Apple Campus 2 Planned Development Permit November 2012

Report 2 Downloads 59 Views
Apple Campus 2 Planned Development Permit November 2012

$$$SYTIME$$$

General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work.

$$$DGNSPEC$$$

4. Foster + Partners shall be notified in writing of any discrepancies. 5. Any areas indicated on this sheet are approximate and indicative only.

East Homestead Road

North Wolfe Road

North Wolfe Road

North Tantau Avenue

East Homestead Road

05

11/01/12

Planning Revision

04

05/25/12

Planning Revision

03

02/29/12

Planning Revision

02

01/17/12

Planning Revision

01

11/04/11

Planning Revision

00

08/09/11

Planned Development Permit

Rev.

Date

Chk

Reason For Issue

North Tantau Avenue

Key Plan

Pruneridge Avenue N

© Foster

Partners 2010

Arup North America Ltd. 560 Mission Street, Suite 700 San Francisco, CA 94105 USA Tel (415) 957 9445 Fax (415) 957 9096 www.arup.com

KIER & WRIGHT 3350 Scott Boulevard, Building 22 Santa Clara, California 95054

Int

er

sta

te

Phone: (408) 727 6665 www.kierwright.com

Int er sta te 28 0

28

0

Fax: (408) 727 5641 © Kier & Wright, 2011

Client

Apple Inc.

Project

Impermeable Area:

130.4 acres

Impermeable Area:

64.2 acres

Permeable Area:

42.6 acres

Permeable Area:

108.8 acres

Apple Campus 2

Title

01

Existing Absorbent Landscape NTS

02

Proposed Absorbent Landscape

Existing and Proposed Landscape

NTS Project No.

Date

1858

11/01/2012

Number

P1.22

Scale @ Arch E1

NTS Revision

04

$$$SYTIME$$$

General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work.

$$$DGNSPEC$$$

4. Foster + Partners shall be notified in writing of any discrepancies. 5. Any areas indicated on this sheet are approximate and indicative only.

East Homestead Road

North Wolfe Road

North Wolfe Road

East Homestead Road

06

11/01/12

Planning Revision

05

07/10/12

Planning Revision

04

05/25/12

Planning Revision

03

02/29/12

Planning Revision

02

01/17/12

Planning Revision

01

11/04/11

Planning Revision

00

08/09/11

Planned Development Permit

Rev.

Date

Chk

Reason For Issue

Key Plan

Pruneridge Avenue N

North Tantau Avenue

North Tantau Avenue

© Foster

Partners 2010

Arup North America Ltd. 560 Mission Street, Suite 700 San Francisco, CA 94105 USA Tel (415) 957 9445 Fax (415) 957 9096 www.arup.com

KIER & WRIGHT Int

er

sta

te

3350 Scott Boulevard, Building 22 Santa Clara, California 95054

Int er sta te 28 0

28

Phone: (408) 727 6665 www.kierwright.com

Fax: (408) 727 5641 © Kier & Wright, 2011

0

Client

Apple Inc.

Total Existing Trees:

4506

Existing Standard Trees:

4438

Existing Heritage Trees:

0

Existing Specimen Trees:

68

Proposed Trees:

6200

Standard Trees to Remain:

835

Standard Trees to Transplant:

72

Specimen Trees to Remain:

03

Specimen Trees to Transplant:

11

Total Trees:

7038

Total Trees to Transplant:

83

Project

Apple Campus 2

See P7.02 and P7.03

See P7.00 and P7.01

Proposed locations for Transplanted Trees, including redwood grove along Calabazas Creek Tree #1034 Memorial English Oak will be transplanted If it does not survive it will be replaced by another specimen oak

108 new specimen trees will replace the 54 specimen trees to be removed at a rate of 2 trees for every 1 removed Existing Tree to Remain

01

Existing Trees NTS

02

Proposed Trees NTS

Title

Existing and Proposed Trees Project No.

Date

1858

11/01/2012

Number

P1.23

Scale @ Arch E1

NTS Revision

04