GONDOLA PLAZA PEDESTRIAN CROSSING | CITY OF ...

Report 4 Downloads 57 Views
OPTION 2A| RAISED INTERSECTION with CONTINUOUS PLAZA PAVING, RAIN GARDENS and BULB-OUTS

Hunt er St .

Ajax Mountain Building

Aspen Square Condominiums

Dura

nt Av

e.

North of Nell

Little

Gondola Plaza

Nell G

uest

Drop

-off

Proposed Improvements include: * Raised intersection so Gondola Plaza and sidewalks on north side of intersection are flush with each other

PLAN 0 10 20 SCALE: 1”=20’

SECTION/PERSPECTIVE

Hunter Street

CONCEPTUAL SKETCH SIMULATION

40

Bulb-out expansions to each corner and Gondola Plaza to narrow road cross section to 24 ft. width

Raised Intersection 5% Ramp Rain Garden

* Rain Gardens at bulb-outs to promote “green” stormwater management of runoff

Durant Avenue

* Brick paving and colored concrete bands to carry pavement character of Gondola Plaza throughout intersection and announce that this is a pedestrian zone

Sidewalk

Parallel Parking

Drive Lane

Drive Lane

Angled Parking

Hunter Street

Durant Avenue

* Low bollards/disks to delineate edge of vehicular way, minimize vertical visual obstructions, promote unabated connectivity, and allow for emergency vehicle access and programming flexibility

EXISTING CONDITION PHOTO

Bike “Sharrows” along Durant Avenue to designate this as a bicycle-friendly street and for motorists to share road Bus stop becomes a “winter-only” stop and is relocated to the west side of intersection to better direct riders behind bus and to safer crossing at intersection

Parallel Parking

Drive Lane and Bus Stop/Shared Bike Lane

Drive Lane/Shared Bike Lane

Angled Parking

* Unique to alternative

GONDOLA PLAZA PEDESTRIAN CROSSING | CITY OF ASPEN

OCTOBER 15, 2012