BART PhaseII SEIS SEIR Volume I Part II

Report 2 Downloads 15 Views
Milestones

Outreach

Pre-Construction Activities

Construction

Graphics … 00332.13 (10-4-2016)

Testing & Commissioning

Source: VTA, 2016.

Figure 5-1 Construction Schedule VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (10-11-2016)

CONCEPTUAL PLANS

Source: VTA, 2016.

Figure X-X: Mabury Road and U.S. 101 Construction Staging Areas

Figure 5-2 Proposed Mabury Road and U.S. 101 Construction Staging Areas VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (10-11-2016)

CONCEPTUAL PLANS

Source: VTA, 2016.

Figure X-X: Alum Rock/28th Street Station Construction Staging Areas

Figure 5-3 Proposed Alum Rock Construction Staging Areas VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (10-11-2016)

Source: VTA, 2016.

CONCEPTUAL PLANS Figure X-X: 13th Street Ventilation Structure Construction Staging Area

Figure 5-4 Proposed 13th Street Mid-Tunnel Ventilation Structure Construction Staging Area VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (10-11-2016)

CONCEPTUAL PLANS Figure X-X: Downtown San Jose Station East Option Construction Staging Areas

Source: VTA, 2016.

Figure 5-5 Proposed Downtown San Jose Station East Option Construction Staging Areas VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (11-3-2016)

CONCEPTUAL PLANS

Source: VTA, 2016.

Figure X-X: Downtown San Jose Station West Option Construction Staging Areas

Figure 5-6 Proposed Downtown San Jose Station West Option Construction Staging Areas VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (10-18-2016)

CONCEPTUAL PLANS

Source: VTA, 2016.

Figure X-X: Diridon Station North Option Construction Staging Areas

Figure 5-7 Proposed Diridon Station North Construction Staging Area VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (10-11-2016)

CONCEPTUAL PLANS

Source: VTA, 2016.

Figure X-X: Diridon Station South Option Construction Staging Areas

Figure 5-8 Proposed Diridon Station South Option Construction Staging Areas VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (10-11-2016)

CONCEPTUAL PLANS

Source: VTA, 2016.

Figure X-X: Stockton Avenue Ventilation Structure Options Construction Staging Areas

Figure 5-9 Proposed Stockton Avenue Mid-Tunnel Ventilation Structure Construction Staging Areas VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (10-11-2016)

CONCEPTUAL PLANS

Source: VTA, 2016.

Figure X-X: Santa Clara Station and Newhall Maintenance Facility Construction Staging AreaFigure 5-10 Proposed Santa Clara Station Construction Staging Area VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (10-11-2016)

CONCEPTUAL PLANS

Source: VTA, 2016.

Figure X-X: Newhall Maintenance Facility Construction Staging Area

Figure 5-11 Proposed Newhall Maintenance Facility Construction Staging Area VTA’s BART Silicon Valley–Phase II Extension Project

*

= Maintenance Facility

*

e Rd

Graphics … 00332.13 (6-20-2016)

McKe

urce: Hexagon, 2016

Source: Hexagon, 2016.

Figure 5-32 Truck Haul Routes VTA’s BART Silicon Valley-Phase II Extension Project

Figure 5-12 Truck Haul Routes VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

Silicon Valley Rapid Transit Corridor Final EIS

Source: VTA, 2011.VTA, 2007. Source:

Figure 5-13 Examples of Tunnel Boring Machines VTA’s BART Silicon Valley–Phase II Extension Project

Figure 6-22: Examples of Tunnel Boring Machines

Graphics … 00332.13 (1-14-2016)

Silicon Valley Rapid Transit Corridor Final EIS

6-38

Source: VTA, 2007.

Source: VTA, 2011.

Figure 6-23: General Arrangement of an Earth Pressure Balanced Tunnel Boring Machine Construction

Figure 5-14 General Arrangement of an Earth Pressure Balanced Tunnel Boring Machine VTA’s BART Silicon Valley–Phase II Extension Project

6-39

Graphics … 00332.13 (6-20-2016)

Silicon Valley Rapid Transit Corridor Final EIS

Source: VTA, 2007.

Source: VTA, 2011.

Figure 6-24: Example of Segmental Concrete Lining Units and Rings

Figure 5-15 Construction Example of Segmental Concrete Lining Units and Rings VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

Silicon Valley Rapid Transit Corridor Final EIS

Source: VTA, 2011. Source: VTA, 2007.

Figure 5-16 Conveyor System Figure 6-25: Conveyor System VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

Silicon Valley Rapid Transit Corridor Final EIS

6-35

Source: VTA, 2011. Source: VTA, 2007.

Figure 6-20: Diameter and Spacing of Tunnel Bores (TRD)

Figure 5-17 Construction Diameter and Spacing of Tunnel Bores (TRD) VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

Silicon Valley Rapid Transit Corridor Final EIS

6-36

Source: VTA, 2011. Source: VTA, 2007.

Figure 6-21: Twin Tunnel Bores

Figure 5-18 Construction Twin Tunnel Bores VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

Source: VTA, 2016.

Figure 5-19 Single-Bore Tunnel Cross Section VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

Source: VTA, 2016.

Figure 5-20 Example of Single-Bore Tunnel Transit System VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (12-7-2016)

Source: VTA, 2016.

Figure 5-21 Example of Single-Bore Tunnel Station VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

Silicon Valley Rapid Transit Corridor Final EIS

Source: VTA, 2007.

Source: VTA, 2011.

6-45

Figure 6-27: Cross-Passage Connecting the Tunnel Bores

Figure 5-22 Cross-Passage Connecting the Tunnel Bores Construction VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

Silicon Valley Rapid Transit Corridor Final EIS

Source: VTA, 2007.

Source: VTA, 2011.

6-10

Figure 6-3: At-Grade Guideway Construction

Figure 5-23 At-Grade Guideway VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

Silicon Valley Rapid Transit Corridor Final EIS

Source: VTA, 2007.

Source: VTA, 2011.

6-17

Figure 6-7: Retained Cut U-Wall Construction

Figure 5-24 Retained Cut U-Wall VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

Silicon Valley Rapid Transit Corridor Final EIS

Source: VTA, 2007.

Source: VTA, 2011.

6-19

Figure 6-8: Steel Sheet Pipes Construction

Figure 5-25 Steel Sheet Piles VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

Silicon Valley Rapid Transit Corridor Final EIS

6-20

Source: VTA, 2011.

Source: VTA, 2007.

Figure 6-9: Lateral Bracing Members

Figure 5-26 Construction Lateral Bracing Members VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

Silicon Valley Rapid Transit Corridor Final EIS

Source: VTA, 2007.

Source: VTA, 2011. 6-22

Figure 6-11: Soldier Piles and Lagging Construction

Figure 5-27 Soldier Piles and Lagging VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

-23

Source: VTA, 2007.

Figure 6-12: Soil Nail Wall

Source: VTA, 2011.

Constructio

Figure 5-28 Solid Nail Wall VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

Silicon Valley Rapid Transit Corridor Final EIS

6-25

Source: VTA, 2007.

Source: VTA, 2011.

Figure 6-13: Temporary Deck Installation

FigureConstruction 5-29 Temporary Deck Installation VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

Silicon Valley Rapid Transit Corridor Final EIS

6-26

Source: VTA, 2007. Source: VTA, 2011.

Figure 6-14: Ongoing Excavation After Temporary Deck Installation

FigureConstruction 5-30 Ongoing Excavation After Temporary Deck Installation VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

Silicon Valley Rapid Transit Corridor Final EIS

6-28

Source: VTA, 2007.

Source: VTA, 2011.

Figure 6-15: Temporary Utility Support in an Excavation Construction

Figure 5-31 Temporary Utility Support in an Excavation VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-27-2016)

Silicon Valley Rapid Transit Corridor Final EIS

Source: VTA, 2007.

Source: VTA, 2011.

Figure 5-32 Basic Components of a Tieback Anchor VTA’s BART Silicon Valley–Phase II Extension Project

Figure 6-10: Basic Components of a Tieback Anchor

Graphics … 00332.13 (6-20-2016)

Silicon Valley Rapid Transit Corridor Final EIS

Source: VTA, 2011.

6-29

Figure 6-16: Deep Soil Mix and Auger Rig Installation Construction Figure 5-33 Deep Soil Mix and Auger Rig Installation VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

Silicon Valley Rapid Transit Corridor Final EIS

6-30

Source: VTA, 2011.

Source: VTA, 2007.

Figure 6-17: Deep Soil Mix and Steel Soldier Pipes

Figure 5-34 Construction Deep Soil Mix and Steel Soldier Piles VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

Silicon Valley Rapid Transit Corridor Final EIS

Figure 6-18: Trench Remixing and Deep-Wall Method (TRD) Source: VTA, 2011.

6-31

Construction

Figure 5-35 Trench Remixing and Deep-Wall Method (TRD) VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (6-20-2016)

Silicon Valley Rapid Transit Corridor Final EIS

Source: VTA, 2007.

6-33 VTA, 2011. Source:

Figure 6-19: Construction of a Diaphragm Slurry Wall Construction

Figure 5-36 Construction of a Diaphragm Slurry Wall VTA’s BART Silicon Valley–Phase II Extension Project

VTA BART Phase II

US 1

10

Legend

N

IA

E

L JU

T

ST

E RE

Transit-Oriented Joint Development Parking Lot ^LJƐƚĞŵ&ĂĐŝůŝƟĞƐ

0.25 MILES

0.50 MILES

hŶĚĞƌŐƌŽƵŶĚ^ƚĂƟŽŶ San Jose General Plan >ĂŶĚhƐĞĞƐŝŐŶĂƟŽŶƐ

C TA

AN

ES

1 10

Graphics … 00332.13 (6-9-2016) tm

US

C TA

AN

ES

T

EE

TR

AS

R LA

T

EE

TR

AS

R LA

Urban Village ZĞƐŝĚĞŶƟĂůEĞŝŐŚďŽƌŚŽŽĚ EĞŝŐŚďŽƌŚŽŽĚͬ Community Commercial WƵďůŝĐͬYƵĂƐŝͲWƵďůŝĐ DŝdžĞĚhƐĞEĞŝŐŚďŽƌŚŽŽĚ Open Space, Parklands and Habitat Light Industrial

Source: Circlepoint; Google Earth, 2015.

NOT TO SCALE

^ĂŶ:ŽƐĞ'ĞŶĞƌĂůWůĂŶ>ĂŶĚhƐĞĞƐŝŐŶĂƟŽŶƐͲůƵŵZŽĐŬ^ƚĂƟŽŶ

Source: Circlepoint; Google Earth, 2015

Figure

6.11-1

Figure 6.11-1 San Jose General Plan Land Use Designations – Alum Rock/28th Street Station VTA’s BART Silicon Valley–Phase II Extension Project

VTA BART Phase II

Legend Transit-Oriented Joint Development San Jose General Plan >ĂŶĚhƐĞĞƐŝŐŶĂƟŽŶƐ

INT

SA

N JOH

EET

STR

A LAR

C TA

AN

ES

Graphics … 00332.13 (6-9-2016) tm

N

ER

NF

SA

T

EE

TR

OS

D AN

0.50 MILES

T

EE

STR

0.25 MILES

Urban Village ZĞƐŝĚĞŶƟĂůEĞŝŐŚďŽƌŚŽŽĚ EĞŝŐŚďŽƌŚŽŽĚͬ Community Commercial WƵďůŝĐͬYƵĂƐŝͲWƵďůŝĐ DŝdžĞĚhƐĞEĞŝŐŚďŽƌŚŽŽĚ hƌďĂŶZĞƐŝĚĞŶƟĂů Open Space, Parklands and Habitat Downtown

Source: Circlepoint; Google Earth, 2015.

NOT TO SCALE

Figure 6.11-2 San Jose General Plan Land Use Designations – 13th Street Ventilation Facility ^ĂŶ:ŽƐĞ'ĞŶĞƌĂůWůĂŶ>ĂŶĚhƐĞĞƐŝŐŶĂƟŽŶƐͲϭϯƚŚ^ƚƌĞĞƚsĞŶƟůĂƟŽŶ^ƚƌƵĐƚƵƌĞ 6.11-2 VTA’s BART Silicon Valley–Phase II Extension Project Figure

Source: Circlepoint; Google Earth, 2015

VTA BART Phase II

Legend HN

O TJ

ET

Transit-Oriented Joint Development

RE

ST

T

IN

SA

A

E

A NT

R LA

E RE

ST

C

AN

S

AN

RN

FE

ET

RE

ST

hŶĚĞƌŐƌŽƵŶĚ^ƚĂƟŽŶ ^LJƐƚĞŵ&ĂĐŝůŝƟĞƐ

SA

0.25 MILES

DO

0.50 MILES

San Jose General Plan >ĂŶĚhƐĞĞƐŝŐŶĂƟŽŶƐ

Urban Village hƌďĂŶZĞƐŝĚĞŶƟĂů ZĞƐŝĚĞŶƟĂůEĞŝŐŚďŽƌŚŽŽĚ EĞŝŐŚďŽƌŚŽŽĚͬ Community Commercial WƵďůŝĐͬYƵĂƐŝͲWƵďůŝĐ Mixed Use Commercial

Graphics … 00332.13 (6-9-2016) tm

dƌĂŶƐŝƚZĞƐŝĚĞŶƟĂů Open Space, Parklands and Habitat Downtown

Source: Circlepoint; Google Earth, 2015.

^ĂŶ:ŽƐĞ'ĞŶĞƌĂůWůĂŶ>ĂŶĚhƐĞĞƐŝŐŶĂƟŽŶƐͲŽǁŶƚŽǁŶ^ĂŶ:ŽƐĞĂƐƚKƉƟŽŶ

Source: Circlepoint; Google Earth, 2015

Figure

NOT TO SCALE

6.11-3

Figure 6.11-3 San Jose General Plan Land Use Designations – Downtown San Jose Station East Option VTA’s BART Silicon Valley–Phase II Extension Project

VTA BART Phase II

Legend T

EE

HN

O TJ

R ST

Transit-Oriented Joint Development

0.50 MILES

^LJƐƚĞŵ&ĂĐŝůŝƟĞƐ

IN

SA

0.25 MILES E

SA

A NT

A

AR

CL

ET

RE

ST

hŶĚĞƌŐƌŽƵŶĚ^ƚĂƟŽŶ San Jose General Plan >ĂŶĚhƐĞĞƐŝŐŶĂƟŽŶƐ

Urban Village hƌďĂŶZĞƐŝĚĞŶƟĂů ZĞƐŝĚĞŶƟĂůEĞŝŐŚďŽƌŚŽŽĚ EĞŝŐŚďŽƌŚŽŽĚͬ Community Commercial WƵďůŝĐͬYƵĂƐŝͲWƵďůŝĐ Mixed Use Commercial

N

NA

N

Graphics … 00332.13 (6-9-2016) tm

SA

Source: Circlepoint; Google Earth, 2015. Source: Circlepoint; Google Earth, 2015

R FE

DO

ST

RE

ET

dƌĂŶƐŝƚZĞƐŝĚĞŶƟĂů Open Space, Parklands and Habitat Downtown

^ĂŶ:ŽƐĞ'ĞŶĞƌĂůWůĂŶ>ĂŶĚhƐĞĞƐŝŐŶĂƟŽŶƐͲŽǁŶƚŽǁŶ^ĂŶ:ŽƐĞtĞƐƚKƉƟŽŶ

Figure

NOT TO SCALE

6.11-4

Figure 6.11-4 San Jose General Plan Land Use Designations – Downtown San Jose Station West Option VTA’s BART Silicon Valley–Phase II Extension Project

Legend

LIAN W JU

S

T EE TR

0.50 MILES

Transit-Oriented Joint Development / WƵďůŝĐ&ĂĐŝůŝƟĞƐ

Bus Transit Center 0.25 MILES W SANTA CLARA STREET

Urban Village

US

Neighborhood / Community Commercial Public / Quasi-Public Transit Employment Center Mixed Use Neighborhood

87

Graphics … 00332.13 (6-9-2016) tm

PARK AVE

Source: Circlepoint; Google Earth, 2015.

Open Space, Parklands and Habitat Downtown Commercial Downtown Combined Industrial / Commercial

NOT TO SCALE NOT TO SCALE

Figure 6.11-5 San Jose General Plan Land Use Designations — Diridon Station South Option San Jose General Plan Land Use Designations – Diridon Station South Option VTA’s BART Silicon Valley–Phase II Extension Project VTA’s BART Silicon Valley–Phase II Extension Project

Legend

LIAN W JU

S

T EE TR

0.50 MILES

Transit-Oriented Joint

Bus Transit Center 0.25 MILES W SANTA CLARA STREET

Urban Village

US

Neighborhood / Community Commercial Public / Quasi-Public Transit Employment Center Mixed Use Neighborhood

87

Graphics … 00332.13 (6-9-2016) tm

PARK AVE

Source: Circlepoint; Google Earth, 2015.

Open Space, Parklands and Habitat Downtown Commercial Downtown Combined Industrial / Commercial

NOT TO SCALE

Figure 6.11-6 San Jose General Plan Land Use Designations – Diridon Station North, Single-Bore Option VTA’s BART Silicon Valley–Phase II Extension Project

Legend LIAN W JU

S

T EE TR

0.50 MILES

Transit-Oriented Joint

Bus Transit Center 0.25 MILES

Urban Village

W SANTA CLARA STREET

US 87

Graphics … 00332.13 (6-9-2016) tm

PARK AVE

Source: Circlepoint; Google Earth, 2015.

Neighborhood / Community Commercial Public / Quasi-Public Transit Employment Center Mixed Use Neighborhood

Open Space, Parklands and Habitat Downtown Commercial Downtown Combined Industrial / Commercial

NOT TO SCALE

Figure 6.11-7 San Jose General Plan Land Use Designations – Diridon Station North, Twin-Bore Option VTA’s BART Silicon Valley–Phase II Extension Project

VTA BART Phase II

E UP AL AD GU

AN

M LE

CO

Legend

E AV

Transit-Oriented Joint Development 0.25 MILES

0.50 MILES

San Jose General Plan >ĂŶĚhƐĞĞƐŝŐŶĂƟŽŶƐ

ZĞƐŝĚĞŶƟĂůEĞŝŐŚďŽƌŚŽŽĚ

T EE

WƵďůŝĐͬYƵĂƐŝͲWƵďůŝĐ KƉĞŶ^ƉĂĐĞ͕WĂƌŬůĂŶĚƐ ĂŶĚ,ĂďŝƚĂƚ ŽŵďŝŶĞĚ/ŶĚƵƐƚƌŝĂůͬ ŽŵŵĞƌĐŝĂů >ŝŐŚƚ/ŶĚƵƐƚƌŝĂů

R

O

R

W

YL TA

ST

N

TO

CK

O ST E AV

IAN W JUL

T

STREE

DŝdžĞĚhƐĞEĞŝŐŚďŽƌŚŽŽĚ Transit Employment Center

Graphics … 00332.13 (6-9-2016) tm

EĞŝŐŚďŽƌŚŽŽĚͬ ŽŵŵƵŶŝƚLJŽŵŵĞƌĐŝĂů hƌďĂŶsŝůůĂŐĞ dƌĂŶƐŝƚZĞƐŝĚĞŶƟĂů

Source: Circlepoint; Google Earth, 2015.

NOT TO SCALE

6.11-8 6.11-6 San Jose General Plan Land Use Designations – Stockton Avenue Ventilation Facility VTA’s BART Silicon Valley–Phase II Extension Project ^ĂŶ:ŽƐĞ'ĞŶĞƌĂůWůĂŶ>ĂŶĚhƐĞĞƐŝŐŶĂƟŽŶƐͲ^ƚŽĐŬƚŽŶǀĞŶƵĞsĞŶƟůĂƟŽŶ^ƚƌƵĐƚƵƌĞ

Source: Circlepoint; Google Earth, 2015

Figure Figure

VTA BART Phase II

0.50 MILES

Legend Transit-Oriented Joint Development WĂƌŬŝŶŐ>Žƚ ^LJƐƚĞŵ&ĂĐŝůŝƟĞƐ CO

LE

MA

AV E

BR

OK

AW

DE

RO

LA

AD

CR UZ

BL VD

N

ƚͲ'ƌĂĚĞ^ƚĂƟŽŶͬ Bus Transit Center DĂŝŶƚĞŶĂŶĐĞ&ĂĐŝůŝƚLJ ǁŝƚŚsĞŚŝĐůĞ^ƚŽƌĂŐĞ

82

THE

Graphics … 00332.13 (6-9-2016) tm

DA

ME

ALA

Source: Circlepoint; Google Earth, 2015. Source: Circlepoint; Google Earth, 2015

0.25 MILES

Santa Clara General Plan >ĂŶĚhƐĞĞƐŝŐŶĂƟŽŶƐ

ZĞƐŝĚĞŶƟĂůEĞŝŐŚďŽƌŚŽŽĚ WƵďůŝĐͬYƵĂƐŝͲWƵďůŝĐ KƉĞŶ^ƉĂĐĞ͕WĂƌŬůĂŶĚƐ ĂŶĚ,ĂďŝƚĂƚ ŽŵďŝŶĞĚ/ŶĚƵƐƚƌŝĂůͬ ŽŵŵĞƌĐŝĂů Santa Clara Caltrain ^ƚĂƟŽŶ >ŝŐŚƚ/ŶĚƵƐƚƌŝĂů Heavy Industrial DŝdžĞĚhƐĞŽŵŵĞƌĐŝĂů DŝdžĞĚhƐĞEĞŝŐŚďŽƌŚŽŽĚ

^ĂŶƚĂůĂƌĂ'ĞŶĞƌĂůWůĂŶ>ĂŶĚhƐĞĞƐŝŐŶĂƟŽŶƐʹ^ĂŶƚĂůĂƌĂ^ƚĂƟŽŶ

Figure

NOT TO SCALE

6.11-7

Figure 6.11-9 Santa Clara General Plan Land Use Designations – Santa Clara Station VTA’s BART Silicon Valley–Phase II Extension Project

East Portal Location

Newhall Maintenance Facility

ALUM ROCK ³ STATION 2 1

West Portal Location

Source: Station and Track, VTA 2014; Basemap, ESRI 2015

Stockton Avenue Vent Structure

! ( 13th Street Vent Structure

8

3

DOWNTOWN SAN JOSE STATION - EAST OPTION

DOWNTOWN SAN JOSE STATION - WEST OPTION

7

DIRIDON STATION SOUTH OPTION

Legend Legend Key Viewpoint Location & Number Single Bore Alignment Only Twin Bore Alignment Only Twin and Single Bore Alignment Overlap

J J J

DIRIDON STATION NORTH OPTION

4

³

5,6

³

³

9

³

! (

³

11

SANTA CLARA STATION

10

³³

³

Path: K:\Projects_2\VTA\00332_13_SVSX\mapdoc\PD_Figures\Fig_02_ProjectMap_BothBoreDiridonOption_20160509.mxd; User: 29391; Date: 5/10/2016

BERRYESSA STATION (under construction)

±

0

0.5

1

Miles

FigureFigure 6.14-12 Viewpoints Map for Map Visual Simulations Project (with Options)

VTA's BART Silicon Valley – Phase II Extension Project

Graphics … 00332.13 (1-26-2016)

Alum Rock/28th Street Station – BART Extension with TOJD Alternative

Note: These are intended to be preliminary conceptual representations of the project. Final design and landscaping will be determined in coordination with local cities. Source: Circlepoint, 2016.

Figure 6.14-2 Key Viewpoint 1: Alum Rock/28th Street TOJD – Santa Clara and North 28th Street VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (1-26-2016)

Alum Rock/28th Street Station – BART Extension with TOJD Alternative

Note: These are intended to be preliminary conceptual representations of the project. Final design and landscaping will be determined in coordination with local cities. Source: Circlepoint, 2016.

Figure 6.14-3 Key Viewpoint 2: Alum Rock/28th Street TOJD – North 28th Street and Five Wounds Lane VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (1-26-2016)

Downtown San Jose East Station Option – BART Extension with TOJD Alternative

Note: These are intended to be preliminary conceptual representations of the project. Final design and landscaping will be determined in coordination with local cities. Source: Circlepoint, 2016.

Figure 6.14-4 Key Viewpoint 3: Downtown San Jose East Station Option – TOJD & Station Entrances at Santa Clara and 6th Streets VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (1-26-2016)

San Jose East Station Option – BART Extension with TOJD Alternative

Note: These are intended to be preliminary conceptual representations of the project. Final design and landscaping will be determined in coordination with local cities. Source: Circlepoint, 2016.

Figure 6.14-5 Key Viewpoint 4: Downtown San Jose East Station Option – TOJD & Station Entrances at Santa Clara and 4th Streets VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (1-26-2016)

Downtown San Jose East Station Option – BART Extension with TOJD Alternative Note: These are intended to be preliminary conceptual representations of the project. Final design and landscaping will be determined in coordination with local cities. Source: Circlepoint, 2016.

Figure 6.14-6 Key Viewpoint 5: Downtown San Jose East Station Option – TOJD at Santa Clara and 3rd Streets VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (1-26-2016)

Downtown San Jose West Station Option – BART Extension with TOJD Alternative Note: These are intended to be preliminary conceptual representations of the project. Final design and landscaping will be determined in coordination with local cities. Source: Circlepoint, 2016.

Figure 6.14-7 Key Viewpoint 6: Downtown San Jose West Station Option – TOJD & Station Entrances at Santa Clara and 3rd Streets VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (1-26-2016)

Diridon Station North and South Option – BART Extension with TOJD Alternative

Note: These are intended to be preliminary conceptual representations of the project. Final design and landscaping will be determined in coordination with local cities. Source: Circlepoint, 2016.

Figure 6.14-8 Key Viewpoint 7: Diridon Station North and South Option TOJD along Santa Clara Street VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (1-26-2016)

Diridon Station South Option – BART Extension with TOJD Alternative

Note: These are intended to be preliminary conceptual representations of the project. Final design and landscaping will be determined in coordination with local cities. Source: Circlepoint, 2016.

Figure 6.14-9a Key Viewpoint 8: Diridon Station South Option TOJD & Station Entrance on Cahill Street VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (1-26-2016)

Diridon Station North Option – BART Extension with TOJD Alternative

Note: These are intended to be preliminary conceptual representations of the project. Final design and landscaping will be determined in coordination with local cities. Source: Circlepoint, 2016.

Figure 6.14-9b Key Viewpoint 8: Diridon Station North Option TOJD on Cahill Street VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (1-26-2016)

Stockton Avenue TOJD – BART Extension with TOJD Alternative Note: These are intended to be preliminary conceptual representations of the project. Final design and landscaping will be determined in coordination with local cities. Source: Circlepoint, 2016.

Figure 6.14-10 Key Viewpoint 9: Stockton Avenue TOJD from Villa Avenue VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (1-26-2016)

Santa Clara Station – BART Extension with TOJD Alternative

Note: These are intended to be preliminary conceptual representations of the project. Final design and landscaping will be determined in coordination with local cities. Source: Circlepoint, 2016.

Figure 6.14-11 Key Viewpoint 10: Santa Clara Station TOJD from the Existing Station Platform VTA’s BART Silicon Valley–Phase II Extension Project

Graphics … 00332.13 (1-26-2016)

Santa Clara Station – BART Extension with TOJD Alternative Note: These are intended to be preliminary conceptual representations of the project. Final design and landscaping will be determined in coordination with local cities. Source: Circlepoint, 2016.

Figure 6.14-12 Key Viewpoint 11: Santa Clara Station TOJD from El Camino Real VTA’s BART Silicon Valley–Phase II Extension Project

Fremont

am

Co l

.

a ar

Co

.

Legend

nt

Al

e

da

C

1

22

a

19

San Francisco Bay

Sa

SVSX Project Alignment Proposed BART Station

NOT SHOWN

680 880

6

237

Alviso

101

23

Milpitas

23 Milpitas Station

Mountain View 7

237

85 82

Sunnyvale

14

NOT SHOWN

11

6 7

20

NOT SHOWN

Berryessa Station

87 101

Santa Clara

Los Altos

10

Santa Clara Station

82

24

16

San Jose 8 9

24

12

Cupertino

SVSX Project Alignment 280

V

Graphics … 00332.13 (6-20-2016) tm

24

17 24

14 15 16 17 18 19 20 21 22 23 24

Proposed Ventilation Structure

TRANSPORTATION PROJECTS BART Warm Springs Extension Project (in Fremont) Capitol Expressway Light Rail Transit Project California High-Speed Rail Project (Preliminary Concept) Peninsula Corridor Electrification Project Caltrain South Terminal Project (Phase II and III) ACEforward Program/Project Capital Corridor Oakland to San Jose, Phase II Project City of San Jose’s Assessing the Development Impacts of BART Phase II Study City of San Jose Station Area Access and Connectivity Study US 101/Taylor-Mabury Interchange Project BART Silicon Valley- Berryessa Extension Project (Phase I) El Camino Bus Rapid Transit (BRT) Santa Clara/Alum Rock Bus Rapid Transit (BRT) AREA PLANS North San Jose Area Development Policy Diridon Station Area Plan Santa Clara Station Area Plan Five Wounds/Brookwood Terrace Strong Neighborhoods Initiative Plan Five Wounds Urban Village Plan Core Modification Study (Existing BART Stations) LAND DEVELOPMENT PROJECTS Flea Market Mixed-Use Transit Villages Project 785-807 The Alameda Project BART Operational Control Center Project (OCC Project) (in Oakland) City Place Santa Clara Project VTA’s TOJD (at the 4 proposed BART stations and 2 vent structures)

Alum Rock Station

2

17

Downtown San Jose Station Option 2 Downtown San Jose Station Option 1 Diridon Station

21

280

24

5 880

V

24

8

15 85

8 9

18

V

13

1 2 3 4 5 6 7 8 9 10 11 12 13

V

3 4 87

Saratoga

Campbell

Figure 7-1 Cumulative Projects VTA’s BART Silicon Valley–Phase II Extension Project

US S

D e L a C r u z B lv d

01 -1 C

N7

t

Ch ec ke

rs

33 rd

t

St

Cla

ra

rn a

nd

oS

t

a E S San Jose State University

E

th

St

lli Wi

am

S

St

I -2

St

st S S1

P8

St

P5

St

a

t

ar

th St

t

e Av

tS

rk

ke

Pa

S7

SM

e Av

P12

do

ta

S4

ed

S

an

E

n Sa

t

m

na

W

e rn

t

t 1s

la

Da

P17 P16

P14

e nF

b

F an

sS

P2

P4

t sS

hS

eA

St

P15

e Jam

Rd

St

S

an

1 -10

uli

S2

P7 P13 P11

t

me

in g

US

St

EJ

t Ja

SK

N

to n

9t S1

P9 P13

1 -10

St

Th

St

an

St

US

th

P

P18 W Julian

P3

St

St N9

St

ion

ing

S10

c

Rd

P1

7th N1

St St St

e Av

Un

P6

2 th N1

th th

sh Wa

ES

fi aci

ee cK

N

St

n Ave

on

se

m

St

nd

e ma

kt

or

ap

N M o n r o e St

Em

y or

or

M

Dr

ES

oc

St

Guadalupe River Park

St

g

St

in

i

tle

dd

dr

Ch

W

He

en

yr

M

t

cK

t eS

Col

St

dro

da

M

sS

t

ion

East Portal Location

Fw y

Pe

e St

vi

me

gS

Guadalupe Gardens

M

e Av St iso A lv

nro

Da

Ala

P19

in

N2

k

Mo

Newhall St

The

W

dd

an

West Portal Location

He

NS

ta C

Pa r

S an

lar

a St

N4

Santa Clara University

ore

S 1st

St N6

P20

iss

ay l ET

t

P21

t

N2

EM

0 th N1

st S N1

Av e

c ia l S

B a ys h

St

y

an

er

St

th

Pk

P22

le m

m

th

pe

N5

a lu

l vd

ad

tB

Co

om

N

st S N1

or

Gu

rp

St

-10 1

Oakland Rd

Norman Y Mineta San Jose Int’l

Ai

d Re e

US

r ip e

n Ju 0

Se

rr a

F

80

la in c

ir F

wy

S

wy

.25

1 MILES

Source: ESRI, 2015. Google Maps, 2015

Legend Study Area Build Alternative BART Extension Alternative Berryessa Extension (under construction) Proposed Trail Berryessa Station (under construction) Graphics … 00332.13 (6-23-2016)

Alum Rock Station Downtown San Jose Station - East Option Downtown San Jose Station - West Option Diridon DiridonStation Station(North and South Options)

Santa Clara Station Park School

Park and Recreation Facility Lower Silver Creek Trail (Proposed) * Five Wounds Trail (Proposed) * Hacienda Park Roosevelt Park Coyote Creek Trail (Proposed)* Watson Park City Hall Plaza Plaza de Cesar Chavez St. James Park Horace Mann Elementary School Almaden Entrance Triangle Park McEnery Park Guadalupe River Park & Trail * b *

Map Icon P1 P2 P3 P4 P5 P6 P7 P8 P9 S10 P11 P12 P13

Feature depicted shows those portions within the Study Area

Park and Recreation Facility San Fernando Station Plaza Arena Green Los Gatos Creek Trail (Proposed) Cahill Park Theodore Lenzen Park Newhall Park Coleman Soccer Fields The Forge Garden Larry J. Marsalli Park

Map Icon P14 P15 P16 P17 P18 P19 P20 P21 P22

Figure 3 Parks within 1,000 feet of Project Corridor VTA's BART Silicon Valley – Phase II Extension Project

Figure 8-1 Park and Recreational Facilities within 1,000 feet of BART Extension Alternative VTA’s BART Silicon Valley–Phase II Extension Project