LEED 2009 for Schools New Construction and Major Renovations IEQ ...

Report 2 Downloads 12 Views
LEED 2009 for Schools New Construction and Major Renovations IEQ PREREQUISITE 2: ENVIRONMENTAL TOBACCO SMOKE (ETS) CONTROL All fields and uploads are required unless otherwise noted.

EXTERIOR SMOKING POLICY This static sample form has been modified for offline access. All sections of the form are visible. Sample forms are for reference only. Select one of the following: Smoking is prohibited on the entire project site. Smoking is prohibited within 25 feet of entries, outdoor air intakes and operable windows.

SMOKING PROHIBITED ON SITE Signatory IEQp2-1. Smoking is prohibited on the project site. Select one of the following: Signature. Provide a digital signature affirming the signatory statement in gray directly above.

OR

Upload IEQp2-S1. Provide a document with the signatory statement, copied directly from the form, signed and dated on letterhead.

Initial here:

Upload IEQp2-1. Provide evidence of signage communicating the exterior smoking policy. Drawing(s) with signage details or photos are acceptable.

LEED 2009 for Schools New Construction and Major Renovations IEQ Prerequisite 2: Environmental Tobacco Smoke (ETS) Control

Points Attempted:

Points Awarded:

Upload

Files:

0

Upload

Files:

0

Page of

Version 4.0 Copyright © 2009 U.S. Green Building Council. All Rights Reserved.

SMOKING PROHIBITED WITHIN 25 FEET Signatory IEQp2-2. Smoking is prohibited within 25 feet of entries, outdoor air intakes and operable windows. Select one of the following: Signature. Provide a digital signature affirming the signatory statement in gray directly above.

OR

Upload IEQp2-S2. Provide a document with the signatory statement, copied directly from the form, signed and dated on letterhead.

Initial here:

Upload IEQp2-2. Provide evidence of signage communicating the exterior smoking policy. Drawing(s) with signage details or photos are acceptable.

Upload

Files:

0

Upload

Files:

0

Select one of the following: Upload L-2 from PI Form 2 is a site plan showing the location of the designated outdoor smoking/ nonsmoking areas. Upload

Files:

OR

Upload IEQp2-3. Provide a site plan/map that shows the location of the designated outdoor smoking /nonsmoking areas. Upload

0

Files:

0

INTERIOR SMOKING POLICY Signatory IEQp2-3. Smoking is prohibited in the project building. Select one of the following: Signature. Provide a digital signature affirming the signatory statement in gray directly above.

OR

Upload IEQp2-S3. Provide a document with the signatory statement, copied directly from the form, signed and dated on letterhead.

Initial here:

Upload

Files:

0

Does project building include residential units? Yes

No

LEED 2009 for Schools New Construction and Major Renovations IEQ Prerequisite 2: Environmental Tobacco Smoke (ETS) Control

Points Attempted:

Points Awarded:

Page of

Version 4.0 Copyright © 2009 U.S. Green Building Council. All Rights Reserved.

Describe the project's non-smoking policy. Include specific information about how the policy will be communicated and enforced in residential units/hotel guest rooms/rentals.

Upload IEQp2-4. Provide a copy of the non-smoking policy or letter signed by the owner describing the project's non-smoking policy and enforcement and/or provide a copy of legally binding covenants/restrictions to verify the status of the residential units as non-smoking.

Upload

Files:

0

ADDITIONAL DETAILS Special circumstances preclude documentation of prerequisite compliance with the submittal requirements outlined in this form.

SPECIAL CIRCUMSTANCES Describe the circumstances limiting the project team's ability to provide the submittals required in this form. Be sure to reference what additional documentation has been provided, if any. Non-standard documentation will be considered upon its merits.

Upload IEQp2-SC. Provide any additional documentation that supports the claim to special circumstances. (Optional)

Upload

Files:

0

The project team is using an alternative compliance approach in lieu of standard submittal paths.

LEED 2009 for Schools New Construction and Major Renovations IEQ Prerequisite 2: Environmental Tobacco Smoke (ETS) Control

Points Attempted:

Points Awarded:

Page of

Version 4.0 Copyright © 2009 U.S. Green Building Council. All Rights Reserved.

ALTERNATIVE COMPLIANCE PATH Describe the alternative compliance path used by the project team. Include justification that this path meets the prerequisite intent and requirements. Be sure to reference what additional documentation has been provided, if any. Nonstandard documentation will be considered upon its merits.

Upload IEQp2-ACP. Provide any additional documents that support the alternative compliance path approach. (Optional)

Upload

Files:

0

SUMMARY IEQ Prerequisite 2: Environmental Tobacco Smoke (ETS) Control Compliance Documented:

LEED 2009 for Schools New Construction and Major Renovations IEQ Prerequisite 2: Environmental Tobacco Smoke (ETS) Control

Points Attempted:

Points Awarded:

Check Compliance

Page of

Version 4.0 Copyright © 2009 U.S. Green Building Council. All Rights Reserved.