SR1605 USA Instructions SR1605-01-120416-USA - Amazon Web ...

Report 2 Downloads 20 Views
Assembly Instructions

Shelter type: SR1605 Email : [email protected] Web : www.nobutts.com Tel : 1-888-662-8887

SR1605-01-120416-USA

EXPLODED VIEW 4

15

17

16

14

7 16

17

13 3

6

5

9

20 2

10 11

15 10

5

8 18

12

18

Tools required:

Tools included:

Drill/Screwdriver

Wrench

Mallet

Torx bit

Hack saw 2

PARTS LIST

ITEM NO.

PART NO.

DESCRIPTION

SIZE

1

S1/HS

FRAME

3 3 78 4 x 40 4

5

2

CB1

BRACKET

1 1 4 3x4 3

6

3

JF1

PLATE/ BRACKET

2 5 8 3x1 8

6

4

NBBS S1

STUB

6 5 5 5 8x1 8x1 8

2

5

RB2

BRACKET

1 7 4 3x1 8

8

6

JF2

PLATE/ BRACKET

1 1 5 8x1 4

4

7

R5

CURVED RAFTER

5 5 85 x 1 8 x 1 8

1

8

R4

CURVED RAFTER

5 5 85 x 1 8 x 1 8

3

9

L1

BRACKET

3 3 3 4x1 4

6

10

ST9

TIE BAR

1 5 5 61 2 x 1 8 x 1 8

2

11

JF3

PLATE/ BRACKET

1 6 8 4x1 8

2

12

P4

POST

3 78 4

1

13

SS

SEALING STRIP

3 trim to 87 8

6

14

PCC2

ROOF PANEL

3 1 87 8 x 40 2

1

15

PCE2

ROOF PANEL

3 3 87 8 x 41 8

2

16

RC2

ROOF STRIP

7 85 8

4

17

2MD

ROOF EDGE TRIM

62

4

18

FT1

BRACKET

1 4 3x4

7

19

EC40

END CAPS

1 1 1 2x1 2

6

Fittings Bolt set M10 3/8th x 2 3/8"

Pack A+B Required Spare

Nut

T25 T50 Washer Black Cap 1" Tech 2" Tech

40

40

80

1

1

2

39

39

IMAGE

78

Image

3

80 78 2

screw

136 64

72

QUANTITY.

AB1210 1/2 x 4"

screw Concrete Bolt

66

13

26

6

40

7

Step 1 Assemble S1 frames to make up the main structure using CB1 brackets

in the corners and JF1 brackets on the straight joints. Attach the S1 stub as shown using JF1 brackets. 1 " 40 2 12

4"

A CB1

S1 STUB

GENERAL NOTE: THE 2" TECH SCREWS ARE FOR FIXING ROOF STRIPS (RC) ONLY

JF1 CB1

JF1 S1 STUB

S1

JF1

CB1

JF1

S1

S1 STUB

JF1 S1 JF1 Check the dimension of the shelter to ensure correct alignment

CB1

S1

S1 FRAME DETAIL A (S1 STUB) SCALE 1 : 5 S1

S1

CB1

JF1

JF1

S1

CB1

S1 CB1

ENSURE CORRECT ALIGNMENT ON BOTH SIDES

S1 CB1

S1 STUB

S1 STUB 4

Step 2 Attach R5 rafters using RB2 brackets on the back of the shelter and JF2 brackets in the middle.

R5 RB2 JF2

RB2

JF2

R4

JF2 CB1

JF1

S1

S1 STUB DETAIL

5

Step 3 Assemble the T-frame using two ST9 tie bars and a P4 post. Join the two ST9 bars together first using JF3 brackets, then attach the P4 post using two RB2 brackets.

JF3

ST9 RB2

RB2

JF3

ST9

P4

6

Step 4

Use L1 brackets to attach the T-bar to the front of the shelter and install the R4 rafters using RB2 brackets on the rear and L1 brackets at the front. Attach the FT1 brackets and move the shelter in to its final position before using anchor bolts to secure it to the ground.

R4 RB2 R4 RB2 L1

L1 L1

L1 FT1

FT1

FT1 FT1

FT1 FT1 FT1

7

Step 5 Stick sealing strips (SS) to the rafters and align the PCE2 panels to the outside of the shelter and centralise the PCC2 panel in the centre.

PCE2

PCC2

PCE2

SS

SS

SS

8

Step 6

Screw down the RC2 strips to secure the roof panels and clip on the 2MD edge trim to the bottom of the roof panels. Then fit the Black plastic caps on exposed nuts and bolts. Fit the square end caps to any open ends of box sections.

2MD

RC2

RC2 2MD 2MD

RC2

RC2

2MD

GENERAL NOTE: THE 2" TECH SCREWS ARE FOR FIXING ROOF STRIPS (RC) ONLY

9

Notes:

10

PLAN VIEW OVERALL DIMENSIONS AND GROUND FIXING POSITIONS 5"

1 40 2 "

124"

1 40 2 "

1 59 2 "

37"

39"

37" 87" Suggested size for concrete base: 200mm oversized on all sides

11

THANK YOU FOR PURCHASING THIS PRODUCT

MAINTENANCE: To ensure your product gives you many years of use we recommend that you: • • •

Clean panels regularly with soapy water Ensure all fittings are tight (for example after a big storm) Touch up any exposed metal should it get scratched

CONTACT DETAILS: Email : [email protected] Web : www.nobutts.com Tel : 1-888-662-8887 No Butts Bin Company, Inc. 16 Birch Lane, Madison, CT 06443

All Parts and Fixings checked by: Print Name:

Signature:

12