Wonder Dome
Shibuya-Homes603, 2-1 Udagawachou, Shibuya-ku, Tokyo, JAPAN 150-0042 TEL:03-5456-1348 FAX:03-5456-1347 http://www.iguchi-in.co.jp
1
Wonder Dome project ①
Certain Co. Co the main office plan
P Preschool h l plan l
Pavilion , assembly hall plan
Jewel processing factory plan
Observatory in park plan
Soccer club house plan
Di Direct t sale l off product d t place l plan l
Franchise store plan
2
Wonder Dome project ② Standard Type
Open Café Type
3
Timber construction Wonder Dome ~Sample of construction~
Y k hi Yakushima D Dome
Kumagaya Farm Dome
Kirishima Dome
Fukiage Dome
Kiire Dome
Amami Dome
Yoshino Child Club
Torikai Dome
Construction process
Timber Panel
Assembling panels
Assembling 1
Assembling 2
4
Wonder Dome type
plan
elevation
~Specification of panel kit~ area
type
plan
elevation
area
11.80 5.88 2.45 1.50
5.60
4.99
3.95
11.22
6.49
1.50
13.24 7.07 2 99 2.99
5.60
4.49
1.50
6.72
12.59
7.10
1.50
14.75
8.84 3.74 8.40
6.24
5.24 14.03
1.50
7 74 7.74
1.50
10.58
4.48 10.07
※practicable to your offer for the other size i depends d d on building b ildi area
5.98
1 50 1.50
13.24
12.59
5.60
7.10
1.50
5
The feature of Wonder Dome
1.Earthquake-proof ・Strength and weather resistance by shape ・Structure Structure analysis by its company
2.Energy Save ①Solar power generation ・enable enable to generate 10,300kWh 10 300kWh power in a year as much as 7.0% power of electric for convenient store ・all lights come with LED lights
ECO Fire proof Dome & Triangle Solar power generation
Appl ing patent Applying The schedule will be Oct-Dec 2010
②Reuse ・all structure materials for a Dome are able to reuse as a returnable materials ・No large-scale materials for saving extra t transportation t ti
Cost
3. Deliver and the term of construction ・short term by simplified process ・The Th equation ti off performance f b by standardized t d di d process
4. Cost
Effective work
Adjustment
・High quality and the low cost with industrial production ・cutt the th costt down d by b short h t term t off construction t ti 6
1.Earthquake q proof p ・consult an expert on analysis of construction by ourselves (a construction architect office) ・structuring t t i with ith two t different diff t type t off triangle panels ・structuring 60panels with bolts
C Capable bl building b ildi area off ECO Fireproof Dome
→
ALL AREA Galvalium plate
Wood wool cement plate Jointing bolts
midas Gen is that a general construction analytic program and optimum architect tools are integrated into a construction analytic system for design corresponding di ffor Wi Windows d
Solar panel
Plate Weight ditch type steel
7
2.Energy gy save ①Solar power generation 48% 52% 56% 67%
75%
48%
48%
60%
60%
64%
56% 56%
48%
82%
82%
81%
88%
88% 95%
75% 90%
56% 67%
56%
92%
81% 90%
86%
94%
94% 92%
75% 75%
100%
92%
92% 99%
92% 92%
The South side The decrease rate of azimuth and oblique angle 2.43m 3.3㎡ 3.3m
about 330W
2.6㎡ 2.73m
Wonder Dome
○
56%
81%
95%
86%
Solar panel
52%
64%
・A triangle module by structuring right triangle cells ・No waste, improve for design ・Energy save with LED lights ・Applying a patent on an original invent
1.92m
Remarkable on introducing Solar power generation
The Entire roof making 10,300kWh dynamo possible in a year
about 7.0% (about 21,000yen/month) The South side making 6,900kWh dynamo possible in a year
about 5.0 5 0% (about ( 15,000yen/month) / )
about 260W
A 330W×∑(decrease rate×0.7)/100 = 7395.3 ≒ 7.4kW B 260W×∑(decrease rate×0.7)/100 rate×0 7)/100 = 2919.8 2919 8 ≒ 2.9kW 2 9kW A + B = 10.3kW
※in case of annual electric power consumption for convenient store in a year (about 145,850kWh/year) ※decrease rate follows a date of Japan Photovoltaic Energy Association, and calculate
8
2.Energy save ②Reuse 3 D li 3.Deliver andd the th tterm of f construction t ti processed steel frame manufacture (at a certified JIS manufacture in foreign country) producing frame installing roof
steel frame foundation foundation・eave eave
PC factory
・ All structure materials for Dome are
F Foundation d ti plate l t
able to reuse as a reuse materials ・No large-scale materials for saving transportation
1cycle Container ttransportation a spo tat o
2cycles~ demolition
Reuse
Reuse materials for a new shop
environmental protection by reducing transportation and packs
・Reduce R d scrap b by di dismantling tli ・ reducing d i transportation i containers i ・Saving construction cost for a new shop ・reducing a number of transportation ・Effective use of steel resource vehicles foundation work assembling Dome water proof construction for roof
decorating the inside the outside wall/ the outside ditch construction
facility construction
※Solar power generation facility ※Attaching 12panels and 1eave in a day at average ・ jointing only bolts, it makes simply take the Dome down ・High Hi h quality lit and d reuse from f industrial i d t i l production. d ti (※A conditional reuse:in case of construction permit is not revised)
1.Foundation work about b t 2days 2d
+
2.Dome construction about 3-4days
+
3.Inside and outside ・ facility construction about 14days
complete in about 3weeks
9
4.Cost 1
order for 50Domes package⇒Price×α
Estimated cost of Standard type yp
((α=0.85~0.90))
Size Panel type
Estimated construction cost (including panel kit)
In case of using kit for 3cycles
Weight of steel frame
Diameter
High
Area
080
10.58 m
5.98 m
81.30 ㎡
now adjusting
9.0 t
100
11.80 m
6.49 m
101.01 ㎡
now adjusting
11.2 t
130
13.24 m
7.10 m
127.21 ㎡
160
14.75 m
7.74 m
157.90 ㎡
The list of Standard
$165,000
3,800$/㎡ j g now adjusting
2,780$/㎡
14.0 t 17.4 t
・ roof , eaves…panel(cemented excelsior board t=25、 steel sheett=0.4) ・ exterior wall… cemented board ・ floor…plastic tile ・ interior wall ・ceilimg…oil paint ・ insulating material…styrofoam
Others
・ electricity construction
・ utensil 、refrigerator etc
・facilities for water supply and drainage
・ solar power generate
・ air conditioning units construction
※about 5,000,000-7,000,000yen(estimated introducing cost) ・ TAX
10
4.Cost 2 cut the cost down by returnable one cycle for 20years 20years、considering considering three cycles Type 130
1
20
40
-$67 $67,000 000 $165,000 In case of using kit for 3cycles
60Years
-$67 $67,000 000
reuse kit
reuse kit
●kit $89,000
$98,000
$98,000
●repairing kit
●repairing kit
$22,000
$22,000
●construction cost
●construction cost
$76,000
$76,000
In case of using kit for 3 cycles
In case of all NEW
165,000 165 000 + 98 98,000 000 + 98,000 =
165,000 165 000 + 165 165,000 000 + 165,000 =
$361,000
$495,000
(2 780$/㎡) (2,780$/㎡)
(3 800$/㎡) (3,800$/㎡)
●construction cost $76,000
Difference of $134,000
※repairing kit show the cost of dismantle and reuse ※electricity water supply and drainage, ※electricity, drainage air conditioning are NOT include
3cycles compare to a case of all NEW cut the cost about 27% 11