NEW FACILITY

Report 5 Downloads 170 Views
NEW FACILITY FOR PENSKE TRUCK LEASING COBURG, OR NORTH COBURG INDUSTRIAL WAY COBURG INDUSTRIAL PARK, LOT 1, BLOCK 2

K/G ARCHITECTS

SPECIFICATIONS, SYMBOLS, AND SCHEDULES

E0.0

NEW FACILITY FOR PENSKE TRUCK LEASING COBURG, OR NORTH COBURG INDUSTRIAL WAY COBURG INDUSTRIAL PARK, LOT 1, BLOCK 2

K/G ARCHITECTS

ENERGY COMPLIANCE DOCUMENTATION

E0.1

NEW FACILITY FOR PENSKE TRUCK LEASING COBURG, OR NORTH COBURG INDUSTRIAL WAY COBURG INDUSTRIAL PARK, LOT 1, BLOCK 2

K/G ARCHITECTS

DETAILS

E0.2

ELECTRICAL SITE PLAN

E1.0

C

7

6

3

1

NEW FACILITY FOR PENSKE TRUCK LEASING COBURG, OR NORTH COBURG INDUSTRIAL WAY COBURG INDUSTRIAL PARK, LOT 1, BLOCK 2

K/G ARCHITECTS

LIGHTING FLOOR PLAN

E2.0

F

A

C

2

NEW FACILITY FOR PENSKE TRUCK LEASING COBURG, OR NORTH COBURG INDUSTRIAL WAY COBURG INDUSTRIAL PARK, LOT 1, BLOCK 2

K/G ARCHITECTS

POWER FLOOR PLAN

E3.0

C

7.0

D

E

G

7

7

6.1

6

6

4.1

3.1 3

1.0

1

1

NEW FACILITY FOR PENSKE TRUCK LEASING COBURG, OR NORTH COBURG INDUSTRIAL WAY COBURG INDUSTRIAL PARK, LOT 1, BLOCK 2

K/G ARCHITECTS

HVAC/ SPECIAL SYSTEMS PLAN

E4.0

C

D

E

G

7

7

6.1

6

6

4.1

3.1 3

1

1

CO-RAY-VAC ZONE RELAY CONTROL LAYOUT BACK VIEW

FRONT VEW

L

R C 1

Low Voltage

T

4

W G

Y

COIL

3 2 5

6 COIL

Thermostat

L

Vacuum proving L

TRANSFORMER RELAY L

Outside air proving switch

N Vacuum pump L 120V-60Hz Supply Circuit

Burner 1

L1 L2 Gnd.

N

SEQUENCE OF OPERATION:

N Burner 2

Thermostat contacts close when calling for heat contacts on relay 1 and 3 close, 115 v power energizes the vacuum pump negative pressure pulls on vacuum switch (normally open switch) and closes contacts in switch, power will pass through the outside air proving switch ( normally closed switch) which is a safety switch incase the outside air system was closed off. (excess negative pressure would open the switch) Burners are energized Burners will delay ignition for 45 sec for a pre purge cycle. The contacts in the thermostat will open when the temperature reaches the selected settings contacts in 1 and 3 in relay will open and the complete system will be de-energized

NEW FACILITY FOR PENSKE TRUCK LEASING COBURG, OR NORTH COBURG INDUSTRIAL WAY COBURG INDUSTRIAL PARK, LOT 1, BLOCK 2

K/G ARCHITECTS

SECURITY / CCTV / FUEL/ SPECIAL SYSTEMS PLAN

E4.1

NEW FACILITY FOR PENSKE TRUCK LEASING COBURG, OR NORTH COBURG INDUSTRIAL WAY COBURG INDUSTRIAL PARK, LOT 1, BLOCK 2

K/G ARCHITECTS

D.A.C.T. RISER AND EQUIPMENT SCHEDULE

E4.2

NEW FACILITY FOR PENSKE TRUCK LEASING COBURG, OR NORTH COBURG INDUSTRIAL WAY COBURG INDUSTRIAL PARK, LOT 1, BLOCK 2

K/G ARCHITECTS

SINGLE-LINE DIAGRAM, CALCS, AND DETAILS

E5.0

NEW FACILITY FOR PENSKE TRUCK LEASING COBURG, OR NORTH COBURG INDUSTRIAL WAY COBURG INDUSTRIAL PARK, LOT 1, BLOCK 2

K/G ARCHITECTS

PANELBOARD SCHEDULES

E6.0