Township of Holland Project Summary - 3 Buildings The total cost of the proposed project is: The NJ Clean Energy Incentive covers: The total cost to you is:

$ $ $

90,139.07 63,097.35 27,041.72

The estimated annual energy savings associated with this project is: Therefore, the estimated payback period for these measures is:

$

25,935.63 1 years

Project Submission Requirements: Scope Of Work Attachment - signed - 1 per facility 2013 Direct Install Program Application and Participation Agreement - signed - 1 per facililty Gas Bill - Winter 2012/2013 Gas Bill - all pages attached Electric Bills - 12 Months - all pages attached

70% 30%

Project: Township of Holland - DPW and Library The total cost of the proposed project is: The NJ Clean Energy Incentive covers: The total cost to you is: The estimated annual energy savings associated with this project is: Therefore, the estimated payback period for these measures is:

$11,873.95 $8,311.76 $3,562.18

70% 30%

$4,081.07 0.9 years

Project: Township of Holland - Municipal Building The total cost of the proposed project is: The NJ Clean Energy Incentive covers: The total cost to you is: The estimated annual energy savings associated with this project is: Therefore, the estimated payback period for these measures is:

$4,437.90 $3,106.53 $1,331.37

70% 30%

$868.99 1.5 years

Project: Township of Holland - Community Center The total cost of the proposed project is: The NJ Clean Energy Incentive covers: The total cost to you is:

$73,827.22 $51,679.05 $22,148.17

The estimated annual energy savings associated with this project is: Therefore, the estimated payback period for these measures is:

$20,985.57 1.1 years

70% 30%

Savings values are estimates. Actual savings will vary. Incentives and participation subject to program rules and Participation Agreement.

New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool (ver. 8.1)

TRC Energy Services

General Project Information Participating Customer: Contractor / Project #: Facility Name: Street Address:

Township of Holland RJ Donnelly DPW and Library 129 Spring Mills Road

City / Zip Code: Milford Will the project receive EECBG funding?:

Facility Type: Office-Small Total Facility Square Footage: Avg Weekly Hrs of Operation: # of Full-Time Employees:

DN2845

08848 Y

Year Constructed: Tax Exempt?:

ELECTRIC UTILITY INFORMATION

Y

GAS UTILITY INFORMATION

Electric Provider: <Select Electric Provider> Service Class: Account #: Billing Period Start Date: Billing Period End Date: Billing Period kWh Consumption: 1 Billing Period Total Cost: $0.14 Total Taxes + Fees on Bill:

Gas Provider: <Select Gas Provider> Service Class: Account #: Billing Period Start Date: Billing Period End Date: Billing Period Therm Consumption: Billing Period Total Cost: Total Taxes + Fees on Bill:

Project Summary Electric - Average Cost ($/kWh):

Lighting Measures Total: Motors & VFD Measures Total: HVAC Electric Measures Total: Refrigeration Measures Total: TOTAL ELECTRIC MEASURES: TOTAL GAS MEASURES:

Gas - Average Cost ($/Therm):

$0.140 kWh Saved per Year 28,500 650 29,150 Therms /yr. Gallons/yr.

$ $ $ $ $

Estimated Incentive Amount $ 7,919.10 $ $ 392.67 $ $ 8,311.76

Total Cost to Customer $ 3,393.90 $ $ 168.29 $ $ 3,562.18

Simple Payback (Yrs) 0.85 0.00 1.85 0.00 0.87

$

-

$

-

$

-

$

-

0.00

TOTAL OIL MEASURES: $ Oil Gallons/yr. Gas Therms/yr. CONVERSION MEASURES: $ Gallons/yr. (OIL TO GAS)

-

$

-

$

-

$

-

0.00

-

$

-

$

-

$

-

0.00

-

$

-

$

-

$

-

0.00

TOTAL PROPANE MEASURES:

-

$

COMBINED PROJECT TOTALS: $

Projected Energy Savings Per Measure Category HVAC

Lighting

10/7/2013

Annual Total Measure Savings Cost 3,990.07 $ 11,313.00 $ 91.00 $ 560.95 $ 4,081.07 $ 11,873.95

$0.00

4,081.07 $

11,873.95 $

Projected Dollar Savings Per Measure Category HVAC

8,311.76 $

3,562.18

0.87

PROJECT TRC TEST:

4.24

Estimated Reduction in Total Energy Consumption 100.0%

Lighting

Project Summary

Direct Install Energy Assessment Tool (ver. 8.1) ©2013 TRC Energy Services. Property of TRC. Contractor granted limited license.

New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool (ver. 8.1) Lighting Measures Default Annual Oper. Hours

Actual Annual Oper. Hrs (if different)

Fixture Controlled?

Fixture Location

1

2,808

Library

2

2,808

Library

3

2,808

Library

4

2,808

Closet

5

2,808

Bathroom

6

2,808

Closet

7

2,808

Garage

8

2,808

Closet

9

2,808

2nd Garage

10

2,808

Bathroom

12

2,808

Office

13

2,808

Copy

14

2,808

2nd Garage

15

2,808

3rd Garage

Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed

N N N N N N N Y N Y N Y N N N Y N N N N N Y N N N N N N

Actual Ceiling # of Default Watts per Height Fix- Watts per Fixture (if tures Fixture >12 ft? different)

Lighting Measure Description

Fluorescent, (4) 48", STD lamp 4' T8 2-lamp with EB plus reflector Fluorescent, (2) U-Tube, STD lamp 2' T8 U-Lamp with EB Incandescent, (1) 120W lamp LED: PAR38 (19W) Fluorescent, (4) 48", STD lamp 4' T8 2-lamp with EB plus reflector Incandescent, (1) 60W lamp LED: A-Lamp (9W) Incandescent, (1) 60W lamp LED: A-Lamp (9W) Fluorescent, (2) 96", STD lamp 8' T8 2-lamp with EB Fluorescent, (2) 96", STD lamp 8' T8 2-lamp with EB Fluorescent, (2) 96", STD lamp 8' T8 2-lamp with EB Incandescent, (1) 60W lamp LED: A-Lamp (9W) Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Incandescent, (1) 60W lamp LED: A-Lamp (9W) Fluorescent, (2) 96", STD lamp 8' T8 2-lamp with EB TOTALS:

35 35 4 4 3 3 2 2 3 3 1 1 9 9 1 1 10 10 2 2 1 1 1 1 3 3 19 19

188 54 96 31 120 19 188 54 60 9 60 9 173 109 173 109 173 109 60 9 94 59 94 59 60 9 173 109

Total Cost

Est. Demand Annual kWh Savings Savings (kW)

N

$

3,780.26

3.7

15,408

N

$

314.34

0.2

854

N

$

237.02

0.2

995

N

$

216.02

0.2

616

N

$

151.01

0.1

352

N

$

50.34

0.0

117

Y

$

1,230.06

0.5

1,892

N

$

110.41

0.1

147

Y

$

1,366.73

0.5

2,103

N

$

100.67

0.1

335

N

$

68.71

0.0

80

N

$

68.71

0.0

115

N

$

151.01

0.1

503

N

$

2,097.75

1.0

3,995

$

9,943.02

6.8

27,514

Lighting Notes:

Lighting Controls Est. # of Annual Fixtures Hours Conw/o trolled Controls

Fixture Location

Est. Annual Hrs. w/ Controls

Actual Annual Hours (if different)

Lighting Controls Measure Description

Reduced # of Total # of Annual Add'l Watts ConUnits Lighting Relays trolled Hours Needed

Total Cost

Est. Demand Annual kWh Savings Savings (kW)

4

2,808

2

Closet

1,966

Dual Tech Occ. Sensor Wall Switch

1

842

376

$

171.25

0.1

371

5

2,808

3

Bathroom

1,966

Dual Tech Occ. Sensor Wall Switch

3

842

180

$

513.74

0.0

177

6

2,808

1

Closet

1,966

Dual Tech Occ. Sensor Wall Switch

1

842

60

$

171.25

0.0

59

8

2,808

1

Closet

1,966

Dual Tech Occ. Sensor Wall Switch

1

842

173

$

171.25

0.0

171

11

2,808

2

Conference Room

1,966

Dual Tech Occ. Sensor Wall Switch

1

842

118

$

171.25

0.0

116

12

2,808

1

Office

1,966

Dual Tech Occ. Sensor Wall Switch

1

842

94

$

171.25

0.0

93

$

1,369.97

0.2

987

TOTALS:

Notes:

Lighting 10/7/2013

Direct Install Energy Assessment Tool (ver. 8.1) ©2013 TRC Energy Services. Property of TRC. Contractor granted limited license.

New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool (ver. 8.1) HVAC Control Measures Measure Description

Controlled Cooling Unit Energy Opera# of Units Cooling Efficiency tionally Installed Capacity Ratio Tested? (Tons) (EER)

Measure Location

Total Cost

$

Measure Description

Annual HVAC Unit Fuel # of Units Capacity HVAC Fuel Usage Installed (thousand Source (therms,

Measure Location

BTU/hr)

1

Electronic Fuel-Use Economizers (for AC)

Measure Description

Outside

Measure Location

Annual kWh Savings

-

gallons or KWh /yr)

Electric

5,000

$

-

Annual kWh Savings

Total Cost

560.95

Est. Demand Savings (kW) -

Nat. Gas Savings (therms /yr)

650

1

61

# of Units Installed

Annual HVAC Electric Usage (kWh)

Gas, Oil, Primary or LPG Fuel Usage Source for (therms or Heating gal./yr)

Total Cost

Annual kWh Savings

Nat. Gas Savings (therms /yr)

# of Units Installed

Days per Year Facility Operates

Hot Water Current Fuel Flow Rate Source (gal./min)

Total Cost

Annual kWh Savings

Nat. Gas Savings (therms /yr)

Pipe Diameter

Pipe Length

Total Cost

(inches)

(feet)

Annual kWh Savings

Nat. Gas Savings (therms /yr)

650

0.0

Hot Water Demand Control Measures Measure Description

Measure Description

Measure Location

Measure Location

TOTALS

Hot Water Fuel Source

Low or High Temp Piping?

$

560.95

Notes:

HVAC & HW Controls Measures 10/7/2013

Direct Install Energy Assessment Tool (ver. 8.1) ©2013 TRC Energy Services. Property of TRC. Contractor granted limited license.

Savings values are estimates. Actual savings will vary. Incentives and participation subject to program rules and Participation Agreement.

New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool (ver. 8.1)

TRC Energy Services

General Project Information Participating Customer: Contractor / Project #: Facility Name: Street Address:

Township of Holland RJ Donnelly Municipal Building 61 Church Rd

Facility Type: Other Total Facility Square Footage: Avg Weekly Hrs of Operation: # of Full-Time Employees:

DN2844

City / Zip Code: Milford Will the project receive EECBG funding?:

08848 Y

Year Constructed: Tax Exempt?:

ELECTRIC UTILITY INFORMATION

Y

GAS UTILITY INFORMATION

Electric Provider: <Select Electric Provider> Service Class: Account #: Billing Period Start Date: Billing Period End Date: Billing Period kWh Consumption: 1 Billing Period Total Cost: $0.14 Total Taxes + Fees on Bill:

Gas Provider: <Select Gas Provider> Service Class: Account #: Billing Period Start Date: Billing Period End Date: Billing Period Therm Consumption: 1 Billing Period Total Cost: $1.05 Total Taxes + Fees on Bill:

Project Summary Electric - Average Cost ($/kWh):

Lighting Measures Total: Motors & VFD Measures Total: HVAC Electric Measures Total: Refrigeration Measures Total: TOTAL ELECTRIC MEASURES: TOTAL GAS MEASURES:

Gas - Average Cost ($/Therm):

$0.140 kWh Saved per Year 6,207 6,207 Therms /yr. Gallons/yr.

$ $ $ $ $

Annual Total Measure Savings Cost 868.99 $ 4,437.90 $ $ $ 868.99 $ 4,437.90

Estimated Incentive Amount $ 3,106.53 $ $ $ $ 3,106.53

Total Cost to Customer $ 1,331.37 $ $ $ $ 1,331.37

$1.05 Simple Payback (Yrs) 1.53 0.00 0.00 0.00 1.53

$

-

$

-

$

-

$

-

0.00

TOTAL OIL MEASURES: $ Oil Gallons/yr. Gas Therms/yr. CONVERSION MEASURES: $ Gallons/yr. (OIL TO GAS)

-

$

-

$

-

$

-

0.00

-

$

-

$

-

$

-

0.00

-

$

-

$

-

$

-

0.00

TOTAL PROPANE MEASURES:

-

$

COMBINED PROJECT TOTALS: $

Projected Energy Savings Per Measure Category

868.99 $

4,437.90 $

Projected Dollar Savings Per Measure Category

3,106.53 $

1,331.37

1.53

PROJECT TRC TEST:

2.22

Estimated Reduction in Total Energy Consumption 100.0%

Lighting

10/7/2013

Lighting

Project Summary

Direct Install Energy Assessment Tool (ver. 8.1) ©2013 TRC Energy Services. Property of TRC. Contractor granted limited license.

New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool (ver. 8.1) Lighting Measures Default Annual Oper. Hours

Actual Annual Oper. Hrs (if different)

Fixture Location

2

4,242

Office

4

4,242

Entrance

6

4,242

Women's Rom

7

4,242

Men's Room

8

4,242

Men's Room

22

4,242

Bathroom

23

4,242

Bathroom

Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed

Fixture Controlled?

Lighting Measure Description

N N N N N Y N Y N Y N N N N

Incandescent, (1) 60W lamp LED: A-Lamp (9W) Incandescent, (1) 65W lamp LED: BR30 (11W) Incandescent, (1) 60W lamp LED: A-Lamp (9W) Incandescent, (1) 60W lamp LED: A-Lamp (9W) Incandescent, (1) 60W lamp LED: A-Lamp (9W) Incandescent, (1) 60W lamp LED: A-Lamp (9W) CFL: 13W LED: A-Lamp (9W)

Actual Ceiling # of Default Watts per Height Fix- Watts per Fixture (if tures Fixture >12 ft? different) 4 4 2 2 1 1 2 2 2 2 2 2 4 4

60 9 65 11 60 9 60 9 60 9 60 9 13 9

Total Cost

Est. Demand Annual kWh Savings Savings (kW)

N

$

201.34

0.2

978

N

$

127.72

0.1

518

N

$

50.34

0.0

171

N

$

100.67

0.1

342

N

$

100.67

0.1

342

N

$

100.67

0.1

489

N

$

201.34

0.0

77

$

882.75

0.6

2,917

TOTALS:

Lighting Notes:

Downstairs

Lighting Controls Est. # of Annual Fixtures Hours Conw/o trolled Controls 3

4,242

4

5

4,242

6

4,242

7

Fixture Location

Est. Annual Hrs. w/ Controls

Actual Annual Hours (if different)

Lighting Controls Measure Description

Reduced # of Total # of Annual Add'l Watts ConUnits Lighting Relays trolled Hours Needed

Total Cost

Est. Demand Annual kWh Savings Savings (kW)

Copy

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

236

$

171.25

0.1

339

1

Tax Assesor

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

89

$

171.25

0.0

128

1

Women's Rom

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

60

$

171.25

0.0

86

4,242

2

Men's Room

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

120

$

171.25

0.0

173

8

4,242

2

Men's Room

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

120

$

171.25

0.0

173

9

4,242

1

Women's Room

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

59

$

171.25

0.0

85

10

4,242

2

Finance

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

224

$

171.25

0.1

322

11

4,242

2

Planning

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

224

$

171.25

0.1

322

12

4,242

2

Zoning

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

224

$

171.25

0.1

322

13

4,242

2

Tax

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

118

$

171.25

0.0

170

14

4,242

1

Entrance

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

59

$

171.25

0.0

85

15

4,242

2

Office

2,969

Dual Tech. Occ.Sens Ceiling (low v)

1

1,273

118

$

321.98

0.0

170

16

4,242

2

Office

2,969

Dual Tech. Occ.Sens Ceiling (low v)

1

1,273

118

$

321.98

0.0

170

17

4,242

1

Server

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

59

$

171.25

0.0

85

18

4,242

1

Room

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

59

$

171.25

0.0

85

19

4,242

2

Office

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

224

$

171.25

0.1

322

20

4,242

1

Office

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

59

$

171.25

0.0

85

21

4,242

1

Kitchen

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

59

$

171.25

0.0

85

24

4,242

1

Closet

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

59

$

171.25

0.0

85

$

3,555.15

0.6

3,290

TOTALS:

Notes:

Lighting 10/7/2013

Direct Install Energy Assessment Tool (ver. 8.1) ©2013 TRC Energy Services. Property of TRC. Contractor granted limited license.

Savings values are estimates. Actual savings will vary. Incentives and participation subject to program rules and Participation Agreement.

New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool (ver. 8.1)

TRC Energy Services

General Project Information Participating Customer: Contractor / Project #: Facility Name: Street Address:

Township of Holland RJ Donnelly DN2888 Community Center 910 Milford-Warren Glen Rd

City / Zip Code: Milfrord Will the project receive EECBG funding?:

Facility Type: Other Total Facility Square Footage: Avg Weekly Hrs of Operation: # of Full-Time Employees:

08848 Y

Year Constructed: Tax Exempt?:

ELECTRIC UTILITY INFORMATION

Y

GAS UTILITY INFORMATION

Electric Provider: <Select Electric Provider> Service Class: Account #: Billing Period Start Date: Billing Period End Date: Billing Period kWh Consumption: 1 Billing Period Total Cost: $0.14 Total Taxes + Fees on Bill:

Gas Provider: <Select Gas Provider> Service Class: Account #: Billing Period Start Date: Billing Period End Date: Billing Period Therm Consumption: 1 Billing Period Total Cost: $1.10 Total Taxes + Fees on Bill:

Project Summary Electric - Average Cost ($/kWh):

Lighting Measures Total: Motors & VFD Measures Total: HVAC Electric Measures Total: Refrigeration Measures Total: TOTAL ELECTRIC MEASURES: TOTAL GAS MEASURES:

Gas - Average Cost ($/Therm):

$0.140 kWh Saved per Year 28,265 28,265 Therms /yr. 15,480 Gallons/yr.

$ $ $ $ $ $

TOTAL OIL MEASURES: $ Oil Gallons/yr. Gas Therms/yr. CONVERSION MEASURES: $ Gallons/yr. (OIL TO GAS) TOTAL PROPANE MEASURES:

-

$

COMBINED PROJECT TOTALS: $

Annual Total Measure Savings Cost 3,957.12 $ 12,602.75 $ $ $ 3,957.12 $ 12,602.75

Estimated Incentive Amount $ 8,821.93 $ $ $ $ 8,821.93

61,224.47 $

-

$

-

$

-

$

-

0.00

-

$

-

$

-

$

-

0.00

-

$

-

$

-

$

-

0.00

73,827.22 $

51,679.05

$

$

18,367.34

22,148.17

PROJECT TRC TEST:

Projected Energy Savings Per Measure Category

Simple Payback (Yrs) 0.96 0.00 0.00 0.00 0.96

17,028.45 $

20,985.57 $

42,857.13

Total Cost to Customer $ 3,780.83 $ $ $ $ 3,780.83

$1.10

Projected Dollar Savings Per Measure Category

Lighting

1.08

1.06 10.16

Estimated Reduction in Total Energy Consumption 100.0%

Lighting

Gas

10/7/2013

Gas

Project Summary

Direct Install Energy Assessment Tool (ver. 8.1) ©2013 TRC Energy Services. Property of TRC. Contractor granted limited license.

New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool (ver. 8.1) Lighting Measures Default Annual Oper. Hours

Actual Annual Oper. Hrs (if different)

Fixture Controlled?

Fixture Location

1

4,242

Entrance

2

4,242

Library

3

4,242

Fire / TV Room

4

4,242

Toilet

5

4,242

Maint

13

4,242

Gym

14

4,242

3rd Floor

15

4,242

3rd Floor

Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed

N N N N N N N Y N Y N Y N N N N

Actual Ceiling # of Default Watts per Height Fix- Watts per Fixture (if tures Fixture >12 ft? different)

Lighting Measure Description

CFL: 13W LED: A-Lamp (9W) Incandescent, (1) 60W lamp LED: A-Lamp (9W) CFL: 13W LED: A-Lamp (9W) Fluorescent, (4) 48", STD lamp 4' T8 2-lamp with EB plus reflector Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Metal Halide, (1) 400W lamp 4 LAMP T5 HIGH BAY HO FIXTURE Fluorescent, (4) 48", STD lamp 4' T8 4-lamp with EB Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB TOTALS:

1 1 9 9 31 31 1 1 2 2 12 12 7 7 8 8

13 9 60 9 13 9 188 54 94 59 458 234 188 112 94 59

Total Cost

Est. Demand Annual kWh Savings Savings (kW)

N

$

50.34

0.0

19

N

$

453.02

0.4

2,200

N

$

1,560.39

0.1

594

N

$

108.01

0.1

450

N

$

137.42

0.1

235

Y

$

4,439.95

2.2

9,019

N

$

599.68

0.4

2,550

N

$

549.67

0.2

1,342

$

7,898.47

3.5

16,410

Lighting Notes:

Lighting Controls Est. # of Annual Fixtures Hours Conw/o trolled Controls

Fixture Location

Est. Annual Hrs. w/ Controls

Actual Annual Hours (if different)

Lighting Controls Measure Description

Reduced # of Total # of Annual Add'l Watts ConUnits Lighting Relays trolled Hours Needed

Total Cost

Est. Demand Annual kWh Savings Savings (kW)

4

4,242

1

Toilet

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

188

$

171.25

0.0

270

5

4,242

2

Maint

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

188

$

171.25

0.0

270

6

4,242

6

Men's Locker

2,969

Dual Tech. Occ.Sens Ceiling (low v)

1

1,273

534

$

321.98

0.1

768

7

4,242

6

Women's Locker

2,969

Dual Tech. Occ.Sens Ceiling (low v)

1

1,273

534

$

321.98

0.1

768

8

4,242

3

Men's Room

2,969

Dual Tech. Occ.Sens Ceiling (low v)

1

1,273

267

$

321.98

0.1

384

9

4,242

3

Women's Room

2,969

Dual Tech. Occ.Sens Ceiling (low v)

1

1,273

267

$

321.98

0.1

384

10

4,242

4

Kid's Room

2,969

Dual Tech. Occ.Sens Ceiling (low v)

1

1,273

236

$

321.98

0.1

339

11

4,242

4

Office

2,969

Dual Tech. Occ.Sens Ceiling (low v)

1

1,273

356

$

321.98

0.1

512

12

4,242

2

Behind Desk

2,969

Dual Tech Occ. Sensor Wall Switch

1

1,273

178

$

171.25

0.0

256

13

4,242

12

Gym

2,969

Occ.Sensor for High Bay Fixtures

12

1,273

5,496

$

2,258.67

1.3

7,903

$

4,704.29

2.0

11,855

TOTALS:

Notes:

Lighting 10/7/2013

Direct Install Energy Assessment Tool (ver. 8.1) ©2013 TRC Energy Services. Property of TRC. Contractor granted limited license.

New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool (ver. 8.1) Gas, Oil, and Propane HVAC & Hot Water Measures Climate Zone

Measure Location

Measure Description

Existing Proposed Oil-toAge of Proposed Min. Heating Heating Actual Gas # of Efficiency Existing Storage Required Capacity Capacity Efficiency Conver- Units Units Equipment Capacity (if higher) Efficiency (thousand (thousand (Yrs.) (gallons) sion? BTU/hr)

1

Newark

Boiler Room

Gas-Fired Boiler

N

2

985

Total Cost

Natural Gas Heating Oil Savings Savings (therms/yr)

(gal./yr)

Propane Savings (gal./yr)

BTU/hr)

14

500

TOTALS

93.0%

AFUE

$

56,710.48

14,880.4

-

-

$

56,710.48

14,880.4

-

-

Notes:

HVAC & HW 10/7/2013

Direct Install Energy Assessment Tool (ver. 8.1) ©2013 TRC Energy Services. Property of TRC. Contractor granted limited license.

New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool (ver. 8.1) HVAC Control Measures Measure Description

Controlled Cooling Unit Energy Opera# of Units Cooling Efficiency tionally Installed Capacity Ratio Tested? (Tons) (EER)

Measure Location

Total Cost

$

Measure Description

1

Annual HVAC Unit Fuel # of Units Capacity HVAC Fuel Usage Installed (thousand Source (therms,

Measure Location

Measure Description

Measure Location

# of Units Installed

Boiler Reset Control (Hot Water)

Basment

2

BTU/hr)

gallons or KWh /yr)

Annual HVAC Electric Usage (kWh)

Gas, Oil, Primary or LPG Fuel Usage Source for (therms or Heating gal./yr) Gas

12,000

Annual kWh Savings

$

-

-

Est. Demand Savings (kW) -

Total Cost

Annual kWh Savings

Nat. Gas Savings (therms /yr)

Total Cost

Annual kWh Savings

Nat. Gas Savings (therms /yr)

4,513.99

-

600.0

Hot Water Demand Control Measures Measure Description

Measure Description

Measure Location

Measure Location

# of Units Installed

Days per Year Facility Operates

Pipe Diameter

Pipe Length

(inches)

(feet)

TOTALS

Hot Water Current Fuel Flow Rate Source (gal./min)

Hot Water Fuel Source

Low or High Temp Piping?

$

Total Cost

Annual kWh Savings

Nat. Gas Savings (therms /yr)

Total Cost

Annual kWh Savings

Nat. Gas Savings (therms /yr)

0

600.0

4,513.99

Notes:

HVAC & HW Controls Measures 10/7/2013

Direct Install Energy Assessment Tool (ver. 8.1) ©2013 TRC Energy Services. Property of TRC. Contractor granted limited license.