NETRUNNER™ High Capacity Vertical Managers

Report 0 Downloads 108 Views
NETRUNNER™ High Capacity Vertical Managers INSTRUCTIONS CM392C © Panduit Corp. 2009

PART NUMBERS VERTICAL CABLE MANAGEMENT Front/Rear Front Only NRV6 NRV10 NRV12

NRVF6 NRVF10 NRVF12

Mounting Kits NRVCB NRVCB or WMPVSMK

Racks CMR19X47 CMR19X84S NFR84 CMR4P84D23 R4P R4P36

CMR19X84 CMR23X84 3” Deep R2P Series of 2 Post Racks CMR4P84 CMR4P84CN CMR4P84D23CN CMR4P84D23NU R4PCN R4P23 R4P36CN R4P42

Location Guide for Center Mounting (CMR19X84 with NRVCB) Dimensions in (...) parenthesis are for 10” Vertical Cable Management Dimensions in [...] brackets are for 12” Vertical Cable Management

12.5 TYP

Center of manager is forward approximately 0.9” from center of rack

3.00 TYP

16.00” = 19” RACK 20.00” = 23” RACK TYP

CMR19X84NU CMR4P84NU CMR4P84D23CNNU R4P23CN R4P42CN

NRD6 NRD10 NRD12

Bracket Installation

1

6.75 (10.0) [12.0]

20.25” = 19” RACK 24.25” = 23” RACK TYP

1.25 TYP

Doors

11.00 (14.25) [16.25]

Center of rack

Note: When installing between two racks use part number NRVCB for the additional brackets required. Bracket is keyed to be installed in the correct orientation.

2.12 TYP

Standard Rack Installation Note: Cable retainers must point upward

2

4

Mounting Orientation #12-24 Screws

3 #12-24 Screws

Bottom Mounting Location

Location pin(s)

Top Mounting Location

FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp Page 1 of 2

INSTRUCTIONS CM392C 4

4-Post Rack Installation using Brackets. Note: Step 1 is the same as for the Standard Rack. 2

#12-24 Screws

Tapped Mounting Holes

Back of Post Mounting Bracket Bottom half of Manager

Top Half of Manager

#12-24 Screws

3

4 Places

Location pin(s) Installation Instructions NFR84 and 4-Post Racks using WMPVSMK side mounting kit

3

Note: Mount the racks to the floor. 1

Location pin(s)

2

3/8 Bolt, Lock Washer & Nut

3/8 Bolt, Lock Washer & Nut

Top Latch Buttons

Opening and Closing Cover Door Finger Door Latches Tabs

Wire Retainer Installation (WR5E)

To open, grasp back of door and push top button with thumb. Repeat with bottom button.

Bottom Latch Buttons Installation Line up finger tabs with door latches. Then squeeze door and fingers together to engage (4 places).

To close, grasp cable retainers and door until latched

Removal To remove door, press bottom latches first, then press top latch bottons while holding door

For instuctions in Local Languages and Technical Support: www.panduit.com/resources/install_maintain.asp

www.panduit.com Page 2 of 2

Use thumb to release wire retainer for removal

E-mail: [email protected] Fax: (708)444-6448