Allocation based on population of cities and the County of Santa Clara’s road and expressway lane mileage
•
Maintenance of Effort requirement
•
Complete Streets best practices
5
Local Streets & Roads – Proposed Guidelines •
Determine program budget in 2year increments
•
VTA calculates formula share
•
Agencies submit annual program of projects
•
Expenditures reimbursed
•
Maintenance of Effort – Baseline of FY16 levels
6
Bicycle/Pedestrian – Program Description •
$250 Million
•
Countywide significant projects
•
Priority to projects that: ◦ Connect schools, transit, & employment centers ◦ Fill gaps in existing bike/ped network ◦ Safely cross barriers to mobility ◦ Make walking or biking a safer & more convenient means of transportation
•
Bike/Ped educational programs eligible
•
Candidate projects listed in Resolution Attachment A
7
Bicycle/Pedestrian – Proposed Guidelines •
Competitive Grant Program ◦ Three categories • • •
Capital Projects Planning Projects Education Program
◦ 2-year cycle
•
Criteria developed through TAC CIP WG
•
Scoring committee comprised of BPAC and Member Agency staff
•
Complete Streets Policy
•
10% minimum non-VTA and non-2016 Measure B contribution
•
Maintenance of Effort required for Education Program
8
Highway Interchanges – Program Description •
$750 Million
•
Congestion relief
•
Improved highway operations and freeway access
•
Noise abatement
•
Roadway connection overcrossings
•
Advanced technology through ITS
•
Candidate projects listed in Resolution Attachment B
9
Highway Interchanges – Proposed Guidelines • 2-year prioritized Candidate List ◦ VTA BOD adopted Criteria ◦ Project readiness ◦ Level of local contribution
•
Complete Streets Policy •
•
20% minimum of non-VTA and non-2016 Measure B contribution Separate Noise Abatement Program ◦ VTA BOD adopted soundwall criteria
10
Transit Operations – Program Description •
$500 Million
•
Program Goals: ◦ Increase ridership ◦ Improve efficiency ◦ Enhance mobility services for seniors and disabled ◦ Improve affordability for underserved and vulnerable populations in SCCo
•
Four categories per the Resolution
•
Candidate projects & programs listed in Resolution Attachment D
11
Transit Operations – Proposed Guidelines •
2-year allocation
•
Four categories per the Resolution ◦ Expand mobility options & fares for most vulnerable population ◦ Enhance Frequent Core Network ◦ Improve bus stop amenities ◦ First/last mile connections
Increase safety for ◦ Drivers ◦ Bicyclists ◦ Pedestrians
•
Reduce congestion at crossings intersections
13
Caltrain Grade Separation – Proposed Guidelines •
2-year allocation ◦ Implementation plan ◦ Planning & Environmental activities
•
Cities apply for State §190 Grade Separation Program
•
Complete Streets Policy
•
10% minimum of non-VTA non2016 Measure B contribution
•
Discussions with cities identified in Resolution to define implementation plan
14
Caltrain Corridor Capacity Improvements – Program Description •
$314 Million
•
Corridor capacity improvements and increased service in Santa Clara County including: ◦ Increased service to Morgan Hill and Gilroy ◦ Station improvements ◦ Level boarding ◦ Extended platforms ◦ Service enhancements
Funds for increased operations to Morgan Hill & Gilroy distributed annually
•
Improvement projects after completion of Peninsula Corridor Electrification Project
16
SR 85 Corridor – Program Description •
$350 Million
•
Funds new transit and congestion relief projects on SR 85 ◦ Includes new transit lane from SR 87 in San Jose to US 101 in Mountain View
•
Funds noise abatement
•
Transportation alternatives study
17
SR 85 Corridor – Proposed Guidelines •
2-year allocation
•
Projects identified by the SR 85 Corridor Study
•
Projects identified in the SR 85 Noise Abatement Study
•
Complete Streets Policy
•
10% minimum non-VTA and non2016 Measure B contribution for capital projects
18
County Expressways – Program Description •
$750 Million
•
Tier 1 improvements projects in the County’s Expressway Plan
•
Relieves congestion, improves safety and increases effectiveness of expressway system
•
Candidate projects identified on Resolution Attachment C.
19
County Expressways – Proposed Guidelines •
2-year allocation
•
Discussion with County to define 5-year implementation plan and 10-year capital improvements plan
•
Complete Streets Policy
•
10% minimum non-VTA and non2016 Measure B contribution
•
Projects prioritized by SCCo Expressway PAB adopted criteria
20
BART Phase II – Program Description •
$1.5 Billion
•
Capped at 25% of Program Tax Revenues
•
Planning, engineering, construction, and delivery costs
•
Extend BART from Berryessa in San Jose to Santa Clara
•
Station locations: ◦ Alum Rock/28th Street ◦ Downtown San Jose ◦ San Jose Diridon ◦ Santa Clara
21
BART Phase II – Proposed Guidelines •
Allocation based on funding plan to be developed as part of Federal Full Funding Grant Agreement
22
Next Steps Measure B Implementation Committee Work Plan
December 2016
January 2017
February-April 2017
April-May 2017
June 2017
Schedule & Work Plan Overview TAC Workshop on Program Structures Program Guidelines Development Review Program Guidelines Review Final Draft Program Approve Final Draft Program Submit Draft Measure B FY18/FY19 Allocation Approve Measure B FY18/FY19 Allocation with VTA Budget