Test Requirements Mill Test #3 When: Lesson #8 Percentage Weighting = 30% Notes: A. Time allotment is 2 hours. B. The 4 Holes marked “A” on the drawing have previously been drilled. These holes will be used to install ¼” diameter socket head cap screws to fasten the blank part to a fixture. C. The thickness of the part has been previously machined to ½” thickness and does not require machining. 1.
Draw the 2D part Geometry Note: if the part is not drawn correctly a mandatory failing grade will be assigned.
2.
Job Setup Material Size should be rounded up to closest 1/8” Material Type - Aluminium T6061 X0 Y0 center of 1.0175” hole Z0 bottom of part
3.
Machining Processes All Operations Completed – Note: if all operations are not completed and mandatory failing grade will be assigned. Spot Drill Holes – not holes A
Pass/Fail
10%
Pass/Fail 10%
4.
Drill ¼” Holes – not holes A *Use peck drill cycle
10%
5.
Pre Drill 1.0175 diameter hole with suitable drill
10%
6.
Machine 1.0175 diameter hole with an end mill using circle mill Note: If circle mill toolpath not used an automatic 10% will be deducted
20%
7.
Machine 2” dia. Pocket .125” depth
10%
8.
Rough and Finish Contour Use Depth Cuts and Multi Passes Use Lead In Lead Out
18%
9.
Left hand Pocket through part Use Depth Cuts Use Lead In Lead Out