Benjamin A. Fine, P.E. Director of Public Works/City Engineer Eric R. Eldridge, P.E. Senior Engineer October 4, 2017 1
History
Shell Beach Road (SBR) Corridor Important resource “embodies much of the historical ambiance and flavor of small California beach towns” General Plan identifies need for Specific Plan Recommendation for: Revitalization Street tree type and locations Signage Sidewalks Parking Building massing 4
History Continued
Shell Beach Improvement Group (SBIG) SBIG began Master Plan efforts in 2005 Formal work began 2007
5
Project Overview
Cliff Avenue Terrace Avenue Completely transform SBR According to the Master Plan, adopted in April 2009 Over 20 public workshops Council/Planning Commission Meetings Art in the Park Pacific Breezes Bus Tour SBIG Meetings Etc 6
Project Overview Cont.
Public input was received on: Design and placement of street furniture Design and placement of trash and recycle bins Design, placement and length of bulb-outs Design and placement of the multi-use trail Type of landscaping Sidewalk treatments Bollard lighting
7
Project Overview Cont.
The project will Underground overhead utilities Upgrade the water line Install new street lights, benches, trash cans and recycle bins Construct a multimodal path along the east (freeway) side of SBR Construct an 8 foot wide sidewalk with ADA improvements on the west (business) side of SBR Install traffic calming bulb-outs which will also provide pedestrian refuge and landscaping opportunities Construct new parking lot on SBR (Capistrano/Wamona) 8