Assembly Instructions
Email :
[email protected] Web : www.shelters4less.co.uk Tel : 0800 160 1002
Shelter type: SR1557 SR1557-01-010216-UK
BALLOON VIEW
13 11
6
14 12 4 5
15
2
8
6 10
Tools required:
Tools included:
Drill/Screwdriver
Wrench
Mallet
Torx bit
Hack saw
2
PARTS LIST ITEM NO.
PART NO.
DESCRIPTION
DIMENSION (INCH)
1
S1
Frame
2000 x 1035
11
2
CB1
Bracket
110 x 110 x 40
8
3
JF1
Bracket
220 x 40
16
4
P1
Post
2000
1
5
ST3
Roof Tie
2060
1
6
RB2
Bracket
110 x 46
20
7
R2
Rafter
2199
6
8
SS
Sealing Strip
Trim to 2220
20
9
PCE2
Roof Panel
2220 x 1050
2
10
RC1
Roof Strip
2220
6
11
PCC2
Roof Panel
2220 x 1030
3
12
2MD
Roof End Capping
1738.3
6
13
EC40
Plastic End Capping
40 x 40
12
14
FT1
Foot Bracket
109 x 100 x 3
13
Fittings Bolt set M10 M10 x 60 Pack A+B Required Spare
Nut
T25
40
80
1
1
2
39
T50
25mm 50mm Washer Black Cap Tech Tech
40 39
PICTURE
78
Image
3
80 78 2
screw
136 64
72
QTY.
AB1210
M10 x 100 Concrete Bolt screw
66
13
26
6
40
7
Step 1 Assemble all S1 Frames to make up the main structure using JF1 bracket for straight joints and CB1 brackets for the corners.
GENERAL NOTE: THE 50mm TECH SCREWS ARE FOR FIXING ROOF STRIPS (RC) ONLY
10
21
CB1 JF1
52
15
S1
Measure the length and width of the shelter to ensure correct alignment S1
CB1
JF1
CB1
JF1 S1
CB1 JF1
Ensure correct alignment on all four corners 4
Step 2 Attach P1 Post using one JF1 bracket then attach ST3 Tie bar using
two CB1 brackets and one JF1 bracket. Move shelter in to its final position and ensure the structure is square. Then attach FT1 brackets to secure the shelter to the ground.
JF1 JF1
CB1
P1
ST3
JF1 JF1 CB1 CB1 ST3
P1 5
Step 3 Attach R2 Rafters using RB2 brackets. Use four RB2 brackets to secure each Rafter and two for the end Rafters.
R2 (end Rafter) RB2
R2 (end Rafter)
R2
X
View from top 1035
X
1035
1035
1035
RB2
RB2
RB2 brackets to be fixed into pre drilled holes
RB2
SECTION X-X (View from inside the shelter) SCALE 1 : 35 6
1035
Step 4 Attach PCC2 roof panels and PCE2 roof panels using the sealing strips
on top of the rafters and on top of the roof panels. Screw down the RC1 strips to cap it and seal off the end of the panels with the 2MD end caps. Then fit the Black plastic caps on exposed nuts and bolts. Fit the square end caps to any open ends of box sections. RC1
RC1 PCE2
PCE2
sealing strip 2MD
PCC2
2MD
RC1 PCE2
Apply sealing strips to top of rafters and to the top of the plastic roof panels
GENERAL NOTE: THE 2" TECH SCREWS ARE FOR FIXING ROOF STRIPS (RC) ONLY
2MD
7
PLAN VIEW
OVERALL DIMENSIONS AND GROUND FIXING POSITIONS Suggested size for concrete base: 200mm oversized on all 4 sides. 2209 2070
67
935
1035
1035
1035
5215
1035
1035
1035
2167
1046
1035
1035 1970 8
NOTES:
9
NOTES:
10
NOTES:
11
THANK YOU FOR PURCHASING THIS PRODUCT MAINTENANCE: To ensure your products give you many years of use we recommend that you: • • •
Clean panels regularly with soapy water Ensure all fittings are tight (for example after a big storm) Touch up any exposed metal should it get scratched
CONTACT DETAILS: Email :
[email protected] Web : www.shelters4less.co.uk Tel : 0800 160 1002 Shelters4Less, Unit 3, 2 Landsdowne Crescent, Bournemouth, BH1 1SA
All Parts and Fixings checked by: Print Name:
Signature:
12