Wonder Dome

Report 8 Downloads 167 Views
Wonder Dome

Shibuya-Homes603, 2-1 Udagawachou, Shibuya-ku, Tokyo, JAPAN 150-0042 TEL:03-5456-1348 FAX:03-5456-1347 http://www.iguchi-in.co.jp

1

Wonder Dome project ①

Certain Co. Co the main office plan

P Preschool h l plan l

Pavilion , assembly hall plan

Jewel processing factory plan

Observatory in park plan

Soccer club house plan

Di Direct t sale l off product d t place l plan l

Franchise store plan

2

Wonder Dome project ② Standard Type

Open Café Type

3

Timber construction Wonder Dome ~Sample of construction~

Y k hi Yakushima D Dome

Kumagaya Farm Dome

Kirishima Dome

Fukiage Dome

Kiire Dome

Amami Dome

Yoshino Child Club

Torikai Dome

Construction process

Timber Panel

Assembling panels

Assembling 1

Assembling 2

4

Wonder Dome type

plan

elevation

~Specification of panel kit~ area

type

plan

elevation

area

11.80 5.88 2.45 1.50

5.60

4.99

3.95

11.22

6.49

1.50

13.24 7.07 2 99 2.99

5.60

4.49

1.50

6.72

12.59

7.10

1.50

14.75

8.84 3.74 8.40

6.24

5.24 14.03

1.50

7 74 7.74

1.50

10.58

4.48 10.07

※practicable to your offer for the other size i depends d d on building b ildi area

5.98

1 50 1.50

13.24

12.59

5.60

7.10

1.50

5

The feature of Wonder Dome

1.Earthquake-proof ・Strength and weather resistance by shape ・Structure Structure analysis by its company

2.Energy Save ①Solar power generation ・enable enable to generate 10,300kWh 10 300kWh power in a year as much as 7.0% power of electric for convenient store ・all lights come with LED lights

ECO Fire proof Dome & Triangle Solar power generation

Appl ing patent Applying The schedule will be Oct-Dec 2010

②Reuse ・all structure materials for a Dome are able to reuse as a returnable materials ・No large-scale materials for saving extra t transportation t ti

Cost

3. Deliver and the term of construction ・short term by simplified process ・The Th equation ti off performance f b by standardized t d di d process

4. Cost

Effective work

Adjustment

・High quality and the low cost with industrial production ・cutt the th costt down d by b short h t term t off construction t ti 6

1.Earthquake q proof p ・consult an expert on analysis of construction by ourselves (a construction architect office) ・structuring t t i with ith two t different diff t type t off triangle panels ・structuring 60panels with bolts

C Capable bl building b ildi area off ECO Fireproof Dome



ALL AREA Galvalium plate

Wood wool cement plate Jointing bolts

midas Gen is that a general construction analytic program and optimum architect tools are integrated into a construction analytic system for design corresponding di ffor Wi Windows d

Solar panel

Plate Weight ditch type steel

7

2.Energy gy save ①Solar power generation 48% 52% 56% 67%

75%

48%

48%

60%

60%

64%

56% 56%

48%

82%

82%

81%

88%

88% 95%

75% 90%

56% 67%

56%

92%

81% 90%

86%

94%

94% 92%

75% 75%

100%

92%

92% 99%

92% 92%

The South side The decrease rate of azimuth and oblique angle 2.43m 3.3㎡ 3.3m

about 330W

2.6㎡ 2.73m

Wonder Dome



56%

81%

95%

86%

Solar panel

52%

64%

・A triangle module by structuring right triangle cells ・No waste, improve for design ・Energy save with LED lights ・Applying a patent on an original invent

1.92m

Remarkable on introducing Solar power generation

The Entire roof making 10,300kWh dynamo possible in a year

about 7.0% (about 21,000yen/month) The South side making 6,900kWh dynamo possible in a year

about 5.0 5 0% (about ( 15,000yen/month) / )

about 260W

A 330W×∑(decrease rate×0.7)/100 = 7395.3 ≒ 7.4kW B 260W×∑(decrease rate×0.7)/100 rate×0 7)/100 = 2919.8 2919 8 ≒ 2.9kW 2 9kW A + B = 10.3kW

※in case of annual electric power consumption for convenient store in a year (about 145,850kWh/year) ※decrease rate follows a date of Japan Photovoltaic Energy Association, and calculate

8

2.Energy save ②Reuse 3 D li 3.Deliver andd the th tterm of f construction t ti processed steel frame manufacture (at a certified JIS manufacture in foreign country) producing frame installing roof

steel frame foundation foundation・eave eave

PC factory

・ All structure materials for Dome are

F Foundation d ti plate l t

able to reuse as a reuse materials ・No large-scale materials for saving transportation

1cycle Container ttransportation a spo tat o

2cycles~ demolition

Reuse

Reuse materials for a new shop

environmental protection by reducing transportation and packs

・Reduce R d scrap b by di dismantling tli ・ reducing d i transportation i containers i ・Saving construction cost for a new shop ・reducing a number of transportation ・Effective use of steel resource vehicles foundation work assembling Dome water proof construction for roof

decorating the inside the outside wall/ the outside ditch construction

facility construction

※Solar power generation facility ※Attaching 12panels and 1eave in a day at average ・ jointing only bolts, it makes simply take the Dome down ・High Hi h quality lit and d reuse from f industrial i d t i l production. d ti (※A conditional reuse:in case of construction permit is not revised)

1.Foundation work about b t 2days 2d



2.Dome construction about 3-4days



3.Inside and outside ・ facility construction about 14days

complete in about 3weeks

9

4.Cost 1

order for 50Domes package⇒Price×α

Estimated cost of Standard type yp

((α=0.85~0.90))

Size Panel type

Estimated construction cost (including panel kit)

In case of using kit for 3cycles

Weight of steel frame

Diameter

High

Area

080

10.58 m

5.98 m

81.30 ㎡

now adjusting

9.0 t

100

11.80 m

6.49 m

101.01 ㎡

now adjusting

11.2 t

130

13.24 m

7.10 m

127.21 ㎡

160

14.75 m

7.74 m

157.90 ㎡

The list of Standard

$165,000

3,800$/㎡ j g now adjusting

2,780$/㎡

14.0 t 17.4 t

・ roof , eaves…panel(cemented excelsior board t=25、 steel sheett=0.4) ・ exterior wall… cemented board ・ floor…plastic tile ・ interior wall ・ceilimg…oil paint ・ insulating material…styrofoam

Others

・ electricity construction

・ utensil 、refrigerator etc

・facilities for water supply and drainage

・ solar power generate

・ air conditioning units construction

※about 5,000,000-7,000,000yen(estimated introducing cost) ・ TAX

10

4.Cost 2 cut the cost down by returnable one cycle for 20years 20years、considering considering three cycles Type 130



20

40

-$67 $67,000 000 $165,000 In case of using kit for 3cycles

60Years

-$67 $67,000 000

reuse kit

reuse kit

●kit $89,000

$98,000

$98,000

●repairing kit

●repairing kit

$22,000

$22,000

●construction cost

●construction cost

$76,000

$76,000

In case of using kit for 3 cycles

In case of all NEW

165,000 165 000 + 98 98,000 000 + 98,000 =

165,000 165 000 + 165 165,000 000 + 165,000 =

$361,000

$495,000

(2 780$/㎡) (2,780$/㎡)

(3 800$/㎡) (3,800$/㎡)

●construction cost $76,000

Difference of $134,000

※repairing kit show the cost of dismantle and reuse ※electricity water supply and drainage, ※electricity, drainage air conditioning are NOT include

3cycles compare to a case of all NEW cut the cost about 27% 11