Fairfax Drive Bike Lane Improvements and Related ... - Arlingtonva

Report 1 Downloads 102 Views
DES Division Of Transportation

Clarendon Area Capital Improvement Projects 13th Street Phase III N. Hudson to N. Ivy Street

N. Hudson St. Curb Extensions Wilson Blvd and N. Hudson Street

Clarendon Circle Improvements Wilson and Washington Blvd

Washington Blvd Improvements Kirkwood Road to Wilson Blvd

Department of Environmental Services Division Of Transportation Tom Hutchings [email protected] 703 228 3809

12/15/2015

N. Hudson Street Curb Extensions Wilson Blvd and N. Hudson Street Project Schedule •100% Design Complete • Construction Spring 2016

N. Hudson Street Curb Extensions Wilson Blvd and N. Hudson Street

N. Wilson Blvd and N. Hudson Street

N. Hudson Street Curb Extensions Wilson Blvd and N. Hudson Street

N. Hudson Street Curb Extensions Wilson Blvd and N. Hudson Street

13th Street N. - Phase III N. Hudson to N. Jackson Street Project Schedule •100% Design • Construction Spring 2016

13th Street N. - Phase III N. Hudson to N. Jackson Street

13th Street N. & N. Irving Street

13th Street N. - Phase III N. Hudson to N. Jackson Street

13th Street N. & N. Hudson Street (complete)

Clarendon Circle Improvements Wilson Blvd and Washington Blvd

Existing Conditions

Clarendon Circle Improvements Wilson Blvd and Washington Blvd

Existing Conditions

Clarendon Circle Improvements Wilson Blvd and Washington Blvd

Existing Conditions

Clarendon Circle Improvements Wilson Blvd and Washington Blvd

Existing Conditions

Clarendon Circle Improvements Wilson Blvd and Washington Blvd Project Schedule • 60% Engineering December 2016 • 100% Design scheduled Summer 2016 • Bid Package planned for Fall 2016 • Begin construction Winter 2017 • Complete project Summer 2017

Approved Conceptual Design

Project Elements •Tighten intersection geometry •Widen crosswalks and shorten crossing distances •Better align Washington Boulevard and Wilson Boulevard •New traffic signals and timing •New Carlyle Streetlights •Add wider medians at all crossings •Remove slip lane at the Olmstead Building •Close N. Irving Street next to Silver Diner, add a green streets element •Adds curb extensions at Liberty Tavern and old Sam’s Deli corner. •Adds bike lanes to improve bike connections

Clarendon Circle Improvements Wilson Blvd and Washington Blvd

Sector Plan Concept

Clarendon Circle Improvements Wilson Blvd and Washington Blvd

60% Engineering Design

Clarendon Circle Improvements Wilson Blvd and Washington Blvd

60% Planting Plan

Clarendon Circle Improvements Wilson Blvd and Washington Blvd

60% Planting Plan – East Side

Clarendon Circle Improvements Wilson Blvd and Washington Blvd

60% Planting Plan - Center

Clarendon Circle Improvements Wilson Blvd and Washington Blvd

60% Planting Plan – East side

Illustrations of Proposed Improvements View looking south on Washington Boulevard Silver Diner Corner

O’ Sullivan's Corner

North Side Social Corner

Illustrations of Proposed Improvements View looking south on Washington Boulevard from NE Corner (old Petco site)

Silver Diner Corner

Old Petco Building Corner

Illustrations of Proposed Improvements View looking West on Wilson Blvd Liberty Tavern Corner

Wells Fargo bank Corner

Olmstead Building Corner

Clarendon Circle Improvements Wilson Blvd and Washington Blvd

Sidewalks and Bike Routing by North Side Social

Clarendon Circle Improvements Wilson Blvd and Washington Blvd

Existing Conditions

Clarendon Circle Improvements Clarendon Sector Plan

Clarendon Circle Improvements Clarendon Sector Plan

Clarendon Circle Improvements Clarendon Sector Plan

Public Spaces enlarged

Clarendon Circle Improvements Clarendon Sector Plan

Clarendon Circle Improvements Clarendon Sector Plan

Sector Plan graphics showing park space and new building location

Approved 12th Street location and Park space overlay

Impact of the new 12th Street alignment as per Clarendon West approval New Street (yellow) is 50 +’ east of Sector Plan location.

Washington Boulevard Improvements Wilson Blvd to N. Kirkwood Drive

Images reflects new street alignments as per approved Red Top Site Plans

Washington Boulevard Improvements Wilson Blvd to N. Kirkwood Drive

Graphic does not show exact final Washington Blvd alignment

Project Schedule Existing Conditions To be coordinated with approval and development

Washington Boulevard Improvements Wilson Blvd to N. Kirkwood Drive

Existing Conditions

Washington Boulevard Improvements Wilson Blvd to N. Kirkwood Drive

Existing Conditions

Washington Boulevard Improvements Wilson Blvd to N. Kirkwood Drive

Approved new streets layout over existing conditions

Washington Boulevard Improvements Wilson Blvd to N. Kirkwood Drive

Existing Conditions

Washington Boulevard Improvements Wilson Blvd to N. Kirkwood Drive

Planned Streets - Detail Layout Next Steps: •

Utility Undergrounding



Easements



Construction timing to be coordinated with the Red Top Phase I build out



County responsible for street frontages not directly abutting development



Project funded through Developer Contributions

Graphic does not show exact final Washington Blvd alignment

Washington Boulevard Improvements Wilson Blvd to N. Kirkwood Drive

Proposed Open Space / Future Park At 13th Street and Washington Blvd. Graphic does not show exact final Washington Blvd alignment

Schedules / Next Steps: Estimate Construction Start

13th Street Phase III N. Hudson to N. Ivy Street

N. Hudson St. Curb Extensions Wilson Blvd and N. Hudson Street

Clarendon Circle Improvements Wilson and Washington Blvd

Washington Blvd Improvements Kirkwood Road to Wilson Blvd

Timing will be coordinated with the Clarendon West Development

Spring 2016 Spring 2016 Spring 2017 Spring 2017