Harvey-Cleary Builders 8107 Springdale Road, Suite 105 Austin, TX 78752 (512) 928-9300 / (512) 928-9331 fax

7 Hamilton Landing, Ste. 200, Novato, CA



APPROVED

NO EXCEPTIONS TAKEN

APPROVED AS NOTED

NOT SUBJECT TO REVIEW

REVISE & RESUBMIT

SUBMITTAL TRANSMITTAL FORM

REJECTED

Project Name : Hilton Lobby and Restaurant Renovation 04-04108 Project No.

TO:

Andy Carey - HCB

DATE:

6/29/2016

TO:

Gordon Bingaman - AA

DATE:

6/29/2016

TO:

Justin Gesch - AA

DATE:

6/29/2016

CC:

Dave Maynard - EDG

DATE:

6/29/2016

CC:

James Harvey - HCB

DATE:

6/29/2016

CC:

David Pryor - HCB

DATE:

6/29/2016

CC:

Steve Frintz - HCB

DATE:

6/29/2016

CC:

Gene del Monte - HH

DATE:

6/29/2016

CC:

John Culp - HH

DATE:

6/29/2016

RETURN DUE DATE: TO: Harvey-Cleary Builders -



SEE ADDITIONAL COMMENTS BY:

RICCA ___________________________________

CORRECTIONS OR COMMENTS MADE TO THE SUBMITTAL DURING THIS REVIEW DO NOT RELIEVE THE CONTRACTOR FROM COMPLIANCE WITH REQUIREMENTS OF THE DRAWINGS AND SPECIFICATIONS. THIS CHECK IS ONLY FOR REVIEW OF THE GENERAL COMPLIANCE WITH THE DESIGN CONCEPT OF THE PROJECT AND GENERAL COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR: CONFIRMING AND CORRECTING ALL QUANTITIES AND DIMENSIONS; SELECTING FABRICATION PROCESSES AND TECHNIQUES OF CONSTRUCTION; COORDINATING HIS OR HER WORK WITH THAT OF ALL OTHER TRADES AND PERFORMING ALL WORK IN A SAFE AND SATISFACTORY MANNER.

Submittal Number

114000.02R1

Dave Maynard 16-0705 REVIEWED BY: _________________________________ DATE: ______________

1. REVIEWED BY EDG FOR AESTHETIC DESIGN INTENT ONLY - ALL LIFE SAFETY, CODE COMPLIANCE, OPERATIONAL AND INFRASTRUCTURAL REVIEWS BY OTHERS. 2. VERIFY ALL DIMENSIONS IN FIELD. 3. EDG NOTES IN GREEN.

7/5/2016

DATE:

TO:

DATE: X

1

1

4 LIST OF ATTACHED SUBMITTAL ONE TRADE SUB ONLY DRAWING NOS.

ITEMS

11 40 00

1

DESCRIPTION Kitchen Equipment Rough-In and Blocking Drawings

SEE COMMENTS BELOW

Mission Restaurant Supply

REVISE / RESUBMIT

SUBCONTRACTOR OR SUPPLIER:

REVIEWED

Copies

SUBMITTAL RETURNED TO SUB

REVIEW RETURNED TO HCB 3

06/29/16

NOTE MARKINGS

2

7/6/2016

114000.02R1 NO EXCEPTIONS TAKEN

1

FORWARDED FOR REVIEW

SUBMITTED FOR APPROVAL

CONTRACTOR'S SUBMITTAL STAMP:

X

COMMENTS: Expedited review request is so that we can get an approved set sent to our MEP contractors for rough-in purposes.

** Please keep this form with the submittal throughout the entire process. SENT BY: TITLE:

James "Andy" Carey Assistant Project Manager

DATE:

6/29/2016

cc:

File Field

JIM DITRAPANI

06-30-2016

page 1 of 1

S T RUCT URA L ,

Arizona

ME P ,

California

CI V I L

E NG I NE E RI NG

Colorado

Florida

&

Texas

CO NS T RUCT I O N

Lebanon

S E RV I CE S

Saudi Arabia

U.A.E.

SHOP DRAWING SUBMITTAL REVIEW COMMENTS

DATE: 2016-06-30

PROJECT NAME: Hilton Lobby and Restaurant Renovation

TTG PROJ. NO: 1540262

OWNER: Hilton

CLIENT: Antenora Architects

ITEM(S) SUBMITTED: Kitchen Equipment Shop Drawings

SUBMITTAL NO: 14000.02R1

TITLE: Kitchen Equipment Rough-In and Blocking Drawings SUBMITTED BY: Harvey-Cleary Builders CODE

CODE DESCRIPTION

ACTION REQUIRED

A

NO EXCEPTIONS TAKEN.

NONE-FINAL REVIEW.

B

GENERAL COMPLIANCE WITH CONTRACT DOCUMENTS WITH EXCEPTIONS AND COMMENTS AS NOTED.

NONE-FINAL REVIEW IF NOTED COMMENTS ARE ACCEPTED - OTHERWISE RESUBMIT (SEE NOTE 1, 2, & 3 BELOW).

C

REJECTED - NOT IN COMPLIANCE WITH CONTRACT DOCUMENTS - EXCEPTION NOTED.

RESUBMIT SPECIFICATION SECTION IN ITS ENTIRETY.

D

ITEMS NOT INCLUDED IN SUBMITTAL.

SUBMIT SPECIFICATION SECTION IN ITS ENTIRETY.

E

OTHER.

MAKE CORRECTIONS AND RESUBMIT.

NOTE 1: FINAL SUBMITTAL DOCUMENTS WHICH BECOME A PART OF THE OWNER’S OPERATING AND MAINTENANCE MANUAL SHALL BE CORRECTED TO INCORPORATE ALL OF THE ENGINEER’S COMMENTS. NOTE 2: REVIEW IS FOR GENERAL COMPLIANCE WITH BASIC CONCEPT ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE FOR PROPER MATCHING OF SPACES AND EQUIPMENT AT THE PROJECT SITE, FOR INFORMATION THAT PERTAINS SOLELY TO THE FABRICATION PROCESS OR TO TECHNIQUES OF CONSTRUCTION, FOR COORDINATION OF THE WORK OF ALL TRADES AND FOR COMPLYING WITH THE REQUIREMENTS OF ALL LOCAL TRADES AND THEIR ENFORCING AUTHORITIES. NOTE 3: WHEN THE CONTRACT DOCUMENTS CALL FOR MATERIALS OR CONSTRUCTION OF BETTER QUALITY OR LARGER SIZE THAN REQUIRED BY CODES AND REGULATIONS, PROVIDE THE QUALITY AND SIZE REQUIRED BY THE CONTRACT DOCUMENTS.

12710 Research Blvd., Suite 355, Austin, Texas 78759

(512) 416-1654

www.ttgcorp.com

ITEM

SPEC. SECTION

1

22 00 00

[Item P-118] Refer to plumbing drawing for PCU drain pipe routing. Drain shall connect to grease waste piping.

B

7

23 00 00

[Hood] Make sure to provide both hoods with modulating motorized damper furnished by Gaylord Industry. Dampers shall be connected to air vantage system.

B

8

26 00 00

All of the kitchen equipment electrical schedule shall be verify by the kitchen designer.

B

COMMENTS

CODE

REVIEWER: Arash Pasgar, Tim Bulgrin, and Aaron Garcia

DATE: 06-30-2016

PROJECT MANAGER: Paul Reyes P.E.

DATE: 06-30-2016

KEC TO VERIFY ALL DIMENSIONS

UP

FAX 972-241-3575 972-230-5000

13970 N. Stemmons Freeway Dallas, TX 75234

RESTAURANT SUPPLY

MISSION

NOTE: ITEMS 22 - 27 TO BE PROVIDED AND INSTALLED BY LIQUID LOGISTICS, CONTACT: KRIS BYRD, 512-987-8096. COORDINATE DIVISION OF RESPONSIBILITIES AND NECESSARY SERVICES. VERIFY WITH OWNER.

UP

HILTON AUSTIN

Food Service Equipment Plan

Schindler Schindler

HILTON AUSTIN CONVENTION CENTER 500 E. 4TH STREET AUSTIN, TX 78701

DN

HILTON AUSTIN LEVEL 2

1

EQUIPMENT LAYOUT PLAN SCALE:

1/4" = 1'-0"

6/10/2016

K-1

P-01

(9)

UP

UP B

CW

COLD WATER SUPPLY

FS

FLOOR SINK (WITH GRATE)

SU

STUB-UP

SCW

SOFT COLD WATER SUPPLY

FS

FLOOR SINK

AFF

ABOVE FINISHED FLOOR

HW

HOT WATER SUPPLY (140°)

G

GAS

FFF

FLUSH W/FINISHED FLOOR

W

WASTE DRAIN

G

GAS CONNECTION

BFF

BELOW FINISHED FLOOR

HD

HUB DRAIN

SS

STEAM SUPPLY

BTC

BRANCH TO CONNECTION

FD

FLOOR DRAIN

CR

CONDENSATE RETURN

FFD

FUNNEL FLOOR DRAIN

PVC

6" PVC CONDUIT

FAX 972-241-3575 972-230-5000

PLUMBING SYMBOLS AND ABBREVIATIONS

13970 N. Stemmons Freeway Dallas, TX 75234

ITEM/#

RESTAURANT SUPPLY

QTY.

MISSION

PLUMBING COORDINATION

B

B B

F

A

B

Schindler

B C

D

E

F

G

H

I

J

K

L

HILTON AUSTIN CONVENTION CENTER 500 E. 4TH STREET AUSTIN, TX 78701

B

HILTON AUSTIN

Schindler

F

Food Service Special Conditions Plan

DN

L

HILTON AUSTIN LEVEL 2

2

EQUIPMENT SPECIAL CONSITIONS PLAN SCALE:

1/4" = 1'-0"

6/10/2016

K-2

UP

DN

FAX 972-241-3575 972-230-5000

SCALE: NOT TO SCALE

13970 N. Stemmons Freeway Dallas, TX 75234

-

RESTAURANT SUPPLY

INDIRECT WASTE LINE

MISSION

UP

-

PLEASE REFERENCE GAYLORD SHOP DRAWINGS - AC

GENERAL PLUMBING AND MECHANICAL NOTES

GENERAL PLUMBING AND MECHANICAL NOTES

3

SCALE:

1/4" = 1'-0"

LEVEL 2

PLUMBING SYMBOLS AND ABBREVIATIONS CW

COLD WATER SUPPLY

FS

FLOOR SINK (WITH GRATE)

SU

STUB-UP

SCW

SOFT COLD WATER SUPPLY

FS

FLOOR SINK

AFF

ABOVE FINISHED FLOOR

HW

HOT WATER SUPPLY (140°)

G

GAS

FFF

FLUSH W/FINISHED FLOOR

W

WASTE DRAIN

G

GAS CONNECTION

BFF

BELOW FINISHED FLOOR

HD

HUB DRAIN

SS

STEAM SUPPLY

BTC

BRANCH TO CONNECTION

FD

FLOOR DRAIN

CR

CONDENSATE RETURN

FFD

FUNNEL FLOOR DRAIN

PVC

6" PVC CONDUIT

HILTON AUSTIN CONVENTION CENTER 500 E. 4TH STREET AUSTIN, TX 78701

HILTON AUSTIN

GENERAL PLUMBING AND MECHANICAL NOTES

EQUIPMENT LAYOUT PLAN PLUMBING CONNECTIONS PLAN

HILTON AUSTIN

Food Service Plumbing Connections Plan

Schindler Schindler

PLUMBING COORDINATION

6/10/2016

K-3

GENERAL ELECTRICAL NOTES

POS IN THIS LOCATION IS INTEGRATED INTO MILLWORK. OUTLETS TO BE APPROX. 36" AFF - COORDINATE WITH MILLWORK

There will be a conflict with electrical stub up, floor sink and trash can. KEC to coordinate and locate all correctly.

EC

UP

FAX 972-241-3575

ELEC PANELS NOW FACE THE RESTAURANT-AA

972-230-5000

NOT TO SCALE

13970 N. Stemmons Freeway Dallas, TX 75234

-

EX. HOOD FIRE SYSTEM REMOTE PULL STATION RECESSED J-BOX

RESTAURANT SUPPLY

DETAIL

MISSION

-

UP COORDINATE LOCATION OF PULL STATION WITH LIGHTING CONTROLS AND ELECTRICAL PANELS, ETC.

AGREED BY EDG, FOR AESTHETIC INTENT ONLY

EC

ELECTRICAL SYMBOLS AND ABBREVIATIONS Schindler

HILTON AUSTIN CONVENTION CENTER 500 E. 4TH STREET AUSTIN, TX 78701

V.I.F.

HILTON AUSTIN

Schindler

EC

Food Service Electrical Connections Plan

COORD NEW PULL STATION LOCATION ON BACK OR SIDE OF COLUMN - AA

DN

HILTON AUSTIN LEVEL 2

ELECTRICAL GENERAL NOTES

4

EQUIPMENT LAYOUT PLAN ELECTRICIAL CONNECTIONS PLAN

ALL DIMENSIONS ARE FROM COLUMN CENTER LINES, FINISHED FACE OF WALLS AND/OR FLOORS TO CENTERS OF BOXES OR CONDUIT ALL DIMENSIONS UP TO 4'-0" ARE SHOWN IN INCHES. ROUGH-INS SHOWN ARE FOR EQUIPMENT TO BE FURNISHED. SEE ARCHITECTURAL/ELECTRICAL DRAWINGS FOR ALL OTHER REQUIREMENTS.

SCALE:

WILL NOT BE RESPONSIBLE TO FURNISH ELECTRICAL APPURTENANCES SUCH AS LINE OR DISCONNECT SWITCHES, SAFETY CUTOUTS, CONTROL PANELS, FUSE BOXES, FITTINGS, CONDUIT, OR WIRING OTHER THAN THOSE FURNISHED AS A STANDARD PART OF THE EQUIPMENT BY THE MANUFACTURER

1/4" = 1'-0"

ALL WORK TO BE PERFORMED IN FULL ACCORDANCE WITH ALL APPLICABLE CODES RELATING TO ROUGH-INS, HOOK-UP, AND INSTALLATION OF EQUIPMENT.

6/10/2016

K-4

Schindler

5 SCALE: Schindler

HILTON AUSTIN CONVENTION CENTER 500 E. 4TH STREET AUSTIN, TX 78701

HILTON AUSTIN

Food Service Ventilation Connections Plan

UP UP

DN

HILTON AUSTIN

LEVEL 2

EQUIPMENT LAYOUT PLAN VENTILATION CONNECTIONS PLAN

1/4" = 1'-0"

6/10/2016

K-5

972-230-5000

FAX 972-241-3575

13970 N. Stemmons Freeway Dallas, TX 75234

RESTAURANT SUPPLY

MISSION

FAX 972-241-3575 972-230-5000

13970 N. Stemmons Freeway Dallas, TX 75234

RESTAURANT SUPPLY

MISSION NOTE: ITEMS 122 - 128 TO BE PROVIDED AND INSTALLED BY LIQUID LOGISTICS, CONTACT: KRIS BYRD, 512-987-8096. COORDINATE DIVISION OF RESPONSIBILITIES AND NECESSARY SERVICES. VERIFY WITH OWNER.

HILTON AUSTIN CONVENTION CENTER 500 E. 4TH STREET AUSTIN, TX 78701

1/4" = 1'-0"

HILTON AUSTIN

SCALE:

Food Service Equipment Plan

6

EQUIPMENT LAYOUT PLAN

HILTON AUSTIN LEVEL 1

6/10/2016

K-6

B

1/4" = 1'-0"

(1)

PLUMBING SYMBOLS AND ABBREVIATIONS CW

COLD WATER SUPPLY

FS

FLOOR SINK (WITH GRATE)

SU

STUB-UP

SCW

SOFT COLD WATER SUPPLY

FS

FLOOR SINK

AFF

ABOVE FINISHED FLOOR

HW

HOT WATER SUPPLY (140°)

G

GAS DROP

FFF

FLUSH W/FINISHED FLOOR

W

WASTE DRAIN

G

GAS CONNECTION

BFF

BELOW FINISHED FLOOR

HD

HUB DRAIN

SS

STEAM SUPPLY

BTC

BRANCH TO CONNECTION

FD

FLOOR DRAIN

CR

CONDENSATE RETURN

FFD

FUNNEL FLOOR DRAIN

PVC

6" PVC CONDUIT

A

B C

D

E

F

G

H

I

J

FAX 972-241-3575 972-230-5000

ITEM/#

P-01

K

HILTON AUSTIN CONVENTION CENTER 500 E. 4TH STREET AUSTIN, TX 78701

QTY.

HILTON AUSTIN

SCALE:

Food Service Special Conditions Plan

7

EQUIPMENT SPECIAL CONDITIONS PLAN

13970 N. Stemmons Freeway Dallas, TX 75234

B

RESTAURANT SUPPLY

MISSION

H

HILTON AUSTIN LEVEL 1

PLUMBING COORDINATION

6/10/2016

K-7

FAX 972-241-3575 972-230-5000

13970 N. Stemmons Freeway Dallas, TX 75234

RESTAURANT SUPPLY

VERIFY WITH OWNER. BELIEVE THESE ARE AIR COOLED NOT WATER COOLED

GENERAL PLUMBING AND MECHANICAL NOTES

-

INDIRECT WASTE LINE

-

SCALE: NOT TO SCALE

PLUMBING / MECHANICAL GENERAL NOTES KEC WILL FIELD VERIFY THAT TABLE/COUNTER LEGS DO NOT LAND ON FLOOR SINKS OR DRAINS MANIFOLD SINK DRAINS WITH AIR GAP CONNECTION TO FLOOR SINK EXTEND SINK DRAIN WITH AIR GAP CONNECTION TO FLOOR SINK

PLUMBING SYMBOLS AND ABBREVIATIONS

MANIFOLD TO EQUIPMENT CONNECTIONS WITH INDIVIDUAL GAS SHUT OFF VALVES INSTALL AUTOMATIC GAS SHUT-OFF VALVES AT CEILING FURNISHED BY KEC FOR EXHAUST HOOD FIRE SUPPRESSION SYSTEM

CW

COLD WATER SUPPLY

FS

FLOOR SINK (WITH GRATE)

SU

STUB-UP

ALL DIMENSIONS ARE FROM COLUMN CENTER LINES, FINISHED FACE OF WALLS AND/OR FLOORS TO CENTERS OF DRAINS OR PIPING

SCW

SOFT COLD WATER SUPPLY

FS

FLOOR SINK

AFF

ABOVE FINISHED FLOOR

ROUGH-INS SHOWN ARE FOR EQUIPMENT TO BE FURNISHED BY THE KITCHEN EQUIPMENT CONTRACTOR. SEE ARCHITECEURAL/MECHANICAL DRAWINGS FOR ALL OTHER REQUIREMENTS.

HW

HOT WATER SUPPLY (140°)

G

GAS DROP

FFF

FLUSH W/FINISHED FLOOR

W

WASTE DRAIN

G

GAS CONNECTION

BFF

BELOW FINISHED FLOOR

HD

HUB DRAIN

SS

STEAM SUPPLY

BTC

BRANCH TO CONNECTION

THE KITCHEN EQUIPMENT CONTRACTOR WILL NOT BE RESPONSIBLE FOR FURNISHING ACCESSORIES SUCH AS TEES, MIXING VALVES, ELBOWS, SHUT-OFF VALVES, FITTINGS, PIPING, EXHAUST OR SUPPLY AIR DUCTS, OR DUCT FIRE WRAP OTHER THAN THOSE FURNISHED AS A STANDARD PART OF THE EQUIPMENT BY THE MANUFACTURER.

FD

FLOOR DRAIN

CR

CONDENSATE RETURN

ALL WORK TO BE PERFORMED IN FULL ACCORDANCE WITH ALL APPLICABLE CODES RELATING, TO ROUGH-INS, HOOK-UP, AND INSTALLATION OF EQUIPMENT.

FFD

FUNNEL FLOOR DRAIN

PVC

6" PVC CONDUIT

FLUSH OUT ALL PIPING AND DRAINAGE SYSTEMS PRIOR TO CONNECTION OF FOODSERVICE EQUIPMENT.

HILTON AUSTIN CONVENTION CENTER 500 E. 4TH STREET AUSTIN, TX 78701

SEE NOTE ON K-6.

MISSION

PLUMBING COORDINATION

1/4" = 1'-0"

HILTON AUSTIN

SCALE:

Food Service Plumbing Connections Plan

8

EQUIPMENT LAYOUT PLAN PLUMBING CONNECTIONS PLAN

HILTON AUSTIN LEVEL 1

PLUMBER TO SET GAS VALVES, FURNISHED BY KITCHEN EQUIPMENT SUPPLIER, IN THE GAS LINE AS PART OF THE FUEL SHUT OFFS FOR THE FIRE SUPPRESSION SYSTEM PLUMBER TO MAKE FINAL CONNECTION FROM THE MAIN GAS LINE TO EACH PIECE OF EQUIPMENT WITH FLEXIBLE GAS DISCONNECT HOSE PROVIDED BY KITCHEN EQUIPMENT SUPPLIER

6/10/2016

K-8

ELECTRICAL SYMBOLS AND ABBREVIATIONS

13970 N. Stemmons Freeway Dallas, TX 75234

HILTON AUSTIN LEVEL 1

ELECTRICAL GENERAL NOTES ALL DIMENSIONS ARE FROM COLUMN CENTER LINES, FINISHED FACE OF WALLS AND/OR FLOORS TO CENTERS OF BOXES OR CONDUIT ALL DIMENSIONS UP TO 4'-0" ARE SHOWN IN INCHES. ROUGH-INS SHOWN ARE FOR EQUIPMENT TO BE FURNISHED. SEE ARCHITECTURAL/ELECTRICAL DRAWINGS FOR ALL OTHER REQUIREMENTS. WILL NOT BE RESPONSIBLE TO FURNISH ELECTRICAL APPURTENANCES SUCH AS LINE OR DISCONNECT SWITCHES, SAFETY CUTOUTS, CONTROL PANELS, FUSE BOXES, FITTINGS, CONDUIT, OR WIRING OTHER THAN THOSE FURNISHED AS A STANDARD PART OF THE EQUIPMENT BY THE MANUFACTURER ALL WORK TO BE PERFORMED IN FULL ACCORDANCE WITH ALL APPLICABLE CODES RELATING TO ROUGH-INS, HOOK-UP, AND INSTALLATION OF EQUIPMENT.

6/10/2016

K-9

972-230-5000

FAX 972-241-3575

RESTAURANT SUPPLY

NEEDS TO BE VERIFIED, BY WHO? - AC

HILTON AUSTIN CONVENTION CENTER 500 E. 4TH STREET AUSTIN, TX 78701

GENERAL ELECTRICAL NOTES

MISSION

1/4" = 1'-0"

ASK OWNER. WHAT ARE THEY GETTING FROM THEIR VENDORS.

HILTON AUSTIN

SCALE:

SEE NOTE ON K-6.

Food Service Electrical Connections Plan

9

EQUIPMENT LAYOUT PLAN ELECTRICAL CONNECTIONS PLAN