36th Annual State Construction Conference 2016 SCO Report Key ...

Report 5 Downloads 51 Views
36th Annual State Construction Conference March 2nd, 2017

2016 SCO Report Key Performance Indicators Construction Contracts Construction Management Forecast

SCO Conference 2017

InterSCOPE State Construction Office Project Environment This is how it all started. But now it’s a new system Serving Everyone

Interscope+  

Robust database What reports can be created ……. ……. if the entire database was downloaded ….. …….. Into an Excel Workbook? Let’s start with Contracts awarded in 2016

Construction Contracts All Agencies, Community Colleges & Universities All types of construction contracts Formal, Informal, Non-SCO Oversight, University Download



Awarded in calendar year 2016: Formal: 124 contracts totaling $454,644,472  Informal: 446 contracts totaling $51,965,225 

Construction Contract History 

$ Volume of all Construction contracts 

All types of construction  Vertical  Utilities,

Parking Lots & Decks, Stadiums  Sports Fields, campus roadways (non DOT) 

Annually since 2000

State-wide Construction Contracts Awarded $ $1,200,000,000

$1,000,000,000

$800,000,000

$600,000,000

$400,000,000

$200,000,000

$0 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

$1,200,000,000

$1,000,000,000

$800,000,000

$600,000,000

$400,000,000

$200,000,000

$0 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

$1,200,000,000

What happened here?

$1,000,000,000

$800,000,000

$600,000,000

$400,000,000

$200,000,000

$0 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

$1,200,000,000

What happened here?

University Bond Projects $1,000,000,000

$800,000,000

$600,000,000

$400,000,000

$200,000,000

$0 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

$1,200,000,000

What happened here?

University Bond Projects $1,000,000,000

When did the Bond Pass?

$800,000,000

$600,000,000

$400,000,000

$200,000,000

$0 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

$1,200,000,000

What happened here?

University Bond Projects $1,000,000,000

When did the Bond Pass?

$800,000,000

$600,000,000

$400,000,000

$200,000,000

$0 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

Where are we headed? $1,200,000,000

$1,000,000,000

$800,000,000

$600,000,000

$400,000,000

$200,000,000

$0 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

State-wide Construction Contracts Projection $1,200,000,000

$1,000,000,000

$800,000,000

$600,000,000

$400,000,000

$200,000,000

$0 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

What about the Volume? 

Not $ amounts ……. ….. but the sheer volume of projects



Ryan Scruggs “have you heard the story about the boxer... ….. and his optimistic manager?

Total Contract $ vs number of Projects $1,200,000,000

450

400 $1,000,000,000

350

$800,000,000

300

250 $600,000,000 200

$400,000,000

150

100 $200,000,000 50

$0

0 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Construction Contracts All Agencies, Community Colleges & Universities All types of construction contracts Formal, Informal, Non-SCO Oversight, University Download



Awarded in calendar year 2016: Formal: 124 contracts totaling $454,644,472  Informal: 446 contracts totaling $51,965,225 

Historical Staffing 

Last Bond Project in 2000



Latif Kaid Track only Appropriated Funds Positions. 2009 DOI transferred to SCO

 

  

4 Engineer/Architect positions for Code-Only Review 4 State Electrical Inspector Positions All Receipt Supported positions by Fire Fund

Work Load vs Appropriated Fund Staffing $1,200,000,000

70

60

$1,000,000,000

50 $800,000,000

40 $600,000,000 30

$400,000,000 20

$200,000,000 10

$0

0 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

actual

forecast

Staff

Actual Staffing Due to retirements, vacancies, long term medical conditions….. ………. and key staff being stolen. 

Bob Talley “have you heard the Jerry Clower story….. ….. about Marcell Ledbetter ….. ….. up in the top of a 100’ sweetgum tree…. …. with a Lynx …. aka a Bobcat.

Work Load vs ACTUAL Appropriated Fund Staffing Includes all current vacancies $1,200,000,000

70

60 $1,000,000,000

50 $800,000,000

40 $600,000,000 30

$400,000,000 20

$200,000,000 10

$0

0 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

actual

forecast

Staff

What about Cost per sqft ? First, what is this?

A grain of salt

SCO Index of $/sqft ** 

Data set: SCO Construction Contracts since 2004  Vertical Construction only  Design must have construction > 5000 sqft  Includes all types of construction 

Classrooms, Labs, Dorms, Renovations, upfits just MEP or some combination thereof.

Remember: take this with a grain of salt

SCO Vertical Construction Combined Cost Index ** $250.00

$200.00

$150.00

$100.00

$50.00

$0.00 2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

Connect NC Bond Status Projects Established in Interscope:

242

Funds assigned to Programs in Interscope+

Funds Assigned

Funds Committed in Interscope+ Design Contracts, Construction Contracts

Committed, $113,551,816 6%

Uncommitted , $1,886,448,18 4 94%

So where do we go from here…. … with this Robust Interscope+ database? Just imagine if SCO had a full-time Professional estimator working with this data?

Listen carefully to Paul Boney’s presentation on the Recommendations of the Blue Ribbon Commission