Assembly Instructions
Shelter type: SR1606 Email :
[email protected] Web : www.shelters4less.co.uk Tel : 0800 160 1002
SR1606-01-270116-UK
EXPLODED VIEW 15
7
15
16 15
16 15
16
15 8 3
9 12 1
14
4 11
2 16
18
10
6
1
13
18 18
5
18 18
Fittings Bolt set M10 M10 x 60 mm
Pack A+B Required Spare
Nut
40
40
0
0
40
40
T25
T50
AB1210
136
66
13
60
11
5
25mm 50mm M10 x 100mm Washer Black Cap Tech Tech screw screw Concrete Bolt
80 80
0
Image
2
80 80 0
76
55
8
PARTS LIST ITEM NO.
DESCRIPTION
DIMENSION
PART NO.
1
FRAME
2000 x 1035
S1
6
2
BRACKET
110 x 110 x 40
CB1
6
3
BRACKET
220 x 40
JF1
8
4
BRACKET
110 x 46
RB2
10
5
POST
2000
P4
1
6
ROOF TIE
2080x40x40
ST4
2
7
NBBS S1
145 x 40 x 40
S1 STUB
2
8
BRACKET
130 x 30 x 3
JF2
4
9
ROOF RAFTER
2159 x 40 x 40
R5
1
10
ROOF RAFTER
2159 x 40 x 40
R4
4
11
BRACKET
95 x 45 x3
L1
8
12
SEALING STRIP
Trim to 2220
SS
8
13
ROOF PANEL
2220 x 1050
PCE2
2
14
ROOF PANEL
2220 x 1030
PCC2
2
15
ROOF STRIP
2180
RC2
5
16
ROOF END CAPPING
2000
2MD
4
17
ROOF END CAPPING
180
2MD
2
18
FOOT BRACKET
109 x 100 x 3
FT1
8
19
BRACKET
210 x 30 x 5
JF3
1
20
PLASTICS END CAP
40 X 40
EC40
7
3
IMAGE
QTY.
Step 1 Assemble S1 frames to make up the main structure using CB1 brackets for the corners and JF1 brackets for the straight joints. 35
10
Please note 50mm Tec Screws are for roof panels only
S1 CB1
JF1
S1
41
80
CB1
S1 JF1
S1
JF1
CB1
CHECK DIMENSIONS TO ENSURE CORRECT ALIGNMENT
S1
S1
CB1
S1
JF1
JF1 S1
S1
S1
JF1
JF1
S1
JF1
CB1 S1
4
Step 2 Attach the R5 and R4 rafters to the outside edges of the shelter using RB2 brackets on the rear and S1 stubs at the front.
R5 RB2
R4
RB2
JF2
JF1
CB1 S1 Stub
S1 STUB DETAIL
5
Step 3 Assemble the T-section by joining the two ST4 tie bars using a JF3 bracket then join the P4 post using two RB2 brackets and attach a L1 bracket to each end.
L1 ST4
RB2 ST4
JF3 L1
P4
6
Step 4
Attach the T-section to the shelter, then fix the R4 rafters in place using RB2 brackets on the rear and L1 brackets on the front. Bolt the FT1 brackets to the shelter and move it to its final position before using anchor bolts to secure it to the ground.
R4
RB2
R4
RB2
R4
RB2 L1 L1 L1 FT1
FT1
FT1
FT1
FT1 FT1
7
Step 5 Stick the sealing strips (SS) to the rafters and line up the PCE2 panels with
the outside of the shelter then equally space the PCC2 panels in the gap.
PCE2 PCC2 PCC2 PCE2
SS
SS SS SS
8
Step 6 Screw down the RC2 strips to secure the roof panels an d push the 2MD end caps on the bottom of the panels.
RC2 RC2 2MD
RC2 RC2 2MD
2MD
2MD
9
RC2
Step 7
Attach the FT1 brackets to the shelter and move it to its final position before using anchor bolts to secure it to the ground.
FT1 FT1
FT1 FT1 FT1 FT1
FT1 FT1
10
PLAN VIEW
OVERALL DIMENSIONS AND GROUND FIXING POSITIONS Suggested size for concrete base: 200mm oversized on all four sides. 2209 108
938 11
63
1035
1035
4180
1035
2036
935
989
THANK YOU FOR PURCHASING THIS PRODUCT
MAINTENANCE: To ensure your products give you many years of use we recommend that you: • • •
Clean panels regularly with soapy water Ensure all fittings are tight (for example after a big storm) Touch up any exposed metal should it get scratched
CONTACT DETAILS: Email :
[email protected] Web : www.shelters4less.co.uk Tel : 0800 160 1002 Shelters4Less, Unit 3, 2 Lansdowne Crescent, Bournemouth, BH1 1SA
All Parts and Fixings checked by: Print Name:
Signature:
12