SR1555 UK Instructions - SR1555-01-150116-UK - Amazon Web ...

Report 2 Downloads 31 Views
Assembly Instructions

Shelter type: SR1555 www.shelters4less.co.uk [email protected] 0800 160 1002

SR1555-01-150116-UK

Exploded View of Shelter 10

5

13 11

12

13 9

10

13

12

9

8

2

7

1

6

1

3

2 6

14

5 14

14

4 14

14 14 Tools required:

3 Tools included:

Drill/Screwdriver

Wrench

Mallet

Torx bit

Hack saw

2

PARTS LIST AND FIXINGS ITEM PART DESCRIPTION DIMENSIONS NO. NO.

IMAGE

QTY.

1

S1

Frame

2000 x 1035

7

2

S3

Frame

2000 x 517

1

3

P1

Post

2000

1

4

ST5

Roof Tie

1543x40x40

1

5

CB1

Bracket

110 x 110 x 40

7

6

JF1

Bracket

220 x 40

10

7

RB2

Bracket

110 x 46

12

8

R2

Rafter

2199

4

9

SS

Sealing Strip

Trim to 2220

8

10

PCE2

Roof Panel

2220 x 1050

2

11

PCC2

Roof Panel

2220 x 1030

1

12

RC2

Roof strip

2180

4

13

2MD

Roofing Edge trim

1572.5

4

14

FT1

Bracket

109 x 100 x 3

10

15

EC40

Plastic End Cap

40 x 40

12

Fittings Bolt set M10

Pack A+B Required Spare

T25

T50

25 mm 50 mm Black Tech screw screw Caps

M10 x 60mm

Nut

33

33

66

136

40

5

5

10

64

8

28

28

Washer Tech

56

72

Image

3

32

66 56 10

BTANCM12100 M10/12 x 100 mm Concrete Bolt

11 8

3

Step 1 Assemble S1 frames to make up the main structure using CB1 brackets for the Corners and JF1 brackets for the straight joints.

10

21

Please note 50mm Tec Screws are for roof panels only

CB1

JF1

JF1

S1

S1

CB1

45

JF1

CB1 JF1

31

JF1

CB1

JF1

S1

S1 MEASURE THE WIDTH AND DEPTH OF THE SHELTER TO CHECK CORRECT ALIGNMENT. S1

CB1

JF1

JF1 JF1

CB1 Ensure corect alignment on all corners

CB1

4

Step 2 Attach P1 post using a JF1 bracket then use two JF1 brackets to attach S3 frame. The ST5 tie bar is mounted using a CB1 and a JF1 bracket. Make sure the structure is square then move the shelter to its final location before using the FT1 foot brackets to secure it to the ground.

JF1

CB1 JF1

ST5 FT1 S3

P1

FT1

ST5

S3

P1

5

Step 3 Attach R2 rafters using RB2 brackets. R2

RB2

R2 RB2

R2

RB2

RB2

RB2

RB2

RB2 RB2

1035 R2

1035 R2

ENSURE CORRECT ALIGNMENT OF RAFTERS

SIDE VIEW

R2

6

Step 4 Stick sealing strips (SS) to the rafters. Align the PCE2 roof panels with the outer roof rafters and equaly space the PCC2 panel in the middle.

PCE2 PCC2 PCE2 SS SS

SS

SS

7

Step 5

Screw down the RC2 strips as shown below. Then apply the 2MD edge trim to the bottom edges of the roof panels. RC2 2MD

RC2 RC2 2MD

2MD

RC2

2MD

RC2

RC2

RC2

RC2

2MD

8

2MD

Notes:

9

Notes:

10

PLAN VIEW OVERALL DIMENSIONS AND GROUND FIXING POSITIONS Suggested size for concrete base: 200mm oversized on all 4 sides.

1035

112

1533

1035 938

3145

477

1035

981

935

113

995

1035 2209

11

THANK YOU FOR PURCHASING THIS PRODUCT

MAINTENANCE: To ensure your products give you many years of use we recommend that you: • • •

Clean panels regularly with soapy water Ensure all fittings are tight (for example after a big storm) Touch up any exposed metal should it get scratched

CONTACT DETAILS: Email : [email protected] Web : www.shelters4less.co.uk Tel : 0800 160 1002 Shelters4Less, Unit 3, 2 Landsdowne Crescent, Bournemouth, BH1 1SA

All Parts and Fixings checked by: Print Name:

Signature:

12