Mar-13

25-Mar-13

PRB292360

INSTALL OWNER SIGNAGE

5

5

26-Mar-13

01-Apr-13

PRB292370

CONTRACTOR CLEAN & PUNCHLIST

5

5

26-Mar-13

01-Apr-13

PRB292390

OWNER PUNCH AND FINAL

5

5

02-Apr-13

08-Apr-13

PRB292380

HEALTH DEPARTMENT INSPECTION

2

2

09-Apr-13

10-Apr-13

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 31 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE BAR

Orig Dur

Rem Dur

Start

Finish

68

68

29-Jan-13

02-May-13

CBF630

SET BAR DIE WALL

4

4

29-Jan-13

01-Feb-13

CBF640

INSTALL UMBRELLA STRUCTURES

4

4

04-Feb-13

07-Feb-13

CBF650

QUARRY TILE BEHIND DIE WALL

3

3

08-Feb-13

12-Feb-13

CBF660

PULL SODA / BEVERAGE LINES (OWNER)

2

2

13-Feb-13

14-Feb-13

CBF665

INSTALL FRP BEHIND DIE WALL

2

2

14-Feb-13

15-Feb-13

CBF670

MILLWORK / FRONT & BACK BARS

15

15

18-Feb-13

08-Mar-13

CBF690

SET & HOOK UP BAR EQUIPMENT

15

15

11-Mar-13

29-Mar-13

CBF710

INSTALL STONE TOP AT BAR

2

2

01-Apr-13

02-Apr-13

CBF720

INSTALL SPECIAL FINISHES

10

10

03-Apr-13

16-Apr-13

CBF740

MEPS TRIM

5

5

10-Apr-13

16-Apr-13

CBF750

CONTRACTOR CLEAN & PUNCHLIST

5

5

17-Apr-13

23-Apr-13

CBF770

OWNER PUNCH & FINAL

5

5

24-Apr-13

30-Apr-13

CBF780

HEALTH DEPARTMENT INSPECTION

2

2

01-May-13

02-May-13

129

129

20-Nov-12

17-May-13

CF2060

FRAME WALLS, CEILINGS & SOFFITS / DOOR FRAMES

15

15

20-Nov-12

12-Dec-12

CF2070

MEP ROUGH IN WALLS, CEILINGS & SOFFITS

15

15

06-Dec-12

28-Dec-12

CF2080

DRYWALL WALLS. CEILINGS & SOFFITS

10

10

20-Dec-12

07-Jan-13

CF2090

TAPE / PAINT

12

12

31-Dec-12

16-Jan-13

CF2100

INSTALL & HOOK-UP SERVICE LINE EQUIPMENT

20

20

15-Jan-13

11-Feb-13

CF2110

WALL COVERING & MURALS

10

10

17-Jan-13

30-Jan-13

CF2120

SET SERVING LINE DIE WALL

10

10

17-Jan-13

30-Jan-13

CF2130

MILLWORK TRIM AND BOOTH BASES

25

25

24-Jan-13

27-Feb-13

CF3140

WATERPROOF / QUARRY TILE AT SERVICE LINE

10

10

31-Jan-13

13-Feb-13

CF2160

SET & HOOK UP SERVING LINE KITCHEN EQUIPMENT

25

25

14-Feb-13

20-Mar-13

CF2170

SET STONE TOP / TRAY RAILS

10

10

28-Feb-13

13-Mar-13

CF3120

INSTALL TILE AT FLOOR

10

10

14-Mar-13

27-Mar-13

CF2190

INSTALL WOOD & CARPET FLOORING

10

10

28-Mar-13

10-Apr-13

CF2180

INSTALL SNEEZE GUARDS

10

10

11-Apr-13

24-Apr-13

CF2200

OWNER LIGHT FIXTURES & MEPS TRIM

10

10

11-Apr-13

24-Apr-13

CF2210

HEALTH DEPARTMENT INSPECTION

5

5

25-Apr-13

01-May-13

CF2220

PUNCH LIST & FINAL CLEAN

10

10

02-May-13

15-May-13

CF2230

OWNER FF&E

5

5

13-May-13

17-May-13

131

131

02-Nov-12

03-May-13

BUFFET DINING (1401) / BUFFET SERVERY (1402)

MARGARITAVILLE COOKING (1406) / WASH (1407) / COOLER FREEZER (1409) / DRY STORAGE (1408) CARB2901530

GREASE DUCT & DUCT WRAP

10

10

02-Nov-12

15-Nov-12

CARB2901540

FRAME WALLS/DOOR FRAMES

10

10

20-Nov-12

05-Dec-12

CARB2901550

MEPS ROUGH-IN WALLS/BACKING

20

20

29-Nov-12

28-Dec-12

CARB2901560

DRYWALL & TAPE WALLS

10

10

20-Dec-12

07-Jan-13

CARB2901570

INSTALL HOODS & WALK-IN COOLERS

7

7

31-Dec-12

09-Jan-13

CARB2901600

FRP/STAINLESS WALL COVERING

10

10

08-Jan-13

21-Jan-13

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 32 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

TASK filter: All Activities Activity ID

Activity Name

Orig Dur

Rem Dur

Start

8

8

10-Jan-13

Finish

CARB2901580

TERMINATE HOOD TO GREASE DUCT/WRAP

CARB2901610

INSTALL CEILING GRID

5

5

22-Jan-13

28-Jan-13

CARB2901620

MEPS DROPS TO GRID

10

10

25-Jan-13

07-Feb-13

CARB2901590

INSTALL QUARRY TILE FLOOR

10

10

08-Feb-13

21-Feb-13

CARB2901630

INSTALL / HOOK-UP FOOD SERVICE EQUIPMENT

25

25

22-Feb-13

28-Mar-13

CARB2901640

INSTALL CEILING TILE

10

10

22-Mar-13

04-Apr-13

CARB2901650

MEPS WALL/CEILING TRIM - KITCHEN

10

10

22-Mar-13

04-Apr-13

CARB3000009

ANSUL / FIRE DEPT. TEST

2

2

04-Apr-13

08-Apr-13

CARB3000004

INSTALL OWNER SIGNAGE

2

2

05-Apr-13

08-Apr-13

CARB3000006

CONTRACTOR CLEAN & PUNCHLIST

10

10

09-Apr-13

22-Apr-13

CARB3000007

OWNER PUNCH & FINAL

5

5

23-Apr-13

29-Apr-13

CARB3000008

HEALTH DEPARTMENT INSPECTION

2

2

30-Apr-13

01-May-13

CARB3001008

DROP TEST / KITCHEN BURN-IN

2

2

02-May-13

03-May-13

122

122

20-Nov-12

08-May-13

CENTRAL KITCHEN (1405) / DRY STOR (1410) / COOLERS/FREEZERS (1411/1412/1413/1414) / MEAT(1415/1416)

21-Jan-13

CF2250

GREASE DUCT & DUCT WRAP

10

10

20-Nov-12

05-Dec-12

CF2260

FRAME WALLS / DOOR FRAMES

10

10

29-Nov-12

12-Dec-12

CF2270

MEPS ROUGH IN WALLS

20

20

06-Dec-12

07-Jan-13

CF2280

DRYWALL / TAPE

10

10

31-Dec-12

14-Jan-13

CF2290

PAINT

5

5

15-Jan-13

21-Jan-13

CF2300

INSTALL HOODS / FREEZERS & COOLERS

20

20

22-Jan-13

18-Feb-13

CF2310

FRP WALLS

10

10

22-Jan-13

04-Feb-13

CF2320

STAINLESS WALL COVERING

10

10

05-Feb-13

18-Feb-13

CF2330

INSTALL ACOUSTICAL GRID

5

5

19-Feb-13

25-Feb-13

CF2350

QUARRY TILE

10

10

19-Feb-13

04-Mar-13

CF2340

MEPS DROPS TO GRID

5

5

26-Feb-13

04-Mar-13

CF2360

INSTALL FOOD SERVICE EQUIPMENT

10

10

05-Mar-13

18-Mar-13

CF2380

HOOK UP FOOD SERVICE EQUIPMENT

25

25

12-Mar-13

15-Apr-13

CF2370

DOORS + HARDWARE / DROP CEILING TILE

5

5

16-Apr-13

22-Apr-13

CF2375

MEPS WALL/CEILING TRIM - KITCHEN

10

10

16-Apr-13

29-Apr-13

CF2390

CONTRACTOR CLEAN & PUNCHLIST

10

10

23-Apr-13

06-May-13

CF2395

ANSUL / FIRE DEPT. TEST

2

2

29-Apr-13

01-May-13

CF2400

HEALTH DEPARTMENT INSPECTION

2

2

07-May-13

08-May-13

CF2410

DROP TEST / KITCHEN BURN-IN

2

2

07-May-13

08-May-13

78

78

13-Dec-12

01-Apr-13

ASSOCIATE DINING (1420) CCRBB85570

FRAME WALLS / DOOR FRAMES

5

5

13-Dec-12

19-Dec-12

CCRBB85580

MEPS ROUGH-IN WALLS/BACKING

5

5

20-Dec-12

28-Dec-12

CCRBB85590

DRYWALL & TAPE WALLS

5

5

31-Dec-12

07-Jan-13

CCRBB85595

FRP WALL FINISH

5

5

08-Jan-13

14-Jan-13

CCRBB85600

INSTALL TILE FLOORING / COUTERTOPS

10

10

15-Jan-13

28-Jan-13

CCRBB85610

INSTALL CEILING GRID

5

5

29-Jan-13

04-Feb-13

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 33 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

CCRBB85620

MEPS DROP TO GRID

5

5

05-Feb-13

11-Feb-13

CCRBB85630

INSTALL & HOOK-UP FOOD SERVICE EQUIPMENT

15

15

12-Feb-13

04-Mar-13

CCRBB85640

INSTALL CEILING TILE

2

2

05-Mar-13

06-Mar-13

CCRBB85650

MEPS WALL/CEILING TRIM/DL FIXTURES

5

5

07-Mar-13

13-Mar-13

CCRBB85660

INSTALL DOORS & HARDWARE

5

5

14-Mar-13

20-Mar-13

CCRBB85670

INSTALL OWNER SIGNAGE

3

3

21-Mar-13

25-Mar-13

CCRBB85680

CONTRACTOR CLEAN & PUNCHLIST

ELECTRICAL ROOM (1423) / (1422)

5

5

26-Mar-13

01-Apr-13

78

78

04-Sep-12

20-Dec-12

PERS81650

FRAME METAL STUD WALLS/DOOR FRAMES

3

3

04-Sep-12

06-Sep-12

PERS81660

MEP WALL ROUGH-IN / BACKING

5

5

06-Sep-12

12-Sep-12

PERS81690

FORM/REBAR/POUR HOUSEKEEPING PADS

2

2

07-Sep-12

10-Sep-12

PERS83700

SET TEMP TRANSFORMER/PANELS 1422

5

5

10-Sep-12

18-Sep-12

PERS84670

TEMP. ELECTRICAL SERVICE

20

20

10-Sep-12

09-Oct-12

PERS81700

SET ELECTRICAL GEAR & PANELS

10

10

11-Sep-12

24-Sep-12

PERS81670

DRYWALL/TAPE

3

3

13-Sep-12

17-Sep-12

PERS81680

INSTALL FAN COIL

5

5

18-Sep-12

24-Sep-12

PERS81710

DOORS & HARDWARE

2

2

25-Sep-12

26-Sep-12

PERS81720

PULL FEEDERS & TERMINATE TO PANELS

40

40

27-Sep-12

21-Nov-12

PERS83670

ENERGIZE TEMP ELECTRICAL SERVICE

0

0

09-Oct-12

PERS83680

ENERGIZE MAIN ELECTRIC GEAR

1

1

21-Nov-12

26-Nov-12

PERS81730

PERMANENT LIGHTING/MEPS TRIM

5

5

26-Nov-12

30-Nov-12

PERS81740

TOUCH-UP PAINT WALL

2

2

03-Dec-12

04-Dec-12

PERS81750

CLEAN & SEAL FLOOR

5

5

05-Dec-12

11-Dec-12

PERS81760

OWNER SIGNAGE

2

2

12-Dec-12

13-Dec-12

PERS82250

CONTRACTOR CLEAN & PUNCHLIST

MEZZANINE - FINISHES - LOWRISE SOUTH

5

5

14-Dec-12

20-Dec-12

165

165

25-Sep-12

13-May-13

67

67

19-Oct-12

21-Jan-13

PRBS82140

FRAME METAL STUD WALLS/DOOR FRAMES

3

3

19-Oct-12

23-Oct-12

PRBS82230

MEPS WALL ROUGH-IN/BACKING

5

5

24-Oct-12

30-Oct-12

PRBS82240

DRYWALL

5

5

31-Oct-12

06-Nov-12

PRBS82245

TAPE & PAINT

8

8

07-Nov-12

16-Nov-12

PRBS82246

INSTALL FRP AT LIQUOR STORAGE

2

2

19-Nov-12

20-Nov-12

PRBS82250

INSTALL CEILING GRID

2

2

21-Nov-12

26-Nov-12

PRBS82260

MEPS DROPS TO GRID

5

5

27-Nov-12

03-Dec-12

PRBS82270

INSTALL MILLWORK

5

5

04-Dec-12

10-Dec-12

PRBS82280

INSTALL CEILING TILE

2

2

11-Dec-12

12-Dec-12

PRBS82290

MEPS TRIM WALLS/CEILING

5

5

13-Dec-12

19-Dec-12

PRBS82310

CARPET FLOORING & BASE

5

5

20-Dec-12

28-Dec-12

PRBS82330

INSTALL DOORS & HARDWARE

3

3

31-Dec-12

03-Jan-13

PRBS82340

OWNER SIGNAGE

2

2

04-Jan-13

07-Jan-13

MANAGER / GM / ADMIN OFFICES / LIQUOR STORAGE

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 34 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

TASK filter: All Activities Activity ID

Activity Name

Orig Dur

Rem Dur

Start

5

5

08-Jan-13

Finish

PRBS82350

CONTRACTOR CLEAN & PUNCHLIST

PRBS82360

OWNER PUNCH AND FINAL

5

5

15-Jan-13

21-Jan-13

ELEC. ROOM / A/V DATA ROOM / ELEV. EQUIPMENT ROOM

75

75

24-Oct-12

05-Feb-13

14-Jan-13

24-Oct-12

26-Oct-12

PERS82740

FRAME METAL STUD WALLS/DOOR FRAMES

3

3

PERS82770

MEP WALL ROUGH-IN / BACKING

5

5

26-Oct-12

01-Nov-12

PERS82780

DRYWALL

3

3

02-Nov-12

06-Nov-12

PERS82781

FORM/REBAR/POUR HOUSEKEEPING PADS

3

3

07-Nov-12

09-Nov-12

PERS82782

TAPE / PAINT WALL

5

5

12-Nov-12

16-Nov-12

PERS82790

INSTALL FAN COILS

3

3

19-Nov-12

21-Nov-12

PERS82810

SET ELECTRICAL EQUIPMENT

5

5

26-Nov-12

30-Nov-12

PERS82812

INSTALL OWNER RACKS / EQUIP. AT AV/DATA ROOM

5

5

26-Nov-12

30-Nov-12

PERS82814

INSTALL ELEVATOR MACHINE ROOM EQUIP.

10

10

26-Nov-12

07-Dec-12

PERS82820

DOORS & HARDWARE

2

2

10-Dec-12

11-Dec-12

PERS82830

PULL & TERMINATE FEEDERS

5

5

12-Dec-12

18-Dec-12

PERS82835

HOOK-UP ELEC. EQUIPMENT / TAGGING / LABELING

25

25

12-Dec-12

18-Jan-13

PERS82838

PUNCH DOWN / PROGRAMMING AV EQUIPMENT

25

25

12-Dec-12

18-Jan-13

PERS82840

MEPS TRIM

3

3

21-Jan-13

23-Jan-13

PERS82850

CLEAN & SEAL FLOOR

2

2

24-Jan-13

25-Jan-13

PERS82860

OWNER SIGNAGE

2

2

28-Jan-13

29-Jan-13

PERS83260

CONTRACTOR CLEAN & PUNCHLIST

BOH CIRCULATION / ELEVATOR LOBBY / ENTERTAINMENT CHANGING ROOMS

5

5

30-Jan-13

05-Feb-13

65

65

29-Oct-12

25-Jan-13

PRBS84420

FRAME METAL STUD WALLS/DOOR FRAMES

3

3

29-Oct-12

31-Oct-12

PRBS84480

MEPS WALL ROUGH-IN/BACKING

5

5

01-Nov-12

07-Nov-12

PRBS84510

DRYWALL

3

3

08-Nov-12

12-Nov-12

PRBS84515

TAPE & PAINT

7

7

13-Nov-12

21-Nov-12

PRBS84520

INSTALL CEILING GRID

2

2

26-Nov-12

27-Nov-12

PRBS84530

MEPS DROPS TO GRID

5

5

28-Nov-12

04-Dec-12

PRBS84550

INSTALL MILLWORK

5

5

05-Dec-12

11-Dec-12

PRBS84560

INSTALL CEILING TILE

3

3

12-Dec-12

14-Dec-12

PRBS84570

MEPS TRIM WALLS/CEILING

5

5

17-Dec-12

21-Dec-12

PRBS84580

VCT/CARPET FLOORING & BASE

5

5

26-Dec-12

02-Jan-13

PRBS84590

INSTALL DOORS & HARDWARE

2

2

03-Jan-13

04-Jan-13

PRBS84600

OWNER SIGNAGE

5

5

07-Jan-13

11-Jan-13

PRBS84610

CONTRACTOR CLEAN & PUNCHLIST

5

5

14-Jan-13

18-Jan-13

PRBS84810

OWNER PUNCH AND FINAL

SECURITY / HOLDING / HOUSEKEEPING / UNASSIGNED ROOMS

5

5

21-Jan-13

25-Jan-13

59

59

01-Nov-12

22-Jan-13

PERS84260

FRAME METAL STUD WALLS/DOOR FRAMES

5

5

01-Nov-12

07-Nov-12

PERS85260

MEP WALL ROUGH-IN / BACKING

7

7

08-Nov-12

16-Nov-12

PERS86260

DRYWALL

3

3

19-Nov-12

21-Nov-12

PERS86290

TAPE / PAINT

7

7

26-Nov-12

04-Dec-12

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 35 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

PERS87260

INSTALL CEILING GRID

3

3

05-Dec-12

07-Dec-12

PERS88260

MEPS DROPS TO GRID

5

5

10-Dec-12

14-Dec-12

PERS90260

DOORS & HARDWARE

2

2

17-Dec-12

18-Dec-12

PERS91260

INSTALL CEILING TILE

5

5

19-Dec-12

27-Dec-12

PERS92260

MEPS TRIM

5

5

28-Dec-12

04-Jan-13

PERS94260

VCT / SEAL FLOOR

5

5

07-Jan-13

11-Jan-13

PERS95260

OWNER SIGNAGE

2

2

14-Jan-13

15-Jan-13

PERS96260

CONTRACTOR CLEAN & PUNCHLIST

5

5

16-Jan-13

22-Jan-13

88

88

08-Nov-12

11-Mar-13

POOL EQUIPMENT ROOM (M413) / POOL STORAGE (M407) PPS83830

FRAME WALLS/DOOR FRAMES

2

2

08-Nov-12

09-Nov-12

PPS83840

MEPS ROUGH-IN WALLS

5

5

12-Nov-12

16-Nov-12

PPS83842

DRYWALL

3

3

19-Nov-12

21-Nov-12

PPS83843

FORM/REBAR/POUR CURBS & PADS

2

2

26-Nov-12

27-Nov-12

PPS83860

PREP & INSTALL EPOXY FLOORING / SEALER

5

5

28-Nov-12

04-Dec-12

PPS83844

TAPE & PAINT WALL

7

7

28-Nov-12

06-Dec-12

PPS83870

SET POOL EQUIPMENT

5

5

05-Dec-12

11-Dec-12

PPS83880

DOORS & HARDWARE

1

1

12-Dec-12

12-Dec-12

PPS83890

HOOK-UP POOL EQUIPMENT

25

25

13-Dec-12

21-Jan-13

PPS83910

MEPS TRIM

5

5

22-Jan-13

28-Jan-13

PPS83930

EQUIPMENT START-UP

20

20

29-Jan-13

25-Feb-13

PPS83940

OWNER SIGNAGE

5

5

26-Feb-13

04-Mar-13

PPS83950

CONTRACTOR CLEAN & PUNCHLIST

MECHANICAL ROOM (M443)

5

5

05-Mar-13

11-Mar-13

94

94

08-Nov-12

19-Mar-13

PERS110260

FRAME METAL STUD WALLS/DOOR FRAMES

2

2

08-Nov-12

09-Nov-12

PERS111260

MEP WALL ROUGH-IN / BACKING

5

5

12-Nov-12

16-Nov-12

PERS112260

DRYWALL

2

2

19-Nov-12

20-Nov-12

PERS114260

FORM/REBAR/POUR HOUSEKEEPING PADS

5

5

21-Nov-12

29-Nov-12

PERS114265

TAPE / PAINT

5

5

30-Nov-12

06-Dec-12

PERS115260

SET EQUIPMENT / PUMPS

10

10

07-Dec-12

20-Dec-12

PERS116260

DOORS & HARDWARE

1

1

21-Dec-12

21-Dec-12

PERS117260

HOOK-UP EQUIPMENT / INSULTATE & LABEL

45

45

26-Dec-12

27-Feb-13

PERS118260

MEPS TRIM

3

3

28-Feb-13

04-Mar-13

PERS120260

PREP, CLEAN & SEAL FLOOR

5

5

05-Mar-13

11-Mar-13

PERS121260

OWNER SIGNAGE

1

1

12-Mar-13

12-Mar-13

PERS122260

CONTRACTOR CLEAN & PUNCHLIST

RESTROOMS (M438) / (M439)

5

5

13-Mar-13

19-Mar-13

76

76

12-Nov-12

25-Feb-13

CARB192390

FRAME METAL STUD WALLS/DOOR FRAMES

3

3

12-Nov-12

14-Nov-12

CARB192400

MEPS WALL ROUGH-IN/BACKING

8

8

13-Nov-12

26-Nov-12

CARB192520

FRAME CEILINGS & SOFFITS

5

5

27-Nov-12

03-Dec-12

CARB192530

MEPS DROPS TO CEILING & SOFFITS

5

5

04-Dec-12

10-Dec-12

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 36 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

TASK filter: All Activities Activity ID

Activity Name

Orig Dur

Rem Dur

Start

Finish

CARB192540

DRYWALL-WALLS/CEILINGS

5

5

11-Dec-12

17-Dec-12

CARB192550

TAPE/PAINT-WALLS/CEILINGS

7

7

18-Dec-12

28-Dec-12

CARB192560

INSTALL SUB-TOPS

2

2

31-Dec-12

02-Jan-13

CARB192570

INSTALL TILE FLOORING/WALLS/COUNTERTOPS IN RESTROOMS

10

10

03-Jan-13

16-Jan-13

CARB192580

INSTALL PLUMBING FIXTURES

5

5

17-Jan-13

23-Jan-13

CARB192590

INSTALL TOILET PARTITIONS & ACCESSORIES

5

5

24-Jan-13

30-Jan-13

CARB192600

MEPS TRIM WALLS/CEILING

5

5

31-Jan-13

06-Feb-13

CARB192610

HANG DOORS & HARDWARE

2

2

07-Feb-13

08-Feb-13

CARB192620

OWNER SIGNAGE

1

1

11-Feb-13

11-Feb-13

PERS121270

CONTRACTOR CLEAN & PUNCHLIST

5

5

12-Feb-13

18-Feb-13

PERS122270

OWNER PUNCHLIST

5

5

19-Feb-13

25-Feb-13

150

150

25-Sep-12

22-Apr-13

PPD3025

FORM & POUR STAIRS, PLANTERS AND RAMP WALLS

15

15

25-Sep-12

15-Oct-12

PPD4030

WATERPROOFING/WATER TEST

10

10

16-Oct-12

29-Oct-12

PPD4040

POOL & JACUZZI - GUNNITE / PLASTER / TILE

60

60

30-Oct-12

28-Jan-13

PPD4060

INSTALL PRECAST COPING

10

10

29-Jan-13

11-Feb-13

PPD4072

INSTALL DECORATIVE RAILINGS

15

15

29-Jan-13

18-Feb-13

PPD4074

INSTALL FLAGSTONE AT POOL DECK

20

20

12-Feb-13

11-Mar-13

PPD4080

INSTALL CABANAS

5

5

12-Mar-13

18-Mar-13

PPD4084

INSTALL TREES & PLANTS

10

10

12-Mar-13

25-Mar-13

PPD4090

FILL, CLEAN & COMMISSION POOL/JACUZZI

10

10

19-Mar-13

01-Apr-13

PPD4100

INSTALL POOL/JACUZZI ACCESSORIES

5

5

19-Mar-13

25-Mar-13

PRB325400

INSTALL OWNER SIGNAGE

5

5

19-Mar-13

25-Mar-13

PRB326400

CONTRACTOR CLEAN & PUNCHLIST

5

5

26-Mar-13

01-Apr-13

PRB328400

OWNER PUNCH AND FINAL

5

5

02-Apr-13

08-Apr-13

PRB328500

HEALTH DEPARTMENT INSPECTION

5

5

09-Apr-13

15-Apr-13

PRB328510

INSTALL OWNER FF&E

POOL / POOL DECK (M415)

MARGARITAVILLE BALCONY DINING / PORCH DINING / POOL DECK BAR / SERVICE BAR

5

5

16-Apr-13

22-Apr-13

150

150

16-Oct-12

13-May-13

16-Oct-12

29-Oct-12

PRB311390

SET BAR CANOPY STRUCTURE / ROOF

10

10

PRB312390

SET DIE WALL

3

3

30-Oct-12

01-Nov-12

PRB313390

MEPS ROUGH-IN AT DIE WALL

5

5

02-Nov-12

08-Nov-12

PRB317390

WATERPROOFING / INSTALL QUARRY TILE AT BAR

5

5

09-Nov-12

15-Nov-12

PRB318390

INSTALL & HOOK-UP BAR EQUIPMENT & SERVICE BAR EQUIPMENT

10

10

29-Jan-13

11-Feb-13

PRB319390

INSTALL MILLWORK / BACK BAR / SPECIAL FINISHES / COLUMN WRAPS

20

20

12-Feb-13

11-Mar-13

PRB321390

MEPS TRIM AT CANOPY

10

10

05-Mar-13

18-Mar-13

PRB321400

INSTALL WATERPROOFING AT SEATING AREA / WATER TEST

5

5

19-Mar-13

25-Mar-13

PRB324390

INSTALL MMA DECK COATING AT PORCH & BALCONY SEATING AREAS

10

10

26-Mar-13

08-Apr-13

PRB325390

INSTALL OWNER SIGNAGE

5

5

09-Apr-13

15-Apr-13

PRB326390

CONTRACTOR CLEAN & PUNCHLIST

5

5

16-Apr-13

22-Apr-13

PRB328390

OWNER PUNCH AND FINAL

5

5

23-Apr-13

29-Apr-13

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 37 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

PRB328395

HEALTH DEPARTMENT INSPECTION

PRB328520

INSTALL OWNER FF&E

LEVEL 2 - FINISHES - LOWRISE SOUTH MECHANICAL ROOM (2412)

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

5

5

30-Apr-13

06-May-13

5

5

07-May-13

13-May-13

154

154

19-Oct-12

22-May-13

89

89

19-Oct-12

20-Feb-13

PERS110250

FRAME METAL STUD WALLS/DOOR FRAMES

2

2

19-Oct-12

22-Oct-12

PERS111250

MEP WALL ROUGH-IN / BACKING

5

5

23-Oct-12

29-Oct-12

PERS112250

DRYWALL/TAPE

7

7

30-Oct-12

07-Nov-12

PERS114250

FORM/REBAR/POUR HOUSEKEEPING PADS

2

2

08-Nov-12

09-Nov-12

PERS115250

SET EQUIPMENT

10

10

19-Nov-12

04-Dec-12

PERS117250

HOOK-UP EQUIPMENT/TAGGING

30

30

05-Dec-12

18-Jan-13

PERS118250

PERMANENT LIGHTING/MEPS TRIM

5

5

21-Jan-13

25-Jan-13

PERS120250

CLEAN & SEAL FLOOR

10

10

28-Jan-13

08-Feb-13

PERS120255

DOORS & HARDWARE

1

1

11-Feb-13

11-Feb-13

PERS121250

OWNER SIGNAGE

2

2

12-Feb-13

13-Feb-13

PERS122250

CONTRACTOR CLEAN & PUNCHLIST

SPA / SALON / MASSAGE ROOMS / LOCKER ROOMS / SUPPORT AREAS

5

5

14-Feb-13

20-Feb-13

152

152

23-Oct-12

22-May-13

PRB290112

FRAME METAL STUD WALLS/DOOR FRAMES

5

5

23-Oct-12

29-Oct-12

PRB292290

DRYALL RIPPER

5

5

30-Oct-12

05-Nov-12

PRB292400

FRAME CEILINGS & SOFFITS

10

10

30-Oct-12

12-Nov-12

PRB292410

MEPS WALL & CEILING ROUGH-IN/BACKING

20

20

06-Nov-12

05-Dec-12

PRB292420

DRYWALL - WALLS/CEILING

10

10

29-Nov-12

12-Dec-12

PRB292425

TAPE & PAINT / VWC

10

10

13-Dec-12

28-Dec-12

PRB292426

INSTALL GRID CEILINGS

5

5

31-Dec-12

07-Jan-13

PRB292427

MEPS DROPS TO GRID CEILINGS

5

5

08-Jan-13

14-Jan-13

PRB292430

INSTALL MILLWORK/SPECIAL FINISHES

20

20

15-Jan-13

11-Feb-13

PRB292435

INSTALL STONE FLOOR / WALL / COUNTERTOPS

15

15

05-Feb-13

25-Feb-13

PRB292440

INSTALL PLUMBING FIXTURES / DISHWASHER

15

15

26-Feb-13

18-Mar-13

PRB292450

INSTALL TOILET ACCESSORIES

5

5

12-Mar-13

18-Mar-13

PRB292460

INSTALL CARPET FLOORING

5

5

19-Mar-13

25-Mar-13

PRB292470

INSTALL MEN'S / WOMEN'S LOCKERS

10

10

26-Mar-13

08-Apr-13

PRB292480

INSTALL SPECIALITY LIGHTING

10

10

09-Apr-13

22-Apr-13

PRB292485

INSTALL CEILING TILE

5

5

09-Apr-13

15-Apr-13

PRB292490

MEPS TRIM WALLS/CEILING

10

10

16-Apr-13

29-Apr-13

PRB292500

ROUGH-IN FOR EQUIPMENT DATA STATIONS

5

5

16-Apr-13

22-Apr-13

PRB292510

HANG DOORS & HARDWARE

5

5

23-Apr-13

29-Apr-13

PRB292530

OWNER SIGNAGE

5

5

30-Apr-13

06-May-13

PRB292540

CONTRACTOR CLEAN & PUNCHLIST

5

5

30-Apr-13

06-May-13

PRB292550

OWNER PUNCHLIST

5

5

07-May-13

13-May-13

PRB292560

OWNER FF&E

5

5

14-May-13

20-May-13

PRB292570

HEALTH DEPT. INSPECTION

2

2

21-May-13

22-May-13

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 38 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

TASK filter: All Activities Activity ID

Activity Name

FITNESS CENTER (2410)

Orig Dur

Rem Dur

Start

Finish

89

89

30-Oct-12

01-Mar-13

PRB290102

FRAME METAL STUD WALLS/DOOR FRAMES

3

3

30-Oct-12

01-Nov-12

PRB290122

INSTALL STOREFRONT MULLIONS & GLASS

10

10

02-Nov-12

15-Nov-12

PRB292050

MEPS WALL ROUGH-IN/BACKING

5

5

16-Nov-12

26-Nov-12

PRB292070

FRAME CEILINGS & SOFFITS

3

3

27-Nov-12

29-Nov-12

PRB292080

MEPS DROPS TO CEILING & SOFFITS

5

5

30-Nov-12

06-Dec-12

PRB292090

DRYWALL - WALLS / SOFFITS

3

3

07-Dec-12

11-Dec-12

PRB292095

TAPE/PAINT - WALLS / SOFFITS

7

7

12-Dec-12

20-Dec-12

PRB292096

INSTALL CEILING GRID

2

2

21-Dec-12

26-Dec-12

PRB292097

MEPS DROPS TO GRID

5

5

27-Dec-12

03-Jan-13

PRB292140

INSTALL EXERCISE FLOORING

5

5

04-Jan-13

10-Jan-13

PRB292150

INSTALL MIRROR WALLS IN FITNESS ROOM

10

10

11-Jan-13

24-Jan-13

PRB292160

INSTALL SPECIALITY LIGHTING

5

5

25-Jan-13

31-Jan-13

PRB292170

MEPS TRIM WALLS/CEILING

5

5

25-Jan-13

31-Jan-13

PRB292190

HANG DOORS & HARDWARE

1

1

01-Feb-13

01-Feb-13

PRB292200

OWNER SIGNAGE

5

5

04-Feb-13

08-Feb-13

PRB292210

CONTRACTOR CLEAN & PUNCHLIST

5

5

11-Feb-13

15-Feb-13

PRB292220

OWNER PUNCHLIST

5

5

11-Feb-13

15-Feb-13

PRB292520

INSTALL OWNER FITNESS EQUIP.

10

10

18-Feb-13

01-Mar-13

92

92

14-Jan-13

21-May-13

66

66

14-Jan-13

15-Apr-13

LEVEL 1 - FINISHES - LOWRISE NORTH SLOT REPAIR (1112) / PARTS STORAGE (1111) / STORAGE (1110) / REPAIR SUPERVISOR (1113) PRB188350

FRAME METAL STUD WALLS/DOOR FRAMES

5

5

14-Jan-13

18-Jan-13

PRB188570

MEPS WALL ROUGH-IN/BACKING

5

5

21-Jan-13

25-Jan-13

PRB188580

DRYWALL

5

5

28-Jan-13

01-Feb-13

PRB188582

TAPE & PAINT

8

8

04-Feb-13

13-Feb-13

PRB188590

INSTALL CEILING GRID

3

3

14-Feb-13

18-Feb-13

PRB188600

MEPS DROPS TO GRID

5

5

19-Feb-13

25-Feb-13

PRB188610

INSTALL MILLWORK

5

5

19-Feb-13

25-Feb-13

PRB188620

INSTALL CEILING TILE

2

2

26-Feb-13

27-Feb-13

PRB188630

MEPS TRIM WALLS/CEILINGS

5

5

28-Feb-13

06-Mar-13

PRB188640

PREP/CLEAN/SEAL FLOORS

5

5

07-Mar-13

13-Mar-13

PRB188650

VCT/CARPET FLOORING & BASE

3

3

14-Mar-13

18-Mar-13

PRB188660

INSTALL DOORS & HARDWARE

5

5

19-Mar-13

25-Mar-13

PRB188670

OWNER SIGNAGE

5

5

26-Mar-13

01-Apr-13

PRB188680

CONTRACTOR CLEAN & PUNCHLIST

5

5

02-Apr-13

08-Apr-13

PRB190380

OWNER PUNCH AND FINAL

5

5

09-Apr-13

15-Apr-13

SELF-SERVE BEVERAGE CENTER (1114)

36

36

14-Jan-13

04-Mar-13

WPRB291410

FRAME WALLS/DOOR FRAMES

2

2

14-Jan-13

15-Jan-13

WPRB291420

MEPS ROUGH-IN WALLS/BACKING

5

5

16-Jan-13

22-Jan-13

WPRB291430

DRYWALL & TAPE WALLS

6

6

23-Jan-13

30-Jan-13

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 39 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

WPRB291450

FRP/STAINLESS STEEL WALL COVERING

1

1

31-Jan-13

31-Jan-13

WPRB291440

INSTALL QUARRY TILE FLOOR

3

3

01-Feb-13

05-Feb-13

WPRB291460

INSTALL CEILING GRID

1

1

06-Feb-13

06-Feb-13

WPRB291470

MEPS DROP TO GRID

2

2

07-Feb-13

08-Feb-13

WPRB291480

INSTALL FOOD SERVICE EQUIPMENT

5

5

11-Feb-13

15-Feb-13

WPRB291500

MEPS WALL/CEILING TRIM

2

2

12-Feb-13

13-Feb-13

WPRB291520

INSTALL FLOORING

2

2

14-Feb-13

15-Feb-13

WPRB291490

INSTALL CEILING TILE

1

1

18-Feb-13

18-Feb-13

WPRB291530

INSTALL OWNER SIGNAGE

5

5

18-Feb-13

22-Feb-13

WPRB291540

CONTRACTOR CLEAN & PUNCHLIST

5

5

18-Feb-13

22-Feb-13

WPRB291545

OWNER PUNCH AND FINAL

5

5

25-Feb-13

01-Mar-13

WPRB291550

HEALTH DEPARTMENT INSPECTION

PUBLIC RESTROOMS (1120) / (1121) / JANITOR (1122)

1

1

04-Mar-13

04-Mar-13

70

70

14-Jan-13

19-Apr-13

CARB1993240

FRAME METAL STUD WALLS/DOOR FRAMES

5

5

14-Jan-13

18-Jan-13

CARB1993250

MEPS WALL ROUGH-IN/BACKING

15

15

16-Jan-13

05-Feb-13

CARB1993260

DRYWALL RIPPER

1

1

21-Jan-13

21-Jan-13

CARB1993270

FRAME CEILINGS & SOFFITS

5

5

21-Jan-13

25-Jan-13

CARB1993280

MEPS DROPS TO CEILING & SOFFITS

5

5

24-Jan-13

30-Jan-13

CARB1993290

DRYWALL WALLS/CEILINGS

5

5

31-Jan-13

06-Feb-13

CARB1993292

TAPE / PAINT WALLS/CEILINGS

10

10

07-Feb-13

20-Feb-13

CARB1993293

INSTALL SUB-TOPS

5

5

21-Feb-13

27-Feb-13

CARB1993294

INSTALL TILE FLOORING/WALLS/COUNTERTOPS

15

15

28-Feb-13

20-Mar-13

CARB1993320

INSTALL PLUMBING FIXTURES

10

10

14-Mar-13

27-Mar-13

CARB1993330

INSTALL TOILET PARTITIONS & ACCESSORIES

5

5

28-Mar-13

03-Apr-13

CARB1993340

MEPS TRIM WALLS/CEILING

5

5

04-Apr-13

10-Apr-13

CARB1993360

HANG DOORS & HARDWARE

2

2

04-Apr-13

05-Apr-13

CARB1993380

OWNER SIGNAGE

5

5

08-Apr-13

12-Apr-13

CARB1993390

CONTRACTOR CLEAN & PUNCHLIST

5

5

08-Apr-13

12-Apr-13

CARB1993395

OWNER PUNCH & FINAL

5

5

15-Apr-13

19-Apr-13

71

71

21-Jan-13

29-Apr-13

5

5

21-Jan-13

25-Jan-13

NORTH ENTRY VESTIBULE (1125) CARB1988340

FRAME METAL STUD WALLS / CEILINGS

CARB1988350

MEPS WALL ROUGH-IN/BACKING

7

7

24-Jan-13

01-Feb-13

CARB1989101

DRYWALL WALLS & CEILINGS

10

10

04-Feb-13

15-Feb-13

CARB1989102

TAPE/PAINT WALLS & CEILINGS

6

6

18-Feb-13

25-Feb-13

CARB1989103

INSTALL STOREFRONT MULLIONS & GLASS

10

10

26-Feb-13

11-Mar-13

CARB1989190

MEPS DROPS TO CEILING & SOFFITS

5

5

12-Mar-13

18-Mar-13

CARB1989210

INSTALL MILLWORK/SPECIAL FINISHES

5

5

19-Mar-13

25-Mar-13

CARB1989220

INSTALL FLOORING

5

5

26-Mar-13

01-Apr-13

CARB1989230

MEPS TRIM WALLS/CEILING/SURVEILANCE

5

5

02-Apr-13

08-Apr-13

CARB1989270

OWNER SIGNAGE

5

5

09-Apr-13

15-Apr-13

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 40 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

TASK filter: All Activities Activity ID

Activity Name

CARB1989280

CONTRACTOR CLEAN & PUNCHLIST

CARB1989285

OWNER PUNCH & FINAL

MAIN BANK (1128)/(1130) / CASHIERS (1131)/ CAGE (1127)/COUNT ROOM (1202) / MAN TRAPS (1203) & (1129)

Orig Dur

Rem Dur

Start

5

5

16-Apr-13

Finish 22-Apr-13

5

5

23-Apr-13

29-Apr-13

87

87

21-Jan-13

21-May-13

CARB1988320

FRAME METAL STUD WALLS/DOOR FRAMES

10

10

21-Jan-13

01-Feb-13

CARB1988330

MEPS WALL ROUGH-IN/BACKING

15

15

28-Jan-13

15-Feb-13

CARB1989070

FRAME/SECURITY MESH - CEILINGS & SOFFITS

7

7

11-Feb-13

19-Feb-13

CARB1989080

MEPS DROPS TO CEILING & SOFFITS

10

10

20-Feb-13

05-Mar-13

CARB1989090

DRYWALL WALLS & CEILINGS

10

10

27-Feb-13

12-Mar-13

CARB1989092

TAPE/PAINT WALLS & CEILINGS

10

10

06-Mar-13

19-Mar-13

CARB1989100

INSTALL MILLWORK/SPECIAL FINISHES

10

10

13-Mar-13

26-Mar-13

CARB1989110

INSTALL FLOORING

10

10

27-Mar-13

09-Apr-13

CARB1989120

MEPS TRIM WALLS/CEILING/SURVEILANCE

10

10

03-Apr-13

16-Apr-13

CARB1989130

ROUGH-IN FOR OWNER DATA STATIONS

10

10

03-Apr-13

16-Apr-13

CARB1989140

HANG DOORS & HARDWARE

5

5

03-Apr-13

09-Apr-13

CARB1989150

INSTALL CARPET

5

5

10-Apr-13

16-Apr-13

CARB1989160

OWNER SIGNAGE

5

5

17-Apr-13

23-Apr-13

CARB1989165

INSTALL AND TEST OWNER DATA EQUIPMENT

15

15

17-Apr-13

07-May-13

CARB1989170

CONTRACTOR CLEAN & PUNCHLIST

10

10

24-Apr-13

07-May-13

CARB1989175

OWNER PUNCH & FINAL

10

10

08-May-13

21-May-13

65

65

28-Jan-13

26-Apr-13

PERS82650

FRAME METAL STUD WALLS/DOOR FRAMES

5

5

28-Jan-13

01-Feb-13

PERS82660

MEP WALL ROUGH-IN / BACKING

3

3

01-Feb-13

05-Feb-13

PERS82670

DRYWALL

3

3

06-Feb-13

08-Feb-13

PERS82672

TAPE / PAINT WALL

5

5

11-Feb-13

15-Feb-13

PERS82680

INSTALL FAN COIL

2

2

18-Feb-13

19-Feb-13

PERS82690

FORM/REBAR/POUR HOUSEKEEPING PADS

2

2

20-Feb-13

21-Feb-13

PERS82700

SET MAJOR EQUIPMENT

5

5

22-Feb-13

28-Feb-13

PERS82710

DOORS & HARDWARE

2

2

01-Mar-13

04-Mar-13

PERS82720

PULL & TERMINATE FEEDERS

10

10

05-Mar-13

18-Mar-13

PERS82725

HOOK-UP EQUIPMENT / TAGGING / LABELING

25

25

12-Mar-13

15-Apr-13

PERS82730

MEPS TRIM

3

3

11-Apr-13

15-Apr-13

PERS82750

CLEAN & SEAL FLOOR

2

2

16-Apr-13

17-Apr-13

PERS82760

OWNER SIGNAGE

2

2

18-Apr-13

19-Apr-13

PERS83250

CONTRACTOR CLEAN & PUNCHLIST

5

5

22-Apr-13

26-Apr-13

ELEC. NORTH (1204) / SECURITY DISPATCH (1205)

76

76

28-Jan-13

13-May-13

PRB188270

FRAME METAL STUDS WALLS/DOOR FRAMES

3

3

28-Jan-13

30-Jan-13

PRB188380

MEPS WALL ROUGH-IN/BACKING

7

7

31-Jan-13

08-Feb-13

PRB188400

FRAME CEILINGS & SOFFITS

5

5

11-Feb-13

15-Feb-13

PRB188410

MEPS DROPS TO CEILING & SOFFITS

8

8

14-Feb-13

25-Feb-13

PRB188420

DRYWALL WALLS/CEILINGS

5

5

22-Feb-13

28-Feb-13

PLAYER'S CLUB (1206) / CLUB STO (1208) / MARKETING MANAGER/IDF/ CARD & DICE (1209)

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 41 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

8

8

01-Mar-13

12-Mar-13

PRB188422

TAPE/PAINT WALLS/CEILINGS

PRB188424

INSTALL FAN COIL

2

2

13-Mar-13

14-Mar-13

PRB188430

INSTALL MILLWORK/SPECIAL FINISHES

10

10

15-Mar-13

28-Mar-13

PRB188442

INSTALL OWNER RACKS / EQUIPMENT (IDF)

2

2

15-Mar-13

18-Mar-13

PRB188444

PUNCH DOWN / PROGRAMMING - EQUIPMENT (IDF)

20

20

19-Mar-13

15-Apr-13

PRB188440

INSTALL STONE TOPS

2

2

29-Mar-13

01-Apr-13

PRB188450

MEPS TRIM WALLS/CEILING

5

5

09-Apr-13

15-Apr-13

PRB188460

ROUGH-IN FOR OWNER DATA STATIONS

5

5

09-Apr-13

15-Apr-13

PRB188470

HANG DOORS & HARDWARE

5

5

09-Apr-13

15-Apr-13

PRB188480

INSTALL CARPET

5

5

16-Apr-13

22-Apr-13

PRB188490

OWNER SIGNAGE

5

5

23-Apr-13

29-Apr-13

PRB188500

CONTRACTOR CLEAN & PUNCHLIST

5

5

30-Apr-13

06-May-13

PRB190400

OWNER PUNCH AND FINAL

5

5

07-May-13

13-May-13

FINISHES (CASINO BARGE)

150

150

16-Nov-12

13-Jun-13

CASINO GAMING FLOOR (1100)

150

150

16-Nov-12

13-Jun-13

CARB190040

MEPS ROUGH-IN WALLS/BACKING

10

10

16-Nov-12

03-Dec-12

CARB190050

DRYWALL RIPPER AT CEILINGS AND SOFFITS

5

5

14-Dec-12

20-Dec-12

CARB190060

FRAME HARD LID SOFFITS AND CEILINGS

15

15

14-Dec-12

08-Jan-13

CARB190062

MEPS / SECURITY / SURVEILLANCE DROPS

20

20

21-Dec-12

22-Jan-13

CARB190070

DRYWALL WALLS, SOFFITS AND CEILINGS

10

10

09-Jan-13

22-Jan-13

CARB190080

TAPE/PAINT WALLS, SOFFITS AND CEILINGS

15

15

16-Jan-13

05-Feb-13

CARB190090

INSTALL MILLWORK / RAILING / THEMING / PIT CANOPIES

40

40

23-Jan-13

19-Mar-13

CARB190100

INSTALL CEILING GRID

15

15

30-Jan-13

19-Feb-13

CARB190110

MEPS DROPS TO CEILING

15

15

06-Feb-13

26-Feb-13

CARB190120

PULL ELECTRICAL / LOW VOLTAGE TO SLOT BASES

15

15

06-Feb-13

26-Feb-13

CARB190130

INSTALL CEILING TILE

10

10

20-Feb-13

05-Mar-13

CARB190140

MEPS TRIM/DL FIXTURES AND OWNER SIGNAGE - CASINO

15

15

27-Feb-13

19-Mar-13

CARB190150

INSTALL CARPET FLOORING

10

10

14-Mar-13

27-Mar-13

CARB190160

INSTALL SLOT BASES/TERMINATE DATA AND POWER

15

15

21-Mar-13

10-Apr-13

CARB190170

INSTALL SLOTS AND SLOT SIGNAGE / PROGRAMMING

30

30

04-Apr-13

15-May-13

CARB190180

CONTRACTOR CLEAN & PUNCHLIST

10

10

16-May-13

30-May-13

CARB190175

TEST & BALANCE

15

15

16-May-13

06-Jun-13

CARB190190

OWNER PUNCH & FINAL - CASINO

10

10

31-May-13

13-Jun-13

86

86

02-Jan-13

01-May-13

CBF400

FRAME RAISED FLOOR @ CENTER BAR

5

5

02-Jan-13

08-Jan-13

CBF410

METAL DECK / MEP ROUGH-IN RAISED FLOOR @ CENTER BAR

5

5

09-Jan-13

15-Jan-13

CBF420

REBAR & POUR RAISED FLOOR SLAB @ CENTER BAR

2

2

16-Jan-13

17-Jan-13

CBF430

FRAME WALLS & CEILINGS

3

3

18-Jan-13

22-Jan-13

CBF470

SET BAR DIE WALL

3

3

18-Jan-13

22-Jan-13

CASINO BAR (1102) / SERVER STATIONS (1103) / (1104)

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 42 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

10

10

23-Jan-13

Finish

CBF440

MEPS ROUGH-IN - WALLS & CEILINGS

CBF480

WATERPROOF / QUARRY TILE BEHIND DIE WALL

5

5

23-Jan-13

29-Jan-13

CBF490

SEATING AREA MILLWORK / FRONT & BACK BARS

15

15

30-Jan-13

19-Feb-13

CBF450

DRYWALL & TAPE WALLS

8

8

05-Feb-13

14-Feb-13

CBF460

PAINT WALLS / INSTALL FRP

5

5

15-Feb-13

21-Feb-13

CBF500

INSTALL FRP BEHIND DIE WALL

2

2

22-Feb-13

25-Feb-13

CBF510

SET & HOOK UP BAR/SERVICE BARS EQUIPMENT

15

15

26-Feb-13

18-Mar-13

CBF520

SEATING AREA SPECIAL FINISHES

15

15

26-Feb-13

18-Mar-13

CBF530

INSTALL STONE TOP AT BAR

2

2

19-Mar-13

20-Mar-13

CBF540

SEATING AREA CARPET & STONE FLOORING

10

10

19-Mar-13

01-Apr-13

CBF550

SEATING AREA MISC. METALS & HANDRAILS

10

10

26-Mar-13

08-Apr-13

CBF560

MEPS WALL/CEILING TRIM

5

5

09-Apr-13

15-Apr-13

CBF570

CONTRACTOR CLEAN & PUNCHLIST

5

5

16-Apr-13

22-Apr-13

CBF580

OWNER PUNCH & FINAL

5

5

23-Apr-13

29-Apr-13

CBF590

HEALTH DEPARTMENT INSPECTION

FINISHES (TOWER FOOTPRINT) TOWER LEVEL 1 FRONT DESK (1212) / CHECK IN / HOTEL ADMIN. (1211) / FIRE COMMAND

05-Feb-13

2

2

30-Apr-13

01-May-13

174

174

20-Sep-12

22-May-13

161

161

09-Oct-12

22-May-13

150

150

09-Oct-12

06-May-13

CARB194890

FRAME METAL STUD WALLS/COLUMNS/DOOR FRAMES

7

7

09-Oct-12

18-Oct-12

CARB194900

MEPS WALL ROUGH-IN/BACKING

15

15

11-Oct-12

01-Nov-12

CARB194910

DRYWALL RIPPER

2

2

22-Oct-12

24-Oct-12

CARB194920

FRAME CEILINGS / SOFFITS / COFFERS

15

15

22-Oct-12

12-Nov-12

CARB194930

MEPS DROPS TO CEILINGS / SOFFITS / COFFERS

15

15

05-Nov-12

28-Nov-12

CARB194933

DRYWALL-WALLS/CEILINGS

10

10

28-Nov-12

11-Dec-12

CARB194934

INSTALL TEMP. ENTRY DOORS

5

5

12-Dec-12

18-Dec-12

CARB194936

TAPE/PAINT/VWC -WALLS/CEILING

15

15

19-Dec-12

11-Jan-13

CARB194937

INSTALL FIRE COMMAND PANELS

2

2

14-Jan-13

15-Jan-13

CARB194942

INSTALL DIE WALL AT REGISTRATION COUNTER

5

5

16-Jan-13

22-Jan-13

CARB194938

TERMINATE & HOOK-UP FIRE COMMAND PANELS

10

10

16-Jan-13

29-Jan-13

CARB194943

INSTALL CEILING GRID

3

3

23-Jan-13

25-Jan-13

CARB194944

MEPS DROPS TO CEILING GRID

5

5

28-Jan-13

01-Feb-13

CARB194946

PROGRAMMING AT FIRE COMMAND PANELS

30

30

28-Jan-13

08-Mar-13

CARB194948

INSTALL STONE FLOORING

15

15

04-Feb-13

22-Feb-13

CARB194950

INSTALL MILLWORK / COLUMN WRAPS / REGISTRATION DESK

20

20

25-Feb-13

22-Mar-13

CARB194949

INSTALL VESTIBULE GLASS & DOORS / AUTOMATIC CLOSERS

15

15

25-Feb-13

15-Mar-13

CARB194952

INSTALL SPECIAL FINISHES

30

30

11-Mar-13

19-Apr-13

CARB194960

MEPS TRIM WALLS/CEILING

15

15

25-Mar-13

12-Apr-13

CARB194955

ROUGH-IN DATA STATIONS AT REGISTRATION DESK

10

10

25-Mar-13

05-Apr-13

CARB194970

INSTALL CARPET & BASE

5

5

12-Apr-13

18-Apr-13

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 43 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

TASK filter: All Activities Activity ID

Activity Name

Orig Dur

Rem Dur

Start

Finish

CARB194980

HANG DOORS & HARDWARE

5

5

16-Apr-13

22-Apr-13

CARB194990

OWNER SIGNAGE

5

5

16-Apr-13

22-Apr-13

CARB194995

CONTRACTOR CLEAN & PUNCHLIST

5

5

23-Apr-13

29-Apr-13

PRB189045

OWNER PUNCH AND FINAL

5

5

30-Apr-13

06-May-13

137

137

18-Oct-12

29-Apr-13

7

7

18-Oct-12

29-Oct-12

EVENT CENTER PREFUNCTION (1220) /PASS. ELEVATOR LOBBY / VESTIBULE (1200) CARB194935

FRAME METAL STUD WALLS/COLUMNS/DOOR FRAMES

CARB194940

INSTALL ELEVATOR FRONTS

7

7

29-Oct-12

07-Nov-12

CARB194941

MEPS WALL ROUGH-IN/BACKING

10

10

07-Nov-12

21-Nov-12

CARB194945

FRAME CEILINGS / SOFFITS / COFFERS

10

10

19-Nov-12

05-Dec-12

CARB194947

MEPS DROPS TO CEILINGS / SOFFITS / COFFERS

15

15

28-Nov-12

19-Dec-12

CARB194953

DRYWALL-WALLS/CEILINGS

8

8

17-Dec-12

31-Dec-12

CARB194956

TAPE/PAINT/VWC -WALLS/CEILING

15

15

31-Dec-12

22-Jan-13

CARB194963

INSTALL CEILING GRID

3

3

22-Jan-13

25-Jan-13

CARB194964

MEPS DROPS TO CEILING GRID

5

5

25-Jan-13

01-Feb-13

CARB194968

INSTALL STONE FLOORING

10

10

01-Feb-13

15-Feb-13

CARB195040

INSTALL MILLWORK / COLUMN WRAPS

20

20

15-Feb-13

15-Mar-13

CARB195042

INSTALL SPECIAL FINISHES

30

30

15-Feb-13

29-Mar-13

CARB195050

MEPS TRIM WALLS/CEILING

15

15

15-Mar-13

05-Apr-13

CARB195060

INSTALL CARPET & BASE

5

5

04-Apr-13

11-Apr-13

CARB195070

HANG DOORS & HARDWARE

5

5

08-Apr-13

15-Apr-13

CARB195080

OWNER SIGNAGE

5

5

08-Apr-13

15-Apr-13

CARB195082

CONTRACTOR CLEAN & PUNCHLIST

5

5

15-Apr-13

22-Apr-13

PRB189055

OWNER PUNCH AND FINAL

5

5

22-Apr-13

29-Apr-13

147

147

29-Oct-12

22-May-13

EVENT CENTER BUS BAR CARB194965

FRAME METAL STUD WALLS/COLUMNS/CEILINGS

4

4

29-Oct-12

02-Nov-12

CARB194966

MEPS WALL ROUGH-IN/BACKING

10

10

02-Nov-12

16-Nov-12

CARB194973

DRYWALL-WALLS/COLUMNS

8

8

16-Nov-12

30-Nov-12

CARB194976

TAPE/PAINT

7

7

30-Nov-12

11-Dec-12

CBF680

SET BAR DIE WALL

4

4

11-Dec-12

17-Dec-12

CBF682

INSTALL EVENT CENTER ENTRY - STOREFRONT GLASS

20

20

17-Dec-12

17-Jan-13

CBF685

INSTALL BUS FACADE

10

10

10-Jan-13

24-Jan-13

CBF700

QUARRY TILE BEHIND DIE WALL

4

4

24-Jan-13

30-Jan-13

CBF705

PULL SODA / BEVERAGE LINES (OWNER)

2

2

30-Jan-13

01-Feb-13

CBF715

INSTALL FRP BEHIND DIE WALL

2

2

31-Jan-13

04-Feb-13

CBF730

MILLWORK / FRONT & BACK BARS

15

15

04-Feb-13

25-Feb-13

CBF760

SET & HOOK UP BAR EQUIPMENT

20

20

25-Feb-13

25-Mar-13

CBF790

INSTALL STONE TOPS AT BAR

5

5

25-Mar-13

01-Apr-13

CBF795

INSTALL SPECIAL FINISHES

30

30

25-Mar-13

06-May-13

CBF800

MEPS TRIM

5

5

29-Apr-13

06-May-13

CBF810

CONTRACTOR CLEAN & PUNCHLIST

5

5

06-May-13

13-May-13

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 44 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

TASK filter: All Activities Activity ID

Activity Name

CBF830

OWNER PUNCH & FINAL

CBF840

HEALTH DEPARTMENT INSPECTION

PUBLIC RESTROOMS (1237) / (1239) / (1241)

Orig Dur

Rem Dur

Start

Finish

5

5

13-May-13

20-May-13

2

2

20-May-13

22-May-13

89

89

29-Oct-12

01-Mar-13

CARB192240

FRAME METAL STUD WALLS/DOOR FRAMES

5

5

29-Oct-12

05-Nov-12

CARB192250

MEPS WALL ROUGH-IN/BACKING

10

10

01-Nov-12

15-Nov-12

CARB192260

DRYWALL RIPPER

2

2

15-Nov-12

19-Nov-12

CARB192270

FRAME CEILINGS & SOFFITS

5

5

19-Nov-12

28-Nov-12

CARB192280

MEPS DROPS TO CEILING & SOFFITS

5

5

28-Nov-12

05-Dec-12

CARB192290

DRYWALL-WALLS/CEILINGS

5

5

05-Dec-12

12-Dec-12

CARB192295

TAPE/PAINT-WALLS/CEILINGS

7

7

12-Dec-12

21-Dec-12

CARB192300

INSTALL MILLWORK SUB-TOPS

3

3

21-Dec-12

28-Dec-12

CARB192310

INSTALL TILE FLOORING/WALLS/COUNTERTOPS

12

12

26-Dec-12

14-Jan-13

CARB192320

INSTALL PLUMBING FIXTURES

10

10

14-Jan-13

28-Jan-13

CARB192330

INSTALL TOILET PARTITIONS & ACCESSORIES

5

5

28-Jan-13

04-Feb-13

CARB192340

MEPS TRIM WALLS/CEILING

5

5

04-Feb-13

11-Feb-13

CARB192360

HANG DOORS & HARDWARE

2

2

11-Feb-13

13-Feb-13

CARB192380

OWNER SIGNAGE

2

2

13-Feb-13

15-Feb-13

PRB189050

CONTRACTOR CLEAN & PUNCHLIST

5

5

15-Feb-13

22-Feb-13

PRB189065

OWNER PUNCH AND FINAL

5

5

22-Feb-13

01-Mar-13

72

72

29-Oct-12

06-Feb-13

PRB188520

FRAME WALLS/DOOR FRAMES

2

2

29-Oct-12

31-Oct-12

PRB188890

MEPS ROUGH-IN WALLS/BACKING

5

5

31-Oct-12

07-Nov-12

PRB188930

DRYWALL

5

5

07-Nov-12

14-Nov-12

PRB188935

TAPE & PAINT

7

7

14-Nov-12

27-Nov-12

PRB188940

INSTALL DIE WALL

2

2

27-Nov-12

29-Nov-12

PRB188945

INSTALL QUARRY TILE

3

3

29-Nov-12

04-Dec-12

PRB188950

INSTALL MILLWORK

5

5

04-Dec-12

11-Dec-12

PRB188960

INSTALL STONE FLOORING

3

3

11-Dec-12

14-Dec-12

PRB188965

INSTALL REFRIGERATED DISPLAY CASES

5

5

14-Dec-12

21-Dec-12

PRB188970

INSTALL FOOD SERVICE EQUIPMENT

12

12

21-Dec-12

11-Jan-13

PRB188980

MEPS TRIM

3

3

04-Jan-13

09-Jan-13

PRB189010

INSTALL CARPET

5

5

09-Jan-13

16-Jan-13

PRB189020

INSTALL OWNER SIGNAGE

5

5

09-Jan-13

16-Jan-13

PRB189030

CONTRACTOR CLEAN & PUNCHLIST

5

5

16-Jan-13

23-Jan-13

PRB189035

OWNER PUNCH AND FINAL

5

5

23-Jan-13

30-Jan-13

PRB189040

HEALTH DEPARTMENT INSPECTION

5

5

30-Jan-13

06-Feb-13

CAFE (1242) / CAFE BOH (1243)

58

58

05-Nov-12

24-Jan-13

PRBS84350

FRAME METAL STUD WALLS/DOOR FRAMES

3

3

05-Nov-12

08-Nov-12

PRBS84360

MEPS WALL ROUGH-IN/BACKING

7

7

08-Nov-12

19-Nov-12

PRBS84370

DRYWALL

5

5

19-Nov-12

28-Nov-12

BOH CIRCULATION (1245) / EMPLOYEE ENTRY / SERVICE ELEVATOR LOBBY

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 45 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

TASK filter: All Activities Activity ID

Activity Name

Orig Dur

Rem Dur

Start

Finish

PRBS84380

TAPE & PAINT

7

7

19-Nov-12

30-Nov-12

PRBS84390

INSTALL CEILING GRID

3

3

29-Nov-12

04-Dec-12

PRBS84400

MEPS DROPS TO GRID

5

5

04-Dec-12

11-Dec-12

PRBS84440

INSTALL CEILING TILE

3

3

11-Dec-12

14-Dec-12

PRBS84450

MEPS TRIM WALLS/CEILING

5

5

14-Dec-12

21-Dec-12

PRBS84460

VCT FLOORING & BASE

3

3

21-Dec-12

28-Dec-12

PRBS84470

INSTALL DOORS & HARDWARE

3

3

28-Dec-12

03-Jan-13

PRBS84490

OWNER SIGNAGE

5

5

03-Jan-13

10-Jan-13

PRBS84500

CONTRACTOR CLEAN & PUNCHLIST

5

5

10-Jan-13

17-Jan-13

PRBS84800

OWNER PUNCH AND FINAL

TRASH RECYCLING (1247) RECEIVING (1430) / REC. OFFICE(1429)/LIQ.STORAGE (1428)

5

5

17-Jan-13

24-Jan-13

112

112

08-Nov-12

15-Apr-13

PRBB88690

FRAME METAL STUD WALLS/DOOR FRAMES / TUBE STEEL SUPPORTS

5

5

08-Nov-12

15-Nov-12

PRBB89050

MEPS WALL ROUGH-IN/BACKING

10

10

14-Nov-12

30-Nov-12

PRBB89060

DRYWALL

7

7

21-Nov-12

04-Dec-12

PRBB89070

TAPE & PAINT

10

10

04-Dec-12

18-Dec-12

PRBB89072

INSTALL ROLL-UP DOORS

7

7

18-Dec-12

31-Dec-12

PRBB89074

INSTALL DOCK LEVELERS

5

5

31-Dec-12

08-Jan-13

PRBB89075

INSTALL TRASH COMPACTOR AT TRASH RECYCLING

10

10

08-Jan-13

22-Jan-13

PRBB89076

INSTALL FRP AT LIQUOR STORAGE / SODA ROOM / JANITOR CLOSET

10

10

15-Jan-13

29-Jan-13

PRBB89077

INSTALL MOP SINK / RACK AT JANITOR CLOSET

5

5

29-Jan-13

05-Feb-13

PRBB89080

INSTALL CEILING GRID

7

7

05-Feb-13

14-Feb-13

PRBB89090

MEPS DROPS TO GRID

10

10

07-Feb-13

21-Feb-13

PRBB89100

INSTALL CEILING TILE

5

5

21-Feb-13

28-Feb-13

PRBB89110

MEPS TRIM WALLS/CEILING

10

10

21-Feb-13

07-Mar-13

PRBB89120

VCT FLOORING & BASE

5

5

07-Mar-13

14-Mar-13

PRBB89130

PREP / CLEAN / SEAL CONCRETE FLOORS

2

2

14-Mar-13

18-Mar-13

PRBB89140

INSTALL DOORS & HARDWARE

5

5

18-Mar-13

25-Mar-13

PRBS84540

OWNER SIGNAGE

5

5

25-Mar-13

01-Apr-13

PRBS84620

CONTRACTOR CLEAN & PUNCHLIST

5

5

01-Apr-13

08-Apr-13

PRBS84820

OWNER PUNCH AND FINAL

TOWER MEZZ LEVEL

5

5

08-Apr-13

15-Apr-13

81

81

20-Sep-12

10-Jan-13

60

60

20-Sep-12

12-Dec-12

PRBS81090

FRAME METAL STUD WALLS/DOOR FRAMES

3

3

20-Sep-12

24-Sep-12

PRBS81100

MEPS WALL ROUGH-IN/BACKING

5

5

25-Sep-12

01-Oct-12

PRBS81110

DRYWALL

3

3

02-Oct-12

04-Oct-12

PRBS81115

TAPE & PAINT

7

7

05-Oct-12

15-Oct-12

PRBS81120

INSTALL CEILING GRID

5

5

16-Oct-12

22-Oct-12

PRBS81130

MEPS DROPS TO GRID

5

5

19-Oct-12

25-Oct-12

PRBS81160

INSTALL CEILING TILE

2

2

26-Oct-12

29-Oct-12

PRBS81170

MEPS TRIM WALLS/CEILING

5

5

30-Oct-12

05-Nov-12

WAREHOUSE & EVENT CENTER STORAGE / MAINTENANCE / SERVICE ELEVATOR LOBBY

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 46 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

PRBS81180

PREP/CLEAN/SEAL FLOORS

5

5

06-Nov-12

12-Nov-12

PRBS81190

VCT/ FLOORING & BASE

5

5

13-Nov-12

19-Nov-12

PRBS81200

INSTALL DOORS & HARDWARE

3

3

20-Nov-12

26-Nov-12

PRBS81210

OWNER SIGNAGE

2

2

27-Nov-12

28-Nov-12

PRBS81220

CONTRACTOR CLEAN & PUNCHLIST

5

5

29-Nov-12

05-Dec-12

PRBS81320

OWNER PUNCH AND FINAL

5

5

06-Dec-12

12-Dec-12

58

58

25-Sep-12

13-Dec-12

PRBS81140

FRAME METAL STUD WALLS

2

2

25-Sep-12

26-Sep-12

PRBS81150

MEPS WALL ROUGH-IN/BACKING

5

5

27-Sep-12

03-Oct-12

PRBS81230

INSTALL WALK-IN COOLERS

10

10

04-Oct-12

17-Oct-12

PRBS81235

INSTALL QUARRY TILE AT WALK-IN COOLERS

7

7

18-Oct-12

26-Oct-12

PRBS81240

INSTALL CEILING GRID

5

5

29-Oct-12

02-Nov-12

PRBS81250

MEPS DROPS TO GRID

5

5

05-Nov-12

09-Nov-12

PRBS81260

INSTALL CEILING TILE

2

2

12-Nov-12

13-Nov-12

PRBS81270

MEPS TRIM WALLS/CEILING

5

5

14-Nov-12

20-Nov-12

PRBS81280

CONTRACTOR CLEAN & PUNCHLIST

5

5

21-Nov-12

29-Nov-12

PRBS81330

OWNER PUNCH AND FINAL

5

5

30-Nov-12

06-Dec-12

PRBS81340

HEALTH DEPT. INSPECTION

5

5

07-Dec-12

13-Dec-12

76

76

27-Sep-12

10-Jan-13

WALK-IN COOLER #1 & #2

BOH RESTROOMS (M451) / (M452) CARB192630

FRAME METAL STUD WALLS/DOOR FRAMES

3

3

27-Sep-12

01-Oct-12

CARB192640

MEPS WALL ROUGH-IN/BACKING

8

8

28-Sep-12

09-Oct-12

CARB192650

FRAME CEILINGS & SOFFITS

5

5

10-Oct-12

16-Oct-12

CARB192660

MEPS DROPS TO CEILING & SOFFITS

5

5

17-Oct-12

23-Oct-12

CARB192670

DRYWALL-WALLS/CEILINGS

5

5

24-Oct-12

30-Oct-12

CARB192680

TAPE/PAINT-WALLS/CEILINGS

7

7

31-Oct-12

08-Nov-12

CARB192690

INSTALL SUB-TOPS

2

2

09-Nov-12

12-Nov-12

CARB192700

INSTALL TILE FLOORING/WALLS/COUNTERTOPS IN RESTROOMS

10

10

13-Nov-12

28-Nov-12

CARB192710

INSTALL PLUMBING FIXTURES

5

5

29-Nov-12

05-Dec-12

CARB192720

INSTALL TOILET PARTITIONS & ACCESSORIES

5

5

06-Dec-12

12-Dec-12

CARB192730

MEPS TRIM WALLS/CEILING

5

5

13-Dec-12

19-Dec-12

CARB192740

HANG DOORS & HARDWARE

2

2

20-Dec-12

21-Dec-12

CARB192750

OWNER SIGNAGE

1

1

26-Dec-12

26-Dec-12

PERS121280

CONTRACTOR CLEAN & PUNCHLIST

5

5

27-Dec-12

03-Jan-13

PERS122280

OWNER PUNCHLIST

5

5

04-Jan-13

10-Jan-13

139

139

11-Oct-12

23-Apr-13

82

82

11-Oct-12

01-Feb-13

TOWER LEVEL 2 ELECTRICAL ROOM (2209) ELES110250

FRAME METAL STUD WALLS/DOOR FRAMES

1

1

11-Oct-12

11-Oct-12

ELES111250

MEP WALL ROUGH-IN / BACKING

2

2

12-Oct-12

15-Oct-12

ELES112250

DRYWALL

5

5

16-Oct-12

22-Oct-12

ELES112260

TAPE

5

5

23-Oct-12

29-Oct-12

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 47 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

ELES113250

INSTALL / HOOK-UP FAN COIL

5

5

30-Oct-12

05-Nov-12

ELES114250

FORM/REBAR/POUR HOUSEKEEPING PADS

2

2

06-Nov-12

07-Nov-12

ELES115250

SET EQUIPMENT

2

2

15-Nov-12

16-Nov-12

ELES116250

DOORS & HARDWARE

1

1

19-Nov-12

19-Nov-12

ELES117250

PULL FEEDERS / HOOK-UP EQUIPMENT/TAGGING

30

30

20-Nov-12

07-Jan-13

ELES118250

PERMANENT LIGHTING/MEPS TRIM

3

3

08-Jan-13

10-Jan-13

ELES119250

CLEAN & SEAL FLOOR

5

5

11-Jan-13

17-Jan-13

ELES120250

OWNER SIGNAGE

1

1

18-Jan-13

18-Jan-13

ELES121250

CONTRACTOR CLEAN & PUNCHLIST

5

5

21-Jan-13

25-Jan-13

ELES122250

OWNER PUNCH AND FINAL

SERVER ROOM/SOUND ROOMS/IT SUPERVISOR/MIS

5

5

28-Jan-13

01-Feb-13

102

102

12-Oct-12

04-Mar-13

PERS84250

FRAME METAL STUD WALLS/DOOR FRAMES

3

3

12-Oct-12

16-Oct-12

PERS85250

MEP WALL ROUGH-IN / BACKING

7

7

17-Oct-12

25-Oct-12

PERS86250

DRYWALL

5

5

26-Oct-12

01-Nov-12

PERS86300

TAPE

3

3

02-Nov-12

06-Nov-12

PERS87250

INSTALL / HOOK-UP FAN COIL

5

5

07-Nov-12

13-Nov-12

PERS88250

FORM/REBAR/POUR HOUSEKEEPING PADS

2

2

14-Nov-12

15-Nov-12

PERS88253

PAINT

3

3

16-Nov-12

20-Nov-12

PERS89250

SET EQUIPMENT / RACKS

10

10

21-Nov-12

06-Dec-12

PERS90250

DOORS & HARDWARE

2

2

07-Dec-12

10-Dec-12

PERS91250

PUNCH DOWN & PROGRAMMING

30

30

11-Dec-12

24-Jan-13

PERS92250

MEPS TRIM

5

5

25-Jan-13

31-Jan-13

PERS94250

CLEAN & SEAL FLOOR

10

10

01-Feb-13

14-Feb-13

PERS95250

OWNER SIGNAGE

2

2

15-Feb-13

18-Feb-13

PERS96250

CONTRACTOR CLEAN & PUNCHLIST

5

5

19-Feb-13

25-Feb-13

PRBS82370

OWNER PUNCH AND FINAL

5

5

26-Feb-13

04-Mar-13

SLOT MANAGER/TABLE MANGER / GAMING OPERATIONS

45

45

17-Oct-12

18-Dec-12

PRBS82090

FRAME METAL STUD WALLS/DOOR FRAMES

2

2

17-Oct-12

18-Oct-12

PRBS82100

MEPS WALL ROUGH-IN/BACKING

5

5

19-Oct-12

25-Oct-12

PRBS82110

DRYWALL

3

3

26-Oct-12

30-Oct-12

PRBS82115

TAPE & PAINT

7

7

31-Oct-12

08-Nov-12

PRBS82120

INSTALL CEILING GRID

1

1

09-Nov-12

09-Nov-12

PRBS82130

MEPS DROPS TO GRID

3

3

12-Nov-12

14-Nov-12

PRBS82160

INSTALL CEILING TILE

2

2

15-Nov-12

16-Nov-12

PRBS82170

MEPS TRIM WALLS/CEILING

5

5

19-Nov-12

27-Nov-12

PRBS82190

CARPET FLOORING & BASE

2

2

28-Nov-12

29-Nov-12

PRBS82200

INSTALL DOORS & HARDWARE

1

1

30-Nov-12

30-Nov-12

PRBS82210

OWNER SIGNAGE

2

2

03-Dec-12

04-Dec-12

PRBS82220

CONTRACTOR CLEAN & PUNCHLIST

5

5

05-Dec-12

11-Dec-12

PRBS82320

OWNER PUNCH AND FINAL

5

5

12-Dec-12

18-Dec-12

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 48 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

TASK filter: All Activities Activity ID

Activity Name

SURV STORAGE / SURV. ROOM / SERVER ROOM / SUPERVISOR OFFICE / STATE POLICE

Orig Dur

Rem Dur

Start

Finish

104

104

19-Oct-12

13-Mar-13

PERS84270

FRAME METAL STUD WALLS/DOOR FRAMES

2

2

19-Oct-12

22-Oct-12

PERS85270

MEP WALL ROUGH-IN / BACKING

7

7

23-Oct-12

31-Oct-12

PERS86270

DRYWALL

2

2

01-Nov-12

02-Nov-12

PERS86310

TAPE & PAINT

7

7

05-Nov-12

13-Nov-12

PERS86320

INSTALL CARPET & BASE

2

2

14-Nov-12

15-Nov-12

PERS87270

INSTALL/HOOK-UP FAN COILS

5

5

16-Nov-12

26-Nov-12

PERS89270

SET EQUIPMENT / RACKS

10

10

27-Nov-12

10-Dec-12

PERS90270

DOORS & HARDWARE

2

2

11-Dec-12

12-Dec-12

PERS91270

PUNCH DOWN & PROGRAMMING

40

40

13-Dec-12

11-Feb-13

PERS92270

MEPS TRIM

5

5

12-Feb-13

18-Feb-13

PERS93270

CLEAN & SEAL FLOOR

5

5

19-Feb-13

25-Feb-13

PERS94270

OWNER SIGNAGE

2

2

26-Feb-13

27-Feb-13

PERS95270

CONTRACTOR CLEAN & PUNCHLIST

5

5

28-Feb-13

06-Mar-13

PERS96270

OWNER PUNCH AND FINAL

MEN'S / WOMEN'S RESTROOMS

5

5

07-Mar-13

13-Mar-13

83

83

23-Oct-12

14-Feb-13

CARB192350

FRAME METAL STUD WALLS/DOOR FRAMES

3

3

23-Oct-12

25-Oct-12

CARB192370

MEPS WALL ROUGH-IN/BACKING

7

7

26-Oct-12

05-Nov-12

CARB192410

FRAME CEILINGS & SOFFITS

3

3

06-Nov-12

08-Nov-12

CARB192420

MEPS DROPS TO CEILING & SOFFITS

3

3

09-Nov-12

13-Nov-12

CARB192430

DRYWALL-WALLS/CEILINGS

5

5

14-Nov-12

20-Nov-12

CARB192440

TAPE/PAINT-WALLS/CEILINGS

10

10

21-Nov-12

06-Dec-12

CARB192450

INSTALL MILLWORK/SUB-TOPS

4

4

07-Dec-12

12-Dec-12

CARB192460

INSTALL TILE FLOORING/WALLS/COUNTERTOPS

10

10

13-Dec-12

28-Dec-12

CARB192470

INSTALL PLUMBING FIXTURES

7

7

31-Dec-12

09-Jan-13

CARB192480

INSTALL TOILET PARTITIONS & ACCESSORIES

5

5

10-Jan-13

16-Jan-13

CARB192485

INSTALL MIRRORS

5

5

17-Jan-13

23-Jan-13

CARB192490

MEPS TRIM WALLS/CEILING

5

5

24-Jan-13

30-Jan-13

CARB192500

HANG DOORS & HARDWARE

1

1

31-Jan-13

31-Jan-13

CARB192510

OWNER SIGNAGE

1

1

31-Jan-13

31-Jan-13

CARB192515

CONTRACTOR CLEAN & PUNCHLIST

5

5

01-Feb-13

07-Feb-13

CARB192518

OWNER PUNCH AND FINAL

EVENT CENTER VIP LOUNGE / VIP RESTROOM

5

5

08-Feb-13

14-Feb-13

100

100

26-Oct-12

14-Mar-13

4

4

26-Oct-12

31-Oct-12

TFS189900

FRAME METAL STUD WALLS/DOOR FRAMES/PONY WALLS

TFS189910

FRAME HARDLID CEILING/SOFFITS

3

3

01-Nov-12

05-Nov-12

TFS189920

MEPS ROUGH-IN WALLS & CEILINGS

10

10

06-Nov-12

19-Nov-12

TFS189930

DRYWALL - WALLS & CEILINGS

5

5

20-Nov-12

28-Nov-12

TFS189935

TAPE & PAINT WALLS & CEILINGS

5

5

29-Nov-12

05-Dec-12

TFS189940

INSTALL BAR DIE

3

3

06-Dec-12

10-Dec-12

TFS189936

RESTROOM FLOOR & WALL TILE

5

5

06-Dec-12

12-Dec-12

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 49 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start 10-Dec-12

Finish

TFS189941

QUARRY TILE @ BAR

3

3

TFS189942

INSTALL MILLWORK / SPECIAL FINISHES

15

15

11-Dec-12

03-Jan-13

TFS189937

RESTROOM PLUMBING FIXTURES / ACCESORIES

5

5

13-Dec-12

19-Dec-12

TFS189946

PULL SODA/BEER/LIQUOR LINES (OWNER)

2

2

14-Dec-12

18-Dec-12

TFS189947

INSTALL & HOOK-UP BAR EQUIPMENT

15

15

19-Dec-12

11-Jan-13

TFS189943

INSTALL STONE FLOORING / BAR TOPS

5

5

27-Dec-12

03-Jan-13

TFS189955

THEMED INTERIOR FINISHES

15

15

03-Jan-13

25-Jan-13

TFS189980

MEPS WALL/CEILING TRIM/DL FIXTURES

7

7

24-Jan-13

01-Feb-13

TFS189990

INSTALL DOORS & HARDWARE

2

2

04-Feb-13

05-Feb-13

TFS190000

INSTALL CARPET

3

3

06-Feb-13

08-Feb-13

TFS190010

INSTALL SEATING

5

5

11-Feb-13

15-Feb-13

TFS190020

INSTALL OWNER SIGNAGE

5

5

18-Feb-13

22-Feb-13

TFS190030

CONTRACTOR CLEAN & PUNCHLIST

5

5

25-Feb-13

01-Mar-13

TFS190035

OWNER PUNCH AND FINAL

5

5

04-Mar-13

08-Mar-13

TFS190040

INSTALL OWNER FF&E

2

2

11-Mar-13

12-Mar-13

TFS191040

HEALTH DEPARTMENT INSPECTION

2

2

13-Mar-13

14-Mar-13

14-Dec-12

124

124

01-Nov-12

23-Apr-13

PERS84290

FRAME METAL STUD WALLS/DOOR FRAMES

3

3

01-Nov-12

05-Nov-12

PERS85290

MEP WALL ROUGH-IN / BACKING

7

7

06-Nov-12

14-Nov-12

PERS86330

DRYWALL

2

2

15-Nov-12

16-Nov-12

PERS86340

TAPE

3

3

19-Nov-12

21-Nov-12

PERS87290

INSTALL / HOOK-UP FAN COIL

5

5

26-Nov-12

30-Nov-12

PERS88262

FORM/REBAR/POUR HOUSEKEEPING PADS

2

2

03-Dec-12

04-Dec-12

PERS88263

PAINT

3

3

05-Dec-12

07-Dec-12

PERS89260

SET EQUIPMENT / RACKS

15

15

10-Dec-12

02-Jan-13

PERS90290

DOORS & HARDWARE

2

2

03-Jan-13

04-Jan-13

PERS90300

PULL FEEDERS & TERMINATE

30

30

07-Jan-13

15-Feb-13

PERS91290

PUNCH DOWN & PROGRAMMING

30

30

04-Feb-13

15-Mar-13

PERS92290

MEPS TRIM

5

5

18-Mar-13

22-Mar-13

PERS94290

CLEAN & SEAL FLOOR

10

10

25-Mar-13

05-Apr-13

PERS95290

OWNER SIGNAGE

2

2

08-Apr-13

09-Apr-13

PERS96300

CONTRACTOR CLEAN & PUNCHLIST

5

5

10-Apr-13

16-Apr-13

PRBS82390

OWNER PUNCH AND FINAL

5

5

17-Apr-13

23-Apr-13

136

136

11-Oct-12

18-Apr-13

DATA / ELECTRICAL (2228)

ELECTRICAL (2428) PERS100255

FRAME METAL STUD WALLS/DOOR FRAMES

3

3

11-Oct-12

15-Oct-12

PERS100256

MEP WALL ROUGH-IN / BACKING

10

10

16-Oct-12

29-Oct-12

PERS100257

DRYWALL/TAPE

6

6

30-Oct-12

06-Nov-12

PERS100260

INSTALL / HOOK-UP FAN COIL

5

5

07-Nov-12

13-Nov-12

PERS101260

FORM/REBAR/POUR HOUSEKEEPING PADS

5

5

07-Nov-12

13-Nov-12

PERS102260

SET EQUIPMENT

20

20

14-Nov-12

13-Dec-12

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 50 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

TASK filter: All Activities Activity ID

Activity Name

Orig Dur

Rem Dur

Start

Finish

PERS103260

DOORS & HARDWARE

1

1

30-Nov-12

30-Nov-12

PERS104260

PULL FEEDERS / HOOK-UP EQUIPMENT/TAGGING

75

75

03-Dec-12

20-Mar-13

PERS105260

PERMANENT LIGHTING/MEPS TRIM

5

5

21-Mar-13

27-Mar-13

PERS106260

CLEAN & SEAL FLOOR

5

5

28-Mar-13

03-Apr-13

PERS107260

OWNER SIGNAGE

1

1

04-Apr-13

04-Apr-13

PERS108260

CONTRACTOR CLEAN & PUNCHLIST

5

5

05-Apr-13

11-Apr-13

PERS109260

OWNER PUNCHLIST

FACILITIES / SERVICE ELEVATOR LOBBY

5

5

12-Apr-13

18-Apr-13

55

55

06-Nov-12

21-Jan-13

PERS84280

FRAME METAL STUD WALLS/DOOR FRAMES

3

3

06-Nov-12

08-Nov-12

PERS85280

MEP WALL ROUGH-IN / BACKING

5

5

09-Nov-12

15-Nov-12

PERS86280

DRYWALL

2

2

16-Nov-12

19-Nov-12

PERS87280

TAPE & PAINT

7

7

20-Nov-12

30-Nov-12

PERS88280

INSTALL CEILING GRID

2

2

03-Dec-12

04-Dec-12

PERS89280

MEPS DROPS TO GRID

5

5

05-Dec-12

11-Dec-12

PERS90280

DOORS & HARDWARE

2

2

12-Dec-12

13-Dec-12

PERS91280

INSTALL CEILING TILE

2

2

14-Dec-12

17-Dec-12

PERS92280

MEPS TRIM

5

5

18-Dec-12

26-Dec-12

PERS93280

CLEAN & SEAL FLOOR / VCT / CARPET

5

5

27-Dec-12

03-Jan-13

PERS94280

OWNER SIGNAGE

2

2

04-Jan-13

07-Jan-13

PERS95280

CONTRACTOR CLEAN & PUNCHLIST

5

5

08-Jan-13

14-Jan-13

PERS96280

OWNER PUNCH AND FINAL

5

5

15-Jan-13

21-Jan-13

122

122

23-Oct-12

10-Apr-13

CCRBB91240

FRAME METAL STUD WALLS/DOOR FRAMES/PARTITION POCKETS

5

5

23-Oct-12

29-Oct-12

CCRBB91250

MEPS WALL ROUGH-IN/BACKING

10

10

26-Oct-12

08-Nov-12

CCRBB91255

INSTALL RODS FOR PARTTION WALLS

5

5

02-Nov-12

08-Nov-12

CCRBB91256

INSTALL A/V SUPPORT SYSTEM (PROJECTORS)

5

5

09-Nov-12

15-Nov-12

CCRBB91260

DRYWALL RIPPER

2

2

16-Nov-12

19-Nov-12

CCRBB91265

FRAME CEILINGS & SOFFITS

5

5

20-Nov-12

28-Nov-12

CCRBB91280

MEPS DROPS TO CEILING & SOFFITS

10

10

29-Nov-12

12-Dec-12

CCRBB91290

DRYWALL

4

4

13-Dec-12

18-Dec-12

CCRBB91295

TAPE/PAINT/VWC

10

10

19-Dec-12

04-Jan-13

CCRBB91296

INSTALL CEILINGS GRID

3

3

07-Jan-13

09-Jan-13

CCRBB91297

INSTALL MEPS DROPS TO GRID

5

5

10-Jan-13

16-Jan-13

CCRBB91300

INSTALL MILLWORK/SPECIAL FINISHES

15

15

17-Jan-13

06-Feb-13

CCRBB91310

INSTALL PROJECTORS / PROJECTOR SCREENS / A/V & DIMMER PANELS

15

15

07-Feb-13

27-Feb-13

CCRBB91340

INSTALL CEILING TILE

3

3

28-Feb-13

04-Mar-13

CCRBB91350

MEPS TRIM WALLS/CEILING

7

7

05-Mar-13

13-Mar-13

CCRBB91360

INSTALL CARPET

3

3

07-Mar-13

11-Mar-13

CCRBB91370

HANG DOORS & HARDWARE

5

5

12-Mar-13

18-Mar-13

CCRBB91365

INSTALL PARTITION WALLS

5

5

12-Mar-13

18-Mar-13

MEETING ROOM A, B & BOARD ROOM

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 51 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

CCRBB91380

OWNER SIGNAGE

5

5

19-Mar-13

25-Mar-13

CCRBB91385

ADJUST PARTITION WALLS

2

2

19-Mar-13

20-Mar-13

CCRBB91390

CONTRACTOR CLEAN & PUNCHLIST

5

5

21-Mar-13

27-Mar-13

CCRBB91395

OWNER PUNCH & FINAL

5

5

28-Mar-13

03-Apr-13

CCRBB91398

INSTALL MEETING ROOMS / BOARD ROOM FF&E

FINISHES (EVENT CENTER) EVENT CENTER LEVEL 1 ELECTRICAL ROOM

5

5

04-Apr-13

10-Apr-13

143

143

09-Nov-12

28-May-13

125

125

09-Nov-12

02-May-13

67

67

09-Nov-12

11-Feb-13

PERS82800

FRAME METAL STUD WALLS/DOOR FRAMES

2

2

09-Nov-12

12-Nov-12

PERS82870

MEP WALL ROUGH-IN / BACKING

3

3

12-Nov-12

14-Nov-12

PERS82880

DRYWALL

3

3

15-Nov-12

19-Nov-12

PERS82882

TAPE / PAINT WALL

5

5

20-Nov-12

28-Nov-12

PERS82890

INSTALL FAN COIL

2

2

29-Nov-12

30-Nov-12

PERS82900

FORM/REBAR/POUR HOUSEKEEPING PADS

2

2

03-Dec-12

04-Dec-12

PERS82910

SET EQUIPMENT

5

5

05-Dec-12

11-Dec-12

PERS82920

DOORS & HARDWARE

2

2

12-Dec-12

13-Dec-12

PERS82930

PULL & TERMINATE FEEDERS

10

10

14-Dec-12

31-Dec-12

PERS82932

HOOK-UP EQUIPMENT / TAGGING / LABELING

25

25

21-Dec-12

29-Jan-13

PERS82940

MEPS TRIM

3

3

25-Jan-13

29-Jan-13

PERS82950

CLEAN & SEAL FLOOR

2

2

30-Jan-13

31-Jan-13

PERS82960

OWNER SIGNAGE

2

2

01-Feb-13

04-Feb-13

PERS83270

CONTRACTOR CLEAN & PUNCHLIST

5

5

05-Feb-13

11-Feb-13

46

46

12-Nov-12

15-Jan-13

ELEVATOR / MACHINE ROOM PELS11010

INSTALL SHAFT WALLS / ELEV. FRONTS

5

5

12-Nov-12

19-Nov-12

PELS21010

INSTALL ELEVATOR

30

30

28-Nov-12

10-Jan-13

PELS71016

STATE ELEVATOR INSPECTION

1

1

11-Jan-13

11-Jan-13

PELS81010

CONTRACTOR CLEAN & PUNCHLIST

2

2

14-Jan-13

15-Jan-13

DRESSING ROOMS / BATHROOMS / WORK ROOM

59

59

13-Nov-12

01-Feb-13

CARB1993530

FRAME METAL STUD WALLS/DOOR FRAMES

2

2

13-Nov-12

14-Nov-12

CARB1993800

MEPS WALL ROUGH-IN/BACKING

5

5

15-Nov-12

21-Nov-12

CARB1993810

DRYWALL RIPPER

1

1

26-Nov-12

26-Nov-12

CARB1993820

FRAME CEILINGS & SOFFITS

2

2

27-Nov-12

28-Nov-12

CARB1993830

MEPS DROPS TO CEILING & SOFFITS

2

2

29-Nov-12

30-Nov-12

CARB1993840

DRYWALL-WALLS/CEILINGS

3

3

03-Dec-12

05-Dec-12

CARB1993841

TAPE/PAINT-WALLS/CEILINGS

7

7

06-Dec-12

14-Dec-12

CARB1993842

INSTALL CEILING GRID

1

1

17-Dec-12

17-Dec-12

CARB1993844

MEPS DROPS TO CEILING GRID

3

3

18-Dec-12

20-Dec-12

CARB1993850

INSTALL MILLWORK/SPECIAL FINISHES

5

5

21-Dec-12

31-Dec-12

CARB1993860

INSTALL TILE FLOORING/WALLS/COUNTERTOPS IN RESTROOMS

5

5

21-Dec-12

31-Dec-12

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 52 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

CARB1993870

INSTALL PLUMBING FIXTURES

4

4

02-Jan-13

07-Jan-13

CARB1993880

INSTALL TOILET ACCESSORIES

1

1

08-Jan-13

08-Jan-13

CARB1993882

INSTALL CEILING TILE

1

1

09-Jan-13

09-Jan-13

CARB1993890

MEPS TRIM WALLS/CEILING

5

5

10-Jan-13

16-Jan-13

CARB1993900

HANG DOORS & HARDWARE

1

1

17-Jan-13

17-Jan-13

CARB1993910

OWNER SIGNAGE

2

2

17-Jan-13

18-Jan-13

CARB1993920

CONTRACTOR CLEAN & PUNCHLIST

5

5

21-Jan-13

25-Jan-13

CARB1993922

OWNER PUNCH & FINAL

5

5

28-Jan-13

01-Feb-13

103

103

11-Dec-12

02-May-13

MAIN FLOOR - SEATING AREA THE1020

FRAME WALLS & SOFFITS

5

5

11-Dec-12

17-Dec-12

THE1030

MEPS ROUGH-IN WALLS & SOFFITS

5

5

18-Dec-12

26-Dec-12

THE1040

DRYWALL WALLS & SOFFITS

10

10

27-Dec-12

10-Jan-13

THE1050

TAPE WALLS & SOFFITS

10

10

11-Jan-13

24-Jan-13

THE1060

PAINT WALLS & SOFFITS

10

10

25-Jan-13

07-Feb-13

THE1080

INSTALL SOUND PROOFING PANELS ON WALLS / MILLWORK

20

20

08-Feb-13

07-Mar-13

THE1140

PERMANENT LIGHTING/MEPS TRIM

10

10

08-Mar-13

21-Mar-13

THE1200

INSTALL DOORS & HARDWARE

5

5

22-Mar-13

28-Mar-13

THE1210

INSTALL FLOORING

10

10

29-Mar-13

11-Apr-13

THE1220

OWNER SIGNAGE

5

5

12-Apr-13

18-Apr-13

THE1230

CONTRACTOR CLEAN & PUNCHLIST

10

10

19-Apr-13

02-May-13

33

33

18-Dec-12

31-Jan-13

STAIRS #3 & #4 STE1240

INSTALL STAIRS / STAIR FINISHES

MEZZ LEVEL EVENT CENTER SERVICE BAR

30

30

18-Dec-12

31-Jan-13

116

116

18-Dec-12

28-May-13

34

34

18-Dec-12

01-Feb-13

THE1250

FRAME WALLS

1

1

18-Dec-12

18-Dec-12

THE1260

MEPS ROUGH-IN WALLS

3

3

19-Dec-12

21-Dec-12

THE1270

DRYWALL

1

1

26-Dec-12

26-Dec-12

THE1280

TAPE/PAINT/FRP

5

5

27-Dec-12

03-Jan-13

THE1282

INSTALL CEILING GRID

1

1

04-Jan-13

04-Jan-13

THE1284

MEPS DROPS GRID

1

1

07-Jan-13

07-Jan-13

THE1294

INSTALL CEILING TILE

1

1

08-Jan-13

08-Jan-13

THE1300

PULL BEVERAGE LINES

2

2

09-Jan-13

10-Jan-13

THE1305

QUARRY TILE

3

3

11-Jan-13

15-Jan-13

THE1310

INSTALL/HOOK-UP FOOD SERVICE EQUIPMENT

7

7

16-Jan-13

24-Jan-13

THE1320

CLEAN & PUNCH

5

5

25-Jan-13

31-Jan-13

THE1330

HEALTH DEPT. INSPECTION

1

1

01-Feb-13

01-Feb-13

60

60

19-Dec-12

12-Mar-13

PERS83080

FRAME METAL STUD WALLS/DOOR FRAMES

2

2

19-Dec-12

20-Dec-12

PERS83090

MEP WALL ROUGH-IN / BACKING

3

3

20-Dec-12

26-Dec-12

PERS83100

DRYWALL

2

2

27-Dec-12

28-Dec-12

SOUND / AUDIO BOOTH

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 53 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

PERS83105

TAPE / PAINT WALL

5

5

31-Dec-12

07-Jan-13

PERS83125

INSTALL GRID CEILING

1

1

08-Jan-13

08-Jan-13

PERS83126

MEPS DROPS TO GRID

2

2

09-Jan-13

10-Jan-13

PERS83129

INSTAL GLASS WALL

5

5

11-Jan-13

17-Jan-13

PERS83130

SET A/V EQUIPMENT

5

5

18-Jan-13

24-Jan-13

PERS83131

DOORS & HARDWARE

1

1

25-Jan-13

25-Jan-13

PERS83135

HOOK-UP EQUIPMENT / PROGRAMMING

20

20

28-Jan-13

22-Feb-13

PERS83160

MEPS TRIM

3

3

25-Feb-13

27-Feb-13

PERS83170

CARPET FLOORING

2

2

28-Feb-13

01-Mar-13

PERS83180

OWNER SIGNAGE

2

2

04-Mar-13

05-Mar-13

PERS83290

CONTRACTOR CLEAN & PUNCHLIST

5

5

06-Mar-13

12-Mar-13

30

30

21-Dec-12

31-Jan-13

PRBS81290

FRAME METAL STUD WALLS/DOOR FRAMES

1

1

21-Dec-12

21-Dec-12

PRBS81300

MEPS WALL ROUGH-IN/BACKING

3

3

26-Dec-12

28-Dec-12

PRBS81310

DRYWALL

1

1

31-Dec-12

31-Dec-12

PRBS81315

TAPE & PAINT

5

5

02-Jan-13

08-Jan-13

PRBS81350

INSTALL CEILING GRID

1

1

09-Jan-13

09-Jan-13

PRBS81360

MEPS DROPS TO GRID

2

2

10-Jan-13

11-Jan-13

PRBS81370

INSTALL CEILING TILE

1

1

14-Jan-13

14-Jan-13

PRBS81380

MEPS TRIM WALLS/CEILING

2

2

15-Jan-13

16-Jan-13

PRBS81390

PREP/CLEAN/SEAL FLOORS

2

2

17-Jan-13

18-Jan-13

PRBS81410

INSTALL DOORS & HARDWARE

1

1

21-Jan-13

21-Jan-13

PRBS81420

OWNER SIGNAGE

1

1

22-Jan-13

22-Jan-13

PRBS81430

CONTRACTOR CLEAN & PUNCHLIST

2

2

23-Jan-13

24-Jan-13

PRBS81440

OWNER PUNCH AND FINAL

SOUND BALCONY STORAGE

CATWALK ACCESS PRBS81450

INSTALL CATWALKS / CATWALK FINISHES

BALCONY - SEATING AREA

5

5

25-Jan-13

31-Jan-13

61

61

26-Dec-12

20-Mar-13

60

60

26-Dec-12

20-Mar-13

115

115

19-Dec-12

28-May-13

THE1070

FRAME WALLS & SOFFITS

7

7

19-Dec-12

31-Dec-12

THE1090

MEPS ROUGH-IN WALLS & SOFFITS

10

10

28-Dec-12

11-Jan-13

THE1100

DRYWALL WALLS & SOFFITS

5

5

14-Jan-13

18-Jan-13

THE1110

TAPE WALLS & SOFFITS

6

6

21-Jan-13

28-Jan-13

THE1120

PAINT WALLS & SOFFITS / BLACK-OUT AT EXPOSED STRUCTURE

5

5

29-Jan-13

04-Feb-13

THE1130

INSTALL SOUND PROOFING PANELS ON WALLS / MILLWORK

20

20

05-Feb-13

04-Mar-13

THE1150

PERMANENT LIGHTING/MEPS TRIM

10

10

26-Feb-13

11-Mar-13

THE1160

THEATRICAL RIGGING & LIGHTING (BY OWNER)

15

15

26-Feb-13

18-Mar-13

THE1240

INSTALL DOORS & HARDWARE

5

5

12-Mar-13

18-Mar-13

THE1290

INSTALL FLOORING

10

10

19-Mar-13

01-Apr-13

THE1295

INSTALL SEATING

30

30

02-Apr-13

13-May-13

THE1340

OWNER SIGNAGE

5

5

14-May-13

20-May-13

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 54 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

WBS-RAC TASK filter: All Activities Activity ID

Activity Name

THE1350

CONTRACTOR CLEAN & PUNCHLIST

EVENT CENTER LEVEL 2 ELECTRICAL ROOM

MARGARITAVILLE RESORT AND CASINO - BOSSIER CITY (July 9, 2012)

Run Date: 26-Jul-12

ROY ANDERSON CORP.

Data Date: 10-Jul-12

Orig Dur

Rem Dur

Start

Finish

5

5

21-May-13

28-May-13

65

65

02-Jan-13

02-Apr-13

65

65

02-Jan-13

02-Apr-13

PERS82970

FRAME METAL STUD WALLS/DOOR FRAMES

5

5

02-Jan-13

08-Jan-13

PERS82980

MEP WALL ROUGH-IN / BACKING

3

3

08-Jan-13

10-Jan-13

PERS82990

DRYWALL

3

3

11-Jan-13

15-Jan-13

PERS82992

TAPE / PAINT WALL

5

5

16-Jan-13

22-Jan-13

PERS83000

INSTALL FAN COIL

2

2

23-Jan-13

24-Jan-13

PERS83010

FORM/REBAR/POUR HOUSEKEEPING PADS

2

2

25-Jan-13

28-Jan-13

PERS83020

SET EQUIPMENT

5

5

29-Jan-13

04-Feb-13

PERS83021

DOORS & HARDWARE

2

2

05-Feb-13

06-Feb-13

PERS83022

PULL & TERMINATE FEEDERS

10

10

07-Feb-13

20-Feb-13

PERS83023

HOOK-UP EQUIPMENT / TAGGING / LABELING

25

25

14-Feb-13

20-Mar-13

PERS83050

MEPS TRIM

3

3

18-Mar-13

20-Mar-13

PERS83060

CLEAN & SEAL FLOOR

2

2

21-Mar-13

22-Mar-13

PERS83070

OWNER SIGNAGE

2

2

25-Mar-13

26-Mar-13

PERS83280

CONTRACTOR CLEAN & PUNCHLIST

5

5

27-Mar-13

02-Apr-13

SITE WORK/HARDSCAPE/LANDSCAPE

83

83

18-Jan-13

14-May-13

83

83

18-Jan-13

14-May-13

PN67370

BACKFILL TO SUBGRADE

10

10

18-Jan-13

31-Jan-13

PN67380

FRP CURB & SIDE WALKS

10

10

25-Jan-13

07-Feb-13

PN67390

LIGHTING POLE BASES/BOLLARDS

10

10

01-Feb-13

15-Feb-13

PN67400

FINAL GRADE FOR ASPHALT

10

10

08-Feb-13

22-Feb-13

PN67410

LAY 1ST COURSE OF ASPHALT

5

5

25-Feb-13

01-Mar-13

PN67420

INSTALL IRRIGATION FOR LANDSCAPING

15

15

04-Mar-13

25-Mar-13

PN67430

INSTALL LARGE TREES

10

10

19-Mar-13

01-Apr-13

PN67440

FINAL LAYER OF ASPHALT AND STRIPPING

5

5

02-Apr-13

08-Apr-13

PN67450

GRASS COVER LANDSCAPING

10

10

09-Apr-13

23-Apr-13

PN67460

CLEAN UP

5

5

24-Apr-13

30-Apr-13

PN67470

CONTRACTOR / OWNER PUNCHLIST

10

10

01-May-13

14-May-13

37

37

24-Apr-13

13-Jun-13

37

37

24-Apr-13

13-Jun-13

ROADWAY/LANDSCAPING/PAVING

LIFE SAFETY, TESTING & OCCUPANCY LIFE SAFETY, TESTING & OCCUPANCY HTLS210

FLS PRE-TESTING (CONTRACTORS)

15

15

24-Apr-13

14-May-13

HTLS230

3RD PARTY SCENARIO / DEVICE VERIFICATION

10

10

15-May-13

29-May-13

HTLS235

3RD PARTY REPORT

5

5

30-May-13

05-Jun-13

HTLS255

SITE SIGN OFF / CLEARANCES

10

10

31-May-13

13-Jun-13

HTLS250

CITY / COUNTY / 3RD PARTY FINAL

10

10

31-May-13

13-Jun-13

HTLS280

FINAL PROJECT COMPLETION

0

0

13-Jun-13

HTLS270

TCO & SUBSTANTIAL COMPLETION

0

0

13-Jun-13

Remaining Level of Effort

Critical Remaining Work

Actual Level of Effort

Milestone

Actual Work Remaining Work

2012 Jun

Page 55 of 55 Project Schedule

2013 Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun