DRAWING TYPE
Washington Metropolitan Area Transit Authority CONTRACTOR DRAWING/MATERIAL SUBMITTALS
CONTRACTOR:
Potomac Construction Co., Inc. 4701 Lydell Road Hyattsville, MD 20781
A-
OA - Outline Dimensions
B-
Cross Section and Parts List
CDEFGLEPRS-
Catalog Cut Performance Data Wiring Diagram Shop Details Priced Rec. Spare Parts Data Sheet Equipment Manual Print Reproducible Samples
CONTRACT NO.
SUB/CONTRACTOR
FQ9098
POTOMAC /SA
1-
Approved
2-
Approved as Corrected
3-
Disapproved
FQ9098-372
06/06/2016
RESIDENT ENGINEER
Mr. Jyotindra Shah, Program Manager NAME
INITIAL DATE
REVIEW ASSIGNMENT:
Project Description: Rehabilitation of Landover Bus Division, Northern Bus Division, Western Bus Division, Metro Supply Facility, and Landover Open Material Storage Facility
APPROVAL CODE
600 5th Street, NW#4A-12 Washington DC 20001
DATE
FIELD OFFICE DESIGNATION
*
ATTENTION: Mr. Noyes
SUMITTAL NO.
Resubmittal not Required Resubmittal Required
ITEM
CONTRACTOR NUMBER
DATE
WMATA CONTRACTOR PRINT NO.
REV.
1
201101/L03-MOD04
06/06/16
CP-FQ9098-L03-00
1
TITLE Drawings Submission for Generator to AST Tank Connection
TYPE
APPR’VL
1-e copy
COMMENTS TO CONTRACTOR:
DATE:
06/06/2016
PROJECT MANAGER:
Mukesh Patel, P.E.
Submittal 372
INDEX OF DRAWINGS:
CERTIFICATION - ISSUED FOR CONSTRUCTION SHEET NO.
AS DESIGN QC MANAGER, I HEREBY CERTIFY THAT THE DESIGN DOCUMENTS FOR THE PROJECT DESIGN TASK DESCRIBED AND PRESENTED HEREWITH MEET THE REQUIREMENTS AS STIPULATED IN
DRAWING NO.
01
L03-CS
TITLE COVER SHEET
THE CONTRACT GENERAL PROVISIONS: DESIGN CHECKS HAVE BEEN COMPLETED; WORK CONFORMS TO THE
LANDOVER BUS DIVISION
CONTRACT REQUIREMENTS; DESIGN QC ACTIVITIES ARE IN COMPLIANCE WITH THE POLICIES AND PROCEDURES SET FORTH IN THE DESIGN QC PLAN.
CIVIL 02
3433 PENNSY DRIVE HYATTSVILLE, MD 20785
AUDIT BY:
JAVAHAR DESAI, PE, DESIGN QC MANAGER
L03-C1
SITE PLAN
ARCHITECTURAL
DATE
03
L03-A1
DEMOLITION PLAN
04
L03-A2
GENERATOR PAD PLAN AND SECTIONS
SHELADIA ISSUED BY:
ELECTRICAL
TASK L03 EMERGENCY DIESEL GENERATOR REPLACEMENT REVISED APRIL 18, 2016 WITH COMMENT RESPONSES JUNE 1, 2016
AS DESIGN MANAGER, I CERTIFY THAT THE DESIGN DOCUMENTS FOR THE PROJECT DESIGN TASK DESCRIBED AND PRESENTED HEREWITH MEET THE REQUIREMENTS AS STIPULATED IN THE CONTRACT GENERAL PROVISIONS; ACCURACY; ADEQUACY; CONFORMANCE TO STANDARDS OF PRACTICE; COMPLIANCE WITH CODES AND STANDARDS; COST EFFECTIVENESS, QUALITY; AND FITNESS OF FUNCTION AS SPECIFIED IN THE CONTRACT, AND WITH MY SIGNATURE ISSUE THESE DOCUMENTS TO WMATA FOR CONSTRUCTION.
05
L03-E1
GENERAL NOTES AND ABBREVIATIONS
06
L03-E2
GENERATOR PLAN - DEMOLITION
07
L03-E3
GENERATOR PLAN - NEW WORK
08
L03-E4
DETAILS
09
L03-E5
SITE PLAN
10
L03-E6
SCHEDULES AND SINGLE LINE
STRUCTURAL 11
L03-S1
CONCRETE PAD DETAILS
MECHANICAL 3A MUGDHA PIMPRIKAR, DESIGN MANAGER
L03-M1
FUEL OIL PIPING
DATE
SHELADIA ASSOCIATES
AS RESPONSIBLE ELECTRICAL ENGINEER, I HEREBY CERTIFY THAT THE DESIGN DRAWINGS AND SPECIFICATIONS FOR THE PROJECT DESIGN TASK# L03 CONFORM TO THE OVERALL DESIGN CONTRACT REQUIREMENTS. PROFESSIONAL CERTIFICATION. I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED ELECTRICAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND.
INDEX OF SPECIFICATIONS: SECTION NO.
05/02/2016 DESIGN TASK #: L03 RESPONSIBLE ELECTRICAL ENGINEER: GEOFF COPE DATE
LICENSE NO.:
EXPIRATION DATE:
30041
TITLE
260119
UNDERGROUND DUCTS AND UTILITY STRUCTURES
263213
ENGINE GENERATORS
.
04/08/2018
.
CUT SHEETS (REFERENCED):
LANDOVER BUS DIVISION
6/6/2016 10:24 AM
Dennis Castaneda
LANDOVER 600KW GENERATOR SUBMITTAL (87 PAGES)
CONTRACT NO.
REFERENCE DRAWINGS DESIGNED
TM
3/16/16
DRAWN
SC
3/16/16
DATE
11011 LBD-L3-CS.DWG
DATE CHECKED
SH
3/16/16
NUMBER
DESCRIPTION
REVISIONS DATE
NO
DESCRIPTION
8/16/11 4/18/16 6/01/16
0 1 2
ISSUED FOR CONSTRUCTION ADDED M1, REVISED CS & E3 & E6 COMMENT RESPONSES
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY SHELADIA
DATE APPROVED
SH
3/16/16 DATE
Potomac Construction Co., Inc.
SUBMITTED DATE
ASSOCIATES, INC.
Engineers Development Consultants Architects
FQ9098 MAJOR INFRASTRUCTURE REHABILITATION OF LANDOVER BUS DIVISION
EMERGENCY DIESEL GENERATOR REPLACEMENT COVER SHEET SCALE N/A
DRAWING NO.
L03-CS
1 OF 11
Dennis Castaneda 6/6/2016 10:24 AM
CONTRACT NO.
REFERENCE DRAWINGS DESIGNED
TM
3/16/16
DRAWN
SC
3/16/16
DATE
11011 LBD-L3-E3.DWG
DATE CHECKED
SH
NUMBER
DESCRIPTION
REVISIONS DATE
NO
DESCRIPTION
8/16/11 4/18/16
0 1
ISSUED FOR CONSTRUCTION ADJUSTED FOR FIELD CONDITIONS
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
3/16/16
SHELADIA
DATE APPROVED
SH
3/16/16 DATE
Potomac Construction Co., Inc.
SUBMITTED DATE
ASSOCIATES, INC.
Engineers Development Consultants Architects
FQ9098 MAJOR INFRASTRUCTURE REHABILITATION OF LANDOVER BUS DIVISION EMERGENCY DIESEL GENERATOR REPLACEMENT GENERATOR PLAN - NEW WORK SCALE :1/4"=1'-0"
DRAWING NO.
L03-E3
7 OF 11
Dennis Castaneda 6/6/2016 10:24 AM
CONTRACT NO.
REFERENCE DRAWINGS DESIGNED
TM
3/16/16
DRAWN
SC
3/16/16
DATE
11011 LBD-L3-M1.DWG
DATE CHECKED
SH
3/16/16
NUMBER
DESCRIPTION
REVISIONS DATE
NO
DESCRIPTION
8/16/11 4/18/16 6/01/16
0 1 2
ISSUED FOR CONSTRUCTION ADJUSTED FOR FIELD CONDITIONS COMMENT RESPONSES
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY SHELADIA
DATE APPROVED
SH
3/16/16 DATE
Potomac Construction Co., Inc.
SUBMITTED DATE
ASSOCIATES, INC.
Engineers Development Consultants Architects
FQ9098 MAJOR INFRASTRUCTURE REHABILITATION OF LANDOVER BUS DIVISION EMERGENCY DIESEL GENERATOR REPLACEMENT FUEL OIL PIPING SCALE :1/4"=1'-0"
DRAWING NO.
L03-M1
3A OF 11