FIG 3 (DRINKING WATER MAP) (24X36)

Report 6 Downloads 182 Views
LEGEND

INVISTA

COOLING POND

MW-5C

BACKGROUND MONITORING WELL (SURVEYED)

MW-27B

COMPLIANCE MONITORING WELL (SURVEYED)

MW-32C

MONITORING WELL (SURVEYED)

PRW-1

POSSIBLE WATER SUPPLY WELL

DW-1

REPORTED/OBSERVED WATER SUPPLY WELL

EDR 3

EDR REPORTED SUPPLY WELL ( APPROXIMATE ) DUKE ENERGY PROGRESS PRODUCTION WELL ( APPROXIMATE ) DUKE ENERGY PROGRESS PRODUCTION WELL ( SURVEYED )

PE-SW2 PE-SW2

CFPUA PRODUCTION WELL ( APPROXIMATE ) INVISTA REPORTED PRODUCTION WELL LOCATION HALF MILE SURVEY BOUNDARY

NHC-SW4 0H2 NC AY W GH HI

MW-5C IL RA

1 42

DUKE ENERGY PROGRESS SUTTON PLANT 500 ft COMPLIANCE BOUNDARY

AD RO

WASTE BOUNDARY 2007 LiDAR CONTOUR MAJOR

20

2007 LiDAR CONTOUR MINOR PARCEL LINE (NEW HANOVER CO GIS) NEW HANOVER COUNTY WATERLINE (APPROXIMATE ) POTENTIAL AREA OF INTEREST (APPROXIMATE ) GENERALIZED GROUNDWATER FLOW DIRECTION

W

DW-1

H2

SUPPORTED BY GROUNDWATER ELEVATION DATA OR TOPOGRAPHIC DATA

DW-2

0H2

DW-3

SOURCES: NC W GH

HI

2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP FLOWN ON APRIL 17, 2014

2.

2013 AERIAL PHOTOGRAPH WAS OBTAINED FROM THE NRCS GEOSPATIAL DATA GATEWAY AT http://datagateway.nrcs.usda.gov/

3.

DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD 83).

4.

PARCEL DATA WAS OBTAINED FROM THE NORTH CAROLINA STATE LIBRARIES AT http://www.lib.ncsu.edu/gis/counties.html FOR NEW HANOVER COUNTY.

5.

2ft CONTOUR INTERVALS FROM NCDOT LIDAR DATED 2007 https://connect.ncdot.gov/resources/gis/pages/cont-elev_v2.aspx

6.

WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A SURVEY BY JAMES L. HAINES & ASSOCIATES FOR ISH, INC. DATED DECEMBER 23, 2008. ISH DRAWING IS TITLED "POTENTIAL LOCATIONS FOR PROPOSED GEOPROBE AND WELL INSTALLATIONS", DATED FEBRUARY 25, 2009 WITH A CAD FILE NAME Figure 22.dwg

7.

NEW WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A TABLE BY PARAMOUNTE ENGINEERING, WILMINGTON NC DATED 2012-03-05 SUPPLIED BY PROGRESS ENERGY. HORIZONTAL DATUM IS NAD83(NSRS2007) AND THE VERTICAL DATUM IS NGVD29.

8.

THE PROPERTY BOUNDARY FOR THE L.V. SUTTON STEAM ELECTRIC PLANT WAS BASED ON A COMPOSITE MAP PREPARED BY DAVIS-MARTIN-POWELL & ASSOC., INC. THE DRAWINGS ARE DATED JUNE, 1995 WITH REVISION NOTE FOR MARCH 4, 2004. FILE NAME IS L-D-9022-7.DWG. HORIZONTAL DATUM IS NAD83 AND THE VERTICAL DATUM IS NGV 29.

9.

THE LOCATION OF THE FORMER ASH DISPOSAL AREAS WAS BASED ON A FIGURE 2-2 PREPARED BY BLASLAND, BOUCK & LEE, INC. THE FIGURE IS TITLED "HORIZONTAL EXTENT OF THE ASH WITHIN THE FORMER DISPOSAL AREA".

AY

1.

NC WILDLIFE LAKE ACCESS

LAKE SUTTON

MW-11

RD

D OA ILR RA

COOLING POND WATER LEVEL = 9.60 ft PROVIDED BY DUKE ENERGY 06-02-2014

1 42

MW-27B

DW-4

G

PRW-1

DW-5 MW-31C

MW-24B

PRW-2

MW-24C

NEW ASH BASIN AREA

RD

W

KE

LA

S

N TO

HI GH

DW-8

DW-7

MW-12

AY

17

)

S. T. WOOTEN CORPORATION

0 E

ED

FR

DW-9

1 42

DW-10

IN T

AY

LCH HOLDINGS

MW-23C

ER

W

ST

AT

GH HI

DW-6

MW-23B

14

NC

OLD ASH BASIN AREA

(U

T

SU

RIC KS

FLEMINGTON TANK

ON

CA

W W

-1 W D

SC

W

PRW-7 NHC-SW3

MA ROY

HIP W

NHC-SW4

W

K RIC W D

LR

VE

D

BE

HI

W

800

W GH W

1

1600

W

PE-SW5

RAILROAD

800

(IN FEET)

42

AD

400

W

PE-SW4

ACCESS RO

0

AY

W

PE-SW2

PE-SW6A PE-SW6B

W

W

CANAL

EDR 11

GRAPHIC SCALE

NC

W

EDR 5

AL

CAN

CAPE FEAR RIVER

CONTOUR LINES ARE USED FOR REPRESENTATIVE PURPOSES ONLY AND ARE NOT TO BE USED FOR DESIGN OR CONSTRUCTION PURPOSES.

W

D N RW

CFPUA

OA ILR RA

SO

NEW HANOVER COUNTY

1.

W

ED

(NOT IN USE)

NOTE:

APPROXIMATE ROUTE OF THE NEW WILMINGTON BYPASS (I-140)

FR

W

NHC-SW1 (ABANDONED)

MW-7C

C DR

W

ROYMAC BUSINESS PARK

W

& ILK O. AM C OL EAM MAE CR IC

NHC-SW2

CONCRETE PAD

OM

W

AN

W

AST

PRW-6 RO PA YMA RT C NE RS

FORMER ASH DISPOSAL AREA

EDR 3

W

W

ABSOLUTE PROPERTIES

TR

CT

W

SOLAR FARM

W

-

W M

MW-28C

3 -1

MW-28B

C 33

W

W

ANE RIC TIES HUROPER PR

MW-32C FORMER ASH DISPOSAL AREA

W

MW-19

MW-21C

D

2

CI

W

COOLING POND

W

W

O TR ME

SAUNDERS & SAUNDERS, LLC

W

E CL

R

PRW-5

PRW-3

PRW-4

DW-11

MW-22C

MW-22B

L

W

NA

RD

EZZELL TRUCKING

W

SUTTON ST

W

EAM PLAN T RD

W

W

W

W

W

W

W

PE-SW3

W

W

PE-SW6D

W

ILR

RA

PE-SW6E

OA D W

W W W

MW-4B W

148 River Street, Suite 220 Greenville, South Carolina 29601 864-421-9999 www.synterracorp.com

W

W W

DRAWN BY: S. ARLEDGE DATE: 2014-09-30 CHECKED BY: H. FRANK DATE: 2014-09-30 PROJECT MANAGER: KATHY WEBB LAYOUT NAME: FIG 3 (DRINKING WATER MAP) (24X36)

W W W

PROPOSED WATERLINE RIVER CROSSING TIE-IN

L.V. SUTTON ENERGY COMPLEX 801 SUTTON POWER PLANT RD WILMINGTON, NORTH CAROLINA

PROPOSED WATERLINE RIVER CROSSING

FIGURE 3 DRINKING WATER SUPPLY WELL SURVEY MAP