Metropolitan Park - Arlingtonva

Report 6 Downloads 141 Views
Metropolitan Park ‐ Phase 4/5

SPRC #4 Part 2 March 11, 2013

SPRC #04 - Part 2 03/11/2013

Infrastructure Transit Facilities

Legend − Bus Stop within ¼‐mile

Long Bridge  Park

Pentagon City

− Metro Station − VRE Station

*

− Proposed Streetcar Stop − Capital Bikeshare Station Virginia  Highlands Park

*

− Proposed Columbia Pike  Streetcar Alignment Crystal Drive

Crystal City

23rd Street

− Proposed Capital  Bikeshare with PenPlace

− Proposed Crystal City  Streetcar Alignment − Site Boundary

____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 2 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

SPRC #04 - Part 2 03/11/2013

Infrastructure Street Sections

South Elm Street

South Eads Street

12th Street

13th Street

CHANGES FROM EXISTING: ADDS PARKING LANE ON WEST SIDE

____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 3 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

SPRC #04 - Part 2 03/11/2013

Infrastructure

Retail Access – Vehicle & Pedestrian Vehicle Trips

Pedestrian Trips

Existing and Future Intersections Operate at Acceptable Levels of Service AM Peak Hour (7:45 to 8:45) PM Peak (5:00 to 6:00) Saturday Peak Hour (Noon to 1:00)

Vehicle Trips (50%)

Pedestrian/Transit/Other Trips (50%)

Total Trips (100%)

64 227 217

64 227 217

128 454 434

The project will include a Transportation Management Plan (TMP) that will include commitments specific to the site both in  ongoing building management and physical design meant to incentivize alternate modes of transportation. ____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 4 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

SPRC #04 - Part 2 03/11/2013

Infrastructure

Residential Access – Vehicle & Pedestrian Vehicle Trips

Pedestrian Trips

Existing and Future Intersections Operate at Acceptable Levels of Service AM Peak Hour (7:45 to 8:45) PM Peak (5:00 to 6:00) Saturday Peak Hour (Noon to 1:00)

Vehicle Trips (40%) 139 162 123

Pedestrian/Transit/Other Trips (60%) 209 242 185

Total Trips (100%) 348 404 308

The project will include a Transportation Management Plan (TMP) that will include commitments specific to the site both in  ongoing building management and physical design meant to incentivize alternate modes of transportation. ____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 5 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

SPRC #04 - Part 2 03/11/2013

Traffic Analysis • Study Area — 6 Existing Intersections — 2 Future Intersections • Program Assumptions — 699 Residential Units — 40,000 SF of Grocery Use  Retail • Levels of Service — All intersections have  acceptable overall  intersection and turning  movement levels of  service.

____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 6 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

SPRC #04 - Part 2 03/11/2013

Transportation Demand Management •

Designation of a TDM Coordinator



Contribution to Arlington County  Commuter Services (ACCS)



Display and distribution of transit‐related  information



Submission of an annual report to the  County regarding TDM activities of the site



Participation in transportation  performance monitoring studies of the  site



Provision of bicycle parking consistent  with Arlington County’s standards

____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 7 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

SPRC #04 - Part 2 03/11/2013

Parking and Loading Phase 4 & 5 ‐ Access

Proposed Design

39’

30’

P



1 Parking Entrance



2 Loading Docks ◦ 1 Residential Loading Dock ◦ 1 Residential/Retail Loading  Dock

P 51’

Grocery Type of Space Full Spaces HC Accessible Van Accessible Compact TOTAL

Zoning Baseline 154 5 1 ‐ 160

Proposed 161 5 1 19 186

Residential Zoning Baseline 601 12 13 23 108 724

Proposed 553 552 11 13 23 129 696

____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 8 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

SPRC #04 - Part 2 03/11/2013

Grocery Store Parking G1 Level 12th Street

23’

Pedestrian  Circulation to  Grocery

23’

BIKES

Exit

Ramp Down to  Residential Parking

23’

23’

Entry

S. Eads Street

23’

S. Elm Street

23’

• •

186 Parking Spaces (Grocery Customer Use) 1 Parking Space per 200 sf (5 spaces per 1,000 sf)

13th Street

____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 9 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

SPRC #04 - Part 2 03/11/2013

Residential Parking G2 Level 12th Street

23’ 23’

23’

S. Eads Street

S. Elm Street

23’

23’

21’

23’

• • •

696 Residential Parking Spaces (Levels G2 – G4) 0.996 Parking Spaces per Unit 258 Spaces for Bicycle Storage

13th Street

____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 10 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

SPRC #04 - Part 2 03/11/2013

Residential Parking G3 Level 12th Street

23’ 23’

23’

S. Eads Street

S. Elm Street

23’

23’

21’

23’ BIKES

13th Street • • •

696 Residential Parking Spaces (Levels G2 – G4) 0.996 Parking Spaces per Unit 258 Spaces for Bicycle Storage

____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 11 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

SPRC #04 - Part 2 03/11/2013

Residential Parking G4 Level 12th Street

23’ 23’

23’

S. Eads Street

S. Elm Street

23’

23’

21’

23’ BIKES

13th Street • • •

696 Residential Parking Spaces (Levels G2 – G4) 0.996 Parking Spaces per Unit 258 Spaces for Bicycle Storage

____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 12 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

Loading Patterns

SPRC #04 - Part 2 03/11/2013

Grocery

• Docks designed to accommodate WB 65 trucks  (73.5’ in length) without encroaching into sidewalk • Other deliveries in smaller vendor trucks

____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 13 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

Loading Patterns

SPRC #04 - Part 2 03/11/2013

Residential

• Docks designed to accommodate WB 50 trucks  (55’ in length)

____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 14 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

SPRC #04 - Part 2 03/11/2013

Regional Access

____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 15 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

SPRC #04 - Part 2 03/11/2013

Open Space

Plan from  4.1 Submission

11,873 sf

5,000 sf ____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 16 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

SPRC #04 - Part 2 03/11/2013

S. Eads St Open Space

Plan from  4.1 Submission

Proposed Design

Precedent Images

____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 17 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

SPRC #04 - Part 2 03/11/2013

Responses to Comments/Questions  from SPRC #3

____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 18 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

SPRC #04 - Part 2 03/11/2013

13th Street Views

4.1 Submission

Proposed Design ____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 19 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

SPRC #04 - Part 2 03/11/2013

13th Street Loading Area Design

4.1 Submission

Proposed Design ____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 20 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.

SPRC #04 - Part 2 03/11/2013

12th Street Context – Retail

Legend − Retail/Lobby Façade − Potential Retail ____________________________________________________________________________________________________________________________________________________________________________________ METROPOLITAN PARK 4/5 VORNADO / CHARLES E. SMITH L.P. 21 TORTI GALLAS URBAN, INC. | MAURICE WALTERS, INC.