MR CREDIT 5: REGIONAL MATERIALS All fields and uploads are required unless otherwise noted.
ALL OPTIONS This static sample form has been modified for offline access. All sections of the form are visible. Sample forms are for reference only. Download, complete, and upload Materials and Resource Calculator (found under "Credit Resources") to document sustainable criteria values for MR Credits 3-7. Upload L-10. Provide the complete Materials and Resource Calculator.
Upload
Files:
0
Files:
0
Provide the following information from "Tab C. Summary" of the Materials and Resource Calculator. Total materials cost for the LEED project:
$
Table MRc5-1. Summary for Regional Materials Total value of materials manufactured and extracted/harvested/recovered within 500 miles Regional value as a percentage of total materials cost Must be at least 10% for 1 point, 20% for 2 points, 30% for exemplary performance
Percentage of MRc5 materials with cutsheets provided (by cost) Must be at least 20% to document credit compliance
Upload MRc5-1. Provide cutsheets for 20% of the materials (by cost) to support regional materials claims.
Upload
ADDITIONAL DETAILS Special circumstances preclude documentation of credit compliance with the submittal requirements outlined in this form.
LEED 2009 for Retail: New Construction and Major Renovations MR Credit 5: Regional Materials
SPECIAL CIRCUMSTANCES Describe the circumstances limiting the project team's ability to provide the submittals required in this form. Be sure to reference what additional documentation has been provided, if any. Non-standard documentation will be considered upon its merits.
Upload MRc5-SC. Provide any additional documentation that supports the claim to special circumstances. (Optional)
Upload
Files:
0
The project team is using an alternative compliance approach in lieu of standard submittal paths and/or documentation.
ALTERNATIVE COMPLIANCE PATH Describe the alternative compliance path used by the project team. Include justification that this path meets the credit intent and requirements. Be sure to reference what additional documentation has been provided, if any. Non-standard documentation will be considered upon its merits.
Upload MRc5-ACP. Provide any additional documents that support the alternative compliance path approach. (Optional)