RANGITIKEI DISTRICT COUNCIL ROADING NETWORK

PRESENTATION BY REUBEN POKIHA AND PAUL MURPHY

INTRODUCTION Rangitikei District comprises 4,500 Km2 Population of 14,500 Total network = 1237 Km’s 783 Km sealed 454 Km unsealed 222 bridges (includes culverts greater than 3.4 m2) Approx 4673 culverts 80 Kms Footpaths

ROADING TEAM Shared Services with MDC

Asset Manager- Roading 3 Project Engineers:



Project Engineer – Maintenance (Engineers Rep)



Project Engineer – AWPT /Reseals/Emergency Works

• Project Engineer – Footpaths/Lighting/Trees/Public Enquiries

CONTRACT • Contract awarded to Downers • July 1 2010 – June 30 2015 • Contract price is approx $11.4m that includes AWPT and Reseals as

separable proportions • AWPT Programme approx 9 Km’s per annum • Resurfacing Programme approx 70 Km’s per annum • Footpath Programme – $85,500 (Maintenance) $80,000 (Renewals)

$60,000 (Capital)

CONTRACT • The aim District Plan to have a footpath at least down one side of the street • Streetlights approx 1890 in number

• The latest NZTA/Audit NZ audit of the network indicated that the network is in good condition • Concerns the affect Forestry Industry may have to the roads

Taihape Napier Road 2

Start

AWPT site

Finish

Taihape Napier Road 2 Local Material

30T Excavator

Greywacke (Sandstone)

Taihape Napier Road 2 Corner Visibility

Improve Sightline

Taihape Napier Road 2 Test Results

Existing Top 150mm – 200mm not suitable (Failing) Hard base

Taihape Napier Road 2 Rock Stockpile

Taihape Napier Road 2 Problems!

30T Excavator unable to move Suggestions please!!

Taihape Napier Road 2 Construction

Milling

Taihape Napier Road 2 Construction

Batter Work

Taihape Napier Road 2 Construction

Batter Work

Taihape Napier Road 2 Construction

Taihape Napier Road 2 Savings

• Local rock extraction - reduced metal import • Reduced number of truck movements • Estimated saving of $110,000

Taihape Napier Road 2 Savings

• Stabilising v Traditional construction option - $100,000

Taihape Napier Road 2 Savings

• Reduced number of truck movements across RDC network • Estimated reduction in pavement deterioration - $100,000

Taihape Napier Road 2 Savings

• Rock extraction of corners on minor improvement sites - $200,000 • Taihape Napier 1 minor Improvement local material use - $60,000

Taihape Napier Road 2 Savings

• Surplus rock crushed and utilised as maintenance metal - $100,000