ROAD, BIKE AND SIDEWALK CONSTRUCTION (CURRENT - AUG. 2017) January 24, 2017

Shields St. & Elizabeth St. bike/pedestrian underpass December 2016 - August 2017 (Closure of the intersection starting February 25 - March 19, 2017. Anticipate minimal lane closures on Elizabeth St. ) W. LAUREL ST.

S. COLLEGE AVE.

W. LAUREL ST.

OLD MAIN DR.

UNIVERSITY AVE.

MASON ST.

SOUTH DR.

W. PITKIN ST.

W. PITKIN ST. EAST DR.

N 6,000’ FEET

12,000’

W. PROSPECT RD.

. AVE TRE CEN

Lake St. repaving (Shields St. to College Ave.) March - August 2017. Full closure of Lake Street for 2 weeks in July 2017. All IN COORDINATION with College and Prospect improvements.

W. LAKE ST.

Prospect Rd. repaving (Shields St. to College Ave.) March - August 2017. Lane Closures: March, April and July 2017 IN COORDINATION with College and Prospect improvements.

S. COLLEGE AVE.

W. PROSPECT RD.

SHIELDS ST.

Sidewalk expansion on south side of Lake St. from Shields to Whitcomb Spring 2017

1,500’ 3,000’

New sidewalk on south side of RR tracks at Lake St. Summer 2017

CENTER AVE.

W. LAKE ST.

WHITCOMB ST.

SPRINGFIELD DR.

0’

New sidewalk on south side of RR tracks at Pitkin St. Summer 2017 Pitkin St. low-stress bike network improvements. Spring 2017

College Ave. & Prospect Rd. intersection improvements (Intersection & lane closures at both College and Remington). February - July 2017. Intersection of Prospect & Remington Closed February 13 - March 10

REMINGTON ST.

Pitkin St. low-stress bike network improvements. Spring 2017

MASON ST.

MERIDIAN AVE.

W. ELIZABETH ST.

EAST DR.

AMY VAN DYKEN WY.

SHIELDS ST.

W. PLUM ST.

ROAD CONSTRUCTION: SHIELDS & ELIZABETH January 24, 2017

What to expect: Who to contact for more information: Tim Kemp, City of Fort Collins Engineering Capital Projects [email protected] Steven Flores, CSU Project Manager [email protected] Shields & Elizabeth Project Hotline: (970)491-0189

• A full closure of Shields Street (south of Elizabeth) will be required from February 25 – March 19, 2017: * Business accesses will be open and signed accordingly * The Moby driveway at Elizabeth will be open * Detour routes will be signed along Prospect, College, Mulberry, and Taft Hill * Bicycle and pedestrian crossings of Shields Street will be accommodated at the intersection with Elizabeth during this phase • Various lane closures can be expected on Elizabeth, west of Shields from February – August 2017 • Allow for extra travel time in and around the intersection during construction. Speeds will be slower with more congestion in the area

www.fcgov.com/engineering/ elizabeth-shields.php

What we are working on:

• Coordinating this construction project with other work occurring on and along the perimeter of the CSU campus • Managing signal timing and congestion along the arterial street detour routes • 'HWHUULQJQHLJKERUKRRGFXWWKURXJKWUDIÀF • Communication and public outreach open houses, mailers, and social media updates • Getting this project completed prior to Fall 2017 CSU move-in day and the start of city-wide schools

ROAD CONSTRUCTION: SHIELDS & ELIZABETH January 24, 2017

ELIZABETH & SHIELDS CLOSURE FEB. 25TH - MAR. 19TH: VEHICULAR DETOUR

ELIZABETH & SHIELDS CLOSURE FEB. 25TH - MAR. 19TH: PEDESTRIAN DETOUR ELIZABETH ST

W. MULBERRY ST

Green Trail CITY PARK AVE

S. SHIELDS ST

Campus West Business Pedestrian Access

Pedestrian Detour UNIVERSITY AVE HUGHES WAY SHIELDS ST

COLORADO STATE UNIVERSITY

W. ELIZABETH ST

S. COLLEGE AVE

ROAD CLOSED FEB 25 TO MAR 19

ROAD CLOSED LOCAL ACCESS ONLY

W. PROSPECT RD

N

CONSTRUCTION TIMELINE 2016 OCT

NOV

2017 DEC

JAN

FEB

MAR

APR

MAY

JUN

JUL

AUG

SEP

OCT

Utility Relocations

Phase One (CSU Property)

Phase Two (Shields Street Crossing) LANE CLOSURES DEC 27 - JAN 20

FULL CLOSURE FEB 25 - MAR 19

Expect varying lane closures throughout phase three

Phase Three (Elizabeth & Campus West Shops)

NOV

PITKIN ST

BENNETT RD

ELIZABETH & SHIELDS UNDERPASS SEP

Intramural Fields

DEC

LAKE ST

MERIDIAN AVE

S. TAFT HILL RD

Shields to Elizabeth remains open

ROAD CLOSED FEB 25 TO MAR 19

Aggie Trail

Vehicle Detour

ROAD CONSTRUCTION: COLLEGE & PROSPECT January 24, 2017

What to expect: Who to contact for more information: Dan Woodward City of Fort Collins Project Manager [email protected] (970) 416-4203

What we are working on:

• 3 Major road closures along Prospect: * Feb 13th through March 2 – Remington intersection CLOSED * Feb 13th through March 19th – East leg of intersection CLOSED – Prospect Road, eastbound and westbound, from College to Remington * March 19th through April 16th – Westbound Prospect CLOSED – Remington to RR tracks west of College • From mid-April through early July there will be daily lane closures to complete the construction. • Allow for extra travel time through and around this intersection from February through July 2017 • Detour routes along Drake, Mulberry, Riverside and Lemay

• Coordination with other City projects as well as CSU projects • Messaging impacts to the traveling public as well as the directly affected businesses and neighborhoods • 'HWHUULQJQHLJKERUKRRGFXWWKURXJKWUDIÀF • Managing signal timing and congestion along detour routes • Public outreach and communications before and during construction • Completion of project by July 2017

COLLEGE & PROSPECT INTERSECTION IMPROVEMENTS After April 16, expect single lane closures.

ROAD CLOSED WESTBOUND FEB 13 TO APR 16

PROSPECT RD Business access will be maintained from either College or Prospect.

ROAD CLOSED EASTBOUND FEB 13 TO MAR 17

REMINGTON ST

ROAD CLOSED WESTBOUND MAR 19 TO APR 16

COLLEGE AVE

ROAD CLOSURES FEB 13 TO APR 16

INTERSECTION CLOSED FEB 13 TO MAR 10

ROAD CONSTRUCTION: COLLEGE & PROSPECT January 24, 2017

COLLEGE & PROSPECT INTERSECTION IMPROVEMENTS VEHICLE DETOUR ROUTE ROAD CLOSED WESTBOUND FEB 13 TO APR 16

RI

MULBERRY

VE

RS

ID

E

PROSPECT

LEMAY

ROAD CLOSED EASTBOUND FEB 13 TO MAR 17 REMINGTON

Use Shields Street to access Prospect west of MAX/RR tracks

COLLEGE

ROAD CLOSED WESTBOUND MAR 19 TO APR 16

DRAKE

COLLEGE & PROSPECT INTERSECTION IMPROVEMENTS PEDESTRIAN/BIKE DETOUR ROUTE PITKIN

ROAD CLOSED EASTBOUND FEB 13 TO MAR 17

LAKE

REMINGTON

COLLEGE

MAX TRAIL

ROAD CLOSED WESTBOUND FEB 13 TO APR 16

PROSPECT

PARKER

STUART

STREET MAINTENANCE: PROSPECT ROAD AND LAKE STREET (SHIELDS STREET TO COLLEGE AVENUE) January 24, 2017

What to expect: Who to contact for more information:

• 7UDIÀFFRQWURODQGVFKHGXOLQJFRRUGLQDWHGZLWKWKH&ROOHJHDQG3URVSHFWSKDVLQJ • Prospect lane closures in March, April and July • Full closure of Lake Street for two weeks in July • Business and residential access with enhanced signage during construction • Allow for extra travel time through and around these corridors from March through August 2017

Tim Kemp City of Fort Collins Engineering Capital Projects [email protected] (970) 416-2719

• Detour routes along Drake, Mulberry, College, Riverside and Lemay

What we are working on:

• Coordination with other City projects as well as CSU projects • Messaging impacts to the traveling public as well as the directly affected businesses and neighborhoods • Managing signal timing and congestion along detour routes • Public outreach and communications before and during construction • Underground utility upgrades, ADA compliant routes, Lake Street bike lanes, and improved ride quality • Completion of projects August 2017

PROSPECT ROAD PHASE 2 SHIELDS TO I-25, ENDING AUGUST 2017 2015

2016

2017

SEP OCT NOV DEC

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

JAN FEB MAR APR MAY JUN JUL AUG

East Prospect Bridges Prospect & Timberline Landscaping

Prospect & Timberline Intersection Improvements

COMPLETED

Prospect Pros ospect s c & Stover v

Prospect & College

Stormwater Stor rmwater m t Improvements m e

Intersection Improvements

Prospect Street Mainten Maintenance n nance

Prospect & Lake

REMINGTON TO TIMBERLINE

Street Maintenance

Prospect and Center Underpass sss Prospect and Whitcomb Sewer

Elizabeth & Shields Bicycle & Pedestrian Underpass

CITY CSU