PHASE
PHASE
AD
PHASE
PHASE
PHASE
N .W .G OR D
ON ST .
N.W. LOWER S
N.W. VAIL AVENUE
N.W. GREENWOOD CT.
ILVER LAKE R O
PHASE
PROJECT HIGHLIGHTS: · COMPLETE PAVEMENT REMOVAL/REPLACEMENT. · LOWER SILVER LAKE ROAD INTERSECTION WILL BE CONCRETE PAVEMENT · DITCHES WILL BE CLEANED OUT · PROJECT EXPECTED TO START APRIL 2018 · PROJECT EXPECTED TO FINISH NOVEMBER 2018
PHASE
PHASE
PHASE
PHASE
N.W. LYMAN ROAD
Jason Fundis, P.E., Project Manager Professional Engineering Consultants, P.A. 1263 SW Topeka Blvd. Topeka, KS 66612 (785) 233-8300
[email protected] Illustration depicts the proposed improvements of the NW Vail Avenue from NW Gordon to NW 24 Frontage Road. The design details and right-of-way cannot be determined from this illustration. The City of Topeka and PEC make no warranties, guarantees, or representation for the accuracy of this information and assume no liability for errors or omissions. Temporary Access Routes and Construction Phasing boundaries are subject to change.
1263 SW Topeka Blvd Topeka, KS 66612 785-233-8300 www.pec1.com
N.W. VAIL CT.
GENERAL NOTES · PROJECT FUNDED BY CITYWIDE HALF-CENT SALES TAX · DURING ALL PHASES, VAIL AVENUE WILL BE CLOSED TO THROUGH TRAFFIC. · ACCESS TO RESIDENCES AND BUSINESSES WILL REMAIN OPEN THROUGHOUT CONSTRUCTION. · DURING PHASE 3 CONSTRUCTION, LOWER SILVER LAKE ROAD INTERSECTION WILL BE CLOSED. A DETOUR ROUTE WILL BE PROVIDED.
N.W. 8TH ST.
N.W. VAIL AVENUE
Robert Bidwell, P.E., Project Manager City of Topeka 620 SE Madison Street Topeka, KS 66607 (785) 368-3842
[email protected] N.W. VAIL AVENUE STREET REPAIR PROJECT
N.W. VAIL AVENUE from N.W. GORDON STREET to N.W. US 24 FRONTAGE ROAD PROFESSIONAL ENGINEERING CONSULTANTS, P.A. 1263 SW TOPEKA BLVD. TOPEKA, KS 66612 785-233-8300 www.pec1.com
CITY OF TOPEKA STREET REPAIR PROJECT NO. T-841017.82 620 SE MADISON St. ¨ 2nd Floor ¨ TOPEKA, KS 66607 Phone: (785) 368-3842 ¨ Fax: (785) 368-3881
PROJECT NO. T-841017.82 FROM N.W. GORDON STREET TO N.W. FRONTAGE ROAD
N.W. VAIL AVENUE GENERAL CONSTRUCTION SEQUENCE