Street Maintenance

Report 10 Downloads 70 Views
PUBLIC WORKS

217 of 336

218 of 336

Annual Report for the Year 2008

Service Center Expansion Construction

Contents Pubic Works Administration Equipment Maintenance Street Maintenance Waste Removal & Recycling Engineering Sewer Maintenance 219 of 336

220 of 336

Public Works Administration

Annual Report 2008

Administration The Public Works Department is organized into six integrated divisions for the implementation of the Town’s goals and objectives relating to basic environmental services and infrastructure. A brief description of the function of each of these divisions is provided below: Public Works Administration This division provides organization, direction and coordination of the five operating divisions of the Department including policies and procedures, personnel management, planning programs, budgeting, management of records and reporting. This division is also responsible for departmental communications including public and media relations.

Street Maintenance This division, largest of the six, is responsible for the maintenance of streets, alleys, bridges and traffic control systems. This maintenance includes, but is not limited to repair, snow removal, ice control, sweeping, pavement traffic markings and signs. In addition to these basic maintenance items, this division also collects, disposes or recycles residential brush and leaves. Equipment Maintenance This division coordinates the routine maintenance and repair of the Town’s entire vehicle fleet and all major specialized units of equipment. This division also provides technical assistance in the preparing and evaluating specifications and bidding documents for the purchase and replacement of all vehicles and equipment. Engineering The primary function of this division is to organize, direct, implement and monitor the planning, designing, contracting and inspecting of all public work and private development projects for and within the Town. Waste Removal This division performs the weekly curbside collection and disposal of residential household and bulk solid waste. In addition to these basic services, this division also collects solid waste from Town owned facilities and trash containers in the central downtown business district, handles special waste generated by Town operations and manages the Town’s recycling program. Sewer Maintenance This division maintains and repairs all public storm and sanitary sewers and appurtenances including, but not limited to replacement, testing, cleaning and inspection of conduit, inlets, manholes and pump stations. An organizational chart is shown on the next page, which graphically demonstrates the distribution of function for the Department. 221 of 336

Public Works Administration

Annual Report 2008

Departmental Organization Administration Mike Hall Director 454-9576 [email protected]

Doris Hale Office Associate 454-9571 [email protected]

2 Full-time Employees 1 Part-time Employee Polices & procedures Accounts payable Planning Records/documents Budget Payroll Communications Facilities maintenance

Equipment Maintenance Rick Worth Supervisor 454-9736 [email protected] Steve Thomas Inventory Clerk 6 Full-time Employees Vehicle fleet maintenance Fleet inventory Vehicle records Specifications

Engineering Gene Brown Town Engineer 454-9574 [email protected] Donna Maaks Office Associate 454-9578 [email protected] Storm Water Utility 433-3403 [email protected] 10 Full-time Employees 1 Part-time Employee

Street Maintenance

Waste Removal

Al Slagell Supervisor 454-9738 [email protected]

Tom Ramirez Supervisor 454-9715 [email protected]

Scott Dennewitz Assistant Supervisor 454-9638 [email protected]

10 Full-time Employees 2 Part-time Employees

19 Full-time Employees 9 Part-time Employees Streets, alleys & bridges Street sweeping Streetlights Sidewalks Snow & ice control Brush collection & chipping Traffic control maintenance Leaf collection

Residential refuse collection Bulk waste collection Recycling Landscape waste collection Town facility refuse collection Special waste handling Downtown trash collection Special event refuse collection Fleet fueling

Sewer Maintenance Mike Myers Supervisor 454-9768 [email protected] 11 Full-time Employees 2 Part-time Employees Storm Water Utility Sanitary sewers Sewer testing Sewer inspection Inlet & manhole repairs Pump station operation Service dye testing

Subdivision review Mapping Traffic planning Street Excavation permits Resurfacing Site plan review Storm Water Utility Capital improvements JULIE/ROW Permits

222 of 336

Public Works Administration

Annual Report 2008

Staff The Department’s current staffing level is 58 full-time employees and 15 seasonal & part-time employees. The following chart breaks down the total annual staff utilization by division for 2008:

Departmental Staff Time Utilization Sewer Maintenance 10%

Admin 17% Equipment Maintenance 6%

Engineering 14%

Waste Removal 19%

Street Maintenance 34%

Maintenance Facility Building & Site Improvements A contract in the amount of $3.1 million to construct the first phase (34,000 square feet) of a major two phase expansion (total 100,000 square feet) to the Public Works maintenance facility at 1301 Warriner Street was awarded to CORE Construction of Morton, IL by the Town Council on January 22, 2008. This phase was designed to meet LEED certification and will provide a new vehicle maintenance area; supervisory offices and employee break room, locker rooms and restrooms. Construction began in May and is expected to be completed by February 2009.

223 of 336

Public Works Administration

Annual Report 2008

Intergovernmental Coordination Numerous functions performed by this Department are coordinated with other local governments such as Illinois State University, Normal Township, the Bloomington-Normal Water Reclamation District, the County of McLean and the City of Bloomington. Below is a list of activities, which are routinely coordinated: • • • • • •

Snow removal & ice control Pavement traffic markings Traffic signal coordination and maintenance Temporary equipment backup and utilization Transportation planning Infrastructure and services coordination associated with development

In addition to these routine functions, several special projects and programs were conducted: • • •



The McLean Co. Geographic Information System (McGIS) provides on-line mapping applications on the intergovernmental intranet of the county. A committee of the McLean County Greenways Coalition worked on an update of the County’s Greenway Plan. East Side Highway Corridor steering committee (under the direction of the McLean County Regional Planning Commission) with an $880,000 earmark in the current federal transportation bill to prepare an alignment study. By intergovernmental agreement between McLean County, the City of Bloomington and the Town, this study was launched in December 2006 and a draft of the final report was presented in September 2008. The Town was involved in storm water planning associated with the Lake Bloomington Watershed Total Maximum Daily Load (TMDL) Study for phosphorous and nitrates and a plan was completed in 2008. Development of the Town within the watershed is currently under way.

224 of 336

Public Works Equipment Maintenance

Annual Report 2008

Equipment Maintenance In the past year the Equipment Maintenance Division performed repairs and routine maintenance on the Town’s total fleet of 299 vehicles. The fleet has 13 (4.5%) more vehicles than last year. Equipment Maintenance Staff Time Utilization Emergency Service 2%

M isc 1%

Vehicle Delivery 6% P arts Invento ry & Delivery 20%

P reventative M aintenance Service 17%

Fleet Fueling 213,951 gallons of unleaded and diesel fuel was consumed in 2008. This is 5,765 gallons (2.8%) more than last year.

Repairs 54%

Gallons

Total Annual Fuel Consumption 250,000 200,000 150,000 100,000 50,000 0

2004 2005 2006 2007 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2008

Fuel Prices Paid $5.00 $4.00 $3.00 $2.00 $1.00 $0.00

The average fuel price paid in 2007 was $3.23 per gallon. This is $0.64 per gallon (25%) more than last year.

2004 2005 2006

The total amount expended in 2008 for fuel was $690,694. This total is $151,450 (28%) more than expended last year.

2007 Jan Feb Mar Apr May Jun Jul

Aug Sep Oct Nov Dec

2008

225 of 336

Public Works Street Maintenance

Annual Report 2008

Street Maintenance Street Pavement Repair & Maintenance The division continues to increase the amount of street pavement repairs and maintenance as demonstrated by the following statistics of total area repaired and materials used.

Street Pavement Maintenance 3500 3000 2500 2000 1500 1000 500

2008

2007

2006

2005

2004

2003

2002

2001

2000

1999

0

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 Pothole Patching (tons)

154

60

111

65

69

88

93

75

122

217

Asphalt Pavement Repair (tons)

48

205

118

164

220

223

180

32

53

137

Concrete Pavement Repair (SY)

148

116

559

893 1146 1810 2335 2335 2885 3045

Pavement Joint Sealing (Gal) 2695 2500 810 1764 1400 1045 1430 810 1155 100

226 of 336

Public Works Street Maintenance

Annual Report 2008

Street Sweeping The division continues to seasonally sweep streets utilizing two sweepers beginning in 2006.

Street 12000 10000 Curb miles 8000 6000 4000 2000 0 Street Sweeping

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

5045

4602

4702

5409

4610

3933

4829

11171

9187

10784

Brush Collection & Chipping The division utilizes three knuckle-boom type collection vehicles and a drum-type wood chipper.

Brush Collection & Chipping 60000 48444

40000

47455

32597

30570 31774

36135 31670

30000 20000

23925 19564 20053

10000 2008

2007

2006

2005

2004

2003

2002

2001

2000

0 1999

Cubic Yards

50000

227 of 336

Public Works Street Maintenance

Annual Report 2008

Snow Removal & Ice Control The total number of winter storms requiring snow and ice removal this calendar year (26) is 6 more than last year (20):

30 25

2 2

20

0 1

1 1 3

9

5

4

4

Category 2 (2-3") 16

13

2 0 5

11

2007

0 2 3

2006

0 3

2003

5

1 3

1 0

2002

10

Category 4 (4" & greater) Category 3 (3-4")

6

5

5

15

2001

6

Category 1 (1-2") 2008

2005

0 2004

Number of storm events

Annual Winter Storm Events

Winter Street Maintenance

9445

10000

8690

9000 8000

7325 7000 6636 5745 5917

5265

6000 5000

3690

4000

3202

2987 3436

3000

3873

2968

2001

3572

1863 1420 869 201

2000

1678

1512

1694

1000 376

376

0 2001

300

1081

2002

392

2003

401

2004

407

2005

409

423

2006

425

2007

2008

2001

2002

2003

2004

2005

2006

2007

Street System (Lane-miles)

376

376

392

401

407

409

423

2008 425

Personnel time (Man-hours)

1420

1863

3436

1678

1694

1081

3873

3572

Sodium Chloride (Tons)

869

2001

2987

3202

2968

1512

5917

6636

Calcium Chloride (Gal)

201

3690

9445

5265

8690

300

5745

7325

228 of 336

Public Works Street Maintenance

Annual Report 2008

Leaf Collection & Composting This division collects leaves placed on the public right-of-way by property owners. By agreement these leaves are transported to the Illinois State University farm (Lexington) and incorporated into a composting operation together with the Town’s landscape waste and farm animal wastes.

11156

2008

2006

2005

2004

2003

2002

2001

2000

9167 7576

6822

5872 5791

1999

5025

9510

2007

8568 8414

8290 8264

1998

12000 10000 8000 6000 4000 2000 0

1997

Cubic yards

Annual Leaf Collection Program

229 of 336

Public Works Waste Removal

Annual Report 2008

Waste Removal Division Household Waste Program Description Household waste is collected on a regular five-day weekly schedule from single-family homes and two family duplexes. Residents are encouraged to place their waste in containers having close-fitting covers with handles for carrying. The combined weight of the container and its contents shall not exceed 35 pounds. (Except garbage totters purchased from the Town) Plastic bags with a minimum 1.5 mil thickness tied at the top may also be used. Containers must be placed just behind the curb in front of the residence by 5:00 a.m. on the day of collection, but not earlier than 6:00 p.m. on the preceding day. The emptied container must be returned to the residence within 12 hours after collection. In addition, solid waste is collected from all town facilities including offices; trashcans located in the uptown business district, and dumpsters servicing special events like the annual Cornfest, and Sugar Creek Arts Festivals. The Town also offers 96-gallon wheeled waste containers for sale to residents. A semiautomated arm attached to the refuse collection vehicles empties these containers. This semiautomated system is more efficient and reduces potential for operator injuries.

230 of 336

Public Works Waste Removal

Annual Report 2008

Household Waste Trend 15,000 Waste (tons)

Household Waste Collected (tons)

10,000

Number of Households Waste Recycled (tons)

5,000

0

Total Household/Recycled

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

Household Waste Collected (tons)

7,098

7,323

7,731

7,795

8,928

8,983

9,047

9,317

9,422

9,347

Number of Households

8,218

8,458

8,540

8,910

9,213

9,602

9,845 10,078 10,269 10,327

Waste Recycled (tons)

2,226

2,857

3,164

3,337

3,505

3604

3,775

3,863

4,153

4,433

Total Household/Recycled Wastes (tons) 9,324 10,180 10,895 11,132 12,433 12,587 12,822 13,180 13,575 13,780

231 of 336

Public Works Waste Removal

Annual Report 2008

Landscape Waste Collection Program A part-time seasonal employee collected landscape waste (other than grass) from March through December. The collected material was delivered to the Illinois State University farm for inclusion into the experimental composting study operation conducted by the University’s Agriculture Department.

Landscape Waste (lbs)

December November October September

2500000

August July June May

2000000 1500000 1000000

April March February January

500000 0

2008

2007

2006

2005

2004

Bulk Waste Collection

4471 4460 4656

2008

2007

3323

2006

2003

3040

3834

2005

3620

2004

3894

2002

5000 4500 4000 3500 3000 2500 2000 1500 1000 500 0

2001

Tons

Bulk Waste Collection

232 of 336

Public Works Waste Removal

Annual Report 2008

Special Waste Handling Program The Waste Removal Division is responsible for the removal of “special wastes” generated from Town owned facilities. The Town does not provide this service to residents and businesses. These services must be contracted to licensed special waste handlers. The Division documents, temporarily stores the materials prior to removal and contracts with a licensed handler for their removal. Examples of special wastes managed by the Division are herbicides & cleaning chemicals generated by the Parks & Rec Department, old car batteries and used engine oil collected at the Public Works maintenance facility, and mercury switches & capacitors removed from discarded appliances collected in the Town’s bulk waste collection program.

Recycling Program Since 1998 the Town has operated a volunteer drop-off recycling program with Waste Removal staff collecting and transporting the recycled materials in fabricated roll-off containers seven days a week. By an agreement starting in 1999 this program began receiving materials collected from recycle programs at Illinois State University. In May 2000, Bloomington and the Town agreed to combine the transfer (storage, loading and trucking) of recycled materials from their respective programs in a new recycle transfer building under the management of this division.

7377

2008

2007

2004

6474

6780

2006

5384

5602

2005

5139

5576

2003

8000 7000 6000 5000 4000 3000 2000 1000 0

2002

Tons

Recycled Materials Transferred through Town's Facility

In response to the continued, sustained interest and acceptance of this program, nine additional collection sites have been added to the original five sites since 1998 bringing the total number of drop-off centers to fourteen.

233 of 336

Public Works Waste Removal

Annual Report 2008

Beginning in 2002, the Town began conducting monthly recycling drives for electronic equipment. The Town received a grant from the Illinois Department of Commerce and Economic Opportunity in 2005 for a storage building and equipment to allow collection of recycled electronic equipment on a regular business-day schedule.

145

147

2007

2008

138

57

2006

61

2005

68

2004

110

2003

160 140 120 100 80 60 40 20 0

2002

Tons

Recycled Electronics Collection

Following is a complete record of the total amount of recycles materials collected this past year compared to the previous five years. This year’s collection exceeded last year’s by 7.5%. This year’s revenue from the resale of recycled materials and reimbursement from the City of Bloomington for the proportionate cost to operate the transfer operation was $289,427.16 (18% over last year).

234 of 336

Public Works Waste Removal

Annual Report 2008

Normal Recycling Program

4,433 4,154 3,864

4,500

3,775

3,604 2008

4,000

2007

3,500

Tons

2006 3,000

2005

2,500

2004

2,000 1,500 1,000 500 0

2008 Recycled Material Breakdown

Cardboard 12%

Electronics 3%

Containers 23%

Mixed Paper 62%

235 of 336

Public Works Waste Removal

Annual Report 2008

Recycle Program Revenue $350,000.00 $300,000.00 $250,000.00 $200,000.00 $150,000.00 $100,000.00

2008

2007

2006

2005

2004

2003

$0.00

2002

$50,000.00

Containers

Mixed Paper

Cardboard

Bloomington Reimbursement

LeRoy Reimbursement

Miscellaneous

236 of 336

Public Works Waste Removal

Annual Report 2008

1

2

3

4

5

6

7

8

Kroger

Wal-Mart E

Jewel

Eagle

Twnshp

Kingsley

Chiddix N.

Parkside

Total (lbs)

January

212121

142207

91095

53220

43243

9217

16792

6398

800403

February

165220

111833

72362

40450

35403

16817

16086

2854

642216

March

191236

127042

102288

52339

43268

14129

18977

5429

741032

April

183037

120896

99786

44942

44804

16925

15735

1509

701180

May

192434

138938

106555

47309

43008

22148

18652

5934

762860

June

192286

138928

99652

41367

39996

13921

13688

6252

720900

July

165517

138612

86424

41262

36421

13041

11091

5545

678400

August

190470

125302

91045

39108

46304

14921

14691

4713

697290

September

184943

122324

97741

47106

39217

18301

15062

5136

699260

October

183286

124156

98260

38579

43190

17730

15689

7042

690460

November

196900

142451

92007

48338

41083

16548

14900

8606

721320

December

211254

152917

108583

43531

39806

14712

18600

6146

797200

Total (lbs)

2268704

1585605

1145799

537551

495743

188409

189963

65563

8652521

1134

793

573

269

248

94

95

33

189059

132134

95483

44796

41312

15701

15830

5464

721043

Monthly Avg (tons)

95

66

48

22

21

8

8

3

361

2007 Average

84

59

46

20

20

5

7

3

313

Total (tons) Monthly Avg (lbs)

237 of 336

Public Works Waste Removal

Annual Report 2008

9

10

11

12

ISU Willow St Wal-Mart W Prairieland January February March April May June July August September October November December Total (lbs) Total (tons) Monthly Avg (lbs) Monthly Avg (tons) 2007 Average

13

14

Wesleyan Heartland

NCWHS

Total (lbs)

ISU

5638

74891

23975

71557

11448

13900

775702

24701

800403

7948

57774

13845

56654

5142

7571

609958

32258

642216

4686

76675

26193

48464

5777

9605

726106

14926

741032

9377

70283

16033

56857

8920

12076

701180

0

701180

11661

71596

27139

56739

7245

13501

762860

0

762860

8529

66861

31002

53521

9830

5066

720900

0

720900

9587

69106

25495

57827

6509

7543

673980

4420

678400

9036

64766

19588

54190

9610

8346

692090

5200

697290

8144

69248

27510

49073

5576

9879

699260

0

699260

6239

64727

26171

51149

5390

8854

690460

0

690460

10688

65412

26343

45386

3822

8835

721320

0

721320

10336

83710

30472

62352

4702

10080

797200

0

797200

101869

835050

293765

663769

83971

115254

8571016

81505

8652521

51

418

147

332

42

58

4286

41

8489

69587

24480

55314

6998

9604

714251

6792

721043

4

35

12

28

3

5

357

3

361

2

27

10

19

2

4

308

9

313

238 of 336

Public Works Waste Removal

Annual Report 2008

2008 Recycle Program Location Breakout

Wal-Mart W 10%

Twnshp 6%

Prairieland 3%

Eagle 6%

Wesleyan 8%

Kroger 27%

Jewel 13%

Wal-Mart E 19%

239 of 336

Public Works Engineering

Annual Report 2008

Engineering Division The Engineering Division of the Public Works Department was established in 1988. The Division has expanded to a total of eleven individuals whose primary mission is to effectively organize, direct, implement and monitor the planning, designing, contracting and inspecting of all public works and private development projects, and storm water management responsibilities for and within the Town of Normal. Staffing In October of 2008, Julie Weger, was hired to fill the Storm Water Engineering Technician position that was created in 2006. Shown below is a current list of Engineering staff and positions. Gene Brown, P.E. Donna Maaks Fred Zbinden, P.E. Eric Herbst, P.E. Wayne Hopper Steve Sochotsky Terry Whalen Gary Dean Tim Gillenwater Darryl Barron Julie Weger

Town Engineer Office Associate Project Engineer II Project Engineer II Traffic Technician G.I.S. Specialist Engineering Technician II Engineering Technician II Construction Technician Utility Permit Technician Storm Water Engineering Technician

General Business Operations Total engineering expense for the Town in 2008 was approximately one million one hundred twenty thousand dollars ($1,120,000.00). This does not include engineering work for the uptown redevelopment project or water related projects. To supplement the work performed by the Engineering Division, the Town has engineering service contracts with the Farnsworth Group; Lewis, Yockey and Brown, Inc.; Clark-Dietz; and Hanson Professional Services. The Town also has agreements with Terracon, Inc. and Testing Service Corporation for material testing and geotechnical engineering services. Approximately 82 % of the $1,120,000.00 dollars of is attributed to the Engineering Division, with the remaining 18 % going to the private engineering consultants. The Engineering Division provides the following services as part of general business operations: ƒ ƒ ƒ ƒ ƒ ƒ ƒ

Issues permits for work performed in the public right-of-way Administers the Town of Normal Flood Plain Ordinance Provides technical assistance and information to local residents and other Town Departments Performs bridge and culvert inspections on the 27 structures under the Town’s jurisdiction Coordinates with outside agencies regarding transportation systems and other engineering issues Prepares various official and informational maps Manages erosion control permitting and inspection program

1

240 of 336

Public Works Engineering

Annual Report 2008

Engineering Time Allocation – 2008

General Business Operations Data Operations/GIS Capital Projects Private Development Traffic Management Special Projects

2006 5% 10% 25% 45% 10% 5%

2005 5% 10% 45% 25% 10% 5%

2007 10% 10% 40% 25% 10% 5%

2008 5% 10% 50% 25% 10% 0%

Capital Improvement Program The Engineering Division is involved in all phases of capital improvement projects including conceptual planning, budgeting, design, contract bidding/management, and construction supervision and inspection. Staff members and/or consultants completed design work on these projects depending on the size of the project and workload of the staff. All project management and construction inspection on capital projects was completed by in-house staff in 2008. Capital improvement projects completed in 2008 included: Annual Street Resurfacing Program Annual Sidewalk Program Annual PCC Pavement Patching Towanda Avenue / College Avenue Intersection Improvements North Bridge Trail Extension Uptown Infrastructure and Streets College Avenue Bridge Replacement Towanda Avenue / Shelbourne Drive Intersection Improvements Hillcrest Street / Clay Street Brick Street Rehabilitation Project Trails at Sunset Lakes Lift Station The contract values for the above projects totaled approximately $4.3 million dollars excluding the Uptown projects.

2

241 of 336

Public Works Engineering

Annual Report 2008

COLLEGE / TOWANDA INTERSECTION IMPROVEMENTS

New traffic signals and intersection widening were constructed at College Avenue and Towanda Avenue. Project added northbound and eastbound left turn lanes. Total project cost was approximately $692,000 including $207,000 in Federal Safety Funds.

Engineering Inspectors must be aware of activities around them at all times. Here a concrete truck tips over while backing off the existing pavement onto the proposed subgrade. Fortunately, no one was injured.

Recently poured northbound left turn lane and sidewalk construction on northbound Towanda Avenue at College Avenue.

3

242 of 336

Public Works Engineering

Annual Report 2008

TOWANDA / SHELBOURNE INTERSECTION IMPROVEMENTS

Long awaited traffic signals and intersection widening at Towanda Avenue and Shelbourne Drive was completed in October. Project added dual northbound left turn lanes alleviating rush hour backups at the existing four-way stop

Towanda Avenue / Shelbourne Drive looking south

Stark Excavating, Inc. crew pouring pavement widening at Towanda Avenue and Shelbourne Drive

Summer help employee Chuck Junis assisting in concrete testing and field inspections. Chuck is currently attending North Carolina State University majoring in civil engineering.

4

243 of 336

Public Works Engineering

Annual Report 2008

COLLEGE AVENUE BRIDGE REPLACEMENT

Photo taken during removal of south half of existing structure. New structure was built in two phases maintaining one lane of westbound traffic during phase I and two-way traffic during phase II. Construction was started in May and completed in October a month ahead of schedule. Anderson Park is in the background.

View of new bridge looking west. Bridge design includes a protected pedestrian walkway. Image to the right illustrates textured concrete parapet wall and black decorative railing protecting pedestrians from approaching traffic.

5

244 of 336

Public Works Engineering

Annual Report 2008

NORTH BRIDGE BIKE TRAILL EXTENSION

Completed trail section along north side of Northtown Road east of Towanda Avenue

A new trail section was constructed along the north side of Northtown Road east from Towanda Avenue, then north along a drainage way through Heather Ridge subdivision to Pipeline Road, and then north between North Bridge Lake and Pipeline Road to North Bridge Drive.

Trail extension along Pipeline Road north of Chaffee Drive looking south

6

245 of 336

Public Works Engineering

Annual Report 2008

Private Development The Engineering Division is responsible for assuring that public improvements associated with private developments are designed and constructed in accordance with Town Code. Construction plans for subdivisions, and site plans for commercial and multi-family developments, are reviewed and approved by Engineering. All public sewer and street improvements are inspected and approved by Engineering prior to acceptance by the Town Council. In 2008 the Engineering Division was involved with review and inspection of public improvements in the following subdivisions: ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ

North Bridge Heather Ridge Wintergreen Savannah Green Pheasant Ridge The Vineyards Constitution Trail Centre Trails at Sunset Lake Oaks on Hovey

Traffic Operations

The Engineering Division manages all traffic operations in the Town including: ƒ ƒ ƒ

Operation and maintenance of 37 traffic signal installations and 9 flasher installations Regulation of street signing, pavement marking and other traffic control devices Administration of the traffic maintenance program

Engineering conducts various traffic studies concerning traffic counts, site distance studies, delay, speed studies, parking analysis, intersection design and capacity analysis, roadway capacity analysis and other citizen requests and concerns. The Traffic Engineering Technician spent significant man hours in the field in 2008 on several projects. He provided construction supervision for the intersection improvement projects at Towanda Avenue and College Avenue, Towanda Avenue and Shelbourne Drive, College Avenue and Constitution Blvd. on the Uptown Redevelopment Project, and the Raab Road / Main Street intersection construction in the Constitution Trail Centre development.

7

246 of 336

Public Works Engineering

Annual Report 2008

The Towanda Avenue / Shelbourne Drive signal improvements included the first illuminated street sign installation in Normal depicted in the picture to the right. These signs are illuminated with LED lights making street identification easier for the traveling public. They will be included in all newly designed signal improvement projects.

The Traffic Engineering Technician also devoted substantial man hours to reviewing and studying traffic related issues involved with the proposed expansion of Sugar Creek School on Towanda Avenue. He worked closely with Unit 5 and their consultant on access and design of the parent drop-off and pick-up lot proposed at the school site in an effort to minimize traffic congestion associated with the proposed doubling of the schools enrollment to approximately 600 students. Data Operations/Geographical Information Systems (GIS) Since 1994, the Town of Normal has been involved in a joint project with the City of Bloomington, McLean County and McLean County Regional Planning in developing the McLean County Geographic Information System (McGIS). This cooperative effort will provide the community a basis for developing information systems based on maps and other geographic information. The GIS Specialist works with many departments throughout the Town in the preparation of maps and exhibits as required. The GIS Specialist also represents the Town on the technical committee of the GIS Consortium. Among the highlights of the consortium is the completion of new aerial photography and topography data gathering for the entire county which will be used to update the GIS base maps.

8

247 of 336

Public Works Engineering

Annual Report 2008

The GIS Specialist continues to work with the Utility Permit Technician, Traffic Engineering Technician, sewer department, and water department in gathering existing utility information using hand held GPS units. This information, including manhole locations, traffic signal poles, hand holes, fire hydrants, water valves, etc., is then downloaded to the GIS database for use in preparing maps which can be used for JULIE locating and general information dispersal as required. The GIS Specialist also assigns addresses to all newly platted lots and proposed buildings. He also maintains the Divisions digital plan files scanning all approved and as-built plans for archiving and reference purposes. This year several new projects were started including the development of a crash report data base and map, and a pavement inventory data base and map. The GIS Specialist attended the URISA National Conference in New Orleans in October along with 2000 other GIS professionals.

Storm Water Management The new position of Storm Water Engineering Technician created in 2007 was filled in October of 2008 with the hiring of Julie Weger. Julie had previously worked for the Illinois Department of Transportation in Paris, IL. In 2008 she updated storm water billing information for various properties that had experienced impervious area additions to their site in the past year. She also begun developing the erosion control inspection and permitting program to be implemented in 2009. JULIE The Town of Normal is member of JULIE (Joint Utility Locating Information for Excavators). JULIE, is a not-for-profit corporation that provides homeowners and professional excavators with a one call center for underground utility locating services. The Utility Permit Technician, Darryl Barron, handled approximately 6038 locating requests in 2008, routing them to the proper Town department for locating of their facilities.

9

248 of 336

Public Works Engineering

Annual Report 2008

Continuing Education Engineering Division staff has continued to attend classes and seminars offered by Northwestern University, University of Wisconsin, Illinois Department of Transportation and Brown Traffic. Staff is also kept up-to-date through membership in various professional organizations including: the American Public Works Association, Illinois G.I.S. Association, Institute of Traffic Engineers, International Municipal Sign Association and the National Society of Professional Engineers. Increasing demands for services and the ever-expanding new technologies being utilized require continuing education and training is a high priority within the Division. Also, requirements by the Illinois Department of Professional Regulation requires professional engineers to acquire 30 professional development hours every two years to renew their licenses. In 2008 the Engineering Staff attended the following training courses and conferences: Illinois and National URISA Conferences Traffic Engineering and Parking Seminar Illinois Traffic Engineering and Safety Conference Illinois Traffic and Highway Engineers Conference Brown Traffic User’s Group IDOT Training Seminars

10

249 of 336

Public Works Sewer Maintenance

Annual Report 2008

Sewer Maintenance Sewer Testing Acceptance leakage “dye” tests are completed on new sanitary sewer services. All new subdivision sanitary sewer systems were air tested to check for leaks in the sewers prior to accepting the subdivision for maintenance. Leakage "dye" Tests Performed 500

441

400

311

300

232

187

200

191 100

100 0 2003

2004

2005

2006

2007

2008

Lift Station Operations Sanitary lift stations are routinely inspected daily on weekdays. The Town operated six sanitary lift stations (Northtown Road, Ironwood, Northbridge, Wintergreen, Franklin Heights and Airport Road) and one storm water lift station (Vernon Avenue Underpass). Operation of the Wintergreen lift station was discontinued in November after the Firestone Sanitary Trunk Sewer was placed into service. A new sanitary lift station was constructed in the Trails at Sunset Lakes subdivision and will be placed into service in 2009.

Preventive Sewer Maintenance In order to minimize and prevent sewer backups, this division is responsible for a preventive maintenance program that includes a periodic television inspection and cleaning of the sanitary sewer system. An accepted frequency for complete system maintenance is once in five years or 20% annually.

Lineal Feet of Sewer

Preventive Sanitary Sewer Maintenance 92015

100000 80000

80835 68485 70175

64075 60717

60000 40000 20000 0 2003

2004

2005

2006

2007

2008

250 of 336

Public Works Sewer Maintenance

Annual Report 2008

Sewer Repair Storm & Sanitary Sewer Repairs 100

80

80 60

64

63

48

38

38

2005

2006

40 20 0 2003

2004

2007

2008

Emergency Service Emergency Service Calls 300

243

250 200 150 100

182

153

207

196

2006

2007

120

50 0 2003

2004

2005

2008

Joint Utility Location (JULIE)

Number of Requests

JULIE Utility Location Requests 9000 8000 7000 6000 5000 4000 3000 2000 1000 0

8347

8035

7850

7810 6781 6038

2003

2004

2005

2006

2007

2008

251 of 336

252 of 336