GB Application Can be used in conjunction with: Pressurized storage heaters, thermally & hydraulically controlled instantaneous heaters and low-pressure displacement water heaters.
Pressure range:
Flush piping system prior and after installation of fitting thoroughly (considering EN806) Refer to the dimensional drawing on fold-outⅠ. Refer to the installation step guide fig. [1-5] The cold water supply must be connected on the right and the hot water supply on the left. Open cold and hot water supplies and check connections for leak tightness.
Shut off cold and hot water supply! Replace thermostatic cartridge, see fig. [6] Lever out handle cap (A); Remove screw (B) using a cross-head screwdriver. Take out handle set (C). Remove screw (D) using a 2.5 mm Allen key, and remove fixation base (E), washer (F), handle (G) and ring (H).
∅72mm ∅2 13/16"
Ⅴ
Thermostatic Concentric Mixer with Transparent Soap Dish VENTA SHOWER
Temperature --Hot water inlet (maximum) 90℃ Correct operation suggestion: --Hot water inlet temperature 55 ℃≤T≤65℃ --Recommended (energy saving): 60℃ --Cold water inlet temperature T ≤25℃ Water connection: Cold-Right Hot-Left
Dear Customer, We want to ensure that you get long-lasting satisfaction and pleasure from your fitting. Therefore, please read the following care instructions because damage to the surface and underlying material resulting from improper treatment is not covered by warranty. Do not use any abrasive sponges or scouring agents for cleaning. We also advise you not to use cleaning agents containing solvent or acid, limescale removers, household vinegar and cleaning agents with acetic acid in them. They are aggressive to the surface and will leave your fitting dull and scratched. As the formutations of commercially available cleaning agents frequently charge, we cannot guarantee they will provide the gentle care our fitting deserves. Clean the fitting with a little soap and a moist cloth only, then simply rinse off and wipe dry. You can avoid lime spots by drying the fitting each time it is used.
725mm 28 9/ 16"
Product Care 0. 2 bar 5 bar 16 bar
1500mm 59 1/16"
Minimum flow pressure: Maximum operating pressure: Air leakage pressure
ES104
Use a 48mm wrench to unscrew nut (Ⅰ) anti-clockwise. Replace cartridge (J). Reassemble in reverse order.
G1/ 2B
Ⅰ
1
ES104
2
Remove the fixation base.
5 2.
m
5
Dismantle the mixer par ts shown.
m
Operate the product for a couple of minutes, varying both temperature and volume to determine correct operation.
6
Replace the thermostatic car tridge.
J
I
H
G
FE
RP551189
2. 5mm
Draw lines for Step 3 in accordance with the hole positions on the fixation base. Drill holes onto installation wall and fix the base. 560mm 22 1/ 16"
∅6mm ∅1/4"
RP381048
The distance should be decided based on the user's height and convenientce . Suggested height is 1.1 m. (43 5/16'')