750 north glebe road - Arlingtonva

Report 1 Downloads 200 Views
750 NORTH GLEBE ROAD SPRC MEETING #4 MARCH 21, 2016

EXISTING SITE AERIAL

2

Building 1 & 3 at Wilson Blvd. and N Glebe Rd.

Buildings 3 & 4 at 7th St. N and N Glebe Rd.

Buildings 1 & 2 at Wilson Blvd. and N Tazewell St.

Building 2 along N Tazewell St.

3

INITIAL PROPOSAL

REVISED PROPOSAL

INTERIM PROPOSAL

Comparative View Looking South Along N Glebe Rd.

4

INITIAL PROPOSAL

REVISED PROPOSAL INTERIM PROPOSAL

Comparative Aerial View Looking SW

5

INITIAL PROPOSAL

REVISED PROPOSAL INTERIM PROPOSAL

Comparative Aerial View Looking SW

6

INITIAL PROPOSAL

REVISED PROPOSAL INTERIM PROPOSAL

Comparative Aerial View Looking SW

7

145’

72’ 72’ INITIAL PROPOSAL

REVISED PROPOSAL INTERIM PROPOSAL

Comparative View Looking West on 7th St. N

8

PREVIOUSLY PROPOSED

REVISED PROPOSAL

(NO CHANGE)

Comparative View Looking North on N Tazewell St.

9

MASSING/HEIGHTS 10 STORIES HT: +/-115’ 9 STORIES HT: +/-105’ 6 STORIES HT: +/-75’

9 STORIES HT: +/-105’

4 STORIES HT: +/-55’

RESIDENTIAL 3-4 STORIES HT: +/- 40’

RESIDENTIAL 6 STORIES HT: +/- 76’

RESIDENTIAL 3-4 STORIES HT: +/- 40’

10

MASSING/HEIGHTS

9 STORIES HT: +/-105’

12 STORIES HT: +/-135’

10 STORIES HT: +/-115’

‘CROWN’ HT: +/-155’ RESIDENTIAL 6 STORIES HT: +/-76’

OFFICE (800 N GLEBE) 10 STORIES HT: +/-125’

OFFICE 11 STORIES HT: +/-150’

OFFICE 11 STORIES HT: +/-157’

OFFICE 11 STORIES HT: +/-157’

HOTEL 16 STORIES HT: +/-170’

11

TAPERING

12 STORIES

9 STORIES

10 STORIES

12

TAPERING

10 STORIES 9 STORIES 6 STORIES

4 STORIES + MEZZ

13

TAPERING

5 STORIES +/-50’

3 STORIES +/-30’ +/-58’

+/-133’

INITIAL PROPOSAL

REVISED PROPOSAL

14

SETBACKS – GROUND PLANE

WILSON BLVD/GLEBE ROAD SETBACK: Varies: 0’ to +/-30’ SIDEWALK/LANDSCAPE: 15’-8” Min. 19’-8” Typical +/-50’ at Corner

7th STREET SETBACK: 15’ Min. SIDEWALK/LANDSCAPE: +/- 22’-3”

TAZEWELL STREET SETBACK: 15’ Min. SIDEWALK/LANDSCAPE: +/-18’-9”

15

SETBACKS – BUILDING BREAKS

INITIAL PROPOSAL

REVISED PROPOSAL

INTERIM PROPOSAL

16

SETBACKS – BUILDING BREAKS

INITIAL PROPOSAL

NO BREAK

+/-14’

INTERIM PROPOSAL

36’

REVISED PROPOSAL

17

SETBACKS – BUILDING BREAKS

INITIAL PROPOSAL

INTERIM PROPOSED

REVISED PROPOSAL 18

SETBACKS – BUILDING BREAKS

+/-10’ SETBACK TO BALCONY FACE 19

SETBACKS – STEP BACK MASSING 2’ SETBACK AT 11th FLOOR 4’ SETBACK AT BAY

6’ SETBACK 8’ SETBACK

3’ SETBACK

3’ SETBACK

20

FAÇADE TREATMENTS BUILDING 1

21

FAÇADE TREATMENTS BUILDING 1

22

FAÇADE TREATMENTS BUILDING 3

23

FAÇADE TREATMENTS BUILDING 3

24

FAÇADE TREATMENTS BUILDING 2

25

FAÇADE TREATMENTS BUILDING 2

26

16’ STEP BACK 14’ STEP BACK

ROOFLINE, PENTHOUSE FORM & MATERIALS

4’ STEP DOWN 2’ STEP DOWN 2’ STEP DOWN

27

ROOFLINE, PENTHOUSE FORM & MATERIALS

28

ROOFLINE, PENTHOUSE FORM & MATERIALS

29

ROOFLINE, PENTHOUSE FORM & MATERIALS

30

STREET LEVEL ACTIVISM/ENTRY/EXIT RESIDENTIAL

31

STREET LEVEL ACTIVISM/ENTRY/EXIT RETAIL

32

STREET LEVEL ACTIVISM/ENTRY/EXIT RETAIL

33

STREET LEVEL ACTIVISM/ENTRY/EXIT RETAIL

34

RETAIL: LOCATION/SIZE, CEILING HEIGHTS

PEDESTRIAN ACCESS TO PARKING

VEHICULAR ACCESS TO PARKING

PEDESTRIAN ACCESS TO PARKING

22’ FL-FL HEIGHT GROUND FLOOR

RETAIL EXITS ONLY

35

RETAIL: STOREFRONT

36

RETAIL: STOREFRONT

37

SERVICE: UTILITIES FIRE COMMAND CENTER

ABOVE GROUND EXISTING ELECTRICAL SWITCH

IN-GROUND ELECTRICAL VAULT 38

SERVICE: VENTING – INTAKE AIR

GARAGE INTAKE AIR SHAFT

39

SERVICE: VENTING – EXHAUST AIR

GARAGE EXHAUST SHAFT TO BUILDING ROOF RESTAURANT KITCHEN EXHAUST

40

VENTING – GROUND FLOOR SPACES

41

SERVICE: LOADING RES/RETAIL PARKING ENTRY ONLY

RES/RETAIL LOADING

RES/RETAIL LOADING

RES/RETAIL PARKING ACCESS

42

SERVICE – LOADING DOCK DOOR

43

LIGHTING

SAMPLE TRADITIONAL STYLED SCONCE

SAMPLE DECO STYLED SCONCE

44

LIGHTING

45

Strategies to Achieve LEED GOLD Selected Key Credits • Electric vehicle charging stations • Rainwater capture stored in cistern for irrigation • Water efficient irrigation measures including drip lines and moisture sensors • ENERGY STAR clothes washer, dishwasher, refrigerator (energy model recommendations) • Occupant accessible lighting controls and thermostats in amenity spaces • Low flow plumbing fixtures that reduce potable water demand by 40% • High efficiency filtration media for better air quality (MERV 13) • Renewable energy credits 46

THANK YOU

47