BRT Mailer Map4

Report 5 Downloads 209 Views
REVISED DATES

REVISED DATES

PROJETO BUS RAPID TRANSIT (BRT) SANTA CLARA-ALUM ROCK

SANTA CLARA-ALUM ROCK BUS RAPID TRANSIT (BRT) PROJECT

Reconstrução e Pavimentação da via na Alum Rock Avenue

Alum Rock Avenue Roadway Reconstruction and Paving

Os seguintes pontos entrarão em vigor, caso o tempo e as condições o permitam:

The following will be in effect as indicated, weather and conditions permitting:

ESTACIONAMENTO: Os acessos estarão inacessíveis a todos os veículos. O acesso de peões estará disponível. • Poderá estacionar nas ruas das proximidades durante as obras.

O QUÊ: A reconstrução e pavimentação da via serão efetuadas por segmentos no lado norte (em direção a oeste) da Alum Rock Avenue desde a

King Road to U.S. 101

QUANDO:

Cada segmento levará 72 horas a ser concluído e incluirá 2 a 3 noites de atividades ligadas à construção desde

Os acessos estarão inacessíveis a todos os veículos, exceto os de emergência, durante o referido período de 72 horas. O acesso de peões estará disponível. As atividades produzirão ruído, vibração e impactos consideráveis no trânsito, incluindo, entre outros: • Aumento do trânsito de pesados • Serragem e trituração do asfalto • Uso de equipamento pesado para demolição e remoção de betão • Abertura de fossos e escavação • Alarmes de recuo do equipamento (bip) • Luzes intensas • Compactação e Pavimentação • Poeiras • Desvio de peões/de trânsito

WHAT:

Roadway reconstruction and paving will be performed on the north side (westbound) of Alum Rock Avenue from

King Road to U.S. 101 .

5/26/15,7pm - 5/29/15,7pm 72 hours

NOISE: Night work may be required to reduce the duration of closed driveways. Heavy noise and vibration is to be expected from heavy equipment for demolition and concrete removal, saw-cutting, grinding of pavement, and back up alarms. Suggestions to help minimize the noise include keeping windows facing Alum Rock Avenue closed, and consider ear-plugs (provided).

• Comunidades de habitação múltipla: Se um dos acessos alternativos a partir da Alum Rock Avenue estiver vedado, contacte a administração para abrir o acesso.

RUÍDO: Poderão ocorrer trabalhos nocturnos para .

reduzir a duração do encerramento dos acessos. São esperados ruídos e vibrações intensas devido ao uso de equipamento pesado para demolições e remoção de betão, serragem, trituração do pavimento e alarmes de segurança. As sugestões para minimizar o ruído incluem manter as janelas viradas para a Alum Rock Avenue fechadas e usar tampões para os ouvidos (fornecidos).

LIXO:

A recolha do lixo não estará disponível de segunda a quinta neste segmento.

NOTAS: Para segurança do público e dos trabalhadores da construção civil, serão tomadas medidas de controlo de tráfego sempre que necessárias. Serão colocados sinais de aviso para garantir a segurança. As equipas de construção farão o possível para manter as passagens e para minimizar os inconvenientes para os motoristas, ciclistas, peões, empresas e moradores. Para mais informações sobre o projeto: Comunicação da Comunidade VTA (408) 321-7575 | Apenas TTY (408) 321-2330 E-mail: [email protected] Web: www.vta.org/scar-brt

.

WHEN:

This segment will take 72 hours to complete

and may include 1-3 nights of construction activities from

5/26/15,7pm - 5/29/15,7pm 72 hours

.

Driveways will be inaccessible to all vehicles except emergency vehicles during this 72 hour period. Pedestrian access will be maintained. Activities will generate noticeable noise, vibration, and traffic impacts, including and not limited to: • Increased truck traffic • Saw cutting and grinding of asphalt • Heavy equipment used for demolition and concrete removal • Trenching and excavation • Equipment back up alarms (beeping) • Bright lights • Compaction and paving • Dust • Pedestrian/Traffic detours

PARKING: Driveways will be inaccessible to all vehicles. Pedestrian access will be available. • Consider parking on nearby side streets during this time.

• Multi-housing communities: If there is an alternate driveway off of Alum Rock Avenue that is gated, contact your management to make this driveway accessible.

1503-0051

GARBAGE: Garbage pick-up will not be available Monday through Thursday in this segment. NOTES:

For the safety of the public and construction workers, traffic control measures will be used when needed. Information and warning signs will be posted to ensure safety. Construction crews will make every effort to maintain access and minimize inconvenience to motorists, bicyclists, pedestrians, businesses and neighbors. For more project information: VTA Community Outreach (408) 321-7575 | TTY only (408) 321-2330 Email: [email protected] Website: www.vta.org/scar-brt

REVISED DATES

REVISED DATES

PROYECTO DE TRANSPORTE RÁPIDO DE AUTOBÚS (BRT) DE LA RUTA SANTA CLARA-ALUM ROCK Reconstrucción y pavimentación vial de Alum Rock Avenue Las siguientes actividades se estarán llevando a cabo, tal y como se indica, si el clima y las condiciones lo permiten:

RUIDO: Podría ser necesario realizar labores

QUÉ: La pavimentación y reconstrucción vial se llevarán a cabo en el lado norte (rumbo al oeste) de Alum Rock Avenue desde King Road to U.S. 101 .

CUÁNDO:

Este segmento tomará 72 horas para concluirlo y podría incluir de 1 a 3 noches de actividades de construcción de

5/26/15,7pm - 5/29/15,7pm 72 hours

BASURA: El servicio de recolección de basura no estará disponible en este segmento de lunes a jueves. .

Durante este periodo de 72 horas las entradas de las cocheras serán inaccesibles para todos los vehículos excepto los vehículos de emergencia. Se conservará el acceso para peatones. Las actividades generarán un ruido considerable, vibración e impactos al tráfico, incluyendo, pero sin limitarse a lo siguiente: • Aumento en el tráfico de camiones de carga • Corte con sierras y molienda de asfalto • Presencia de equipo pesado utilizado para demolición y retiro de concreto • Apertura de zanjas y excavaciones • Alarmas de retroceso de los equipos (pitidos) • Luces intensas • Compactación y pavimentado • Polvo • Desviaciones de peatones y tráfico

ESTACIONAMIENTO: Las entradas de las cocheras estarán inaccesibles a todos los vehículos. Estará disponible el acceso para peatones. • Considere estacionarse en calles aledañas durante este periodo.

• Comunidades multiviviendas: Si existe una entrada alternativa a una cochera en Alum Rock Avenue que esté cercada, contacte a sus administradores para hacer esta entrada accesible.

nocturnas para reducir la duración del cierre de cocheras. Es de esperar que haya ruido y vibración fuertes causados por el equipo pesado de demolición y retiro de concreto, corte con sierras, molienda de pavimento y alarmas de retroceso. Algunas sugerencias para ayudar a minimizar el ruido incluyen mantener cerradas las ventanas ubicadas al lado de Alum Rock Avenue, y considerar usar tapones para los oídos (proporcionados).

NOTAS: Para mayor seguridad del público y del personal de construcción, se implementarán medidas de control del tránsito conforme sean necesarias. Se colocarán avisos de información y precaución para garantizar la seguridad. Las cuadrillas de construcción harán todo lo posible por mantener el acceso y minimizar los inconvenientes para los conductores, ciclistas, peatones, negocios y vecinos. Para más información sobre el proyecto: Programa de Extensión de VTA en la Comunidad (VTA Community Outreach) (408) 321-7575 | Solo TTY (408) 321-2330 Email: [email protected] Sitio web: www.vta.org/scar-brt

King Road to U.S. 101

5/26/15,7pm - 5/29/15,7pm

72 hours