Holly Grove Stream Restoration Site Guilford County, North Carolina Cataloging Unit: 03030002 EEP Contract #: D06028-B December 8, 2009
MONITORING REPORT 2009 (YEAR 1)
Submitted to: North Carolina Department of Environment and Natural Resources North Carolina Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699-1652
Submitted by: Restoration Systems, LLC 1101 Haynes Street, Suite 211 Raleigh, North Carolina 27604 Point of Contact: Tara Disy Allden Phone: 919-755-9490
Holly Grove Stream Restoration Site
MONITORING REPORT 2009 (YEAR 1) Prepared for:
Restoration Systems, LLC 1101 Haynes Street, Suite 211 Raleigh, North Carolina 27604
Prepared by:
Wolf Creek Engineering, pllc 51 North Knob Lane Weaverville, NC 28787
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
TABLE OF CONTENTS EXECUTIVE SUMMARY ........................................................................................................... iii 1.0 project goals, background, and attributes ........................................................................... 1 1.1 General Project Description............................................................................................ 1 1.1.1 USGS and NCDWQ River Basin Designations...................................................... 1 1.1.2 NCDWQ Surface Water Classification .................................................................. 1 1.2 Project Goals and Objectives .......................................................................................... 2 1.3 Project Structure.............................................................................................................. 2 1.4 Restoration Type and Approach ..................................................................................... 2 1.5 Project History, Contacts and Attribute Data ................................................................. 3 2.0 Project condition and monitoring results .......................................................................... 21 2.1 Vegetation Assessment ................................................................................................. 21 2.1.1 Stem Counts .......................................................................................................... 21 2.1.2 Vegetative Problem............................................................................................... 21 2.1.3 Vegetation Plot Photos.......................................................................................... 22 2.2 Stream Assessment ....................................................................................................... 22 2.2.1 Hydrology ............................................................................................................. 22 2.2.2 Geomorphology .................................................................................................... 23 2.2.3 Problem Areas....................................................................................................... 23 2.2.4 Photo Reference Stations ...................................................................................... 24 2.2.5 Stability Assessment Table ................................................................................... 24
LIST OF TABLES Table I. Table II. Table III. Table IV. Table V. Table VI. Table VII. Table VIII. Table IX.
Project Components …………………………………….…….…..………………...Page 7 Project Activity and Reporting History …………………………….…..…………..Page 8 Project Contacts ………………………………………………….….…..………….Page 8 Project Attributes …………………………………………….….….....…………....Page 9 Verification of Bankfull Events ………………………………...………………....Page 22 BEHI and Sediment Export Estimates……………………………………………..Page 23 Categorical Stream Feature Visual Stability Assessment……………………..Page 24 - 25 Baseline Morphology and Hydraulic Summary………………………………Page 26 - 31 Morphology and Hydraulic Monitoring Summary……………………………Page 32 - 39
LIST OF FIGURES Figure 1. Vicinity Map……………………………………………………………………..Page 5 Figure 2. Vicinity Map……………………………………………………………………..Page 6 Figure 3. Monitoring Plans…………………………………………………………..Page 11 - 20
APPENDIX A: Vegetative Raw Data APPENDIX B: Geomorphic Raw Data
Holly Grove / Restoration Systems
i
Monitoring Year 1 (Dec. 2009)
HOLLY GROVE RESTORATION SITE
Holly Grove / Restoration Systems
MONITORING REPORT
ii
Monitoring Year 1 (Dec. 2009)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
EXECUTIVE SUMMARY The Holly Grove Site is located in Guilford County, North Carolina within the Cape Fear River Basin, Cataloging Unit 03030002. The project consisted of restoring, enhancing, and preserving approximately 21,000 linear feet of stream, restoring approximately 42 acres of riparian buffers, and preserving approximately 1.11 acres of wetlands. The Site is in a rural setting in the Southern Outer Piedmont hydrophysiographic ecoregion and was previously used to grow row crops with woody vegetation confined to isolated areas. Prior to restoration, the channels were highly degraded due to unrestricted livestock access, channelization activities, and lack of riparian vegetation. The restoration design was based on a Priority Level 1 and 2 approach to restore proper channel dimension and allow for appropriate sediment transport. Restoration practices on this project were implemented with the intent of minimizing unnecessary disturbance to adjacent land and to protect mature riparian vegetation where it existed. The constructed stream profile has restored stable bed morphology including appropriate riffle-pool sequencing. Cross-vanes, J-Hook vanes, and in-stream log structures have been integrated into the channel to provide grade control, maintain stable streambanks while the riparian vegetation establishes, and provide in-stream habitat. Biodegradable fiber matting was used to provide temporary stabilization on the newly graded streambanks. Excavated materials from the existing channel were used to backfill around in-stream structures and to build riffles with a natural substrate and function. Hydrology Following completion of the construction in October of 2008, the Site has been subjected to one greater-than-bankfull event and at least two near bankfull events. It should be noted that, prior to completion of construction, Tropical Storm Fay (August 2008) produced a high-flow event in which floodwaters crested 2.5 feet above bankfull. Approximately seventy percent (70%) of the project was complete at that time and subjected to this high water event. Stream The restored stream reaches have successfully managed the high-flow events of the first year. Visual inspection of the Site following the greater-than-bankfull event in August of 2008 and the bankfull event in June 2009 revealed no noticeable adjustments in the bed or banks. The overall grade of the channel has been maintained and the banks of the channels are intact throughout the Site. Vegetation Native woody and herbaceous species were used to establish, at minimum, a fifty-foot riparian buffer on each side of the restored reach. Herbaceous species have successfully established throughout the entire site. The riparian buffer bare-root planting had an overall survival rate of 65% and showed significant evidence of additional volunteer species becoming established. In general, herbaceous planting resulted in vigorous growth throughout the site. Planned Action Continued visual monitoring is planned for the few stream areas that have been identified as “Areas of Concern”. Repair work is not warranted at this time on any of the areas. This is based on the judgment that these issues have not risen to level of posing a threat to channel or structure Holly Grove / Restoration Systems
iii
Monitoring Year 1 (Dec. 2009)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
stability and are not resulting in excessive erosion. It is recommended that natural stream processes and natural re-vegetation be allowed the opportunity to mend these areas and then reassess their condition in the next monitoring cycle.
Holly Grove / Restoration Systems
iv
Monitoring Year 1 (Dec. 2009)
HOLLY GROVE RESTORATION SITE
1.0
MONITORING REPORT
PROJECT GOALS, BACKGROUND, AND ATTRIBUTES
The purpose of the Holly Grove Stream Restoration Site (Site) was to restore degraded sections of Buckhorn Creek and several of its tributaries located in Guilford County, North Carolina. This monitoring report presents information regarding the site and watershed conditions, the restoration approach for the project, the monitoring results, remedial action plan and detailed monitoring drawings of the site. 1.1
General Project Description
Buckhorn Creek is located approximately 15 miles northeast of the City of Greensboro in rural Guilford County, North Carolina (Figure 1: Vicinity Map). The site consists of approximately 42 acres of floodplain, approximately 21,000 linear feet of stream designated as Buckhorn Creek and its tributaries, and 1.11 acres of existing wetlands (Figure 2: Project Map). The stream reaches consist of perennial, first and second order streams that have historically been impacted by riparian and bank vegetation removal, channel straightening, unrestricted livestock access, and agricultural land-use practices. Existing land use within the site consists of forested areas and row crops. The site is located within moderately sloping colluvial valleys and elevations range from approximately 615 to 720 feet above sea level. Past land management activities have consisted of timber harvesting with subsequent land clearing for agricultural uses including cattle and row crop farming. The land outside of the conservation easement remains in active agricultural production. 1.1.1 USGS and NCDWQ River Basin Designations The project reach is located in the Haw River watershed of the Cape Fear River Basin (United States Geological Survey (USGS) 14-digit Hydrologic Unit 03030002020070) within North Carolina Division of Water Quality (NCDWQ) sub-basin 03-06-02. This sub-basin is primarily rural agriculture, although residential land use accounts for a significant portion. Buckhorn Creek drains into Reedy Fork Creek approximately ¾ miles downstream of the Site, which in turn flows to the Haw River eight miles downstream. 1.1.2
NCDWQ Surface Water Classification
Reedy Fork Creek in the vicinity of the Site is assigned a best usage classification of C, NSW by the NCDWQ and as such there are no restrictions on watershed development or types of discharge. These waters are suitable for aquatic life propagation and survival, fishing, wildlife, secondary recreation, and agriculture. Secondary recreation includes wading, boating, and other uses not involving human body contact with water on an organized or frequent basis. The supplemental classification, NSW (Nutrient Sensitive Waters) includes areas with water quality problems associated with excessive plant growth resulting from nutrient enrichment. The portion of Reedy Fork Creek to which Buckhorn Creek drains and the portion of the Haw River that is approximately two miles east of the Site are listed on the DWQ final
Holly Grove / Restoration Systems
1
Monitoring Year 1 (Dec. 2009)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
2004 and draft 2006 303(d) lists. Streams which are included in the 303(d) list do not meet water quality standards or have impaired uses. 1.2
Project Goals and Objectives
The primary goals of the Holly Grove Stream Restoration Project are to: • Restore aquatic and riparian habitat within the on-site portions of the Buckhorn Creek watershed. • Restore geomorphic stability to the subject stream reaches. These goals will be accomplished through the following objectives: • Restoration of approximately forty-two acres of Mesic Mixed Hardwood Forest along both sides of Buckhorn Creek and its tributaries. • Removing nonpoint sources of pollution associated with agricultural activities including the establishment of a native woody riparian buffer (at least 50’ wide) adjacent to streams and wetlands to treat surface runoff which may be laden with sediment and/or agricultural pollutants from the adjacent landscape. • Reestablishing stream stability and the capacity to transport watershed flows and sediment loads by restoring a stable dimension, pattern, and profile supported by natural in-stream habitat and grade/bank stabilization structures. • Promoting floodwater attenuation through a) conveying bankfull stream flows through construction of bankfull bench, b) restoring secondary, entrenched tributaries thereby reducing floodwater velocities, and c) revegetating floodplains to increase frictional resistance on floodwaters crossing the Site. • Improving aquatic habitat by enhancing stream bed variability and the use of instream structures. • Providing wildlife habitat including fringe and forest edge. These accomplishments will result in: • Restoration and enhancement of 15,822 Stream Mitigation Units. • Protecting the Site with a perpetual conservation easement. 1.3
Project Structure
The project is composed of seven distinct reaches; the main channel, Buckhorn Creek, and each of its tributaries, Middle Branch, West Branch, East Branch, Lower East Branch, Southeast Creek, and Southwest Creek. The project structure is tabulated in the corresponding Table 1 (See Below). 1.4
Restoration Type and Approach
Restoration and enhancement practices implemented on this project were designed to minimize unnecessary disturbance to adjacent land and to protect mature riparian vegetation where it exists. Consideration was given to the potential functional lift provided by restoration activities in comparison to the functional lift that could be realized through the natural process of channel evolution. Included in this consideration was an attempt to determine the disturbance and sedimentation that could occur as a result of this natural process. Where restoration was determined to be warranted,
Holly Grove / Restoration Systems
2
Monitoring Year 1 (Dec. 2009)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
consideration was given to which reaches could best be served by maintaining as much of the existing channel pattern as possible. The proposed channels of Buckhorn Creek and its tributaries are designed as Type B4c streams with the exception of the lower reach of Middle Branch. This channel configuration provides the most stable and natural form in the moderately sloping colluvial valleys that are found throughout the Site. Not only does it effectively convey bankfull discharge and sediment load but also conforms to the natural conveyance of flood flows. Additionally, since broad alluvial valleys are generally not found within the Site, the lower sinuosity of the Type B4c streams will result in minimizing grading and earthwork activities. The proposed channel dimensions, patterns, and profiles are based on hydraulic relationships and morphologic dimensionless ratios of the reference reaches. Restoration activities included restoring stable channel morphology supported by natural in-stream habitat and grade/bank stabilization structures, the elimination of accelerated bank erosion, and reestablishment of native riparian buffers at least 50 feet in width. Exotic riparian vegetation was removed in areas of the project to allow for replanting of native riparian species. In-stream structures were installed to provide for enhanced aquatic habitat, protection of the newly constructed stream banks, and grade control for the newly constructed channel. 1.5
Project History, Contacts and Attribute Data
The summary of the project history, contacts, and attribute data is tabulated in Tables II, III, and IV (See Below).
Holly Grove / Restoration Systems
3
Monitoring Year 1 (Dec. 2009)
5
6
HOLLY GROVE RESTORATION SITE
MITIGATION PLAN Table I Project Components
Restoration Reach/Area
Restoration Level
Approach
PreRestoration LF or AC
PostRestoration LF or AC
Holly Grove Stream Restoration Site / EEP Contact #D06028-B
Station Range/Location
Buckhorn Creek West Branch West Branch Middle Branch Middle Branch Middle Branch Middle Branch East Branch East Branch East Branch East Branch Little Branch SW Creek SW Creek UT to SW Creek SE Creek SE Creek UT to SE Creek Wetland A
R E2 R E2 R E2 R P E2 R R E2 R E2 P R P P E
P2 E2 P2 E2 P1 E2 P1 E2 P1 P1 E2 P1 E2 P1 -
8,757 870 390 240 1,549 472 90 960 920 300 739 553 723 2,229 325 342 881 528 1.11
8,848 870 391 240 1,561 472 194 960 920 329 761 553 723 2,229 325 363 881 528 1.11
100+00 - 194+50 300+00 - 308+00 300+00 - 303+91 398+91 - 401+31 401+31 - 417+37 417+37 - 422+09 423+00 - 425+40 480+00 - 498+80 480+00 - 498+80 490+00 - 493+29 500+00 - 507+61 19+945 - 205+54 600+00 - 607+34 608+26 - 630+55 650+00 - 653+50 700+00 - 704+36 706+25 - 715+06 750+00 - 755+28 Middle Branch
Comments
Component Summation Restoration Level
Stream (LF)
Riparian Wetland (Ac) Riverine
Restoration Enhancement Enhancement I Enhancement II Creation Preservation HQ Preservation
13,170
Totals
21,148
Non-Riparian (Ac) Upland (Ac)
Buffer (Ac)
BMP
42
BMP Count
Non-Riverine
1.11 5,284 2,694 1.11 1.11
= Non-Applicable
Holly Grove / Restoration Systems
7
Monitoring Year 1 (Dec 2009)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
Table II Project Activity and Reporting History Holly Grove Restoration Project Data Collection Activity or Report Complete Restoration Plan Apr 2007 Final Design - Construction Plans N/A Construction N/A Temporary S&E mix applied to entire project area N/A Permanent seed mix applied to entire site N/A Bare-root plantings for floodplain and uplands N/A Mitigation Plan / As-Built (Year 0 Monitoring - baseline) Oct 2008 Year 1 Monitoring Oct 2009 Year 2 Monitoring Year 3 Monitoring Year 4 Monitoring Year 5 Monitoring
Completion or Delivery Jun 2007 Oct 2007 Oct 2008 Sep 2008 Sep 2008 Dec 2008 Dec 2008 Dec 2009
Table III Project Contact Table Holly Grove Restoration Project Designer Wolf Creek Engineering, pllc
51 North Knob Lane Weaverville NC, 28787 828-658-3649
S. Grant Ginn Construction Contractor North State Environmental, Inc
2889 Lowery St. Winston-Salem, NC 27101 336-725-2010
Darrell Westmoreland Planting & Seeding Contractor North State Environmental, Inc
2889 Lowery St. Winston-Salem, NC 27101 336-725-2010
Stephen Joyce Monitoring Performers Stream Monitoring - Wolf Creek Engineering, pllc Vegetation Monitoring - Catena Group
Holly Grove / Restoration Systems
S. Grant Ginn Mike Wood
8
828-658-3649 919-732-1300
Monitoring Year 1 (Dec 2009)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
Table IV Project Attribute Table Holly Grove Restoration Project Guilford Piedmont Southern Outer Piedmont Cape Fear River Basin 03030002020070 03-06-02
Project County Physiographic Region Ecoregion Project River Basin USGS HUC for Project (14 digit) NCDWQ Sub-basin for Project Within extent of EEP Watershed Plan? WRC Class (Warm, Cool, Cold) % of project esaement fenced or demarcated Beaver activity observed during design phase?
100% Demarcated Easement Corners Yes, on Buckhorn Creek upstream of bridge
Restoration Component Attribute Table Buckhorn West Middle 4.27 0.2 0.2 Second First First 8757 390 1639 Perennial Perennial Perennial Rural Rural Rural
Drainage area (mi2) Stream order Restored length (feet) Perennial or Intermittent Watershed type Watershed LULC Distribution (e.g.)
Residential Ag-Row Crop Ag-Livestock Forested Watershed impervious cover (%) NCDWQ AU/Index number NCDWQ classification 303d listed? Upstream of a 303d listed segment? Reasons for 303d listing or stressor Total acreage of easement Total vegetated acreage within easement Total planted acreage as part of the restoration Rosgen classification of pre-existing Rosgen classification of As-Built Valley type Valley slope Valley side slope range Valley toe slope range Cowardin classification Trout waters designation Species of concern, endangered? Dominant soil series and characteristics Series Depth (in) Clay % K T
Holly Grove / Restoration Systems
East 0.2 First 1039 Perennial Rural
20% 10% 5% 10% 40% 60% 50% 10% 10% 5% 10% 0% 30% 25% 35% 80% 10 5 5 5 16-(1)a C, NSW C, NSW C, NSW C, NSW No Yes non-point urban and agricultural runoff 64.87 47.06 45.3 F, G G G G B4c B4c B4c B4c II II II II 0.0051 0.0239 0.0165 0.0119 4% - 40% 0.4% - 2% N/A N/A Yes, Bald Eagle & Carolina Darter Ch , Co CcD Ch CcD , Ch Congaree Cecil Chewacla Chewacla 0-80 0-80 0-70 0-70 5-35 5-70 5-35 5-35 Moderate Moderate Moderate Moderate -
9
Southeast Southwest 0.14 0.19 First First 342 723 Perennial Perennial Rural Rural 5% 90% 0% 5% 2
10% 10% 0% 80% 2
C, NSW
C, NSW
G B4c II 0.0159
G B4c II 0.0169
CcD Cecil 0-80 5-70 Moderate -
CcD Cecil 0-80 5-70 Moderate -
Monitoring Year 1 (Dec. 2009)
11
12
13
14
15
16
17
18
19
20
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
2.0
PROJECT CONDITION AND MONITORING RESULTS
2.1
Vegetation Assessment
The Carolina Vegetation Survey – Ecosystem Enhancement Program (CVS-EEP) 2008 protocol for recording vegetation (Lee et. al 2008) was used to determine the planting pattern of woody stems with respect to species, spacing, and density as well as to forecast survivability and growth of planted stems in subsequent monitoring years. Eleven (11) randomly placed 10 meter by 10 meter vegetative sampling plots were established within the project easement area. The corners of each monitoring plot have been marked in the field and their position documented by GPS survey. Plots were placed within the applicable planting zones to capture the heterogeneity of the designed vegetative communities. Plot corners were permanently marked with rebar and recorded during the baseline survey. All planted stems and plot corners were marked with orange flagging tape to facilitate relocation during subsequent monitoring years. A reference photograph was taken for each plot at the origin looking diagonally across the plot to the opposite corner. Year 1 vegetation for the Site occurred on October 27-28, 2009. The project has an average of 361 planted stems per acre, which is above the interim success criterion of 320 steams per acre at the end of the Year 3 monitoring period. The riparian buffer planting had an overall survival rate of 65% but showed significant evidence of additional volunteer species taking root. 2.1.1
Stem Counts
Across all vegetation monitoring plots (VP), Year 1 monitoring documented a moderate survivability range of 162 to 567 planted stems per acre. VP2 had the lowest average stem density whereas VPC had the highest. VP2, 5, & 8 did not meet the interim success criterion. Approximately 17% of total planted stems were missing and 18% were dead. Of these, silky willow and common witchhazel had the highest mortality rates. Twentyone (21) species were documented among the vegetation plots, a 12.5% reduction in the total species planted. Several species such as black walnut, willow oak, winged elm, possum haw, and willow were represented by only one individual. Approximately 37% of planted stems had a vigor code of good or excellent. High numbers of natural stems were found in seven of the eleven vegetation monitoring plots. Volunteer stems were also found in vegetation plots VP6, 7, A, & B but in significantly lower numbers. It is expected that recruitment will continue to contribute to the total stem density for the restoration site. 2.1.2
Vegetative Problem
No significant vegetation problem areas were noted within the vegetation monitoring plots on-site although some damage and mortality was recorded. Of all damaged, missing, or dead stems within the vegetation monitoring plots 52% of the damage has been attributed to browsing activity by deer and 47% to insects. Expansion of invasive
Holly Grove / Restoration Systems
21
Monitoring Year 1 (Dec. 2009)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
exotic plant populations should be monitored both within the vegetation plots in which they occur and within the larger restoration area. It should be noted that after the vegetation survey was conducted VP7 was partially mowed along with the gas easement that crosses Southeast Creek. 2.1.3 Vegetation Plot Photos A photo point was established in each vegetation plot. Photo points are positioned for each plot at the origin facing diagonally across the plot to the opposite corner. The photographs were captured on the same day as the vegetation plot surveys (Appendix A). 2.2
Stream Assessment
Monitoring protocol follows that outlined within the EEP Site Specific Mitigation Plan and detailed in the U.S. Army Corps of Engineers (USACE) Stream Mitigation Guidelines for Monitoring Level I. Specifically, stream monitoring included measurements of stream dimension, profile, pattern, bed materials, photo documentation, and stream bankfull return interval. The restored stream reaches have managed the extreme flow events of the first year. Streambanks remain intact and stable and fully vegetated throughout the site. Vegetation has grown into many riffles on the main channel due to a lack of shade and mature buffer. This has limited the mobility of bed material but has not had noticeable effects on overall stability. All in-stream structures remain intact and fully functional with the exception of a few minor piping issues. 2.2.1 Hydrology Since completion of construction in October of 2008, the site has been subjected to at least one greater-than-bankfull event and several bankfull or near-bankfull events. In August of 2008, Tropical Storm Fay crossed central North Carolina resulting in eight (8) inches of rainfall on-site and water elevations 2.5 feet above bankfull on Buckhorn Creek. Approximately seventy percent (70%) of the project was complete at that time and subjected to this estimated fifty-year storm event. In October of 2008, locally heavy rainfall produced a bankfull event at the Site during the final stages of construction. In June of 2009, heavy rainfall resulted in water elevations 0.2 to 0.3 feet above bankfull. Heavy rainfall associated with remnants of Hurricane Ida produced one additional event in November of 2009, after monitoring was completed which again resulted in water elevations above bankfull. Table V Verification of Bankfull Events – Lick Creek Stream Restoration Site (D04013-1) Date of Data Collection 9/3/08 8/13/09
Date of Occurrence of Bankfull Event 8/27/08 June 2009
Holly Grove / Restoration Systems
Height above Bankfull (ft) 2.5 0.2
22
Method of Data Collection Debris Evidence Crest Gauge
Monitoring Year 1 (Dec. 2009)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
2.2.2 Geomorphology Following the procedures established in the USDA Forest Service Manual (Harrelson et al 1994) and the methodologies utilized in the Rosgen stream assessment and classification system (Rosgen 1994, 1996), data collected consisted of detailed dimension and pattern measurements, longitudinal profiles, and bed materials sampling. Re-survey of the permanent cross sections and profile reaches have shown only minimal alterations in local bed elevations with the bed form and the channel pattern remaining consistent with the As-built condition. All eight riffle cross sections exhibit consistent maximum depth while six of the eight retain nearly the same cross-sectional area as documented in the baseline monitoring. Six of the eight pool cross-sections have maintained their depth and cross-sectional area and two show only slight adjustments relative to the As-built condition. Location of bed features relative to the pattern is consistent with the As-built survey. Pebble counts were conducted at each riffle cross-section, as well as across the overall study reaches. Pebble count data was plotted by size distribution in order to assess the D50 and D84 size class. On Buckhorn Creek the material size generally increased from the As-built condition with the D50 on Reach 1 and 2 increasing from 38mm to 67mm and from 38mm to 61mm. Likewise the D84 increased on both of these reaches. On Reach 1 of Buckhorn the D50 remained constant while the D84 decreased from 118mm to 64mm. This may be due in part to the fact that Reach 1 is at the upstream end of the project and may be receiving finer sediment input from upstream of the Site where the channel remains degraded. It also may be related to the significant growth of vegetation in the riffles that may be trapping finer particles in the bed. All of the tributaries, with the exception of Southeast Creek, showed an increase in the D50 over the As-built condition, although generally the increases were not appreciable. The D50 on Middle Branch increased from 10mm to 21mm and from 12mm to 15mm. On Lower East Branch the D50 increased from 7mm to 10mm and Southwest Creek increased from 0.3mm to 7mm. The D50 on Southeast Creek remained constant at 0.1mm which was to be expected since the primary bed material is clay and there is a farm pond located immediately upstream which traps much of the sediment from the watershed. Table VI. BEHI and Sediment Export Estimates – (Not Required in Year 1) 2.2.3 Problem Areas In the year following construction of the Holly Grove Stream Restoration Site, a few minor problem areas have been documented. 1.) Several riffles on Buckhorn Creek exhibit excessive vegetation in the channel bed. 2.) There were six (6) locations of piping identified at log vanes. 3.) There was one (1) area of bank scour identified. Inadequate shade due to lack of mature riparian buffer has allowed vegetation to take root in the bed matrix. It is anticipated that this vegetation will die back during the winter but
Holly Grove / Restoration Systems
23
Monitoring Year 1 (Dec. 2009)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
will reestablish during each growing season until sufficient shading is provided by the canopy of the buffer. This has affected bedload transport by limiting bed mobility, but it is not expected to have any significant impact on the overall stability or integrity of the channel bed. Continued visual monitoring is planned for the stream areas that have been identified as “Areas of Concern”. Repair work is not warranted at this time on any of the areas. This is based on the judgment that these issues have not risen to level of posing a threat to channel or structure stability and are not resulting in excessive erosion. It is recommended that natural stream processes and natural re-vegetation be allowed the opportunity to mend these areas and then reassess their condition in the next monitoring cycle. 2.2.4 Photo Reference Stations Photograph reference Stations (PRSs) have been established to assist in characterizing the site and to allow qualitative evaluation of the site conditions. The location of each photo station has been permanently marked in the field and the bearing/orientation of the photograph is indicated on the As-built plans to allow for consistent repetition. A total of twenty-eight (28) PRSs have been established along the restored stream (Appendix B). Sixteen (16) of these PRSs have been located upstream of the permanent monitoring cross sections. These photographs are taken facing downstream looking at the section, and show as much of the banks and channel as possible. 2.2.5
Stability Assessment Table
Table VII. Categorical Stream Feature Visual Stability Assessment
Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders
Initial 100% 100% 100% 100% 100% 100% 100%
Holly Grove / Restoration Systems
Performance Percentage Buckhorn Creek (8,848 ft) MY-01 MY-02 MY-03 MY-04 100% 100% 100% 100% 100% 99% 100%
24
MY-05
Monitoring Year 1 (Dec. 2009)
HOLLY GROVE RESTORATION SITE
Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders
Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders
Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders
Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders
MONITORING REPORT
Initial 100% 100% 100% 100% 100% 100% 100%
Performance Percentage Middle Branch (1,755 ft) MY-01 MY-02 MY-03 MY-04 97% 100% 100% 100% 100% 98% 83%
Initial 100% 100% 100% 100% 100% 100% 100%
Performance Percentage East Branch (1,090 ft) MY-01 MY-02 MY-03 MY-04 100% 100% 100% 100% 100% 100% 100%
Initial 100% 100% 100% 100% 100% 100% 100%
Performance Percentage Southeast Creek (363 ft) MY-01 MY-02 MY-03 MY-04 96% 100% 100% 100% 100% 100% 100%
Initial 100% 100% 100% 100% 100% 100% 100%
Performance Percentage Southwest Creek (723 ft) MY-01 MY-02 MY-03 MY-04 100% 100% 100% 100% 100% 100% 100%
Holly Grove / Restoration Systems
25
MY-05
MY-05
MY-05
MY-05
Monitoring Year 1 (Dec. 2009)
Table VIII-a
Baseline Stream Data Summary
Holly Grove Restoration Site - Buckhorn Creek (8848 ft) Parameter
Gauge
Simension and Substrate - Riffle
Regional Curve LL
Bankfull Width (ft)
UL
Pre-Existing Condition Eq.
Min
Mean
Med
Max
24
Reference Reach(es) Data SD
n
Min
26
Mean
Med
Max
20.1
As-Built / Baseline
Design SD
n
Min
Med
Max
Min
22
23
25
23.4
Mean
Med
Max
23.4
25.4
Floodprone Width (ft)
32
32
63
30
52.5
75
50
50
70
Bankfull Mean Depth (ft)
1.6
2.3
1.73
1.69
1.78
1.91
1.3
1.5
1.9
1
Bankfull Max Depth (ft)
2.3
3
2
2.3
2.4
2.6
1.9
2.1
2.6
Bankfull Cross-Sectional Area (ft2)
42
55
34.8
37
40.9
48
30.3
34.3
48.3
16
18.1
1.4
2.28
Width/Depth Ratio
10
16
Entrenchment Ratio
1.2
1.3
Bank Height Ratio
2
2.3
1.2
d50 (mm)
14
14
28
1
12 2.7
13
2.9
3.1
13.4 3
SD
2.5
1
Profile Riffle Length (ft)
23
40
64
38
58
74
0.006
0.007
0.008
0.013
0.004
0.005
0.006
0.0026
0.0069
0.017
21
25
54
55
67
87
Pool Max Depth (ft)
2.8
3.35
3.9
2.6
3.4
3.6
3.8
1.08
2.89
3.51
Pool Spacing (ft)
60
110
160
71
134
88
119
150
56
119
136
Riffle Slope (ft/ft) Pool Length (ft)
2
102.5
Pool Volume (ft3)
Pattern Channel Beltwidth (ft)
40
80
120
33
36.5
40
33
54
75
183
217
250
Radius of Curvature (ft)
50
145
240
47
182.5
318
44
59.5
75
41
87
167
Radius of Curvature Ratio (ft/ft)
1.9
5.95
10
2.3
9.15
16
2
2.5
3
1.7
3.72
7
Meander Wavelength (ft)
110
225
340
37
104.5
172
44
134.5
225
140
221
380
Meander Width Ratio (ft/ft)
1.7
3.15
4.6
1.6
1.8
2
1.5
2.25
3
7.82
9.27
10.7
Substrate, bed and transport parameters 4 4 4
Ri% / Ru% / P% / G% / S%
35
18
17
29
SC% / Sa% / G% / C% / B% / Be%
d16 / d35 / d50 / d84 / d95 / dip / disp (mm) Reach Shear Stress (competency) lb/ft2
0.66
Max part size (mm) mobilized at bankfull
144
Stream Power (transport capacity) W/m2 Additional Reach Parameters Drainage Area (sq mi)
3.76
2.2
B4c
Impervious cover estimate (%) Rosgen Classification
F4 & G4
Bankfull Velocity (fps)
3.3
Bankfull discharge (cfs)
186
B4c
B4c 4.5
Valley length (ft) Channel Thalweg length (ft)
8756
Sinuosity (ft)
1.17
1.05
1.2
Water Surface Slope (channel) (ft/ft)
0.0054
0.0079
0.005
BF slope (ft/ft)
0.005
0.006
0.006
5
Bankfull Floodplain Area (acres) 6
7
Proportion Overwide (%)
Entrenchment Class (ER Range) 8
8848
8777
Incision Class (BHR Ranch)
BEHI VL% / L% / M% / H% / VH% / E% Channel Stability or Habitat Metric Biological or Other
26
1.17 0.0042
0.0051 0.0047
n
Table VIII-b
Baseline Stream Data Summary
Holly Grove Restoration Site - West Branch (391 ft) Parameter
Regional Curve
Gauge
Simension and Substrate - Riffle
LL
UL
Pre-Existing Condition Eq.
Min
Mean
Med
Max
Reference Reach(es) Data SD
n
Min
Mean
Med
Max
Design SD
n
Min
Bankfull Width (ft)
6.3
Floodprone Width (ft)
7.5
63
Bankfull Mean Depth (ft)
0.9
1.73
0.7
1
20.1
Med 9
12
19.5
Bankfull Max Depth (ft)
1.2
2
0.95
Bankfull Cross-Sectional Area (ft2)
5.5
34.8
6.3
7
12
Width/Depth Ratio Entrenchment Ratio 1
1.2
2.7
As-Built / Baseline Max
Min
Mean
Med
Max
9
10.5
12
40
46
52
27
13
2.9
3.1
Bank Height Ratio
1.7
1.2
d50 (mm)
28
28
0.02
0.013
1.4
2.6
1.4
1.7
3
1
Profile Riffle Length (ft)
13
Riffle Slope (ft/ft) Pool Length (ft)
7
Pool Max Depth (ft) Pool Spacing (ft) 2
30
65
100
33
16
19
0.013 14
20
1.4
36.5
40
36
45
54
Pool Volume (ft3)
Pattern Channel Beltwidth (ft)
40
50
60
33
36.5
40
13
20
27
Radius of Curvature (ft)
45
97.5
150
47
182.5
318
18
22.5
27
23
41.5
80 60
Radius of Curvature Ratio (ft/ft)
7
15
23
2.3
9.15
16
2
2.5
3
2.3
4.2
6
Meander Wavelength (ft)
55
77.5
100
37
104.5
172
18
49.5
81
Meander Width Ratio (ft/ft)
6
8
10
1.6
1.8
2
1.5
2.25
3
89
Substrate, bed and transport parameters 4 4 4
Ri% / Ru% / P% / G% / S%
SC% / Sa% / G% / C% / B% / Be%
d16 / d35 / d50 / d84 / d95 / dip / disp (mm) Reach Shear Stress (competency) lb/ft2
0.53
Max part size (mm) mobilized at bankfull
96
Stream Power (transport capacity) W/m2 Additional Reach Parameters Drainage Area (sq mi)
0.2
2.2
B4c
Impervious cover estimate (%) Rosgen Classification
G4
Bankfull Velocity (fps)
3.9
Bankfull discharge (cfs)
28
B4c
B4c
4.5
Valley length (ft) Channel Thalweg length (ft)
400
386
391
Sinuosity (ft)
1.06
1.05
1.2
1.17
Water Surface Slope (channel) (ft/ft)
0.014
0.0079
0.013
BF slope (ft/ft)
0.015
-
0.015
5
Bankfull Floodplain Area (acres) 6
7
Proportion Overwide (%)
Entrenchment Class (ER Range) 8
Incision Class (BHR Ranch)
BEHI VL% / L% / M% / H% / VH% / E% Channel Stability or Habitat Metric Biological or Other
27
SD
n
Table VIII-c
Baseline Stream Data Summary
Holly Grove Restoration Site - Middle Branch (1796 ft) Parameter
Gauge
Simension and Substrate - Riffle
Regional Curve LL
UL
Pre-Existing Condition Eq.
Min
Mean
Med
Max
Reference Reach(es) Data SD
n
Min
Mean
Med
Max
n
Min
20.1
Med
Bankfull Width (ft)
6.3
Floodprone Width (ft)
7.5
63
Bankfull Mean Depth (ft)
0.9
1.73
0.7
1
As-Built / Baseline
Design SD
Max
9 12
19.5
Min
Mean
Med
Max
6.2 27
55
80
0.6
0.7 1.1
Bankfull Max Depth (ft)
1.2
2
0.95
1
Bankfull Cross-Sectional Area (ft2)
5.5
34.8
6.3
3.7
5.2
7
12
13
10
10.4
7.6
13
Width/Depth Ratio Entrenchment Ratio 1
1.2
2.7
2.9
3.1
Bank Height Ratio
1.7
1.2
d50 (mm)
28
28
0.02
0.013
1.4
2.6
1.4
1.7
3
SD
7.2
1
Profile Riffle Length (ft)
10
Riffle Slope (ft/ft) Pool Length (ft)
6
Pool Max Depth (ft) Pool Spacing (ft) 2
30
65
100
33
15
32
0.013 13
16
1.4
36.5
40
36
45
54
17
38
0.0148
0.0184
17
29
0.9
1.32
44
75
Pool Volume (ft3)
Pattern Channel Beltwidth (ft)
40
50
60
33
36.5
40
13
20
27
30
88
Radius of Curvature (ft)
45
97.5
150
47
182.5
318
18
22.5
27
16
130 19.4
Radius of Curvature Ratio (ft/ft)
7
15
23
2.3
9.15
16
2
2.5
3
2.4
Meander Wavelength (ft)
55
77.5
100
37
104.5
172
18
49.5
81
60
Meander Width Ratio (ft/ft)
6
8
10
1.6
1.8
2
1.5
2.25
3
3
105 8.8
82.5
Substrate, bed and transport parameters 4 4 4
Ri% / Ru% / P% / G% / S%
34
25
12
29
SC% / Sa% / G% / C% / B% / Be%
d16 / d35 / d50 / d84 / d95 / dip / disp (mm) Reach Shear Stress (competency) lb/ft2
0.58
Max part size (mm) mobilized at bankfull
115
Stream Power (transport capacity) W/m2 Additional Reach Parameters Drainage Area (sq mi)
0.2
2.2
B4c
Impervious cover estimate (%) Rosgen Classification
G4
Bankfull Velocity (fps)
3.9
Bankfull discharge (cfs)
28
B4c
B4c 4.5
Valley length (ft) Channel Thalweg length (ft)
1778
Sinuosity (ft)
1.06
1.05
1.2
Water Surface Slope (channel) (ft/ft)
0.014
0.0079
0.013
0.0164
0.0187
BF slope (ft/ft)
0.015
-
0.015
0.016
0.019
5
Bankfull Floodplain Area (acres) 6
7
Proportion Overwide (%)
Entrenchment Class (ER Range) 8
1796
1790
Incision Class (BHR Ranch)
BEHI VL% / L% / M% / H% / VH% / E% Channel Stability or Habitat Metric Biological or Other
28
1.07
n
Table VIII-d
Baseline Stream Data Summary
Holly Grove Restoration Site - East Branch (1073 ft) Parameter
Gauge
Simension and Substrate - Riffle
Regional Curve LL
UL
Pre-Existing Condition Eq.
Min
Mean
Med
Max
Reference Reach(es) Data SD
n
Min
Mean
Med
Max
n
Min
20.1
Med
Bankfull Width (ft)
6.3
Floodprone Width (ft)
7.5
63
Bankfull Mean Depth (ft)
0.9
1.73
0.7
1
As-Built / Baseline
Design SD
Max
Min
Mean
9 12
19.5
Med
27
18
Bankfull Max Depth (ft)
1.2
2
0.95
1
5.5
34.8
6.3
6.5
Width/Depth Ratio
1
7
12
1.2
2.7
13
2.9
3.1
Bank Height Ratio
1.7
1.2
d50 (mm)
28
28
0.02
0.013
1.4
2.6
1.4
1.7
SD
0.8
Bankfull Cross-Sectional Area (ft2)
Entrenchment Ratio
Max
8.6
11.4 3
2.1
1
Profile Riffle Length (ft)
12
Riffle Slope (ft/ft) Pool Length (ft)
12
Pool Max Depth (ft) Pool Spacing (ft) 2
30
65
100
33
17
21
0.013 15
18
1.4
36.5
40
36
45
54
22
23
26
0.0071
0.0104
0.0132
13
14
17
0.5
0.8
0.9
34
35
44
Pool Volume (ft3)
Pattern Channel Beltwidth (ft)
40
50
60
33
36.5
40
13
20
27
28
36
45
Radius of Curvature (ft)
45
97.5
150
47
182.5
318
18
22.5
27
33
44
60
Radius of Curvature Ratio (ft/ft)
7
15
23
2.3
9.15
16
2
2.5
3
3.8
5.1
7
Meander Wavelength (ft)
55
77.5
100
37
104.5
172
18
49.5
81
76
81
91
Meander Width Ratio (ft/ft)
6
8
10
1.6
1.8
2
1.5
2.25
3
3.25
9.4
5.25
Substrate, bed and transport parameters 4 4 4
Ri% / Ru% / P% / G% / S%
41
16
24
SC% / Sa% / G% / C% / B% / Be%
d16 / d35 / d50 / d84 / d95 / dip / disp (mm) Reach Shear Stress (competency) lb/ft2
0.54
Max part size (mm) mobilized at bankfull
102
Stream Power (transport capacity) W/m2 Additional Reach Parameters Drainage Area (sq mi)
0.2
2.2
B4c
Impervious cover estimate (%) Rosgen Classification
G4
Bankfull Velocity (fps)
3.9
Bankfull discharge (cfs)
28
B4c
B4c
4.5
Valley length (ft) Channel Thalweg length (ft)
1039
Sinuosity (ft)
1.06
1.05
1.2
1.04
Water Surface Slope (channel) (ft/ft)
0.014
0.0079
0.013
0.011
BF slope (ft/ft)
0.015
-
0.015
0.011
5
Bankfull Floodplain Area (acres) 6
7
1058
Proportion Overwide (%)
Entrenchment Class (ER Range) 8
Incision Class (BHR Ranch)
BEHI VL% / L% / M% / H% / VH% / E% Channel Stability or Habitat Metric Biological or Other
29
1073
19
n
Table VIII-e
Baseline Stream Data Summary
Holly Grove Restoration Site - Southeast Creek (363 ft) Parameter
Gauge
Simension and Substrate - Riffle
Regional Curve LL
UL
Pre-Existing Condition Eq.
Min
Mean
Med
Max
Reference Reach(es) Data SD
n
Min
Mean
Med
Max
As-Built / Baseline
Design SD
n
Min
Max
Min
Mean
7.5
Med
Bankfull Width (ft)
6.3
Floodprone Width (ft)
7.5
63
Bankfull Mean Depth (ft)
0.9
1.73
0.6
0.5
1
20.1
Med
10
16.5
23
Bankfull Max Depth (ft)
1.2
2
0.75
0.8
5.5
34.8
4.2
4.3
7
12
13
Entrenchment Ratio 1
1.2
2.7
2.9
3.1
Bank Height Ratio
1.7
1.2
d50 (mm)
28
28
0.02
0.013
1.4
2.6
1.4
2.2
SD
25
Bankfull Cross-Sectional Area (ft2) Width/Depth Ratio
Max
8
15 3
3.1
1
Profile Riffle Length (ft)
10
Riffle Slope (ft/ft) Pool Length (ft)
10
Pool Max Depth (ft) Pool Spacing (ft) 2
30
65
100
33
12
19
14
15
0.016 13
20
1.1
36.5
18
0.0067 18
19
21
0.49
0.52
1.4 40
40
30
37.5
45
20
22
Pool Volume (ft3)
Pattern Channel Beltwidth (ft)
40
50
60
33
36.5
40
11
17
23
27
30.5
34
Radius of Curvature (ft)
45
97.5
150
47
182.5
318
15
19
23
40
64
88
Radius of Curvature Ratio (ft/ft)
7
15
23
2.3
9.15
16
2
2.5
3
5
8
11
Meander Wavelength (ft)
55
77.5
100
37
104.5
172
15
41.5
68
81
86
91
Meander Width Ratio (ft/ft)
6
8
10
1.6
1.8
2
1.5
2.25
3
3.4
38.5
4.3
Substrate, bed and transport parameters 4 4 4
Ri% / Ru% / P% / G% / S%
40
15
30
SC% / Sa% / G% / C% / B% / Be%
d16 / d35 / d50 / d84 / d95 / dip / disp (mm) Reach Shear Stress (competency) lb/ft2
0.53
Max part size (mm) mobilized at bankfull
96
Stream Power (transport capacity) W/m2 Additional Reach Parameters Drainage Area (sq mi)
0.2
2.2
B4c
Impervious cover estimate (%) Rosgen Classification
G4
Bankfull Velocity (fps)
3.9
Bankfull discharge (cfs)
28
B4c
B4c
4.5
Valley length (ft) Channel Thalweg length (ft)
342
359
363
Sinuosity (ft)
1.06
1.05
1.2
1.05
Water Surface Slope (channel) (ft/ft)
0.014
0.0079
0.016
0.0106
BF slope (ft/ft)
0.015
-
0.019
0.0106
5
Bankfull Floodplain Area (acres) 6
7
Proportion Overwide (%)
Entrenchment Class (ER Range) 8
Incision Class (BHR Ranch)
BEHI VL% / L% / M% / H% / VH% / E% Channel Stability or Habitat Metric Biological or Other
30
15
n
Table VIII-f
Baseline Stream Data Summary
Holly Grove Restoration Site - Southwest Creek (723 ft) Parameter
Gauge
Simension and Substrate - Riffle
Regional Curve LL
UL
Pre-Existing Condition Eq.
Min
Mean
Med
Max
Reference Reach(es) Data SD
n
Min
Mean
Med
Max
As-Built / Baseline
Design SD
n
Min
Max
Min
Mean
6.3
Floodprone Width (ft)
7.5
63
Bankfull Mean Depth (ft)
0.9
1.73
0.6
0.4
Bankfull Max Depth (ft)
1.2
2
0.85
0.7
Bankfull Cross-Sectional Area (ft2)
5.5
34.8
4.9
3.4
7
12
13
18.6
Width/Depth Ratio Entrenchment Ratio 1
1.2
2.7
8
Med
Bankfull Width (ft)
1
20.1
Med
11
2.9
3.1
Bank Height Ratio
1.7
1.2
d50 (mm)
28
28
0.02
0.013
1.4
2.6
1.4
17.5
2.2
Max
SD
8 24
15.6
3
1.95
1
Profile Riffle Length (ft)
10
Riffle Slope (ft/ft) Pool Length (ft)
6
Pool Max Depth (ft) Pool Spacing (ft) 2
30
65
100
33
14
19
0.007 10
13
1.3
36.5
9
11
18
0.0012
0.0018
0.032
5
8
12
1.15
1.45
1.65
25
32
60
40
32
40
48
19
Pool Volume (ft3)
Pattern Channel Beltwidth (ft)
40
50
60
33
36.5
40
12
18
24
50
55
Radius of Curvature (ft)
45
97.5
150
47
182.5
318
16
20
24
20
28.5
37
Radius of Curvature Ratio (ft/ft)
7
15
23
2.3
9.15
16
2
2.5
3
2.5
3.55
4.6
Meander Wavelength (ft)
55
77.5
100
37
104.5
172
16
44
72
60
93
126
Meander Width Ratio (ft/ft)
6
8
10
1.6
1.8
2
1.5
2.25
3
6.25
6.88
7.5
Substrate, bed and transport parameters 4 4 4
Ri% / Ru% / P% / G% / S%
33
19
30
SC% / Sa% / G% / C% / B% / Be%
d16 / d35 / d50 / d84 / d95 / dip / disp (mm) Reach Shear Stress (competency) lb/ft2
0.25
Max part size (mm) mobilized at bankfull
50
Stream Power (transport capacity) W/m2 Additional Reach Parameters Drainage Area (sq mi)
0.2
2.2
B4c
Impervious cover estimate (%) Rosgen Classification
G4
Bankfull Velocity (fps)
3.9
Bankfull discharge (cfs)
28
B4c
B4c
4.5
Valley length (ft) Channel Thalweg length (ft)
723
Sinuosity (ft)
1.06
1.05
1.2
1.17
Water Surface Slope (channel) (ft/ft)
0.014
0.0079
0.007
0.0122
BF slope (ft/ft)
0.015
-
0.008
0.0122
5
Bankfull Floodplain Area (acres) 6
7
Proportion Overwide (%)
Entrenchment Class (ER Range) 8
Incision Class (BHR Ranch)
BEHI VL% / L% / M% / H% / VH% / E% Channel Stability or Habitat Metric Biological or Other
31
18
n
Table IX-a Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 1: Buckhorn Creek Cross Section 1 Riffle
Parameter Dimension Bkf Width (ft) Floodprone Width (ft) Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Parameter
MY1 20 70
MY2
MY3
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
MY5
MY+
35.4 1.5 2.1 15.3 >3 1
MY1 22 -
MY2
MY3
MY4
Cross Section MY5
MY+
MY1
MY2
MY3
MY4
MY5
MY+
48 2.2 3.9 -
26.5 64
MY-1 (2006)
Pattern
MY4
Cross Section 2 Pool
Min 40 29 125 2
Max 115 371 320 5.75
Med 65 105 180 3.25
MY-2 (2007) Min
Max
Med
MY-3 (2008) Min
Max
Profile Riffle Length (ft) 28 81 47 Riffle Slope (ft/ft) 0.0024 0.0126 0.0094 Pool length (ft) 24.4 38 29.5 Pool Spacing (ft) 37 130 82 Additional Reach Parameters Valley Length (ft) 967 Channel Length (ft) 1085 Sinuosity 1.1 Water Surface Slope (ft/ft) 0.0024 0.0126 0.0094 Bkf Slope (ft/ft) 0.006 Rosgen Classification B4c Habitat Index Macrobenthos
32
Med
MY-4 (2009) Min
Max
Med
MY-5 (2010) Min
Max
Med
MY+ (2011) Min
Max
Med
Table IX-b Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 2: Buckhorn Creek Cross Section 3 Riffle
Parameter Dimension Bkf Width (ft) Floodprone Width (ft) Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Parameter
MY1 20.4 34
MY2
MY3
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
MY5
MY+
25.4 1.2 1.7 16.4 1.6 1.7
MY1 22.2 -
MY2
MY3
MY4
Cross Section
MY5
MY+
MY1
MY2
MY3
MY4
MY5
MY+
45.1 2 3 -
67.2 184
MY-1 (2006)
Pattern
MY4
Cross Section 4 Pool
Min 55 61 182 2.5
Max 162 245 225 7.5
Med 60 130 195 2.8
MY-2 (2007) Min
Max
Med
MY-3 (2008) Min
Max
Profile Riffle Length (ft) 25 87 34 Riffle Slope (ft) 0.0012 0.0228 0.0099 Pool length (ft) 16.2 36.8 31.8 Pool Spacing (ft) 26 151 56 Additional Reach Parameters Valley Length (ft) 882 Channel Length (ft) 968 Sinuosity 1.18 Water Surface Slope (ft/ft) 0.0012 0.0228 0.0099 Bkf Slope (ft/ft) 0.0057 Rosgen Classification B4c Habitat Index Macrobenthos
33
Med
MY-4 (2009) Min
Max
Med
MY-5 (2010) Min
Max
Med
MY+ (2011) Min
Max
Med
Table IX-c Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 3: Buckhorn Creek Cross Section 5 Riffle
Parameter Dimension Bkf Width (ft) Floodprone Width (ft) Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Parameter
MY1 25.5 65
MY2
MY3
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
MY5
MY+
48 1.9 2.6 13.5 2.5 1
MY1 22.5 -
MY2
MY3
MY4
Cross Section
MY5
MY+
MY1
MY2
MY3
MY4
MY5
MY+
62.8 2.8 4.7 -
60.6 118
MY-1 (2006)
Pattern
MY4
Cross Section 6 Pool
Min 45 177 243 1.8
Max 87 284 288 3.4
Med 50 222 274 2
103 0.014 49.6 167
49 0.007 24.7 75
0.014 -
1009 1040 1.03 0.0066 0.0047 B4c
MY-2 (2007) Min
Max
Med
MY-3 (2008) Min
Max
Profile Riffle Length (ft) 17 Riffle Slope (ft) 0.0032 Pool length (ft) 19.9 Pool Spacing (ft) 31 Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) 0.0032 Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos
34
Med
MY-4 (2009) Min
Max
Med
MY-5 (2010) Min
Max
Med
MY+ (2011) Min
Max
Med
Table IX-d Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 4: Middle Branch Cross Section 1 Riffle
Parameter Dimension Bkf Width (ft) Floodprone Width (ft) Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
MY1 5 40
MY2
MY3
MY+
MY1 17 -
MY3
MY4
MY5
MY+
MY1
MY2
MY3
MY4
MY5
MY+
20.6 58
Min 14 25 66 2.8
Max 21 59 100 4.2
Med 18 40 88 3.6
MY-2 (2007) Min
Max
Med
MY-3 (2008) Min
Max
Profile Riffle Length (ft) 9 23 15.8 Riffle Slope (ft/ft) 0.0155 0.0409 0.0271 Pool length (ft) 5 11.9 8.7 Pool Spacing (ft) 20 41 23 Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos
MY2
Cross Section
17 1 2.5 -
MY-1 (2006)
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
MY5
3.1 0.6 1 8.1 >3 1.45
Parameter Pattern
MY4
Cross Section 2 Pool
-
-
220 236 1.1 0.0205 B4c
35
Med
MY-4 (2009) Min
Max
Med
MY-5 (2010) Min
Max
Med
MY+ (2011) Min
Max
Med
Table IX-e Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 5: Middle Branch Cross Section 3 Riffle
Parameter Dimension Bkf Width (ft) Floodprone Width (ft) Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
MY1 8.2 40
MY2
MY3
MY+
MY1 8.6 -
MY3
MY4
MY5
MY+
MY1
MY2
MY3
MY4
MY5
MY+
15.3 44
Min 22 52 91 237
Max 24 71 133 2.9
Med 23 62 108 2.8
MY-2 (2007) Min
Max
Med
MY-3 (2008) Min
Max
Profile Riffle Length (ft) 16 Riffle Slope (ft) 0.009 Pool length (ft) 11.7 Pool Spacing (ft) 44 Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos
MY2
Cross Section
9.7 1.1 2 -
MY-1 (2006)
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
MY5
5.9 0.7 1.2 11.5 >3 1.3
Parameter Pattern
MY4
Cross Section 4 Pool
-
43 18 0.0093 0.0092 16.2 16.2 74.6 48.5
-
197 211 1.1 0.0117 B4c
36
Med
MY-4 (2009) Min
Max
Med
MY-5 (2010) Min
Max
Med
MY+ (2011) Min
Max
Med
Table IX-f Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 6: Lower East Branch Cross Section 5 Riffle
Parameter Dimension Bkf Width (ft) Floodprone Width (ft) Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
MY1 7.1 30
MY2
MY3
MY+
MY1 12.1 -
MY3
MY4
MY5
MY+
MY1
MY2
MY3
MY4
MY5
MY+
9.8 29
Min 16 2.3
Max 17 2.4
Med 16 193 87 2.3
MY-2 (2007) Min
Max
Med
MY-3 (2008) Min
Max
Profile Riffle Length (ft) 17.5 27 Riffle Slope (ft) 0.0037 0.0176 Pool length (ft) 6.5 12.5 Pool Spacing (ft) 30 44 Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos
MY2
Cross Section
11.5 1 2.5 -
MY-1 (2006)
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
MY5
2.7 0.4 0.6 18.6 >3 1.6
Parameter Pattern
MY4
Cross Section 6 Pool
-
-
18.8 0.012 9.5 38.4
207.4 209.7 1.0 0.0104 B4c
37
Med
MY-4 (2009) Min
Max
Med
MY-5 (2010) Min
Max
Med
MY+ (2011) Min
Max
Med
Table IX-g Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 7: Southeast Creek Cross Section 1 Riffle
Parameter Dimension Bkf Width (ft) Floodprone Width (ft) Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
MY1 15 35
MY2
MY3
MY+
MY1 10.5 -
MY3
MY4
MY5
MY+
MY1
MY2
MY3
MY4
MY5
MY+
0.1 43
Min 21 37 70 1.4
Max 26 48 80 1.7
Med 23 44 77 1.5
MY-2 (2007) Min
Max
Med
MY-3 (2008) Min
Max
Profile Riffle Length (ft) 12 20.5 19 Riffle Slope (ft/ft) 0.0017 0.0052 0.0029 Pool length (ft) 5 8.1 6 Pool Spacing (ft) 29.6 43.5 40.5 Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos
MY2
Cross Section
9.7 0.9 1.8 -
MY-1 (2006)
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
MY5
9.5 0.6 1.2 23.8 2.3 2.1
Parameter Pattern
MY4
Cross Section 2 Pool
-
-
157.6 167 1.1 0.0106 B4c
38
Med
MY-4 (2009) Min
Max
Med
MY-5 (2010) Min
Max
Med
MY+ (2011) Min
Max
Med
Table IX-h Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 8: Southwest Creek Cross Section 3 Riffle
Parameter Dimension Bkf Width (ft) Floodprone Width (ft) Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
MY1 8.2 15
MY2
MY3
MY+
MY1 6.6 -
MY3
MY4
MY5
MY+
MY1
MY2
MY3
MY4
MY5
MY+
7.3 56
Min 19 19 59 2.3
Max 42 26 99 5.1
Med 25 25 66 3
MY-2 (2007) Min
Max
Med
MY-3 (2008) Min
Max
Profile Riffle Length (ft) 4 Riffle Slope (ft) 0.002 Pool length (ft) 7 Pool Spacing (ft) 21 Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos
MY2
Cross Section
7.4 1.1 1.7 -
MY-1 (2006)
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
MY5
4.4 0.5 0.7 15.2 1.83 2.3
Parameter Pattern
MY4
Cross Section 4 Pool
-
15 9 0.0092 0.0056 19.5 11.4 38.5 27.5
-
174.4 198.2 1.1 0.0123 B4c
39
Med
MY-4 (2009) Min
Max
Med
MY-5 (2010) Min
Max
Med
MY+ (2011) Min
Max
Med
APPENDIX A VEGETATION RAW DATA
database name
Vegetation Survey Metadata Holly Grove Veg Plot Data.mdb
DESCRIPTION OF WORKSHEETS IN THIS DOCUMENT-----------Description of database file, the report worksheets, and a summary of Metadata project(s) and project data. Each project is listed with its PLANTED stems per acre, for each year. This excludes live stakes. Proj, planted Each project is listed with its TOTAL stems per acre, for each year. This includes live stakes, all planted stems, and all natural/volunteer Proj, total stems stems. List of plots surveyed with location and summary data (live stems, dead Plots stems, missing, etc.). Vigor Frequency distribution of vigor classes for stems for all plots. Frequency distribution of vigor classes listed by species. Vigor by Spp List of most frequent damage classes with number of occurrences and Damage percent of total stems impacted by each. Damage by Spp Damage values tallied by type for each species. Damage by Plot Damage values tallied by type for each plot. A matrix of the count of total living stems of each species (planted and natural volunteers combined) for each plot; dead and missing stems ALL Stems by Plot and spp are excluded. PROJECT SUMMARY------------------------------------Project Code HGV project Name Holly Grove Stream Restoration Description Buckhorn Creek, Middle Creek, etc River Basin Cape Fear length(ft) stream-to-edge width (ft) area (sq m) Required Plots (calculated) Sampled Plots 0
Table 2 - Vegetation Vigor by Species Species 4 3 2 1 0 Missing Unknown Betula nigra 3 3 3 Carya cordiformis 1 Celtis laevigata 1 1 1 Cornus amomum 4 1 2 2 Corylus americana 2 2 1 Diospyros virginiana 1 3 Fraxinus pennsylvanica 13 8 1 Juglans nigra 1 Liquidambar styraciflua 2 Nyssa sylvatica 2 1 1 Quercus phellos 1 Salix sericea 1 Sambucus canadensis 4 Ulmus alata 1 Viburnum dentatum 3 Ilex decidua 1 Cercis canadensis 2 3 2 4 2 Fagus grandifolia 2 1 Quercus 11 8 2 2 Hamamelis virginiana 1 2 3 Liriodendron tulipifera 4 4 1 2 1 Platanus occidentalis 2 3 2 2 Salix 1 Ulmus 1 Unknown 1 10 11 TOT: 25 1 59 41 3 29 28
Betula nigra Carya cordiformis Celtis laevigata Cercis canadensis Cornus amomum Corylus americana Diospyros virginiana Fagus grandifolia Fraxinus pennsylvanica Hamamelis virginiana Ilex decidua Juglans nigra Liquidambar styraciflua Liriodendron tulipifera Nyssa sylvatica Platanus occidentalis Quercus Quercus phellos Salix Salix sericea Sambucus canadensis Ulmus Ulmus alata Unknown Viburnum dentatum TOT: 25
9 1 3 13 9 5 4 3 22 6 1 1 2 12 4 9 23 1 1 1 4 1 1 22 3 161
5 1 1 7 4 1 1 4 6
Ins ec ts Un kn ow n
am ag (no eC ate da ma go rie ge De s ) er
All D
Sp ec ies
Table 3 - Vegetation Damage by Species
1
3
2 4 4 1 3 1 7
1 1 3 1 1 11
1
1 1 2 4 2 5 5
4 1 1 9 1
4 1 3 9
2
2
1 2 45
1 41
1 1 1 1 21 74
1
HGV-01-VP1-year:2 HGV-01-VP2-year:2 HGV-01-VP3-year:2 HGV-01-VP4-year:2 HGV-01-VP5-year:2 HGV-01-VP6-year:2 HGV-01-VP7-year:2 HGV-01-VP8-year:2 HGV-01-VPA-year:2 HGV-01-VPB-year:2 HGV-01-VPC-year:2 TOT: 11
Ins ec ts Un kn ow n
am ag eC da ate ma go De ge rie er ) s (no
All D
plo
t
Table 4 - Vegetation Damage by Plot
21 15 3 2 10 7 2 1 14 5 4 5 11 4 7 11 4 5 2 14 11 3 17 8 6 3 8 2 3 3 20 7 8 5 17 7 4 6 18 4 14 161 74 45 41
1
1
Betula nigra Celtis laevigata Cercis canadensis Cornus amomum Corylus americana Diospyros virginiana Fagus grandifolia Fraxinus pennsylvanica Hamamelis virginiana Ilex decidua Juglans nigra Liriodendron tulipifera Nyssa sylvatica Platanus occidentalis Quercus Quercus phellos Salix Sambucus canadensis Ulmus alata Unknown Viburnum dentatum TOT: 21
nte dS lot s te m av s g# s te plo ms tH G V plo t H -01-V plo GV-0 P1-y ea 1-V tH r:2 G P V 2 plo -ye 0 1 tH ar -V plo GV-0 P3-y :2 ea 1-V tH r:2 G P V 4 plo y 0 e 1-V tH ar plo GV-0 P5-y :2 ea 1-V tH r plo GV-0 P6-y :2 ea 1-V tH r plo GV-0 P7-y :2 ea 1-V tH r plo GV-0 P8-y :2 ea 1-V tH r plo GV-0 PA-y :2 1 e tH GV -VPB ar:2 -0 1 -ye -V PC ar:2 -ye ar: 2
Pla
#p
To tal
Sp
ec ie
s
Table 5 - Steam Count by Plot and Species
6 4 3 3 7 4 5 3 4 3 4 2 2 2 21 9 1 1 1 1 1 1 9 4 3 1 5 3 19 9 1 1 1 1 4 1 1 1 1 1 3 2 102 21
2 1 2 2 1 2 1 2 1 1 1 2 3 2 2 1 1 4 1 1 2
1 1
1 2 1 1
1 3 1
1
1
3
1 3 1
1 2
2 2
1 1
2 1
1 1 1
2
2
2
2
2
3
3
5
3
1 2 3 3
3
1 1
1
1 3
3 1
1
1
1 5
1 4 1 1 10
4 10
9
7
9
9
2 1 6 13 11 14
Vegetation Monitoring Plot 1 – 10/28/09
Vegetation Monitoring Plot 2 – 10/28/09
Holly Grove Stream Restoration Site
December 2009
Vegetation Monitoring Plot 3 – 10/28/09
Vegetation Monitoring Plot 4 – 10/28/09
Holly Grove Stream Restoration Site
December 2009
Vegetation Monitoring Plot 5 – 10/28/09
Vegetation Monitoring Plot 6 – 10/28/09
Holly Grove Stream Restoration Site
December 2009
Vegetation Monitoring Plot 7 – 10/28/09
Vegetation Monitoring Plot 8 – 10/28/09
Holly Grove Stream Restoration Site
December 2009
Vegetation Monitoring Plot A – 10/28/09
Vegetation Monitoring Plot B – 10/28/09
Holly Grove Stream Restoration Site
December 2009
Vegetation Monitoring Plot C – 10/28/09
Holly Grove Stream Restoration Site
December 2009
APPENDIX B GEOMORPHIC RAW DATA
Photo Point 1
Buckhorn Creek facing upstream – Year 0
Photo No. 1
Photo Point 1
Buckhorn Creek facing upstream – Year 1
Holly Grove Stream Restoration Site
Photo No. 2
Dec. 2009
Photo Point 2
Buckhorn Creek facing upstream – Year 0
Photo No. 3
Photo Point 2
Buckhorn Creek facing upstream – Year 1
Holly Grove Stream Restoration Site
Photo No. 4
Dec. 2009
Photo Point 3
Buckhorn Creek facing upstream – Year 0
Photo No. 5
Photo Point 3
Buckhorn Creek facing upstream – Year 1
Holly Grove Stream Restoration Site
Photo No. 6
Dec. 2009
Photo Point 4
West Branch facing downstream – Year 0
Photo No. 7
Photo Point 4
West Branch facing downstream – Year 1
Holly Grove Stream Restoration Site
Photo No. 8
Dec. 2009
Photo Point 5
Buckhorn Creek facing upstream – Year 0
Photo No. 9
Photo Point 5
Buckhorn Creek facing upstream – Year 1
Holly Grove Stream Restoration Site
Photo No. 10
Dec. 2009
Photo Point 6
Buckhorn Creek at bridge, facing upstream – Year 0
Photo No. 11
Photo Point 6
Buckhorn Creek at bridge, facing upstream – Year 1
Holly Grove Stream Restoration Site
Photo No. 12
Dec. 2009
Photo Point 7
Buckhorn Creek at bridge, facing downstream – Year 0
Photo No. 7
Photo Point 7
Buckhorn Creek at bridge, facing downstream – Year 1
Holly Grove Stream Restoration Site
Photo No. 14
Dec. 2009
Photo Point 8
Buckhorn Creek facing upstream – Year 0
Photo No. 15
Photo Point 8
Buckhorn Creek facing upstream – Year 1
Holly Grove Stream Restoration Site
Photo No. 16
Dec. 2009
Photo Point 9
Buckhorn Creek facing upstream – Year 0
Photo No. 17
Photo Point 9
Buckhorn Creek facing upstream – Year 1
Holly Grove Stream Restoration Site
Photo No. 18
Dec. 2009
Photo Point 10
Buckhorn Creek facing upstream – Year 0
Photo No. 19
Photo Point 10
Buckhorn Creek facing upstream – Year 1
Holly Grove Stream Restoration Site
Photo No. 20
Dec. 2009
Photo Point 11
Southwest Creek facing downstream – Year 0
Photo No. 21
Photo Point 11
Southwest Creek facing downstream - Year 1
Holly Grove Stream Restoration Site
Photo No. 22
Dec. 2009
Photo Point 12
Southwest Creek facing upstream – Year 0
Photo No. 12
Photo Point 12
Southwest Creek facing upstream – Year 1
Holly Grove Stream Restoration Site
Photo No. 24
Dec. 2009
Table B2. Visual Morphological Stability Assessment Holly Grove Stream Restoration Site (D06028-B) Buckhorn Creek 8,848 ft (# Stable) Total Total Number Number Number / Performing per As- feet in Metric as built unstable Intended state
Feature Category
% Performing in Stable Condition
Feature Performing Mean or Total
A. Riffles
1. Present 2. Armor stable 3. Facet grade appears stable 4. Minimal evidence of embedding/fining 5. Length appropriate
84 86 86 86 86
86 86 86 86 86
N/A N/A N/A N/A N/A
98% 100% 100% 100% 100%
100%
B. Pools
1. Present 2. Sufficently deep 3. Length appropriate
88 88 88
88 88 88
0 N/A N/A
100% 100% 100%
100%
C. Thalweg
1. Upstream of meander bend centered 2. Downstream of meander bend centered
86 86
86 86
N/A N/A
100% 100%
100%
D. Meanders
1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief
88 0 88 88
88 N/A 88 88
N/A N/A N/A N/A
100% 100% 100% 100%
100%
E. Bed General
1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting
N/A
N/A
0/0
100%
N/A
N/A
0/200
100%
100%
F. Vanes
1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures
108 108 108 105
108 108 108 108
N/A N/A N/A N/A
100% 100% 100% 97%
99%
1. Free of scour 2. Footing stable
23 23
23 23
N/A N/A
100% 100%
100%
% Performing in Stable Condition
Feature Performing Mean or Total
100% 93% 93% 100% 100%
97%
G. Wads/Boulders
Table B2. Visual Morphological Stability Assessment
Feature Category
A. Riffles
B. Pools
Holly Grove Stream Restoration Site (D06028-B) Middle Branch 1,755 ft (# Stable) Total Total Number / Number Number Metric Performing per As- feet in built unstable as state Intended 1. Present 44 44 N/A 2. Armor stable 41 44 N/A 3. Facet grade appears stable 41 44 N/A 4. Minimal evidence of embedding/fining 44 44 N/A 5. Length appropriate 44 44 N/A 1. Present 2. Sufficently deep 3. Length appropriate
46 46 46
46 46 46
N/A N/A N/A
100% 100% 100%
100%
1. Upstream of meander bend centered 2. Downstream of meander bend centered
44 44
44 44
N/A N/A
100% 100%
100%
D. Meanders
1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief
46 0 46 46
46 N/A 46 46
N/A N/A N/A N/A
100% 100% 100% 100%
100%
E. Bed General
1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting
N/A
N/A
0/0
100%
N/A
N/A
0/0
100%
100%
F. Vanes
1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures
66 69 69 66
69 69 69 69
N/A N/A N/A N/A
96% 100% 100% 96%
98%
G. Wads/Boulders
1. Free of scour 2. Footing stable
3 2
3 3
N/A N/A
100% 67%
83%
C. Thalweg
Table B2. Visual Morphological Stability Assessment
Feature Category
A. Riffles
Holly Grove Stream Restoration Site (D06028-B) East Branch 1,090 ft Total (# Stable) Total Number / Number Number Metric Performing per As- feet in built unstable as state Intended 1. Present 25 25 N/A 2. Armor stable 25 25 N/A 3. Facet grade appears stable 25 25 N/A 4. Minimal evidence of embedding/fining 25 25 N/A 5. Length appropriate 25 25 N/A
% Performing in Stable Condition
Feature Performing Mean or Total
100% 100% 100% 100% 100%
100%
B. Pools
1. Present 2. Sufficently deep 3. Length appropriate
25 25 25
25 25 25
N/A N/A N/A
100% 100% 100%
100%
C. Thalweg
1. Upstream of meander bend centered 2. Downstream of meander bend centered
25 25
25 25
N/A N/A
100% 100%
100%
D. Meanders
1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief
25 0 25 25
25 N/A 25 25
N/A N/A N/A N/A
100% 100% 100% 100%
100%
E. Bed General
1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting
N/A
N/A
0/0
100%
N/A
N/A
0/0
100%
100%
F. Vanes
1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures
38 38 38 38
38 38 38 38
N/A N/A N/A N/A
100% 100% 100% 100%
100%
1. Free of scour 2. Footing stable
1 1
1 1
N/A N/A
100% 100%
100%
% Performing in Stable Condition
Feature Performing Mean or Total
100% 80% 100% 100% 100%
96%
G. Wads/Boulders
Table B2. Visual Morphological Stability Assessment
Feature Category
A. Riffles
B. Pools
Holly Grove Stream Restoration Site (D06028-B) Southeast Creek 363 ft (# Stable) Total Total Number Number Number / Metric Performing per As- feet in as built unstable Intended state 1. Present 10 10 N/A 2. Armor stable 8 10 N/A 3. Facet grade appears stable 10 10 N/A 4. Minimal evidence of embedding/fining 10 10 N/A 5. Length appropriate 10 10 N/A 1. Present 2. Sufficently deep 3. Length appropriate
10 10 10
10 10 10
N/A N/A N/A
100% 100% 100%
100%
C. Thalweg
1. Upstream of meander bend centered 2. Downstream of meander bend centered
10 10
10 10
N/A N/A
100% 100%
100%
D. Meanders
1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief
9 0 9 9
9 N/A 9 9
N/A N/A N/A N/A
100% 100% 100% 100%
100%
1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting
N/A
N/A
0/0
100%
N/A
N/A
0/0
100%
100%
F. Vanes
1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures
11 11 11 11
11 11 11 11
N/A N/A N/A N/A
100% 100% 100% 100%
100%
G. Wads/Boulders
1. Free of scour 2. Footing stable
2 2
2 2
N/A N/A
100% 100%
100%
E. Bed General
Table B2. Visual Morphological Stability Assessment
Feature Category
A. Riffles
B. Pools
C. Thalweg
D. Meanders
E. Bed General
F. Vanes
G. Wads/Boulders
Holly Grove Stream Restoration Site (D06028-B) Southwest Creek 723 ft Total (# Stable) Total Number / Number Number Metric Performing per As- feet in built unstable as state Intended 1. Present 23 23 N/A 2. Armor stable 23 23 N/A 3. Facet grade appears stable 23 23 N/A 4. Minimal evidence of embedding/fining 23 23 N/A 5. Length appropriate 23 23 N/A
% Performing in Stable Condition
Feature Performing Mean or Total
100% 100% 100% 100% 100%
100%
1. Present 2. Sufficently deep 3. Length appropriate
25 25 25
25 25 25
N/A N/A N/A
100% 100% 100%
100%
1. Upstream of meander bend centered 2. Downstream of meander bend centered
23 23
23 23
N/A N/A
100% 100%
100%
1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief
25 0 25 25
25 N/A 25 25
N/A N/A N/A N/A
100% 100% 100% 100%
100%
1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting
N/A
N/A
0/0
100%
N/A
N/A
0/0
100%
100%
1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures
9 9 9 9
9 9 9 9
N/A N/A N/A N/A
100% 100% 100% 100%
100%
1. Free of scour 2. Footing stable
34 34
34 34
N/A N/A
100% 100%
100%
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF1 Reach 1 - Buckhorn Creek - Sta 11+81.0
As-Built
Year 1
Facing Downstream
Riffle Cross Section
104 102
Elevation (ft)
100 98
As-built Year 1 Year 2 Year 3 Year 4 Year 5
▼ BKF
96 94 92 90 -20
-10
0
10
20
30
40
50
60
70
Station (ft)
As-Built Date 1/8/09 Area 34.3 Bkf W 23.4 Dmean 1.5 Dmax 2.1 W/d 16.0
Year 1 Date 10/20/09 Area 35.4 Bkf W 23.3 Dmean 1.5 Dmax 2.1 W/d 15.3
Year 2 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF1 Reach 1 - Buckhorn Creek - Sta 11+81.0 Station BM HI -20 -10 -5 0 5 10 15.5 18.4 21.3 25.5 26.5 29 32.2 34.4 35.3 38.9 46 49.4 52.5 57 62
As-Built FS/BS Elev. 6.36 97.34 103.70 3.11 100.59 3.60 100.10 4.71 98.99 5.26 98.44 5.61 98.09 6.07 97.63 6.46 97.24 7.25 96.45 8.19 95.51 8.45 95.25 8.59 95.11 8.46 95.24 8.25 95.45 8.36 95.34 8.01 95.69 6.46 97.24 6.41 97.29 6.49 97.21 5.99 97.71 4.78 98.92 3.00 100.70
Desc. PL1 IR Lt GRND
GRND
BKF TOE EOW THL
EOW TOE BKF
GRND
Station BM HI 0 2 7 13 15.6 17.5 18.5 20 20.4 20.9 21.7 22.5 24 26 28 29.5 30.9 32 33.8 34.6 34.8 35.3 36 36.7 37.4 38.9 42 46 48 50 51.6 52.6
FS/BS 3.78 4.02 4.15 4.58 4.94 5.20 5.65 5.96 6.37 6.48 6.71 6.98 7.29 7.33 7.23 7.17 7.19 7.33 7.33 7.26 7.10 6.89 6.75 6.45 6.21 5.83 5.18 5.22 5.27 5.37 5.04 4.82 4.7
25
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Station BM HI
Year 1 Elev. 98.67 102.45 98.43 98.30 97.87 97.51 97.25 96.80 96.49 96.08 95.97 95.74 95.47 95.16 95.12 95.22 95.28 95.26 95.12 95.12 95.19 95.35 95.56 95.70 96.00 96.24 96.62 97.27 97.23 97.18 97.08 97.41 97.63 97.75
Desc. RF1 IR Lt
Station BM HI
Year 2 FS/BS Elev.
Desc. IR Lt
0.00
GRND GRND GRND GRND GRND BKF LT BNK BNK BNK BNK EOW BED BED BED BED BED BED BED BED BED EOW BNK BNK BNK BKF RT GRND GRND GRND GRND GRND GRND GRND
97.14
FS/BS 0.00
Year 4 Elev. 100.00 100.00
Desc. IR Lt
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL1 Reach 1 - Buckhorn Creek - Sta 12+30.5
As-Built
Year 1
Facing Downstream
Pool Cross Section
100
98 Elevation (ft)
▼ BKF
As-built Year 1 Year 2 Year 3 Year 4 Year 5
96
94
92
90 -25
-15
-5
5
15
25
35
45
55
65
75
Station (ft)
As-Built Date 1/8/09 Area 52.7 Bkf W 23.2 Dmean 2.3 Dmax 4.0 W/d 10.2
Year 1 Date 10/20/09 Area 48.0 Bkf W 22.1 Dmean 2.2 Dmax 3.9 W/d 10.2
Year 2 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL1 Reach 1 - Buckhorn Creek - Sta 12+30.5 Station BM HI -25 -10 -3 0 4 10.5 14.1 18.4 19.9 20.5 20.8 23.1 24.7 27.6 29.2 30.6 31.2 31.5 33.7 37.3 42.3 44.9 48.7 52 55 58.4 62.6 67.5
As-Built FS/BS Elev. 6.36 97.34 103.70 3.35 100.35 4.12 99.58 4.91 98.79 5.51 98.19 6.37 97.33 6.85 96.85 6.71 96.99 8.35 95.35 8.45 95.25 8.80 94.90 9.83 93.87 10.54 93.16 10.73 92.97 10.59 93.11 10.49 93.21 9.75 93.95 8.84 94.86 8.40 95.30 7.97 95.73 6.95 96.75 7.41 96.29 6.92 96.78 6.59 97.11 6.76 96.94 7.16 96.54 5.95 97.75 4.57 99.13 3.17 100.53
Desc. PL1 IR Rt
GRND
BKF
EOW
EOW
BKF
Station BM HI 0 1.1 3.6 6.6 10.1 13.1 14.7 16.8 17.9 19.6 20.2 20.8 22.2 24.1 24.1 28.7 29.5 29.9 31.3 31.7 32.2 34.5 34.6 35.5 36.8 39.1 40.1 43.1 44.1 47.9 25
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Station BM HI
Year 1 FS/BS Elev. 3.78 98.67 102.45 4.17 98.28 4.41 98.04 5.12 97.33 5.40 97.05 5.54 96.91 5.49 96.96 5.62 96.83 6.46 95.99 6.89 95.56 7.14 95.31 7.43 95.02 8.44 94.01 8.96 93.49 9.51 92.94 9.55 92.9 9.01 93.44 8.92 93.53 8.53 93.92 8.26 94.19 7.43 95.02 6.87 95.58 6.75 95.7 6.28 96.17 6.04 96.41 5.77 96.68 5.76 96.69 5.88 96.57 6 96.45 5.71 96.74 5.64 96.81
Desc. RF1 IR Lt
Station BM HI
Year 2 FS/BS Elev.
Desc. IR Lt
0.00
GRND GRND GRND GRND GRND GRND GRND GRND BKF LT BNK LOG EOW BED BED BED BED BED BED BED BED EOW BNK BNK BNK BKF RT GRND GRND GRND GRND GRND
97.14
Year 4 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 1 - Buckhorn Creek
Elevation (ft)
Profile 100 99 98 97 96 95 94 93 92 91 90 89 88 87 86 85 1000
1050
1100
1150
1200
1250
1300
1350
1400
1450
1500
1550
1600
1650
1700
1750
1800
1850
1900
1950
2000
2050
Station (ft)
Year 1 Bed
Year 1 Water
hw mark
Year 1 Bankfull
As-Built Bed
2100
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 1 - Buckhorn Creek
HI 102.58 102.58 102.58 102.58 102.58 102.58 102.58 102.58 102.58 102.58 102.58 102.58 102.58 102.58 102.58 102.58 102.58 102.58 100.68 100.68 100.68 100.68 100.68 100.68 100.68 100.68 100.68 100.68 100.68 100.68 100.68 100.68 100.68 100.68 100.68 100.68 100.68 100.68 100.68 100.68 100.68 100.34 100.34 100.34 100.34 100.34 100.34 100.34 100.34 100.34 100.34 100.34 100.34 100.34 100.34 100.34 100.34 100.34 100.34
Station 1000 1011 1027 1041 1052 1072 1080.5 1100 1108 1138 1181 1219 1230.5 1263 1309 1330 1355 1398 1412 1427 1434 1455 1473 1492 1507 1534 1546 1557 1577 1593 1620 1632 1637 1671 1695 1706 1718 1728 1744 1773 1798 1810 1832 1839 1861 1879 1889 1900 1917 1952 1962.5 1974 1979 1994 2002 2011 2021 2049 2085.1
Bed FS 6.29 6.47 9.48 7.70 6.84 7.07 7.10 7.56 8.19 7.32 7.40 7.79 9.67 8.04 8.09 10.72 8.84 9.05 7.22 9.19 9.37 7.92 8.02 8.97 8.04 7.80 10.08 10.73 8.44 8.15 8.23 10.05 10.09 8.49 8.64 8.85 10.18 10.33 8.98 9.01 9.19 10.55 10.17 9.46 9.81 8.91 10.66 11.62 9.54 9.53 9.48 11.77 12.27 10.34 9.58 11.50 11.18 9.74 9.80
Water Depth 0.09 0.08 3.00 1.24 0.37 0.40 0.27 0.62 1.25 0.36 0.33 0.26 2.12 0.47 0.06 2.36 0.48 0.32 0.03 1.75 1.94 0.55 0.55 1.46 0.55 0.12 2.40 3.05 0.75 0.32 0.23 2.00 2.10 0.42 0.32 0.42 1.75 1.93 0.58 0.56 0.28 1.88 1.50 0.77 1.06 0.08 1.63 2.60 0.52 0.54 0.35 2.52 3.02 1.10 0.33 2.25 1.93 0.46 0.30
Year 1 Bankfull FS
4.35
5.13
5.44 5.82
6.87
5.45
5.75
6.25
7.09
7.45
8.24
7.74
Description HOR LV INV POOL END PL HOR RIFF BED ROCK POOL POOL HOR XS RF1 LV XS PL1 HOR LV POOL HOR TOR LV INV B POOL E POOL HOR TOR POOL HOR LV INV B POOL E POOL HOR RIFF LV INV B POOL E POOL HOR TOR LV INV B POOL E POOL HOR RIFF LV INV BP EP HOR TOR RCV BP EP HOR TOR LV BP POOL EP RJH BP EP HOR THL
Bed Elev. 96.29 96.11 93.10 94.88 95.74 95.51 95.48 95.02 94.39 95.26 95.18 94.79 92.91 94.54 94.49 91.86 93.74 93.53 93.46 91.49 91.31 92.76 92.66 91.71 92.64 92.88 90.60 89.95 92.24 92.53 92.45 90.63 90.59 92.19 92.04 91.83 90.50 90.35 91.70 91.67 91.49 89.79 90.17 90.88 90.53 91.43 89.68 88.72 90.80 90.81 90.86 88.57 88.07 90.00 90.76 88.84 89.16 90.60 90.54
Water Elev. 96.38 96.19 96.10 96.12 96.11 95.91 95.75 95.64 95.64 95.62 95.51 95.05 95.03 95.01 94.55 94.22 94.22 93.85 93.49 93.24 93.25 93.31 93.21 93.17 93.19 93.00 93.00 93.00 92.99 92.85 92.68 92.63 92.69 92.61 92.36 92.25 92.25 92.28 92.28 92.23 91.77 91.67 91.67 91.65 91.59 91.51 91.31 91.32 91.32 91.35 91.21 91.09 91.09 91.10 91.09 91.09 91.09 91.06 90.84
Bankfull Elev.
98.23
97.45
97.14 96.76
95.71
95.23
94.93
94.43
93.59
92.89
92.10
92.60
weighted particle count:
80.9
20 16.3
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 1 Note: Reach Data 1 Pebble Count, Holly Grove Stream Restoration Site
100% 90% 80% 70% 60%
percent finer than
1% 0% 16% 1% 4% 2% 14% 7% 0% 12% 3% 2% 10% 4% 9% 10% 8% 10% 15% 6% 15% 9% 4% 6% 1% 2% 0% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range
Pebble Count Weighted by Channel Feature Percent Riffle: 35.5 Percent Run: Percent Pool: 28.2 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 0.9 # very fine sand 0.062 0.13 0.0 # 0.13 0.25 0.9 # fine sand medium sand 0.25 0.5 3.6 # 0.5 1 1.8 # coarse sand 1 2 5.5 # very coarse sand 2 4 0.0 # very fine gravel 4 6 2.7 # fine gravel 6 8 1.8 # fine gravel 8 11 3.6 # medium gravel 11 16 7.3 # medium gravel 16 22 8.2 # coarse gravel 22 32 8.2 # coarse gravel very coarse gravel 32 45 11.8 # very coarse gravel 45 64 11.8 # small cobble 64 90 7.3 # medium cobble 90 128 4.5 # large cobble 128 180 0.9 # very large cobble 180 256 0.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder
50% 40% 30% 20% 10% 0% 0.01
0.1
1
10
weighted percent
particle size (mm)
100
riffle
pool
1000
run
glide
0% bedrock
19.1
clay hardpan
0.0
detritus/wood
0.0
artificial
0.0
weighted total count:
100
based on sediment particles only based on total count
size percent less than (mm)
particle size distribution gradation geo mean
std dev
D16
D35
D50
D65
D84
D95
4.127
16.08
26.5
40
64
100
4.4
16.2
3.9
boulder 0%
bedrock 19%
hardpan 0%
wood/det 0%
artificial 0%
percent by substrate type silt/clay 1%
sand 12%
gravel 55%
cobble 13%
bedrock clay hardpan detritus/wood
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Pebble Count, Holly Grove Stream Restoration Site
100%
25
80% 70%
20
60% 50%
15
40% 10
30% 20%
5
10% 0% 0.01
0.1
1
10
100
100
1000
0 10000
particle size (mm) cumulative %
97
artificial
30
90% percent finer than
3 2 3 6 12 9 25 15 10 7 2 1 2
3
total count:
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 1 Note: Riffle RF1
Count
number of particles
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
based on sediment particles only based on total count
size percent less than (mm)
# of particles
particle size distribution gradation geo mean
std dev
D16
D35
D50
D65
D84
D95
16.659
30.63
38.5
48
80
131
2.2
36.5
2.2
percent by substrate type silt/clay
sand
gravel
cobble
boulder
bedrock
hardpan
wood/det
artificial
0%
0%
75%
20%
2%
3%
0%
0%
0%
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF2 Reach 2 - Buckhorn Creek - Sta 15+90.2
As-Built
Year 1
Facing Downstream
Riffle Cross Section
648
Elevation (ft)
646 As-built Year 1 Year 2 Year 3 Year 4 Year 5
644
▼ BKF
642
640
638 -20
-10
0
10
20
30
40
50
60
70
Station (ft)
As-Built Date 1/8/09 Area 26.3 Bkf W 19.9 Dmean 1.3 Dmax 1.7 W/d 15.1
Year 1 Date 10/20/09 Area 25.4 Bkf W 20.4 Dmean 1.2 Dmax 1.7 W/d 16.4
Year 2 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF2 Reach 2 - Buckhorn Creek - Sta 15+90.2 Station BM HI -20 -10 -5 -2 0 2 4.5 7 9.6 10.6 11.3 12 14 16 19 21 24 26 27.3 27.8 29.5 30.4 31.2 34 37 41 43.6 48
As-Built FS/BS Elev. 6.90 644.39 651.29 5.33 645.96 5.45 645.84 5.66 645.63 6.27 645.02 7.04 644.25 7.85 643.44 8.95 642.34 9.38 641.91 9.46 641.83 9.90 641.39 10.00 641.29 11.18 640.11 11.06 640.23 11.08 640.21 11.20 640.09 11.12 640.17 10.75 640.54 10.71 640.58 10.83 640.46 10.27 641.02 9.50 641.79 9.28 642.01 8.23 643.06 7.73 643.56 6.70 644.59 6.04 645.25 4.96 646.33 2.38 648.91
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. RF2 IR Lt
GRND
BKF EOW
EOW
BKF
Station BM HI 0 4.5 6 8.5 9.6 10.7 11.3 12.3 13 15 17 19 21 23.1 25 27.5 28.4 30 31.2 33 35 37 41 43.7
FS/BS 6.55
Station BM HI
FS/BS 0.00
7.06 8.89 9.24 9.42 9.50 9.98 10.67 10.88 11.11 11.04 11.12 11.18 11.13 10.90 10.55 10.71 9.95 9.42 8.31 8.08 7.54 6.73 6.05 5.04
Year 1 Elev. 644.77 651.32 644.26 642.43 642.08 641.90 641.82 641.34 640.65 640.44 640.21 640.28 640.20 640.14 640.19 640.42 640.77 640.61 641.37 641.90 643.01 643.24 643.78 644.59 645.27 646.28
Desc. PL2 IR Lt
Station BM HI
Year 2 FS/BS Elev.
Desc. IR Lt
0.00
GRND GRND GRND GRND BKF LT BNK BNK EOW BED BED BED BED BED EOW BED BED BANK BANK BKF RT GRND GRND GRND GRND GRND
GRND
Desc. IR Lt
Year 4 Elev. 100.00 100.00
Desc. IR Lt
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL2 Reach 2 - Buckhorn Creek - Sta 15+30.2
As-Built
Year 1
Facing Downstream
Pool Cross Section
648
Elevation (ft)
646 As-built Year 1 Year 2 Year 3 Year 4 Year 5
644 ▼ BKF
642
640
638 -25
-15
-5
5
15
25
35
45
55
65
75
Station (ft)
As-Built Date 1/8/09 Area 45.6 Bkf W 23.3 Dmean 2.0 Dmax 2.8 W/d 11.9
Year 1 Date 10/20/09 Area 43.8 Bkf W 22.2 Dmean 2.0 Dmax 2.9 W/d 11.2
Year 2 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL2 Reach 2 - Buckhorn Creek - Sta 15+30.2 Station BM HI -20 -10 -3 0 5 7 8.8 10 11.7 14.2 15.5 18 20.5 23 26 29 31 32.3 35 38 39 40.8
As-Built FS/BS Elev. 6.90 644.39 651.29 5.09 646.20 5.13 646.16 5.30 645.99 6.68 644.61 8.65 642.64 8.60 642.69 8.91 642.38 8.75 642.54 8.95 642.34 10.22 641.07 10.80 640.49 11.25 640.04 11.70 639.59 11.73 639.56 11.65 639.64 11.58 639.71 10.90 640.39 10.22 641.07 8.15 643.14 5.98 645.31 5.27 646.02 3.10 648.19
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. RF2 IR Lt
GRND
BKF
BR BR
EOW
Desc. IR Lt
Station BM HI 0 4.2 5.7 8.7 10.7 11.9 12.7 14.2 15.2 16.7 18.7 21.7 24.7 27.7 29.3 30.9 32.2 34.1 36.7 39
Year 1 FS/BS Elev. 6.55 644.77 651.32 6.75 644.57 8.54 642.78 8.75 642.57 8.92 642.4 8.84 642.48 8.96 642.36 9.16 642.16 10.17 641.15 10.69 640.63 10.82 640.5 11.47 639.85 11.86 639.46 11.63 639.69 11.59 639.73 11.37 639.95 11.01 640.31 10.14 641.18 9.03 642.29 7.01 644.31 5.32 646
Station BM HI
Year 4 FS/BS Elev. 0.00 100.00 100.00
Desc. PL2 IT Lt
Station BM HI
Year 2 FS/BS Elev.
Desc. IR Lt
0.00
GRND GRND GRND GRND GRND BKF LT BNK EOW BED BED BED BED BED BED BED BED EOW BNK BNK GRND
Desc. IR Lt
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 2 - Buckhorn Creek
Elevation (ft)
Profile 650 649 648 647 646 645 644 643 642 641 640 639 638 637 636 635 1000
1050
1100
1150
1200
1250
1300
1350
1400
1450
1500
1550
1600
1650
1700
1750
1800
1850
1900
1950
Station (ft)
Year 1 Bed
Year 1 Water
As-Built Bed
Year 1 Bankfull
2000
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 2 - Buckhorn Creek
HI 650.89 650.89 650.89 650.89 650.89 650.89 650.89 650.89 650.89 650.89 650.89 650.89 650.89 650.89 650.89 650.89 650.89 650.89 650.89 650.89 650.89 649.55 649.55 649.55 649.55 649.55 649.55 649.55 649.55 649.55 649.55 649.55 649.55 649.55 649.55 649.55 649.55 649.55 649.55 649.55 649.55 649.55 649.55 649.55 649.55 647.47 647.47 647.47 647.47 647.47 647.47 647.47 647.47 647.47 647.47 647.47 647.47 647.47 647.47
Station 1000 1013 1035 1069 1085 1120 1144.5 1155 1174 1185 1197 1211 1234 1266 1278 1286 1291 1320 1334 1350 1358 1394 1412 1429 1438 1458 1470 1495 1505 1530.2 1543 1554 1590.2 1611 1641 1656 1673 1699 1708 1715 1733 1765 1776 1783 1800 1810 1818 1827 1838 1860 1871 1882 1888 1916 1926 1932 1953 1968 1975
Bed FS 7.01 10.64 8.52 8.81 7.37 7.72 7.53 9.76 9.66 7.75 9.71 10.22 8.02 8.17 10.26 10.10 8.60 9.39 9.99 9.93 9.62 8.61 9.13 8.55 10.81 10.57 8.95 8.72 9.93 9.86 9.69 8.83 9.40 9.80 9.63 11.96 9.65 10.06 11.73 11.82 10.42 10.93 10.31 11.16 11.47 9.08 8.31 10.29 11.22 8.58 8.35 10.58 10.64 8.99 10.84 11.39 8.68 8.55 8.58
Water Depth 0.17 3.66 1.54 1.82 0.39 0.42 0.09 2.31 2.22 0.14 2.03 2.54 0.31 0.00 1.75 1.58 0.07 0.20 0.66 0.59 0.15 0.24 0.75 0.15 2.40 2.15 0.55 0.29 1.50 1.43 1.27 0.23 0.20 0.46 0.18 2.49 0.11 0.25 1.72 1.80 0.42 0.90 0.21 1.03 1.34 1.15 0.29 2.27 3.17 0.56 0.22 2.45 2.51 0.85 2.70 3.26 0.54 0.34 0.16
Year 1 Bankfull FS
5.49
5.96
7.53
7.17
7.48
6.55
Description RCV B POOL POOL E POOL HOR TOR LV EPL EPL LV-JH B PL EPL HOR LV BPL EPL B.ROCK TOR PL E PL THL THL PL LV BPL EPL HOR L SILL PL XS PL2 EPL HOR XS RF2 TOR LOG PL HOR LV BPL EPL HOR THL RCV? BPL EPL EPL RCV BPL EPL THL LV BPL EPL RCV BPL EPL HOR EP2 LV
Bed Elev. 643.88 640.25 642.37 642.08 643.52 643.17 643.36 641.13 641.23 643.14 641.18 640.67 642.87 642.72 640.63 640.79 642.29 641.50 640.90 640.96 641.27 640.94 640.42 641.00 638.74 638.98 640.60 640.83 639.62 639.69 639.86 640.72 640.15 639.75 639.92 637.59 639.90 639.49 637.82 637.73 639.13 638.62 639.24 638.39 638.08 638.39 639.16 637.18 636.25 638.89 639.12 636.89 636.83 638.48 636.63 636.08 638.79 638.92 638.89
Water Elev. 644.05 643.91 643.91 643.90 643.91 643.59 643.45 643.44 643.45 643.28 643.21 643.21 643.18 642.72 642.38 642.37 642.36 641.70 641.56 641.55 641.42 641.18 641.17 641.15 641.14 641.13 641.15 641.12 641.12 641.12 641.13 640.95 640.35 640.21 640.10 640.08 640.01 639.74 639.54 639.53 639.55 639.52 639.45 639.42 639.42 639.54 639.45 639.45 639.42 639.45 639.34 639.34 639.34 639.33 639.33 639.34 639.33 639.26 639.05
Bankfull Elev.
645.40
644.93
643.36
642.38
642.07
640.92
weighted particle count:
96.0
31 11
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 2 Note: Reach Data 2 Pebble Count, Holly Grove Stream Restoration Site
100% 90% 80% 70% 60%
percent finer than
0% 0% 16% 0% 0% 1% 14% 2% 1% 12% 1% 1% 10% 3% 1% 9% 8% 9% 13% 6% 6% 15% 4% 9% 11% 2% 10% 3% 0% 1% 10000 2% % of particles 0% weighted percent of particles in range
Pebble Count Weighted by Channel Feature Percent Riffle: 32 Percent Run: Percent Pool: 26 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 0.0 # very fine sand 0.062 0.13 0.0 # 0.13 0.25 0.0 # fine sand medium sand 0.25 0.5 0.0 # 0.5 1 1.0 # coarse sand 1 2 2.0 # very coarse sand 2 4 1.0 # very fine gravel 4 6 1.0 # fine gravel 6 8 1.0 # fine gravel 8 11 3.0 # medium gravel 11 16 1.0 # medium gravel 16 22 9.0 # coarse gravel 22 32 9.0 # coarse gravel very coarse gravel 32 45 12.0 # very coarse gravel 45 64 6.0 # small cobble 64 90 14.0 # medium cobble 90 128 9.0 # large cobble 128 180 11.0 # very large cobble 180 256 10.0 # small boulder 256 362 3.0 # small boulder 362 512 1.0 # medium boulder 512 1024 2.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder
50% 40% 30% 20% 10% 0% 0.01
0.1
1
10
weighted percent
particle size (mm)
100
riffle
pool
1000
run
glide
0% bedrock
4.0
clay hardpan
0.0
detritus/wood
0.0
artificial
0.0
weighted total count:
100
based on sediment particles only based on total count
size percent less than (mm)
particle size distribution gradation geo mean
std dev
D16
D35
D50
D65
D84
D95
19.341
37.52
67.2
99
184
294
3.1
59.7
3.1
boulder 6%
bedrock 4%
hardpan 0%
wood/det 0%
artificial 0%
percent by substrate type silt/clay 0%
sand 3%
gravel 43%
cobble 44%
bedrock clay hardpan detritus/wood
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Pebble Count, Holly Grove Stream Restoration Site
100%
percent finer than
2 0 2 1 4 2 2 4 15 16 12 16 11 1 1
artificial 100
18
90%
16
80%
14
70%
12
60%
10
50% 8
40%
6
30% 20%
4
10%
2
0% 0.01
0.1
1
10
100
1000
0 10000
particle size (mm) cumulative %
89 11
total count:
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 2 Note: Riffle RF2
Count
number of particles
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
based on sediment particles only based on total count
size percent less than (mm)
# of particles
particle size distribution gradation geo mean
std dev
D16
D35
D50
D65
D84
D95
35.567
62.74
83.5
120
175
237
2.2
79.0
2.2
percent by substrate type silt/clay
sand
gravel
cobble
boulder
bedrock
hardpan
wood/det
artificial
0%
0%
32%
55%
2%
11%
0%
0%
0%
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF3 Reach 3 - Buckhorn Creek - Sta 12+51.6
As-Built
Year 1
Facing Downstream
Riffle Cross Section
642
Elevation (ft)
640 As-built Year 1 Year 2 Year 3 Year 4 Year 5
638 ▼ BKF
636
634
632 -20
-10
0
10
20
30
40
50
60
70
Station (ft)
As-Built Date 1/8/09 Area 48.3 Bkf W 25.4 Dmean 1.9 Dmax 2.6 W/d 13.4
Year 1 Date 10/20/09 Area 47.5 Bkf W 25.5 Dmean 1.9 Dmax 2.6 W/d 13.7
Year 2 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF3 Reach 3 - Buckhorn Creek - Sta 12+51.6 Station BM HI -20 -10 -1 0 0.8 2.3 5 8.3 10.6 12 13.5 14 15.5 15.8 16.9 17.9 20 22 23 25 27 30 32.1 32.6 33.2 34.1 36.2 37.4 41.5 45.1 46 47.8 49.5 50.4 51.2 54.7 61 68
As-Built FS/BS Elev. 5.88 638.55 644.43 4.71 639.72 5.33 639.10 5.61 638.82 6.12 638.31 6.53 637.90 7.08 637.35 8.14 636.29 7.86 636.57 7.85 636.58 8.14 636.29 8.70 635.73 9.23 635.20 9.87 634.56 10.22 634.21 10.35 634.08 10.47 633.96 10.48 633.95 10.64 633.79 10.78 633.65 10.70 633.73 10.68 633.75 10.48 633.95 10.43 634.00 10.33 634.10 9.78 634.65 9.49 634.94 8.35 636.08 8.07 636.36 8.21 636.22 7.89 636.54 7.49 636.94 6.43 638.00 5.56 638.87 5.17 639.26 4.85 639.58 3.67 640.76 3.18 641.25 2.85 641.58
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. RF3 IR Lt
GRND
BKF
EOW
EOW
BKF
GRND
Desc. IR Lt
Station BM HI 0 2 4 7 9 11 11.6 12.2 12.8 13.6 14.8 15.4 16 18 19.6 21 22 24 26 28 30 32 32.7 33.5 34.8 35.8 36.5 37.1 40 43.5 45.6 47 49 50.4
FS/BS 3.92
Station BM HI
FS/BS 0.00
4.27 5.04 5.93 6.19 5.95 6.03 6.14 6.29 6.60 6.85 7.69 7.86 8.27 8.50 8.49 8.60 8.65 8.81 8.66 8.51 8.48 8.27 8.27 7.61 7.16 6.56 6.37 6.17 6.17 6.1 5.77 4.97 3.87 3.22
Year 1 Elev. 638.55 642.47 638.20 637.43 636.54 636.28 636.52 636.44 636.33 636.18 635.87 635.62 634.78 634.61 634.20 633.97 633.98 633.87 633.82 633.66 633.81 633.96 633.99 634.20 634.20 634.86 635.31 635.91 636.10 636.30 636.30 636.37 636.70 637.50 638.60 639.25
Year 4 Elev. 100.00 100.00
Desc. RF3 IR Lt
Station BM HI
Year 2 FS/BS Elev.
Desc. IR Lt
0.00
GRND GRND GRND GRND GRND BKF LT? BKF LT BKF LT BANK BANK BANK BANK EOW BED BED BED BED BED BED BED BED BED TOE BNK BNK BNK BNK BKF GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL3 Reach 3 - Buckhorn Creek - Sta 13+33.0
As-Built
Year 1
Facing Downstream
Pool Cross Section
640
Elevation (ft)
638 As-built Year 1 Year 2 Year 3 Year 4 Year 5
▼ BKF
636
634
632
630 -25
-15
-5
5
15
25
35
45
55
65
75
Station (ft)
As-Built Date 1/8/09 Area 62.7 Bkf W 22.2 Dmean 2.8 Dmax 4.6 W/d 7.9
Year 1 Date 10/20/09 Area 62.8 Bkf W 22.5 Dmean 2.8 Dmax 4.7 W/d 8.1
Year 2 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL3 Reach 3 - Buckhorn Creek - Sta 13+33.0 Station BM HI -20 -14.5 -12 -2.5 0 3.6 7 12 15 16 18.2 18.7 18.8 20.3 21 23 25 27 29 30.6 31 32 34.2 38.2 42 45.7 49 56 66
As-Built FS/BS Elev. 5.88 638.55 644.43 4.23 640.20 4.60 639.83 5.23 639.20 5.62 638.81 6.61 637.82 8.09 636.34 8.39 636.04 8.61 635.82 10.03 634.40 10.56 633.87 10.49 633.94 11.09 633.34 11.83 632.60 12.60 631.83 13.20 631.23 13.10 631.33 12.87 631.56 12.68 631.75 12.20 632.23 11.89 632.54 11.09 633.34 10.14 634.29 9.23 635.20 8.64 635.79 7.65 636.78 6.39 638.04 5.49 638.94 5.14 639.29 4.82 639.61
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. RF3 IR Lt
BKF
LOG EOW
EOW BKF
GRND
Desc. IR Lt
Station BM HI 0 2 3.5 6 7.5 10 12 13.5 16 17.7 18.3 18.8 19 21 23 25 27 29 31 31.3 31.8 33.2 34.5 36 38 40 43 44.3 45.7
Year 1 FS/BS Elev. 3.92 638.55 642.47 4.62 637.85 5.48 636.99 6.06 636.41 6.42 636.05 6.68 635.79 6.57 635.9 6.70 635.77 7.55 634.92 8.35 634.12 8.66 633.81 8.54 633.93 9.17 633.3 10.03 632.44 11.06 631.41 11.38 631.09 11.06 631.41 10.84 631.63 10.44 632.03 9.38 633.09 9.14 633.33 8.44 634.03 7.61 634.86 7.22 635.25 7.10 635.37 6.76 635.71 6.19 636.28 5.42 637.05 5.13 637.34 4.42 638.05
Station BM HI
Year 4 FS/BS Elev. 0.00 100.00 100.00
Desc. PL2 IT Lt
Station BM HI
Year 2 FS/BS Elev.
Desc. IR Lt
0.00
GRND GRND GRND GRND GRND GRND BKF LT BNK BNK BNK LOG EOW BED BED BED BED BED BED BED EOW BNK BNK BKF RT GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 3 - Buckhorn Creek
Elevation (ft)
Profile 640 639 638 637 636 635 634 633 632 631 630 629 628 627 626 625 1000
1050
1100
1150
1200
1250
1300
1350
1400
1450
1500
1550
1600
1650
1700
1750
1800
1850
1900
1950
2000
Station (ft)
Year 1 Bed
Year 1 Water
As-Built Bed
Year 1 BKF
2050
2100
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 3 - Buckhorn Creek
HI 644.61 644.61 644.61 644.61 644.61 644.61 644.61 644.61 644.61 644.61 644.61 644.61 644.61 644.61 644.65 644.65 644.65 644.65 644.65 644.73 644.73 644.73 644.73 644.34 644.34 644.34 644.34 644.34 644.34 644.34 644.34 644.34 644.34 644.34 644.34 644.34 644.34 644.34 644.34 644.34 644.34 644.34 644.34 644.34 644.34 644.34 644.34 640.79 640.79 640.79 640.79 640.79 640.79 640.79 640.79 640.79 640.79 640.79 640.79 640.79 640.79 640.79 640.79
Station 1000 1018 1038 1058 1061 1073 1090 1110 1144 1169 1178 1202 1214 1239 1251.6 1272 1287 1303 1324 1333 1354 1378 1400 1418 1427 1438 1454 1465 1487 1504 1515 1523 1532 1539 1550 1568 1585 1597 1630 1647 1663 1692 1720 1750 1764 1784 1795 1806 1815 1835 1860 1886 1890 1904 1915 1924 1933 1952 1968 1988 2004 2023 2040.3
Bed FS 10.08 10.12 10.44 10.81 11.32 10.04 11.99 10.55 10.61 10.95 13.10 10.65 13.60 10.93 10.85 10.99 12.62 11.18 11.24 13.36 11.72 11.70 11.84 11.52 11.72 13.45 13.26 11.46 11.46 11.60 13.64 13.88 11.95 11.56 13.86 12.08 12.06 15.42 14.88 12.33 12.26 12.90 12.44 12.59 14.46 12.70 15.06 11.14 9.35 9.79 10.19 10.46 10.35 12.52 12.64 11.21 11.80 10.61 10.54 11.73 10.84 10.83 10.92
Water Depth 0.32 0.25 0.52 0.91 1.40 0.05 1.90 0.30 0.30 0.40 2.60 0.10 3.04 0.35 0.25 0.15 1.70 0.22 0.02 2.20 0.35 0.25 0.36 0.32 0.52 2.28 2.06 0.21 0.14 0.11 2.17 2.41 0.47 0.07 2.00 0.21 0.07 3.41 2.98 0.36 0.24 0.79 0.23 0.12 1.96 0.11 2.48 1.95 0.15 0.20 0.35 0.26 0.10 2.36 2.40 1.00 1.55 0.36 0.19 1.29 0.39 0.35 0.31
Year 1 Bankfull FS 7.58
8.07 8.37
8.59
9.05
9.86
9.74
10.19
7.30
8.35 8.70
Description ? ? ? POOL POOL HOR POOL HOR TOR LV INV POOL LV INV ? HOR RF 3 XS RCV INV POOL HOR LV INV PL3 XS HOR TOR 0 TOR LV INV POOL POOL HOR RIFF LV INV POOL POOL 0 LV INV POOL HOR LV INV POOL POOL HOR RIFF THL THL RCV INV POOL LV INV POOL POOL HOR RIF RIF RIF LV INV POOL POOL POOL POOL 0 HOR POOL HOR 0 END PROP
Bed Elev. 634.53 634.49 634.17 633.80 633.29 634.57 632.62 634.06 634.00 633.66 631.51 633.96 631.01 633.68 633.80 633.66 632.03 633.47 633.41 631.37 633.01 633.03 632.89 632.82 632.62 630.89 631.08 632.88 632.88 632.74 630.70 630.46 632.39 632.78 630.48 632.26 632.28 628.92 629.46 632.01 632.08 631.44 631.90 631.75 629.88 631.64 629.28 629.65 631.44 631.00 630.60 630.33 630.44 628.27 628.15 629.58 628.99 630.18 630.25 629.06 629.95 629.96 629.87
Water Elev. 634.85 634.74 634.69 634.71 634.69 634.62 634.52 634.36 634.30 634.06 634.11 634.06 634.05 634.03 634.05 633.81 633.73 633.69 633.43 633.57 633.36 633.28 633.25 633.14 633.14 633.17 633.14 633.09 633.02 632.85 632.87 632.87 632.86 632.85 632.48 632.47 632.35 632.33 632.44 632.37 632.32 632.23 632.13 631.87 631.84 631.75 631.76 631.60 631.59 631.20 630.95 630.59 630.54 630.63 630.55 630.58 630.54 630.54 630.44 630.35 630.34 630.31 630.18
Bankfull Elev. 637.03
636.54 636.24
636.02
635.60
634.48
634.60
634.15
633.49
632.44 632.09
weighted particle count:
99.1
17 20.5
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 3 Note: Reach Data 3 Pebble Count, Holly Grove Stream Restoration Site
100% 90% 80% 70% 60%
percent finer than
0% 0% 20% 0% 0% 18% 2% 4% 16% 0% 1% 14% 1% 5% 12% 1% 10% 7% 11% 8% 7% 14% 6% 17% 19% 4% 6% 4% 2% 2% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range
Pebble Count Weighted by Channel Feature Percent Riffle: 38.4 Percent Run: Percent Pool: 24.1 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 0.0 # very fine sand 0.062 0.13 0.0 # 0.13 0.25 0.0 # fine sand medium sand 0.25 0.5 0.0 # 0.5 1 1.8 # coarse sand 1 2 3.6 # very coarse sand 2 4 0.0 # very fine gravel 4 6 0.9 # fine gravel 6 8 0.9 # fine gravel 8 11 4.5 # medium gravel 11 16 0.9 # medium gravel 16 22 7.1 # coarse gravel 22 32 10.7 # coarse gravel very coarse gravel 32 45 7.1 # very coarse gravel 45 64 14.3 # small cobble 64 90 17.0 # medium cobble 90 128 18.8 # large cobble 128 180 6.2 # very large cobble 180 256 3.6 # small boulder 256 362 1.8 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder
50% 40% 30% 20% 10% 0% 0.01
0.1
1
10
weighted percent
particle size (mm)
100
riffle
pool
1000
run
glide
0% bedrock
0.9
clay hardpan
0.0
detritus/wood
0.0
artificial
0.0
weighted total count:
100
based on sediment particles only based on total count
size percent less than (mm)
particle size distribution gradation geo mean
std dev
D16
D35
D50
D65
D84
D95
18.585
39.35
60.6
82
118
187
2.6
46.9
2.5
boulder 2%
bedrock 1%
hardpan 0%
wood/det 0%
artificial 0%
percent by substrate type silt/clay 0%
sand 5%
gravel 46%
cobble 46%
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Pebble Count, Holly Grove Stream Restoration Site
100%
14
80% 12 70% 10
60%
8
50% 40%
6
30% 4 20% 2
10% 0% 0.01
0.1
1
10
100
100
1000
0 10000
particle size (mm) cumulative %
100
artificial
16
90% percent finer than
2 0 0 3 2 4 7 6 11 10 14 9 12 11 7 2
bedrock clay hardpan detritus/wood total count:
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 3 Note: Riffle RF3
Count
number of particles
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
based on sediment particles only based on total count
size percent less than (mm)
# of particles
particle size distribution gradation geo mean
std dev
D16
D35
D50
D65
D84
D95
14.376
32.00
51.0
80
145
220
3.2
45.6
3.2
percent by substrate type silt/clay
sand
gravel
cobble
boulder
bedrock
hardpan
wood/det
artificial
0%
2%
57%
39%
2%
0%
0%
0%
0%
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF4 Reach 4 - Middle Branch - Sta 10+89.8
As-Built
Year 1
Facing Downstream
Riffle Cross Section
675
Elevation (ft)
674 As-built Year 1 Year 2 Year 3 Year 4 Year 5
673 ▼ BKF
672
671
670 -15
-10
-5
0
5
10
15
20
25
30
35
Station (ft)
As-Built Date 1/8/09 Area 3.7 Bkf W 6.2 Dmean 0.6 Dmax 1.0 W/d 10.4
Year 1 Date 10/20/09 Area 3.5 Bkf W 6.4 Dmean 0.5 Dmax 1.0 W/d 11.8
Year 2 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF4 Reach 4 - Middle Branch - Sta 10+89.8 Station BM HI -15 -6 0 3.6 7.1 8.1 8.8 9.4 9.9 10.5 11.2 11.9 12.4 12.8 13.5 14.3 16 19 21 22.4 24.5 29 34
As-Built FS/BS Elev. 3.96 674.94 678.90 5.26 673.64 6.00 672.90 6.21 672.69 6.10 672.80 6.24 672.66 6.54 672.36 6.89 672.01 7.03 671.87 7.50 671.40 7.53 671.37 7.44 671.46 7.50 671.40 7.42 671.48 7.04 671.86 6.72 672.18 6.54 672.36 6.56 672.34 6.52 672.38 6.50 672.40 6.20 672.70 6.00 672.90 5.27 673.63 4.44 674.46
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. BP4 IR Lt
bkf
bkf
Desc. IR Lt
Station BM HI 0 2.7 4.7 6.7 7.7 7.9 8.3 9.3 9.6 10.2 10.8 11.4 12.3 12.5 12.9 13.3 13.7 14.3 16.7 17.7 19.7 21.3 21.8 22.3
FS/BS 4.31
Station BM HI
FS/BS 0.00
6.40 6.29 6.29 6.45 6.65 6.74 6.99 7.21 7.66 7.71 7.67 7.63 7.60 7.24 7.01 6.88 6.73 6.68 6.73 6.80 6.63 6.66 6.43 6.36
Year 1 Elev. 674.77 679.08 672.68 672.79 672.79 672.63 672.43 672.34 672.09 671.87 671.42 671.37 671.41 671.45 671.48 671.84 672.07 672.20 672.35 672.40 672.35 672.28 672.45 672.42 672.65 672.72
Year 4 Elev. 100.00 100.00
Desc. BP4 IR Rt
Station BM HI
Year 2 FS/BS Elev.
Desc. IR Lt
0.00
GRND GRND GRND GRND GRND BKF LT BNK BNK BED BED BED BED BED BNK BKF GRND GRND GRND GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL4 Reach 4 - Middle Branch - Sta 11+14.3
As-Built
Year 1
Facing Downstream
Pool Cross Section
674 673 ▼ BKF
Elevation (ft)
672
As-built Year 1 Year 2 Year 3 Year 4 Year 5
671 670 669 668 -15
-10
-5
0
5
10
15
20
25
30
35
Station (ft)
As-Built Date 1/8/09 Area 20.5 Bkf W 18.9 Dmean 1.1 Dmax 3.0 W/d 17.4
Year 1 Date 10/20/09 Area 17.0 Bkf W 17 Dmean 1.0 Dmax 2.5 W/d 17.0
Year 2 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL4 Reach 4 - Middle Branch - Sta 11+14.3 Station BM HI -20 -10 -3 0 4 6 8 9.2 9.8 9.9 11.4 12.4 13.4 14 15.1 15.3 16.5 18 20.5 22.2 22.9 25.5 27.3 31 36
As-Built FS/BS Elev. 3.20 674.94 678.14 5.17 672.97 5.55 672.59 5.95 672.19 5.94 672.20 5.84 672.30 6.08 672.06 6.58 671.56 6.51 671.63 7.24 670.90 8.87 669.27 8.60 669.54 8.50 669.64 8.37 669.77 8.12 670.02 7.25 670.89 7.02 671.12 6.62 671.52 6.45 671.69 6.38 671.76 5.95 672.19 5.84 672.30 5.73 672.41 5.80 672.34 4.68 673.46 4.70 673.44
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. BP4 IR Lt
EOW
EOW
Desc. IR Lt
Station BM HI 0 2 4 5.3 6.8 8 9 9.9 10 10.5 11.3 11.9 12.5 13 13.6 14 14.8 15.4 16 18 21.4 22.3 22.9
Year 1 FS/BS Elev. 4.31 674.77 679.08 6.92 672.16 6.95 672.13 6.90 672.18 6.91 672.17 7.23 671.85 7.51 671.57 7.49 671.59 7.80 671.28 8.84 670.24 8.66 670.42 9.44 669.64 9.40 669.68 9.44 669.64 9.41 669.67 9.21 669.87 8.94 670.14 8.44 670.64 7.81 671.27 7.64 671.44 7.42 671.66 7.32 671.76 6.92 672.16 6.85 672.23
Station BM HI
Year 4 FS/BS Elev. 0.00 100.00 100.00
Desc. BP4 IR Rt
Station BM HI
Year 2 FS/BS Elev.
Desc. IR Lt
0.00
GRND GRND GRND GRND GRND GRND LOG LOG BED BLDR BED BED BED BED BED BED BED BNK BKF RT GRND GRND GRND GRND
Desc. IR Lt
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 4 - Middle Branch
Profile 675 674 673
Elevation (ft)
672 671 670 669 668 667 666 665 1000
1025
1050
1075
1100
1125
1150
1175
1200
1225
Station (ft)
Year 1 Bed
Year 1 Water
As-Built Bed
Year 1 Bankfull
1250
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 4 - Middle Branch
HI 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08 679.08
Station 1000 1009 1016 1024 1030 1038 1046 1054.5 1063.5 1069 1073 1081 1089.8 1097 1104 1110 1114.3 1117 1123 1126 1131 1143.5 1151 1156 1159 1162 1169 1173 1179 1185.5 1188 1193 1196 1202 1211 1217.5 1224 1228 1234 1236
Bed FS 5.71 6.09 6.36 7.26 7.69 6.80 7.85 6.93 7.14 7.75 8.08 7.52 7.68 8.30 7.88 9.09 9.39 9.34 8.25 9.26 9.12 8.61 9.20 9.26 8.90 10.20 9.43 10.41 10.61 9.95 9.69 10.80 10.80 10.45 10.00 10.20 11.33 11.28 10.30 10.28
Water Depth 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Year 1 Bankfull FS
6.34
6.50
7.81
8.85
9.63
9.55
Description THL THL LVL INV BPL EPL LV INV POOL HOR LV INV BPL E POOL HOR RF-4 THL X-SEC THL LV INV BPL PL-4 X-SEC EPL LS INV POOL THL SCOURED RIFF LV INV BPL EPL LS INV POOL LV INV BPL EPL HOR RCV INV BPL EPL HOR BED SCOUR THL LV INV BPL EPL HOR END PROFILE
Bed Elev. 673.37 672.99 672.72 671.82 671.39 672.28 671.23 672.15 671.94 671.33 671.00 671.56 671.40 670.78 671.20 669.99 669.69 669.74 670.83 669.82 669.96 670.47 669.88 669.82 670.18 668.88 669.65 668.67 668.47 669.13 669.39 668.28 668.28 668.63 669.08 668.88 667.75 667.80 668.78 668.80
Water Elev. 673.38 673.00 672.73 671.83 671.40 672.29 671.24 672.16 671.95 671.34 671.01 671.57 671.41 670.79 671.21 670.00 669.70 669.75 670.84 669.83 669.97 670.48 669.89 669.83 670.19 668.89 669.66 668.68 668.48 669.14 669.40 668.29 668.29 668.64 669.09 668.89 667.76 667.81 668.79 668.81
Bankfull Elev.
672.74
672.58
671.27
670.23
669.53
weighted particle count:
100.0
17 21
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 4 Note: Reach Data 4 Pebble Count, Holly Grove Stream Restoration Site
100% 90% 80% 70% 60%
percent finer than
13% 0% 25% 2% 0% 0% 0% 20% 1% 3% 3% 4% 15% 8% 20% 12% 10% 8% 14% 5% 4% 5% 3% 0% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range
Pebble Count Weighted by Channel Feature Percent Riffle: 38 Percent Run: Percent Pool: 24 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 13.0 # very fine sand 0.062 0.13 0.0 # 0.13 0.25 2.0 # fine sand medium sand 0.25 0.5 0.0 # 0.5 1 0.0 # coarse sand 1 2 0.0 # very coarse sand 2 4 1.0 # very fine gravel 4 6 3.0 # fine gravel 6 8 3.0 # fine gravel 8 11 4.0 # medium gravel 11 16 8.0 # medium gravel 16 22 20.0 # coarse gravel 22 32 12.0 # coarse gravel very coarse gravel 32 45 8.0 # very coarse gravel 45 64 14.0 # small cobble 64 90 5.0 # medium cobble 90 128 4.0 # large cobble 128 180 3.0 # very large cobble 180 256 0.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder
50% 40% 30% 20% 10% 0% 0.01
0.1
1
10
weighted percent
particle size (mm)
100
riffle
pool
1000
run
glide
0% bedrock
0.0
clay hardpan
0.0
detritus/wood
0.0
artificial
0.0
weighted total count:
100
based on sediment particles only based on total count
size percent less than (mm)
particle size distribution gradation geo mean
std dev
D16
D35
D50
D65
D84
D95
4.000
16.26
20.6
31
58
107
4.0
15.2
3.8
boulder 0%
bedrock 0%
hardpan 0%
wood/det 0%
artificial 0%
percent by substrate type silt/clay 13%
sand 2%
gravel 73%
cobble 12%
Pebble Count, Holly Grove Stream Restoration Site
100%
artificial 105
25
90% 20
80% 70%
15
60% 50%
10
40% 30%
5
20% 10% 0% 0.01
0.1
1
10
100
1000
0 10000
particle size (mm) cumulative %
105
bedrock clay hardpan detritus/wood total count:
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 4 Note: Riffle RF4
percent finer than
Count 1 0 0 0 2 0 0 2 3 4 8 11 21 23 18 8 2 1 1
number of particles
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
based on sediment particles only based on total count
size percent less than (mm)
# of particles
particle size distribution gradation geo mean
std dev
D16
D35
D50
D65
D84
D95
13.773
24.38
32.2
41
58
85
2.1
28.3
2.1
percent by substrate type silt/clay
sand
gravel
cobble
boulder
bedrock
hardpan
wood/det
artificial
1%
2%
86%
11%
0%
0%
0%
0%
0%
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF5 Reach 5 - Middle Branch - Sta 11+67.2
As-Built
Year 1
Facing Downstream
Riffle Cross Section
665 664 As-built Year 1 Year 2 Year 3 Year 4 Year 5
Elevation (ft)
663 ▼ BKF
662 661 660 659 -15
-10
-5
0
5
10
15
20
25
30
35
Station (ft)
As-Built Date 1/8/09 Area 6.0 Bkf W 8.9 Dmean 0.7 Dmax 1.2 W/d 13.2
Year 1 Date 10/20/09 Area 5.9 Bkf W 8.2 Dmean 0.7 Dmax 1.2 W/d 11.5
Year 2 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF5 Reach 5 - Middle Branch - Sta 11+67.2 Station BM HI -18 -9 -5 -1 0 2 6 9 10.3 11 11.7 12 12.5 13.4 14.3 15.3 16 16.6 17.5 17.9 19.5 22 24 28 32.1 37 42 52
As-Built FS/BS Elev. 2.82 665.59 668.41 5.60 662.81 5.80 662.61 6.05 662.36 6.15 662.26 6.15 662.26 6.63 661.78 6.55 661.86 6.42 661.99 6.50 661.91 6.68 661.73 6.90 661.51 7.29 661.12 7.59 660.82 7.49 660.92 7.56 660.85 7.50 660.91 7.39 661.02 7.14 661.27 6.47 661.94 6.40 662.01 6.18 662.23 6.02 662.39 5.98 662.43 5.57 662.84 5.45 662.96 5.24 663.17 5.42 662.99 5.3 663.11
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. BP5 IR Lt
Desc. IR Lt
Station BM HI 0 2.7 5.7 8.7 9.3 9.9 10.6 11.7 12.4 13.2 13.9 14.9 16.2 16.5 17.2 17.7 18.1 19 20.7 23.7 27.7 32.2
FS/BS 3.98
Station BM HI
FS/BS 0.00
7.22 7.75 7.64 7.52 7.55 7.51 7.67 8.14 8.59 8.64 8.58 8.67 8.48 8.19 7.71 7.54 7.48 7.35 7.11 7.14 6.76 6.53
Year 1 Elev. 665.59 669.57 662.35 661.82 661.93 662.05 662.02 662.06 661.90 661.43 660.98 660.93 660.99 660.90 661.09 661.38 661.86 662.03 662.09 662.22 662.46 662.43 662.81 663.04
Year 4 Elev. 100.00 100.00
Desc. BP5 IR Lt
Station BM HI
Year 2 FS/BS Elev.
Desc. IR Lt
0.00
GRND GRND GRND GRND GRND BKF LT BNK BNK BED BED BED BED BED BANK BANK BANK BKF RT GRND GRND GRND GRND GRND
Desc. IR Lt
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL5 Reach 5 - Middle Branch - Sta 10+62.4
As-Built
Year 1
Facing Downstream
Pool Cross Section
666 665 As-built Year 1 Year 2 Year 3 Year 4 Year 5
Elevation (ft)
664 ▼ BKF
663 662 661 660 -15
-10
-5
0
5
10
15
20
25
30
35
Station (ft)
As-Built Date 1/8/09 Area 8.4 Bkf W 7.9 Dmean 1.1 Dmax 1.7 W/d 7.4
Year 1 Date 10/20/09 Area 9.7 Bkf W 8.6 Dmean 1.1 Dmax 2.0 W/d 7.6
Year 2 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL5 Reach 5 - Middle Branch - Sta 10+62.4 Station BM HI -20 -10 -7 0 5 9 11 12.4 13.6 15 16 17 18 19 19.7 19.9 20.3 21.4 22.8 24 27 28.4 31 36
Station BM HI
As-Built FS/BS Elev. 2.82 665.59 668.41 4.65 663.76 4.35 664.06 4.12 664.29 4.52 663.89 4.89 663.52 5.09 663.32 5.25 663.16 5.41 663.00 6.01 662.40 6.52 661.89 6.93 661.48 7.15 661.26 7.05 661.36 6.62 661.79 6.27 662.14 5.51 662.90 5.33 663.08 5.26 663.15 5.30 663.11 5.02 663.39 4.61 663.80 4.25 664.16 3.90 664.51 3.42 664.99 668.41
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. BP5 IR Lt
Desc. IR Lt
Station BM HI 0 3 7 10 12 12.4 13.1 14 14.6 15 15.9 16.6 17.3 18.1 18.8 19.7 20 20.3 21 22.5 23 24 26 28.5
Year 1 FS/BS Elev. 3.98 665.59 669.57 5.57 664 5.81 663.76 6.16 663.41 6.29 663.28 6.55 663.02 6.55 663.02 6.80 662.77 7.32 662.25 7.60 661.97 7.85 661.72 8.22 661.35 8.49 661.08 8.54 661.03 8.45 661.12 8.19 661.38 7.54 662.03 6.72 662.85 6.51 663.06 6.52 663.05 6.51 663.06 6.45 663.12 6.13 663.44 5.98 663.59 5.53 664.04
Station BM HI
Year 4 FS/BS Elev. 0.00 100.00 100.00
Desc. BP5 IR Lt
Station BM HI
Year 2 FS/BS Elev.
Desc. IR Lt
0.00
GRND GRND GRND GRND GRND BKF LT BNK BNK BNK BED BED BED BED BED BED BNK LOG LOG BNK GRND GRND GRND GRND GRND
Desc. IR Lt
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 5 - Middle Branch
Profile 665 664 663
Elevation (ft)
662 661 660 659 658 657 656 655 1000
1025
1050
1075
1100
1125
1150
1175
1200
1225
Station (ft)
Year 1 Bed
Year 1 Water
As-Built Bed
Year 1 Bankfull
1250
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 5 - Middle Branch
HI 669.57 669.57 669.57 669.57 669.57 669.57 669.57 669.57 669.57 669.57 669.57 669.57 669.57 669.57 669.57 669.57 669.57 669.57 669.57 669.57 669.57 669.57 669.57 669.57 669.57
Station 1000 1012.5 1018 1023 1030.5 1035 1039 1055 1062.4 1069.2 1072 1076 1088 1105 1131.5 1137 1143 1153 1162 1167.2 1180 1185.5 1191 1197 1210.4
Bed FS 5.68 5.93 7.76 7.77 6.32 7.16 6.89 6.78 8.53 6.98 8.37 8.45 7.51 7.78 7.91 9.69 9.69 8.30 8.55 8.63 8.72 9.95 9.77 8.94 9.21
Water Depth
Year 1 Bankfull FS
6.68
7.46
8.00
Description THL LV-MINOR PIPING BPL EPL L SILL PL HOR LV XS PLS RCV C/L ROCK BPL EPL HOR THL LV BPL EPL L SILL HOR XS RF 5 XLOG BPL EPL HOR THL
Bed Elev. 663.89 663.64 661.81 661.80 663.25 662.41 662.68 662.79 661.04 662.59 661.20 661.12 662.06 661.79 661.66 659.88 659.88 661.27 661.02 660.94 660.85 659.62 659.80 660.63 660.36
Water Elev.
Bankfull Elev.
662.89
662.11
661.57
weighted particle count:
100.0
14 17
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 5 Note: Reach Data 5 Pebble Count, Holly Grove Stream Restoration Site
100% 90% 80% 70% 60%
percent finer than
21% 0% 25% 0% 0% 0% 1% 20% 8% 6% 4% 3% 15% 8% 12% 11% 10% 11% 7% 5% 3% 5% 0% 0% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range
Pebble Count Weighted by Channel Feature Percent Riffle: 40 Percent Run: Percent Pool: 29 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 21.0 # very fine sand 0.062 0.13 0.0 # 0.13 0.25 0.0 # fine sand medium sand 0.25 0.5 0.0 # 0.5 1 0.0 # coarse sand 1 2 1.0 # very coarse sand 2 4 8.0 # very fine gravel 4 6 6.0 # fine gravel 6 8 4.0 # fine gravel 8 11 3.0 # medium gravel 11 16 8.0 # medium gravel 16 22 12.0 # coarse gravel 22 32 11.0 # coarse gravel very coarse gravel 32 45 11.0 # very coarse gravel 45 64 7.0 # small cobble 64 90 5.0 # medium cobble 90 128 3.0 # large cobble 128 180 0.0 # very large cobble 180 256 0.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder
50% 40% 30% 20% 10% 0% 0.01
0.1
1
10
weighted percent
particle size (mm)
100
riffle
1000
pool
run
glide
0% bedrock
0.0
clay hardpan
0.0
detritus/wood
0.0
artificial
0.0
weighted total count:
100
based on sediment particles only based on total count
size percent less than (mm) D16 0.062
particle size distribution gradation geo mean
std dev
D35
D50
D65
D84
D95
5.61
15.3
24
44
79
124.6
1.6
26.5
boulder 0%
bedrock 0%
hardpan 0%
wood/det 0%
artificial 0%
percent by substrate type silt/clay 21%
sand 1%
gravel 70%
cobble 8%
Pebble Count, Holly Grove Stream Restoration Site
100%
artificial 100
18
90%
16
80%
14
70%
12
60%
10
50% 8
40%
6
30% 20%
4
10%
2
0% 0.01
0.1
1
10
100
1000
0 10000
particle size (mm) cumulative %
100
bedrock clay hardpan detritus/wood total count:
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 5 Note: Riffle RF5
percent finer than
Count 12 0 0 2 0 0 4 5 5 4 7 6 7 12 16 13 5 2
number of particles
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
based on sediment particles only based on total count
size percent less than (mm)
# of particles
particle size distribution gradation geo mean
std dev
D16
D35
D50
D65
D84
D95
2.828
12.92
28.8
46
71
104
6.3
14.2
5.0
percent by substrate type silt/clay
sand
gravel
cobble
boulder
bedrock
hardpan
wood/det
artificial
12%
2%
66%
20%
0%
0%
0%
0%
0%
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF6 Reach 6 - Lower East Branch - Sta 11+07.4
As-Built
Year 1
Facing Downstream
Riffle Cross Section
644 643 As-built Year 1 Year 2 Year 3 Year 4 Year 5
Elevation (ft)
642 641 640 ▼ BKF
639 638 -10
-5
0
5
10
15
20
25
30
35
40
Station (ft)
As-Built Date 1/8/09 Area 4.0 Bkf W 10.7 Dmean 0.4 Dmax 0.6 W/d 28.5
Year 1 Date 10/20/09 Area 2.8 Bkf W 8 Dmean 0.4 Dmax 0.6 W/d 22.7
Year 2 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF6 Reach 6 - Lower East Branch - Sta 11+07.4 Station BM HI -10 -5 -2 0 3.5 6 7.6 8.8 10 11 12 13 14 15 15.7 16.2 18 19.5 21 23.5 25.5 27.5 28.2 35
As-Built FS/BS Elev. 5.02 643.14 648.16 5.28 642.88 5.76 642.40 6.05 642.11 6.62 641.54 7.92 640.24 8.04 640.12 8.19 639.97 8.75 639.41 8.88 639.28 9.07 639.09 9.05 639.11 9.07 639.09 9.17 638.99 9.16 639.00 9.00 639.16 8.74 639.42 8.71 639.45 8.54 639.62 8.68 639.48 8.39 639.77 7.78 640.38 7.00 641.16 6.77 641.39 5.05 643.11
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. BP6 IR Lt
Desc. IR Lt
Station BM HI 0 1.5 3.5 5.5 7.5 7.8 8.7 9.6 10.2 11 11.7 12.3 12.8 13.7 14.3 15.5 16.7 19.5 21.5 23.3 24.5 26.3 28.2
FS/BS 6.06
Station BM HI
FS/BS 0.00
7.67 8.16 8.87 9.09 9.25 9.27 9.60 9.81 9.95 10.06 10.05 10.14 10.23 10.21 10.09 10.03 9.65 9.58 9.70 9.48 9.14 8.46 7.77
Year 1 Elev. 643.14 649.20 641.53 641.04 640.33 640.11 639.95 639.93 639.60 639.39 639.25 639.14 639.15 639.06 638.97 638.99 639.11 639.17 639.55 639.62 639.50 639.72 640.06 640.74 641.43
Year 4 Elev. 100.00 100.00
Desc. BP6 IR Lt
Station BM HI
Year 2 FS/BS Elev.
Desc. IR Lt
0.00
GRND GRND GRND GRND GRND BKF LT BNK BNK BED BED BED BED BED BED BED BNK BKF RT GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL6 Reach 6 - Lower East Branch - Sta 11+33.4
As-Built
Year 1
Facing Downstream
Pool Cross Section
643 642 As-built Year 1 Year 2 Year 3 Year 4 Year 5
Elevation (ft)
641 ▼ BKF
640 639 638 637 -10
-5
0
5
10
15
20
25
30
35
40
Station (ft)
As-Built Date 1/8/09 Area 10.2 Bkf W 8.5 Dmean 1.2 Dmax 1.9 W/d 7.1
Year 1 Date 10/20/09 Area 10.0 Bkf W 9.2 Dmean 1.1 Dmax 2.0 W/d 8.5
Year 2 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL6 Reach 6 - Lower East Branch - Sta 11+33.4 Station BM HI -10 -8.5 -2 0 3 5 6.5 8 9 10.5 11 12 13 14 15 15.5 16.5 18 21 23 24 26 27.5 32
As-Built FS/BS Elev. 5.02 643.14 648.16 5.68 642.48 5.57 642.59 6.38 641.78 7.10 641.06 7.99 640.17 7.82 640.34 8.22 639.94 8.19 639.97 8.57 639.59 9.60 638.56 9.87 638.29 10.03 638.13 10.10 638.06 9.94 638.22 9.78 638.38 8.71 639.45 8.05 640.11 8.10 640.06 9.07 639.09 9.21 638.95 9.00 639.16 8.12 640.04 7.35 640.81 6.45 641.71
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. BP6 IR Lt
Desc. IR Lt
Station BM HI 0 0.8 2 4 6 7.9 9 9.8 10.7 11.3 12 13.2 14.7 15.6 17.1 20 21 22.8 24 26
Year 1 FS/BS Elev. 6.06 643.14 649.20 8.13 641.07 8.20 641 8.71 640.49 8.85 640.35 9.13 640.07 9.23 639.97 9.74 639.46 10.02 639.18 10.68 638.52 10.97 638.23 11.10 638.1 11.18 638.02 10.72 638.48 9.63 639.57 9.18 640.02 9.49 639.71 10.11 639.09 10.22 638.98 9.94 639.26 9.21 639.99
Station BM HI
Year 4 FS/BS Elev. 0.00 100.00 100.00
Desc. BP6 IR Lt
Station BM HI
Year 2 FS/BS Elev.
Desc. IR Lt
0.00
GRND GRND GRND GRND GRND BKF LT BNK BNK BNK BED BED BED BED BED BED BNK LOG LOG BNK GRND
Desc. IR Lt
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 6 - Lower East Branch
Profile 645 644 643
Elevation (ft)
642 641 640 639 638 637 636 635 1000
1025
1050
1075
1100
1125
1150
1175
1200
1225
Station (ft)
Year 1 Bed
Year 1 Water
As-Built Bed
Year 1 Bankfull
1250
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 6 - Lower East Branch
HI 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19 649.19
Station 1000 1010 1017.5 1021 1029.2 1032 1040 1047 1051 1057 1060.5 1070 1080 1089 1095 1100 1107.5 1118 1126 1133.4 1140 1150 1156 1161 1169 1180 1190 1196 1200 1209.7 1211
Bed FS 8.63 8.82 8.64 9.16 8.79 9.96 9.37 9.31 9.85 9.37 10.10 9.81 9.74 9.88 10.75 10.63 10.19 10.25 10.42 11.15 10.86 10.99 10.45 11.13 10.41 10.76 10.92 10.88 11.90 11.00 10.86
Water Depth
Year 1 Bankfull FS 8.05
8.40
8.95
9.70
9.52
Description HDR RIF LV INV POOL LS INV POOL THL HOR POOL LS INV POOL BED BED LV INV POOL END POOL XS RF6 RIF LV INV PL6 # X-SEC HDR THL LS INV POOL HOR THL THL LV INV POOL END PROFILE LS INV
Bed Elev. 640.56 640.37 640.55 640.03 640.40 639.23 639.82 639.88 639.34 639.82 639.09 639.38 639.45 639.31 638.44 638.56 639.00 638.94 638.77 638.04 638.33 638.20 638.74 638.06 638.78 638.43 638.27 638.31 637.29 638.19 638.33
Water Elev.
Bankfull Elev. 641.14
640.79
640.24
639.49
639.67
weighted particle count:
100.0
22.6 17.6
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC East Branch: Reach 6 Note: Reach Data 6 Pebble Count, Holly Grove Stream Restoration Site
100% 90% 80% 70% 60%
percent finer than
23% 0% 25% 5% 0% 0% 1% 20% 7% 6% 4% 8% 15% 11% 16% 6% 10% 6% 2% 3% 2% 5% 2% 0% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range
Pebble Count Weighted by Channel Feature Percent Riffle: 38.2 Percent Run: Percent Pool: 21.6 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 22.5 # very fine sand 0.062 0.13 0.0 # 0.13 0.25 4.9 # fine sand medium sand 0.25 0.5 0.0 # 0.5 1 0.0 # coarse sand 1 2 1.0 # very coarse sand 2 4 6.9 # very fine gravel 4 6 5.9 # fine gravel 6 8 3.9 # fine gravel 8 11 7.8 # medium gravel 11 16 10.8 # medium gravel 16 22 15.7 # coarse gravel 22 32 5.9 # coarse gravel very coarse gravel 32 45 5.9 # very coarse gravel 45 64 2.0 # small cobble 64 90 2.9 # medium cobble 90 128 2.0 # large cobble 128 180 2.0 # very large cobble 180 256 0.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder
50% 40% 30% 20% 10% 0% 0.01
0.1
1
10
weighted percent
particle size (mm)
100
riffle
1000
pool
run
glide
0% bedrock
0.0
clay hardpan
0.0
detritus/wood
0.0
artificial
0.0
weighted total count:
100
based on sediment particles only based on total count
size percent less than (mm) D16 0.062
particle size distribution gradation geo mean
std dev
D35
D50
D65
D84
D95
3.89
9.8
16
29
80
80.3
1.4
21.8
boulder 0%
bedrock 0%
hardpan 0%
wood/det 0%
artificial 0%
percent by substrate type silt/clay 23%
sand 6%
gravel 65%
cobble 7%
Pebble Count, Holly Grove Stream Restoration Site
100%
artificial 100
18
90%
16
80%
14
70%
12
60%
10
50% 8
40%
6
30% 20%
4
10%
2
0% 0.01
0.1
1
10
100
1000
0 10000
particle size (mm) cumulative %
100
bedrock clay hardpan detritus/wood total count:
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC East Branch: Reach 6 Note: Riffle RF6
percent finer than
Count 4 0 1 4 1 0 3 4 9 8 9 17 13 13 9 3 2
number of particles
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
based on sediment particles only based on total count
size percent less than (mm)
# of particles
particle size distribution gradation geo mean
std dev
D16
D35
D50
D65
D84
D95
5.422
11.47
18.2
25
43
64
2.9
15.2
2.8
percent by substrate type silt/clay
sand
gravel
cobble
boulder
bedrock
hardpan
wood/det
artificial
4%
6%
85%
5%
0%
0%
0%
0%
0%
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF7 Reach 7 - Southeast Creek - Sta 11+20.7
As-Built
Year 1
Facing Downstream
Riffle Cross Section
655 654 As-built Year 1 Year 2 Year 3 Year 4 Year 5
Elevation (ft)
653 652 ▼ BKF
651 650 649 -10
-5
0
5
10
15
20
25
30
35
40
Station (ft)
As-Built Date 1/8/09 Area 9.4 Bkf W 14.5 Dmean 0.6 Dmax 1.2 W/d 22.3
Year 1 Date 10/20/09 Area 9.5 Bkf W 15 Dmean 0.6 Dmax 1.2 W/d 23.8
Year 2 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 7 - Southeast Creek
HI 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58
Station 1000 1012.5 1018.5 1026 1030 1036 1045 1056.5 1059 1063 1067 1069 1072 1080 1087 1090.5 1094 1099 1102.5 1107 1110 1115 1120.7 1127 1132.1 1135 1140.5 1145 1153 1162 1167
Bed FS 7.24 7.02 7.73 7.16 7.78 7.36 7.57 7.42 8.02 8.03 7.87 7.59 8.13 7.74 7.98 8.14 7.95 7.84 8.62 8.05 8.73 8.35 8.35 8.37 9.42 9.53 8.44 8.95 8.83 8.59 8.99
Water Depth
Year 1 Bankfull FS 6.32
6.75
6.96
7.60
7.98
Description HOR LV INV POOL LS? POOL HOR THL LV INV POOL POOL HOR? ROCK STR POOL HOR THL POOL HOR STR? POOL LS INV POOL HOR RF7 XS LV INV PL7 XS POOL LS INV POOL HOR THL EP
Bed Elev. 651.34 651.56 650.85 651.42 650.80 651.22 651.01 651.16 650.56 650.55 650.71 650.99 650.45 650.84 650.60 650.44 650.63 650.74 649.96 650.53 649.85 650.23 650.23 650.21 649.16 649.05 650.14 649.63 649.75 649.99 649.59
Water Elev.
Bankfull Elev. 652.26
651.83
651.62
650.98
650.60
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL7 Reach 7 - Southeast Creek - Sta 11+32.1
As-Built
Year 1
Facing Downstream
Pool Cross Section
654 653 As-built Year 1 Year 2 Year 3 Year 4 Year 5
Elevation (ft)
652 ▼ BKF
651 650 649 648 -10
-5
0
5
10
15
20
25
30
35
40
Station (ft)
As-Built Date 1/8/09 Area 10.5 Bkf W 9.5 Dmean 1.1 Dmax 2.0 W/d 8.6
Year 1 Date 10/20/09 Area 9.6 Bkf W 9.7 Dmean 1.0 Dmax 1.8 W/d 9.8
Year 2 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL7 Reach 7 - Southeast Creek - Sta 11+32.1 Station BM HI -4 0 2 5 7.5 8.2 8.5 9 10 11 12 13 14 14.3 14.6 15.4 16.5 17.8 20 24 27 29 34 40
Station BM HI
As-Built FS/BS Elev. 7.17 653.43 660.60 6.17 654.43 7.20 653.40 7.92 652.68 9.03 651.57 9.77 650.83 9.81 650.79 10.45 650.15 10.80 649.80 11.26 649.34 11.59 649.01 11.56 649.04 11.31 649.29 10.94 649.66 10.41 650.19 10.22 650.38 10.05 650.55 9.61 650.99 9.46 651.14 9.45 651.15 9.33 651.27 8.95 651.65 8.69 651.91 8.15 652.45 7.55 653.05 660.60
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. BP7 IR Lt
Desc. IR Lt
Station BM HI 0 1.5 2.5 4 6.2 8 8.7 9.3 10 11 12 13 14 14.1 14.6 15.5 16.7 19 22 24 27 29.1
Year 1 FS/BS Elev. 5.15 653.43 658.58 5.21 653.37 5.62 652.96 6.19 652.39 6.66 651.92 7.51 651.07 7.81 650.77 8.48 650.1 9.01 649.57 9.25 649.33 9.41 649.17 9.34 649.24 9.16 649.42 8.85 649.73 8.52 650.06 8.22 650.36 7.91 650.67 7.62 650.96 7.39 651.19 7.38 651.2 7.27 651.31 6.85 651.73 6.67 651.91
Station BM HI
Year 4 FS/BS Elev. 0.00 100.00 100.00
Desc. BP7 IR Lt
Station BM HI
Year 2 FS/BS Elev.
Desc. IR Lt
0.00
GRND GRND GRND GRND GRND LOG EOW
EOW BKF RT GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 7 - Southeast Creek
Profile 655 654 653
Elevation (ft)
652 651 650 649 648 647 646 645 1000
1025
1050
1075
1100
1125
1150
1175
Station (ft)
Year 1 Bed
Year 1 Water
As-Built Bed
Year 1 Bankfull
1200
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 7 - Southeast Creek
HI 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58 658.58
Station 1000 1012.5 1018.5 1026 1030 1036 1045 1056.5 1059 1063 1067 1069 1072 1080 1087 1090.5 1094 1099 1102.5 1107 1110 1115 1120.7 1127 1132.1 1135 1140.5 1145 1153 1162 1167
Bed FS 7.24 7.02 7.73 7.16 7.78 7.36 7.57 7.42 8.02 8.03 7.87 7.59 8.13 7.74 7.98 8.14 7.95 7.84 8.62 8.05 8.73 8.35 8.35 8.37 9.42 9.53 8.44 8.95 8.83 8.59 8.99
Water Depth
Year 1 Bankfull FS 6.32
6.75
6.96
7.60
7.98
Description HOR LV INV POOL LS? POOL HOR THL LV INV POOL POOL HOR? ROCK STR POOL HOR THL POOL HOR STR? POOL LS INV POOL HOR RF7 XS LV INV PL7 XS POOL LS INV POOL HOR THL EP
Bed Elev. 651.34 651.56 650.85 651.42 650.80 651.22 651.01 651.16 650.56 650.55 650.71 650.99 650.45 650.84 650.60 650.44 650.63 650.74 649.96 650.53 649.85 650.23 650.23 650.21 649.16 649.05 650.14 649.63 649.75 649.99 649.59
Water Elev.
Bankfull Elev. 652.26
651.83
651.62
650.98
650.60
weighted particle count:
98.0
19.8 11.9
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southeast Creek: Reach 7 Note: Reach Data 7 Pebble Count, Holly Grove Stream Restoration Site
100% 90% 80% 70% 60%
percent finer than
51% 0% 60% 0% 0% 0% 50% 0% 1% 2% 40% 7% 2% 1% 30% 10% 4% 7% 20% 5% 5% 5% 10% 0% 0% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range
Pebble Count Weighted by Channel Feature Percent Riffle: 44.5 Percent Run: Percent Pool: 23.8 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 49.5 # very fine sand 0.062 0.13 0.0 # 0.13 0.25 0.0 # fine sand medium sand 0.25 0.5 0.0 # 0.5 1 0.0 # coarse sand 1 2 0.0 # very coarse sand 2 4 1.0 # very fine gravel 4 6 2.0 # fine gravel 6 8 6.9 # fine gravel 8 11 2.0 # medium gravel 11 16 1.0 # medium gravel 16 22 9.9 # coarse gravel 22 32 4.0 # coarse gravel very coarse gravel 32 45 6.9 # very coarse gravel 45 64 5.0 # small cobble 64 90 4.9 # medium cobble 90 128 5.0 # large cobble 128 180 0.0 # very large cobble 180 256 0.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder
50% 40% 30% 20% 10% 0% 0.01
0.1
1
10
weighted percent
particle size (mm)
100
riffle
1000
pool
run
glide
0% bedrock
2.0
clay hardpan
0.0
detritus/wood
0.0
artificial
0.0
weighted total count:
100
based on sediment particles only based on total count
size percent less than (mm) D16 0.062
particle size distribution gradation geo mean
std dev
D35
D50
D65
D84
D95
0.06
0.1
17
43
90
348.8
1.6
26.4
boulder 0%
bedrock 2%
hardpan 0%
wood/det 0%
artificial 0%
percent by substrate type silt/clay 50%
sand 0%
gravel 39%
cobble 10%
bedrock clay hardpan detritus/wood artificial total count:
101
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southeast Creek: Reach 7 Note: Riffle RF7 Pebble Count, Holly Grove Stream Restoration Site
100%
80
90%
70
80% percent finer than
Count 69 ## ## ## ## ## ## ## 3 ## 2 ## 7 ## 4 ## 2 ## 2 ## 7 ## 3 ## 0 ## 2 ## ## ## ## ## ## ## ## 101
60 70% 50
60%
40
50% 40%
30
30%
number of particles
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
20 20% 10
10% 0% 0.01
0.1
1
10
100
1000
0 10000
particle size (mm) cumulative %
based on sediment particles only based on total count
size percent less than (mm)
# of particles
particle size distribution gradation geo mean
std dev
D16
D35
D50
D65
D84
D95
0.062
0.06
0.1
0
16
45
127.6
1.0
15.9
percent by substrate type silt/clay
sand
gravel
cobble
boulder
bedrock
hardpan
wood/det
artificial
68%
0%
30%
2%
0%
0%
0%
0%
0%
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF8 Reach 8 - Southwest Creek - Sta 11+48.1
As-Built
Year 1
Facing Downstream
Riffle Cross Section
100 99 As-built Year 1 Year 2 Year 3 Year 4 Year 5
Elevation (ft)
98 97 ▼ BKF
96 95 94 -10
-5
0
5
10
15
20
25
30
35
40
Station (ft)
As-Built Date 1/8/09 Area 3.4 Bkf W 8 Dmean 0.4 Dmax 0.7 W/d 18.6
Year 1 Date 10/20/09 Area 4.4 Bkf W 8.2 Dmean 0.5 Dmax 0.7 W/d 15.2
Year 2 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF8 Reach 8 - Southwest Creek - Sta 11+48.1 Station BM HI -15 -8 -3 0 3 7 9.3 10.6 11.9 12.3 12.6 12.8 14 15 16 17 18 18.7 19.4 19.9 21.2 22.4 24.9 26.9 28 28.9 30 33 37 40
As-Built FS/BS Elev. 2.51 98.99 101.50 3.36 98.14 3.67 97.83 3.94 97.56 4.05 97.45 4.10 97.40 4.04 97.46 4.24 97.26 4.56 96.94 5.04 96.46 5.26 96.24 5.41 96.09 5.58 95.92 5.56 95.94 5.76 95.74 5.56 95.94 5.46 96.04 5.43 96.07 5.34 96.16 5.23 96.27 5.04 96.46 4.91 96.59 4.71 96.79 4.23 97.27 3.99 97.51 4.03 97.47 3.86 97.64 3.92 97.58 3.64 97.86 2.72 98.78 2.35 99.15
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. Stump
Desc. IR Lt
Station BM HI 0 2 6 8 9 10 11 11.9 12.5 13.6 15 16.6 18 19 20.1 21 23 26
FS/BS 3.78
Station BM HI
FS/BS 0.00
6.68 6.77 6.71 6.70 6.83 7.05 7.33 7.63 8.15 8.29 8.37 8.34 8.18 7.93 7.63 7.59 7.22 6.77
Year 1 Elev. 100.42 104.20 97.52 97.43 97.49 97.50 97.37 97.15 96.87 96.57 96.05 95.91 95.83 95.86 96.02 96.27 96.57 96.61 96.98 97.43
Year 4 Elev. 100.00 100.00
Desc. BP8 IR Rt
Station BM HI
Year 2 FS/BS Elev.
Desc. IR Lt
0.00
GRND GRND GRND GRND GRND GRND BKF BNK BED BED BED BED BED BNK BKF GRND GRND GRND
Desc. IR Lt
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL8 Reach 8 - Middle Branch - Sta 100+79.5
As-Built
Year 1
Facing Downstream
Pool Cross Section
102 101 100 As-built Year 1 Year 2 Year 3 Year 4 Year 5
Elevation (ft)
99 98 ▼ BKF
97 96 95 94 -15
-10
-5
0
5
10
15
20
25
30
35
Station (ft)
As-Built Date 1/8/09 Area 7.9 Bkf W 7.1 Dmean 1.1 Dmax 1.6 W/d 6.4
Year 1 Date 10/20/09 Area 7.4 Bkf W 6.6 Dmean 1.1 Dmax 1.7 W/d 5.9
Year 2 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL8 Reach 8 - Middle Branch - Sta 100+79.5 Station BM HI -17 -10.5 -4 -1 0 1.5 3.6 5.2 6 9 11 11.7 12.2 12.5 12.8 13 13.5 14.3 15 16 17 17.7 18.3 18.8 19 19.9 21 22.8 25.4 26.9 30 34 36 40
As-Built FS/BS Elev. 5.31 98.99 104.30 3.29 101.01 4.42 99.88 5.09 99.21 5.26 99.04 5.30 99.00 5.47 98.83 5.83 98.47 5.72 98.58 5.93 98.37 6.76 97.54 7.00 97.30 7.11 97.19 7.28 97.02 7.48 96.82 7.64 96.66 8.00 96.30 8.42 95.88 8.62 95.68 8.63 95.67 8.66 95.64 8.61 95.69 8.37 95.93 7.63 96.67 7.41 96.89 5.87 98.43 5.65 98.65 5.30 99.00 4.9 99.40 5 99.30 5.03 99.27 4.73 99.57 4.64 99.66 4.17 100.13 4.06 100.24
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. Stump
Desc. IR Lt
Station BM HI 0 2.4 4.9 8.4 9.4 10.9 11.9 12.9 13.9 14.5 15.3 16.3 17.6 17.9 18.5 19.1 19.9 21.4 23.4 25.4
Year 1 FS/BS Elev. 3.78 100.42 104.20 5.15 99.05 5.37 98.83 5.50 98.7 6.45 97.75 6.66 97.54 6.85 97.35 7.03 97.17 7.86 96.34 8.33 95.87 8.65 95.55 8.74 95.46 8.58 95.62 8.09 96.11 7.48 96.72 7.10 97.1 5.73 98.47 5.53 98.67 5.13 99.07 4.86 99.34 4.89 99.31
Station BM HI
Year 4 FS/BS Elev. 0.00 100.00 100.00
Desc. BP8 IR Rt
Station BM HI
Year 2 FS/BS Elev.
Desc. IR Lt
0.00
GRND GRND GRND GRND GRND GRND BKF BNK BED BED BED BED BED ROOTWAD ROOT TOB GRND GRND GRND GRND
Desc. IR Lt
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 8 - Southwest Creek
Elevation (ft)
Profile 105 104 103 102 101 100 99 98 97 96 95 94 93 92 91 90 1000
1025
1050
1075
1100
1125
1150
1175
1200
1225
Station (ft)
Year 1 Bed
Year 1 Water
As-Built Bed
Year 1 Bankfull
1250
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 8 - Southwest Creek
HI 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20 104.20
Station 1000 1013 1017.5 1026 1037 1052 1056 1059 1063 1073 1077.5 1079.5 1084 1093 1101 1105 1110 1117 1121 1123 1127 1131 1137 1142 1148.1 1154 1158 1162 1167 1184 1187 1192.5 1196 1198.2
Bed FS 6.71 6.67 7.99 8.10 7.19 7.22 8.43 8.50 7.54 7.36 8.57 8.73 8.69 7.89 7.86 8.90 9.02 7.89 9.04 9.06 8.36 8.09 9.64 9.43 8.39 8.31 9.51 9.50 8.89 9.05 9.98 9.88 9.33 9.26
Water Depth
Year 1 Bankfull FS
6.56
6.91
7.56
8.15
Description HOR LV BPL EPL HOR X-LOG BPL EPL HOR R ARCH BPL XS PL8 EPL HOR R ARCH BPL EPL R ARCH BPL EPL HOR R ARCH BPL EPL XS RF8/HOR R ARCH BPL EPL HOR R ARCH BPL EPL HOR EP8 THL
Bed Elev. 97.49 97.53 96.21 96.10 97.01 96.98 95.77 95.70 96.66 96.84 95.63 95.47 95.51 96.31 96.34 95.30 95.18 96.31 95.16 95.14 95.84 96.11 94.56 94.77 95.81 95.89 94.69 94.70 95.31 95.15 94.22 94.32 94.87 94.94
Water Elev.
Bankfull Elev.
97.64
97.29
96.64
96.05
weighted particle count:
100.0
21.8 16.8
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southwest Creek: Reach 8 Note: Reach Data 8 Pebble Count, Holly Grove Stream Restoration Site
100% 90% 80% 70% 60%
percent finer than
19% 3% 20% 9% 2% 18% 0% 1% 16% 3% 6% 14% 11% 6% 12% 11% 10% 7% 2% 8% 0% 8% 6% 5% 3% 4% 2% 2% 2% 1% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range
Pebble Count Weighted by Channel Feature Percent Riffle: 32.7 Percent Run: Percent Pool: 28.7 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 18.8 # very fine sand 0.062 0.13 3.0 # 0.13 0.25 8.9 # fine sand medium sand 0.25 0.5 2.0 # 0.5 1 0.0 # coarse sand 1 2 1.0 # very coarse sand 2 4 3.0 # very fine gravel 4 6 5.9 # fine gravel 6 8 10.9 # fine gravel 8 11 5.9 # medium gravel 11 16 10.9 # medium gravel 16 22 6.9 # coarse gravel 22 32 2.0 # coarse gravel very coarse gravel 32 45 0.0 # very coarse gravel 45 64 7.9 # small cobble 64 90 5.0 # medium cobble 90 128 3.0 # large cobble 128 180 2.0 # very large cobble 180 256 2.0 # small boulder 256 362 1.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder
50% 40% 30% 20% 10% 0% 0.01
0.1
1
10
weighted percent
particle size (mm)
100
riffle
pool
1000
run
glide
0% bedrock
0.0
clay hardpan
0.0
detritus/wood
0.0
artificial
0.0
weighted total count:
100
based on sediment particles only based on total count
size percent less than (mm) D16 0.062
particle size distribution gradation geo mean
std dev
D35
D50
D65
D84
D95
2.74
7.3
13
56
127
62.7
1.9
30.0
boulder 1%
bedrock 0%
hardpan 0%
wood/det 0%
artificial 0%
percent by substrate type silt/clay 19%
sand 15%
gravel 53%
cobble 12%
Pebble Count, Holly Grove Stream Restoration Site
100%
artificial 100
16
90%
14
80% 12 70% 10
60%
8
50% 40%
6
30% 4 20% 2
10% 0% 0.01
0.1
1
10
100
1000
0 10000
particle size (mm) cumulative %
100
bedrock clay hardpan detritus/wood total count:
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southwest Creek: Reach 8 Note: Riffle RF8
percent finer than
Count 15 1 4 3 0 0 5 2 9 4 9 9 4 4 9 5 9 5 3
number of particles
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
based on sediment particles only based on total count
size percent less than (mm)
# of particles
particle size distribution gradation geo mean
std dev
D16
D35
D50
D65
D84
D95
0.125
7.04
14.7
32
94
157
62.1
3.4
27.4
percent by substrate type silt/clay
sand
gravel
cobble
boulder
bedrock
hardpan
wood/det
artificial
15%
8%
55%
22%
0%
0%
0%
0%
0%