2o Tab 17 CD.PDF

Report 4 Downloads 191 Views
Developmentl Total I Project Cost I Category

Project Description

FAA Eligible

I

NMDOT Eligible

I

Local Share

Project Description

2017 Construct - Runwa 2-20 Resurfacing 2 Construct - Taxiwa D Reconstruction (Phase I) 3 State Ma intenance Grant 2017Total

MN MN MN

$3,827,400 $1,920,000 $11,100 $5,758,500

$3,588,188 $1,800,000 $0 $5,388,188

$119,606 $60,000 $10,000 $189,605

1 2 3 4

$119,606 $60,000 $1,100 $180,706

2018

5

4 Terminal Building Expansion/Relocation Study and Prel im inar Desi n 5 Desi n - Rental Car QTA/ Pre aration Faci lit 6 Pavement Rehabilitation - Aircraft Parking Apron Crack and Surface Seal (East A ron) 7 Environmental - Taxiway D Construction (Phase 11) and Taxiwa A Rea li nment 8 State Maintenance Grant 2018Total

DM/OP DM/EF

$500,000 $60,000

$468,750 $0

$15,625 $30,000

$15,625 $30,000

6

MN

$100,000

$93,750

$3,125

$3,125

7 8

EN MN

$200,000 $11,100 $871,100

$187,500 $0 $750,000

$6,250 $1 0,000 $65,000

$6,250 $1,100 $56,100

9 10

2019 9 Environmental and Design - Term inal Building Expansion/Relocation 10 Construct - Rental Car OTA/Preparation Facility 11 Design and Construct - Relocate Hold Line Markings on Taxiwa s Associated with Runwa 10-28 to 200' 12 Pavement Rehabilitation - Aircraft Parking Apron Crack and Surface Seal (North Apron) 13 State Maintenance Grant 2019Total

EN/DM DM/EF

ss MN MN

* $980,000 $30,000 $200,000 $11 ,100 $1,221,100

* $0 $0 $187,500 $0 $187,500

* $490,000 $15,000 $6,250 $10,000 $521,250

11 12

* $490,000

13

$15,000

14

$6,270 $1,100 $512,370

15

2020 14 Construct - Terminal Building Expansion/ Relocation and Associated Infrastructure (Access and Parking) 15 Construct - Taxiway D Construction (Phase 11) and Taxiway A Realignment 16 Design - Taxiway G Reconstruction/Realignment at Runwa 15 Threshold 17 Design - Improve RSA and ROFA Beyond Southeast End ofRunwa 15-33 18 Design and Construct - Implement PAPl-4 on Runway 15, PAPl-2 on Runwa 10-28, and Construct Electrical Vault 19 State Maintenance Grant 2020Total

DM

*

*

*

*

EF

$2,980,000

$2,793,750

$93,125

$93,125

SS/MN

$150,000

$140,625

$4,688

$4,688

ss ss

$50,000

$46,875

$1,563

$1,563

MN

16 17 ~

2 $700,000 $11,100 $3,891,100

$656,250 $0 $3,637,500

$21,875 $10,000 $1 3 1,250

$21,875 $1,100 $122,350

3 4 Construct New Holding Bay Serving Runway 2 to Meet Recommended FAA Standards 5 6 7 Reconstruct/Rehabilitate Runwa 10-28 8 Im lement REILs on Runwa 28 9 General Pavement Maintenance Pro·ects 10 State Maintenance Grants (1 OYears)

2021 20 Construct - Taxiway G Reconstruction/ Realignment at Runway 15 Threshold (Construct New Hold Apron) 21 Construct - Improve RSA and ROFA Beyond Southeast End ofRunwa 15-33 22 Design and Construct - Implement No-Taxi Islands at VariousTaxiwa /A ron Intersections 23 State Ma intenance Grant 2021 Total

$3,000,000

$2,81 2,500

$93,750

$93,750

55

$500,000

$468,750

$15,625

$15,625

55 MN

$50,000 $11,100 $3,561,100

$46,875 $0 $3,328,125

$1,563 $10,000 $120,938

$1,563 $1 ,100 $112,038

55/MN

Ke:

FAA Eligible

I

NMDOT Eligible

I

Local Share

MN EF EN

$2,000,000 $750,000 $300,000

$1 ,875,000 $703,125 $281,250

$62,500 $23,438 $9,375

$62,500 $23,438 $9,375

ss

$1,000,000

$937,500

$31,250

$31,250

ss

$500,000

$468,750

$15,625

$15,625

ss

EF

$400,000 $200,000

$375,000 $187,500

$12,500 $6,250

$12,500 $6,250

ss ss

$1,000,000 $1,000,000

$937,500 $937,500

$31,250 $31,250

$31,250 $31,250

$50,000 $150,000

$46,875 $140,625

$1,563 $4,688

$1,563 $4,688

OM

$3,000,000

$2,812,500

$93,750

$93,750

ss

$150,000

$140,625

$4,688

$4,688

ss

$700,000

$656,250

$21,875

$21,875

MN MN MN

$1,125,000 $300,000 $55,500 l[S.li,6sQ,

$1,054,688 $281,250 $0

$35,156 $9,375 $50,000

$35,156 $9,375 $5,500

SS/DM SS/ DM

OP SS/EF

ilil.,8}5,938J• $~4fl~.~3J]!~

$1,500,000

$0

$750,000

$750,000

***

ss

$25,000

*** $23,438

*** $781

*** $781

ss

$500,000 $500,000 $500,000 $750,000 $25,000 $500,000 $111,000

$468,750 $468,750 $468,750 $703,125 $23,438 $468,750 $0

$15,625 $15,625 $15,625 $23,438 $781 $15,625 $100,000

$15,625 $15,625 $15,625 $23,438 $781 $15,625 $11,000

SS/DM SS/DM MN

ss

MN MN

Note:

ARFF - Aircraft Rescue and Firefighting LED - Light Emitting Diode MITL - Medium Intensity Taxiway Lighting PAPI - Precision Approach Path Indicator QTA - Quick-Turn-Around

.

DRA FT Chapter

INTERMEDIATE TERM PROGRAM (6-10 YEARS) Reconstruct/Rehabi litate Runway 15-33 Implement LED Lighting on Runway 15-33 and Taxiway D Environmental - Runway 2-20 Extension** Realign Taxiway Cat Runway 33 Threshold (Construct New Hold Apron) Realign Taxiway A at Runway 20 Threshold (Construct New Holding Bay) Construct New Exit Taxiway Serving Runway 2-20 Between Taxiways A and G Implement M ITL on Taxiway J Improve ROFZ and ROFA Adjacent to East End of Runway 10-28 (Relocate Roadway) Purchase New ARFF Vehicle Relocate Hold Line Markings on Taxiways Associated with Runways 2-20 and 15-33 to 314' Enlarqe Blast Pad on Runway 20 Extend Runway 2-20 634' Southwest and Associated Para llel Taxiway D (Relocate Glideslope Antenna)** Construct Blast Pad on Runway 2 and Implement PAPl-4 on Runway 2 Acquire Property Interests Associated with RPZ Serving Runway 2-20 Extension (2.5 acres affecting three parcels)** Construct Airport Maintenance Faci lity to Support Equipment Storage (60'x60') General Pavement Maintenance Projects State Maintenance Grants (5 Years) TERM~DIATEJ ERMJ!RQGRL\MTOT~~ LONG TERM PROGRAM (11 -20 YEARS) Construct Roadway Between Aviation Drive and New Airport Entrance Road to Support Landside Develo ment Potentia l Implement Enhanced Instrument Approach Minimums on Runwa 20

IDevelopmentl Total I Category Project Cost

s,x - 3

Project cost estimates prepared by Molzen Corbin.

REIL - Runway End Identification Light ROFA - Runway Object Free Area ROFZ - Runway Obstacle Free Zone RSA - Runway Safety Area SS - Safety/S ecurity

EF - Effic iency MN - Maintenance EN - Environmental OM - Demand OP - Opportunity

* The Terminal Building Expansion/Relocation St udy will further define the project and associated costs for terminal area improvements. ** Dependent on justification and further coordination with the FAA. *** Coordination with the FAA will be needed to further define the potential for the relocation of County Highway 56 and property acquisition interests.

J'..,

"""""""'

..,,,,.,,._

""'¥"•

,,,,,,,.

""

Exhibit 6A CAPITAL IMPROVEMENT PROGRAM

1