Green Deal & ECO in Devon - Regensw

Report 6 Downloads 88 Views
Green Deal & ECO in Devon Ian Bateman Climate Change Officer Devon County Council 12 June 2013

Ready for Retrofit

1

Agenda • • • •

Why are we here? What are we doing about it? What is GD/ECO? What are Local Authorties doing?

12 June 2013

Ready for Retrofit

2

Q1. Why are we here? 13th May 13 - CO2 emissions exceed 400 ppm for the first time in human history!!

400 ppm 12 June 2013

Ready for Retrofit

Q1. Why are we here? 13th May 13 - CO2 emissions exceed 400 ppm for the first time in human history!!

12 June 2013

Ready for Retrofit

Ans: Global Warming & Climate Change 'Warming of the climate system is unequivocal…'

'Most of the observed increase in globally averaged temperatures since the mid-20th century is very likely due to the observed increase in anthropogenic greenhouse gas concentrations.’

12 June 2013

Ready for Retrofit

5

Q2.What are we doing about it? EU Target = 20 – 20 – 20 by 2020. 20% reduction in energy consumption 20% reduction in emissions 20% from renewables

UK Target = Based on Carbon Budgets. 3rd = 35% reduction in emissions by 2020 4th = 50% reduction in emissions by 2025 Final goal = 80% reduction by 2050 12 June 2013

Ready for Retrofit

6

Ans: The Carbon Plan 2011

12 June 2013

Ready for Retrofit

7

Ans: The Carbon Plan 2011 The “easy stuff”

Renewable Heat Green Deal & Energy Company Solid Obligation Wall Insulation

Complete domestic energy efficiency inc Smart meters .

“Prepare” for decarb of electricity

12 June 2013

Industry, aviation, shipping & agriculture

“Decarbonise”

Power generation & road transport.

.

2011

The “difficult stuff”

2020

2030 Ready for Retrofit

2050 8

Q3. What is GD/ECO? Quotes from Charles Phillips, Head of ECO @ DECC @ DECC ECO Roadshow in Bath 13th March His Vision “Green Deal/ECO is a framework...it’s up to the market to find innovative solutions.” “Low hanging fruit largely completed…it’s time to move to higher cost measures.” “The past involved a highly regulated market…now need to get consumers to spend their own money!” 12 June 2013

Ready for Retrofit

9

Ans. An opportunity? (Finance Mechanism)

Measures that fully meet the “Golden Rule” Savings > Cost

ECO Carbon

Measures that require ECO top up to meet the “Golden Rule”

Green Deal

“You Pay”

ECO ECO

Measures providing “affordable warmth” to vulnerable

Affordable (Subsidy) Warmth

12 June 2013

Ready for Retrofit

Ans. An opportunity? Energy Company Obligation – ECO Ofgem – ECO is intended to work alongside Green Deal to provide additional support in the domestic sector, with a particular focus on vulnerable customer groups and hard–to-treat homes Affordable Warmth Carbon Reduction (75%) (25%)

£1.2bn p.a. Nationally CSCO Carbon Saving Community Obligation 6.8 MtCO2 by Mar 15 £190m p.a. 15%

CERO

Carbon Emissions Reduction Obligation 20.9 MtCO2 by Mar 15 £760m p.a. 58%

HHCRO

Home Heating Cost Reduction Obligation £4.2bn savings by Mar 15 £350m p.a. 27%

£24m p.a. for Devon Green Deal “top ups” LSOAs 85%

“Affordable Warmth Group” benefits driven

Rural

15%

Up to 20% in adjoining areas

CERO and CSCO – Measure must be a “recommended measure” in a Green Deal Advice Report (GDAR) or a Chartered Surveyors Report (not district heating) •

Primary Measures Solid wall insulation & Hard-to-treat cavity wall insulation. Secondary Measures • Improve insulating properties of the premises. • Connection to district heating.

12 June 2013

Ready for Retrofit

As per CERO secondary measures

HHCRO measures do not need report recommendations Measures to reduce the overall cost of space heating. • Qualifying boiler repair or replacement.



11

Q4. What are Local Authorities doing? Quotes from Greg Barker, Minister of State for DECC @ LGA Climate Local Conference 11th March His Vision “It’s no longer about finding benefit claimants but a street-by-street, community-by-community roll out using ECO top up where required. “to retrofit 14 million properties by 2020 and a further 12 million by 2030.”

“value of the energy efficiency retrofit is £18bn p.a.” “Local authorities are an essential partner.” 12 June 2013

Ready for Retrofit

12

Ans. Procuring an ECO Funding Partner Ended with the completion of CERT and CESP in Dec 12

Partnership to continue with GD/ECO

12 June 2013

Ready for Retrofit

13

Ans. Procuring an ECO Funding Partner Objectives • Reduce carbon emissions. • Address fuel poverty & health issues. • Promote local job creation. The Task

£150k

12 June 2013

148,000 11,000 52,000 340,000 96,000 Ready for Retrofit

un-insulated cavities. un-insulated lofts. HHCRO eligible homes. C or below rated boilers. solid walled properties. 14