Pre-construction Track record 2011 / 2012 - Health & safety management - Turbine procurement - Electrical engineering - Civil engineering design - Civil & electrical procurement - Satisfying planning conditions - Grid connection management
Services and advice from the people that build their own
Wind farm projects Projects ALL - 121 Wind farms, 3,130MW
KEY:
Civil engineering design
Health & safety Management
Turbine procurement
Electrical engineering
Civil & electrical ProcurEment
Satifying planning conditions
Grid connection management
AUSTRALIA: 2 wind farms, 588MW YEAR
WIND FARM
2010 Boco Rock 2010 Sapphire
CLIENT SUPPLIER
MODEL
MW Role (See Key Above)
Wind Prospect CWP Under review Wind Prospect CWP Under review
270 318
Canada: 1 wind farm, 5MW YEAR
WIND FARM
CLIENT SUPPLIER
MODEL
MW Role (See Key Above)
2011
Fairmont
Wind For All LP Enercon
E82
4.60
CLIENT SUPPLIER
MODEL
MW Role (See Key Above) 49.5
China: 1 wind farm, 50MW YEAR
WIND FARM
2008
Qian’an (Phase 1) IW Power
Chinese Turbines
FIJI: 1 wind farm, 10MW YEAR
WIND FARM
CLIENT SUPPLIER
MODEL
MW Role (See Key Above)
2007
Butoni
Fiji Electricity Authority Vergnet
GEV-MP
10.36
France: 3 wind farms, 35MW YEAR
WIND FARM
CLIENT SUPPLIER
MODEL
MW Role (See Key Above)
2006 2006 2006
Chemin Blanc Demie Lieue La Marette
Bank of Scotland Bank of Scotland Bank of Scotland
E70 E70 E70
12 12 11.5
MODEL
MW Role (See Key Above) 3.60 18 4 13.80 4.60 9 8 14 12 92 26 15.30
Enercon Enercon Enercon
Ireland & Northern Ireland: 52 wind farms, 694MW YEAR
WIND FARM
CLIENT SUPPLIER
2012 Ballaman Ballaman Wind Farm Under review 2012 Ballycumber KBM Wind Farm Under review 2012 Ballynancornan Ballynancornan Wind Farm Enercon E82 2012 Carn Hill Gaelectric Under review 2012 Clydaghroe Clydaghroe Wind Enercon E70 2012 Hollyford Energia Renewables Under review 2012 Knockalour Knockalour Wind Farm Enercon E70 2012 Knocknagoum Knocknagoum Wind Farm Under review 2012 Maghanknockane Maghanknockane Wind Farm Under review 2012 Meenadreen Energia Renewables Under review 2011 Ballycadden Ballycadden Wind Farm Enercon E82 2011 Cahercullenagh Upper Cahercullenagh Upper Under review Wind Farm 2011 Caherdowney Energia Renewables Enercon E70 2011 Carrowleagh Powercon Wind Energy Enercon E70 2011 Churchill Energia Renewables Enercon E70 2011 Corkermore Energia Renewables Gamesa G80 2011 Crigshane Energia Renewables Enercon E70 2011 Esk Esk Wind Farm Under review 2011 Greenouge Extension Greenouge Wind Farm Under review 2011 Oonagh Aeropower Wind Energy Enercon E70 2010 Ballincollig Hill Tra Investments Enercon E48 & E44 2010 Bawnmore Bawnmore Wind Farm Enercon E82 2010 Boggeragh Green Energy Company Vestas V90 2010 Cronelea II Cronelea Wind Farm Enercon E70
2
9.20 27.25 18.4 10 32.2 6.90 2.60 6.90 12.80 25.30 57 2.30
Health & safety management | Turbine procureme
Wind Prospect has successfully developed wind farm projects around the world. Our expertise acquired over two decades and distributed across 200 experts is available to aid you in finding, developing, building, operating and buying your own renewable energy projects. Ireland & Northern Ireland (Continued): 52 wind farms, 694MW YEAR
WIND FARM
CLIENT SUPPLIER
MODEL
MW Role (See Key Above) 1.70 28 10.20 6 4.60 2.70 8 1.60 2.30 4 4 4.60 6.90 7.65 5 13.80 1.70 16.20 40 2.70 6 32.45 3.40 6.90 32 0.85 3.40 6.80
2010 Cuillalea Extension Cuillalea Wind Farm Vestas V52 2010 Dromdeeveen Reirk Energy Vestas V80 2010 Drumlough Hill Extension Wind Farm Management Gamesa G52 2010 Glanlee Extension Midas Energy Vestas V90 2010 Seltannaveeny West Clare Wind Farms Enercon E70 2010 Shannagh Shannagh Wind Farm Enercon E44 200 9 Derrynadivva Ecopower Enercon E48 2009 Dunmore II Dunmore Wind Power Enercon E48 & E44 2009 Glackmore Hill Glackmore Wind Power Enercon E70 2009 Rahora Rahora Wind Farm Enercon E48 2009 Reenascreena Reenascreena Wind Farm Enercon E48 2009 Sheeragh Sheeragh Wind Enercon E70 2009 Sorne II Sorne Wind Enercon E70 2008 Loughderryduff North West Wind Vestas V52 2008 Lurganboy Highland Wind Energy Enercon E44 2008 Meenachullalan Airoishin Enercon E70 2008 Mount Eagle II Mount Eagle Wind Farm Vestas V52 2008 Muignaminnane Saorgus Energy Enercon E48 & E44 2008 Pallas Pallas Wind Farm Enercon E70 2007 Cornacahan Hill Killybegs Wind Farm Enercon E44 2007 Lackan Lackan Wind Energy Enercon E70 2007 Midas Midas Energy Vestas V90/V52 2006 Carrane Hill DP Energy Gamesa G52 2006 Cronelea Cronelea Wind Farm Enercon E70 2006 Sorne Hill Sorne Wind Enercon E70 2005 Dundalk Dundalk Institute of Technology Vestas V52 2004 Cuillalea Cuillalea Wind Farm Vestas V52 2004 Tursillagh II Saorgus Energy Vestas V52
Nicaragua: 1 wind farm, 40MW YEAR
WIND FARM
CLIENT SUPPLIER
2010 Amayo
MODEL
MW Role (See Key Above) 39.9
Globeleq Suzlon S88
POLAND: 1 wind farm, 160MW YEAR
WIND FARM
CLIENT SUPPLIER
MODEL
2009
Confidential
Confidential
GE 2.5
GE Wind
MW Role (See Key Above) 160
ROmania: 1 wind farm 347MW YEAR
WIND FARM
CLIENT SUPPLIER
MODEL
MW Role (See Key Above)
2008
Fantanele
Continental Wind Partners
GE 2.5
347.5
MODEL
MW Role (See Key Above) 32
GE Wind
RUSSIA: 1 wind farm, 32MW YEAR
WIND FARM
CLIENT SUPPLIER
2010 The Far East Wind Farm Activity Under review
Thailand: 1 wind farm, 46MW YEAR
WIND FARM
CLIENT SUPPLIER
MODEL
MW Role (See Key Above)
2009
Phetchaboon
Sustainable Energy Corp
SWT-2.3-82 VS
46
Grid connection management
Siemens
Health & safety Management 93 WIND FARMS
96 WIND FARMS
Turbine procurement
Satifying planning conditions
85 WIND FARMS
93 WIND FARMS
Civil & electrical ProcurEment 107 WIND FARMS
Electrical engineering 59 WIND FARMS
Civil engineering design 75 WIND FARMS
rement | Electrical engineering | Civil engineering design | Civil & electrical procurement | Satisfying planning
Wind farm projects UK: 56 wind farms, 1,123MW YEAR
WIND FARM CLIENT SUPPLIER MODEL MW Role (See Key Above) 2012 Confidential Confidential Nordex N90 32.5 2012 Confidential Confidential Nordex N90 7.5 2012 Todmorden Moor Confidential Under review 2012 Baillie Baillie Wind Farm Under review 52.5 2012 Boundary Lane EDF Energy Renewables Under review 6 2012 Mars Petcare Wind Direct Nordex N90 2.5 2011 Dewlay Cheese Wind Direct REpower MM92 2 2011 Fallago Rig North British Windpower Vestas V90 144 2011 Little Raith Latium GE Wind GE 2.75 24.75 2011 Roy Humphrey Group (Eye Airfield) Wind Direct Under review 5 2011 South Staffordshire College - Rodbaston Campus Wind Direct REpower MM92 4 2010 Broom Hill EDF Energy Renewables REpower MM82 8 2010 Burnfoot Hill EDF Energy Renewables REpower MM82 26 2010 Butterwick Moor E.ON REpower MM82 20 2010 Craigengelt GDF Suez Energy UK Nordex N90 20 2010 East Midlands Airport East Midlands Int. Airport Wind Technik Nord WTN250 1 2010 Fairfield Farm EDF Energy Renewables Nordex N60 6.5 2010 FMC Technologies Wind Direct Acciona AW77 1.5 2010 Great Eppleton E.ON REpower MM92 8 2010 Green Rigg EDF Energy Renewables Vestas V80 36 2010 Haswell Moor E.ON REpower MM82 10 2010 Longpark EDF Energy Renewables REpower MM82 38 2010 Maesgywn Pennant Walters Alstom/ Ecotecnia Eco80 26 2010 Rusholme EDF Energy Renewables REpower MM82 24 2010 Stags Holt Extension E.ON Vestas V80 2 2010 Teesside EDF Energy Renewables Under review 90 2009 Aikengall Community Wind Power Vestas V90 48 2009 Bagmoor HgCapital REpower MM92 16 2009 Bicker Fen EDF Energy Renewables REpower MM82 26 2009 Langley EDF Energy Renewables REpower MM82 8 2009 Lochhead A7 Energy REpower MM82 6 2009 Solutia Wind Direct Nordex N90 5 2008 Arnish Moor FIM Nordex N60 3.9 2008 Griffin SSE Under review 204 2008 High Headley II EDF Energy Renewables Nordex N60 5.2 2008 Trimdon EDF Energy Renewables Nordex N60 5.2 2008 Walkway EDF Energy Renewables REpower MM82 14 2008 Wardlaw Wood Community Wind Power Vestas V90 18 2008 Wharrels Hill FIM Nordex N60 10.4 2007 Croda Chemicals Croda Chemicals REpower MM92 2 2007 Greendykeside A7 Energy REpower MM82 4 2007 Knabs Ridge Hanson REpower MM82 16 2007 Nissan Motors Nissan Motors Vestas V47 2.64 2007 Red Tile EDF Energy Renewables REpower MM82 24 2007 Stags Holt E.ON Vestas V80 18 2006 Deeping St Nicholas EDF Energy Renewables REpower MM82 16 2006 Eastman Wind Direct REpower MM82 4 2006 Glass Moor EDF Energy Renewables REpower MM82 16 2006 Red House EDF Energy Renewables REpower MM82 12 2004 Tir Mostyn & Foel Goch HgCapital Gamesa G52 21.25 2005 Haverigg III Windcluster Vestas V52 3.4 2005 Longhill Road Snowmountain REpower MM82 2 2005 Winscales I K/S Winscales Vestas V47 1.98 2003 Burradale II Shetland Aerogenerators Vestas V52 1.7 2003 Llangwyryfon Repowering Llangwryfon Repowering Vestas V52 9.35 2000 Burradale I Shetland Aerogenerators Vestas V47 1.98
g conditions | Grid connection management
4
Global We have provided pre-construction services to our clients internationally.
China 1 Wind Farm
Canada 1 Wind Farm
588MW
FIJI 1 Wind Farm
Australia
Australia
France
2 Wind Farms
Canada
3 Wind Farm
5MW
UK
China
1,123MW
50MW
UK 56 Wind Farms
FIJI 10MW
France 35MW
Thailand
IRELAND
IRELAND
694MW
52 Wind Farm
46MW
Russia 32MW
Nicaragua Romania 347MW
40MW
Poland 160MW
Thailand 1 Wind Farm
Russia 1 Wind Farm
Romania 1 Wind Farm
Nicaragua 1 Wind Farm
Poland 1 Wind Farm
WP has developed a track record and expertise in wind farm planning development and construction. It’s a one stop shop where a client can choose from as little or as much help as he wants to make his project a success. Good advice and professional service assured E.ON are pleased to recommend WP to new and prospective clients. Martin Roberts, E.ON
Wind Prospect client list includes Developers Akuo Energy Biotherm Energy Bord na Mona Coillte Continental Wind Partners Eco Wind Power Enerco Energy Energia Renewables Eole 76 Green Bear Corporation Kennedy Power North British Wind Power Red Cap Saorgus Energy Statkraft SARGE Windcluster
Investors BNP Paribas Clean Energy Fund Climate Change Capital Globeleq HgCapital Oxfam Renerco
Banks ABSA Allied Irish Bank Bank of Ireland Bank of Scotland Barclays Group Santander HSBC HSH Nordbank IIB Bank KBC LBBW Nedbank Rand Merchant Bank Standard Bank of South Africa Triodos Ulster Bank
Wind turbine manufacturers GE Vestas
Utilities AGL CLP EDF Energy Renewables EDP Renováveis E.ON ESB GDF Suez Energy UK International Power Malakoff NRG Energy Oklahoma Gas & Electric Tarong Energy TrustPower
Pre-construction services Health & safety Management
Turbine procurement
Electrical Engineering
Civil Engineering Design
civil & Electrical Procurement
Satisfying planning cond.
Grid Connection Management
• Construction design & management coordinator for design phase • Designer assessment & review • Tender information pack • Environmental management plan
• Turbine specification • Turbine tendering • Turbine-grid compliance • Turbine technology reviews • Contract negotiation
• Electrical systems design • Electrical studies • System specification • Grid offer assessment & review
• Geotechnical specification & investigation • Infrastructure design • Turbine foundation design • Access studies • Highway approvals • Enviromental
•Turbine supply • Civil works • Electrical works • Balance of plant • Contestable works • Operation & maintenance • Power purchase agreement
• Environmental • Statutory bodies • Construction method statements • Legal agreements
• Feasibility • Connection applications • Methodology negotiations • Regulatory
Contact us Development
Pre-construction
construction
OperaTIONS
CE
DUE DILIGEN Colin Aimers
Cormac Ó Dubhthaigh
Engineering Director
Senior Civil Engineer
[email protected] [email protected] Australia
Wind Prospect Group Ltd Registration number: 03254615
Canada
China
France
Ireland
Poland
Singapore
South Africa United Kingdom
Printed on 100% recycled paper using vegetable based inks.
Visit us online at www.windprospect.com