WEEKLYOPERATINGNOTICE CONTAI NI NG

TE MP ORARY S P E E D RE S T RI CT I O NS TE M P ORARY E NGI NE E RI NG W O R K S SIGNALLING A N D P E RMANE NT W A Y AL T E RAT I ONS GENERAL I NS TRUCTI ONS A N D NOT I CE S

SATURDAY18 SEPTEMBER TO

FRIDAY 24 SEPTEMBER 1982 INCLUSIVE

Trainmen must pay particular attention to works contained in this notice and keep a good look-out for handsignals which may be exhibited in accordance with the Rules and Regulations. Work at places other than those mentioned may be in progress and Drivers must be on the look-out and be prepared to stop or run at reduced speed when, and where, handsignals may be exhibited.

NS-2 SECTION A

TEMPORARYSPEEDRESTRICTIONS (Until further notice unless otherwise specified) Warning Boards and Indicators provided unless otherwise shown. t Indicates that the Warning Boards and Indicators will be moved as the work progresses. Where two speeds are shown for a restriction e.g. 20, the Rule Book, Section T, clause 21.2 applies. 4 0 Lines affected

Location

a M

Mileage or between Re s tr i c ti o n C h . Ni. C h . m . p . h . Remarks

t .

DONCASTER BLACK CARR M. TO SKELTON BRIDGE 1 P o t t e ric Carr sin. D o w n and Decoy North Jn. F a s t

1

2 Po tte ric Carr „In. D o w n and Decoy North „in. F a s t

1

5

4

(

8

F

5

2

4 r

04 1 5 4 10 /

4 3

0

0 4 1 5 4 10 o

2 0 m

Tra c k wo rk . 7 ) Until 14 00 Sunday 19 September. Tra c k wo rk . 14 00 Sunday 19 September.

Warning Board situated at 159m. 35ch. on the Down applies only to trains proceeding towards Askern.

SHAFTHOLME JINI. TO FERRYBRIDGE NORTH 3

Shaftholme and Norton L.C.

Down

4 No rt o n LC and Shaftholme Jn.

Up

6

7

68 40 6 7 58

3

0

T ra c k w o rk . (82/25)

23 6 7 66

2

0

Tra c k wo rk . (82/35) Until 15 00 Wednesday 22 September.

Warning Board located at Signal No.K386 (on the Down line) applies only to trains towards Pontefract.

YORKTO SCARBOROUGH 5 Falsgrave and Seamer East

Up Main

41 5 5 4 1 3 0

1

0

• Tra ckwo rk. (82/37)

6

0

S u b sid e n ce . (82/8)

DONCASTER MARSHGATE JN. TO LEEDS WEST M. 6 A d w i c k Jn. and South Elmsall Station

Down

U p

1

6

2

1 0 1 6 2 50

NS-3 SECTION A —TEMPORARY SPEEDRESTRICTIONS — continued Mileage Lines a t or between R e s tr i c ti o n Location a f f e c t e d M . C h . M. C h . m . p . h . Remarks DONCASTER MARSHGATE M. TO LEEDS WEST M. — continued 7 S o u th Kirkby Jn. f

U

8 So u th Kirkby Jr).

U

p

1

6

6

00 1 6 5 70

2

0

T ra c k w o rk • (82/38)

p

1

6

6

0 0 1 6 5 70

2

0

T ra c k w o rk •

1

6 3

6

00 1 6 6 60 3 / 3

0

Tra c k wo rk . 3 )

0

B rid g e wo rk .

9 So u th Kirkby sin. D o w n and Fitzwilliam M a i n Station

— ʻ

2

STAINFORMI JN. TO SKELLOW ADWICK JN. 10 Bramvvith StnIC and Do wn Thorpe Road LC

U p

164 53 1 6 4 44

2

EASTWOOD L.M.R. TO NORMANTON GOOSE HILL M. 11 E l land Tunnel

Down

31 0 9 3 1 2 4

20 T ra c k w o rk • (82/37) Until 15 09 Tuesday 21 September.

DIGGLE Al. LMR TO HEALEY MILLS HEATON LODGE JN. 11A Diggle sin. and D o w n U p 1 Standedge Tunnel M a i n M a i n Goods F Loop T h 12 Marsden

D

13 Springwood and MarsdenJn. 14 Springwood and Marsden

o

w

n U p Main M a i n



U

U

p

p

4

45 1 5 09 2 0 T ra c k w o rk . L M ) r o m 10 00 u r s d a y 23 September. (

1

8 (

8

60 1 8 68 2 0 2 / 3

Tra c k wo rk • 3 )

2

0

70 2 0 37

2

0

T ra c k w o rk •

2

2

17 2 0 70

4

0

Tra c k wo rk . (82/36)

THORNHILL LNW JN. TO LEEDS HOLBECK EAST JN. 15 De wsb u ry Station D o w n and Batley

U p

33 73 3 4 03

20 C o n d i t i o n of viaduct (Dewsbury).

NS-4 SECTION A — TEMPORARY SPEED RESTRICTIONS — continued Lines Location a f f e c t e d HORBURY STATION M . TO CRIGGLESTONE JN.

Mileage at or between R e s t r i c t i o n M. C h . M . C h . m . p . h . Remar ks

20 T r a c k w o r k . (82/23)

45 00 4 5 50

16 Ho rb u ry Station Jn. S i n g l e and Crigglestone Jn.

BARNSLEY STATION JN. TO HORBURY JN.

17 Barnsley Station „In. D o w n and Woolley Coal Siding

U p

49 37 4 8 51

2

0

Track work. (82/37)

18 Wo o lle y Coal Siding D o w n and Woolley Tunnels

U p

48 00 4 7 41

2

0

19 Wo o lle y Tunnels D o w n and Horbury Jr).

U p

45 70 1 5 0

2

0

Subs i d e n(82/21) ce. Trackwork. (82/19)

20 Barnsley Station Jn. D o w n and Darton Station

U p

52 00 5 1 4 0

2

0

Earthwork. (82/38) From 23 30 Saturday 18 September.

ALDWARKE NORTH JN. (MID) TO LEEDS NORTH JN. Warning Board at 11m. 47ch• (on Down line) applies only to trains towards South Kirkby „In.

20 T ra c k wo rk .

21 Swinton Jri. and Aldwarke

Up Pontefract

164 60 1 6 4 58

22 Swin to n Jr). and D o w n Cudworth Station Jr). Ma in

Up Main

171 41 1 7 2 21

6

0

S u b sid e n ce . (80/28)

173 2 0 1 7 4 0 0

3 0

S u b sid e n ce . (78/4)

177 2 2 1 7 7 1 5

2

0

C o n d i t i o n of track.(82/36)

183 5 5 1 8 4 00

4

0

S u b sid e n ce . (82/29)

23 Swin to n Jn. and Cudworth Stn. Jri.

Down U p Main M a i n

24 Ro ysto n Jr). and Cudworth North Jr). 25 Oakenshaw and Goose Hill „In.

Up Main Down

U p

NORMANTON ALTOFTS JN. TO YORK CHALONERS WHIN JN.

26 Copmanthorpe and Bolton Percy

Up Normanton

5 20

5

72

20 T ra c k w o rk • I (82/35)

CASTLEFORD WEST JN. TO PONTEFRACT WEST JN.

27 Cu t s y k e Jn. and D o w n Prince of Wales

U p

58 2 0 5 8 16

20 C o n d i t i o n of track. (82/12)

NS-5 SECTION A —TEMPORARY SPEED RESTRICTIONS — continued Lines Location a f f e c t e d CASTLEFORD EAST JN. TO ALLERTON MAIN BOVP:tiS 28

Castleford East Jn. and Ledston Station

Mileage at or between Ch. M. Ch. AST

5 40

Single

Restriction m.p.h. Remarks

4 60

5

53 15

20

Subsidence, (81/50)

WAKEFIELDKIRKGATE WEST TO GOOLE POTTERS GRANGE JN. 29

Featherstone LC and Red Lane LC

30

Red Lane LC and Featherstone LC

31

Featherstone LC and Red Lane LC

32

Featherstone LC and Pontefract West Jn.

33

Knottingley West Jn. and Pontefract Goods Jn,

34

35

Up

53 26

C ondi ti on of

track. (8 1 /6 ) Down Main

53 62

53 72

20

Condition Dl track.

53 70

53 61

15

Trackwork. (82/26)

55 50

56 30

20

Condition of track. (81/49)

Up

58 15

57 60

20

Trackwork 82/23)

Gowdall Lane LC and Hensall Jn.

Up

66 42

66 37

20

Trackwork. From 08 00 Sunday 19 September.

Snaith Station LC and Hensall

Up

66 42

66 37

20

Trackwork From 08 00 Sunday 19 September,

Up Down

DRAXPOWER STATION BRANCH 14 5

36 Hensa II Jn. and D o w n •Jacky Duff in Wood LC

1

76

20 T r a c k w o r k . (82/31)

ALDWARKE NORTH JN. (MID) TO BURTON SALMON 37

Swinton Jn. — and Aldwarke Jn.

Up Pontefract

38

Hickleton and — Bolton-on-Deame Station

Up

164 60

164 58

20

Trackwork. (82/37)

15 10

15 58

30

Trackwork. (82/38) From 07 00 Sunday 19 September.

NS—b

SECTION A —TEMPORARY SPEEDRESTRICTIONS — continued Location

a

f f e

c

Mileage at or between M. C h . M. Ch.

Lines t e d

Restriction m.p.h. Remarks

ALDWARKE NORTH JN. (MID) TO BURTON SALMON — continued 39

Moorthorpe Station D o w n Jn. and Pontefract BaghiI I Station

Up

5 06

4 49

20

Subsidence. (82/31)

40

Pontefract Baghill — Station and Moorthorpe Station Jn.

Up

7 45

8 05

30

Trackwork. (82/37)

41

Moorthorpe Station Jn. Down and Pontefract Baghill Station

7 54

7 05

20

Trackwork. (82/29)

42

Ferrybridge Power I n g o i n g Station L i n e

0 19

0 45

10

Trackwork.

2 43

2 38

20

Trackwork. (82/38) From 00 01 Sunday 19 September.

LEEDS WHITEHALL M. TO BRADFORD EXCHANGE 43

New Pudsey Stn. and — Arrnley Moor C.F.

Up

MOORTHORPE STATION M . TO SOUTH KIRKBY M . 44 Moorthorpe Station D o w n Jn. and South Kirkby Jn.

0 56

U p

0

01

20 T r a c k w o r k . (82/31)

203 4 5 2 0 3 59

20 T r a c k w o r k . (82/21)

35 2 0 4 66

20 T r a c k w o r k . (82/37)

APPERLEY M . TO ILKLEY STATION 45 Apperley Lane Tunnel and Springs Tunnel

Down

LEEDS TO SKIPTON STATION SOUTH LMR 46 Th a ckle y Tunnel D o w n and Thackley Jn.

2

0

4

LEEDS TO HULL PARAGON 47 Gascoigne Wood D o w n

U p

6 33

6 15

2 0

Trackwork. (82/24)

NS-7 SECTION A — TEMPORARY SPEED RESTRICTIONS — continued

Location

Lines affected

a M

Mileage or between R e s t r i c t i o n C h . M. C h . m . p . h . Remar ks

t .

STAINFORTH M . TO SKELLOW ADWICK JN.

48 B ra mwith Station LC D o w n U p and Thorpe Road LC (

8

1

6 2

4

53 1 6 4 44 2 / 3

0 3

B rid g e wo rk . )

THORNE JN. TO GILBERDYKE

49 G o o l e LC and D o w n Goole Bridge F

r

5

35 o

5

27

2 0 m

B rid g e wo rk . 10 00 Wednesday 22 September.

HULL PARAGON STATION TO SEAMER WEST

50 A rra m Station — LC and Beverley North LC

U t

p

1 r

1 a

1 8 1 0 60 5 0 c k

C o n d i t i o n of . (82/25)

NS-8 SECTION B

TEMPORARY ENGINEERING WORKS

At or between

Lines affected

Remarks

DONCASTER BLACK CARR JN. TO SKELTON BRIDGE UNTIL FURTHER NOTICE

51 B l a c k Carr Jn, and A l l Decoy North Jn,

Continuously. Earthwork and bridgework (BR. No.323E) 153m. 78ch. and 154m. 05ch. Crane and mechanical equipment in use. ( 8 1 / 3 2 )

52 Doncaster North A l l Jn, and Marshgate Jr].

08 00 to 17 00, Earthworks 156m, 18ch. and 156m. 23ch. ( 8 2 / 9 )

53

Down and Up

07 00 to 20 00, Earthwork, 169 and 169'Am.p. Cranes and mechanical equipment in use. (80/24)

l

Repairing station roof 188m. 06ch. and 188m. 11cl 07 L 00 to 17 00. Bridgework lm. 050. Mechanical equipment in use. ( 8 2 / 3 3 ) S c a f f 22 00 to 16 00 ) Rebal lasting, 154m. o l ) 04ch. and 154m. lOch. d 00 i to 13 00 22 ) Crane and mechanical n ) equipment in use., Trains to travel via g Slow lines. i n 00 to 09 00. Track maintenance, 155m. 60ch. 23 u 156m. lOch. Mechanical equipment in use. and Possession s to be given up for passage of trains. e 22 00 to 23 59. Track renewal, 155m. 70ch. and , 156m. 04ch. Crane and mechanical equipment in use.

Shaftholme Jn. and Selby Canal Jn.

54 Y o rk Station

A

Between Trains

l

Between Trains

55 Y o rk and Skelton

A

l

l

B e t w e e n

Trains

SATURDAY/SUNDAY 18/19 SEPTEMBER

56 Loversall Jn. and Down Fast Decoy North Jo. B L O C K E D Up Fast BLOCKED

57 Doncaster South Yorkshire Jn. and Doncaster North Jn.

3,4,5,6,7,8 All Platform Roads

58 Doncaster North Jo. and Doncaster South Yks. Jo.

Platforms 1 and 2 Carriage Sdgs. and Old Yard

BLOCKED

BLOCKED

59 Shaftholme Jn. and Selby South Jn,

Down BLOCKED

Up

23 15 to 08 15

)

23 15 to 10 15

)

BLOCKED

Track maintenance and ) earthworks, 160m. 16ch. and 174m. 4ch, Cranes ) and mechanical

equipment in use. Trains diverted via Askern.

60 Shaftholme Jo, and Selby South Jn,

Down BLOCKED

Up BLOCKED

23 15 to 08 15 23 15 to10 15

)

) Track maintenance and ) earthwork, 160m. 16ch. and 174m. ()Lich. Cranes ) and mechanical

equipment in use. Trains diverted via Askern• 1

61 B a rlb y North Jn. and Chaloners Whin

Down and Up BLOCKED

23 30 to 08 15. Track maintenance, 178m. 24ch. and 184m. 25ch. 'Trains diverted via Askem and Church Fenton. ,

NS-9 SECTION B —TEMPORARY ENGINEERING WORKS— continued Remarks At or between L i n e s affected DONCASTER BLACK CARR Mk TO SKELTON BRIDGE — continued SUNDAY 19 SEPTEMBER Platform 11 BLOCKED Platform 10 Between Trains Platform 10 BLOCKED Platform 11 Between Trains

00 01 to 05 00

63 York and Skelton

Down and Up Main BLOCKED

04 00 to 11 00. In connection with Bridgework between York Yard North and Skelton. Cranes and mechanical equipment in use. Possession to be given up for passage of trains.

64 Skelton

Down Fast and Down and Up Slow BLOCKED

00 01 to 05 15. Track maintenance lm 35ch and lm 65ch. Mechanical equipment in use. Possession to be given up for passage of trains.

65 Skelton and Tollerton

Up Fast and Up Slow BLOCKED Down Fast and Down Slow BLOCKED

05 15 to 08 45

62 York Station

00 01 to 05 00

Repairs to station roof 188m. 06ch. and 188m. 11cho Restricted clearance.

05 00 to 09 00 05 00 to 09 00

05 15 to 09 00

) Track maintenance ) 3 and 3 )1Mechanical equipment )/ 2i n use. m . p .

MONDAY 20 to WEDNESDAY 22 SEPTEMBER 66 Doncaster North Jn. P la t f o rm No.1 & and Sth. Yorks Jn. O l d Yard BLOCKED

00 01 Mon to 16 00 Wed. Track renewal 156m 04ch and 155m 04ch. Crane in use.

SHAFTHOLME M. TO FERRYBRIDGE NORTH M. UNTIL FURTHER NOTICE 67 No rt o n L.C. and U p Shaftholme Jn. B e t w e e n Trains

08 00 to 16 00. Earthwork 68m. 30ch. and 68%m.p. Crane and mechanical equipment in use. (82/24)

68 Shaftholme Jn. D o w n and Up and Norton LC B e t w e e n Trains

08 00 to 16 00. Earthwork, 66m. 63ch. Cranes and mechanical equipment in use. ( 8 2 / 3 3 )

YORKHOLGATE JN. TO SKELTON UNTIL FURTHER NOTICE 69 Ho lg a t e Jn. and D o w n Goods York Yard South B e t w e e n Trains

07 30 to 16 30. Track renewal Om.p. and Om. 25ch. Mechanical equipment in use. ( 8 2 / 6 )

SUNDAY/MONDAY 19/20 SEPTEMBER 70 York Yard North A l and Skelton B L O C K E D l

04 00 Sun to 04 00 Mon. Bridgework lm 05ch. Mechanical equipment in use.

NS-10 SECTION B - TEMPORARY ENGINEERING WORKS.- continued Remarks At or between L i n e s affected YORKTO SCARBOROUGH SATURDAY/SUNDAY 18/19 and SUNDAY 19 SEPTEMBER 71 Seamer West and Falsgrave

Down and Up BLOCKED Down and Up Between Trains

22 45 Sat to 09 30 09 30 t o l l 00 Sun

) Track renewal 41m. ) 30ch. and 41m, 42ch. ) Cranes and mechanical ) i n use.

WEDNESDAY 22 to FRIDAY 24 SEPTEMBER 72 Seamer West D o w n and Up and Falsgrave B L O C K E D

22 45 Wed and Thu to 06 30 Thu and Fri. Track maintenance 41m. 30ch. and 41m. 55ch. Mechanical equipment in use.

YORKSKELTON TO HARROGATE UNTIL FURTHER NOTICE 73 Starbeck and D o w n Harrogate B e t w e e n Trains

08 00 to 16 00. Track maintenance 19m. 51ch. and 19m. 72ch. Crane and mechanical equipment in use. ( 8 2 / 9 )

SATURDAY/SUNDAY 18/19 SEPTEMBER 74 Skelton and D o w n and Up Poppleton B L O C K E D

22 15 to 08 15. Track maintenance lm. 50ch. and 2m. 70ch. Mechanical equipment in use.

MONDAY 20 to FRIDAY 24 SEPTEMBER 75 Ca t t a l Station S i n g l e / D o w n and Up and Knaresborough B L O CK E D

DONCASTER MARSHGATE M. TO LEDS WEST siN.

22 00 Mon to Thu to 05 30 Tue to Fri. Track maintenance 101/2 and 1 6 equipment in use. 1 / 4 m. p . M e c h a n i c a l

UNTIL FURTHER . n in s k P re a 76 D o NOTICE w H and Up Between Trains and Wakefield Westgate South Jn. All 77 Wa ke fie ld Westgate Station Between Trains

07 30 to 18 00. Erecting and dismantling scaffolding and safety nets for renewal of overhead power lines 173m. 43ch. ( 8 2 / 3 3 )

78 G e ld e rd Road ..1n.

All Between Trains

08 00 to 18 00. Earthwork, 184m. 22ch. Crane in use. ( 8 2 / 1 2 )

79 L e e d s West Jn.

All

06 00 to 18 00. Signalling work.

80 Ha re Park „in. and Wakefield Westgate South Jr1.1

Down Between Trains

07 30 to 16.30. Earthwork, 174m. 30ch. and 174m. 38ch. Crane in use. ( 8 2 / 3 7 )

07 30 to 17 00. Bridgework (BR. No.5) 175m. 63ch. Restricted clearance. ( 8 2 / 1 1 )

SATURDAY/SUNDAY 18/19 SEPTEMBER 81 B e n tle y LC and Carcroft

Down and Up BLOCKED

23 15 to 09 00. Reballasting 158m. 05ch. and 158m. 35ch. Mechanical equipment in use. Trains diverted via Askern.

NS-11 SECTION B —TEMPORARY ENGINEERING WORKS— continued At or between

L i n e s

affected

Remarks

DONCASTER MARSHGATE JN. TO LEEDS WEST M. — continued SATURDAY/SUNDAY, 18/19 SEPTEMBER --' continued 82 Wakefield Westgate Station and Gelderd Road Jo.

Down and Up BLOCKED

SATURDAY/SUNDAY 18/19 and SUNDAY 19 SEPTEMBER 83 South Kirkby Jn.

A l l

South Kirkby Jn. and U p Main Hare Park Jo. B L O C K E D Down Main BLOCKED Up Main Between Trains Down Main Between Trains

23 30 to 08 00. Drainage 177m. 58ch. and 180m. 55ch. Cranes in use. Possession to be given up for passage of 1L22, 23 25 Kings Cross to Bradferd Exchange over Down line and 1D57, 01 00 Leeds to Doncaster over Up line.

23 00 Sat to 20 00 Sun 23 00 Sat to 09 00 23 00 Sat to 12 30 09 00 to 17 00 Sun 12 30 to 17 00 Sun

SUNDAY 19 SEPTEMBER

Track renewal, 185m.

75ch. and 167 imp. and signalling work. Cranes and mechanical equipment in use. 23 00 Sat to 09 00. Trains diverted via Askern. 09 00 to 12 30 Sun. Down trains diverted via Askern. (See Section 'C').

84 Wakefield Westgate U p Station and Wakefield BLOCKED Westgate South Jn.

06 00 to 13 00. In connection with engineering work between Wakefield Westgate South Jn. and Wakefield Kirkgate West Jn. Possession to be given up for passage of trains.

85 Wakefield Westgate D o w n and Up Station Between Trains

07 00 to 17 00. Track maintenance, 175m. 75ch. and 176m. 05ch.

MONDAY 20 to FRIDAY 24 SEPTEMBER 86 South Kirkby Jn.

A l l

87 Wakefield Westgate D o w n Station and Gelderd B e twe e n Trains Road Jn.

08 00 to 17 00 daily. Signalling work. 08 00 to 16 00 daily. Earthwork, 183m. 25ch. and 183m. 30ch. Crane in use.

WEDNESDAY 22 SEPTEMBER 88

Bentley LC and Castle Hills South Jn,

Up BLOCKED Down Between Trains

89 Ge ld e rd Road Jr,. D o w n and Leeds West Jri. BLOCKED

03 20 to 07 00. Track renewal 158m. 05ch. and 158m. 35ch. Mechanical equipment in use. Possession to be given up for passage of MGR and local trip trains. Other Up trains diverted via Askern. 09 00 to 16 00. Track maintenance 184 11851/4 m.p. Down trains to travel via Whitehall /2 a n d

STAINFORTH M. TO SKELLOW ADWICK JN. UNTIL FURTHER NOTICE 90 Stainforth Rd. and D o w n and Up Thorpe Road LC

Continuously. Bridgework (BR.7 and 8), 164m. 53ch. and 164m. 44ch. ( 8 2 / 2 9 )

NS-12 SECTION B —TEMPORARY ENGINEERING WORKS— continued At or between

L i n e s

affected

Remarks

STAINFORTH sIN. TO SKELLOW ADWICK JN. — continued THURSDAY 23 SEPTEMBER 91 Stainforth Jn. D o w n and Up and Skellow Jn. B L O C K E D

00 01 to 06 00. Track renewal 164 and 1 6 2 Mechanical equipment in use. Possession to be 1 given up for passage of trains. / 2 m. p .

WAKERELDWESTGATE SOUTH M . TO WAKEFIELD KIRKGATE WEST JN. somata 19 SEPTEMBER 92

Wakefield Westgate S i n g l e South Jn. and B L O C K E D Wakefield Kirkgate West Jn,

06 00 to 16 00. Track renewal, 0 m.o. and Om. 26ch. Possession to be given up for passage of trains.

LEEDS GELDERD ROAD M. TO LEEDS HOLBECKWESTJINI. UNTIL FURTHER NOTICE 93 Gelderd Road Jn.

All Between Trains

08 00 to 18 00. Earthworks 184m. 22ch. Crane in use. ( 8 2 / 1 2 )

EASTWOODLNIR TO NORMANTON GOOSE HILL M. UNTIL FURTHER NOTICE 94 E l land and A l l Bradley Wood Jri. B e t w e e n Trains

08 00 to 18 00. Erecting and dismantling scaffolding and safety nets for overhead power line maintenance 32m. 113ch. ( 8 2 / 3 2 )

95 Wakefield Kirkgate P l a t f o rms 1, 2 and 3 Station B e t w e e n Trains

07 30 to 17 00. Platform work, 47m. 55ch. and 47m. 70ch. Mechanical equipment in use. (See Section 'D').

96 Mirfi e ld Station D o w n and Up Slow Between Trains

07 30 to 17 00. Platform work, 38m.132ch. Mechanical equipment in use. iSee Section •D'.

97

07 00 to 17 00. Signalling work.

Hebden Bridge

Down and Up

SATURDAY/SUNDAY 18/19 SEPTEMBER 98 Wakefield Kirkgate P l a t f o r m 1/Down West Jn. and M a i n and Up Main Turners Lane Jn. P l a t f o r m 2 BLOCKED Wakefield Kirkgate

Through line BLOCKED

23 30 to 09 30. Drainage, 1 Cranes to be given up for 1 7 m . in6use. 3 Possession c h . passage of trains. a n d 4 8 m . p .

NS-13 SECTION B —TEMPORARY ENGINEERING WORK— continued Lines affected

At or between

Remarks

EASTWOODLMR TO NORMANTON GOCSE HILL M. — continued SUNDAY 19 SEPTEMBER 99 Sovverby Bridge D o w n and Up West and Milner B L O C K E D Royd

00 30 to 08 00. Bridgework (Sowerby Bridge Viaduct) 28m. 30ch. Crane in use.

100

Greetland and Elland

Down BLOCKED

101

Horbury Station in. and Midland in.

Up Fast BLOCKED

102

Mirfield Up Sidings G.F.

Up Fast

07 30 to 17 00. Signalling work. (See Section 'C').

103

Wakefield Kirkgate West in. and Wakefield Kirkgate East in.

Down Slow and Down Fast BLOCKED

06 00 to 16 00. In connection with engineering work between Wakefield Westgate South in. and Wakefield Kirkgate West in. 06 00 to 13 00. Single line working over Up Slow for Down trains between Horbury Jn. and Wakefield Kirkgate West

00 30 to 08 15. Track maintenance 31 and 3 1 1 /07 2 00 m . to p .17 00. Track maintenance 44m. 05ch. and 43m. 70ch. Up trains to travel over Up Slow line.

in. Possession to be given up for passage of 2L57, 09 25 Doncaster to Leeds (Diverted). 13 00 to 16 00. Possession to be given up for passage of trains.

SUNDAY 19 to FRIDAY 24 SEPTEMBER 104 Ho rb u ry Jn.

A

l

l

07 00 to 17 00 daily. Signalling work.

MONDAY 20 and TUESDAY 21 SEPTEMBER 185 Bradley Wood Jo. D o w n and Up and Heaton Lodge B L O C K E D

08 00 to 16 00 daily. Track renewal 3 5 33 7 to 1/4beagiven n d up for passage of trains. A WEDNESDAY/THURSDAY 22/23 SEPTEMBER m. 106 Wakefield Kirkgate P l a t f o r m 2 (Up L & V) p . 30 to 06 00. Track renewal, 47m. 68ch. and 23 East in. and B L O C K E D M 53ch. Trains to travel over Through line. 47m. Wakefield Kirkgate e West in. c h WEDNESDAY 22 to FRIDAY 24 SEPTEMBER a 107 He a to n Lodge in. D o w n Slow 23 n 45 Wed and Thu to 06 30 thu and Fri. Track and Thornhill B L O C K E D renewal, 37 i LNW in. in 1c use. Down trains to travel over Down Fast line. /2 a al n d SOWERBYBRIDGE MILNER ROYD JN. TO BRADFORD MILL3eLANE JN. 9 3q UNTIL FURTHER NOTICE A u m . p 108 Mill Lane sin. A l ! .i07 30 to 17 00. Signalling work. ( 8 2 / 1 9 ) M p e c 109 Ha lif a x and D o w n and Up 00 30 to 09 45. Loading rails, 32'Am.p. and 33m. h m a n Mill Lane Jo. B L O C K E D 13ch. in use. Possession to be given up for ie c Cranes a passage of 1E31, 01 10 Manchester Victoria — ln Bradford Exchange over Down line. et q

NS-14 SECTION B —TEMPORARY ENGINEERING WORKS— continued At or between Lines affected Remarks GREETLAND TO DRYCLOUGH SUNDAY 19 to TUESDAY 21 SEPTEMBER 110 G re e t land and D o w n and Up Dryclough Jn. B L O C K E D

22 00 Sun and Mon to 07 00 Mon and lue. Bridgework (No.6), lm. 06ch. Crane in use. Possession to be given up for passage of 1L28, 02 06 Doncaster to Halifax over Down line.

DIGGLE JN. LMR TO HEALEY MILLS HEATON LODGE M. UNTIL FURTHER NOTICE 111 Ma rsd e n and Gledholt

Down and Up Between Trains

07 30 to 17 00. Bridgework (Nos.62, 65 and 79). Construction work, 21m. 18ch. and 24m. 15ch. Crane and mechanical equipment in use. (81/48)

112 Gledholt Jn. and Huddersfield

Down Fast and Down Slow Between Trains

07 30 to 17 00. Bridgework (No.85), 25m 03ch. Crane and mechanical equipment in use. From 07 30 Sunday 19 September.

Springvvood „in. and Marsden

Up Main Between Trains

SUNDAY 19 SEPTEMBER 113 Dig g le Jn. and Marsden

114 Marsden and Gledholt Jn. Springwood Jn. and Marsden

Down Between Trains Up BLOCKED Down BLOCKED

00 15 to 02 00

Down BLOCKED

02 00 to 18 00

Up Main BLOCKED

SUNDAY 19 to FRIDAY 24 SEPTEMBER 115

Marsden

116 Huddersfield

) Signalling work and ) tunnelwork (Standedge ) Tunnel) 15m 1 lch and ) 18m 14ch. Mechanical ) equipment in use. Trains diverted via Hebden Bridge.

00 15 to 16 15 02 00 to 16 15

)

Track renewal and ) bridgework (No.85) ) 20m 37ch and 25m 00 15 to 18 15 ) 03ch. Cranes and ) mechanical equipment in use. Trains diverted via Hebden Bridge.

All

07 00 to 17 00 daily. Signalling work.

All

07 00 to 17 00 daily. Signalling work.

MONDAY 20 to FRIDAY 24 SEPTEMBER 117 Gledholt Jn. and Huddersfield

Down Slow BLOCKED

08 00 to 16 00 daily. Drainage 25m 04ch and 25m 08ch. Cranes in use. Down trains to travel over Down Fast line.

Up BLOCKED

01 30 to 05 30. Track renewal and track maintenance 25',/4 rn.p. and 21m 70ch. Mechanical equipment in use. Up trains diverted via Hebden Bridge.

TUESDAY 21 SEPTEMBER 118 Springwood Jn. and Marsden

NS-15 SECTION B — TEMPORARY ENGINEERING WORKS — continued At or between L i n e s affected R e m a r k s THORNHILL L.N.W. JN. TO LEEDS HOLBECK EAST JN. SUNDAY 19 SEPTEMBER Down and Up

119 Rav ens t horpe G.F.

0

7

30 t o 17 00. Signalling work. (See Section 'C').

SATURDAY/SUNDAY 18/19 and SUNDAY 19 SEPTEMBER 120 B a t l e y and D o w n 2 Morley B e t w e e n Trains Up 2 BLOCKED Down 0 BLOCKED

3

35 Sat to 03 45 D r a i n a g e 36m. 18ch. n d 38m. 16ch. Cranes 35 Sat to 07 30 i n use.

a 3 3

45 to 08 00 Sun

TUESDAY 21 to THURSDAY 23 SEPTEMBER 23 35 Tue and Wed to 06 15 Wed and Thu. Bridgework (No.19). 33m. 76ch. and 34m. 05ch. Crane in use. Possession to be given up for passage of trains.

121 De ws b u r y Wellington D o w n and Up Road GF and Batley B L O C K E D

BARNSLEY STATION JN. TO HORBURY JN. UNTIL FURTHER NOTICE 122 B a r n s l e y Station Jn. D o w n and Up 2 3 30 to 06 00. Track maintenance, 48Y4 and and Horbury Jn. B L O C K E D 4 7 1 SATURDAY/SUNDAY 18/19 and SUNDAY 19 SEPTEMBER / 4 m . p . 8 2 D o w/ n 1 Earthwork and track 123 Da(r t o n Station and 23 30 Sat to 13 15 8 ) renewal 52n.p. and Woolley Coal Siding B L O CK E D 23 30 Sat to 16 30 48m. 54ch. Cranes and Up BLOCKED mechanical equipment in use. 13 15 to 16 30 Down 13 15 to 16 30 Sun Between Trains Sun. Single line working over Down line. SUNDAY 19 SEPTEMBER 124 Wo o l l e y Coal Siding D o w n and Up and Crigglestone Jn. Between Trains

0 7 4 7 m

.

30 to 16 00. Tunnelwork (Woolley Tunnels), 33ch. Restricted clearance..

SUNDAY 19 to FRIDAY 24 SEPTEMBER 125 Wo o l l e y Coal Sdg. D o w n and Up 126 Ho r b u r y Jn.

A

l

l

0

0

7 7

00 to 17 00 daily. Signalling work. 00 to 17 00 daily. Signalling work.

ALDWARKE NORTH JN. (MID) TO LEEDS NORTH JN. UNTIL FURTHER NOTICE 127 S wi n t o n sin. and Down Main 0 7 30 to 17 00. Earthwork, 1 7 4 Cudworth Station Jn. B e1t we e n Trains Crane in use. ( 8 2 / A a n d 1 7 4 Y 2 m . p .

3

7

)

NS-16 SECTION B — TEMPORARY ENGINEERING WORKS — continued At or between

L i

n e

s

affected

Remarks

ALDVVARKE NORTH M . IMID) TO LEEDS NORTH JN. —continued UNTIL FURTHER NOTICE — continued

128 Royston Jn. and D o w n and Up Oakenshaw South B e t w e e n Trains Jo.

129 Stourton Jn and A l l Leeds North Jo.

07 30 to 17 00. Earthwork, slip treatment and track renewal, 178m. 77ch. and 179m. 35ch. Cranes and mechanical equipment in use. ( 8 1 / 5 0 ) 08 00 to 18 00. Signalling work.

SUNDAY 19 to FRIDAY 24 SEPTEMBER

07 30 to 17 00 daily. Signalling work.

130 De a rn e Valley A l l North „In. and Cudworth Station

OAKENSHAW SOUTH M . TO OAKENSHAW JN. UNTIL FURTHER NOTICE

131 Oakenshaw South Jo. Down and Up and Oakenshaw Jn. B e t we e n Trains

07 30 to 17 30. Erecting/dismantling scaffolding and safety nets for overhead power line renewal. 49m. 02ch. ( 8 2 / 3 4 )

NORMANTON ALTOFTS M . TO YORK CHALONERS WHIN UNTIL FURTHER NOTICE 132

Whitwood and

Castieford Station 133

Fryston and Burton Salmon

134 Chaloners Whin Jo. and Church Fenton

Down and Up

07 30 to 16 00. Signalling work.

Down and Up

07 30 to 17 00. Bridgework (No.43) 18m. 09ch. Crane and mechanical equipment in use. (82/31)

Up Normanton

Between Trains

07 00 to 18 00. Earthwork 5 and BEND. Cranes and mechanical equipment in use. ( 8 1 / 8 )

Between Trains Between Trains

SUNDAY 19 SEPTEMBER 135

Fryston

Down Main

08 00 to 16 00. Signalling work.

136

Sherburn-in-Elmet South

All

08 00 to 16 00. Signalling work.

137

Church Fenton North Jri. and Chaloners Whin Jo.

Down and Up Leeds

07 00 to 16 00. Construction work 4m. 35ch. and 4m. 16ch. Cranes and mechanical equipment in

;BLOCKED

Down Norman ton

use. Trains to travel over Normanton lines.

•Between Trains

MONDAY 20 to FRIDAY 24 SEPTBVIBER 138

Cha loners Whin Jn. and Church Fenton North Jo.

Up Normanton

Between Trains

08 00 to 16 00 daily. Track renewal 5 6 1 m.p. Crane in use. /4 a n d

NS-17 SECTION B — TEMPORARY ENGINEERING WORKS — continued At or between

Lines affected

Remarks

CASTLEFORD WEST M . TO PONTEFRACT WEST JN. UNTIL FURTHER NOTICE

139 Ca stle fo rd West D o w n and Up Jn. and Prince of Wales

07 30 to 16 00. Signalling work.

SUNDAY 19 SEPTEMBER

140 Cu tsyke Jn. and D o w n Prince of Wales B L O C K E D

06 00 to 16 00. Track maintenance 58 and 5 7 Possession to be given up for passage of MGR 3 trains.

A rn . p .

SHERBURN-IN-ELMET SOUTH TO GASCOIGNE WOOD SUNDAY 19 SEPTEMBER

141 Sherburn-in-Elmet South

A l

08 00 to 16 00. Signalling work.

WAKEFIELD KIRKGATE WEST JN. TO GOOLE POTTERS GRANGE AL . UNTIL FURTHER NOTICE

142 Oakenshaw Jn. and Crofton West Jn.

Down and Up

Between Trains

143 Wakefield (K) Station Platforms 1, 2 & 3 Between Trains

07 30 to 17 30. Erecting/dismantling scaffolding and safety nets for overhead power line renewal 49m. 02ch. ( 8 2 / 3 4 ) 07 30 to 17 00. Platform work 47m. 55ch. and 47m. 70ch. Mechanical equipment in use. (See Section D).

144 Knottingley SUNDAY 19 SEPTEMBER

All

8

1

/

4

6

)

07 30 to 16 00. Signalling work.

Between Trains

145 He n sa ll sin. and D o w n and Up Goole Engine B L O C K E D Shed Jn. 146 Wakefield Kirkgate West Jn. and Calder Bridge Jn.

(

05 00 to 16 00. Track renewal and drainage, 66m. 37ch. and 72m. 25ch. Cranes and mechanical equipment in use.

Down

06 00 to 16 00. Earthwork, 47m. 64ch. and 47m.

BLOCKED

75ch. Crane in use. Possession to be given up for passage of trains.

SUNDAY 19 to FRIDAY 24 SEPTEMBER 147

Oakenshaw Jn. and A l l Featherstone LC

08 00 to 17 00 daily. Signalling work.

WEDNESDAY 22 SEPTEMBER 148

Featherstone LC D o w n and Up and Pontefract B L O C K E D West Jn.

00 01 to 06 00. Track renewal, 55m. 45ch. and 55m. 65ch• Mechanical equipment in use. Possession to be given up for passage of trains.

NS-18 SECTION B - TEMPORARY ENGINEERING WORKS - continued At or between

Lines affected

Remarks

FERRYBRIDGE BRANCH SATURDAY/SUNDAY 18/19 SEPTEMBER

149 Pontefract Goods Jn. and Ferrybridge South Jn.

Single

BLOCKED

22 00 to 08 00. Track maintenance, 3 and 2 1 /2 m.p .

ALDWARKE NORTH M . (MID) TO BURTON SALMON UNTIL FURTHER NOTICE 150

Hickleton A and l

l

Moorthorpe Station

Between Trains

07 30 to 17 00. Earthwork, 11m. 65ch. and 11m. 35ch. Crane and mechanical equipment in use. (82/31)

151

Hickleton and Ferrybridge

All Between Trains

07 30 to 16 00. Signalling work. ( 8 2 / 3 0 )

152

Moorthorpe Station

Down

07 30 to 17 00. Platform work. Mechanical equipment in use. (See Section 'D'). (8 2 / 2 7 )

Between Trains 153

154

Moorthorpe Station Jn. and Pontefract Baghi II Station

Down and Up

Moorthorpe Stn. „In. and Ferrybridge South Jn.

Down

Between Trains

07 30 to 17 00. Bridgework (No.43) and earthwork 10m. 69ch. and 9m. 21ch. Crane and mechanical equipment in use. Restricted clearance.(82/25)

00 01 to 03 00

Between Trains

Up

00 01 to 07 00

Down

03 00 to 07 00

Between Trains

) Track maintenance, ) 5'A and 41/4m.p. ) Mechanical equipment ) i n use. ( 8 2 / 2 9 )

BLOCKED

155 Moorthorpe Station Jn. and Ferrybridge South Jn.

Down and Up

Between Trains

07 30 to 18 00 Bridgework (No.26), 5 rn.p. (82/1)

SATURDAY/SUNDAY 18/19 SEPTEMBER

156 Hickleton and D o w n and Up Main Moorthorpe Station Jn. BLOCKED

23 15 to 17 00. Earthwork and track maintenance, 12m. 45ch. and 11m. 50ch.

157 Moorthorpe Station Jn. and Ferrybridge South Jn.

Down and Up

23 00 to 20 00. Track renewal, 8m. 05ch. and 7m. 45ch. Cranes and mechanical equipment in use.

Down and Up

07 00 to 17 00. Track maintenance, 15m. 17ch. and 15m. lOch. Crane in use.

BLOCKED

Down and Up

00 01 to 08 30. Track renewal, Om. 19ch. and Om. 45ch. Crane in use.

Down and Up

07 30 to 17 00. Earthworks, 11m. 45ch.

158 Dearne Jn. and Hickleton

BLOCKED

BLOCKED

SUNDAY 19 SEPTEMBER

159 Ferrybridge Power Station Branch 160 Moorthorpe Station and Moorthorpe Stn. Jn.

Between Trains

NS-19 SECTION B — TEMPORARY ENGINEERING WORKS — continued At or between

Lines affected

Remarks

ALDWARKE NORTH AL (MID) TO BURTON SALMON — continued THURSDAY/FRIDAY 23/24 SEPTEMBER

161 Moorthorpe Station Jn. and Ferrybridge South Jn. 162 Aldwarke Jn. and Swinton Jn.

Up

BLOCKED

Down

23 30 to 03 00. Track renewal, 8m. 05ch. and 7m. 45ch. Mechanical equipment in use. Possession to

Between Trains

be given up for passage of MGR and local trip trains. Other Up trains diverted via Cudworth.

Down and Up Pontefract

07 00 to 14 00

Up Pontefract

14 00 to 16 00

BLOCKED

BLOCKED

) ) ) )

Track renewal, 164m• 58ch. and 164 Cranes and mechanical 3 equipment /1 m . o in. use.

) ) ) )

Signalling work and in connection with engineering work between South Kirkby

MOORTHORPE STATION M . TO SOUTH KIRKBY AL SATURDAY/SUNDAY, 18/19 and SUNDAY 19 SEPTEMBER

163 Moorthorpe Station Jn. and South Kirkby Jn. •

Down and Up

23 00 Sat to 17 00

Down and Up

17 00 to 20 00 Sun.

BLOCKED

Jn. and Hare Park Jn..(See Section 'C'). MONDAY 20 to FRIDAY 24 SEPTEMBER

164 So u th Kirkby Jn.

A l l

08 00 to 17 00 daily. Signalling work.

LEEDS WHITEHALL M. TO BRADFORD EXCHANGE UNTIL FURTHER NOTICE

165 Whitehall Jn. and Hammerton Street

Down and Up

08 00 to 18 00. Signalling work. ( 8 2 / 1 9 )

166 M i l l Lane Jn,

All

07 30 to 17 00. Signalling work. ( 8 2 / 1 9 )

Down

00 01 to 04 30

SUNDAY 19 SEPTEMBER

167 A r m ley Moor G.F. and Hammetron Street

BLOCKED

Up

00 15 to 08 00

Down

04 30 to 08 00

BLOCKED Between Trains

T r a c k maintenance, 2m. 38ch. and 1 2m. 43ch. Crane in

use. Possession t o given up for passage of 5L69, 04 10 Bradford Exchange to Leeds and OLOO, 05 00 Bradford Exchange to Holbeck over Up line. b

e

LEEDS TO SKIPTON STATION SOUTH LMR UNTIL FURTHER NOTICE

168 L e e d s West Jr). 169

Whitehall Jn. and Kirkstall Jn.

A l l All

06 00 to 18 00. Signalling work. 06 00 to 18 00. Signalling work, ( 8 2 / 1 9 )

NS-20 SECTION B —TEMPORARY ENGINEERING WORKS— continued At or between

Lines affected

Remarks

LEEDS TO SKIPTON STATION SOUTH LMR continued UNTIL FURTHER NOTICE — continued 170 K irksta ll Jn.

Up Goods Loop Between Trains

08 00 to 15 00, Earthwork 197m. 45ch. and 198m.p. Mechanical equipment in use. (82/10)

171 K irk s t a ll Jri. and Apperley

Down and Up Between Trains

07 30 to 17 00. Bridgework (Nos24 and 33) 198m. lOch. and 201m. 45ch. Restricted clearance. (82/32)

172 Apperley Jn. and Thackley Jn,

Down and Up Between Trains

07 30 to 17 00. Tunnelwork (Thackley Tunnel) 203m. 42ch. and 204m. 32ch. Mechanical equipment in use. ( 8 1 / 3 0 )

173 Keighley Station Jn. and Cononley

Down and Up

07 30 to 17 00. Signalling work.

174 Cononley LC and Skipton Station South

Down and Up

Bridgework (No.86A), 2201/4 and 2201/4 m.p. Crane and mechanical equipment in use. ( 8 2 / 3 4 )

175 B in g ley Station

Down and Up Between Trains

07 30 to 17 00. Platform work 208m. 68ch. Mechanical equipment in use. (See Section 'D'). From 07 30 Sunday 19 September. ( 8 2 / 3 8 )

SATURDAY/SUNDAY 18/19 SEPTEMBER 176

Shipley Bingley Jn. and Keighley Station Jn.

Down and Up BLOCKED

23 15 to 09 00. Track maintenance 209 and 209'1/4 m.o. Possession to be given up for passage of trains.

Up Main BLOCKED Down Main BLOCKED Up Main Between Trains

02 30 to 13 15

SUNDAY 19 SEPTEMBER 177 Ap p e rle y Jn. and Guiseley Jn.

Batley Jn. and Guiseley Jn,

178 K ild wic k

Down Loop BLOCKED

Down and Up BLOCKED

SUNDAY 19 to FRIDAY 24 SEPTEMBER 179 G u is e ley Jn. and Shipley Bingley Jn.

Down and Up

LEEDSWORTLEY sIN. TO HARROGATE UNTIL FURTHER NOTICE 180 Wo rtle y Jn. and Horsforth

Down and Up

Track renewal 204m. 35ch. and 204m. 66ch. Cranes and mechanical 03 15 to 16 30 equipment in use. 03 15 to 13 15. 13 15 to 16 30 Possession to be given up for passage of 2M71, 09 10 Leeds to 00 01 to 16 30 Morecambe over Up line under Single line working. 13 15 to 16 30. Single line working over Up line. 04 00 to 14 00. Loading materials 2161/4 and 216 3up for passage of trains. A m. p . 30 to 17 00. Signalling work. 07 C r a n e i n u 06 s 00 to 18 00. Signalling work. e .

NS-21 SECTION B —TEMPORARY ENGINEERING WORKS— continued Remarks Lines affected At or between LEEDSWORTLEY M. TO HARROGATE — continued UNTIL FURTHER NOTICE — continued 181

Horsforth and Weeton Stn.

Down and Up Between Trains

SATURDAY/SUNDAY 18/10 SEPTEMBER 182 Horsforth and Rigton

Down and Up BLOCKED

07 30 to 17 00. Demolition work 8 30ch. ( 8 2 / 3 0 ) 1 A m.p . a n d 8 m . 23 30 to 08 30. Tunnelwork (Bramhope Tunnel) 5m. 65ch. and 7m. 77ch. Mechanical equipment in use.

APPERLEY M. TO ILKLEY STATION UNTIL FURTHER NOTICE 07 30 to 17 00. Construction work 204 and 205 (82/35) 3 4 184 E sh o lt Jn. and Down and Up 07 30 to 17 00. Tunnelwork (Greenbottom Tunnel), r204m. n Guiseley Station B e t w e e n Trains 62ch. and 204m. 68ch. Restricted clearance. . p (82/27) . 185 I l k l e y Station P l a t f o r m 1 07 30 to 17 00. Platform work 211m. 23ch. C Between Trains Mechanical equipment in use. (See Section 'D'). rFrom 07 30 Sunday 19 September. ( B 2 / 3 8 ) SUNDAY 19 SEPTEMBER a n 186 I l k l e y Station A l l 07 30 to 1700. Building work 211m. 23ch. eRestricted Between Trains clearance. a SUNDAY 10 to FRIDAY 24 SEPTEMBER n d 187 G u is e ley Station D o w n and Up 07 00 to 17 00 daily. Signalling work. m e WEDNESDAY/THURSDAY 22/23 SEPTEMBER c 188 E s h o lt Jn. and D o w n and Up h23 30 to 06 15. Track renewal 2 0 5 Ilkley Jn. B L O C K E D 30ch. Mechanical equipment in use. a206m. 3 nA m . p . a n d i c GUISELEY M. TO ESHOLT a UNTIL FURTHER NOTICE l e 180 G u ise ley Jn. and Down and Up 07 30 to 17 00. Construction work 3m 38ch and Esholt Jn. Between Trains 0qm.p. Crane and mechanical equipment in use. u i p SHIPLEY LEEDS JN. TO BRADFORDFORSTERSQUARE m e SUNDAY 19 to FRIDAY 24 SEPTEMBER n 190 L e e d s Jn. and Down and Up t 30 to 17 00 daily. Signalling work. 07 Shipley Bradford sin. i n 183 Apperley „in. and Burley Jn.

Down and Up Between Trains

NS-22 SECTION B —TEMPORARY ENGINEERING WORKS— continued At or between

Lines affected

Remarks

SHIPLEY BRADFORD M. TO SHIPLEY BINGLEY SUNDAY 19 to FRIDAY 24 SEPTEMBER 191 S h ip le y Bradford Jn. S in g le and Shipley Bingley Jn.

07 30 to 17 00 daily. Signalling work.

LEEDS TO HULL PARAGON UNTIL FURTHER NOTICE 192 L e e d s East Jn. and Marsh Lane Jn.

Down and Up Between Trains

193 L e e d s East Jn. and Micklefield Stn. Jn.

All

194 Gascoigne Wood and Selby West „In.

Down and Up Main Between Trains

SUNDAY 19 SEPTEMBER

07 30 to 17 00. Bridgework (Marsh Lane Viaduct) 20m. 25ch. and 1 9 equipment in use. ( 8 2 / 1 8 ) 3 / 4 m. p . 06 00 to 18 00. Signalling work. C r a n e a n d 07 00 to 19 work, earthwork and m e c 00. h Demolition a bridgework, 6m.p. and 2m. 48ch. Cranes and n i c a l mechanical equipment in use. ( 8 0 / 2 1 )

195 Peckfield and Neville Hill East Jn,

Up BLOCKED

00 01 to 07 450 Track maintenance and track renewal, 11m. 30ch. land 14m. 55ch.

196 Broomfleet Stn. IC and Brough East LC

Down and Up BLOCKED

08 00 to 14 00. Bridgework, 10m. 42ch. Ladders in use. Possession to be given up for passage of trains.

SUNDAY 19 to FRIDAY 24 SEPTEMBER 197 Crossgates Station and Peckfield

Down and Up

08 00 to 17 00 daily. 5 ignalling work.1

MONDAY 20 to FRIDAY 24 SEPTEMBER 198 S e lb y LC and Gascoigne Wood

Up BLOCKED

THURSDAY/FRIDAY 23/24 SEPTEMBER 199 Wre ssle Station LC and Howden Stn, LC

Down BLOCKED

06 00 to 19 00 daily. In connection with engineering work. Possession to be given up or passage of trains. 23 35 to 06 30. Track maintenance, 25 m.p. and 22m. 30ch. Mechanical equipment in use. Possession to be given up for passage of trains.

THORNE JN. TO GILBERDYKE UNTIL FURTHER NOTICE 200 P o tte rs Grange Jn. A l l and Goole LC Between Trains MONDAY/TUESDAY 20/21 SEPTEMBER 201 Thorne „In. and Thorne Moorends

Down Main BLOCKED

07 00 to 18 00. Bridgework and earthwork, 7m. 20ch. and 6m. 65ch. Mechanical equipment in use. ( 8 1 / 2 3 ) 23 20 to 04 00. Reballasting, 8m. 05ch. and 9m. 74ch. Mechanical equipment in use.

NS-23 SECTION B —TEMPORARY ENGINEERING WORKS— continued At or between

Lines affected R e m a r k s

THORNE JN. TO GILBERDYKE JN. — continued MONDAY 20 to FRIDAY 24 SEPTEMBER 202 Thorne Jn. and Thorne North

08 00 to 16 00. Burning scrub, 8m. 51ch. and 9m. 20ch.

Down and Up

WEDNESDAY 22 SEPTEMBER 00 01 to 06 30. Reballasting, 9m. 74ch. and 8m. 05ch. Mechanical equipment in use.

203 Thorne Moorends U p Main and Thorne Jn. B L O C K E D

HULL PARAGON STATION TO SEAMERWEST MONDAY 20 to WEDNESDAY 22 SEPTEMBER 204 Bridlington Quay LC S in g le 2 2 00 Mon and Tue to 06 30 Tue and Wed. Track and Hunmanby B L O C K E D m a i n t e n a n c e , 32 and 3 0 Station LC e q u i p m e n t in use. 1 A r n . p . M e c21/22 h a SEPTEM n i cBER a l TUESDAY/WEDNESDAY 22 00 to 06 30. Track maintenance, 46'A and 50m.p. Mechanical equipment in use.

205 Gristhorpe LC and D o w n Seamer West Jn. B L O C K E D WEDNESDAY 22 to FRIDAY 24 SEPTEMBER

206 Lowthorpe LC and D o w n 2 3 00 Wed and Thu to 05 45 Thu and Fri. Track Bridlington South B L O C K E D m a i n t e n a n c e , 2 3 eauiPment in use. 3 A a n d 3 0 1 / 2HAVEN m . p TO . DAIRYCOATES M e c hWEST a VIA n iHULL c YARD a l HESSLE UNTIL FURTHER NOTICE 207 H e s s l e Haven and D o w n and Up Dairycoates West B e t w e e n Trains

0 2

7 m .

30 to 16 00. Track renewal, lm. 62ch. and 2ch. Crane in use. ( 8 2 / 1 8 )

DAIRYCOATES WEST TO NEPTUNE STREET UNTIL FURTHER NOTICE 208 D a irycoates West D o w n and Up and Neptune Street B e t we e n Trains

08 00 to 16 00. Track abandonment, lm. 69ch. and l'Am.p. Cranes and mechanical equipment in use. ( 8 2 / 1 6 )

NS-24 SECTION C

SIGNALLING AND PERMANENTWAY ALTERATIONS Items marked thus w i l l not appear i n futur e i ssues and a note must be taken of them by al l concer ned

With effect from 09 00 Monday 13 September the 20m.p.h. Down and Up speed restrictions between Royston Jn. and Oakenshaw South Jn. (179m. 25ch. and 179m. 40ch.) will become differential restrictions of 20 over 40 in accordance with Section 1 clause 10 on page 1.57 of the General Appendix. (40)

DETAILS OF WORK REFRIED TO IN SECTION B SUNDAY 19 SEPTEMBER— MIRFIELD The points leading to the Up Sidings will be secured out of use in the normal position pending removal. ( 4 1 )

SUNDAY 19 SEPTEMBER—SOUTH KIRKBY JUNCTION The facing lead from the Down Main into South Kirkby Colliery will be restored to its former position. The trailing crossover between the Down and Up Main lines will be re-positioned 30 yards nearer to South Elmsall. Signe King Alterations Down Main ground position light signal (L647) will be re-positioned in the Down Main cess 80 yards further south. A 2-way stencil-type route indicator will be provided, and the following indications will apply :— Indication D e s t i n a t i o n ”M” U p Main L656 signal Up Branch M28 signal A new ground position light signal L651 will be provided in the Up Main cess at the Up Main end of the Main to Main trailing crossover. A 3-way stencil-type route indicator will be provided and the following indications will apply :— Indi cation

Destination Bunker line to B Bunker line to A Down Main L645 signal

THURSDAY 23 SEPTEMBER—BETWEENLEEDS AND GARFORTH The following catch points in the Down line will be secured out of use pending removal and replacement by plain line:— 17m. 52ch. 655 yards before reaching Leeds L791 signal 17m. 20ch. 830 yards before reaching L793 signal 16m. 42ch. 1020 yards before reaching L795 signal 15m. 74ch. 510 yards before reaching L797 signal 15m. 26ch. 600 yards before reaching L799 signal

NS-25 SECTION C — SIGNALLING AND PERMANENT WAY ALTERATIONS — continued DETAILS OF WORK REFERRED TO IN SECTION 8 — continued THURSDAY 23 SEPTEMBER — BETWEEN THORNHILL LNYV JUNCTION (RAVENSTHORPE) AND LEEDS HOLBECK EAST JUNCTION (MORLEY TUNNEL) The f ollowing catch points in the Down line will be secured out of use pending removal and replacement by plain line:— 32m. 76ch. 33m. 39ch. 34m. lOch. 34m. 45ch. 35m. 17ch. 35m. 60ch.

700 yards before 630 yards before 530 yards before 720 yards before 595 yards before 840 yards before

reaching Batley signal No.15 reaching Batley signal No.14 reaching Batley signal No.13 reaching Batley signal No.12 reaching Batley signal No.11 reaching Batley signal No.10

DETAILS OF WORK ALREADY CARRIED OUT MOORHOUSE JUNCTION Up Main signal L.662 has been converted to an Automatic signal. The left-hand off-set subsidiary on Down Main L.669 signal has been abolished. The t railing Main t o Main crossover has been secured out of use pending removal together wit h associated s ignalling.

(40)

* SOUTH KIRKBY The t railing crossover between the Down and Up Main lines and the facing lead from Down Main int o the South Kirkby Colliery lines has been taken out of use pending relaying. Signals Abolished:— Ground disc — Up Main t o Down Main or to Bunker lines Ground disc — Down Main to Up Main; t o Branch; or to Marshalling Loop.

(38)

* *DONCASTER Additional flashing aspects have been fi t t ed to Up Main signals D.812 and D.814. The new aspect sequence reading from Up Main t o Up Slow (D. 292) v ia the facing connection at 156m. 42ch. will be:— SIGNAL D.300 D.812 D.814 D.822

ASPECT Yellow (wit h position 1 indicator) Flashing y ellow Flashing double y ellow Green

WAKEFIELD KIRKGATE Rail access to Whithams Top Yard from the Up Goods line has been terminated and the sidings have been secured out of use pending removal. ( N e w Item) (41)

NS-26 SECTION C — SIGNALLING AND PERMANENT WAY ALTERATIONS c ont i nue d DETAILS OF WORK ALREADY CARRIED OUT c ont i nue d MARSDEN The new mains c ros ov er has been brought into use 100 yards east of its former position. The ,issociated ground disc signal applying Down Main to Up Main has been replaced by a ground position light signal (No.14). The new 2-way route indicator will have the f ollowing indications:— —Down Main to Up Main X— Set back along Down Main to NEW LIMIT OF SHUNT Indicator at the Digqle end of the Down Platform (east face of Bridge No.45). The ground disc signal applying Up Main to Down Main has been replaced by•a ground position light signal (No.17). ( N e w item) (41) PECKFIELD The catch points in the Up Main line at 11m. 38ch. have been removed and replaced by plain line(39) *AATFIELD SIDINGS The connection at 81/4 m.p. leading from the Down Hull line to the Shunt Spur and the t railing connection at 8 m.o. leading from Hatfi eld Sidings to the Up Scunthorpe Slow line have been clamped out of use • pending removal. The Shunt Spur at Hat fi eld Sidings has been abandoned. Associated s i Ta l D.632 together with Ground Position Light signals 1107, 1108 and 1109 has been abolished. 1108 GPL Signal. The route into the shunt spur wi l l be dispensed with. ( A m e n d e d Item) (38) SOUTH KIRKBY JUNCTION TO MOORTHORPE STATION JUNCTION : RE-MODELLING OF SOUTH KIRKBY JUNCTION South Kirkby Junction The Junction between the Down and Up Branch and the Down and Up Main lines has been relayed in a modified form 100 yards further south. The Down and Up Branch lines have been realigned accordingly. The positions of the new and altered signals in relation to the re-modelled junction are as shown on the diagram included in t his notice. Between South Kirkby Junction and Moorthorpe Station Junction The t railing crossover between the Down and Up Branch lines has been repositioned 200 yards nearer to Moorthorpe. The Marshalling Loop has been extended 200 yards towards Moorthorpe. Description of Signals:— Line Signal

Route Indication (Stencil)

Application to or towards

L652

Marshalling Loop

M28 Up Branch

L654

Up Branch

L666

Up Branch

L645 Down Main (Via Branch Crossover) Bunker Line ' A' Bunker Line 'B' L649 Marshalling Loop L645 Down Main ( A m e n d e d Item)

"c

EX 1ST ING S 1C,NA LLING ,

'

r

DS 1

T

1 7 3 , 0 Ds

4 FRom a 5wEFFIEL0 ( 1 1 2 1 e ' i z r

SOUTH k BYJUNCTION REMODELLINGCSUNDANrZITAUGUST

I-G5 2

043 L i t t e

DOWN B R A N C 4

MZS 4 0 1 03 1 50 ,0 5 4 50401.4 K .R 0; 1 JON C ‹ N S N * . A 4

E X IS TING S I G N A L L I N G J N- T O CO LLI E RN

Posers

PADLOCKED b5 0

,‹ L 6 4 . 0 )

1 (

1

TELE TELE.

A

r

ExI S 511. iiNA LO N T I N G

.A .

51GALNoPREFIMS.--L -LEEDS5B M-MOORTHORPESOUrkbe)

L IP B R O . N C H

E

L

- I ( V O I DS

(. 1 . 3 P O 1 4 , 1I ( ) N C 5 N L . G5 3 T S

E

) 0 PAW D O w 0 1770NICASTER i .._1• 4 1 2ID G_ * K OC ' EgX I S TI NG0 1-65C, r 4 - 1 2 5 0 X 1 , 5 S4I GN A L L?I N G' ( 1 1

N —

A

MA IN -4 ,Jto M A I N

A

•+/-

CRIP P ut

503

--•* -E

i 7

L,NE (3 T o I & l o3N o s 4 SouTi-• uT R X p•IEA Z OL L )E R Y SUNKE10 O S

ʻ4 , UP M A I N ,vezotst , LG4b N ;50X I L5 0 M , 1 A r EK. S I ! I K W " N

••• N *IGNALLIP44, IST " Nl L64 e , 6

, slirq

••••0 l a EZ , 5

I 5 IGNIA1-, N4 G

NS-28

SECTION D

GENERAL INSTRUCTIONS AND NOTICES A thi ck ver ti cl e l i ne denotes new or amended items Items m ar ked thus w i l l not appear i n futur e i ssues and a note must be taken of them by al l concer ned

INSTRUCTIONS TO STAFF DEALING WITH M.G.R. TRAINS AND BUNKER/RAPID LOADING COLLIERIES B.R.30059/5 Page 18 (1) and (2) PRINCE OF WALES COLLIERY Delete instructions and substitute:— 1. W h e n s ignal 1 i s cleared, the arriving train must proceed to the marker board for the locomotive to be detached. 2. W h e n the train is ready for tare weighing and part loading, the Guard must advise the Bunker Operator accordingly. 3. T h e train must be propelled for tare weighing and part loading under the control of the laoding signals at 1 m.p.h. 4. W h e n the wagons next to the locomotive have been part loaded the Bunker Operator will advise the Guard that the direction of the train for loading will be reversed and the Guard must advise the Driv er accordingly. 5. T h e train must then be hauled through the bunker under control of the loading signals at 1m.p.h. for completion of loading and for gross weighing.

Crippled Wagons 6. T h e Guard must advise the Bunker Operator when a wagon requires to be detached in the cripple siding. 7. W h e n a movement is ready to return v ia the Bunker line to the approach side of signal 1, the Guard must inform the Bunker Operator. 8 W h e n a t rain is re-formed after detaching operations have been completed, the Guard must advise the Bunker Operator it is ready t o return to the approach s ide of signal 1, ( 4 0 D )

Page 22 WOOLLEY COAL SIDINGS Delete all instructions and substitute:—

WOOLLEY COAL SIDING 1. A l l t rains must be propelled into the s iding from the Down Main line. 2. W h e n a train is propelled into the sidings, it must be stopped wit h the locomotive in rear of the c olliery outlet signal, where the Driv er must await further instructions.

KIS- 29

SECTION D GENERAL INSTRUCTIONS AND NOTICES — continued ERSECTIONAL APPENDIX (NORTHERN AREA) TABLE "A" — DETAILS OF RUNNING LINES Loops and Refuge Sidings

Running Li nes and Signalling System

Permanent Speed Restrictions Catch, Spr ing Down U p and unw or ked At or Between m ph. tr ai l i ng poi nts

MC h,

Location

Page 111 ALDWAPRE NORTH JN. (MID) TO LEEDS NORTH ..IN. Between Royston Jn. and Oakenshaw South Jn, Amend:— 2 0

2 0 1 7 9 m . 25ch. and 40 4 0 1 7 9 m . 40ch. (w.e.f. 09 00 Monday 13 September) (ND40D)

Page 156 LEEDS TO HULL PARAGON Between St. Geor ges Road LC and Anl aby Road Jn, Amend:— 4 0

4 0 l m . Och. and Om. 40ch. ( w.e.f. 14 00 Monday 13 September)

Between Anl aby Road Jn. and Hull Paragon Delete:—

20 2 0 O m . 40ch. and Om. 48ch. (w.e.f. 14 00 Monday 13 September) (ND40D)

LOCAL INSTRUCTIONS Page 372 F E R R Y B R I D G E

'C' POWER STATION

Add C.E.G.13. Level Crossing The instructions in the General Appendix headed "Automatic Open Crossings, Locally monitored (AOCL) — At crossings where trains are required to stop" apply at this crossing. If it becomes necessary for a set-back movement to take place over the crossing, the Guard must be stationed at the Crossing to stop road traffic, before such movement commences. "Incoming" Open Level Crossing The instructions in the General Appendix headed "Open Crossings" apply at this crossing. If it becomes necessary for a set back movement to be made over the crossing, a member of the C.E.G.B. staff will be stationed at the crossing and no movement over the crossing must be made without his authority. ( 4 0 D )

TABLE Z LINE S EQUIPPED WITH THE AUTOMATIC WARNING SYSTEM From

T

o

L

i

n

e

R

e

m

a

r

k

s

Page 271 (Page 127 Supp. Optg. Insts) ALDWARKE NORTHJR1.111/11D)TO BURION•SALMON Delete :— Moorthorpe B u r t o n Down and Up Add:— Aldwarke North „In. • H i c k l e t o n

Down and Up

Pontefract Baghill

Down and Up

Burton Salmon

(40D)

NS-30 SECTION D G E NE RAL INSTRUCTIONS AND NOTICES — continued MISCELLANEOUS NOTICES BIN GLEY STATION

Commencing Sunday 19 September from 07 30 to 17 00 daily, drivers of trains stopping at Bingley Station to observe instructions of Handsignalman and/or warning notices during repairs to platform areas.

ILKLEY STATION

Commencing Sunday 19 September from 07 30 to 17 00 daily, drivers of trains stopping at No.1 platform to observe instructions of Handsignalman and/or warning notices during repairs to platform areas.

DON CASTER STATION

Due to track renewal Up Platform (No.1) drivers of trains booked to call at Platform 3A must bring their trains to a stand at D282 Signal. Until Further Notice.

WAKEFIELD KIRKGATE STATION

Drivers of trains required to stop at Wakefield Kirkgate Station to observe instructions of handsignalmen and/or warning notices during repairs to platforms.

MIRFIELD STATION

Until further notice, between 07 30 to 17 00 daily. Drivers of trains stopping at Mirfield to observe instructions of Handsignalman and/or warning notices during resurfacing of platform area.

MOORTHORPE STATION Until Further Notice

From 07 30 to 17 00 daily, drivers of trains stopping in the Down Platform to observe instructions of Handsignalman and/or warning notices during repairs to platform copings.

MP.32/NS York

C

6 SEPTEMBER, 1982

h

i

G e

. f

GRAHAM Operating Manager

KIS- 29

SECTION D GENERAL INSTRUCTIONS AND NOTICES — continued ERSECTIONAL APPENDIX (NORTHERN AREA) TABLE "A" — DETAILS OF RUNNING LINES Loops and Refuge Sidings

Running Li nes and Signalling System

Permanent Speed Restrictions Catch, Spr ing Down U p and unw or ked At or Between m ph. tr ai l i ng poi nts

MC h,

Location

Page 111 ALDWAPRE NORTH JN. (MID) TO LEEDS NORTH ..IN. Between Royston Jn. and Oakenshaw South Jn, Amend:— 2 0

2 0 1 7 9 m . 25ch. and 40 4 0 1 7 9 m . 40ch. (w.e.f. 09 00 Monday 13 September) (ND40D)

Page 156 LEEDS TO HULL PARAGON Between St. Geor ges Road LC and Anl aby Road Jn, Amend:— 4 0

4 0 l m . Och. and Om. 40ch. ( w.e.f. 14 00 Monday 13 September)

Between Anl aby Road Jn. and Hull Paragon Delete:—

20 2 0 O m . 40ch. and Om. 48ch. (w.e.f. 14 00 Monday 13 September) (ND40D)

LOCAL INSTRUCTIONS Page 372 F E R R Y B R I D G E

'C' POWER STATION

Add C.E.G.13. Level Crossing The instructions in the General Appendix headed "Automatic Open Crossings, Locally monitored (AOCL) — At crossings where trains are required to stop" apply at this crossing. If it becomes necessary for a set-back movement to take place over the crossing, the Guard must be stationed at the Crossing to stop road traffic, before such movement commences. "Incoming" Open Level Crossing The instructions in the General Appendix headed "Open Crossings" apply at this crossing. If it becomes necessary for a set back movement to be made over the crossing, a member of the C.E.G.B. staff will be stationed at the crossing and no movement over the crossing must be made without his authority. ( 4 0 D )

TABLE Z LINE S EQUIPPED WITH THE AUTOMATIC WARNING SYSTEM From

T

o

L

i

n

e

R

e

m

a

r

k

s

Page 271 (Page 127 Supp. Optg. Insts) ALDWARKE NORTHJR1.111/11D)TO BURION•SALMON Delete :— Moorthorpe B u r t o n Down and Up Add:— Aldwarke North „In. • H i c k l e t o n

Down and Up

Pontefract Baghill

Down and Up

Burton Salmon

(40D)

,,,