Centerra Gold Inc. - Oksut Gold Project Drill Results Period October 1st, 2014 to December 31st, 2014 Page 1 of 1
Drill Hole
Target
Section Line
ODD244
Keltepe Exploration
50_KT
From (m)
ODD246
ODD247
ODD248
ODD249
ODD250
ODD251
ODD252
330_GT
Guneytepe Infill
Keltepe NW Exploration
Keltepe Exploration
ODD254
42.7
35.7
1.46
oxide/partially oxidized
14.0
37.7
23.7
1.86
oxide/partially oxidized
42.7
54.8
12.1
0.89
sulphide
54.8
87.7
32.9
1.13
oxide
72.7
17.9
1.05
oxide
and
79.0
87.7
8.7
1.87
oxide
87.7
95.5
7.8
2.57
partially oxidized
95.5
121.5
26.0
0.56
oxide/sulphide
127.0
154.0 (EOH)
27.0
0.31
sulphide
57.0
62.0
5.0
0.33
oxide
68.0
87.7
19.7
0.30
oxide
100_KTNW
150_KT
0.0
10.0
10.0
0.31
oxide
16.0
22.0
6.0
0.22
oxide
50.7
67.0
16.3
0.55
oxide
73.0
89.8
16.8
0.25
oxide
89.8
97.3
7.5
0.38
sulphide
109.3
161.1
51.8
0.27
sulphide
101.0
134.8
33.8
1.06
oxide
108.0
129.1
21.1
1.47
oxide
0.0
7.4
7.4
0.48
oxide
28.0
106.1
78.1
0.53
oxide/sulphide
8.0
36.0
28.0
0.40
oxide
152.5
170.0
17.5
0.31
oxide
170.0
195.5
25.5
0.21
sulphide
337.0
343.5
6.5
0.48
oxide/partially oxidized
270_GT
Keltepe NW Exploration
Keltepe Exploration
Keltepe Exploration
0_KTNW
500_KT
600_KT
Includes
172.0
261.0
89.0
0.45
oxide
236.6
245.6
9.0
1.71
oxide
311.0
345.0
34.0
0.25
oxide
353.0
359.0
6.0
0.29
oxide
42.6
233.0
190.4
0.51
oxide
Includes
ODD253
7.0
54.8
Includes Guneytepe Infill
Keltepe Exploration
Guneytepe Infill
650_KT
330_GT
ODD255
Keltepe Exploration
150_KT
ODD256
Keltepe Infill
300_KT
Oxidation
includes
300_GT
Guneytepe Infill
Au (g/t)
No Signficant Intercepts
includes
ODD245
Core Length (m)
To (m)
54.2
71.8
17.6
1.08
oxide
253.0
267.0
14.0
0.29
oxide
277.0
291.1
14.1
0.30
oxide
355.2
362.0
6.8
0.30
oxide
419.0
424.0
5.0
0.30
sulphide
0.0
57.0
57.0
1.09
oxide/partially oxidized
20.0
37.6
17.6
2.00
oxide
Includes
Includes
57.0
133.0
76.0
0.31
sulphide
133.8
160.5
26.7
1.07
oxide
133.8
146.8
13.0
1.63
oxide
99.0
110.0
11.0
1.10
oxide
Notes: Mineralized intervals are greater than 0.20 g/t Au. Higher grade sub-intervals are greater than 1.00 g/t Au. Minimum 5m width and maximum of 5m internal dilution. True widths for mineralized zones are about 60% to 90% of stated down hole interval. Oxidation assignment is a visual discrimination from core logging. This information should be read together with our news release of February 9th, 2015. Malcolm Stallman, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101. Tables are current as of December 31st, 2014.
Centerra Gold Inc. - Oksut Gold Project, Turkey Diamond Drill Hole Locations Period October 1st, 2014 to December 31st, 2014 Page 1 of 1
Drill Hole
Target
Section Line
Location Easting *
Location Northing *
Elevation (m)
Length (m)
Collar Azimuth **
Collar Dip
ODD0244
Keltepe Exploration
50_KT
719,840
4,240,120
1,855.00
371.00
77
-50
ODD0245
Guneytepe Infill
330_GT
719,301
4,239,767
1,664.00
154.00
60
-45
ODD0246
Keltepe NW Exploration
100_KTNW
718,639
4,240,952
1,654.00
238.40
77
-75
ODD0247
Guneytepe Infill
300_GT
719,320
4,239,730
1,674.00
165.00
60
-45
ODD0248
Keltepe Exploration
150_KT
719,772
4,240,219
1,851.00
220.80
77
-50
ODD0249
Guneytepe Infill
270_GT
719,371
4,239,743
1,685.00
150.10
60
-45
ODD0250
Keltepe NW Exploration
0_KTNW
718,909
4,240,914
1,713.00
199.60
257
-45
ODD0251
Keltepe Exploration
500_KT
719,113
4,240,387
1,796.00
416.70
0
-90
ODD0252
Keltepe Exploration
600_KT
719,156
4,240,518
1,769.00
454.10
0
-90
ODD0253
Keltepe Exploration
650_KT
719,302
4,240,594
1,811.00
513.00
0
-90
ODD0254
Guneytepe Infil
330_GT
719,408
4,239,814
1,706.00
146.70
0
-90
ODD0255
Keltepe Exploration
150_KT
719,808
4,240,232
1,858.00
167.70
77
-45
ODD0256
Keltepe Infill
300_KT
719,692
4,240,339
1,864.00
187.70
0
-90
Notes: Section line is location of the hole collar. This information should be read together with our news release of February 9th, 2015. Malcolm Stallman, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101. Table is current as of December 31st, 2014.
* Datum is UTM ED50 Zone 36 ** Azimuths are relative to grid
Öksüt Project – Q4 2014
Öksüt Geology Map and Drillhole Locations Keltepe NW Zone Boztepe Zone Oksut Project
Keltepe Zone
Oksut Operational License Boundary
Büyüktepe Zone Keltepe NW
Güneytepe Zone
Keltepe
Boztepe Büyüktepe
Güneytepe Yelibelentepe
This information should be read together with our news release of February 9th, 2015. Malcolm Stallman, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
Yelibelentepe Zone 1
Öksüt Project – Q4 2014
Keltepe Prospect Drill Hole Locations and Geology
ODD253
ODD252
ODD251 ODD256
ODD255 ODD248 ODD244
This information should be read together with our news release of February 9th, 2015. Malcolm Stallman, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
2
Öksüt Project – Q4 2014
Keltepe - Section 50_KT SW
NE
ODD244 ODD215 ODD219 ODD225
reference line
ODD236
This information should be read together with our news release of February 9th, 2015. Malcolm Stallman, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
3
Öksüt Project – Q4 2014
Keltepe - Section 150_KT SW
NE
ODD214
ODD255 1.07 / 26.7m Incl. 1.63 / 13.0m
reference line
ODD248 1.06 / 33.8m Incl. 1.47 / 21.1m
This information should be read together with our news release of February 9th, 2015. Malcolm Stallman, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
4
Öksüt Project – Q4 2014
Keltepe - Section 300_KT SW
NE
ODD125 ODD054
ODD256 1.10 / 11.0m
reference line
ODD047
This information should be read together with our news release of February 9th, 2015. Malcolm Stallman, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
5
Öksüt Project – Q4 2014
Keltepe - Section 500_KT SW
NE
ODD023
ODD251
ODD100
ODD208
ODD028A ODD028 ODD045
reference line
ODD251 0.48 / 6.5m
This information should be read together with our news release of February 9th, 2015. Malcolm Stallman, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
6
Öksüt Project – Q4 2014
Keltepe - Section 600_KT SW
NE
ODD252
ODD136 ODD104 ODD082 ODD140
ODD089
ODD129 ODD079 ODD085
ODD252 0.45 / 89.0m Incl. 1.71 / 9.0m
ODD252 0.25 / 34.0m
reference line
ODD252 0.29 / 6.0m
This information should be read together with our news release of February 9th, 2015. Malcolm Stallman, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
7
Öksüt Project – Q4 2014
Keltepe - Section 650_KT SW
NE
ODD074 ODD141 ODD163
ODD198
ODD253 0.51 / 190.4m Incl. 1.08 / 17.6m
ODD051
ODD253 0.29 / 14.0m ODD253 0.30 / 14.1m
ODD253 0.30 / 5.0m
This information should be read together with our news release of February 9th, 2015. Malcolm Stallman, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
reference line
ODD253 0.30 / 6.8m
8
Öksüt Project – Q4 2014
Güneytepe Prospect Drill Hole Locations and Geology
ODD254 ODD245 ODD247
This information should be read together with our news release of February 9th, 2015. Malcolm Stallman, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
9
Öksüt Project – Q4 2014
Güneytepe - Section 270_GT SW
NE ODD021 ODD011
ODD249 0.48 / 7.4m
ODD249
ODD161
ODD099
ODD014 ODD193
ODD241 ODD031
ODD249 0.53 / 78.1m
ODD224 ODD108 ODD032
reference line
ODD044
This information should be read together with our news release of February 9th, 2015. Malcolm Stallman, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
10
Öksüt Project – Q4 2014
Güneytepe - Section 300_GT SW
NE
ODD247 0.31 / 10.0m ODD168 ODD006
ODD247 0.55 / 16.3m
ODD247 ODD033
ODD171
ODD247 0.25 / 16.8m ODD224
ODD247 0.22 / 6.0m
ODD247 0.38 / 7.5m
ODD031 ODD241
reference line
ODD247 0.27 / 51.8m
This information should be read together with our news release of February 9th, 2015. Malcolm Stallman, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
11
Öksüt Project – Q4 2014
Güneytepe - Section 330_GT SW
NE
ODD117 ODD112 ODD009
ODD254
ODD254 1.09 / 57.0m Incl. 2.00 / 17.6m
ODD245
ODD254 0.31 / 76.0m
ODD022
ODD245 2.57 / 7.8m ODD224
ODD031
ODD245 1.46 / 35.7m Incl. 1.86 / 23.7m
ODD245 0.89 / 12.1m
ODD245 0.56 / 26.0m ODD245 0.31 / 27.0m
reference line
ODD245 1.13 / 32.9m Incl. 1.05 / 17.9m and 1.87 / 8.7m
This information should be read together with our news release of February 9th, 2015. Malcolm Stallman, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
12
Öksüt Project – Q4 2014
Keltepe NW Prospect Drill Hole Locations and Geology
This information should be read together with our news release of February 9th, 2015. Malcolm Stallman, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
13
Öksüt Project – Q4 2014
Keltepe NW - Section 0_KTNW SW
NE
ODD229
ODD250 ODD218
ODD231 ODD240
ODD250 0.40 / 28.0m
ODD250 0.31 / 17.5m
reference line
ODD250 0.21 / 25.5m
This information should be read together with our news release of February 9th, 2015. Malcolm Stallman, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
14
Öksüt Project – Q4 2014
Keltepe NW - Section 100_KTNW SW
NE
ODD203
ODD227 ODD043 ODD246 ODD071
ODD246 0.33 / 5.0m
reference line
ODD246 0.30 / 19.7m
This information should be read together with our news release of February 9th, 2015. Malcolm Stallman, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
15