4 0 .0 m 40.0m 60.0m 20.0m 2 0 .0 m 2 0 .0 m 20.0m

Report 0 Downloads 262 Views
m 0 . 0 6

40 . 0m

Indicative extent of

m .0 0 4

railway realignment

02 21 -59 0 -14 PP -D T R D-

PP1405922 02

2+000

1+000

ng i raw D o t er f Re

m 0 . 0 4

HS2 viaduct

on i at nu i t on

0m 20.

0m . 0 2

Q

ForC ont i nuat i on R ef ert o Dr awi ng

M -M 21 3 C

C321 MMD

RTD

0 00 0+

3+00 0 3+00 0

m 0 . 0 4

over B6481

Indicative extent of A639 realignment over HS2

HS2 Leeds East Rolling Stock Depot connection

0m 20.

0m . 20

rC Fo

see drawing C321-MMD-RT-DPP-196-592201

0m . 20

2 0 . 0 m

Plan Scale 1:5,000 @ A1

HSL21

HSL22

60

60

HS2 viaduct over B6481 - 80m

M1

50

Pepper Road

A639

50

TP.26. 7

CH. 2417. 1

TP.27. 2

CH. 2302. 7

TP.29. 1

CH. 2032. 7

TP.29. 6

CH. 1900. 9

TP.29. 9

CH. 1315. 4

TP.29. 8

TP.27. 7

20

CH. 1207. 8

30

CH. 220. 2

30

TP.27. 7

40

CH. 142. 7

40

20

10

10

B6481

50

100

3+000

2+950

2+900

2+850

2+800

2+750

2+700 2719. 6

2654. 5

29. 2 25. 3 3. 9

29. 4 25. 4 4. 0

30. 0 25. 5 4. 5

29. 7 25. 6 4. 1

30. 1 25. 8 4. 3

31. 8 25. 9 5. 9

35. 5 26. 0 9. 5

36. 5 26. 1 10. 4

38. 3 26. 2 12. 1

39. 5 26. 3 13. 2

26. 5 12. 6

39. 1

26. 6 10. 7

37. 3

26. 7 8. 7

35. 4

26. 9 8. 7

35. 6

27. 2 7. 7

34. 9

27. 6 2. 7

30. 3

27. 9 1. 1

29. 0

28. 3 0. 7

29. 0

28. 6 0. 3

28. 9

29. 0 +0. 7

28. 3

29. 3 +1. 3

28. 0

29. 5 +2. 6

26. 9

29. 6 +2. 1

27. 5

29. 6 +0. 7

28. 9

29. 7 +1. 3

28. 4

29. 7 +1. 1

28. 6

29. 7 +0. 8

28. 9

2+650

2+600

2+550

2+500

2+450

2+400

2+350

2+300

2+250

2+200

2+150

2+100

2+050

2+000

1626. 3

28. 9 29. 7 +0. 8

28. 6

29. 0

29. 0

29. 8

29. 9 +2. 1

+1. 2

29. 9 +0. 8

1+950

1+900

1+850

1+800

1+750

1+700

1+650

1+600

1+550 1561. 3

29. 9 +2. 4

29. 8

29. 9 +6. 4

L=597.9

L = 1 3 5 0 . 0 G= 0 . 2 3 5 %

L=114.4 R=-24000.0

+0. 8

29. 9 +0. 5

R=20000.0

29. 8

29. 8 +1. 4

L = 2 7 0 . 0 G= 0 . 7 1 2 %

L=131.8

+0. 8

29. 7 +2. 0

27. 8

29. 1

29. 6 +1. 0

27. 5

29. 5 +2. 4

L = 6 5 . 0

L=1028.2

-10

180km/h

Design Speed:

0

1+500

1+450

1+400

1+350

1+300

29. 4 +2. 5

23. 5

29. 4

29. 3 +3. 5

28. 4

29. 2 +3. 8

27. 7

29. 1 +3. 8

28. 6

29. 0 +4. 4

27. 1

28. 8 +3. 3

26. 9

28. 7 +3. 5

25. 8

28. 6 +4. 7

25. 4

28. 5 +4. 6

25. 3

24. 6

28. 4 +4. 6

25. 5

28. 3 +2. 3

25. 2

28. 2 +0. 9

23. 9

28. 1 +1. 2

23. 9

28. 0 +0. 6

23. 8

26. 0

27. 9 +0. 5

27. 3

27. 8 0. 4

26. 9

27. 4

1+250

1+200

1+150

1+100

1+050

1+000

0+950

0+900

0+850

0+800

0+750

0+700

0+650 640. 5

0+600

0+550

0+500

425. 2

0+450

0+400

0+350

0+300

27. 7 0. 2

27. 4

28. 2

27. 6 0. 4

27. 9

27. 7

28. 0

R=40000.0

0. 3

28. 0

R=-25000.0

R=5500.0

0 . 5 6 = L

L = 5 8 5 . 6 G= 0 . 0 5 3 %

L=107.6

27. 7

28. 4

6 . 7 8 9 = L % 6 1 2 . 0 G=

L=77.5

8. 7

Cut and Fill

L=920.8

27. 8

Proposed Level

36. 4

L =1 2 G= 4 . 7 0 . 0 9 4 %

L = 2 1 5 . 3

0

0. 6

Existing Level

0+250

L=425.2

Horizontal Alignment

Vertical Alignment

0+200

0+150

0+100

R=1539.0

0. 0

Chainage

0+050

-10

0+000

0

200

500

METRES @ 1:5000

0

5

10

20

50

Profile

METRES @ 1:500

Scale H:1:5,000 V:1:500 @ A1

Client's Comments Addressed

JV

AR

MM

P03

Client's Comments Addressed

11/07/17

11/07/17

11/07/17

JV

AR

MM

First Issue

11/07/17

AR

MM

28/06/17

28/06/17

28/06/17

Key Environmental Features Legend

© Crown Copyright and database right 2017. All rights reserved. Ordnance Survey Licence number 100049190

11/07/17

JV

Legends/Notes:

the reproduction of this document after alteration, amendment or abbreviation or if it is issued in part or issued incompletely in any way.

P02 11/07/17

HS2 accepts no responsibility for any circumstances which arise from

© Crown Copyright material is reproduced with the permission of Land

P01

Registry under delegated authority from the Controller of HMSO.

Legend

World Heritage Site

Scheduled Monuments

Track Centrelines

Ramsar

Registered Parks and Gardens

Viaduct

Special Areas of Conservation

Historical Battlefields

Tunnel

Special Protection Areas

Active and/or Authorised Landfill

Existing Railway Connection

SSSI

Historical Landfill

HS2 Connection

Flood Zones

Fully Retained Cutting/Fill Major Contour

National Nature Reserves This material was last updated on 2017 and may not be copied, distributed,

Area of Outstanding Natural

sold or published without the formal permission of Land Registry. Only an official copy of a title plan or register obtained from the Land Registry

Beauty

may be used for legal or other official purposes.

National Park Major Development Sites Additional Development Sites

10

Listed Building Grade I

Registered in England Registration No. 06791686 Registered office: 2 Snow Hill, Queensway, Birmingham, B4 6GA

Engineering Earthworks Railway Cutting

Description

Drawn

Checked

Con App

HS2 App

Scale with caution as distortion can occur.

Leeds Metropolitan Spur Design Stage

West Midlands to Leeds Route Discipline/Function

Post-Consultation Drawing Title

Railway Track Drawn

Checked

JV

Railway Embankment

Ground Profile

Date

Listed Building Grade II*

Track Profile

Listed Building Grade II

Minor Contour

HS2 Depot/Station

Node

Operational Boundary

Approved

AR

MM

HSL22/31 2017 Preferred Route Creator/Originator

Sheet 1 of 2 Mott MacDonald

Rev

Project/Contract

Zone

Scale

07/06/2017

Size

1:5000

Drawing No.

C321-MMD-RT-DPP-140-592201

A1 Rev.

P03