A Combined Solution for Sediment Remediation and Waterfront ...

Report 3 Downloads 28 Views
.

A Combined Solution for Sediment Remediation and Waterfront Development John T. Finn, P.E. GEI Consultants, Inc.

Dredging 2012

The Problem

Dredging 2012

A Complex Problem: A Combined Solution : John Finn, GEI

• Removal of Sheen-Producing Sediments • Protection of Existing Bulkheads • Capping of Remaining Sediments • On-site Solidification of Dredged Sediments • Preparation for Waterfront Redevelopment Dredging 2012

Location: A Slip in New Bedford Harbor

Manufactured Gas and Tar Plant 1880 - 1960

OUTER SLIP

Dredging 2012

Minimum Remedy Requirements

Outer Slip: - Remove all sheen-producing sediment in top foot - No off-site disposal: Place all dredged sediment in Inner Slip - 2-foot Composite Cap

Inner Slip - Solidify dredged sediment and existing sediment/soil to bedrock - Prepare the site for waterfront redevelopment Dredging 2012

Remediation – Plan View

Sheet Pile Walls

Cell 2

Inner Slip ISS & Fill Area

Water Treatment Facility

Cell 1

Dredged Areas for Tar Removal

ISS Mixing Plant

Capping Area Fixed Turbidity Curtain

Dredged Area for Cap Installation

Dredging Requirements and Constraints • Protection of bulkhead stability • Final elevation allows sufficient draft for boat traffic • Limited capacity of Inner Slip: - Account for expansion upon solidification - Account for expansion/settling upon dredging/placement Dredging 2012

Dredging Behind Dual Curtains & Booms

Dredging 2012

Dredging of Outer Slip

Vapor & Odor Suppression Foam

Dredging 2012

GPS Positioning of Dredge Bites

Capping of Remaining Sediments

Benthic Sand – 12 inches

Stone Armor – 3 inches Gravel – 3 inches AquaBlok – 6 inches

Sand Fill – thickness varies

AquaBlok

Dredging 2012

Cap Placement

Dredging 2012

Solidification: Inner Slip – Section View New Sheet Pile Closure Walls Existing Bulkhead Cell 2

Cell 1

Mean High Water Mean Low Water

Top of Dredge Spoils Top of Sediments

Top of Bedrock (El. -24.2)

Top of Bedrock (El. -39.0)

Top of Dredge Spoils

Soil Mixing to Solidify Sediments

Dredging, Capping, and ISS Statistics

• • • • •

1,350 cubic yards dredged 18,000 ft2 dredge area 190 - eight foot diameter ISS columns 37 - three foot diameter ISS columns 7,000 - cubic yards of sediment and soil mixed • 427 ton of AquaBlok

Site Ready for Waterfront Development

Dredging 2012

Thank You

Questions?

Dredging 2012

Post-Scripts • Environmental Business Council’s 2012 Award for Collaboration • Study of In-Situ Solidification of Contaminated Sediments, Sponsored by the Electric Power Research Institute (EPRI)

Dredging 2012

Coordinating Multiple Agencies • MassDEP leadership streamlined complex permitting – Reached out to federal, state & local regulators – Coordinated multi-agency team approach – Hosted & facilitated 2 critical multi-agency meetings

• Public engagement – Public notice soliciting public comments on 10/23/2010 – Public meeting on 12/8/2010 with USEPA and MassDEP

• Innovative MCP site closure strategy

Permitting and Legal Framework • MassDEP – Release Abatement Measure Plan – 401 Water Quality Certification – Chapter 91 License

• EPA – TSCA 61C – Risk-Based Cleanup Plan

• U.S. Army Corps of Engineers, New England District – Category 2 General Permit

• New Bedford Conservation Commission - Wetland Order Of Conditions

• Property Owner Agreement: Fueling Terminal Ops Dredging 2012

Dredge Cut Lines Tolerance Near Bulkheads

Min. Max.

Tolerance In All Other Areas

El -14.

Min.

El -14.5

Max.

Dredging 2012

El -14.

El -15.