TRANSMITTAL MEMORANDUM TO:
The Honorable Mayor and City Council
FROM:
David Martin, Assistant City Manager
DATE:
May 10, 2016
RE:
Change Order No. 1 to Contract No. 16-09, Centennial Building Electrical Upgrades - Island Electric
At its meeting of February 4, 2016 the City Council adopted the motion approving Contract No. 16-09 in the amount of $103,422 for the upg rade to the museum from single phase to three phase power. As indicated in the attached memorandum from Senior Engineering Techn ician Matt Brown, construction activities for this project started on February 17, 2016 and were observed to be substantially complete on April 29, 2016 with successfu l installation of the new transformer and associated distribution equipment. Attached for City Council review and consideration is Change Order No. 1 (Final) to Contract No. 16-09 in the amount of $6,186. Throughout the course of construction there were a series of small change orders that added code-required scope above and beyond the contract drawings. The proposed change orders fit within the project contingency of $7,850 that was approved by the City Council. Should Councilmembers have any questions or concerns, Mr. Brown will be attending the City Council meeting of May 19, 2016 and will be able to respond accordingly. A motion has been prepared for City Council consideration.
RECOMMENDATION
It is recommended that the City Council adopt the motion approving Change Order No.1 (Final) to Contract No. 16-09 Centennial Building Electrical Upgrades to Island Electric in the amount of $6,186; authorizing funding from the Centennial Building Electrical System Replacement Capital Account project contingency; and direct the City Manager to execute the change order on behalf of the City Council.
Recommended Motion: I move the City Council approve Change Order No.1 (Final) to Contract No. 16-09 Centennial Building Electrical Upgrades to Island Electric in the amount of $6,186; authorize funding from the Centennial Building Electrical System Replacement Capital Account project contingency; and direct the City Manager to execute the change order on behalf of the City Council.
AGENDA- 05/19/16- GGNB4
CITY OF KETCHIKAN
Public Works Department MEMORANDUM
DATE:
May 9, 2016
TO:
David Martin, Assistant City Manager
FROM:
Matthew Brown, Senior Engineering Technician
SUBJECT:
Project No. 16-09 Centennial Building Electrical Upgrades-Change Order #1 Final
At the council meeting ofFebruary 4, 2016 the council approved contract #16-09 in the amount of $103,422, for the upgrading the museum from single phase to three phase power. Construction activities for this project started on February 17 and were observed to be substantially complete on April 29 with successful installation of the new transformer and associated distribution equipment. Throughout the course of construction there were a series of small change orders that added code required scope above and beyond the contract drawings. The proposed change orders are listed below and fit within the allotted $7,850 project contingency.
MP No.
Date Issued
Date Responded
Date of Field Directive
Description
Amount
001
3/2/2016
3/3/2016
3/2/2016
Add 2 Removal Bollard
$1 ,971.80
002
3/2/2016
3/3/2016
3/2/2016
Add Concrete Walkway
$420.00
003
4/26/2016
4/26/2016
4/26/2016
Modify and R~lace Main Distribution Panel
$3,795.00
Subtotal
$6,186.80
From an overall budget perspective it is interesting to note that the exterior transformer work associated with Ketchikan Public Utilities was performed for less than the originally budgeted $ 17,072 and will result in credit of $2,854.96 to overall project costs.
RECOMMENDATION: It is recommended that the City Council approve Change Order # 1-Final to Contract No. 16-09 Centennial Building Electrical Upgrades to Island Electric in the amount of $6,186.00 to be paid from the Centennial Building Electrical System Replacement Capital Account project contingency and direct the City Manager to execute contract documents on its behalf.
Attachments: Project # 16-09- Change Order #1 Island Electric Change Order Back up KPU Final Invoice-Email
2930 Tongass Avenue Ketchikan, Alaska 99901 PHONE: 907-228-4 727 Fax: 907-225-8721
City ()f
1\etc:hikan ENGINEERING DEPARTMENT
May 3, 20 16
Re: Change Order #1 Contract #16-09 Centennial Building Electrical Upgrades This Change Order #I modifies the Original Contract Amount and tor additional code required work associated with adding additional bollards and concrete at the exterior transformer, modifying an existing HV AC Duct at the location of the new main distribution panel and modifying and replacing the existing primary electrica l panel. Therefore, the Contract Completion Date Is a mended as follows: Previous Contract Completion Deadline: May I, 2016 Contract Time Extension in Change Order# 1: 0 days New Contract Completion Deadline: May 1, 2016 Therefore, Contract 16-09 is amended as follows: Additions Add 2 Removable Bollards Add Concrete at Walkway Modify and Replace Main Distribution Panel Total Additions CO#l : $ Deductions Total Deductions CO# I: $
/
(,
$ 1971.00 $420.00 $ 3.795.00
Original C ontract: Total Additions Total Deductions Adjustment Total: This C han e Order: New Total Contract:
$ $ $
$ $ $
78,500.00 6, 186.00 (0.00) 6,186.00 6,186.00 84,686.00
$6,186.00 (0.00)
This above amount covers all work jn connection with this change. Your acceptance and the Owner's acceptance shall constitute and become a part of your contract with the City of Ketchikan dated February 9th, 2016. The above changes shall be sub)ect to the same term and conditions as contained in said contract and s7a11 ~e made in ~~cordance with the d\1awings and specifications of the Engineer.
C~N~~~~~li]<E
___/
\ "-.,P_r:~led Jeit-1:~~-:~jl ·o ak)~~\May 4, 20 16 Date Accepted By:
CITY OF KETCHIKAN, OWNER
/
CO~
ADMINIS IRATOR SIGNATURE
!l!ai/.dmvh Printed Name
5" · '-/ ·/!{ Date
Date
Page 1 of 1