ETH ‐ eThekwini Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development

936 Sites Households hectares 280

Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

409210 285379 274928 117062

Households Households Households Households Households Households Households

370812 575098 Households

ETH ‐ eThekwini QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment:                 150                   ‐ 

                200                   ‐ 

                       500                         280 

                  ‐ 

               (280)

                  ‐                    ‐  Annual                    ‐ 

                  ‐                    ‐  20‐60                   ‐ 

                          ‐                              ‐   

             4 880                   ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐               6 400                   ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐  Invalid Input                   ‐  Invalid Input                (461)

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                  375

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                  500

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  10                   ‐  Annual                   ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  16                   ‐  Annual                   ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                         32                             3 

                  ‐                    ‐                    ‐                    ‐ 

                   (3)                   ‐  Invalid Input                   ‐ 

                  22                   ‐                      2                   ‐                      2                   ‐ 

                         40                             2 

Number of hectares of land procured and suitable for Greenfields development

                    ‐ 

                200                   50                 280                 100

Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading

                    ‐                      ‐ 

In Above n/a 20‐60 n/a

                  ‐                    ‐  Annual                     ‐                    ‐                      25 Annual           244 749              6 400              2 190                 461

                  ‐                    ‐  Annual                   ‐ 

             3 570                   ‐ 

Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐  ‐ n/a                   500                 500

                  ‐                    ‐                    ‐                  250

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

               1 086                   16                     2                     3                     ‐  Not Available Annual Annual                     ‐ 

                    4                   ‐  Annual                   ‐ 

                  ‐                    ‐  Annual                   ‐ 

                  ‐                    ‐                    ‐                  125

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐     Invalid Input 

 Invalid Input 

                          ‐                              ‐                              ‐     Invalid Input                   17 040                         461 

                          ‐                              ‐                              ‐                              ‐                        1 250                            ‐   

Roads and storm water:

                          ‐                              ‐     Invalid Input 

 Invalid Input 

                          ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                    22                     2                     2                     4                   ‐                      28                     2 Annual Annual Annual                   ‐                      28                     2 Annual Annual Annual                   ‐ 

                  12                   ‐  Annual                   ‐  Annual                   ‐ 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

                  ‐                    ‐                    ‐ 

                   (2) Invalid Input Invalid Input

Access to Services: Water

                  ‐ 

                297                   ‐ 

 Invalid Input 

                           5 

                  ‐ 

                   (5)

               1 300                 800                 200              1 003                 400                   ‐ 

                600                   ‐ 

                800                   ‐ 

                    2 000                      1 003 

                  ‐ 

            (1 003)

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

          218 248                 295                     5                     5 Annual

Annual

                  ‐ 

                295                   ‐ 

 Invalid Input 

                           5 

                  ‐ 

                   (5)

Number of additional households to be provided with sewer connections 2

             16 000           13 000              4 050                 375              8 100                   ‐ 

          12 150                   ‐ 

          13 000                   ‐ 

                 37 300                         375 

                  ‐ 

               (375)

Nil Nil Nil Nil                   ‐                      88                   88                   88                   88                   88                   ‐            786 307         786 307         786 307         786 307         786 307                   ‐ 

Nil                   ‐                    88                   ‐          786 307                   ‐ 

Nil                   ‐                    88                   ‐          786 307                   ‐ 

 Invalid Input 

                  ‐                    ‐                    ‐ 

Invalid Input                  (88)       (786 307)

          260 660           25 000              3 150              2 211                     ‐                      ‐       1 372 210         338 043         359 471                     ‐ 

             7 500                   ‐          679 425                   ‐ 

                  ‐                    ‐                    ‐                    ‐ 

          17 500                   ‐       1 024 146                   ‐ 

                  ‐                    ‐                    ‐                    ‐ 

          25 000                   ‐       1 372 210                   ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                 53 150                      2 211 

                  ‐                    ‐                    ‐                    ‐ 

            (2 211)                   ‐        (359 471)                   ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    21                       9                       8                     44                     17

Annual  Annual  Annual  Annual  Annual 

Annual Annual Annual Annual

Annual Annual Annual Annual Annual

                  ‐                    ‐                    ‐                    ‐                    ‐ 

Annual Annual Annual Annual Annual

                  ‐                    ‐                    ‐                    ‐                    ‐ 

Annual Annual Annual Annual Annual

                  ‐                    ‐                    ‐                    ‐                    ‐ 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

Invalid Input Invalid Input Invalid Input Invalid Input                   ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    30                     29                     ‐                      ‐                      ‐                      ‐                      28

Annual 

Annual

Annual                   ‐                    ‐                    ‐                    ‐                    ‐  Annual 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

Annual                   ‐                    ‐                    ‐                    ‐                    ‐  Annual 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

Annual                   ‐                    ‐                    ‐                    ‐                    ‐  Annual 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

Invalid Input                   ‐                    ‐                    ‐                    ‐                    ‐  Invalid Input

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

               1 613                 297                     5                     5 Annual

                  ‐ 

Annual

Sewerage

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

 Invalid Input 

                       352                           88              3 145 228                 786 307 

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                3 413 824                 359 471                            ‐                              ‐   

Socio‐Economic Amenities

Local Economic Development and Job Creation:

Annual 

Annual

 Invalid Input 

 Invalid Input 

 Invalid Input 

                          ‐   

 Invalid Input 

 Invalid Input 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐     Invalid Input 

 Invalid Input 

Reason(s) for variation

Remedial action

ETH ‐ eThekwini Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

ETH

                    ‐ 

             7 030              1 350              1 812              2 197                   ‐ 

             2 636                   ‐ 

             7 030                   ‐ 

                 13 213                      1 812 

                  ‐ 

            (1 812)

KZN211 ‐ Vulamehlo Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN211 ‐ Vulamehlo QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN211

Reason(s) for variation

Remedial action

KZN212 ‐ Umdoni Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN212 ‐ Umdoni QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN212

Reason(s) for variation

Remedial action

KZN213 ‐ Umzumbe Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Eskom 

360

Sites Households hectares

DOHS Eskom  Eskom  15510 Ugu District Ugu District Ugu District

Households Households Households Households Households Households Households

N/A Households

KZN213 ‐ Umzumbe QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment:                   ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐  600 beneficia                   ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                      8 Appoint Cont 90 % done                    ‐                      1 Appoint Cont Target not me                   ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

Ugu district

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                    ‐ 

Ugu district

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                  100                   ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐  Target met (1                   ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐  Invalid Input                   ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐  Invalid Input Invalid Input                   ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                           100   Invalid Input                            ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

                          ‐                              ‐   

Transport:                   ‐                    ‐                    ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

Ugu district

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

Ugu district

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                192 48 collections Target met                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐  Invalid Input                   ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐               4 000              4 000 Target met                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐  Invalid Input                   ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                    9 N/A                   ‐                      3 Appoint Cont Target not me                   ‐                    ‐                    ‐  DOH                   ‐  DOE                   ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

 Invalid Input 

                          ‐   

 Invalid Input 

 Invalid Input 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐  Invalid Input                   ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

50+

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

 Invalid Input 

                  ‐ 

Invalid Input

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

 Invalid Input 

 Invalid Input 

                          ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                        4 000   Invalid Input                            ‐                              ‐   

Socio‐Economic Amenities

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN213

50+

Target met

 Invalid Input 

Reason(s) for variation

Remedial action

KZN214 ‐ uMuziwabantu Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development

0

hectares

0

Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

1818 Sites Households

N/A N/A N/A N/A

1818 Households 1818 Households Households Households Households Households Households 1818 1818 Households

KZN214 ‐ uMuziwabantu QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment:                   ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    57                     ‐                      ‐                        5                     ‐                        1                   250                     ‐                        1                   500                     ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

1.6kms 6.9kms

KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

2.3kms

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

70m

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport:                   ‐                    ‐                    ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

             1 818              1 818              1 818                   ‐                    ‐               1 818              1 818              1 818                   ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    1 818                      1 818 

                  ‐                    ‐                    ‐ 

            (1 818)                   ‐              (1 818)

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                 (41)

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                        1 818                      1 818 

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities   Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                      1

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  41                   41                   41                   ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                         41                           41 

                  ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN214

Reason(s) for variation

Remedial action

KZN215 ‐ Ezinqoleni Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN215 ‐ Ezinqoleni QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN215

Reason(s) for variation

Remedial action

KZN216 ‐ Hibiscus Coast Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN216 ‐ Hibiscus Coast QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN216

Reason(s) for variation

Remedial action

DC21 ‐ Ugu Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

DC21 ‐ Ugu QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

DC21

Reason(s) for variation

Remedial action

KZN221 ‐ uMshwathi Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN221 ‐ uMshwathi QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN221

Reason(s) for variation

Remedial action

KZN222 ‐ uMngeni Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN222 ‐ uMngeni QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN222

Reason(s) for variation

Remedial action

KZN223 ‐ Mpofana Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN223 ‐ Mpofana QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN223

Reason(s) for variation

Remedial action

KZN224 ‐ Impendle Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN224 ‐ Impendle QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN224

Reason(s) for variation

Remedial action

KZN225 ‐ Msunduzi Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status

67032  (Elect),109,84 0 (solid  waste),Water  Number of sites currently serviced with electricity, water (house connection), sewerage  connections‐ 80 873 removal service and solid waste removal service Sites Households Number of households living in informal settlements 20 000 hectares Number of hectares of land already acquired and suitable for human settlements  7144 Ha development Number of households in formal areas with access to basic electricity 67032 Households Number of households living in informal areas with access to basic electricity 2968 Households Number of households in formal areas receiving water services 80873 Households 412 Households Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services 85096 Households Number of households living in informal areas receiving sewerage services 58602 Households Households Number of households in formal areas with kerb‐side refuse removal services (once a week) 109840 Number of households living in informal areas with access to refuse removal  10160 Households

KZN225 ‐ Msunduzi QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

Reason(s) for variation

Remedial action

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐ 

                100                   30                 967                   ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                       100                         100 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                  615                   15                     2                     2                     ‐                 1 190                     4                     ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                           2                             2 

KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                    ‐                    ‐                      ‐                    ‐                    ‐                    243                   35                   10                     8                   ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  10                 100                   10                   30                 522                     ‐                    ‐                    ‐                      70                   25                   ‐               20 000              3 213                   ‐                      70                   ‐                    ‐                      ‐                    ‐                    ‐                      ‐                    ‐                    ‐                      ‐                    ‐                    ‐                      ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

               (100)                  (30)                (967)                   ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                   (2)                   ‐  The communities do not request gravel                    ‐  rehabilitation is initially in square meters                    ‐ 

                         10                             8 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                     (8) Delays experienced with property owners not 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                         30                           30                         522                         967                            ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

No informal settlement has been upgraded  No informal settlement has been upgraded  No informal settlement has been upgraded  Assessments are being done to determine  Information not available No title deeds trasferred to beneficiaries

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport:                           ‐                              ‐   

Access to Services: Water

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

This target will be driven by the  completion of the water and sanitation  This target will be driven by the 

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

             43 000                   ‐                        1                     1              43 000                   ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Alternative sites have been identified and 

This target will be driven by the  completion of the water and sanitation  This target will be driven by the 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections

Applications for electricity in the formal  areas are demand driven (Customers make  applications as and when required), there  are no projects in the formal areas. Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                  200                   61                   ‐                    ‐                    ‐                      ‐               9 000              9 000              3 000                   ‐                      ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                        9 000                      3 000                            ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐              (3 000)                   ‐  Street Lights are based on Customer 

Request Socio‐Economic Amenities   Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded

                      3                       2                     2                     1

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                          ‐                              ‐                               1                            ‐   

                  ‐                    ‐ 

                  ‐                    ‐ 

  Number of parks / leisure facilities to be developed  / upgraded

                      2                     1                     1

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                           1                            ‐   

                  ‐ 

                  ‐                    ‐                    ‐                     (1)

  Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐   

                  ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded

                      4                     1                     1                     1                   ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                           1                             1 

                  ‐ 

Planning and Design Phase Athletic Track 65% complete and the  Sweetwaters dual purpose complex will  commence in the 3rd quarter Currently busy with plans and design for  peace park in Imbali

To be budgeted for in the 2016/2017 MIG 

Once plans and design completed work will  commence

Berg Street Pool Upgraded and   Investigations ,Planning and Design Phase  for pools in Edendale, Vulindlela, Imbali and  To be budgeted for in the 2016/2017 MIG  Grange in progress budget for construction in Vulindlela   Number of libraries to be developed / upgradeddeveloped 

                      1                     1                   ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

KZN225 ‐ Msunduzi   Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

             2 000              1 074              1 074                   ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                    ‐                        1                     1                     ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                    1 074                      1 074 

                  ‐ 

            (1 074)

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN225

                    ‐ 

KZN226 ‐ Mkhambathini Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households

ESKOM

UMDM

hectares 53 ESKOM ESKOM UMDM UMDM UMDM UMDM

Households Households Households Households Households Households Households

480                     ‐  Households

KZN226 ‐ Mkhambathini QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment:                   ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

UMDM

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

UMDM

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                      2                   ‐                    ‐                    ‐                    ‐                    ‐                      5 Unknown                   ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport:                   ‐                    ‐                    ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

UMDM

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

UMDM

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                480                   ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

ESKOM ESKOM ESKOM ESKOM

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                    3                     1                   ‐  dept of health Dept of educ

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  70

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN226

Reason(s) for variation

Remedial action

KZN227 ‐ Richmond Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN227 ‐ Richmond QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN227

Reason(s) for variation

Remedial action

DC22 ‐ uMgungundlovu Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

273 310  water; 266014  sanitaion Sites Households Data not

available hectares N/A N/A N/A 273310 17474 266014 20899 N/A N/A

Households Households Households Households Households Households Households Households

DC22 ‐ uMgungundlovu QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

N/A N/A N/A

N/A N/A N/A

N/A N/A N/A

N/A N/A N/A

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

Invalid Input Invalid Input Invalid Input Invalid Input Invalid Input Invalid Input Invalid Input Invalid Input Invalid Input Invalid Input Invalid Input

                  ‐                    ‐                    ‐                    ‐ 

Invalid Input Invalid Input Invalid Input Invalid Input

                  ‐                    ‐                    ‐ 

Invalid Input Invalid Input Invalid Input

Roads and storm water:

Transport:

Access to Services: Water

               7 915              7 915              2 000              3 979              2 000                   ‐ 

             2 000                   ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

             1 915                   ‐ 

                    7 915                      3 979 

                  ‐ 

            (3 979)

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

             2 695              1 000                 500              1 000                   ‐ 

                695                   ‐ 

                  ‐ 

                  ‐ 

                    2 695                         500 

                  ‐ 

               (500)

Number of additional households to be provided with sewer connections 2

               2 695              2 695              1 000                 500              1 000                   ‐ 

                695                   ‐ 

                  ‐ 

                  ‐ 

                    2 695                         500 

                  ‐ 

               (500)

N/A N/A N/A

N/A N/A N/A

N/A N/A N/A

N/A N/A N/A

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

                  ‐                    ‐                    ‐ 

Invalid Input Invalid Input Invalid Input

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

                  ‐                    ‐                    ‐                    ‐ 

Invalid Input Invalid Input Invalid Input Invalid Input

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

N/A N/A N/A N/A ‐

N/A N/A N/A N/A                     7

N/A N/A N/A N/A                     3

N/A N/A N/A N/A                   ‐ 

                  ‐                    ‐                    ‐                    ‐                      4

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

Invalid Input Invalid Input Invalid Input Invalid Input                   ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

N/A N/A N/A N/A N/A N/A                     ‐ 

N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A                   ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

 Invalid Input 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

Invalid Input Invalid Input Invalid Input Invalid Input Invalid Input Invalid Input                   ‐ 

                    ‐ 

                  ‐ 

             6 451              6 428                   ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                    6 451                      6 428 

                  ‐ 

            (6 428)

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

Socio‐Economic Amenities

                           7                            ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

DC22

Reason(s) for variation

Remedial action

KZN232 ‐ Emnambithi/Ladysmith Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares 16570 Households 0 Households Households Households Households Households Households Households

KZN232 ‐ Emnambithi/Ladysmith QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

Reason(s) for variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  453                 453                 453                 453                   ‐  Nil                   27                   27                   27                   ‐               18 671           18 671           18 671           18 671                   ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                       453                         453 

                  ‐                    ‐                    ‐ 

               (453)                  (27)          (18 671)

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                    ‐                      ‐ 

                  33                   33                   33                   ‐                    15                   15                   12                   ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                         33                           33 

                  ‐                    ‐ 

                 (33)                  (12) Three other sportsfield have not yet been 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                     (4)                   ‐                    ‐                    ‐ 

               (196)

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                         27                           27                   18 671                   18 671 

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities   Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded

                         15                           12 

  Number of parks / leisure facilities to be developed  / upgraded

                    ‐ 

                    7                     7                     6                   ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                           7                             6 

  Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                          ‐                              ‐   

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                      4                     4                     4                   ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  25                 196                 196                   ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                       196                         196 

                  ‐ 

                          ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                               4                             4                            ‐                              ‐                              ‐                              ‐   

handed over to Department: Community  Services                    (6) The 7th Park is still being developed  therefore it is not yet maintained.

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

Remedial action

KZN232 ‐ Emnambithi/Ladysmith KZN232

KZN233 ‐ Indaka Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN233 ‐ Indaka QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN233

Reason(s) for variation

Remedial action

KZN234 ‐ Umtshezi Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN234 ‐ Umtshezi QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                      6                     2                   10                   ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                   (10)                   ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                               2                           10                            ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

             6 922              6 922              6 939                   ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    6 922                      6 939 

                  ‐                    ‐                    ‐ 

            (6 939)                   ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

          12 739           12 739           12 751                   ‐                    ‐               5 430              5 430              5 462                   ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                 12 739                   12 751 

                  ‐                    ‐                    ‐                    ‐ 

         (12 751)                   ‐              (5 462)                   ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    13                   13                   13                   ‐                    ‐                      8                     2                   ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                   (13)                   ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

             1 482                 365                 443                   ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                       365                         443 

                  ‐ 

               (443)

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                        5 430                      5 462                            ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                             13                           13                            ‐                              ‐                               2                            ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN234

Reason(s) for variation

Remedial action

KZN235 ‐ Okhahlamba Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

300

8699 Sites Households hectares 20 1292 Households 9000 Households Households Households Households Households Households 3420 5279 Households

KZN235 ‐ Okhahlamba QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

4

5

                    4                   ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  10                   ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    8                   ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    8                   ‐                      4                   ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                         30                             4 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                    1                   ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                           1                            ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    20                   30                     4                     ‐                    ‐                        1                     4                   ‐                    ‐                      ‐                    ‐                      ‐                    ‐                      ‐                    ‐                      ‐                    ‐                      ‐                    ‐                      ‐                    ‐                      ‐                    ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    55                     ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                   (4)                   ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                   (11)                   ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                               4                            ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                    1                   19                     9                   11                   ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                           9                           11                            ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

             8 699              8 699              8 699                   ‐                    ‐               5 279              5 279              5 279                   ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    8 699                      8 699 

                  ‐                    ‐                    ‐ 

            (8 699)                   ‐              (5 279)

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                    1                     1                   ‐                    ‐                    ‐ 

                    1                     1                   ‐                    ‐                    ‐ 

                    1                   ‐                    ‐                    ‐                    ‐ 

                    1                     1                   ‐                    ‐                    ‐ 

                  ‐                      1                   ‐                    ‐                    ‐ 

                    1                     1                   ‐                    ‐                    ‐ 

                           3                             3 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                   (3)                    (3)                   ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                177                   ‐ 

                       708                         187 

                  ‐ 

               (187)

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                        5 279                      5 279 

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities   Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                    3                     1                   ‐                      3                     1                   ‐ 

                           3                             3                            ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN235

                    ‐ 

                708                 177                 187                 177                   ‐ 

                177                   ‐ 

Reason(s) for variation

Remedial action

KZN236 ‐ Imbabazane Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN236 ‐ Imbabazane QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN236

Reason(s) for variation

Remedial action

DC23 ‐ Uthukela Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

DC23 ‐ Uthukela QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

DC23

Reason(s) for variation

Remedial action

KZN241 ‐ Endumeni Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN241 ‐ Endumeni QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN241

Reason(s) for variation

Remedial action

KZN242 ‐ Nquthu Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN242 ‐ Nquthu QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN242

Reason(s) for variation

Remedial action

KZN244 ‐ Msinga Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN244 ‐ Msinga QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN244

Reason(s) for variation

Remedial action

KZN245 ‐ Umvoti Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN245 ‐ Umvoti QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN245

Reason(s) for variation

Remedial action

DC24 ‐ Umzinyathi Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

DC24 ‐ Umzinyathi QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

DC24

Reason(s) for variation

Remedial action

KZN252 ‐ Newcastle Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN252 ‐ Newcastle QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN252

Reason(s) for variation

Remedial action

KZN253 ‐ eMadlangeni Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN253 ‐ eMadlangeni QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN253

Reason(s) for variation

Remedial action

KZN254 ‐ Dannhauser Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN254 ‐ Dannhauser QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN254

Reason(s) for variation

Remedial action

DC25 ‐ Amajuba Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

DC25 ‐ Amajuba QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

DC25

Reason(s) for variation

Remedial action

KZN261 ‐ eDumbe Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN261 ‐ eDumbe QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN261

Reason(s) for variation

Remedial action

KZN262 ‐ uPhongolo Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN262 ‐ uPhongolo QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN262

Reason(s) for variation

Remedial action

KZN263 ‐ Abaqulusi Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN263 ‐ Abaqulusi QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN263

Reason(s) for variation

Remedial action

KZN265 ‐ Nongoma Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN265 ‐ Nongoma QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN265

Reason(s) for variation

Remedial action

KZN266 ‐ Ulundi Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN266 ‐ Ulundi QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN266

Reason(s) for variation

Remedial action

DC26 ‐ Zululand Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

DC26 ‐ Zululand QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

DC26

Reason(s) for variation

Remedial action

KZN271 ‐ Umhlabuyalingana Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN271 ‐ Umhlabuyalingana QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN271

Reason(s) for variation

Remedial action

KZN272 ‐ Jozini Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN272 ‐ Jozini QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN272

Reason(s) for variation

Remedial action

KZN273 ‐ The Big 5 False Bay Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN273 ‐ The Big 5 False Bay QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN273

Reason(s) for variation

Remedial action

KZN274 ‐ Hlabisa Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN274 ‐ Hlabisa QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN274

Reason(s) for variation

Remedial action

KZN275 ‐ Mtubatuba Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN275 ‐ Mtubatuba QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN275

Reason(s) for variation

Remedial action

DC27 ‐ Umkhanyakude Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

DC27 ‐ Umkhanyakude QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

DC27

Reason(s) for variation

Remedial action

KZN281 ‐ Mfolozi Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN281 ‐ Mfolozi QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN281

Reason(s) for variation

Remedial action

KZN282 ‐ uMhlathuze Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN282 ‐ uMhlathuze QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN282

Reason(s) for variation

Remedial action

KZN283 ‐ Ntambanana Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

12826

Sites Households hectares

Households 1062 Households Households Households Households Households Households 12826 12826 Households

KZN283 ‐ Ntambanana QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    60                   20                   20                   ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐                 6 109                5 845                     ‐                      ‐                    123                     ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                   (20)                   ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                             20                           20                            ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                 12 826                   12 826 

                  ‐            12 826           12 826           12 826                   ‐ 

                  ‐                    ‐                    ‐ 

         (12 826)                   ‐           (12 826)

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                    ‐                      ‐                      ‐ 

          12 826           12 826           12 826

                          ‐                              ‐                     12 826                   12 826 

Electricity                4 868                 683                     ‐                      ‐               2 141                   ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                     1                   ‐                      3                   ‐                    ‐                      3

                    1

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN283

                    ‐ 

                  58

Reason(s) for variation

Remedial action

KZN284 ‐ uMlalazi Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN284 ‐ uMlalazi QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN284

Reason(s) for variation

Remedial action

KZN285 ‐ Mthonjaneni Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN285 ‐ Mthonjaneni QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN285

Reason(s) for variation

Remedial action

KZN286 ‐ Nkandla Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN286 ‐ Nkandla QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN286

Reason(s) for variation

Remedial action

DC28 ‐ uThungulu Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

DC28 ‐ uThungulu QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

DC28

Reason(s) for variation

Remedial action

KZN291 ‐ Mandeni Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN291 ‐ Mandeni QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN291

Reason(s) for variation

Remedial action

KZN292 ‐ KwaDukuza Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN292 ‐ KwaDukuza QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN292

Reason(s) for variation

Remedial action

KZN293 ‐ Ndwedwe Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN293 ‐ Ndwedwe QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN293

Reason(s) for variation

Remedial action

KZN294 ‐ Maphumulo Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN294 ‐ Maphumulo QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN294

Reason(s) for variation

Remedial action

DC29 ‐ iLembe Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

DC29 ‐ iLembe QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

DC29

Reason(s) for variation

Remedial action

KZN431 ‐ Ingwe Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services

Distrcit  Municipality

Sites Households hectares

3414 Households Households

Distrcit MunicipHouseholds Distrcit  Households Municipality Number of households in formal areas receiving sewerage services Distrcit MunicipHouseholds Number of households living in informal areas receiving sewerage services Distrcit MunicipHouseholds Households Number of households in formal areas with kerb‐side refuse removal services (once a week) 401 Households Number of households living in informal areas with access to refuse removal 

Number of households living in informal areas receiving water services

KZN431 ‐ Ingwe QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                      8                     3                   ‐                        7                     4                   ‐                      ‐                    ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                        3                     1

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

DM

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

DM

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  401                 401                 401                 401                     ‐                    ‐                      ‐                    ‐ 

                       401                         401 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                          ‐                              ‐   

                401                   ‐                    ‐                    ‐                    ‐                    ‐ 

               3 500 none                3 414 none

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

             1 583                   ‐               3 414 none

                  ‐                    ‐                    ‐               3 414              3 414                   ‐ 

                          ‐                              ‐                        3 414                      3 414                            ‐                              ‐   

                  ‐                    ‐               3 414                   ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐ 

Socio‐Economic Amenities   Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                        8                     5                   ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                        1                   ‐                      ‐                        2                     2                   ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                         77                            ‐   

                  ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN431

                  77                   77

Reason(s) for variation

Remedial action

KZN432 ‐ Kwa Sani Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service

                    ‐                      ‐                      ‐ 

             1 286              1 286              1 286                   ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

KZN433 ‐ Greater Kokstad Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN433 ‐ Greater Kokstad QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN433

Reason(s) for variation

Remedial action

KZN433 ‐ Greater Kokstad Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development

9159 Sites Households

Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

N/A N/A N/A N/A

hectares 0 9159 Households Households Households Households Households Households Households 10774 0 Households

KZN433 ‐ Greater Kokstad QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                      4                     4 3.55 km's of c 3.5 km's of c3                   ‐                      ‐                    ‐                    ‐                    ‐                    ‐                        2                     2 2.13 km's of c 1.2 km's                    ‐  55m

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

 Invalid Input 

KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

Invalid Input                   ‐  Invalid Input                   ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

 Invalid Input 

                          ‐                              ‐     Invalid Input 

 Invalid Input 

                          ‐                              ‐   

Transport:                   ‐                    ‐                    ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

               8 366           10 774           10 774                     ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                 10 774                            ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                  93              4 352

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities   Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐ 

                    ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                    2                     1

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN433

                    ‐ 

                100

Reason(s) for variation

Remedial action

KZN434 ‐ Ubuhlebezwe Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN434 ‐ Ubuhlebezwe QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN434

Reason(s) for variation

Remedial action

KZN435 ‐ Umzimkhulu Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

KZN435 ‐ Umzimkhulu QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment:                   ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                    ‐                      ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                          ‐                              ‐   

                    ‐                      ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                  ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐   

                          ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

KZN435

Reason(s) for variation

Remedial action

DC43 ‐ Harry Gwala Statistical indicators on service delivery as at the beginning of 2015/16 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage  removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements  development Number of households in formal areas with access to basic electricity

Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal 

Sites Households hectares Households Households Households Households Households Households Households Households

DC43 ‐ Harry Gwala QUARTERLY PERFORMANCE REPORTS ‐ 2015/16 Programme / Subprogramme / Performance Measures

Backlog as at  Target for  1st Quarter 1st Quarter  2nd Quarter  2nd Quarter  3rd Quarter  3rd Quarter 4th Quarter  4th Quarter  Summary of  Summary of  beginning of  2015/16 as  Actual  Planned  Planned  Actual  Actual  Planned  Actual  Planned  Actual  Planned  2015/16 output  per the output  output  output for  output  output  output output  output  output  as per SDBIP SDBIP as per SDBIP 2015/16.  as per SDBIP as per SDBIP as per SDBIP

1

2

3

4

5

6

7

8

9

10

[3 + 5 + 7 + 9] 11

[4+6+8+10] 12

Actual  output for  2015/16 as per  Annual  Report 13

Variation

[13‐12] 14

QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Per centage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of Title deeds transferred to eligible beneficiaries 11

                    ‐                      ‐                      ‐ 

KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of  roads resurfaced/rehabilitated/resealed KMs of  storm water drainage installed in addition to current ones

                    ‐                      ‐                      ‐                      ‐ 

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Roads and storm water:

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Transport: KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

Number of additional water service points to be installed for informal settlement dwellers within a 200m  radius Number of additional households to be provided with water connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                          ‐                              ‐   

Access to Services: Water

Sewerage

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Number of additional households to be provided with sewer connections 2

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

                    ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐ 

                    ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐ 

  Number of community halls to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded   Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

                    ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐ 

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded   Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of fire safety and emergency facilities to be developed / upgraded 12

                    ‐                      ‐                      ‐                      ‐                      ‐                      ‐                      ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                          ‐                              ‐   

                          ‐                              ‐   

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                  ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐ 

                    ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                  ‐ 

                          ‐                              ‐   

                  ‐ 

                  ‐ 

Solid Waste Management Number of additional households provided with access to weekly refuse removal  Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2

                          ‐                              ‐                              ‐                              ‐   

Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Socio‐Economic Amenities                           ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

                          ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐                              ‐   

Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and  other municipal programmes

DC43

Reason(s) for variation

Remedial action