New Jersey Office Of Clean Energy
Township of Holland Project Summary - 3 Buildings The total cost of the proposed project is: The NJ Clean Energy Incentive covers: The total cost to you is:
$ $ $
90,139.07 63,097.35 27,041.72
The estimated annual energy savings associated with this project is: Therefore, the estimated payback period for these measures is:
$
25,935.63 1 years
Project Submission Requirements: Scope Of Work Attachment - signed - 1 per facility 2013 Direct Install Program Application and Participation Agreement - signed - 1 per facililty Gas Bill - Winter 2012/2013 Gas Bill - all pages attached Electric Bills - 12 Months - all pages attached
70% 30%
Project: Township of Holland - DPW and Library The total cost of the proposed project is: The NJ Clean Energy Incentive covers: The total cost to you is: The estimated annual energy savings associated with this project is: Therefore, the estimated payback period for these measures is:
$11,873.95 $8,311.76 $3,562.18
70% 30%
$4,081.07 0.9 years
Project: Township of Holland - Municipal Building The total cost of the proposed project is: The NJ Clean Energy Incentive covers: The total cost to you is: The estimated annual energy savings associated with this project is: Therefore, the estimated payback period for these measures is:
$4,437.90 $3,106.53 $1,331.37
70% 30%
$868.99 1.5 years
Project: Township of Holland - Community Center The total cost of the proposed project is: The NJ Clean Energy Incentive covers: The total cost to you is:
$73,827.22 $51,679.05 $22,148.17
The estimated annual energy savings associated with this project is: Therefore, the estimated payback period for these measures is:
$20,985.57 1.1 years
70% 30%
Savings values are estimates. Actual savings will vary. Incentives and participation subject to program rules and Participation Agreement.
New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool (ver. 8.1)
TRC Energy Services
General Project Information Participating Customer: Contractor / Project #: Facility Name: Street Address:
Township of Holland RJ Donnelly DPW and Library 129 Spring Mills Road
City / Zip Code: Milford Will the project receive EECBG funding?:
Facility Type: Office-Small Total Facility Square Footage: Avg Weekly Hrs of Operation: # of Full-Time Employees:
DN2845
08848 Y
Year Constructed: Tax Exempt?:
ELECTRIC UTILITY INFORMATION
Y
GAS UTILITY INFORMATION
Electric Provider: <Select Electric Provider> Service Class: Account #: Billing Period Start Date: Billing Period End Date: Billing Period kWh Consumption: 1 Billing Period Total Cost: $0.14 Total Taxes + Fees on Bill:
Gas Provider: <Select Gas Provider> Service Class: Account #: Billing Period Start Date: Billing Period End Date: Billing Period Therm Consumption: Billing Period Total Cost: Total Taxes + Fees on Bill:
Project Summary Electric - Average Cost ($/kWh):
Lighting Measures Total: Motors & VFD Measures Total: HVAC Electric Measures Total: Refrigeration Measures Total: TOTAL ELECTRIC MEASURES: TOTAL GAS MEASURES:
Gas - Average Cost ($/Therm):
$0.140 kWh Saved per Year 28,500 650 29,150 Therms /yr. Gallons/yr.
$ $ $ $ $
Estimated Incentive Amount $ 7,919.10 $ $ 392.67 $ $ 8,311.76
Total Cost to Customer $ 3,393.90 $ $ 168.29 $ $ 3,562.18
Simple Payback (Yrs) 0.85 0.00 1.85 0.00 0.87
$
-
$
-
$
-
$
-
0.00
TOTAL OIL MEASURES: $ Oil Gallons/yr. Gas Therms/yr. CONVERSION MEASURES: $ Gallons/yr. (OIL TO GAS)
-
$
-
$
-
$
-
0.00
-
$
-
$
-
$
-
0.00
-
$
-
$
-
$
-
0.00
TOTAL PROPANE MEASURES:
-
$
COMBINED PROJECT TOTALS: $
Projected Energy Savings Per Measure Category HVAC
Lighting
10/7/2013
Annual Total Measure Savings Cost 3,990.07 $ 11,313.00 $ 91.00 $ 560.95 $ 4,081.07 $ 11,873.95
$0.00
4,081.07 $
11,873.95 $
Projected Dollar Savings Per Measure Category HVAC
8,311.76 $
3,562.18
0.87
PROJECT TRC TEST:
4.24
Estimated Reduction in Total Energy Consumption 100.0%
Lighting
Project Summary
Direct Install Energy Assessment Tool (ver. 8.1) ©2013 TRC Energy Services. Property of TRC. Contractor granted limited license.
New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool (ver. 8.1) Lighting Measures Default Annual Oper. Hours
Actual Annual Oper. Hrs (if different)
Fixture Controlled?
Fixture Location
1
2,808
Library
2
2,808
Library
3
2,808
Library
4
2,808
Closet
5
2,808
Bathroom
6
2,808
Closet
7
2,808
Garage
8
2,808
Closet
9
2,808
2nd Garage
10
2,808
Bathroom
12
2,808
Office
13
2,808
Copy
14
2,808
2nd Garage
15
2,808
3rd Garage
Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed
N N N N N N N Y N Y N Y N N N Y N N N N N Y N N N N N N
Actual Ceiling # of Default Watts per Height Fix- Watts per Fixture (if tures Fixture >12 ft? different)
Lighting Measure Description
Fluorescent, (4) 48", STD lamp 4' T8 2-lamp with EB plus reflector Fluorescent, (2) U-Tube, STD lamp 2' T8 U-Lamp with EB Incandescent, (1) 120W lamp LED: PAR38 (19W) Fluorescent, (4) 48", STD lamp 4' T8 2-lamp with EB plus reflector Incandescent, (1) 60W lamp LED: A-Lamp (9W) Incandescent, (1) 60W lamp LED: A-Lamp (9W) Fluorescent, (2) 96", STD lamp 8' T8 2-lamp with EB Fluorescent, (2) 96", STD lamp 8' T8 2-lamp with EB Fluorescent, (2) 96", STD lamp 8' T8 2-lamp with EB Incandescent, (1) 60W lamp LED: A-Lamp (9W) Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Incandescent, (1) 60W lamp LED: A-Lamp (9W) Fluorescent, (2) 96", STD lamp 8' T8 2-lamp with EB TOTALS:
35 35 4 4 3 3 2 2 3 3 1 1 9 9 1 1 10 10 2 2 1 1 1 1 3 3 19 19
188 54 96 31 120 19 188 54 60 9 60 9 173 109 173 109 173 109 60 9 94 59 94 59 60 9 173 109
Total Cost
Est. Demand Annual kWh Savings Savings (kW)
N
$
3,780.26
3.7
15,408
N
$
314.34
0.2
854
N
$
237.02
0.2
995
N
$
216.02
0.2
616
N
$
151.01
0.1
352
N
$
50.34
0.0
117
Y
$
1,230.06
0.5
1,892
N
$
110.41
0.1
147
Y
$
1,366.73
0.5
2,103
N
$
100.67
0.1
335
N
$
68.71
0.0
80
N
$
68.71
0.0
115
N
$
151.01
0.1
503
N
$
2,097.75
1.0
3,995
$
9,943.02
6.8
27,514
Lighting Notes:
Lighting Controls Est. # of Annual Fixtures Hours Conw/o trolled Controls
Fixture Location
Est. Annual Hrs. w/ Controls
Actual Annual Hours (if different)
Lighting Controls Measure Description
Reduced # of Total # of Annual Add'l Watts ConUnits Lighting Relays trolled Hours Needed
Total Cost
Est. Demand Annual kWh Savings Savings (kW)
4
2,808
2
Closet
1,966
Dual Tech Occ. Sensor Wall Switch
1
842
376
$
171.25
0.1
371
5
2,808
3
Bathroom
1,966
Dual Tech Occ. Sensor Wall Switch
3
842
180
$
513.74
0.0
177
6
2,808
1
Closet
1,966
Dual Tech Occ. Sensor Wall Switch
1
842
60
$
171.25
0.0
59
8
2,808
1
Closet
1,966
Dual Tech Occ. Sensor Wall Switch
1
842
173
$
171.25
0.0
171
11
2,808
2
Conference Room
1,966
Dual Tech Occ. Sensor Wall Switch
1
842
118
$
171.25
0.0
116
12
2,808
1
Office
1,966
Dual Tech Occ. Sensor Wall Switch
1
842
94
$
171.25
0.0
93
$
1,369.97
0.2
987
TOTALS:
Notes:
Lighting 10/7/2013
Direct Install Energy Assessment Tool (ver. 8.1) ©2013 TRC Energy Services. Property of TRC. Contractor granted limited license.
New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool (ver. 8.1) HVAC Control Measures Measure Description
Controlled Cooling Unit Energy Opera# of Units Cooling Efficiency tionally Installed Capacity Ratio Tested? (Tons) (EER)
Measure Location
Total Cost
$
Measure Description
Annual HVAC Unit Fuel # of Units Capacity HVAC Fuel Usage Installed (thousand Source (therms,
Measure Location
BTU/hr)
1
Electronic Fuel-Use Economizers (for AC)
Measure Description
Outside
Measure Location
Annual kWh Savings
-
gallons or KWh /yr)
Electric
5,000
$
-
Annual kWh Savings
Total Cost
560.95
Est. Demand Savings (kW) -
Nat. Gas Savings (therms /yr)
650
1
61
# of Units Installed
Annual HVAC Electric Usage (kWh)
Gas, Oil, Primary or LPG Fuel Usage Source for (therms or Heating gal./yr)
Total Cost
Annual kWh Savings
Nat. Gas Savings (therms /yr)
# of Units Installed
Days per Year Facility Operates
Hot Water Current Fuel Flow Rate Source (gal./min)
Total Cost
Annual kWh Savings
Nat. Gas Savings (therms /yr)
Pipe Diameter
Pipe Length
Total Cost
(inches)
(feet)
Annual kWh Savings
Nat. Gas Savings (therms /yr)
650
0.0
Hot Water Demand Control Measures Measure Description
Measure Description
Measure Location
Measure Location
TOTALS
Hot Water Fuel Source
Low or High Temp Piping?
$
560.95
Notes:
HVAC & HW Controls Measures 10/7/2013
Direct Install Energy Assessment Tool (ver. 8.1) ©2013 TRC Energy Services. Property of TRC. Contractor granted limited license.
Savings values are estimates. Actual savings will vary. Incentives and participation subject to program rules and Participation Agreement.
New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool (ver. 8.1)
TRC Energy Services
General Project Information Participating Customer: Contractor / Project #: Facility Name: Street Address:
Township of Holland RJ Donnelly Municipal Building 61 Church Rd
Facility Type: Other Total Facility Square Footage: Avg Weekly Hrs of Operation: # of Full-Time Employees:
DN2844
City / Zip Code: Milford Will the project receive EECBG funding?:
08848 Y
Year Constructed: Tax Exempt?:
ELECTRIC UTILITY INFORMATION
Y
GAS UTILITY INFORMATION
Electric Provider: <Select Electric Provider> Service Class: Account #: Billing Period Start Date: Billing Period End Date: Billing Period kWh Consumption: 1 Billing Period Total Cost: $0.14 Total Taxes + Fees on Bill:
Gas Provider: <Select Gas Provider> Service Class: Account #: Billing Period Start Date: Billing Period End Date: Billing Period Therm Consumption: 1 Billing Period Total Cost: $1.05 Total Taxes + Fees on Bill:
Project Summary Electric - Average Cost ($/kWh):
Lighting Measures Total: Motors & VFD Measures Total: HVAC Electric Measures Total: Refrigeration Measures Total: TOTAL ELECTRIC MEASURES: TOTAL GAS MEASURES:
Gas - Average Cost ($/Therm):
$0.140 kWh Saved per Year 6,207 6,207 Therms /yr. Gallons/yr.
$ $ $ $ $
Annual Total Measure Savings Cost 868.99 $ 4,437.90 $ $ $ 868.99 $ 4,437.90
Estimated Incentive Amount $ 3,106.53 $ $ $ $ 3,106.53
Total Cost to Customer $ 1,331.37 $ $ $ $ 1,331.37
$1.05 Simple Payback (Yrs) 1.53 0.00 0.00 0.00 1.53
$
-
$
-
$
-
$
-
0.00
TOTAL OIL MEASURES: $ Oil Gallons/yr. Gas Therms/yr. CONVERSION MEASURES: $ Gallons/yr. (OIL TO GAS)
-
$
-
$
-
$
-
0.00
-
$
-
$
-
$
-
0.00
-
$
-
$
-
$
-
0.00
TOTAL PROPANE MEASURES:
-
$
COMBINED PROJECT TOTALS: $
Projected Energy Savings Per Measure Category
868.99 $
4,437.90 $
Projected Dollar Savings Per Measure Category
3,106.53 $
1,331.37
1.53
PROJECT TRC TEST:
2.22
Estimated Reduction in Total Energy Consumption 100.0%
Lighting
10/7/2013
Lighting
Project Summary
Direct Install Energy Assessment Tool (ver. 8.1) ©2013 TRC Energy Services. Property of TRC. Contractor granted limited license.
New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool (ver. 8.1) Lighting Measures Default Annual Oper. Hours
Actual Annual Oper. Hrs (if different)
Fixture Location
2
4,242
Office
4
4,242
Entrance
6
4,242
Women's Rom
7
4,242
Men's Room
8
4,242
Men's Room
22
4,242
Bathroom
23
4,242
Bathroom
Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed
Fixture Controlled?
Lighting Measure Description
N N N N N Y N Y N Y N N N N
Incandescent, (1) 60W lamp LED: A-Lamp (9W) Incandescent, (1) 65W lamp LED: BR30 (11W) Incandescent, (1) 60W lamp LED: A-Lamp (9W) Incandescent, (1) 60W lamp LED: A-Lamp (9W) Incandescent, (1) 60W lamp LED: A-Lamp (9W) Incandescent, (1) 60W lamp LED: A-Lamp (9W) CFL: 13W LED: A-Lamp (9W)
Actual Ceiling # of Default Watts per Height Fix- Watts per Fixture (if tures Fixture >12 ft? different) 4 4 2 2 1 1 2 2 2 2 2 2 4 4
60 9 65 11 60 9 60 9 60 9 60 9 13 9
Total Cost
Est. Demand Annual kWh Savings Savings (kW)
N
$
201.34
0.2
978
N
$
127.72
0.1
518
N
$
50.34
0.0
171
N
$
100.67
0.1
342
N
$
100.67
0.1
342
N
$
100.67
0.1
489
N
$
201.34
0.0
77
$
882.75
0.6
2,917
TOTALS:
Lighting Notes:
Downstairs
Lighting Controls Est. # of Annual Fixtures Hours Conw/o trolled Controls 3
4,242
4
5
4,242
6
4,242
7
Fixture Location
Est. Annual Hrs. w/ Controls
Actual Annual Hours (if different)
Lighting Controls Measure Description
Reduced # of Total # of Annual Add'l Watts ConUnits Lighting Relays trolled Hours Needed
Total Cost
Est. Demand Annual kWh Savings Savings (kW)
Copy
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
236
$
171.25
0.1
339
1
Tax Assesor
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
89
$
171.25
0.0
128
1
Women's Rom
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
60
$
171.25
0.0
86
4,242
2
Men's Room
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
120
$
171.25
0.0
173
8
4,242
2
Men's Room
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
120
$
171.25
0.0
173
9
4,242
1
Women's Room
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
59
$
171.25
0.0
85
10
4,242
2
Finance
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
224
$
171.25
0.1
322
11
4,242
2
Planning
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
224
$
171.25
0.1
322
12
4,242
2
Zoning
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
224
$
171.25
0.1
322
13
4,242
2
Tax
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
118
$
171.25
0.0
170
14
4,242
1
Entrance
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
59
$
171.25
0.0
85
15
4,242
2
Office
2,969
Dual Tech. Occ.Sens Ceiling (low v)
1
1,273
118
$
321.98
0.0
170
16
4,242
2
Office
2,969
Dual Tech. Occ.Sens Ceiling (low v)
1
1,273
118
$
321.98
0.0
170
17
4,242
1
Server
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
59
$
171.25
0.0
85
18
4,242
1
Room
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
59
$
171.25
0.0
85
19
4,242
2
Office
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
224
$
171.25
0.1
322
20
4,242
1
Office
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
59
$
171.25
0.0
85
21
4,242
1
Kitchen
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
59
$
171.25
0.0
85
24
4,242
1
Closet
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
59
$
171.25
0.0
85
$
3,555.15
0.6
3,290
TOTALS:
Notes:
Lighting 10/7/2013
Direct Install Energy Assessment Tool (ver. 8.1) ©2013 TRC Energy Services. Property of TRC. Contractor granted limited license.
Savings values are estimates. Actual savings will vary. Incentives and participation subject to program rules and Participation Agreement.
New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool (ver. 8.1)
TRC Energy Services
General Project Information Participating Customer: Contractor / Project #: Facility Name: Street Address:
Township of Holland RJ Donnelly DN2888 Community Center 910 Milford-Warren Glen Rd
City / Zip Code: Milfrord Will the project receive EECBG funding?:
Facility Type: Other Total Facility Square Footage: Avg Weekly Hrs of Operation: # of Full-Time Employees:
08848 Y
Year Constructed: Tax Exempt?:
ELECTRIC UTILITY INFORMATION
Y
GAS UTILITY INFORMATION
Electric Provider: <Select Electric Provider> Service Class: Account #: Billing Period Start Date: Billing Period End Date: Billing Period kWh Consumption: 1 Billing Period Total Cost: $0.14 Total Taxes + Fees on Bill:
Gas Provider: <Select Gas Provider> Service Class: Account #: Billing Period Start Date: Billing Period End Date: Billing Period Therm Consumption: 1 Billing Period Total Cost: $1.10 Total Taxes + Fees on Bill:
Project Summary Electric - Average Cost ($/kWh):
Lighting Measures Total: Motors & VFD Measures Total: HVAC Electric Measures Total: Refrigeration Measures Total: TOTAL ELECTRIC MEASURES: TOTAL GAS MEASURES:
Gas - Average Cost ($/Therm):
$0.140 kWh Saved per Year 28,265 28,265 Therms /yr. 15,480 Gallons/yr.
$ $ $ $ $ $
TOTAL OIL MEASURES: $ Oil Gallons/yr. Gas Therms/yr. CONVERSION MEASURES: $ Gallons/yr. (OIL TO GAS) TOTAL PROPANE MEASURES:
-
$
COMBINED PROJECT TOTALS: $
Annual Total Measure Savings Cost 3,957.12 $ 12,602.75 $ $ $ 3,957.12 $ 12,602.75
Estimated Incentive Amount $ 8,821.93 $ $ $ $ 8,821.93
61,224.47 $
-
$
-
$
-
$
-
0.00
-
$
-
$
-
$
-
0.00
-
$
-
$
-
$
-
0.00
73,827.22 $
51,679.05
$
$
18,367.34
22,148.17
PROJECT TRC TEST:
Projected Energy Savings Per Measure Category
Simple Payback (Yrs) 0.96 0.00 0.00 0.00 0.96
17,028.45 $
20,985.57 $
42,857.13
Total Cost to Customer $ 3,780.83 $ $ $ $ 3,780.83
$1.10
Projected Dollar Savings Per Measure Category
Lighting
1.08
1.06 10.16
Estimated Reduction in Total Energy Consumption 100.0%
Lighting
Gas
10/7/2013
Gas
Project Summary
Direct Install Energy Assessment Tool (ver. 8.1) ©2013 TRC Energy Services. Property of TRC. Contractor granted limited license.
New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool (ver. 8.1) Lighting Measures Default Annual Oper. Hours
Actual Annual Oper. Hrs (if different)
Fixture Controlled?
Fixture Location
1
4,242
Entrance
2
4,242
Library
3
4,242
Fire / TV Room
4
4,242
Toilet
5
4,242
Maint
13
4,242
Gym
14
4,242
3rd Floor
15
4,242
3rd Floor
Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed
N N N N N N N Y N Y N Y N N N N
Actual Ceiling # of Default Watts per Height Fix- Watts per Fixture (if tures Fixture >12 ft? different)
Lighting Measure Description
CFL: 13W LED: A-Lamp (9W) Incandescent, (1) 60W lamp LED: A-Lamp (9W) CFL: 13W LED: A-Lamp (9W) Fluorescent, (4) 48", STD lamp 4' T8 2-lamp with EB plus reflector Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Metal Halide, (1) 400W lamp 4 LAMP T5 HIGH BAY HO FIXTURE Fluorescent, (4) 48", STD lamp 4' T8 4-lamp with EB Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB TOTALS:
1 1 9 9 31 31 1 1 2 2 12 12 7 7 8 8
13 9 60 9 13 9 188 54 94 59 458 234 188 112 94 59
Total Cost
Est. Demand Annual kWh Savings Savings (kW)
N
$
50.34
0.0
19
N
$
453.02
0.4
2,200
N
$
1,560.39
0.1
594
N
$
108.01
0.1
450
N
$
137.42
0.1
235
Y
$
4,439.95
2.2
9,019
N
$
599.68
0.4
2,550
N
$
549.67
0.2
1,342
$
7,898.47
3.5
16,410
Lighting Notes:
Lighting Controls Est. # of Annual Fixtures Hours Conw/o trolled Controls
Fixture Location
Est. Annual Hrs. w/ Controls
Actual Annual Hours (if different)
Lighting Controls Measure Description
Reduced # of Total # of Annual Add'l Watts ConUnits Lighting Relays trolled Hours Needed
Total Cost
Est. Demand Annual kWh Savings Savings (kW)
4
4,242
1
Toilet
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
188
$
171.25
0.0
270
5
4,242
2
Maint
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
188
$
171.25
0.0
270
6
4,242
6
Men's Locker
2,969
Dual Tech. Occ.Sens Ceiling (low v)
1
1,273
534
$
321.98
0.1
768
7
4,242
6
Women's Locker
2,969
Dual Tech. Occ.Sens Ceiling (low v)
1
1,273
534
$
321.98
0.1
768
8
4,242
3
Men's Room
2,969
Dual Tech. Occ.Sens Ceiling (low v)
1
1,273
267
$
321.98
0.1
384
9
4,242
3
Women's Room
2,969
Dual Tech. Occ.Sens Ceiling (low v)
1
1,273
267
$
321.98
0.1
384
10
4,242
4
Kid's Room
2,969
Dual Tech. Occ.Sens Ceiling (low v)
1
1,273
236
$
321.98
0.1
339
11
4,242
4
Office
2,969
Dual Tech. Occ.Sens Ceiling (low v)
1
1,273
356
$
321.98
0.1
512
12
4,242
2
Behind Desk
2,969
Dual Tech Occ. Sensor Wall Switch
1
1,273
178
$
171.25
0.0
256
13
4,242
12
Gym
2,969
Occ.Sensor for High Bay Fixtures
12
1,273
5,496
$
2,258.67
1.3
7,903
$
4,704.29
2.0
11,855
TOTALS:
Notes:
Lighting 10/7/2013
Direct Install Energy Assessment Tool (ver. 8.1) ©2013 TRC Energy Services. Property of TRC. Contractor granted limited license.
New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool (ver. 8.1) Gas, Oil, and Propane HVAC & Hot Water Measures Climate Zone
Measure Location
Measure Description
Existing Proposed Oil-toAge of Proposed Min. Heating Heating Actual Gas # of Efficiency Existing Storage Required Capacity Capacity Efficiency Conver- Units Units Equipment Capacity (if higher) Efficiency (thousand (thousand (Yrs.) (gallons) sion? BTU/hr)
1
Newark
Boiler Room
Gas-Fired Boiler
N
2
985
Total Cost
Natural Gas Heating Oil Savings Savings (therms/yr)
(gal./yr)
Propane Savings (gal./yr)
BTU/hr)
14
500
TOTALS
93.0%
AFUE
$
56,710.48
14,880.4
-
-
$
56,710.48
14,880.4
-
-
Notes:
HVAC & HW 10/7/2013
Direct Install Energy Assessment Tool (ver. 8.1) ©2013 TRC Energy Services. Property of TRC. Contractor granted limited license.
New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool (ver. 8.1) HVAC Control Measures Measure Description
Controlled Cooling Unit Energy Opera# of Units Cooling Efficiency tionally Installed Capacity Ratio Tested? (Tons) (EER)
Measure Location
Total Cost
$
Measure Description
1
Annual HVAC Unit Fuel # of Units Capacity HVAC Fuel Usage Installed (thousand Source (therms,
Measure Location
Measure Description
Measure Location
# of Units Installed
Boiler Reset Control (Hot Water)
Basment
2
BTU/hr)
gallons or KWh /yr)
Annual HVAC Electric Usage (kWh)
Gas, Oil, Primary or LPG Fuel Usage Source for (therms or Heating gal./yr) Gas
12,000
Annual kWh Savings
$
-
-
Est. Demand Savings (kW) -
Total Cost
Annual kWh Savings
Nat. Gas Savings (therms /yr)
Total Cost
Annual kWh Savings
Nat. Gas Savings (therms /yr)
4,513.99
-
600.0
Hot Water Demand Control Measures Measure Description
Measure Description
Measure Location
Measure Location
# of Units Installed
Days per Year Facility Operates
Pipe Diameter
Pipe Length
(inches)
(feet)
TOTALS
Hot Water Current Fuel Flow Rate Source (gal./min)
Hot Water Fuel Source
Low or High Temp Piping?
$
Total Cost
Annual kWh Savings
Nat. Gas Savings (therms /yr)
Total Cost
Annual kWh Savings
Nat. Gas Savings (therms /yr)
0
600.0
4,513.99
Notes:
HVAC & HW Controls Measures 10/7/2013
Direct Install Energy Assessment Tool (ver. 8.1) ©2013 TRC Energy Services. Property of TRC. Contractor granted limited license.