Report 0 Downloads 149 Views
Connecticut State Report 2017 NEPPP Meeting Steve Norton

Presentation Overview • Preservation Program Background • Challenge Encountered • Program Achievement • Current and Future Plans

Network Size

Note: 424 centerline miles (459 lane miles) of ramps not included

Preservation Funding Construction

Maintenance

2011

2012

2013

2014

2015

2016

2017

2018

2019

$25.7M

$68.9M

$25.9M

$28.3M

$89.6M

$50.5M

$25M

~ $25M

$25M ?

• In addition to our preservation program, the state also has a maintenance-driven resurfacing program which covers approximately $70M annually.

Treatments Used To Date • Mill and Overlay HMA/PMA • Ultra-Thin Bonded HMA/PMA • Microsurfacing • Rubberized Chip Seal Stress-Absorbing Membrane Interlayer (SAMI) • Asphalt-Rubber Gap-Graded Mix • Thin Friction Wearing Course (Mahoney Mix) • High Friction Surface Treatment

Ultra-Thin Bonded PMA (picture – 2016, treatment – 2014) I-91 in Hartford/Windsor, CT

Treatments Used To Date • Rubberized Chip Seal • Fog Seal • Surface, Partial Depth, and Full Depth Patching • Crack Sealing and Filling • Micro-milling • Diamond Grinding

Rubberized Chip Seal (2011/2016) Route 89 in Mansfield, CT

Challenge Encountered • Change in Contracting Method ▫ Delivering preservation projects through vendor in place contract ▫ Developed contract documents with all treatments proposed ▫ Inspection and oversite through maintenance staff as opposed to construction staff ▫ Training held to help get everyone on board and up to speed ▫ More involvement from Pavement Unit staff from project selection to construction completion

Program Achievement • Broader Use of True Pavement Preservation Treatments for 2018 ▫ Ultra-Thin Bonded PMA  Fog Seal ▫ Rubberized Chip Seal ▫ Crack Sealing

Ultra-Thin Bonded PMA (2016) Shoulders – Fog & Sand Seal I-84 in Cheshire, CT

Current Program Program Year

Centerline Miles

Lane Miles

2016

18.9

122.8

2017

37.3

83.2

2018

75.7

168.4

Plans for 2017 • Budget ▫ $25M

• Treatment Types ▫ Mill and Overlay HMA/PMA

• Approximate Miles ▫ 37.3 – Centerline ▫ 83.2 – Lane

2017 Preservation Overview Treatment

Centerline Miles

Lane Miles

Estimated Cost

Mill and Overlay

37.3

83.2

$25M

Total

37.3

83.2

$25M

• Lack of variety in preservation treatment types for 2017 is mainly due to challenges associated with changes to the contracting method. We anticipate the inclusion of additional, true preservation treatments for 2018 and future use.

Plans for 2018 • Tentative Budget ▫ ~ $25M

• Treatment Types ▫ Mill and Overlay HMA/PMA ▫ Ultra-Thin Bonded PMA  Fog Seal ▫ Rubberized Chip Seal ▫ Crack Sealing

• Approximate Miles ▫ 75.7 – Centerline ▫ 168.4 – Lane

2018 Preservation Overview Treatment

Centerline Miles

Lane Miles

Estimated Cost

Mill and Overlay

17.2

44.4

$10M - $15M

Ultra-Thin Bonded PMA

36.7

80.4

$5M - $10M

Rubberized Chip Seal

21.8

43.6

$2M - $3M

Total

75.7

168.4

~ $25M

Plans for 2019 • Tentative Budget ▫ $25M ?

• Treatment Types ▫ Mill and Overlay HMA/PMA ▫ Ultra-Thin Bonded PMA  Fog Seal ▫ Rubberized Chip Seal ▫ Crack Sealing ▫ Thin Friction Wearing Course ▫ Microsurfacing

• Approximate Miles ▫ ???