Assembly Instructions
Shelter type: SR1556 Email :
[email protected] Web : www.nobutts.com Tel : 1-888-662-8887
SR1556-01-190116-USA
EXPLODED VIEW 11 11 9 10 12
12
8
6
7
6
6
7
2 2 5 3 2 1 4 13
2
PARTS LIST ITEM NO.
PART NO. DESCRIPTION
DIMENSION
IMAGE
QTY.
1
S1
Frame
3 3 78 4 x 40 4
9
2
CB1
Bracket
3 3 1 4 8x4 8x1 2
8
3
JF1
Bracket
5 1 8 8x1 2
12
4
P1
Post
3 78 4
1
5
ST3
Roof Tie
81
1
6
RB2
Bracket
4.3 x 1.81
16
7
R2
Rafter
86.57
5
8
SS
Sealing Strip
Trim to 87.4
10
9
PCE2
Roof Panel
87.4 x 41.34
2
10
PCCE2
Roof Panel
87.4 x 40.55
2
11
RC2
Roof Strip
85.83
5
12
2MD
Roof Edge Trim
54.84
6
13
FT1
Bracket
4.3 x 3.94
11
14
EC40
Plastic End Cap
1 1 1 2x1 2
13
3
Fittings/Tools Bolt set M10 3/8th x 2 3/8"
Pack A+B Required Spare
Nut
T25 T50 Washer Black 1" Tech 2" Tech Cap
40
40
80
19
19
38
21
21
42
Image
Tools required:
Drill/Screwdriver
Mallet
Hack saw Tools included:
Wrench
Torx bit
4
80 42 38
screw
136 112
24
AB1210 1/2 x 4"
screw Concrete Bolt
66
13
16
2
50
11
Step 1 Assemble S1 frames to make up the main structure using CB1 brackets for the corners and JF1 brackets for the straight joints. CB1
S1
GENERAL NOTE: THE 2" TECH SCREWS ARE FOR FIXING ROOF STRIPS (RC) ONLY
JF1
JF1
JF1 S1 CB1 CB1 JF1
S1
S1 S1 CB1 CB1
JF1
ensure correct alignment on all three corners
S1 JF1 CB1
JF1
S1
5
S1
Step 2 Attach P1 post using one JF1 bracket, then attach ST3 tie bar using
another JF1 bracket and two CB1 brackets. Move the shelter to its final position, make sure the structure is square and attach the FT1 foot brackets to secure the shelter to the ground.
JF1 JF1 CB1
ST3 CB1
FT1 P1 FT1
JF1
FT1
JF1 CB1
CB1 ST3
P1
6
Step 3 Use RB2 brackets to secure the R2 roof rafters. R2
RB2 RB2
R2
RB2 RB2
RB2 R2
R2 RB2
R2 RB2 1035
R2
RB2
7
1035
1035
1035
Step 4
Align PCE2 roof panels with the outer rafters then space out the PCC2 panels evenly. Cover the two edges along the outer rafters and gaps with RC2 strips before screwing them into place. GENERAL NOTE: THE 2" TECH SCREWS ARE FOR FIXING ROOF STRIPS (RC) ONLY
RC2 RC2
PCC2 PCC2
PCE2 PCE2
SS
SS
PCE2
RC2
PCC2
PCC2 PCE2 8
Step 5
Clip on the 2MD end caps. Attach the FT1brackets to the uprights and move the shelter to its final position before securing it to the ground using ground anchor bolts. Then fit the Black plastic caps on exposed nuts and bolts. Fit the square end caps to any open ends of box sections. 2MD
2MD
2MD
2MD
9
Plan view
1035
995
112
981
1035
995
1035
4180
1035
2050
935
77
Suggested size for concrete base: 200mm oversized on all four sides.
1035
938 2209 10
NOTES:
11
THANK YOU FOR PURCHASING THIS PRODUCT
MAINTENANCE: To ensure your products give you many years of use we recommend that you: • • •
Clean panels regularly with soapy water Ensure all fittings are tight (for example after a big storm) Touch up any exposed metal should it get scratched
CONTACT DETAILS: Email :
[email protected] Web : www.nobutts.com Tel : 1-888-662-8887 No Butts Bin Company, Inc. 16 Birch Lane, Madison, CT 06443
All Parts and Fixings checked by: Print Name:
Signature:
12