weekly operating notice saturday 25 september friday 1 october 1982

Report 0 Downloads 57 Views
B. R.31262/1

PRIVATE AND NOT FOR PUBLICATION

British Rail N S

E A S T E R N

REGION

3

9

WEEKLYOPERATINGNOTICE CONTAINING

TEMPORARY SPEED RESTRICTIONS TEMPORARY ENGINEERING W O R K S SIGNALLING A N D PERMANENT W A Y ALTERATIONS GENERAL INSTRUCTIONS A N D NOTICES

SATURDAY 25 SEPTEMBER TO

FRIDAY1OCTOBER 1982 INCLUSIVE

Trainmen must pay part ic ular attention t o works contained i n t his notice and keep a good look-out f or handsignals whic h may be ex hibit ed i n accordance wit h t he Rules and Regulations. Work at plac es ot her than those mentioned may be in progress and Drivers must be on the look-out and be prepared to stop or run at reduced speed when, and where, handsignals may be exhibited.

NS-2 SECTION A

TEMPORARYSPEEDRESTRICTIONS (Until further notice unless otherwise specified) Warning Boards and Indicators provided unless otherwise shown. t Indicates that the Warning Boards and Indicators will be moved as the work progresses. Where two speeds are shown for a restriction e.g. 20, the Rule Book, Section T, clause 21.2 applies.

Location

a

f f e

c

Lines t e d

.

Mileage or between Re s tr i c ti o n C h . M . C h . m . p . h . Remarks

5

4 n

0 4 1 5 4 10 2 t i

0

5

4

04 1 5 4 10 o

0 Tra c k wo rk , m 06 00 Sunday 26 until 14 00 Wednesday 29 September.

a M

t

DONCASTER BLACK CARR M. TO SKELTON BRIDGE 1 P o tte ric Carr Jn. D o w n and Decoy North sin. F a s t

1

2 Po tte ric Carr sin. and Do wn Decoy North sin. F a s t

1

U

F

r

6

l

Tra c k wo rk . 06 00 Sunday 26 September.

Warning Board situated at 159m. 35ch. on the Down applies only to trains proceeding towards Askern.

SHAFTHOLME Al. TO FERRYBRIDGE NORTH M . 3 Shaltholme and Norton sin. L.C. D o w n 4 NoShaftholme rt o n LC and Jn.



— U

6

p

6

8

40 6 7 58

3

0

T ra c k w o rk . (82/25)

7

23 6 7 66

2

0

Tra c k wo rk . (82/35)

Warning Board located at towards Signal No.K386 (on the Down line) applies only to trains proceeding onto the Up Wakefield/Goole line Pontefract.

YORKTO SCARBOROUGH 5 Falsgrave and Seamer East

Up

4

1

55 4 1 30

1

0

Tra c k wo rk . (82/37) Until 15 00 Tuesday 28 September.

NS-3 SECTION A —TEMPORARY SPEEDRESTRICTIONS — continued Location

Mileage at or between M. C h . M. C h .

Lines affected

Restriction m.p.h. Remarks

DONCASTERMARSHGATE JN. TO LEEDS WEST M. 6

Adwick Jn. and South Elmsall Station

7

Down

Up

162 10

162 50

60

Subsidence. (82/8)

South Kirkby „in. •

Up

166 00

165 70

20

Trackwork. (82/38) Until 15 00 Tuesday 28 September.

8

South Kirkby Jr).

Up

166 00

165 70

60

Trackwork. From 15 00 Tuesday 28 September.

9

South Kirkby Jr). and Fitzwilliam Station

Down Main

166 00

166 60

30

Trackwork. (82/33) Until 15 00 Tuesday 28 September.

10

South Kirkby Jr). and Fitzwilliam Station

Down Main

166 00

166 60

60

Trackwork. From 1500 Tuesday 28 September.

11

South Kirkby Jr). and Fitzwilliam Station

Down Main

166 60

167 10

30

Trackwork. From 23 00 Saturday 25 September.

164 53

164 44

20

Bridgework.

STAINFORTH M. TO SKELLOW ADWICK JN.' 12

Bramwith Stn.LC and Thorpe Road LC

Down

U p

DIGGLE JN. LMR TO HEALEY MILLS HEA TON LODGE JN. 13

Diggle Jn. and Standedge Tunnel

Down Main Goods Loop

Up Main

14 45

15 09

20

Trackwork. (LM)

14

Marsden

Down Main

Up Main

18 60

18 68

20

Trackwork. (82/33)

15

Springwood Jr). and Marsden

Up

20 70

20 37

20

Trackwork. Until 15 00 Tuesday 28 September.

16

Springwood Jn. and Marsden

Up

22 17

20 70

40

Trackwork. (82/36)



NS-4 SECTION A —TEMPORARY SPEEDRESTRICTIONS — continued Lines Location a f f e c t e d THORNHILL LNW JN. TO LEEDS HOLBECK EAST M. 17 Dewsbury Station and Batley

Down

U p

Mileage at or between R e s t r i c t i o n M. C h . M. C h . m . p . h . Remarks 33 73 3 4 03

20 C o n d i t i o n of viaduct (Dewsbury).

45 00 4 5 50

20 T r a c k w o r k . (82/23)

HORBURY STATION JN. TO CRIGGLESTONE 18 Ho rb u ry Station Jn. S i n g l e and Crigglestone Jn.

•BARNSLEY STATION JN. TO HORBURY JN. 19 B a rn sle y Station Jn. D o w n and Darton Station

51 7 5 5 1 2 0

2

0

E a rt h wo rk . (82/38) From 23 30 Saturday 25 September.

20 Barnsley Station Jo. 1 Down and Woolley Coal Siding

Up

49 37 4 8 51

21 Wo o lle y Coal Siding D o w n and Woolley Tunnels

Up

48 00 4 7 41

2

0

S u b sid e n ce . (82/21)

Up

45 70

2

0

Tra c k wo rk . (82/19)

22

Woolley Tunnels D o w n and Horbury Jn.

1

50

20 Tra ckvvo rk. I (82/37)

ALDWARKE NORTH JN. (MID) TO LEEDS NORTH 23 Swinton dn. and A ldwarke Jn.

Up Pontefract

164 60 1 6 4 58

20 T ra c k wo rk . Until 15 00 Wednesday 28 September.

24 Swin to n Jn. and Aldwarke Jn.

Up Pontefract

164 60 1 6 4 58

40 T r a c k w o r k . From 15 00 Tuesday 28 until 15 00 Thursday 30 September.

25

Svvinton dn. and D o w n Cudworth Station Jn. Ma in

Up Main

171 41 1 7 2 21

26

60 S u b sid e n ce . (80/28)

Swinton Jn. and D o w n Cudworth Stn. Jn. M a i n

Up Main

173 2 0 1 7 4 0 0

30 S u b sid e n ce . (78/4)

27

Royston Jn. and Cudworth North Jn.

Up Main

177 22 1 7 7 15

28

40 C o n d i t i o n of track. (82/36)

Oakenshavv and Goose Hill Jn.

Up

183 5 5 1 8 4 00

40 S u b sid e n ce . (82/29)

Down

NS-5 SECTION A —TEMPORARY SPEED RESTRICTIONS — continued Mileage at or between R e s t r i c t i o n M. C h . M. C h . m . p . h . Remarks

Lines affected

Location

NORMANTON ALTOFTS JN. TO YORK CHALONERS WHIN JN. 29 Copmanthorpe and Bolton Percy



30 Copmanthorpe and Bolton Percy

31 B o lt o n Percy and Copmanthorpe

Up Norman ton

5 20

5

72

4

0

Tra c k wo rk . (82/35) Until 06 00 Sunday 26 September.

Up Norma nton

5 20

6

08

2

0

Tra c k wo rk . (82/39) From 06 00 Sunday 26 September.

6 12

5

65

2

0

Tra c k wo rk . (82/39) From 10 00 Thursday 30 September.

Down Norma nton

CASTLEFORDWEST JN. TO PONTEFRACT WEST JN. 32

Cutsyke Jn. and Prince of Wales

Down

U p

58 16

20

Condition of track. (82/12)

540

460

5

Subsidence. (81/50)

53 26

53 15

20

Condition of track. (8 1 /6 )

53 6 2

53 72

20

Condition of track.

53 7 0

53 61

15

Trackwork. (82/26)

55 50

56 30

20

Condition of track. (81/49)

58 2 0

CASTLEFORD EAST JN. TO ALLERTON MAIN BOWERS OPENCAST 33

Castleford East Jn. and Ledston Station

Single

WAKEFIELDKIRKGATE WEST TO GOOLE POTTERS GRANGE 34

Featherstone LC and Red Lane LC

Up

35

Red Lane LC and Featherstone LC

36

Featherstone LC and Red Lane LC

37

Featherstone LC and Pontefract West Knottingley West Jn. ,and Pontefract Goods Jo.

Up

58 1 5

57 60

20

38

Trackwork. (82/23)

39

Gowdal I Lane LC and Hensall

Up

66 42

66 3 7

20

Trackwork. Until 15 00 Wednesday 29 September.

Down Main

Up Down

NS-6 SECTION A —TEMPORARY SPEEDRESTRICTIONS — continued Location

Lines affected

a M

Mileage or between R e s tr i c ti o n C h . M. C h . m . p . h . Remarks

t .

ALDWARKE NORTH JN. (MID) TO BURTON SALMON 40 Swinton Jn. U p 1 6 and Aldwarke Jn. P o n t e f r a c t

4 (

41 Swin to n Jo. and — U p 1 6 Aldwarke Jn. P o n t e f r a c t

4

42 Hickle to n and — Bolton-on-Deame Station

U

p

1

(

8

5 2

60 1 6 4 58 8 2

F

2 /

0

60 1 6 4 58 4 r o

0

10 1 5 58 / 3

0

Tra c k wo rk . 7 ) Until 15 00 Tuesday 28 September.

3

3

Tra c k wo rk . m 15 00 Tuesday 28 until 15 00 Thursday 30 September. Tra c k wo rk . )

8

Warning Board at 11m. 47ch. (on the Down line) applies only to trains towards South Kirkby sin. 43 Moorthorpe Station D o w n h . and Pontefract ( BaghiI I Station F

9

52

8

2 r

44 Moorthorpe Station Jn. Down and Pontefract Baghi II Station 45 Pontefract Baghi I I Station and Moorthorpe Station Jo. 46 Moorthorpe Station D o w n Jn. and Pontefract ( Baghi I I Station

Up

U p

5 8

47 Ferrybridge Power I n g o i n g Station L i n e

U

2 0

n

9 / o

13 3

3

0

Tra c k wo rk . ) 06 00 Sunday 26 September.

9 m

7 54 I r a

7 05 2 0 c k w o r k .

-

7 45

8

05

3

0

Tra c k wo rk . (82/37)

4

49 3

2

0

06 / 19

t

0

45

i

1

0

(82/29)

1

S u b sid e n ce , )

l

Tra c k wo rk . 15 00 Wednesday 29 September.

MOORTHORPE STATION M . TO SOUTH KIRKBY M . 48 Moorthorpe Station D o w n Jn. and South Kirkby Jn.

U p

0 56

0

01

20 T r a c k w o r k . (82/31)

NS-7 SECTION A —TEMPORARY SPEED RESTRICTIONS — continued Lines Location affected LEEDS TO SKIPTON STATION SOUTH LMR 49 Th a ckle y Tunnel and Thackley

Down

a M

2

t

Mileage or between Re s tr i c ti o n C h . M. C h . m . p . h . Remarks

4

35 2 0 4 66

.

0

2

0

Tra c k wo rk . (82/37)

Warning Boards at 205m. 36ch. (on the Down Main and Down Loop lines) apply only to trains towards Skipton. From 03 30 Sunday 26 September. 50 L e e d s Jn. and D o w n U p 2 Shipley Bingley Jn. ( 8

0

5 2

63 2 0 5 77 / 3

1

5 9

Tra c k wo rk . ) From 03 30 Sunday 26 September.

Warning Board at 206m. 57ch. (on the Up line) applies only to trains towards Leeds Jn. (both routes). From 03 30 Sunday 26 September.

APPERLEY M. TO ILKLEY STATION 51 A p p e rle y Lane Tunnel and Springs Tunnel

Down

203 45 2 0 3 59

20 T r a c k w o r k . (82/21)

GUISELEY JN. TO ESHOLT Warning Board26 atSeptember. 3m. 18ch. (on the Up line) applies only to trains towards Skipton. Applicable from 03 30 Sunday

LEEDS TO HULL PARAGON 52 Gascoigne Wood D o w n Main

Up Main

6 33

6, 15

20

Trackwork. (82/24)

5 35

5 27

20

Bridgework.

11 18

10 60

50

Condition of track. (82/25)

THORNE M. TO GILBERDYKE 53 G o o le LC and D o w n Goole Bridge

HULL PARAGON STATION TO SEAMERWEST 54 A rra m Station LC and Beverley North LC

Up

NS7 8

SECTION B

TEMPORARY ENGINEERING WORKS

At or between

L i n e s

affected

Remarks

DONCASTER BLACK CARR Al. TO SKELTON BRIDGE UNTIL FURTHER NOTICE 55 B la c k Carr in. and A l l Decoy North in .

Continuously. Earthwork and bridgework (BR. No.323E) 153m. 78ch. and 154m. 05ch. Crane and mechanical equipment in use. ( 8 1 / 3 2 )

56 Doncaste r North in. and Marshgate in.

All

08 00 to 17 00. Earthworks 156m. 18ch. and 156m. 23ch. ( 8 2 / 9 )

57 Shaftholme in. and Selby Canal in .

Down and Up Between Trains

07 00 to 20 00. Earthwork, 169 and 169Y2m.p. Cranes and mechanical equipment in use. (80/24)

58 Y o rk Station

All Between Trains

Repairing station roof 188m. 06ch. and 188m. l i c i t Scaffolding in use,

59 Y o rk and Skelton

All Between Trains

07 00 to 17 00. Bridgework lm. 05ch. Mechanical equipment in use. ( 8 2 / 3 3 )

Down Fast BLOCKED

06 00 to 16 00. Track renewal and maintenance 154m. 04ch. and 154m. lOch. Mechanical equipment in use. Trains to travel via Slow line.

61 Doncaster North and Doncaster South Yorks in .

Platform 1 Old Yard and Carriage Sdgs. BLOCKED

00 01 to 12 00. Offloading materials, track renewal and maintenance 156m. 04ch. and 155m. 70ch. Crane in use. Trains to be replatformed.

62 Doncaster North and Doncaster South Yorks in.

Down and Up Fast and Platforms 3 and 4 BLOCKED

00 01 to 10 00. Earthwork at 156m. 14ch. Possession to be given up for passage of trains.

63 Y o rk and Skelton

Down and Up Main BLOCKED

04 00 to 11 00. In connection with bridgework between York Yard North and Skelton. Cranes and mechanical equipment in use. Possession to be given up for passage of trains.

Main and Platform 8 BLOCKED Up Main and Platform 8 Between Trains

04 00 to 08 00

Down and Up Clifton Goods/ Up Clifton Loop

07 30 to 17 00. Signalling work. (See Section 'C').

SUNDAY 26 SEPTEMBER 60

Loversall in . and Decoy North in .

64 Y o rk Station

U

p

T r a c k maintenance, 0 m.o. and Om. lOch.

08 00 to 12 00

WEDNESDAY 29 SEPTEMBER 65 Clif t o n

NS-9 SECTION B —TEMPORARY ENGINEERING WORKS— continued Lines affected R e m a r k s At or between SHAFTHOLME JN. TO FERRYBRIDGE NORTH JN. UNTIL FURTHER NOTICE 08 00 to 16 00. Earthwork 6 8 Cranes and mechanical equipment in use. 1 (82/33) / 2 m. p . a n d 6 6 m . 6 3 c h .

66 Shaftholme Jn. D o w n and Up and Norton LC B e t w e e n Trains SUNDAY 26 SEPTEMBER 67 Shaftholme Jn. and D o w n and Up Norton LC B L O C K E D

13 00 to 20 00. Track maintenance 6 8 Mechanical equipment in use. 3 /4 a n d 6 7 ' A r n . p

YORKHOLGATE JN. TO SKELTON UNTIL FURTHER NOTICE 68 H o !gate Jn. and D o w n Goods 0 7 30 to 16 30. Track renewal Orn.p. and Om. 25ch, York Yard South B e t w e e n Trains M e c h a n i c a l equipment in use, ( 8 2 / 6 ) SUNDAY/MONDAY 26/27 SEPTEMBER 69 Y o r k Yard North and A l l Skelton B L O C K E D

0

4

00 Sun to 04 00 Mon. Bridgework lm. 05ch. Cranes and mechanical equipment in use.

YORKYARD SOUTH TO YORK CLIFTON WEDNESDAY 29 SEPTEMBER 70 C l i f t o n

D

o

w

n and Up Clifton Goods/ Up Clifton Loop

07 30 to 17 00. Signalling work. (See Section 'C').

Up Main and Platform 8 BLOCKED Up Main and Platform 8 Between Trains

04 00 to 08 00

YORKTO SCARBOROUGH SUNDAY 26 SEPTEMBER 71 Y o rk Station

T r a c k maintenance, Orn.p. and Om. lOch.

08 00 to 12 00

MONDAY/TUESDAY 27/28 SEPTEMBER 72 Ma lto n and D o w n and Up Ri II ington B L O C K E D

23 00 to 06 30. Earthwork, 21m. 12ch. and 25m. 42ch. Crane and mechanical equipment in use.

NS-10 SECTION B - TEMPORARY ENGINEERING WORKS,- continued At or between L i n e s affected Remarks YORKSKELTON TO HARROGATE UNTIL FURTHER NOTICE 73 Starbeck and Harrogate

Down Between Trains

08 00 to 16 00. Track maintenance 19m. 51ch. and 19m. 72ch. Crane and mechanical equipment in use. ( 8 2 / 9 )

SATURDAY 26 SEPTEMBER 74 Starbeck

D

o

w

n

and Up

07 00 to 17 00. Signalling work.

MONDAY 27 to WEDNESDAY 29 SEPTEMBER is Knaresborough D o w n and Up Station LC and B L O C K E D Starbeck LC

DONCASTER MARSHGATE JN. TO LEDS WEST M. UNTIL FURTHER NOTICE 76

D Elmsall o w South Station

n Between Trains

22 15 Mon and Tue to 05 30 Tue and Wed. Track maintenance, 1 6 equipment in use. 1 /1 a n d 1 8 1 / 4 m . p . M e c h a08 00 n toi 18c 00. Demolition work 164m. 48ch. a l

77 H a r e Park Jn. and Wakefield Westgate South Jn.

Down and Up Between Trains

07 30 to 18 00. Erecting and dismantling scaffolding and safety nets for renewal of overhead Dower lines 173m. 43ch. ( 8 2 / 3 3 ) Until 18 00 Saturday 25 September,

78 Ha r e Park Jo. and Wakefield Westgate South Jo.

Down Between Trains

07 30 to 1630. Earthwork, 174m. 30ch. and 174m. 38ch. Crane in use. ( 8 2 / 3 7 )

79 Wakefield Westgate Station

All Between Trains

07 30 to 17 00. Bridgework (BR. No.5) 175m. 63ch. Restricted clearance. ( 8 2 / 1 1 )

80 Ge lde rd Road Jn.

All Between Trains

08 00 to 18 00. Earthwork, 184m. 22ch. Crane in use. ( 8 2 / 1 2 ) Until 18 00 Saturday 25 September.

8 All 1 LSATURDAY/SUNDAY 25/26 SEPTEMBER e South Kirkby Jn. 82 Down and Up Main and Hare Park Jn, BLOCKED e d s W Ha r e Park Jn. 83 Down and Up and Wakefield BLOCKED e Westgate South Jn. s tSUNDAY 26 SEPTEMBER J 84 n Carcroft Jn. Down and Up and South BLOCKED . Kirkby sin. 85 Marshgate Jn. and Castle Hills Jn.

Down and Up BLOCKED

06 00 to 18 00. Signalling work.

23 00 to 14 45. Track renewal and reballasting 165m. 75ch. and 167m. lOch. Cranes and mechanical equipment in use. Trains diverted via Askern. 23 15 to 08 45. Earthwork 174m. 32ch. and 174m. 56ch. Mechanical equipment in use. Trains diverted via Askerno

06 00 to 14 45. Earthwork 160m. 12ch• and 160m. 70ch. Mechanical equipment in use. Trains diverted via Askerno 00 01 to 14 00. Track maintenance, 156m. 60ch. and 158m.p. Crane and mechanical equipment in in use. Trains diverted.

NS-11 SECTION B —TEMPORARY ENGINEERING WORKS— continued At or between

Lines affected R e m a r k s

DONCASTER MARSHGATE JN. TO LEEDS WEST WV. continued MONDAY/TUESDAY 27/28 and TUESDAY 28 SEPTEMBER 86 A d w i c k „In. and D o w n South Kirkby Jn. B L O C K E D Down and Up Between Trains Up BLOCKED MONDAY 27 SEPTEMBER to FRIDAY 1 OCTOBER 87 S o u th Kirkby Jri. A l l

23 00 Mon to 02 00

Track maintenance, 160m. 70ch. and 02 00 to 03 15 Tue 164%rn.p. Mechanical equipment in use. 03 15 to C6 15 Tue 23 00 Mon to 02 00. Down trains diverted via Askern. 03 15 to 06 15 Tue. Up trains diverted via Askern. 08 00 to 17 00 daily. Signalling work.

TUESDAY/WEDNESDAY 28/29 SEPTEMBER 88

Adwick Jn. and D o w n South Kirkby Jn. B L O C K E D

23 00 to 00 30. Track maintenance, 164% and 165 trains diverted via Askern• 3 A m. TUESDAY/WEDNESDAY 28/29 and WEDNESDAY 29 SEPTEMBER p. 89 South Kirkby Jn. Down Main 23 ) Track renewal and M 00 Tue to 02 00 and Hare Park ..1n. BLOCKED ) track maintenance e c Up Main 23 00 Tue to 03 00 ) 166m. lOch. and 171m. h Between Trains ) 70ch. Mechanical Up Ma in a 00 to 06 15 Wed ) equipment in use. 03 BLOCKED n i ) 23 00 Tue to 02 00. Down trains 'diverted via Askern. 03 00 to 06 15 c a Wed. Up trains diverted via Askern. l WEDNESDAY/THURSDAY 29/30 and THURSDAY 30 SEPTEMBER e q 90 H a re Park sin. and Down Track maintenance u23 00 Wed to 00 30 Wakefield Westgate BLOCKED 172m.p. and 174m. South Jn. i03 45 to 06 30 Thu Up 70ch. Mechanical BLOCKED p equipment in use. THURSDAY 30 SEPTEMBER m 91 Wakefield Westgate D o w n e 00 30 to 02 15 Track maintenance n Station and Gelderd BLOCKED 179m. lOch. and Road Jn. U p t 25 to 03 30 02 181m.p. Mechanical BLOCKED i equipment in use. n THURSDAY/FRIDAY 30 SEPTEMBER/1 OCTOBER u 92 Wakefield Westgate Up s22 30 to 04 45 T r a c k maintenance Station and BLOCKED e 180% and 184m.p. Gelderd Road Jn. Down 23 20 to 02 15 M e c h a n i c a l equipment . BLOCKED in use. Possession to D be given up for passage of 1D57, 01 00 Leeds to o Doncaster and 0)22, 02 05 Leeds to Doncaster over w Up line. FRIDAY 1 OCTOBER n 93 Bentley LC and Up 03 20 to 07 00. Track renewal 158m. 05ch. and Castle Hills BLOCKED 158m. 35ch. Mechanical equipment in use. South Jn. Down Possession to be given up for passage of M.G.R. Between Trains and local trip trains. Other Up trains diverted via Askern.

NS-12 SECTION B —TEMPORARY ENGINEERING WORKS— continued At or between

Lines affected

Remarks

STAINFORTH JN. TO SKELLOW AMICK M. UNTIL FURTHER NOTICE 94 Stainforth Rd. and D o w n and Up Thorpe Road LC

Continuously. Bridgework (BR.7 and 8), 164m. 53ch. and 164m. 44ch. ( 8 2 / 2 9 )

LEEDS GELDERD ROAD M. TO LEEDS HOLBECKWEST M. UNTIL FURTHER NOTICE 95 Gelderd Road Jn.

All Between Trains

08 00 to 18 00. Earthworks 184m. 22ch. Crane in use. ( 8 2 / 1 2 ) Until 18 00 Saturday 25 September.

EASTWOOD LMR TO NORMANTON GOOSE HILL UNTIL FURTHER NOTICE 96 Hebden Bridge D o w n and Up 97

Elland and Bradley Wood Jn.

07 00 to 17 00. Signalling work.

All Between Trains

08 00 to 18 00. Erecting and dismantling scaffolding and safety nets for overhead power line maintenance 32m. 43ch. ( 8 2 / 3 2 ) Until 18 00 Saturday 25 September.

98 Mirfi e ld Station D o w n and Up Slow Between Trains

07 30 to 17 00. Platform work, 38m. , Mechanical 3 2 c h . 1 equipment in use. See Section '0 '.

99 Wakefield Kirkgate P l a t f o rms 1, 2 and 3 Station B e t w e e n Trains

07 30 to 17 00. Platform work, 47m. 55ch. and 47m. 70ch. Mechanical equipment in use. (See Section 'D').

SATURDAY/SUNDAY 25/26 SEPTEMBER 100 Wakefield Kirkgate West sin. and Turners Lane „in.

Platform 1/ Down Main and Up Main/Platform 2 BLOCKED

Wakefield Kirkgate

23 30 to 09 30. Drainage, 47m. 63ch. and 48 m.p. Cranes in use. Possession to be given up for passage of trains.

Through Line BLOCKED

SUNDAY 26 SEPTEMBER 101 102

Eastwood and Hebden Bridge

Down BLOCKED

Hebden Bridge and Milner Royd Jn.

Down BLOCKED

103 Hebden Bridge and Sowerby Bridge West

00 01 to 08 30. Track maintenance, 22 23m. 3 50ch. Mechanical equipment in use. /4 o 30. . Track a nmaintenance, d 00 05mto. 08 23m. 50ch.

Down and Up Between Trains

SUNDAY 26 SEPTEMBER to FRIDAY 1 OCTOBER 104 Ho rb u ry Jn.

A

l

l

0

7

and 2 9 1 07 00 to 17 00. Track maintenance, 2 7 /4 27 1 m . 1 /4 a n d o . /2 e to 17 00 daily. Signalling work. rM 00 c h n .a n pi c .a l

NS-13 SECTION B —TEMPORARY ENGINEERING WORK— continued At or between

L i n e s

affected

Remarks

SOVVERBYBRIDGE MILNER ROYD M. TO BRADFORD MILL LANE UNTIL FURTHER NOTICE 105 M i l l Lane JiL

A

l l

07 30 to 1700. Signalling work. ( 8 2 / 1 9 )

SUNDAY 26 SEPTEMBER 106

Milner Royd sin. and D o w n and Up Dryclough Jn. B L O C K E D

00 30 to 10 00. Bridgework (No.2), 29m. 70ch. and 30m. 15ch. Crane in use.

SUNDAY 26 to THURSDAY 30 SEPTEMBER 107 Ha lif a x and Down and Up Mill Lane Jri. B L O C K E D

23 45 Sun to Wed to 05 45 Mon to Thu. Bridgework (Nos.21 and 30) 32m. 32ch. and 35m. 24ch. Crane in use. Possession to be given up for passage of 1E27, 02 22 Manchester Victoria to Bradford Exchange and 5L28, 03 50 Halifax to Leeds over Down line.

DIGGLE JN. LMR TO HEALEY MILLS HEATON LODGE M. UNTIL FURTHER NOTICE 108 Marsden and Gledholt Jn.

Down and Up Between Trains

07 30 to 17 00. Bridgework (Nos.62, 65 and 79)an. construction work, 21m. 18ch. and 24m. 15ch. Crane and mechanical equipment in use. (81/48)

109 Gledholt Jn. and Huddersfield

Down Fast and Down Slow Between Trains

07 30 to 17 00. Bridgework (No.85), 25m 03ch. Crane and mechanical equipment in use.

Springwood Jn. and U p Main Marsden B e t w e e n Trains SATURDAY/SUNDAY 25/26 SEPTEMBER 110

Diggle Jn. and Marsden

Down Main Between Trains Up Main BLOCKED Down Main BLOCKED Up Goods Loop BLOCKED

00 15 to 02 00 Sun

) Tunnelwork (Standedge ) Tunnel), 15m. 11 ch. ) and 18m. 14ch. and 00 15 to 16 15 Sun ) i n connection with 02 00 to 16 15 Sun ) engineering work ) between Marsden and 22 00 Sat to 20 00 Sun ) Gledholt Jn. ) Mechanical equipment in use. 00 15 to 02 00 Sun. Up trains diverted via Hebden Bridge. 02 00 to 16 15 Sun. Trains diverted via Hebden Bridge.

Down and Up and Down Goods Loop BLOCKED

02 00 to 20 00. Bridgework (No.39/B) and track renewal, 1 4 Hebden Bridge. 1 /2 a n d 1 5 1 / 4 m . o .

SUNDAY 26 SEPTEMBER 111 Stalybridge and Marsden

NS-14 SECTION B —TEMPORARY ENGINEERING WORKS— continued At or between Lines affected R e m a r k s DIGGLE AL LMR TO HEALEY MILLS HEATON LODGE M. — continued SUNDAY 26 SEPTEMBER— continued 112 Marsden and D o w n 0 Gledholt Jn. B e t w e e n Trains Down 0 BLOCKED 1 Springwood Jn. and U /p2 m . p . 0 Marsden B L O C K E D

0

SUNDAY 26 SEPTEMBER to FRIDAY 1 OCTOBER 113 Marsden 114 Huddersfield

A

l A

05 to 02 00 T r a c k renewal, d g e w o r k (No.62 and 2 00 to 20 00 6 5 ) and slip treatment, 1 8 m . 65ch. and 2 3 Cranes and mechanical 0 05 to 20 00 e q u i p m e n t in use. 0 0 05 to 02 00. Up trains diverted via Hebden Bridge. 02 00 to 20 00. Trains diverted via Hebden Bridge. b

r

i

l l

07 00 to 17 00 daily. Signalling work. l

07 00 to 17 00 daily. Signalling work.

MONDAY 27 SEPTEMBER to FRIDAY 1 OCTOBER 115 Gle d h o lt Jn. and D o w n Slow 0 Huddersfield B L O C K E D C r

8 a

n

WEDNESDAY 29 SEPTEMBER 116 Springwood Jn. U p and Marsden B L O C K E D

0

1 2

1

00 to 16 00 daily. Drainage 25 and 25tArn.p. e and mechanical equipment in use. Down trains to travel over Down Fast line. 30 to 05 30. Track renewal 22m. 30ch. and . 70ch. Mechanical equipment in use. Up trains diverted via Hebden Bridge.

m

THORNHILL L.N.W. ,IN. TO LEEDS HOLBECK EAST ..IN. SATURDAY/SUNDAY 25/26 and SUNDAY 26 SEPTEMBER 117 B a tle y and D o w n 2 Morley B e t w e e n Trains Up 2 BLOCKED e Down 0 BLOCKED

3 3 q 3

a u

35 Sat to 03 45 D r a i n a g e 36m. 18ch. n d 38m. 16ch. Crane 35 Sat to 07 30 a n d mechanical i p m e n t in use. 45 to 08 00 Sun

BARNSLEY STATION JN. TO HORBURY JN. UNTIL FURTHER NOTICE 118 B a rn sle y Station sin. D o w n and Up 2 3 30 to 06 00. Track maintenance, 481/4 and and Horbury Jn. B L O C K E D 4 7 1 SATURDAY/SUNDAY 25/26 SEPTEMBER / 4 r n . p . 2 Do w / n 1 2 119 Wo( o lle y 8Coal Siding 3 30 to 08 30 Tunnelwork (Woolley New Tunnel), and „In. BLOCKED 4 7 m . 33ch. and 46m. 34ch. 8 Crigglestone )

NS-15 SECTION B —TEMPORARY ENGINEERING WORKS— continued At or between L i n e s affected R e m a r k s BARNSLEY STATION JN. TO HORBURY JN. — continued SATURDAY/SUNDAY 25/26 and SUNDAY 26 SEPTEMBER Down BLOCKED Up BLOCKED Down Between Trains

120 Ba rn sle y Station „in. and Woolley Coal Siding

23 30 Sat to 13 15 23 30 Sat to 16 30 13 15 to 16 30 Sun

Track renewal and earthwork, 52m.p. and 48m. 54ch. Cranes and mechanical equipment in use. 13 15 to 16 30 Sun. Single line working over Down line.

SUNDAY 26 SEPTEME3ER to FRIDAY 1 OCTOBER 121 Wo o lle y Coal Siding D o w n and Up

07 00 to 17 00 daily. Signalling work.

122 Ho rb u ry Jn.

07 00 to 17 00 daily. Signalling work.

A

l

l

ALDWARKE NORTH M . (MID) TO LEEDS NORTH UNTIL FURTHER NOTICE 123 Swinton Jn. and Cudworth Station Jn.

Down Main 0 7 30 to 17 00. Earthwork, 174% and 174Y2m.p. Between Trains C r a n e in use. ( 8 2 / 3 7 ) Until 17 00 Saturday 25 September.

124 Royston sin. and Oakenshaw South

Down and Up Between Trains

07 30 to 17 00. Earthwork, slip treatment and track renewal, 178m. 77ch. and 179m. 35ch. Cranes and mechanical equipment in use. ( 8 1 / 5 0 )

l

08 00 to 18 00. Signalling work. 1

All Between Trains

05 30 to 16 00. Bridgework (No.185), 175m. 34ch. Crane in use. Restricted clearance.

125 Stourton and A Leeds North Jn.

l

SUNDAY 26 SEPTEMBER 126 Cudworth Station Jn. and Cudworth South Jn.

SUNDAY 26 SEPTEMBER to FRIDAY 1 OCTOBER 127 Dearne Valley North Jn. and Cudworth Station

All

07 30 to 17 00 daily. Signalling work.

OAKENSHAWSOUTH M. TO OAKENSHAW UNTIL FURTHER NOTICE 128 Oakenshaw South Jn. Down and Up and Oakenshaw Jn. B e t we e n Trains

07 30 to 17 30. Erecting/dismantling scaffolding and safety nets for overhead power line renewal. 49m. 02ch. ( 8 2 / 3 4 ) Until 17 30 Saturday 25 September.

NS-16 SECTION B —TEMPORARY ENGINEERING WORKS— continued At or between

Lines affected

Remarks

NORMANTON ALTOFTS JN. TO YORK CHALONERS WHIN UNTIL FURTHER NOTICE 129 Whitwood and Castleford Station

Down and Up Between Trains

07 30 to 16 00. Signalling work.

130 Fryst o n and Burton Salmon

Down and Up Between Trains

07 30 to 17 00. Bridgework (No.43) 18m. 09ch. Crane and mechanical equipment in use. (82/31)

131 Ch a lo n e rs Whin Jn. and Church entoh

Up Normanton Between Trains

07 00 to 13 00. Earthwork 5 and 6m.p. Cranes and mechanical equipment in use. ( 8 1 / 8 )

SUNDAY 26 SEPTEMBER 132

Hillam Gates LC

All

08 00 to 16 00. Signalling work.

133

Sherburn- i n-E 'met South

All

08 00 to 16 00. Signalling work.

134

Burton Salmon and Milford

All Between Trains

08 00 to 16 00. Level crossing work 15m. 57ch. Crane in use.

135 Sherburn-in-Elmet North L.C. and Church Fenton South Jn.

Down Main BLOCKED

05 00 to 14 00. Track maintenance 11m. 30ch. and 10m. 76ch. Down trains to travel over Down Goods line.

136 Ch u rc h Fenton North Jn. and Chaloners Whin Jn.

Down and Up Normanton BLOCKED Up Leeds Between Trains

00 01 to 12 00. Track renewal and building work 7m. 50ch. and 2 1equipment in use. Trains to travel over Leeds lines / 4 m. p . C r a n e s 08 to 16 d00 daily. Track renewal 6 and 5 a 00 n Crane 1m e in cuse.h /a4 mn. p i. c a l

MONDAY 27 to WEDNESDAY 29 SEPTEMBER 137

Chaloners Whin sin. and Church Fenton North Jr).

Up Normanton Between Trains

THURSDAY 30 SEPTEMBERand FRIDAY 1 OCTOBER 138

Church Fenton North „In. and Chaloners Whin

Up Normanton Between Trains Down and Up Normanton BLOCKED

08 00 to 10 00

)

Daily. Track renewal ) 6m. lOch. and 5 10 00 to 16 00 ) 1Crane and mechanical )/ equipment 4 m . p . in use. 10 00 to 16 00 daily. Possession to be given up for passage of 2L94, 12 50 Bradford Exch. to York over Down Normanton line. Other trains to travel over Leeds lines.

CASTLEFORDWEST M. TO PONTEFRACTWEST JN. UNTIL FURTHER NOTICE 139 Castleford West Jn. and Prince of Wales

Down and Up Between Trains

07 30 to 16 00. Signalling work.

NS-17 SECTION B —TEMPORARY ENGINEERING WORKS— continued At or between Lines affected R e m a r k s CASTLEFORD EAST M. TO ALLERTON MAIN BOWERS OPENCAST SATURDAY 25 SEPTEMBER 140

Castleford East Jn. S i n g l e and Allerton Main B L O C K E D

06 00 to 16 00. Track renewal 4m. 43ch. and 3m. 22ch. Mechanical equipment in use.

MONDAY 27 SEPTEMBER 141 Ca st le f o rd East S i n g l e Jn. and Allerton B L O C K E D Main t

0 2 2 o

6 c h

.

00 to 14 00. Track renewal 4m. 43ch. and 3m. Mechanical equipment in use. Possession be given up for passage of trains.

SHERBURN-IN-ELMET SOUTH TO GASCOIGNE WOOD SUNDAY 26 SEPTEMBER 142 Sherburn-in-Elmet South

All

0

8

00 to 16 00. Signalling work.

WAKEFIELD KIRKGAM WEST M. TO GOOLE POTTERS GRANGE UNTIL FURTHER NOTICE 143 Wakefield (K) Station Platforms 1, 2 & 3 0 7 30 to 17 00. Platform work 47m. 55ch. and Between Trains 4 7 m . 70ch. Mechanical equipment in use. (See Section D). ( 8 1 / 4 6 ) 144 O a kenshaw Jn. and D o w n and Up Crofton West „In. B e t w e e n Trains

145 Knottingley

A

l

l

0 Between Trains

0 a

n

7

7

30 to 17 30. Erecting/dismantling scaffolding d safety nets for overhead power line renewal 49m. 02ch. • ( 8 2 / 3 4 ) Until 17 30 Saturday 25 September. 30 to 16 00. Signalling work.

SATURDAY/SUNDAY 25/26 SEPTEMBER 146 Cro f t o n East Jn. and Pontefract West Jn.

Down and Up Main 2 2 00 to 06 00. Loading rails 5 0 BLOCKED 3 0 c h . Crane in use. Possession to be given up for 1 passage of trains. / 4 m. p . a n d 5 6 m .

147 Pontefract Goods D o w n and Up 2 2 Jn. and Knottingley BL OCKED 1 5 c h 3 West Jn. p a s s a g / 4 m. p . a n d 5 8 m .

148 Knottingley and D o w n Sudforth Lane B L O C K E D 3 4 a n d

45 to 06 00. Loading rails 5 7 . Crane in use. Possession to be given up for e of 1L22, 23 25 Kings Cross to Bradford Exchange (diverted) over Up line and 1D57, 01 00 Leeds to Doncaster (diverted) and 1236, 23 59 Blackpool North to Kings Cross over Down line.

2 2 00 to 06 00. Track maintenance, 5 9 6 0 1 4 r T h p .

NS-18 SECTION B - TEMPORARY ENGINEERING WORKS - continued At or between

Lines affected

Remarks

WAKEFIELDKIRKGATE WEST JN. TO GOOLE POTTERS GRANGE JN. -- continued SUNDAY 26 SEPTEMBER 149 Cro fto n West Jn, and U p Between Trains Calder Bridge Jn,

07 00 to 17 00. Track maintenance, 49m.p. and 48m, 70ch.

150

08 30 to 15 30. Track renewal, 66m. 37ch• and 66m. 42ch.

Hensall Jn. and D o w n and Up Snaith Station LC B L O C K E D

SUNDAY 26 SEPTEMBER to FRIDAY 1 OCTOBER 151 Oakenshaw Jn. and A l ! Featherstone LC

08 00 to 17 00 daily. Signalling work.

ALDWARKE NORTH M . (MID) TO BURTON SALMON UNTIL FURTHER NOTICE 152 Hickle t o n and Moorthorpe Station Jn.

Al! Between Trains

07 30 to 17 00. Earthwork, 11m. 65ch. and 11m. 35ch. Crane and mechanical equipment in use. (82/31)

153 Hickle t o n and Ferrybridge

All Between Trains

07 30 to 16 00. Signalling work. ( 8 2 / 3 0 )

154 Moorthorpe Station

Down Between Trains

07 30 to 17 00. Platform work. Mechanical equipment in use. (See Section 'D'). (8 2 / 2 7 )

155 Moorthorpe Station Jn. and Pontefract Baghill Station

Down and Up Between Trains

07 30 to 17 00. Bridgework (No.43) and earthwork 10m. 69ch. and 9m. 21ch. Crane and mechanical equipment in use. Restricted clearance.(82/25)

156 Moorthorpe Stn. Jn. and Ferrybridge South Jn.

Down Between Trains Up Between Trains Down BLOCKED

00 01 to 03 00

157 Moorthorpe Station Jn. and Ferrybridge South Jn.

Down and Up Between Trains

BLOCKED

Track maintenance, )5 00 01 to 07 00 ) 1Mechanical equipment )/ 2i n use. ( 8 2 / 2 9 ) 03 00 to 07 00 a n 07 30 to 18 00. Bridgework d (No.26), 5 meta. (82/1) 4 1 / 4 23 15 to 14 15. Track renewal m 15m. lOch. and 15m. 58ch. Cranes and mechanical equipment in . use. p 23 30 to 20 00. Track renewal . 9m.13ch. and 7m. 45ch. Cranes and mechanical equipment in use.

Up Pontefract BLOCKED

07 00 to 15 00. Track maintenance, 164m. 61ch, and 164m. 57ch.

SATURDAY/SUNDAY 25/26 SEPTEMBER 158 Dearne Jn. and Hickleton

Down and Up BLOCKED

159 Moort horpe Stn. Jo. and Ferrybridge Sth. Jn.

Down and Up

)

SUNDAY 26 SEPTEMBER 160 Swin to n Jn. and Aldwarke Jn.

NS-19 SECTION B —TEMPORARY ENGINEERING WORKS— continued Lines affected R e m a r k s At or between ALDWARKE NORTH M . (MID) TO BURTON SALMON — continued SUNDAY 26 SEPTEMBER— continued 161 Fe rryb rid g e North sin. and Burton Salmon

Down BLOCKED

00 01 to 12 00. In connection with track renewal in Ferrybridge Power Station. 06 00 to 12 00. Possession to be given up for passage of trains.

162 Ferrybridge Power Station Branch

Down and Up BLOCKED

00 01 to 12 00. Track maintenance and loading rails, Om. 15ch. and Om. 50ch. Crane and mechanical equipment in use.

MONDAY/TUESDAY 27/28 SEPTEMBER 163 Ferrybridge South Jn. and Moorthorpe South Jn.

Up BLOCKED Down Between Trains

23 30 to 03 00. Track renewal, 8m. 05ch. and 7m. 45ch. Mechanical equipment in use. Possession to be given up for passage of MGR aLd local trip trains. Other Up trains diverted via Cudworth.

MONDAY 27 to WEDNESDAY 29 SEPTEMBER 164 Moorthorpe South Down and Up Main and Moorthorpe B L O C K E D Station Jri.

23 15 Mon and Tue to 05 15 Tue and Wed. Track maintenance, 11m. 45ch. and 11m. 15ch. Mechanical equipment in use. 23 15 Mon and Tue to 03 15 Tue and Wed. Possession to be given up for passage of Down trains and Up MGR and local trip trains. Other Up trains diverted via Cudworth. 03 15 to 05 15 Tue and Wed. Possession to be given up for passage of trains.

MOORTHORPE STATION JN. TO SOUTH KIRKBY JNI. SUNDAY 26 SEPTEMBER to FRIDAY 1 OCTOBER 165 Moorthorpe Station D o w n and Up Jn. and South Kirkby Jn.

08 00 to 17 00 daily. Signalling work.

MONDAY 27 SEPTEMBER to FRIDAY 1 OCTOBER 166 Moorthorpe Station D o w n and Up and South B L O C K E D Kirkby „in.

LEEDS WHITEHALL dhl. TO BRADFORD EXCHANGE UNTIL FURTHER NOTICE 167 Whitehall Jn. and D o w n and Up Hammerton Street 168

Mill Lane Jn,

All

SUNDAY 26 SEPTEMBER 169 Wo rt le y West Jn. and U p Holbeck West Jn. B L O C K E D

23 00 Mon to Thu to 07 00 Tue to Fri. Track renewal, 1 /2 equipment in use. Possession to be given up for passage r n . p . of MGR and local trip trains. a n d O m . l O c 00hto 18 00. Signalling work. ( 8 2 / 1 9 ) 08 . M e 07 c 30h to 17 00. Signalling work. ( 8 2 / 1 9 ) a n i c 00 a 15l to 08 00. Track maintenance, Om. 50ch. and Om. lOch. Possession to be given up for passage of trains.

NS-20 SECTION B - TEMPORARY ENGINEERING WORKS - continued At or between

Lines affected

Remarks

LEEDS WHITEHALL JN. TO BRADFORD EXCHANGE - continued THURSDAY 30 SEPTEMBERand FRIDAY 1 OCTOBER 170 A r m ley Moor G.F. and Mill Lane Jn.

Down BLOCKED Up BLOCKED

00 45 to 06 00

) Da ily. Track renewal ) l m . 49ch. to 191m. ) 78ch. Mechanical ) equipment in use. Possession to be given up for passage of trains.

01 15 to 04 00

LEEDS TO SKIPTON STATION SOUTH LMR UNTIL FURTHER NOTICE 171

Leeds West Jn.

172 Whitehall in , and Kirkstall

All

06 00 to 18 00. Signalling work.

All

06 00 to 18 00. Signalling work. ( 8 2 / 1 9 )

173

Kirkstall Jn.

Up Goods Loop Between Trains

08 00 to 15 00. Earthwork 197m. 45ch. and 198m.p. Mechanical equipment in use. (82/10)

174

Kirkstal I „in. and Apperley Jn.

Down and Up Between Trains

07 30 to 17 00. Bridgework (Nos24 and 33) 198m. i lOch. ond 201m. 45ch. Restricted clearance. (82/32)

175 Apperley Jn. and Thackley Jn,

Down and Up Between Trains

07 30 to 17 00. Tunnelwork (Thackley Tunnel) 203m. 42ch. and 204m. 32ch. Mechanical equipment in use. ( 8 1 / 3 0 )

176

Bingley Station

Down and Up Between Trains

07 30 to 17 00. Platform work 208m. 68ch. Mechanical equipment in use. (See Section 'D'). (82/38)

177

Keighley Station Jn. and Cononley

Down and Up

07 30 to 17 00. Signalling work.

SATURDAY/SUNDAY 25/26 SEPTEMBER 178 Apperley Jn. and Guiseley SUNDAY 26 SEPTEMBER 179 Ap p e rle y sin. and Guiseley Jn.

Down Main BLOCKED Up Main Between Trains

23 00 to 02 30. Track renewal, 204m. 35ch. and 204m. 66ch. Mechanical equipment in use.

Up Main BLOCKED Down Main BLOCKED Up Main Between Trains

02 30 to 13 15

120 Gu;seley Jn. and D o w n and Up Shipley Bingley „In. BL OCKED

)

Track renewal 204m. ) 35ch. and 204m. 66ch. 03 15 to 16 30 ) Cranes and mechanical ) in use. 03 15 to 13 15. 13 15 to 16 30 ) Possession to be given ) up for passage of 2M71, 09 10 Leeds to Morecambe over Up line under Single line working. 13 15 to 16 30. Single line working over Up line. 03 30 to 13 30. Track renewal 205m. 64ch. and 205m. 77ch. Crane in use. Possession to be given up for passage of 2M71, 09 10 Leeds to Morecambe over Down line.

NS-21 SECTION B - TEMPORARY ENGINEERING WORKS - continued At or between

L i n e s

affected R e m a r k s

LEEDS TO SKIPTON STATION SOUTH LMR continued SUNDAY 26 SEPTEMBER - continued 181 Ke ig h le y Station Jn. and Steeton L.C.

Down and Up BLOCKED a

0

n

4

d

00 to 14 00. Loading materials 212m. 14ch. 212m. 30ch. Crane in use. Possession to be given up for passage of trains.

SUNDAY 26 SEPTEMBER to FRIDAY 1 OCTOBER 182 G u ise ley Jn. and Shipley Bingley Jn.

Down and Up

0

7

30 to 17 00 daily. Signalling work.

MONDAY 27 SEPTEMBER 183 Th a ckle y Jn.

Down Main and Down Loop

08 00 to 12 00. Signalling work. (See Section 'C').

LEEDSWORTLEY JN. TO HARROGATE UNTIL FURTHER NOTICE 184 Wo rtle y Jn. and Horsforth

Down and Up

185 Ho rsfo rth and Weeton Stn.

Down and Up Between Trains

0

00 to 18 00. Signalling work. 07 30 to 17 00. Demolition work 8 30ch. ( 8 2 / 3 0 ) 1 Until 17 00 Saturday 25 September. A rn . p . a n d 8 m . 23 30 to 08 30. Tunnelwork (Bramhope Tunnel) 5m. 65ch• and 7m. 77ch. Mechanical equipment in use.

SATURDAY/SUNDAY 25/26 SEPTEMBER 186 Horsforth and Rigton

6

Down and Up BLOCKED

APPERLEY JN. TO ILKLEY STATION UNTIL FURTHER NOTICE 187 Apperley „in. and D o w n and Up Burley „in. B e t w e e n Trains 188 E s h o lt Jn. and Guiseley Station

Down and Up Between Trains

189 I l k l e y Station

Platform 1 Between Trains

SUNDAY 26 SEPTEMBER 190 E sh o it Jn. and D o w n and Up Guiseley Station B L O C K E D 191 E sh o lt sin. and D o w n and Up Ilkley Jn. B L O C K E D SUNDAY 26 SEPTEMBER to FRIDAY 1 OCTOBER 192 G u ise ley Station

Down and Up

0

07 30 to 17 00. Construction work 204 and 205 (82/35) 3 4 07 30 to 17 00. Tunnelwork (Greenbottom Tunnel), m 204m. 62ch. and 204m. 68ch. Restricted clearance. . p (82/27) . 07 30 to 17 00. Platform work 211m. 23ch. C Mechanical equipment in use. (See Section 'D'). r (82/38) a n 07 30 to 17 00. Earthwork, 205m. 06ch. eMechanical equipment in use. a n07 00 to 17 00. Earthwork and track maintenance, d205m. 06ch. and 205m. 45ch. m e 7 c 00 to 17 00 daily. Signalling work. h a

NS-22 SECTION B —TEMPORARY ENGINEERING WORKS— continued At or between

Lines affected

Remarks

Down and Up Between Trains

07 30 to 17 00. Construction work 3m 38ch and 0 m.o. Crane and mechanical equipment in use.

GUISELEY JN. TO ESHOLT UNTIL FURTHER NOTICE 193 G u is e ley Jo. and Esholt Jn.

SHIPLEY LEEDS JN. TO BRADFORDFORSTERSQUARE SUNDAY 26 SEPTEMBER to FRIDAY 1 OCTOBER 194 L e e d s Jri. and Shipley Bradford Jn.

Down and Up

07 30 to 17 00 daily. Signalling work.

SHIPLEY BRADFORD JN. TO SHIPLEY BINGLEY SUNDAY 26 SEPTEMBER to FRIDAY 1 OCTOBER 195 Shipley Bradford Jn. S in g le and Shipley Bingley Jn.

07 30 to 17 00 daily. Signalling work.

LEEDS TO HULL PARAGON UNTIL FURTHER NOTICE 196 L e e d s East Jn. and D o w n and Up Marsh Lane Jn. Between Trains 197 L e e d s East Jo. and Micklefield Stn. Jn.

All

198 Gasooigne Wood and Selby West Jo.

Down and Up Main Between Trains

SUNDAY 26 SEPTEMBER

07 30 to 17 00. Bridgework (Marsh Lane Viaduct) 20m. 25ch. and 1 9 equipment in use. ( 8 2 / 1 8 ) 3 A rn . p . 06 00 to 18 00. Signalling work. C r a n e a n d 07 work, earthwork and m 00eto 19 c 00. h Demolition a bridgework, 6rnop. and 2m. 48ch. Cranes and n i c a l mechanical equipment in use. ( 8 0 / 2 1 )

199 Gascoigne Wood

Down and Up Main BLOCKED

00 01 to 08 00. Drainage, 6m. 30ch. and 6m. 16ch. Crane and mechanical equipment in use. Possession to be given up for passage of 1D52, 02 45 Leeds to Hull over Down Main line.

200 Broomfleet

All

08 00 to 16 00. Signalling work.

line Between Trains

06 00 to 16 00. Track maintenance, Om. 19ch. and Om. 21ch.

201 H u l l Paragon



E

'

SUNDAY 26 SEPTEMBER to FRIDAY 1 OCTOBER 202 Cro s s Gates Station D o w n and Up and Peckfield

08 00 to 17 00 daily. Signalling work.

NS-23 SECTION B—TEMPORARY ENGINEERING WORKS— continued At or between

Lines affected

Remarks

LEEDS TO HULL PARAGON— continued MONDAY 27 SEPTEMBER to FRIDAY 1 OCTOBER 203 S e lb y and Gascoigne Wood

Up BLOCKED

TUESDAY 28 and WEDNESDAY 29 SEPTEMBER

06 00 to 19 00 daily. In connection with engineering work. Possession to be given up for passage of trains.

00 01 to 05 45 daily. Track maintenance, 1 2 and 3 13 Possession to be given up for passage of 8D67, 1/4 01 20 Hull to Doncaster over Up line. / I m. p . M e THORNE JN. TO GILBERDYKE c h UNTIL FURTHER NOTICE a n i c a l All 07 00 to 18 00. Bridgework and earthwork, 205 P o tte rs Grange Jr'. e7m. 20ch. and 6m. 65ch. Mechanical equipment Between Trains and Goole LC qin use. ( 8 1 / 2 3 ) SUNDAY 26 SEPTEMBER u i p00 01 to 12 00 Down 206 Goole LC and ) Bridgework 5m. 31ch. m SaI tmarshe Station BLOCKED ) Crane in use. 00 01 to e00 01 to 07 45 LC ) 07 45. Possession to BLOCKED n t ) be given up for passagE iof 1D62, 04 08 Doncaster to Hull over Up line Single line working. 07 45 to 12 00. Single nunder line working over the Up line. u s e HESSLE HAVEN TO DAIRYCOATES WEST VIA HULL YARD . UNTIL FURTHER NOTICE 204 Brough East LC U p and Broomfleet B L O C K E D Station LC D o w n Between Trains

207 H e s s l e Haven and D o w n and Up Dairycoates West B e t w e e n Trains

07 30 to 16 00. Track renewal, lm. 62ch. and 2m. 2ch. Crane in use. ( 8 2 / 1 8 )

DAIRYCOATES WEST TO NEPTUNE STREET UNTIL FURTHER NOTICE 208 D a irycoates West D o w n and Up and Neptune Street B e t we e n Trains SUNDAY 26 SEPTEMBER 209 Dairycoates West LC Do wn and Up BLOCKED HESSLE ROAD TO ALEXANDRA DOCK SUNDAY 2 6 , 210 Down and Up S EHePssle T E Road and Alexandra Dock B L O C K E D MBER

08 00 to 16 00. Track abandonment, lm. 69ch. and 1 use. ( 8 2 / 1 6 ) 1 Until Monday 27 September. / 4 m. 07 p .00 to 16 00. Track maintenance l'Am.p. and lm. 52ch. Crane in use. C r a n e s a n 07 00. Trimming bushes 21/4m.p. and 4m.p. d 00 to 17 equipment Mechanical in use. m e

NS-24

SECTION C

SIGNALLING AND PERMANENTWAY ALTERATIONS Items marked thus w i l l not appear i n futur e i ssues and a note m ust be taken of them by al l concer ned

With effect from 09 00 Monday 13 September the 20m.p.h. Down and Up speed restrictions between Royston „In. and Oakenshaw South Jri. (179m. 25ch. and 179m. 40ch.) will become differential restrictions of 20 over 40 in accordance with Section 1 clause 10 on page 1.57 of the General Appendix. (40)

DETAILS OF WORKREFEREED TO IN SECTION B WEDNESDAY 29 SEPTEMBER—YORK (CLIFTON) Up Clifton Loop ground position light signal No.Y172 will be elevated 5 ft. above rail level, 6 ft. 4 ins. from the running edge. ( 4 2 ) MONDAY 27 SEPTEMBER—THACKLEY JUNCTION The points — Down Main/Down Loop will be secured out of use in the normal position until further notice. ( U . F . N . ) DETAILS OF WORKALREADY CARRIED OUT MIRFIELD The points leading to the Up Sidings have been secured out of use in the normal position pending removal. ( 4 1 ) SOUTHKIRKBY JUNCTION The facing lead from the Down Main into South Kirkby Colliery has been restored to its former position. The trailing crossover between the Down and Up Main lines has been re-positioned 30 yards nearer to South Elmsall, Signalling Alterations Down Main ground position light signal (L647) has been re-positioned in theDown Main cess 80 yards further south. A 2-way stencil-type route indicator has been provided, and the following indications apply:— Indication D e s t i n a t i o n Up Main L656 signal Up Branch M28 signal A new ground position light signal L651 has been provided in the Up Main cess at the Up Main end of the Main to Main trailing crossover. A 3-way stencil-type route indicator has been provided and the following indications will apply:— Indication

Destination Bunker line B Bunker line A Down Main L645 signal

NS-25 SECTION C — SIGNALLING AND PERMANENT WAY ALTERATIONS — continued

DETAILS OF WORKALREADY CARRIED OUT — continued BETWEENLEEDS AND GARFORTH The following catch points in the Down line have been secured out of use pending removal and replacement by plain line:— 17m. 52ch. 655 yards before reaching Leeds L791 signal 17m. 20ch, 830 yards before reaching L793 signal 16m. 42ch. 1020 yards before reaching L795 signal 15m. 74ch. 510 yards before reaching L797 signal 15m. 26ch. 600 yards before reaching L799 signal

BETWEENTHORNHILL LNW JUNCTION (RAVENSTHORPE) AND LEEDS HOLBECK EAST JUNCTION (MORLEY TUNNEL) The following catch points in the Down line have been secured out of use pending removal and replacement by plain line:— 32m. 76ch. 700 yards before reaching Batley signal No.15 33m. 39ch. 630 yards before reaching Batley signal No.14 34m. lOch. 530 yards before reaching Batley signal No.13 34m. 45ch. 720 yards before reaching Batley signal No.12 35m. 17ch. 595 yards before reaching Batley signal No.11 35m. 60ch. 840 yards before reaching Batley signal No.10

MOORHOUSE JUNCTION Up Main signal L.662 has been converted to an Automatic signal. The left-hand off-set subsidiary on Down Main L.669 signal has been abolished. The trailing Main to Main crossover has been secured out of use pending removal together with associated signalling.

(40)

WAKEFIELDKIRKGATE Rail access to Whithams Top Yard from the Up Goods line has been terminated and the sidings have been secured out of use pending removal. ( 4 1 )

MARSDEN The new mains crossover has been brought into use 100 yards east of its former position. The associated ground disc signal applying Down Main to Up Main has been replaced by a ground position light signal (No.14) applying:— —Down Main to Up Main or — —Set back along Down Main to NEW LIMIT OF SHUNT Indicator at the Diggle end of the Down Platform (east face of Bridge No.45). The ground disc signal applying Up Main to Down Main has been replaced by a ground position light signal (No.17). ( A m e n d e d ) (41)

NS-26 SECTION C — SIGNALLING AND PERMANENT WAY ALTERATIONS — continued DETAILS OF WORK ALREADY CARRIED OUT — continued PECKFIELD

The catch points in the Up Main line at 11m. 38ch. have been removed and replaced by plain line(39)

SOUTH KIRKBY JUNCTION TO MOORTHORPE STATION JUNCTION : RE-MODELLING OF SOUTH KIRKBY JUNCTION South Kirkby Junction

The Junction between the Down and Up Branch and the Down and Up Main lines has been relayed in a modified form 100 yards further south. The Down and Up Branch lines have been realigned accordingly. The positions of the new and altered signals in relation to the re-modelled junction are as shown on the diagram included in this notice. Between South Kirkby Junction and Moorthorpe Station Junction

The trailing crossover between the Down and Up Branch lines has been repositioned 200 yards nearer to Moorthorpe. The Marshalling Loop has been extended 200 yards towards Moorthorpe. Description of Signals:— Line Signal

Route Indication (Stencil)

L654

Marshalling Loop Up Branch



L666

Up Branch



L652

"M"

Application to or towards

M28 Up Branch L645 Down Main (Via Branch Crossover) Bunker Line 'A' Bunker Line 'B' L649 Marshalling Loop L645 Down Main

E )dS TI B I GN A L L I N G SBVIC'S ,

I

\ Q — , L G S 2

FROM S HE FFIE LD

,e0o-fm-

MW

T

734N 05

L6to&

S O UTH

REMODELLI NG ( 5 UNDA s r 2I s r AUGUST 1982)

_COP P0,*4 Ts TELE.

A ExisTING SIGNALLINQ

P A T E R

L. 6 0 5

E NI SLTI 1 NG 5G r e 6 I GN A L L I N 4

C = F t c o• i ,

N I 1610 . L -1 7 G0 1 D O WS N 1 , L S O N

A

A -

I 2 5 0 Y OS

CRIPPLE

BOG

L,NE

Ex is ilNe T o 1

l e o o N o s

1 7 3 4 S OuTH NIR KEW COLLIERY BUNAEFO

. 6 1 D Ow N MAIN N

L

3 MA IN

0e0CD-M-t

LEEDS 5 5

M - MOORTHORPE 50uTH 45)

P ON TB PADLOCKED

4. 6 4 ,P 1 T 1 :I ' jg 0 P oi NTS

ORMG0 / C

-

EXISTING SIGNALLING, INT0CoLLIER'y

3_ TELE. L

1 0 0 0 1 05 - - 1 4 * LG57 to5

(SIGNAL No PREFINES

UP B R A N CH

O S 9

LEA6 A

J UNCTI O N

c o w N B RA NCH

-4 -o4 0 3 0 1 5 0 0 VS -J u NC-i oN 500114 IMR*.E.Y1 • 1

K E N

4 , L I P M A I N

E , A

idGINALL.146

4CIS r_,

L. 4E4S

, FLVC._30 Zoo,

V e a r D' a l LG46 135cylos1Z3174 ExiSTiNt,

To LE E DS

NS-28 SECTION D

GENERAL INSTRUCTIONS AND NOTICES A thi ck ver ti cl e l i ne denotes new or amended items 41. , * I t ERSECTIONAL APPENDIX (NORTHERN AREA) e m TABLE "A" — DETAILS OF RUNNING LINES s Permanent Speed Restr ictions Catch, Spr ing Loops and m and unwor ked Refuge Down U p Running Li nes and M. C h At or Between a Location Sidings m ph. tr ailing poi nts Signal ling System r Page 111 k ALDWARKE NORTH JN. (MID) TO LEEDS NORTH JN. e Between Royston Jrh and Oakenshaw South Jn, d Amend:— 20 2 0 1 7 9 m . 25ch. and t 40 4 0 1 7 9 m . 40ch. h (1\11D40D) u s w Page 156 LEEDS TO HULL PARAGON i l Between S t Geor ges Road LC and Anl aby Road „in. Amend:— 40 4 0 l m . Och. and Om. l 40ch. n Between Anl aby Road Jrh and H ul l Paragon o Del ete: 2 0 2 0 O m . 40ch. and Om. t 48ch. a (ND40D) p p e a r i LOCAL INSTRUCTIONS n f Page 372 F E R R Y B R I D G E 'C' POWER STATION u t Add u C.E.G.B. Level Crossing r The instructions in the General Appendix headed "Automatic Open Crossings, Locally monitored e ()NOM.) — At crossings where trains are required to stop" apply at this crossing. i s sIf it becomes necessary for a set-back movement to take place over the crossing, the Guard must be stationed at the Crossing to stop road traffic, before such movement commences. u e"Incoming" Open Level Crossing s The instructions in the General Appendix headed "Open Crossings" apply at this crossing. a nIf it becomes necessary for a set back movement to be made over the crossing, a member of the dC.E.G.13. staff will be stationed at the crossing and no movement over the crossing must be made awithout his authority. ( 4 0 0 ) n o t e m u s

NS-29 SECTION D — GENERAL INSTRUCTIONS AND NOTICES — continued LOCAL INSTRUCTIONS — continued TABLE Z LI NE S EQUIPPED WITH THE AUTOMATIC WARNING SYSTEM From

To

Line

R

e

m

a

r

k

s

Page 271 (Page 127 Supp. Optg. Insts)

ALDWARKE NORTH JN. (MID) TO BURION'SALMON Delete :— Moorthorpe

B

u

r

t

o

n

D

o

w

n

and Up

Add:— Aldwarke North „In. H i c k l e t o n Pontefract Bagh II

D

o

B u r t o n Salmon

w

n

and Up

Down and Up

(

4

0

D

)

INSTRUCTIONS TO STAFF DEALING WITH M.G.R. TRAINS AND BUNKER/RAPID LOADING COLLIERIES B.R.30059/5 Page 18 (1) and (2) PRINCE OF WALES COLLIERY Delete instructions and substitute:— 1. W h e n signal 1 is cleared, the arriving train must proceed to the marker board for the locomotive to be detached. 2. W h e n the train is ready for tare weighing and part loading, the Guard must advise the Bunker Operator accordingly. 3. T h e train must be propelled for tare weighing and part loading under the control of the laoding signals at 1 m.p.h. 4. W h e n the wagons next to the locomotive have been part loaded the Bunker Operator will advise the Guard that the direction of the train for loading will be reversed and the Guard must advise the Driv er accordingly. 5. T h e train must then be hauled through the bunker under control of the loading signals at 1m.p.h. for completion of loading and for gross weighing.

Crippled Wagons 6. T h e Guard must advise the Bunker Operator when a wagon requires to be detached in the cripple siding. When a movement is ready t o return via the Bunker line to the approach side of signal 1, the Guard must inform the Bunker Operator. When a train is re-formed after detaching operations have been completed, the Guard must adv:se the Bunker Operator it is ready t o return to the approach side of signal 1. ( 4 0 D )

NS-30 SECTION D G E NE RAL INSTRUCTIONS AND NOTICES — continued INSTRUCTIONS TO STAFF DEALING WITH M.G.R. TRAINS AND BLINKER/RAPID LOADING COLLIERIES B.R.30059/5 — continued Page 21 (1)/(2) SOUTH KIRKBY COLLIERY Delete and substitute:— 1. Tr a i ns for Discharge 1,1 T r a i n s must be drawn through the hopper under the control of the unloading signals.

1.2 Di s c h a r g e will take place whils t propelling at 1 / 2 m . unloading p.h. usignals. n d e r t h e c o n t r o l 1.3 T h e cg,w Examiner will inform the Guard if any defective wagons require to be detached o f cripple sidings.t The C&W h Examiner e will also inform the Discharge Hopper Operator. in the 1.4 O n completion of discharge the train must be propelled towards line 'A under the authority of signal C.4. 1.5 I f the train is to depart towards Leeds it must be propelled behind the appropriate signal. 1.6 1 1 the trains is to depart empty towards Moorthorpe the locomotive must be detached and run round. 1.7 T h e Guard must advise the Signalman when the train is ready to depart. 2. T r a i n s for Loading 2.1 T r a i n s must proceed at 3 m.p.h. for tare weighing to the furthermost loading signal. 2.2 T r a i n s must then be propelled at 1 signals. / 2 m . control p . h . of ftheo Loading r l o a d i n g 2.3 a Throughout n d the weighing and loading operations, the Guard must be positioned at the emergency stop switch. In an emergency the train must be brought to a stand by operation g rof this o switch. s s Train movements must not be allowed to re-commence until the Guard has w e i g h i n g advised the Bunker Operator that it is safe to do so. The Guard must also operate this u n d e switch to stop the train and enable the last wagon to be loaded whils t stationary. r t2.4 I f a defective h e requires to be detached in the cripple sidings the Guard must inform wagon the Loading Bunker Operator. 2.5 O n completion of gross weighing the Guard will be handed the train documents and the train must then be propelled to line •B'. 2.6 I f the train is to depart towards Leeds it must be propelled behind signal 654. 2.7 I f the train is to depart towards Moorthorpe the locomotive must be detached and run round. 2.8 T h e Guard must advise the Signalman when the train is ready to depart. 3. C r i p p l e Siding 3.1 W h e n it is necessary to detach a defective wagon into the cripple siding the Colliery Controller will provide staff with the padlock key for 'the points, to assist in the detaching operation. 3.2 A f t e r the locomotive has run round and Signal 1 and 3 are cleared the Guard must signal the Driver to set back to the rear of signal 650. 3.3 A f t e r detaching operations have been completed the train must depart via Moorthorpe.

NS-31 SECTION D —GENERAL INSTRUCTIONS AND NOTICES — continued INSTRUCTIONS TO STAFF DEALING WITH M.G.R. TRAINS AND BUNKER/RAPID LOADING COLLIERIES B.R.30059/5 — continued Page 21 (1)1(2)—SOUTH KIRKBY COLLIERY — substitute — continued 4. Le v e l Crossing When a failure affecting the operation of the level crossing occurs, trainmen must be prepared to work to the instructions and hand signals of the attendant provided. 5. Fa i l ure of N.C.B. Signals Should a signal failure occur, the Colliery Controller will arrange for the points to be set in the proper position. The Guard must, after checking the position of the points, work to the Colliery Controller's instructions and hand signal the Driver as necessary. 6. Maximum permissible speeds Between main line connections and level crossing 15 m.p.h. Between level crossina and discharae/loadina lines 5 m.p.h. Page 22

(40D)

WOOLLEY COAL SIDINGS Delete all instructions and substitute:— WOOLLEY COAL SIDING

1. A l l trains must be propelled into the siding from the Down Main line. 2. Wh e n a train is propelled into the sidings, it must be stopped with the locomotive in rear of the colliery outlet signal, where the Driver must await further instructions.

MISCELLANEOUS NOTICES KEIGHLEY STATION From Sunday 26 September, 07 30 to 17 00 daily, drivers of trains stopping at Keighley Station to observe instructions of handsignalman ancVor warning notices during renewal of platform copings.

BINGLEY STATION Commencing Sunday 19 September from 07 30 to 17 00 daily, drivers of trains stopping at Bingley Station to observe instructions of Handsignalman and/or warning notices during repairs to platform areas.

DONCASTER STATION Due to track renewal Up Platform (No.1) drivers o f trains booked to call at Platform 3A must bring their trains to a stand at D282 Signal. Until Further Notice.

NS-32 SECTION D GENERAL INSTRUCTIONS AND NOTICES — continued MISCELLANEOUS NOTICES — continued WAKEFIELDKIRKGATE STATION Drivers of trains required to stop at Wakefield Kirkgate Station to observe instructions of handsignalmen and/or warning notices during repairs to platforms.

MIRFIELD STATION Until further notice, between 07 30 to 17 00 daily. Drivers of trains stopping at Mirfieid to observe instructions of Handsignalman and/or warning notices during resurfacing of platform area.

MOORTHORPE STATION Until Further Notice From 07 30 to 17 00 daily, drivers of trains stopping in the Down Platform to observe instructions of Handsignalman and/or warning notices during repairs to platform copings.

MP.32/NS York

C

13 SEPTEMBER, 1982

h

i

G e

. f

GRAHAM Operating Manager