mr credit 2: construction waste management

Report 3 Downloads 43 Views
MR CREDIT 2: CONSTRUCTION WASTE MANAGEMENT All fields and uploads are required unless otherwise noted.

ALL OPTIONS This static sample form has been modified for offline access. All sections of the form are visible. Sample forms are for reference only. Unit of measurement:

Note: Units must be consistent throughout credit.

Table MRc2-1. Construction Waste Management Complete the following table for all construction waste. For site-separated waste, list each waste type. For commingled waste, designate it as such using the drop down. Note: Documentation is required for commingled waste only. Construction Waste Description

Diverted or Landfill Waste

Commingled Waste Percentage Doc Diverted Provided

Total Waste

Hauler or Location +

Total construction waste

0

Total waste diverted from landfill

0

-

Total percentage of construction waste diverted from landfill (%)

Must be at least 50% for 1 point, 75% for 2 points, or 95% for exemplary performance

Land-clearing debris and soil have not been included in calculations. Upload MRc2-1. Provide the Construction Waste Management Plan identifying the diversion goals of the project, relevant construction debris and materials diverted, implementation protocols, and parties responsible for implementation.

Upload

Files:

0

Upload MRc2-2. For commingled waste, provide documentation verifying the diversion rate of the waste. Documentation can be either a project-specific diversion rate provided by the sorting facility or the average annual recycling rate for the sorting facility provided by the regulating local or state government authority.

Upload

Files:

0

ADDITIONAL DETAILS Special circumstances preclude documentation of credit compliance with the submittal requirements outlined in this form.

Version 4.0 Copyright © 2011 U.S. Green Building Council. All Rights Reserved.

MR Credit 2: Construction Waste Management

Page of

SPECIAL CIRCUMSTANCES Describe the circumstances limiting the project team's ability to provide the submittals required in this form. Be sure to reference what additional documentation has been provided, if any. Non-standard documentation will be considered upon its merits.

Upload MRc2-SC. Provide any additional documentation that supports the claim to special circumstances. (Optional)

Upload

Files:

0

The project team is using an alternative compliance approach in lieu of standard submittal paths and/or documentation.

ALTERNATIVE COMPLIANCE PATH Describe the alternative compliance path used by the project team. Include justification that this path meets the credit intent and requirements. Be sure to reference what additional documentation has been provided, if any. Non-standard documentation will be considered upon its merits.

Upload MRc2-ACP. Provide any additional documents that support the alternative compliance path approach. (Optional)

Upload

Files:

0

The project team is using the above alternative compliance path to document exemplary performance of MR Credit 2.

SUMMARY MR Credit 2: Construction Waste Management Points Documented:

0

MR Credit 2: Construction Waste Management Exemplary Performance Documented:

N

Check Compliance

The project team reserves one point in the Innovation in Design credit category for exemplary performance in MR Credit 2.

Version 4.0 Copyright © 2011 U.S. Green Building Council. All Rights Reserved.