Holly Grove Stream Restoration Site Guilford County, North Carolina Cataloging Unit: 03030002 EEP Contract #: D06028-B November 6, 2012
MONITORING REPORT 2012 (YEAR 4)
Submitted to: North Carolina Department of Environment and Natural Resources North Carolina Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699-1652
Submitted by: Restoration Systems, LLC 1101 Haynes Street, Suite 211 Raleigh, North Carolina 27604 Point of Contact: Tara Disy Allden Phone: 919-755-9490
Holly Grove Stream Restoration Site
MONITORING REPORT 2012 (YEAR 4) Prepared for:
Restoration Systems, LLC 1101 Haynes Street, Suite 211 Raleigh, North Carolina 27604
Prepared by:
Wolf Creek Engineering, pllc 7 Florida Avenue Weaverville, NC 28787
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
TABLE OF CONTENTS EXECUTIVE SUMMARY ........................................................................................................... iii 1.0 Project Goals, Background, and Attributes......................................................................... 1 1.1 General Project Description ............................................................................................ 1 1.1.1 USGS and NCDWQ River Basin Designations...................................................... 1 1.1.2 NCDWQ Surface Water Classification .................................................................. 1 1.2 Project Goals and Objectives .......................................................................................... 2 1.3 Project Structure.............................................................................................................. 2 1.4 Restoration Type and Approach ..................................................................................... 2 1.5 Project History, Contacts and Attribute Data ................................................................. 3 2.0 Project condition and monitoring results .......................................................................... 21 2.1 Vegetation Assessment ................................................................................................. 21 2.1.1 Vegetative Problem ............................................................................................... 22 2.1.2 Vegetation Plot Photos.......................................................................................... 22 2.2 Stream Assessment ....................................................................................................... 22 2.2.1 Hydrology ............................................................................................................. 23 2.2.2 Geomorphology .................................................................................................... 23 2.2.3 Problem Areas ....................................................................................................... 23 2.2.4 Photo Reference Stations ...................................................................................... 24 2.2.5 Stability Assessment Table ................................................................................... 25
LIST OF TABLES Table I. Table II. Table III. Table IV. Table V. Table VI. Table VII. Table VIII. Table IX. Table X.
Project Components …………………………………….…….…..………………...Page 7 Project Activity and Reporting History …………………………….…..…………..Page 8 Project Contacts ………………………………………………….….…..………….Page 8 Project Attributes …………………………………………….….….....…………....Page 9 Vegetation Summary……………………………………………………………….Page 21 Verification of Bankfull Events ………………………………...………………....Page 23 BEHI and Sediment Export Estimates……………………………………………..Page 24 Categorical Stream Feature Visual Stability Assessment……………………..Page 25 - 26 Baseline Morphology and Hydraulic Summary………………………………Page 27 - 32 Morphology and Hydraulic Monitoring Summary……………………………Page 33 - 40
LIST OF FIGURES Figure 1. Vicinity Map……………………………………………………………………..Page 5 Figure 2. Vicinity Map……………………………………………………………………..Page 6 Figure 3. Monitoring Plans…………………………………………………………..Page 11 - 20
APPENDIX A: Vegetative Raw Data APPENDIX B: Geomorphic Raw Data
Holly Grove / Restoration Systems
i
Monitoring Year 4 (Nov. 2012)
HOLLY GROVE RESTORATION SITE
Holly Grove / Restoration Systems
MONITORING REPORT
ii
Monitoring Year 4 (Nov. 2012)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
EXECUTIVE SUMMARY The Holly Grove Site is located in Guilford County, North Carolina within the Cape Fear River Basin, Cataloging Unit 03030002. The project consisted of restoring, enhancing, and preserving approximately 21,000 linear feet of stream, restoring approximately 42 acres of riparian buffers, and preserving approximately 1.11 acres of wetlands. The Site is in a rural setting in the Southern Outer Piedmont hydrophysiographic ecoregion and was previously used to grow row crops with woody vegetation confined to isolated areas. Prior to restoration, the channels were highly degraded due to unrestricted livestock access, channelization activities, and lack of riparian vegetation. The restoration design was based on a Priority Level 1 and 2 approach to restore proper channel dimension and allow for appropriate sediment transport. Restoration practices on this project were implemented with the intent of minimizing unnecessary disturbance to adjacent land and to protect mature riparian vegetation where it existed. The constructed stream profile has restored stable bed morphology including appropriate riffle-pool sequencing. Cross-vanes, J-Hook vanes, and in-stream log structures have been integrated into the channel to provide grade control, maintain stable streambanks while the riparian vegetation establishes, and provide in-stream habitat. Biodegradable fiber matting was used to provide temporary stabilization on the newly graded streambanks. Excavated materials from the existing channel were used to backfill around in-stream structures and to build riffles with a natural substrate and function. Hydrology Following completion of the construction in October of 2008, the Site has been subjected to one greater-than-bankfull event and at least four bankfull or near-bankfull events. It should be noted that, prior to completion of construction, Tropical Storm Fay (August 2008) produced a highflow event in which floodwaters crested 2.5 feet above bankfull. Approximately seventy percent (70%) of the project was complete at that time and subjected to this high water event. In late September, 2010, Tropical Storm Nicole resulted in 3 and 4.5 inches of rain on the site and overbankfull flows. Since this time there has been at least one bankfull event in the past two years. Stream The restored stream reaches have successfully managed the bankfull and above bankfull flow events of the first four years. The overall grade of the channel has been maintained and the banks of the channels are stable throughout the Site. There is one location with minor bank scour and one structure along East Branch is piping. Three beaver dams were identified and removed on upper Buckhorn Creek that were impounding water to the top of bank. Vegetation Native woody and herbaceous species were used to establish, at minimum, a fifty-foot riparian buffer on each side of the restored reach. Herbaceous species have established throughout the site and there is significant evidence of additional volunteer species becoming established within the buffer. The riparian buffer bare-root planting had an average survival rate of 309 stems per acre through the fourth year. There is an average density of 2,347 stems per acre including planted stems and natural volunteers.
Holly Grove / Restoration Systems
iii
Monitoring Year 4 (Nov. 2012)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
Planned Action Continued visual monitoring is planned for the few stream areas that have been identified as “Areas of Concern”. Repairs will be performed on the structure on East Branch that is piping to prevent the possibility of a headcut formation. Additional live staking will be installed on the bank of Buckhorn at STA 153+00 that is exhibiting evidence of erosion. Also, continued monitoring and maintenance of the beaver population will be conducted for the entire site.
Holly Grove / Restoration Systems
iv
Monitoring Year 4 (Nov. 2012)
HOLLY GROVE RESTORATION SITE
1.0
MONITORING REPORT
PROJECT GOALS, BACKGROUND, AND ATTRIBUTES
The purpose of the Holly Grove Stream Restoration Site (Site) was to restore degraded sections of Buckhorn Creek and several of its tributaries located in Guilford County, North Carolina. This monitoring report presents information regarding the site and watershed conditions, the restoration approach for the project, the monitoring results, remedial action plan and detailed monitoring drawings of the site. 1.1
General Project Description
Buckhorn Creek is located approximately 15 miles northeast of the City of Greensboro in rural Guilford County, North Carolina (Figure 1: Vicinity Map). The site consists of approximately 42 acres of floodplain, approximately 21,000 linear feet of stream designated as Buckhorn Creek and its tributaries, and 1.11 acres of existing wetlands (Figure 2: Project Map). The stream reaches consist of perennial, first and second order streams that have historically been impacted by riparian and bank vegetation removal, channel straightening, unrestricted livestock access, and agricultural land-use practices. Existing land use within the site consists of forested areas and row crops. The site is located within moderately sloping colluvial valleys and elevations range from approximately 615 to 720 feet above sea level. Past land management activities have consisted of timber harvesting with subsequent land clearing for agricultural uses including cattle and row crop farming. The land outside of the conservation easement remains in active agricultural production. 1.1.1
USGS and NCDWQ River Basin Designations
The project reach is located in the Haw River watershed of the Cape Fear River Basin (United States Geological Survey (USGS) 14-digit Hydrologic Unit 03030002020070) within North Carolina Division of Water Quality (NCDWQ) sub-basin 03-06-02. This sub-basin is primarily rural agriculture, although residential land use accounts for a significant portion. Buckhorn Creek drains into Reedy Fork Creek approximately ¾ miles downstream of the Site, which in turn flows to the Haw River eight miles downstream. 1.1.2
NCDWQ Surface Water Classification
Reedy Fork Creek in the vicinity of the Site is assigned a best usage classification of C, NSW by the NCDWQ and as such there are no restrictions on watershed development or types of discharge. These waters are suitable for aquatic life propagation and survival, fishing, wildlife, secondary recreation, and agriculture. Secondary recreation includes wading, boating, and other uses not involving human body contact with water on an organized or frequent basis. The supplemental classification, NSW (Nutrient Sensitive Waters) includes areas with water quality problems associated with excessive plant growth resulting from nutrient enrichment. The portion of Reedy Fork Creek to which Buckhorn Creek drains and the portion of the Haw River that is approximately two miles east of the Site are listed on the DWQ final
Holly Grove / Restoration Systems
1
Monitoring Year 4 (Nov. 2012)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
2004 and draft 2006 303(d) lists. Streams which are included in the 303(d) list do not meet water quality standards or have impaired uses. 1.2
Project Goals and Objectives
The primary goals of the Holly Grove Stream Restoration Project are to: • Restore aquatic and riparian habitat within the on-site portions of the Buckhorn Creek watershed. • Restore geomorphic stability to the subject stream reaches. These goals will be accomplished through the following objectives: • Restoration of approximately forty-two acres of Mesic Mixed Hardwood Forest along both sides of Buckhorn Creek and its tributaries. • Removing nonpoint sources of pollution associated with agricultural activities including the establishment of a native woody riparian buffer (at least 50’ wide) adjacent to streams and wetlands to treat surface runoff which may be laden with sediment and/or agricultural pollutants from the adjacent landscape. • Reestablishing stream stability and the capacity to transport watershed flows and sediment loads by restoring a stable dimension, pattern, and profile supported by natural in-stream habitat and grade/bank stabilization structures. • Promoting floodwater attenuation through a) conveying bankfull stream flows through construction of bankfull bench, b) restoring secondary, entrenched tributaries thereby reducing floodwater velocities, and c) re-vegetating floodplains to increase frictional resistance on floodwaters crossing the Site. • Improving aquatic habitat by enhancing stream bed variability and the use of instream structures. • Providing wildlife habitat including fringe and forest edge. These accomplishments will result in: • Restoration and enhancement of 15,822 Stream Mitigation Units. • Protecting the Site with a perpetual conservation easement. 1.3
Project Structure
The project is composed of seven distinct reaches; the main channel, Buckhorn Creek, and each of its tributaries, Middle Branch, West Branch, East Branch, Lower East Branch, Southeast Creek, and Southwest Creek. The project structure is tabulated in the corresponding Table 1 (See Below). 1.4
Restoration Type and Approach
Restoration and enhancement practices implemented on this project were designed to minimize unnecessary disturbance to adjacent land and to protect mature riparian vegetation where it exists. Consideration was given to the potential functional lift provided by restoration activities in comparison to the functional lift that could be realized through the natural process of channel evolution. Included in this consideration was an attempt to determine the disturbance and sedimentation that could occur as a result of this natural process. Where restoration was determined to be warranted,
Holly Grove / Restoration Systems
2
Monitoring Year 4 (Nov. 2012)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
consideration was given to which reaches could best be served by maintaining as much of the existing channel pattern as possible. The proposed channels of Buckhorn Creek and its tributaries were designed as Type B4c streams with the exception of the lower reach of Middle Branch. This channel configuration provides the most stable and natural form in the moderately sloping colluvial valleys that are found throughout the Site. Not only does it effectively convey bankfull discharge and sediment load but also conforms to the natural conveyance of flood flows. Additionally, since broad alluvial valleys are generally not found within the Site, the lower sinuosity of the Type B4c streams allowed for minimization grading and earthwork activities. The constructed channel dimensions, patterns, and profiles were based on hydraulic relationships and morphologic dimensionless ratios of the reference reaches. Restoration activities included restoring stable channel morphology supported by natural in-stream habitat and grade/bank stabilization structures, the elimination of accelerated bank erosion, and reestablishment of native riparian buffers at least 50 feet in width. Exotic riparian vegetation was removed in areas of the project to allow for replanting of native riparian species. In-stream structures were installed to provide for enhanced aquatic habitat, protection of the newly constructed stream banks, and grade control for the newly constructed channel. 1.5
Project History, Contacts and Attribute Data
The summary of the project history, contacts, and attribute data is tabulated in Tables II, III, and IV (See Below).
Holly Grove / Restoration Systems
3
Monitoring Year 4 (Nov. 2012)
HOLLY GROVE RESTORATION SITE
MITIGATION PLAN Table I Project Components
Restoration Reach/Area
Restoration Level
Approach
PreRestoration LF or AC
PostRestoration LF or AC
Holly Grove Stream Restoration Site / EEP Contact #D06028-B
Station Range/Location
Buckhorn Creek West Branch West Branch Middle Branch Middle Branch Middle Branch Middle Branch East Branch East Branch East Branch East Branch Little Branch SW Creek SW Creek UT to SW Creek SE Creek SE Creek UT to SE Creek Wetland A
R E2 R E2 R E2 R P E2 R R E2 R E2 P R P P E
P2 E2 P2 E2 P1 E2 P1 E2 P1 P1 E2 P1 E2 P1 -
8,757 870 390 240 1,549 472 90 960 920 300 739 553 723 2,229 325 342 881 528 1.11
8,848 870 391 240 1,561 472 194 960 920 329 761 553 723 2,229 325 363 881 528 1.11
100+00 - 194+50 300+00 - 308+00 300+00 - 303+91 398+91 - 401+31 401+31 - 417+37 417+37 - 422+09 423+00 - 425+40 480+00 - 498+80 480+00 - 498+80 490+00 - 493+29 500+00 - 507+61 19+945 - 205+54 600+00 - 607+34 608+26 - 630+55 650+00 - 653+50 700+00 - 704+36 706+25 - 715+06 750+00 - 755+28 Middle Branch
Comments
Component Summation Restoration Level
Stream (LF)
Riparian Wetland (Ac) Riverine
Restoration Enhancement Enhancement I Enhancement II Creation Preservation HQ Preservation
13,170
Totals
21,148
Non-Riparian (Ac) Upland (Ac)
Buffer (Ac)
BMP
42
BMP Count
Non-Riverine
1.11 5,284 2,694 1.11 1.11
= Non-Applicable
Holly Grove / Restoration Systems
7
Monitoring Year 4 (Nov. 2012)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
Table II Project Activity and Reporting History Holly Grove Restoration Project Data Collection Activity or Report Complete Restoration Plan Apr 2007 Final Design - Construction Plans N/A Construction N/A Temporary S&E mix applied to entire project area N/A Permanent seed mix applied to entire site N/A Bare-root plantings for floodplain and uplands N/A Mitigation Plan / As-Built (Year 0 Monitoring - baseline) Oct 2008 Year 1 Monitoring Oct 2009 Year 2 Monitoring Oct 2010 Year 3 Monitoring Oct 2011 Year 4 Monitoring Oct 2012 Year 5 Monitoring
Completion or Delivery Jun 2007 Oct 2007 Oct 2008 Sep 2008 Sep 2008 Dec 2008 Dec 2008 Dec 2009 Nov 2010 Oct 2011 Nov 2012
Table III Project Contact Table Holly Grove Restoration Project Designer Wolf Creek Engineering, pllc
7 Florida Avenue Weaverville NC, 28787 828-658-3649
S. Grant Ginn Construction Contractor North State Environmental, Inc
2889 Lowery St. Winston-Salem, NC 27101 336-725-2010
Darrell Westmoreland Planting & Seeding Contractor North State Environmental, Inc
2889 Lowery St. Winston-Salem, NC 27101 336-725-2010
Stephen Joyce Monitoring Performers Stream Monitoring - Wolf Creek Engineering, pllc Vegetation Monitoring - Catena Group
Holly Grove / Restoration Systems
S. Grant Ginn Mike Wood
8
828-658-3649 919-732-1300
Monitoring Year 4 (Nov. 2012)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
Table IV Project Attribute Table Holly Grove Restoration Project Guilford Piedmont Southern Outer Piedmont Cape Fear River Basin 03030002020070 03-06-02
Project County Physiographic Region Ecoregion Project River Basin USGS HUC for Project (14 digit) NCDWQ Sub-basin for Project Within extent of EEP Watershed Plan? WRC Class (Warm, Cool, Cold) % of project esaement fenced or demarcated Beaver activity observed during design phase?
100% Demarcated Easement Corners Yes, on Buckhorn Creek upstream of bridge
Restoration Component Attribute Table Buckhorn West Middle 4.27 0.2 0.2 Second First First 8757 390 1639 Perennial Perennial Perennial Rural Rural Rural
Drainage area (mi2) Stream order Restored length (feet) Perennial or Intermittent Watershed type Watershed LULC Distribution (e.g.)
Residential Ag-Row Crop Ag-Livestock Forested Watershed impervious cover (%) NCDWQ AU/Index number NCDWQ classification 303d listed? Upstream of a 303d listed segment? Reasons for 303d listing or stressor Total acreage of easement Total vegetated acreage within easement Total planted acreage as part of the restoration Rosgen classification of pre-existing Rosgen classification of As-Built Valley type Valley slope Valley side slope range Valley toe slope range Cowardin classification Trout waters designation Species of concern, endangered? Dominant soil series and characteristics Series Depth (in) Clay % K T
Holly Grove / Restoration Systems
East 0.2 First 1039 Perennial Rural
20% 10% 5% 10% 40% 60% 50% 10% 10% 5% 10% 0% 30% 25% 35% 80% 10 5 5 5 16-(1)a C, NSW C, NSW C, NSW C, NSW No Yes non-point urban and agricultural runoff 64.87 47.06 45.3 F, G G G G B4c B4c B4c B4c II II II II 0.0051 0.0239 0.0165 0.0119 4% - 40% 0.4% - 2% N/A N/A Yes, Bald Eagle & Carolina Darter Ch , Co CcD Ch CcD , Ch Congaree Cecil Chewacla Chewacla 0-80 0-80 0-70 0-70 5-35 5-70 5-35 5-35 Moderate Moderate Moderate Moderate -
9
Southeast Southwest 0.14 0.19 First First 342 723 Perennial Perennial Rural Rural 5% 90% 0% 5% 2
10% 10% 0% 80% 2
C, NSW
C, NSW
G B4c II 0.0159
G B4c II 0.0169
CcD Cecil 0-80 5-70 Moderate -
CcD Cecil 0-80 5-70 Moderate -
Monitoring Year 4 (Nov.2012)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
2.0
Project condition and monitoring results
2.1
Vegetation Assessment
The Carolina Vegetation Survey – Ecosystem Enhancement Program (CVS-EEP) 2008 protocol for recording vegetation (Lee et. al 2008) was used to determine the planting pattern of woody stems with respect to species, spacing, and density as well as to forecast survivability and growth of planted stems in subsequent monitoring years. Eleven (11) randomly placed 10 meter by 10 meter vegetative sampling plots were established within the project easement area. The corners of each monitoring plot have been marked in the field and their position documented by GPS survey. Plots were placed within the applicable planting zones to capture the heterogeneity of the designed vegetative communities. Plot corners were permanently marked with rebar and recorded during the baseline survey. All planted stems and plot corners were marked with orange flagging tape to facilitate relocation during subsequent monitoring years. A reference photograph was taken for each plot at the origin looking diagonally across the plot to the opposite corner. There are eleven vegetation plots that were monitored using the CVS-EEP vegetation monitoring protocol, which was implemented for monitoring year (MY) -01, MY-02, MY-03, and MY-04. Vegetation Plot 7 was relocated during MY-02 to avoid disturbance from gas line easement maintenance. Including Plots 1-8, and A-C, there are 309 planted stems/acre which excludes live stakes. There are 2,347 stems/acre that includes planted stems, livestakes, and natural volunteers. Vegetation plots 1, 4, 6, A, B, and C contain planted stem counts above the success criteria. The success criterion for planted woody species is 320 stems/acre after MY-03. A mortality rate of 10 percent will be allowed after MY-04 (288 stems/acre), with another 10 percent allowed after MY-05 (260 stems/acre). Table V: Vegetation Summary Plot
1 2 3 4 5 6 7 8 A B C
Date
Planted Living
Dead or Missing
Sampled
Stems
Stems
9/13/2012 9/13/2012 9/13/2012 9/13/2012 9/13/2012 9/13/2012 9/13/2012 9/13/2012 9/13/2012 9/13/2012 9/13/2012
8 4 7 9 5 10 4 6 9 10 13
Holly Grove / Restoration Systems
Volunteer Stems
1 0 0 2 0 0 0 0 2 3 0
56 83 43 105 38 6 1 92 48 26 55
21
Total
Average
Living
Stems
Stems
Per Acre
64 87 50 114 43 16 5 98 57 36 68
324 162 283 364 202 405 162 243 364 405 526
# species
Monitoring Year 4 (Nov. 2012)
7 3 6 7 4 5 3 3 6 3 5
HOLLY GROVE RESTORATION SITE
2.1.1
MONITORING REPORT
Vegetative Problems
The vegetation problem areas are composed of areas of low planted stem density in the vicinity of plots, 2, 3, 5, 7, and 8, due to the CVS data results. Invasive exotics observed throughout the conservation easement that are a threat to native vegetation include tree of heaven (Ailanthus altissima), princess tree (Paulownia tomentosa), and Johnson grass (Sorghum halapense). Other invasive exotics infrequently observed that did not seem to be an imminent threat include tall fescue (Schedonurus arundinaceus), Japanese honeysuckle (Lonicera japonica), Multiflora rose (Rosa multiflora), and Chinese privet (Ligustrum sinense). According to the EEP Invasives of Concern/Interest List, tree of heaven, princess tree, mulitflora rose, Chinese privet, and Japanese honeysuckle are all classified as “High Concern” species and fescue as a “Low/Moderate Concern” species. 2.1.2
Vegetative Plot Photos
A photo point was established in each vegetation plot. Photo points are positioned for each plot at the origin facing diagonally across the plot to the opposite corner. The photographs were captured on the same day as the vegetation plot surveys (Appendix A). 2.2
Stream Assessment
Monitoring detailed in Monitoring dimension, interval.
protocol follows that outlined within the EEP Site Specific Mitigation Plan and the U.S. Army Corps of Engineers (USACE) Stream Mitigation Guidelines for Level I. Specifically, stream monitoring included measurements of stream profile, pattern, bed materials, photo documentation, and stream bankfull return
Streambanks remain intact and stable and fully vegetated throughout the site. Vegetation has grown into many riffles on the main channel due to a lack of shade and mature buffer. This has limited the mobility of bed material but has not had noticeable effects on overall stability. 2.2.1 Hydrology Since completion of construction in October of 2008, the site has been subjected to at least one greater-than-bankfull event and several bankfull or near-bankfull events. In August of 2008, Tropical Storm Fay crossed central North Carolina resulting in eight (8) inches of rainfall on-site and water elevations 2.5 feet above bankfull on Buckhorn Creek. Approximately seventy percent (70%) of the project was complete at that time and subjected to this estimated fifty-year storm event. In October of 2008, locally heavy rainfall produced a bankfull event at the Site during the final stages of construction. In June of 2009, heavy rainfall resulted in water elevations 0.2 to 0.3 feet above bankfull. Heavy rainfall associated with remnants of Hurricane Ida produced one additional event in November of 2009, after Year 1 monitoring was completed which again resulted in an elevated flow event. In late September of 2010, Tropical Storm Nicole moved north across central and eastern North Carolina and produced approximately 4.5 inches of rain over 48 hours resulting in flood waters which crested 0.4 feet above bankfull. During Year 3, at least one rainfall event occurred resulting in water which crested 0.1 feet above bankfull. There was no evidence of a greater than bankfull event during Year 4 monitoring.
Holly Grove / Restoration Systems
22
Monitoring Year 4 (Nov. 2012)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
Table VI Verification of Bankfull Events – Lick Creek Stream Restoration Site (D04013-1) Date of Data Collection 9/3/08 8/13/09 10/11/10 9/26/11 9/17/12
Date of Occurrence of Bankfull Event 8/27/08 June 2009 September 2010 2011 2012
Height above Bankfull (ft) 2.5 0.2 0.4 0.1 -0.4
Method of Data Collection Debris Evidence Crest Gauge Crest Gauge Crest Gauge Crest Gauge
2.2.2 Geomorphology Following the procedures established in the USDA Forest Service Manual (Harrelson et al 1994) and the methodologies utilized in the Rosgen stream assessment and classification system (Rosgen 1994, 1996), data collected consisted of detailed dimension and pattern measurements, longitudinal profiles, and bed materials sampling. Re-survey of the permanent cross sections and profile reaches have shown only minimal alterations in local bed elevations with the bed form and the channel pattern remaining consistent with the As-built condition. Overall, Buckhorn Creek showed little or no adjustments in the riffle cross sections. Middle Branch, Lower East Branch, Southeast Creek and Southwest Creek all showed evidence of minor adjustment in the riffle cross sections, displaying a slight increase in cross-sectional area while maintaining nearly the same maximum depth as the As-built. Location of bed features relative to the pattern is consistent with the As-built survey. Pebble counts were conducted at each riffle cross-section, as well as across the overall study reaches. Pebble count data was plotted by size distribution in order to assess the D50 and D84 size class. Pebble count data from Reaches 2, 4, 5, 6 and 7 showed no conclusive variations from the Year 3 survey. Reach 1 and 8 showed an increase in both the D50 and the D84 values. Reach 3 showed a general decrease in both the D50 and the D84. This may be due in part to significant growth of vegetation in the riffles that may be trapping finer particles in the bed. Table VII. BEHI and Sediment Export Estimates – (Only Required in Year 5) 2.2.3 Problem Areas In Year 4 Monitoring of the Holly Grove Stream Restoration Site, some minor problem areas remain that were identified during Year 3. 1.) Several riffles on Buckhorn Creek and Southeast Branch still exhibit excessive vegetation in the channel bed. 2.) There was one (1) location of moderate piping at a log vane. 3.) There were three (3) areas of local bank scour. Inadequate shade due to lack of mature riparian buffer has allowed vegetation to take root in the bed matrix. It is anticipated that this vegetation will die back during the winter but will reestablish during each growing season until sufficient shading is provided by the canopy of the
Holly Grove / Restoration Systems
23
Monitoring Year 4 (Nov. 2012)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
buffer. This has affected bedload transport by limiting bed mobility, but it is not expected to have any significant impact on the overall stability or integrity of the channel bed. Continued visual monitoring is planned for the few stream areas that have been identified as “Areas of Concern”. Repairs will be performed on the structure on East Branch that is piping to prevent the possibility of a headcut formation. Additional live staking will be installed on the bank of Buckhorn at STA 153+00 that is exhibiting evidence of erosion. Also, three beaver dams on upper Buckhorn Creek were manually removed prior to Year 4 monitoring. Continued monitoring and maintenance of the beaver population will be conducted for the entire site. 2.2.4 Photo Reference Stations Photograph reference Stations (PRSs) have been established to assist in characterizing the site and to allow qualitative evaluation of the site conditions. The location of each photo station has been permanently marked in the field and the bearing/orientation of the photograph is indicated on the As-built plans to allow for consistent repetition. A total of twenty-eight (28) PRSs have been established along the restored stream (Appendix B). Sixteen (16) of these PRSs have been located upstream of the permanent monitoring cross sections. These photographs are taken facing downstream looking at the section, and show as much of the banks and channel as possible
Holly Grove / Restoration Systems
24
Monitoring Year 4 (Nov. 2012)
HOLLY GROVE RESTORATION SITE
2.2.5
MONITORING REPORT
Stability Assessment Table
Table VIII. Categorical Stream Feature Visual Stability Assessment
Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders
Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders
Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders
Initial 100% 100% 100% 100% 100% 100% 100%
Performance Percentage Buckhorn Creek (8,848 ft) MY-01 MY-02 MY-03 MY-04 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 99% 100% 100% 100% 100% 100% 100% 100%
Initial 100% 100% 100% 100% 100% 100% 100%
Performance Percentage Middle Branch (1,755 ft) MY-01 MY-02 MY-03 MY-04 97% 99% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 99% 100% 100% 100% 100% 100% 100% 98% 99% 100% 100% 83% 83% 100% 100%
Initial 100% 100% 100% 100% 100% 100% 100%
Performance Percentage East Branch (1,090 ft) MY-01 MY-02 MY-03 MY-04 100% 99% 99% 99% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 99% 99% 99% 100% 100% 100% 100%
Holly Grove / Restoration Systems
25
MY-05
MY-05
MY-05
Monitoring Year 4 (Nov. 2012)
HOLLY GROVE RESTORATION SITE
Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders
Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders
MONITORING REPORT
Initial 100% 100% 100% 100% 100% 100% 100%
Performance Percentage Southeast Creek (363 ft) MY-01 MY-02 MY-03 MY-04 96% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Initial 100% 100% 100% 100% 100% 100% 100%
Performance Percentage Southwest Creek (723 ft) MY-01 MY-02 MY-03 MY-04 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Holly Grove / Restoration Systems
26
MY-05
MY-05
Monitoring Year 4 (Nov. 2012)
3.76
Mean
0.013
28
1.2
2.9
12
34.8
2
1.73
63
20.1
Med
2.2
134
3.1
Max
Reference Reach(es) Data SD
n
1.4
37
2.3
1.69
30
22
Min
40 50 1.9 110 1.7
Radius of Curvature Ratio (ft/ft)
Meander Wavelength (ft)
Meander Width Ratio (ft/ft)
Ri% / Ru% / P% / G% / S%
33
36.5
40
2
172
16
318
33
1.5
44
2
44
2.25
134.5
2.5
59.5
54
119
Stream Power (transport capacity) W/m2
Drainage Area (sq mi)
3.3 186
Bankfull discharge (cfs)
6
Proportion Overwide (%)
8
Incision Class (BHR Ranch)
Entrenchment Class (ER Range)
Biological or Other
Channel Stability or Habitat Metric
BEHI VL% / L% / M% / H% / VH% / E%
7
Bankfull Floodplain Area (acres)
0.006
0.005
BF slope (ft/ft)
5
0.0079
1.05
0.0054
1.17
Sinuosity (ft)
Water Surface Slope (channel) (ft/ft)
8756
Channel Thalweg length (ft)
Valley length (ft)
F4 & G4
Rosgen Classification
Bankfull Velocity (fps)
Impervious cover estimate (%) B4c
0.006
0.005
1.2
8777
4.5
B4c
144
1.8
104.5
9.15
182.5
88
0.66
1.6
37
2.3
47
102.5
Reach Shear Stress (competency) lb/ft2
4.6
340
10
240
120
160
3.6
25
0.005
40
1
2.28
13
40.9
2.4
1.78
52.5
23
Med
Design
Max part size (mm) mobilized at bankfull
d16 / d35 / d50 / d84 / d95 / dip / disp (mm)
SC% / Sa% / G% / C% / B% / Be%
3.15
225
5.95
145
80
110
60
Pool Volume (ft3)
Pool Spacing (ft)
2
2.6
21 3.9
3.4
3.35
2.8
Pool Length (ft)
Pool Max Depth (ft)
Channel Beltwidth (ft)
4
71
2.7
Min
23
n
0.004
0.008
SD
Riffle Length (ft)
Radius of Curvature (ft)
Additional Reach Parameters
4
4
0.007
14
2.3
1.3
3
Baseline Stream Data Summary
Riffle Slope (ft/ft)
0.006
2 14
d50 (mm)
10 1.2
Width/Depth Ratio
Entrenchment Ratio
Bank Height Ratio
16
42
1
55
2.3
2.3
Bankfull Max Depth (ft)
1
Substrate, bed and transport parameters
Pattern
Profile
Max
32
Med
Pre-Existing Condition
26
Mean
24
Min
Bankfull Cross-Sectional Area (ft2)
Eq.
32
UL
Regional Curve
1.6
LL
Floodprone Width (ft)
Gauge
Bankfull Mean Depth (ft)
Bankfull Width (ft)
Simension and Substrate - Riffle
Parameter
Table IX-a Holly Grove Restoration Site - Buckhorn Creek (8848 ft)
3
225
3
75
75
150
3.8
54
0.006
64
3
48
2.6
1.91
75
25
Max
0.0042
35
7.82
140
1.7
41
183
56
1.08
55
0.0026
38
13.4
30.3
1.9
1.3
50
23.4
Min
18
Mean
0.0047
1.17
8848
B4c
9.27
221
3.72
87
217
119
2.89
67
0.0069
58
2.5
16
34.3
2.1
1.5
50
23.4
Med
29
0.0051
10.7
380
7
167
250
136
3.51
87
0.017
74
18.1
48.3
2.6
1.9
70
25.4
Max
As-Built / Baseline
17
SD
n
40 45 7 55 6
Channel Beltwidth (ft)
Radius of Curvature (ft)
Radius of Curvature Ratio (ft/ft)
Meander Wavelength (ft)
Meander Width Ratio (ft/ft)
4
Ri% / Ru% / P% / G% / S%
50
0.2
SD
n
60
Mean
Med
36.5
1.8
104.5
9.15
182.5
2.2
2
172
16
318
40
40
3.1
SD
n
1.5
18
2
18
13
36
7
13
1.4
12
Min
2.25
49.5
2.5
22.5
20
45
1.4
14
0.013
16
1
1.7
13
6.3
0.95
0.7
19.5
9
Med
Design
Stream Power (transport capacity) W/m2
Drainage Area (sq mi)
28
Bankfull discharge (cfs)
0.015
Water Surface Slope (channel) (ft/ft)
BF slope (ft/ft)
6
Proportion Overwide (%)
8
Incision Class (BHR Ranch)
Entrenchment Class (ER Range)
Biological or Other
Channel Stability or Habitat Metric
BEHI VL% / L% / M% / H% / VH% / E%
7
Bankfull Floodplain Area (acres)
0.014
Sinuosity (ft)
5
400 1.06
Channel Thalweg length (ft)
Valley length (ft)
G4 3.9
Rosgen Classification
Bankfull Velocity (fps)
Impervious cover estimate (%)
-
0.0079
1.05
B4c
0.015
0.013
1.2
386
4.5
B4c
96
1.6
37
2.3
47
33
36.5
2.6
0.013
28
1.2
2.9
12
34.8
2
1.73
Max
Reference Reach(es) Data
0.53
10
100
23
150
33
2.7
Min
Reach Shear Stress (competency) lb/ft2
8
77.5
15
97.5
100
Max
Max part size (mm) mobilized at bankfull
d16 / d35 / d50 / d84 / d95 / dip / disp (mm)
SC% / Sa% / G% / C% / B% / Be%
Additional Reach Parameters
4
4
30
65
Pool Volume (ft3)
Pool Spacing (ft)
2
1.4
Pool Max Depth (ft)
Pool Length (ft)
Riffle Slope (ft/ft)
0.02
28
d50 (mm)
Riffle Length (ft)
1.7
1.2
Entrenchment Ratio
Bank Height Ratio
7
Width/Depth Ratio
1
1.2 5.5
Bankfull Max Depth (ft)
1
Bankfull Cross-Sectional Area (ft2)
Substrate, bed and transport parameters
Pattern
Profile
Med
Pre-Existing Condition
63
Mean
0.9
Min
7.5
Eq.
Floodprone Width (ft)
UL
Regional Curve
Bankfull Mean Depth (ft)
LL 20.1
Gauge
Baseline Stream Data Summary
6.3
Bankfull Width (ft)
Simension and Substrate - Riffle
Parameter
Table IX-b Holly Grove Restoration Site - West Branch (391 ft)
3
81
3
27
27
54
20
19
3
27
Max
2.3
23
40
9
Min
Mean
1.17
391
B4c
89
4.2
41.5
80
46
10.5
Med
6
60
52
12
Max
As-Built / Baseline SD
n
7 55 6
Meander Wavelength (ft)
Meander Width Ratio (ft/ft)
45
Radius of Curvature Ratio (ft/ft)
40
Channel Beltwidth (ft)
Radius of Curvature (ft)
4
Ri% / Ru% / P% / G% / S%
50
0.2
60
36.5
1.8
104.5
9.15
182.5
2.2
2
172
16
318
40
40
1.5
18
2
18
13
36
6
10
1.4
12
Min
2.25
49.5
2.5
22.5
20
45
1.4
13
0.013
15
1
1.7
13
6.3
0.95
0.7
19.5
9
Med
Design
Stream Power (transport capacity) W/m2
Drainage Area (sq mi)
28
Bankfull discharge (cfs)
0.015
BF slope (ft/ft)
6
Proportion Overwide (%)
8
Incision Class (BHR Ranch)
Entrenchment Class (ER Range)
Biological or Other
Channel Stability or Habitat Metric
BEHI VL% / L% / M% / H% / VH% / E%
7
Bankfull Floodplain Area (acres)
-
0.014
Water Surface Slope (channel) (ft/ft)
5
0.0079
1.06
Sinuosity (ft)
1.05
1778
Channel Thalweg length (ft)
Valley length (ft)
G4 3.9
Rosgen Classification
Bankfull Velocity (fps)
Impervious cover estimate (%) B4c
0.015
0.013
1.2
1790
4.5
B4c
115
1.6
37
2.3
47
33
36.5
3.1
n
0.58
10
100
23
150
33
2.6
0.013
28
1.2
2.9
12
SD
Reach Shear Stress (competency) lb/ft2
8
77.5
15
97.5
100
2.7
2 34.8
Max
Max part size (mm) mobilized at bankfull
d16 / d35 / d50 / d84 / d95 / dip / disp (mm)
SC% / Sa% / G% / C% / B% / Be%
Additional Reach Parameters
4
4
30
65
Pool Volume (ft3)
Pool Spacing (ft)
2
1.4
Pool Max Depth (ft)
Pool Length (ft)
Riffle Slope (ft/ft)
0.02
28
d50 (mm)
Riffle Length (ft)
1.7
Bank Height Ratio
Substrate, bed and transport parameters
Pattern
Profile
1
1.2
1
1.73
Entrenchment Ratio
Med
Reference Reach(es) Data
7
Mean
Width/Depth Ratio
Min
5.5
n
1.2
SD
Bankfull Max Depth (ft)
Max
Bankfull Cross-Sectional Area (ft2)
Med
Pre-Existing Condition
63
Mean
0.9
Min
7.5
Eq.
Floodprone Width (ft)
UL
Regional Curve
Bankfull Mean Depth (ft)
LL 20.1
Gauge
Baseline Stream Data Summary
6.3
Bankfull Width (ft)
Simension and Substrate - Riffle
Parameter
Table IX-c Holly Grove Restoration Site - Middle Branch (1796 ft)
3
81
3
27
27
54
16
32
3
27
Max
0.016
0.0164
34
3
60
2.4
16
30
44
0.9
17
0.0148
17
7.6
10
3.7
1
0.6
55
6.2
Min
25
Mean
1.07
1796
B4c
82.5
Med
29
0.019
0.0187
8.8
105
19.4
130
88
75
1.32
29
0.0184
38
13
10.4
5.2
1.1
0.7
80
7.2
Max
As-Built / Baseline
12
SD
n
7 55 6
Meander Wavelength (ft)
Meander Width Ratio (ft/ft)
45
Radius of Curvature Ratio (ft/ft)
40
Channel Beltwidth (ft)
Radius of Curvature (ft)
4
Ri% / Ru% / P% / G% / S%
50
0.2
60
36.5
1.8
104.5
9.15
182.5
2.2
2
172
16
318
40
40
1.5
18
2
18
13
36
12
12
1.4
12
Min
2.25
49.5
2.5
22.5
20
45
1.4
15
0.013
17
1
1.7
13
6.3
0.95
0.7
19.5
9
Med
Design
Stream Power (transport capacity) W/m2
Drainage Area (sq mi)
28
Bankfull discharge (cfs)
0.014 0.015
Water Surface Slope (channel) (ft/ft)
BF slope (ft/ft)
6
Proportion Overwide (%)
8
Incision Class (BHR Ranch)
Entrenchment Class (ER Range)
Biological or Other
Channel Stability or Habitat Metric
BEHI VL% / L% / M% / H% / VH% / E%
7
Bankfull Floodplain Area (acres)
1.06
Sinuosity (ft)
5
1039
Channel Thalweg length (ft)
Valley length (ft)
G4 3.9
Rosgen Classification
Bankfull Velocity (fps)
Impervious cover estimate (%)
-
0.0079
1.05
B4c
0.015
0.013
1.2
1058
4.5
B4c
102
1.6
37
2.3
47
33
36.5
n
0.54
10
100
23
150
33
3.1
SD
Reach Shear Stress (competency) lb/ft2
8
77.5
15
97.5
100
2.6
0.013
28
1.2
2.9
2
Max
Max part size (mm) mobilized at bankfull
d16 / d35 / d50 / d84 / d95 / dip / disp (mm)
SC% / Sa% / G% / C% / B% / Be%
Additional Reach Parameters
4
4
30
65
Pool Volume (ft3)
Pool Spacing (ft)
2
1.4
0.02
Pool Max Depth (ft)
Pool Length (ft)
Riffle Slope (ft/ft)
Riffle Length (ft)
28
d50 (mm)
Substrate, bed and transport parameters
Pattern
Profile
1.7
Bank Height Ratio
12 2.7
7
1
1.2
1
1.73
Width/Depth Ratio
Med
Reference Reach(es) Data
Entrenchment Ratio
Mean
34.8
Min
1.2
n
5.5
SD
Bankfull Max Depth (ft)
Max
Bankfull Cross-Sectional Area (ft2)
Med
Pre-Existing Condition
63
Mean
0.9
Min
7.5
Eq.
Floodprone Width (ft)
UL
Regional Curve
Bankfull Mean Depth (ft)
LL 20.1
Gauge
Baseline Stream Data Summary
6.3
Bankfull Width (ft)
Simension and Substrate - Riffle
Parameter
Table IX-d Holly Grove Restoration Site - East Branch (1073 ft)
3
81
3
27
27
54
18
21
3
27
Max
41
3.25
76
3.8
33
28
34
0.5
13
0.0071
22
Min
16
Mean
0.011
0.011
1.04
1073
B4c
9.4
81
5.1
44
36
35
0.8
14
0.0104
23
2.1
11.4
6.5
1
0.8
18
8.6
Med
24
5.25
91
7
60
45
44
0.9
17
0.0132
26
Max
As-Built / Baseline
19
SD
n
7 55 6
Meander Wavelength (ft)
Meander Width Ratio (ft/ft)
45
Radius of Curvature Ratio (ft/ft)
40
Channel Beltwidth (ft)
Radius of Curvature (ft)
4
Ri% / Ru% / P% / G% / S%
50
0.2
60
36.5
1.8
104.5
9.15
182.5
2.2
2
172
16
318
40
40
1.5
15
2
15
11
30
10
10
1.4
10
Min
2.25
41.5
2.5
19
17
37.5
1.1
13
0.016
12
1
2.2
13
4.2
0.75
0.6
16.5
7.5
Med
Design
Stream Power (transport capacity) W/m2
Drainage Area (sq mi)
28
Bankfull discharge (cfs)
0.015
Water Surface Slope (channel) (ft/ft)
BF slope (ft/ft)
6
Proportion Overwide (%)
8
Incision Class (BHR Ranch)
Entrenchment Class (ER Range)
Biological or Other
Channel Stability or Habitat Metric
BEHI VL% / L% / M% / H% / VH% / E%
7
Bankfull Floodplain Area (acres)
0.014
Sinuosity (ft)
5
342 1.06
Channel Thalweg length (ft)
Valley length (ft)
G4 3.9
Rosgen Classification
Bankfull Velocity (fps)
Impervious cover estimate (%)
-
0.0079
1.05
B4c
0.019
0.016
1.2
359
4.5
B4c
96
1.6
37
2.3
47
33
36.5
3.1
n
0.53
10
100
23
150
33
2.6
0.013
28
1.2
2.9
12
SD
Reach Shear Stress (competency) lb/ft2
8
77.5
15
97.5
100
2.7
2 34.8
Max
Max part size (mm) mobilized at bankfull
d16 / d35 / d50 / d84 / d95 / dip / disp (mm)
SC% / Sa% / G% / C% / B% / Be%
Additional Reach Parameters
4
4
30
65
Pool Volume (ft3)
Pool Spacing (ft)
2
1.4
Pool Max Depth (ft)
Pool Length (ft)
Riffle Slope (ft/ft)
0.02
28
d50 (mm)
Riffle Length (ft)
1.7
Bank Height Ratio
Substrate, bed and transport parameters
Pattern
Profile
1
1.2
1
1.73
Entrenchment Ratio
Med
Reference Reach(es) Data
7
Mean
Width/Depth Ratio
Min
5.5
n
1.2
SD
Bankfull Max Depth (ft)
Max
Bankfull Cross-Sectional Area (ft2)
Med
Pre-Existing Condition
63
Mean
0.9
Min
7.5
Eq.
Floodprone Width (ft)
UL
Regional Curve
Bankfull Mean Depth (ft)
LL 20.1
Gauge
Baseline Stream Data Summary
6.3
Bankfull Width (ft)
Simension and Substrate - Riffle
Parameter
Table IX-e Holly Grove Restoration Site - Southeast Creek (363 ft)
3
68
3
23
23
45
20
19
3
23
Max
40
3.4
81
5
40
27
20
0.49
18
14
Min
15
Mean
0.0106
0.0106
1.05
363
B4c
38.5
86
8
64
30.5
22
0.52
19
0.0067
15
3.1
15
4.3
0.8
0.5
25
8
Med
30
4.3
91
11
88
34
40
1.4
21
18
Max
As-Built / Baseline
15
SD
n
7 55 6
Meander Wavelength (ft)
Meander Width Ratio (ft/ft)
45
Radius of Curvature Ratio (ft/ft)
40
Channel Beltwidth (ft)
Radius of Curvature (ft)
4
Ri% / Ru% / P% / G% / S%
50
0.2
SD
n
60
Mean
Med
36.5
1.8
104.5
9.15
182.5
2.2
2
172
16
318
40
40
3.1
SD
n
1.5
16
2
16
12
32
6
10
1.4
11
Min
2.25
44
2.5
20
18
40
1.3
10
0.007
14
1
2.2
13
4.9
0.85
0.6
17.5
8
Med
Design
Stream Power (transport capacity) W/m2
Drainage Area (sq mi)
28
Bankfull discharge (cfs)
Proportion Overwide (%)
8
Incision Class (BHR Ranch)
Entrenchment Class (ER Range)
6
Bankfull Floodplain Area (acres)
Biological or Other
Channel Stability or Habitat Metric
BEHI VL% / L% / M% / H% / VH% / E%
7
5
-
0.008
0.0122
0.0122
0.015
BF slope (ft/ft)
0.007
0.014
Water Surface Slope (channel) (ft/ft)
0.0079
723
B4c
6.88
93
3.55
28.5
55
25
1.45
8
0.0018
11
1.95
18.6
3.4
0.7
0.4
15.6
8
Med
30
7.5
126
4.6
37
60
32
1.65
12
0.032
18
Max
As-Built / Baseline
1.17
1.2
19
Mean
1.06
33
6.25
60
2.5
20
50
19
1.15
5
0.0012
9
Min
Sinuosity (ft)
1.05
4.5
B4c
3
72
3
24
24
48
13
19
3
24
Max
Channel Thalweg length (ft)
Valley length (ft)
G4 3.9
Rosgen Classification
Bankfull Velocity (fps)
Impervious cover estimate (%) B4c
50
1.6
37
2.3
47
33
36.5
2.6
0.013
28
1.2
2.9
12
34.8
2
1.73
Max
Reference Reach(es) Data
0.25
10
100
23
150
33
2.7
Min
Reach Shear Stress (competency) lb/ft2
8
77.5
15
97.5
100
Max
Max part size (mm) mobilized at bankfull
d16 / d35 / d50 / d84 / d95 / dip / disp (mm)
SC% / Sa% / G% / C% / B% / Be%
Additional Reach Parameters
4
4
30
65
Pool Volume (ft3)
Pool Spacing (ft)
2
1.4
0.02
Pool Max Depth (ft)
Pool Length (ft)
Riffle Slope (ft/ft)
Riffle Length (ft)
28
d50 (mm)
1.2
Entrenchment Ratio 1.7
7
Width/Depth Ratio
Bank Height Ratio
5.5
Bankfull Cross-Sectional Area (ft2)
1
1.2
Bankfull Max Depth (ft)
1
Substrate, bed and transport parameters
Pattern
Profile
Med
Pre-Existing Condition
63
Mean
0.9
Min
7.5
Eq.
Floodprone Width (ft)
UL
Regional Curve
Bankfull Mean Depth (ft)
LL 20.1
Gauge
Baseline Stream Data Summary
6.3
Bankfull Width (ft)
Simension and Substrate - Riffle
Parameter
Table IX-f Holly Grove Restoration Site - Southwest Creek (723 ft)
18
SD
n
Bkf Width (ft) Floodprone Width (ft)
36.6 77
Min 40 29 125 2
Max 115 371 320 5.75
Med 65 105 180 3.25
Riffle Length (ft) 28 81 47 Riffle Slope (ft/ft) 0.0024 0.0126 0.0094 Pool length (ft) 24.4 38 29.5 Pool Spacing (ft) 37 130 82
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
4.7 55
26.5 64
31.3 1.3 2.3 18 >3 1
MY3 23.7 82
MY-1 (2006)
35.3 1.5 2.6 15.9 >3 1
MY2 23.7 82
35.4 1.5 2.1 15.3 >3 1
MY1 20 70
MY5
MY+
20.5 0 59.5
Min 40 29 125 2
Med 65 105 180 3.25
46.8 2 4.2 -
MY2 23.4 48.4 2.1 4.3 -
MY3 23.5 -
Min 40 29 125 2
Max 115 371 320 5.75
Med 65 105 180 3.25
MY-3 (2008)
48 2.2 3.9 -
MY1 22 -
31.6 0.003 74.2
Min 40 29 125 2
-
MY5
MY+
Med 65 105 180 3.25
-
-
967 1085 1.1 0.006 B4c
71.3 47.8 0.0241 0.0113 119.5 86.1
Max 115 371 320 5.75
MY-4 (2009)
47.2 2 4.2 -
MY4 23.5 -
Cross Section 2 Pool
80.2 37.5 23 51 38 0.0212 0.0071 0.0004 0.0138 0.0042 164 93 20 123.8 85.8
Max 115 371 320 5.75
MY-2 (2007)
38.7 98
32.8 1.4 2.4 16.6 >3 1
MY4 23.3 82
Cross Section 1 Riffle
Additional Reach Parameters Valley Length (ft) 967 967 967 Channel Length (ft) 1085 1085 1085 Sinuosity 1.1 1.1 1.1 Water Surface Slope (ft/ft) 0.0024 0.0126 0.0094 0.0039 0.0081 0.0036 0.0042 Bkf Slope (ft/ft) 0.006 0.0056 0.0047 Rosgen Classification B4c B4c B4c Habitat Index Macrobenthos
Profile
Pattern
Parameter
Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Dimension
Parameter
Table X-a Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 1: Buckhorn Creek
MY2
MY3
Min
Max
Med
MY-5 (2010)
MY1
MY5
MY+
Min
Max
Med
MY+ (2011)
MY4
Cross Section
Bkf Width (ft) Floodprone Width (ft)
22 140
Min 55 61 182 2.5
Max 162 245 225 7.5
Med 60 130 195 2.8
MY5
MY+
Min 55 61 182 2.5
Max 162 245 225 7.5
Med 60 130 195 2.8
MY-2 (2007)
59.6 131
22.7 1.1 1.9 17.6 1.7 1
MY4 20 34 49.1 2.2 3.1 -
MY2 22 47.6 2.1 2.9 -
MY3 22.8
Min 55 61 182 2.5
Max 162 245 225 7.5
Med 60 130 195 2.8
MY-3 (2008)
45.1 2 3 -
MY1 22.2 -
MY5
MY+
Min 55 61 182 2.5
Max 162 245 225 7.5
Med 60 130 195 2.8
MY-4 (2009)
43.2 2.1 2.8 -
MY4 20.6 -
Cross Section 4 Pool
-
-
882 968 1.18 0.007 B4c
Riffle Length (ft) 25 87 34 39 90 50.3 28 90 50.3 13.1 52.6 30.9 Riffle Slope (ft) 0.0012 0.0228 0.0099 0.0023 0.0172 0.0083 0.0023 0.0172 0.0083 0.0052 0.0325 0.0177 Pool length (ft) 16.2 36.8 31.8 Pool Spacing (ft) 26 151 56 39 159 68 39 159 68 28.7 144.7 54.8
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
32 116
67.2 184
21.1 1.1 1.6 18.4 1.7 1
MY3 19.7 34
MY-1 (2006)
27.6 1.4 1.9 14.8 1.6 1
MY2 20.2 34
25.4 1.2 1.7 16.4 1.6 1
MY1 20.4 34
Cross Section 3 Riffle
Additional Reach Parameters Valley Length (ft) 882 882 882 Channel Length (ft) 968 968 968 Sinuosity 1.18 1.18 1.18 Water Surface Slope (ft/ft) 0.0012 0.0228 0.0099 0.0015 0.0046 0.0069 0.0046 0.0069 Bkf Slope (ft/ft) 0.0057 0.0055 0.0062 Rosgen Classification B4c B4c B4c Habitat Index Macrobenthos
Profile
Pattern
Parameter
Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Dimension
Parameter
Table X-b Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 2: Buckhorn Creek
MY2
MY3
Min
Max
Med
MY-5 (2010)
MY1
MY5
MY+
Min
Max
Med
MY+ (2011)
MY4
Cross Section
Bkf Width (ft) Floodprone Width (ft)
Min 45 177 243 1.8
Riffle Length (ft) 17 Riffle Slope (ft) 0.0032 Pool length (ft) 19.9 Pool Spacing (ft) 31
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
15.4 109
60.6 118
17.3 127
45.2 1.7 2.7 15.9 2.4 1
MY3 26.8 65
0.014 -
103 0.014 49.6 167
Max 87 284 288 3.4
1009 1040 1.03 0.0066 0.0047 B4c
49 0.007 24.7 75
Med 50 222 274 2
MY5
MY+
Max 87 284 288 3.4
Med 50 222 274 2
66.2 2.9 4.9 -
MY2 22.8 66.2 2.9 4.8 -
MY3 22.9 -
Min 45 177 243 1.8
Max 87 284 288 3.4
Med 50 222 274 2
MY-3 (2008)
62.8 2.8 4.7 -
MY1 22.5 -
MY5
MY+
Min 45 177 243 1.8
Max 87 284 288 3.4
Med 50 222 274 2
MY-4 (2009)
64.9 2.2 4.8 -
MY4 29.9 -
Cross Section 6 Pool
-
-
1009 1009 1040 1040 1.03 1.03 0.0044 0.0045 0.0045 0.0045 0.0051 0.0047 B4c B4c
-
-
1009 1040 1.03 0.0051 B4c
18 85 51.6 4 72 35 4.25 75.95 33.4 0.0029 0.0217 0.0076 0.0025 0.0148 0.0082 0.0051 0.0196 0.0103 19.5 164 78 31 112 64.9 33.2 157 63.6
Min 45 177 243 1.8
MY-2 (2007)
1.7 83
39 1.6 2.5 15.5 2.6 1
MY4 24.6 65
Cross Section 5 Riffle
MY-1 (2006)
47.7 1.7 2.8 15.9 2.5 1
MY2 27.5 65
48 1.9 2.6 13.5 2.5 1
MY1 25.5 65
Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) 0.0032 Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos
Profile
Pattern
Parameter
Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Dimension
Parameter
Table X-c Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 3: Buckhorn Creek
MY2
MY3
Min
Max
Med
MY-5 (2010)
MY1
MY5
MY+
Min
Max
Med
MY+ (2011)
MY4
Cross Section
Bkf Width (ft) Floodprone Width (ft)
2.2 53
20.6 58
0.1 95
3.7 0.6 1.1 9.9 >3 1
MY3 6 40
Min 14 25 66 2.8
Max 21 59 100 4.2
Med 18 40 88 3.6
MY-1 (2006)
3.8 0.5 1 12.6 >3 1
MY2 6.9 40
3.5 0.6 1 11.8 >3 1
MY1 6.4 40
-
-
220 236 1.1 0.0205 B4c
8.3 0 12
Min 14 25 66 2.8
-
MY5
MY+
Med 18 40 88 3.6
11.1 1 2 -
MY2 10.7 10.4 1 2.3 -
MY3 10 -
Min 14 25 66 2.8
Max 21 59 100 4.2
Med 18 40 88 3.6
MY-3 (2008)
9.4 0.9 2.4 -
MY1 10.5 -
MY5
MY+
Min 14 25 66 2.8
Max 21 59 100 4.2
Med 18 40 88 3.6
MY-4 (2009)
11.5 1 2.1 -
MY4 11.6 -
Cross Section 2 Pool
-
220 236 1.07 0.0197 B4c
-
-
220 236 1.07 0.0209 B4c
-
-
220 236 1.07 0.022 B4c
18.1 14.5 4 16 11.5 13.5 31 15.3 0.0348 0.0348 0.0100 0.0481 0.0131 0.0007 0.0234 0.0149 52 35 10 41.9 21.5 13 50.7 28.1
Max 21 59 100 4.2
MY-2 (2007)
0.1 48
3.7 0.6 1.4 9.6 >3 1
MY4 6 40
Cross Section 1 Riffle
Riffle Length (ft) 9 23 15.8 Riffle Slope (ft/ft) 0.0155 0.0409 0.0271 Pool length (ft) 5 11.9 8.7 Pool Spacing (ft) 20 41 23
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos
Profile
Pattern
Parameter
Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Dimension
Parameter
Table X-d Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 4: Middle Branch
MY2
MY3
Min
Max
Med
MY-5 (2010)
MY1
MY5
MY+
Min
Max
Med
MY+ (2011)
MY4
Cross Section
Bkf Width (ft) Floodprone Width (ft)
10.8 49
15.3 44
Min 22 52 91 237
-
4.5 46
4.9 0.7 1.1 10.5 >3 1
MY3 7.2 40
Med 23 62 108 2.8
MY+
Min 22 52 91 237
Max 24 71 133 2.9
Med 23 62 108 2.8
10.1 1.2 1.9 -
MY2 8.4 8.5 1.2 1.8 -
MY3 8.5 -
Min 22 52 91 237
Max 24 71 133 2.9
Med 23 62 108 2.8
MY-3 (2008)
9.7 1.1 2 -
MY1 8.6 -
MY5
-
197 211 1.1 0.0117 B4c
-
-
197 211 1.07 0.0166 B4c
-
-
197 211 1.07 0.0177 B4c
Min 22 52 91 237
-
MY+
Max 24 71 133 2.9
-
197 211 1.07 0.0112 B4c
26.9 0.009 46.4
Med 23 62 108 2.8
MY-4 (2009)
10.6 1.1 1.8 -
MY4 9.8 -
Cross Section 4 Pool
43 18 13.5 41.5 22 13 46 19.3 14.5 43.7 0.0093 0.0092 0.0044 0.0123 0.0064 0.0096 0.0277 0.0104 0.0013 0.0304 16.2 16.2 74.6 48.5 13.5 61 43 49.5 64.5 54 13.4 63.3
Max 24 71 133 2.9
MY5
MY-2 (2007)
8.8 45
5.8 0.8 1.2 9.9 >3 1
MY4 7.6 40
Cross Section 3 Riffle
MY-1 (2006)
5.6 0.7 1.2 11.1 >3 1
MY2 7.9 40
5.9 0.7 1.2 11.5 >3 1
MY1 8.2 40
Riffle Length (ft) 16 Riffle Slope (ft) 0.009 Pool length (ft) 11.7 Pool Spacing (ft) 44
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos
Profile
Pattern
Parameter
Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Dimension
Parameter
Table X-e Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 5: Middle Branch
MY2
MY3
Min
Max
Med
MY-5 (2010)
MY1
MY5
MY+
Min
Max
Med
MY+ (2011)
MY4
Cross Section
Bkf Width (ft) Floodprone Width (ft)
0.1 23
9.8 29
Min 16 2.3
-
0.1 19
2.9 0.4 0.7 20.3 >3 1
MY3 7.7 30
Max 17 2.4
-
207.4 209.7 1.0 0.0104 B4c
18.8 0.012 9.5 38.4
Med 16 193 87 2.3
MY5
MY+
Max 17 2.4
Med 16 193 87 2.3
10.2 1.1 2 -
MY2 9.2 10.3 1 2.1 -
MY3 10 -
Min 16 2.3
Max 17 2.4
Med 16 193 87 2.3
MY-3 (2008)
11.5 1 2.5 -
MY1 12.1 -
MY5
-
-
207.4 209.7 1.01 0.0141 B4c
-
-
207.4 209.7 1.01 0.0134 B4c
Min 16 2.3
-
MY+
Max 17 2.4
-
207.4 209.7 1.01 0.0102 B4c
11.2 0.018 34.5
Med 16 193 87 2.3
MY-4 (2009)
10.5 1 1.9 -
MY4 10.8 -
Cross Section 6 Pool
11.7 22.5 16.9 4 24 12 6.7 25.4 0.0107 0.0222 0.0107 0.0125 0.0825 0.0149 0.0037 0.0245 28.6 39.5 33.6 25 39 31.3 12 63.6
Min 16 2.3
MY-2 (2007)
0.1 23
2.6 0.4 0.7 20.3 >3 1
MY4 6.5 30
Cross Section 5 Riffle
MY-1 (2006)
3 0.4 0.7 21.6 >3 1
MY2 8 30
2.7 0.4 0.6 18.6 >3 1
MY1 7.1 30
Riffle Length (ft) 17.5 27 Riffle Slope (ft) 0.0037 0.0176 Pool length (ft) 6.5 12.5 Pool Spacing (ft) 30 44
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos
Profile
Pattern
Parameter
Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Dimension
Parameter
Table X-f Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 6: Lower East Branch
MY2
MY3
Min
Max
Med
MY-5 (2010)
MY1
MY5
MY+
Min
Max
Med
MY+ (2011)
MY4
Cross Section
Bkf Width (ft) Floodprone Width (ft)
2.4 21
0.1 43
0.1 9
8.8 0.7 1.1 20.2 2.41 1
MY3 13.3 35
Min 21 37 70 1.4
Max 26 48 80 1.7
Med 23 44 77 1.5
MY-1 (2006)
7.6 0.05 1.2 27.7 2.3 1
MY2 14.5 35
9.5 0.6 1.2 23.8 2.3 1
MY1 15 35
-
-
157.6 167 1.1 0.0106 B4c
Min 21 37 70 1.4
-
MY5
MY+
-
24.9 0.004 44.2
Max 26 48 80 1.7
9.6 1 1.9 -
MY2 9.8 -
157.6 167 1.06 0.0096 B4c
Min 21 37 70 1.4
-
9.9 1.1 1.9 -
MY3 9.3 -
Max 26 48 80 1.7
-
157.6 167 1.06 0.0134 B4c
18.8 0.016 21.3
Med 23 44 77 1.5
MY5
Max 26 48 80 1.7
-
8.5 25.1 0.0314 0.0415 6.85 31.5
Min 21 37 70 1.4
-
MY+
157.6 167 1.06 0.0127 B4c
17.23 0.038 24.6
Med 23 44 77 1.5
MY-4 (2009)
10 1.1 2.1 -
MY4 9.4 -
Cross Section 2 Pool
MY-3 (2008)
9.7 0.9 1.8 -
MY1 10.5 -
18.8 7.8 29.5 0.0032 0.0044 0.0167 36.8 7 45
Med 23 44 77 1.5
MY-2 (2007)
0.1 9
7.3 0.6 1.1 22.8 2.7 1
MY4 12.9 35
Cross Section 1 Riffle
Riffle Length (ft) 12 20.5 19 12.6 Riffle Slope (ft/ft) 0.0017 0.0052 0.0029 0.0024 Pool length (ft) 5 8.1 6 Pool Spacing (ft) 29.6 43.5 40.5 29.3
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos
Profile
Pattern
Parameter
Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Dimension
Parameter
Table X-g Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 7: Southeast Creek
MY2
MY3
Min
Max
Med
MY-5 (2010)
MY1
MY5
MY+
Min
Max
Med
MY+ (2011)
MY4
Cross Section
Bkf Width (ft) Floodprone Width (ft)
13.3 42
7.3 56
Min 19 19 59 2.3
-
15.1 60
5.3 0.6 0.9 15.2 1.67 1
MY3 9 15
Med 25 25 66 3
-
174.4 198.2 1.1 0.0123 B4c
15 9 0.0092 0.0056 19.5 11.4 38.5 27.5
Max 42 26 99 5.1 5.1 0 9.9
Min 19 19 59 2.3
-
MY5
MY+
Med 25 25 66 3
-
174.4 198.2 1.14 0.0128 B4c
14.3 8.5 0.0373 0.0056 32.6 23.9
Max 42 26 99 5.1
MY-2 (2007)
27.5 97
5.1 0.6 0.9 15.5 1.68 1
MY4 8.9 15
Cross Section 3 Riffle
MY-1 (2006)
4.9 0.6 0.8 14.5 1.83 1
MY2 8.4 15
4.4 0.5 0.7 15.2 1.83 1
MY1 8.2 15
Riffle Length (ft) 4 Riffle Slope (ft) 0.002 Pool length (ft) 7 Pool Spacing (ft) 21
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos
Profile
Pattern
Parameter
Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Dimension
Parameter
6.6 0 19.5
Min 19 19 59 2.3
-
9.1 1.3 1.8 -
MY2 7.2 8.6 1.1 1.8 -
MY3 7.5 -
-
16.3 0.0055 33
Max 42 26 99 5.1
174.4 198.2 1.14 0.0107 B4c
12 0.005 26.7
Med 25 25 66 3
MY-3 (2008)
7.4 1.1 1.7 -
MY1 6.6 -
5.4 0 13.5
Min 19 19 59 2.3
-
MY5
MY+
Med 25 25 66 3
-
174.4 198.2 1.14 0.01 B4c
24.9 12.7 0.0223 0.0112 39.6 24.6
Max 42 26 99 5.1
MY-4 (2009)
9.2 1.3 1.7 -
MY4 7.1 -
Cross Section 4 Pool
Table X-h Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 8: Southwest Creek
MY2
MY3
Min
Max
Med
MY-5 (2010)
MY1
MY5
MY+
Min
Max
Med
MY+ (2011)
MY4
Cross Section
APPENDIX A VEGETATION RAW DATA
Vegetation Plot 1 – Year 4
Vegetation Plot 2– Year 4
Holly Grove Restoration Site
October 2012
Vegetation Plot 3– Year 4
Vegetation Plot 4– Year 4
Holly Grove Restoration Site
October 2012
Vegetation Plot 5– Year 4
Vegetation Plot 6– Year 4
Holly Grove Restoration Site
October 2012
Vegetation Plot 7– Year 4
Vegetation Plot 8– Year 4
Holly Grove Restoration Site
October 2012
Vegetation Plot A– Year 4
Vegetation Plot B– Year 4
Holly Grove Restoration Site
October 2012
Vegetation Plot C– Year 4
Holly Grove Restoration Site
October 2012
APPENDIX B GEOMORPHIC RAW DATA
REPRESENTATIVE PROBLEM AREA PHOTOS
Representative Problem Area Photos
Buckhorn Creek, minor bank scour, Sta 152+90
Holly Grove Stream Restoration Site
9/17/12
Photo No. 61
9/17/2012
PHOTOPOINTS
Ph hoto Point 1 Buckh horn Creek facingg upstream
Year 0 Photo No. 1
Buckhhorn Creek facinng upstream
Year 3 Photo No. 4
Year 1 Photo No. 2
Buckhhorn Creek facinng upstream
Year 4 Photo No. 5
Year 2 Photo No. 3
Buckhhorn Creek facinng upstream
Year 5
Buckh horn Creek facingg upstream
Buckh horn Creek facingg upstream
Hollyy Grove Stream Restoration Site
9 9/17/2012
Ph hoto Point 2 Buckh horn Creek facingg upstream
Year 0 Photo No. 6
Buckhhorn Creek facinng upstream
Year 3 Photo No. 9
Year 1 Photo No. 7
Buckhhorn Creek facinng upstream
Year 4 Photo No. 10
Year 2 Photo No. 8
Buckhhorn Creek facinng upstream
Year 5
Buckh horn Creek facingg upstream
Buckh horn Creek facingg upstream
Hollyy Grove Stream Restoration Site
9 9/17/2012
Ph hoto Point 3 Buckh horn Creek facingg upstream
Year 0 Photo No. 11 1
Buckhhorn Creek facinng upstream
Year 3 Photo No. 14
2 Year 1 Photo No. 12
Buckhhorn Creek facinng upstream
Year 4 Photo No. 15
3 Year 2 Photo No. 13
Buckhhorn Creek facinng upstream
Year 5
Buckh horn Creek facingg upstream
Buckh horn Creek facingg upstream
Hollyy Grove Stream Restoration Site
9 9/17/2012
Ph hoto Point 4 West Branch facing do ownstream
Year 0 Photo No. 16 6
West Branch facing ddownstream
Year 3 Photo No. 19
7 Year 1 Photo No. 17
West Branch facing ddownstream
Year 4 Photo No. 20
8 Year 2 Photo No. 18
West Branch facing ddownstream
Year 5
West Branch facing do ownstream
West Branch facing do ownstream
Hollyy Grove Stream Restoration Site
9 9/17/2012
Ph hoto Point 5 Buckh horn Creek facingg upstream
Year 0 Photo No. 21 1
Buckhhorn Creek facinng upstream
Year 3 Photo No.24
2 Year 1 Photo No. 22
Buckhhorn Creek facinng upstream
Year 4 Photo No. 25
3 Year 2 Photo No. 23
Buckhhorn Creek facinng upstream
Year 5
Buckh horn Creek facingg upstream
Buckh horn Creek facingg upstream
Hollyy Grove Stream Restoration Site
9 9/17/2012
Ph hoto Point 6 Buckh horn Creek at briidge, facing upsttream Year 0 Photo No. 26
Buckhhorn Creek at brridge, facing upsstream Year 3 Photo No. 29 9
Buckh horn Creek at briidge, facing upsttream Year 1 Photo No. 27
Buckhhorn Creek at brridge, facing upsstream Year 4 Photo No. 30 0
Buckh horn Creek at briidge, facing upsttream Year 2 Photo No. 28
Buckhhorn Creek at brridge, facing upsstream Year 5
Hollyy Grove Stream Restoration Site
9 9/17/2012
Ph hoto Point 7 Buckh horn Creek at briidge, facing dow wnstream Year 0 0 Photo No. 31 1
Buckhhorn Creek at brridge, facing dow wnstream Year 3 Photo No.34 4
Buckh horn Creek at briidge, facing dow wnstream Year 1 1 Photo No. 32
Buckhhorn Creek at brridge, facing dow wnstream Year 4 Photo No. 35 5
Buckh horn Creek at briidge, facing dow wnstream Year 2 Photo No. 33
Buckhorn C Creek at bridge, facing downstreeam Year 5
Hollyy Grove Stream Restoration Site
9 9/17/2012
Ph hoto Point 8 Buckh horn Creek facingg upstream
Year 0 Photo No. 36 6
Buckhhorn Creek facinng upstream
Year 3 Photo No. 39
7 Year 1 Photo No. 37
Buckhhorn Creek facinng upstream
Year 4 Photo No. 40
8 Year 2 Photo No. 38
Buckhhorn Creek facinng upstream
Year 5
Buckh horn Creek facingg upstream
Buckh horn Creek facingg upstream
Hollyy Grove Stream Restoration Site
9 9/17/2012
Ph hoto Point 9 Buckh horn Creek facingg upstream
Year 0 Photo No. 41 1
Buckhhorn Creek facinng upstream
Year 3 Photo No. 44
2 Year 1 Photo No. 42
Buckhhorn Creek facinng upstream
Year 4 Photo No. 45
3 Year 2 Photo No. 43
Buckhhorn Creek facinng upstream
Year 5
Buckh horn Creek facingg upstream
Buckh horn Creek facingg upstream
Hollyy Grove Stream Restoration Site
9 9/17/2012
Pho oto Point 10 Buckh horn Creek facingg upstream
Year 0 Photo No. 46 6
Buckhhorn Creek facinng upstream
Year 3 Photo No. 49
7 Year 1 Photo No. 47
Buckhhorn Creek facinng upstream
Year 4 Photo No. 50
8 Year 2 Photo No. 48
Buckhhorn Creek facinng upstream
Year 5
Buckh horn Creek facingg upstream
Buckh horn Creek facingg upstream
Hollyy Grove Stream Restoration Site
9 9/17/2012
Pho oto Point 11 Southwest Creek facin ng downstream Year 0 Photo No. 51 1
Southhwest Creek faciing downstream m Year 3 Photo No. 54
Southwest Creek facin ng downstream Year 1 Photo No.5 2
Southhwest Creek faciing downstream m Year 4 Photo No. 55
Southwest Creek facin ng downstream Year 2 Photo No. 53 3
Southhwest Creek faciing downstream m Year 5
Hollyy Grove Stream Restoration Site
9 9/17/2012
Pho oto Point 12 Southwest Creek facin ng upstream
Year 0 Photo No. 56 6
Southhwest Creek faciing upstream
Year 3 Photo No. 59
7 Year 1 Photo No. 57
Southhwest Creek faciing upstream
Year 4 Photo No. 60
8 Year 2 Photo No. 58
Southhwest Creek faciing upstream
Year 5
Southwest Creek facin ng upstream
Southwest Creek facin ng upstream
Hollyy Grove Stream Restoration Site
9 9/17/2012
GEOMORPHIC DATA
Table B2. Visual Morphological Stability Assessment Holly Grove Stream Restoration Site (D06028-B) Buckhorn Creek 8,848 ft (# Stable) Total Total Number Number Number / Performing per As- feet in Metric as built unstable Intended state
Feature Category
% Performing in Stable Condition
Feature Performing Mean or Total
A. Riffles
1. Present 2. Armor stable 3. Facet grade appears stable 4. Minimal evidence of embedding/fining 5. Length appropriate
86 86 86 86 86
86 86 86 86 86
N/A N/A N/A N/A N/A
100% 100% 100% 100% 100%
100%
B. Pools
1. Present 2. Sufficently deep 3. Length appropriate
88 88 88
88 88 88
0 N/A N/A
100% 100% 100%
100%
C. Thalweg
1. Upstream of meander bend centered 2. Downstream of meander bend centered
86 86
86 86
N/A N/A
100% 100%
100%
D. Meanders
1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief
84 0 88 88
88 N/A 88 88
N/A N/A N/A N/A
95% 100% 100% 100%
100%
E. Bed General
1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting
N/A
N/A
0/0
100%
N/A
N/A
0/200
100%
100%
F. Vanes
1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures
108 108 108 108
108 108 108 108
N/A N/A N/A N/A
100% 100% 100% 100%
100%
1. Free of scour 2. Footing stable
23 23
23 23
N/A N/A
100% 100%
100%
% Performing in Stable Condition
Feature Performing Mean or Total
100% 100% 98% 100% 100%
100%
G. Wads/Boulders
Table B2. Visual Morphological Stability Assessment
Feature Category
A. Riffles
B. Pools
Holly Grove Stream Restoration Site (D06028-B) Middle Branch 1,755 ft (# Stable) Total Total Number Number Number / Performing per As- feet in Metric as built unstable Intended state 1. Present 44 44 N/A 2. Armor stable 44 44 N/A 3. Facet grade appears stable 43 44 N/A 4. Minimal evidence of embedding/fining 44 44 N/A 5. Length appropriate 44 44 N/A 1. Present 2. Sufficently deep 3. Length appropriate
46 46 46
46 46 46
N/A N/A N/A
100% 100% 100%
100%
1. Upstream of meander bend centered 2. Downstream of meander bend centered
44 44
44 44
N/A N/A
100% 100%
100%
D. Meanders
1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief
45 0 46 46
46 N/A 46 46
N/A N/A N/A N/A
98% 100% 100% 100%
99%
E. Bed General
1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting
N/A
N/A
0/0
100%
N/A
N/A
0/0
100%
100%
F. Vanes
1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures
69 69 69 69
69 69 69 69
N/A N/A N/A N/A
100% 100% 100% 100%
100%
G. Wads/Boulders
1. Free of scour 2. Footing stable
3 3
3 3
N/A N/A
100% 100%
100%
C. Thalweg
Table B2. Visual Morphological Stability Assessment
Feature Category
A. Riffles
Holly Grove Stream Restoration Site (D06028-B) East Branch 1,090 ft (# Stable) Total Total Number Number / Number Performing per As- feet in Metric as built unstable Intended state 1. Present 25 25 N/A 2. Armor stable 24 25 N/A 3. Facet grade appears stable 25 25 N/A 4. Minimal evidence of embedding/fining 25 25 N/A 5. Length appropriate 25 25 N/A
% Performing in Stable Condition
Feature Performing Mean or Total
100% 96% 100% 100% 100%
99%
B. Pools
1. Present 2. Sufficently deep 3. Length appropriate
25 25 25
25 25 25
N/A N/A N/A
100% 100% 100%
100%
C. Thalweg
1. Upstream of meander bend centered 2. Downstream of meander bend centered
25 25
25 25
N/A N/A
100% 100%
100%
D. Meanders
1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief
25 0 25 25
25 N/A 25 25
N/A N/A N/A N/A
100% 100% 100% 100%
100%
E. Bed General
1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting
N/A
N/A
0/0
100%
N/A
N/A
0/0
100%
100%
F. Vanes
1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures
37 38 38 37
38 38 38 38
N/A N/A N/A N/A
97% 100% 100% 97%
99%
1. Free of scour 2. Footing stable
1 1
1 1
N/A N/A
100% 100%
100%
% Performing in Stable Condition
Feature Performing Mean or Total
100% 100% 100% 100% 100%
100%
G. Wads/Boulders
Table B2. Visual Morphological Stability Assessment
Feature Category
A. Riffles
B. Pools
Holly Grove Stream Restoration Site (D06028-B) Southeast Creek 363 ft (# Stable) Total Total Number Number Number / Performing per As- feet in Metric as built unstable Intended state 1. Present 10 10 N/A 2. Armor stable 10 10 N/A 3. Facet grade appears stable 10 10 N/A 4. Minimal evidence of embedding/fining 10 10 N/A 5. Length appropriate 10 10 N/A 1. Present 2. Sufficently deep 3. Length appropriate
10 10 10
10 10 10
N/A N/A N/A
100% 100% 100%
100%
C. Thalweg
1. Upstream of meander bend centered 2. Downstream of meander bend centered
10 10
10 10
N/A N/A
100% 100%
100%
D. Meanders
1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief
9 0 9 9
9 N/A 9 9
N/A N/A N/A N/A
100% 100% 100% 100%
100%
1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting
N/A
N/A
0/0
100%
N/A
N/A
0/0
100%
100%
F. Vanes
1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures
11 11 11 11
11 11 11 11
N/A N/A N/A N/A
100% 100% 100% 100%
100%
G. Wads/Boulders
1. Free of scour 2. Footing stable
2 2
2 2
N/A N/A
100% 100%
100%
E. Bed General
Table B2. Visual Morphological Stability Assessment
Feature Category
A. Riffles
B. Pools
C. Thalweg
D. Meanders
E. Bed General
F. Vanes
G. Wads/Boulders
Holly Grove Stream Restoration Site (D06028-B) Southwest Creek 723 ft (# Stable) Total Total Number Number / Number Performing per As- feet in Metric as built unstable Intended state 1. Present 23 23 N/A 2. Armor stable 23 23 N/A 3. Facet grade appears stable 23 23 N/A 4. Minimal evidence of embedding/fining 23 23 N/A 5. Length appropriate 23 23 N/A
% Performing in Stable Condition
Feature Performing Mean or Total
100% 100% 100% 100% 100%
100%
1. Present 2. Sufficently deep 3. Length appropriate
25 25 25
25 25 25
N/A N/A N/A
100% 100% 100%
100%
1. Upstream of meander bend centered 2. Downstream of meander bend centered
23 23
23 23
N/A N/A
100% 100%
100%
1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief
23 0 25 25
25 N/A 25 25
N/A N/A N/A N/A
92% 100% 100% 100%
100%
1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting
N/A
N/A
0/0
100%
N/A
N/A
0/0
100%
100%
1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures
9 9 9 9
9 9 9 9
N/A N/A N/A N/A
100% 100% 100% 100%
100%
1. Free of scour 2. Footing stable
34 34
34 34
N/A N/A
100% 100%
100%
Elevation (ft)
87 1000
88
89
90
91
92
93
94
95
96
97
98
99
1050
1100
1150
1200
1250
1300
1350
1400
1450
1500
Station (ft)
1550
Profile
1600
1850
Year 4 BKF
1800
Year 3 Bed
1750
As-Built Bed
1700
Year 1 Bed
1650
Guilford County, NC Profile Reach 1 - Buckhorn Creek
Holly Grove Stream Restoration Site
1900
2000
Year 4 Bed
Year 2 Bed
1950
2050
2100
Elevation (ft)
635 1000
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
1050
1100
1150
1200
1250
1300
1350
1400
1450
Station (ft)
1500
Profile
1550
1750
Year 4 BKF
1700
Year 3 Bed
1650
Year 1 Bed
1600
As-Built Bed
Guilford County, NC Profile Reach 2 - Buckhorn Creek
Holly Grove Stream Restoration Site
1850
Year 4 Bed
Year 2 Bed
1800
1900
1950
2000
Elevation (ft)
625 1000
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
1050
1100
1150
1200
1250
1300
1350
1400
1450
1500
Station (ft)
1550
Profile
1600
1850
Year 4 BKF
1800
Year 3 Bed
1750
As-Built Bed
1700
Year 1 Bed
1650
Guilford County, NC Profile Reach 3 - Buckhorn Creek
Holly Grove Stream Restoration Site
1900
2000
Year 4 Bed
Year 2 Bed
1950
2050
2100
Elevation (ft)
665 1000
666
667
668
669
670
671
672
673
674
675
1025
1050
1075
1100
Station (ft)
1125
Profile
Guilford County, NC Profile Reach 4 - Middle Branch
As-Built Bed
Year 4 BKF
Year 3 Bed
1175
Year 1 Bed
1150
Holly Grove Stream Restoration Site
Year 4 Bed
Year 2 Bed
1200
1225
1250
Elevation (ft)
655 1000
656
657
658
659
660
661
662
663
664
665
1025
1050
1075
1100
Station (ft)
1125
Profile
Guilford County, NC Profile Reach 5 - Middle Branch
Year 1 Bed
Year 4 BKF
Year 3 Bed
1175
As-Built Bed
1150
Holly Grove Stream Restoration Site
1200
Year 4 Bed
Year 2 Bed
1225
1250
Elevation (ft)
635 1000
636
637
638
639
640
641
642
643
644
645
1025
1050
1075
1100
Station (ft)
1125
Profile
Year 1 Bed
Year 4 BKF
Year 3 Bed
1175
As-Built Bed
1150
Guilford County, NC Profile Reach 6 - Lower East Branch
Holly Grove Stream Restoration Site
Year 4 Bed
Year 2 Bed
1200
1225
1250
Elevation (ft)
645 1000
646
647
648
649
650
651
652
653
654
655
1025
1050
1075
Station (ft)
1100
Profile
Guilford County, NC Profile Reach 7 - Southeast Creek
Year 3 Bed Year 4 Bed
Year 2 Bed Year 4 BKF
1150
Year 1 Bed
1125
As-Built Bed
Holly Grove Stream Restoration Site
1175
1200
Elevation (ft)
90 1000
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
1025
1050
1075
1100
Station (ft)
1125
Profile
Guilford County, NC Profile Reach 8 - Southwest Creek
Year 3 Bed Year 4 Bed
Year 2 Bed Year 4 BKF
1200
Year 1 Bed
1175
As-Built Bed
1150
Holly Grove Stream Restoration Site
1225
1250
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF1 Reach 1 - Buckhorn Creek - Sta 11+78.6
Year 4 Facing Downstream
Riffle Cross Section
104 102
Elevation (ft)
100
As-built Year 1
98
BKF
Year 2 Year 3
96
Year 4 Year 5
94
BKF
92 90 -20
-10
0
10
20
30
40
50
60
70
Station (ft)
As-Built Date 1/8/09 Area 34.3 Bkf W 23.4 Dmean 1.5 Dmax 2.1 W/d 16.0
Year 1 Date 10/20/09 Area 35.4 Bkf W 23.3 Dmean 1.5 Dmax 2.1 W/d 15.3
Year 2 Date 10/11/10 Area 35.3 Bkf W 23.7 Dmean 1.5 Dmax 2.6 W/d 15.9
Year 3 Date 10/5/11 Area 31.3 Bkf W 23.7 Dmean 1.3 Dmax 2.3 W/d 18.0
Year 4 Date 9/17/12 Area 32.8 Bkf W 23.3 Dmean 1.4 Dmax 2.4 W/d 16.6
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF1 Reach 1 - Buckhorn Creek - Sta 11+78.6 Station BM HI -20 -10 -5 0 5 10 15.5 18.4 21.3 25.5 26.5 29 32.2 34.4 35.3 38.9 46 49.4 52.5 57 62
As-Built FS/BS Elev. 6.36 97.34 103.70 3.11 100.59 3.60 100.10 4.71 98.99 5.26 98.44 5.61 98.09 6.07 97.63 6.46 97.24 7.25 96.45 8.19 95.51 8.45 95.25 8.59 95.11 8.46 95.24 8.25 95.45 8.36 95.34 8.01 95.69 6.46 97.24 6.41 97.29 6.49 97.21 5.99 97.71 4.78 98.92 3.00 100.70
Desc. PL1 IR Lt GRND
GRND
BKF TOE EOW THL
EOW TOE BKF
GRND
Station BM HI 0 2 7 13 15.6 17.5 18.5 20 20.4 20.9 21.7 22.5 24 26 28 29.5 30.9 32 33.8 34.6 34.8 35.3 36 36.7 37.4 38.9 42 46 48 50 51.6 52.6
FS/BS 3.78 4.02 4.15 4.58 4.94 5.20 5.65 5.96 6.37 6.48 6.71 6.98 7.29 7.33 7.23 7.17 7.19 7.33 7.33 7.26 7.10 6.89 6.75 6.45 6.21 5.83 5.18 5.22 5.27 5.37 5.04 4.82 4.7
25
Station BM HI 0 2 4 8 11 14 15.2 17 18.5 20.4 21.3 24 25.2 26.5 26.6 28 29.2 30.5 32 32.9 33 34.2 34.5 35.2 36.1 38 38.9 41 46 51 52.6
Year 3 FS/BS Elev. 5.82 98.66 104.48 5.85 98.63 6.13 98.35 6.42 98.06 6.68 97.80 6.88 97.60 7.07 97.41 7.09 97.39 7.43 97.05 7.75 96.73 8.02 96.46 8.46 96.02 8.71 95.77 9.01 95.47 9.30 95.18 9.36 95.12 9.46 95.02 9.55 94.93 9.55 94.93 9.48 95.00 9.42 95.06 9.31 95.17 9.16 95.32 8.93 95.55 8.62 95.86 8.16 96.32 7.59 96.89 7.26 97.22 7.15 97.33 7.21 97.27 7 97.48 6.72 97.76
Desc. IR Lt GRND
BKF BNK
BED
EOW BED THL BED
EOW BNK
BKF GRND
Station BM HI 1.4 4.3 5.7 7.2 8.8 9.9 11.3 12.8 14.1 15.8 17.1 18.5 19.9 21.3 23.2 24.7 25.8 26.6 27.6 28.3 29.6 31.0 32.2 33.3 34.5 36.1 37.4 38.2 39.1 39.9 41.8
Year 1 Elev. 98.67 102.45 98.43 98.30 97.87 97.51 97.25 96.80 96.49 96.08 95.97 95.74 95.47 95.16 95.12 95.22 95.28 95.26 95.12 95.12 95.19 95.35 95.56 95.70 96.00 96.24 96.62 97.27 97.23 97.18 97.08 97.41 97.63 97.75
Desc. RF1 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BNK BNK EOW BED BED BED BED BED BED BED BED BED EOW BNK BNK BNK BKF RT GRND GRND GRND GRND GRND GRND GRND
Station BM HI 0 2.8 6.8 11.8 13.8 15.4 16.8 18.8 20.3 21.3 21.9 23.8 25.8 26.8 27.7 28.8 30.8 31.3 32.8 33.1 33.7 34.8 35.8 36.8 37.8 39.1 40.8 44.8 49.8 52.6
Year 2 FS/BS Elev. 4.81 98.73 103.54 5.01 98.53 5.26 98.28 5.62 97.92 5.86 97.68 6.06 97.48 6.09 97.45 6.36 97.18 6.83 96.71 7.06 96.48 7.65 95.89 7.80 95.74 7.77 95.77 7.92 95.62 8.20 95.34 8.29 95.25 8.56 94.98 8.50 95.04 8.71 94.83 8.52 95.02 8.32 95.22 8.05 95.49 7.86 95.68 7.33 96.21 6.85 96.69 6.50 97.04 6.14 97.40 6.15 97.39 6.10 97.44 5.95 97.59 5.65 97.89
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BNK BNK BNK BED BED BED BED EOW BED BED THL BED EOW BED BED BNK BNK BNK BKF GRND GRND GRND GRND
97.14
FS/BS 0.00
Year 4 Elev. 0.00 98.38 98.19 98.05 97.96 97.85 97.74 97.66 97.62 97.48 97.30 97.06 96.76 96.58 96.03 95.84 95.70 95.46 95.16 94.94 94.92 95.03 95.00 95.01 95.25 95.40 96.16 96.69 97.07 97.35 97.46 97.45
Desc. IR Lt
BKF
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL1 Reach 1 - Buckhorn Creek - Sta 12+28.7
Year 4 Facing Downstream
Pool Cross Section
100
98 As-built
Elevation (ft)
BKF
Year 1
96
Year 2 Year 3
94
Year 4 Year 5 BKF
92
90 -25
-15
-5
5
15
25
35
45
55
65
75
Station (ft)
As-Built Date 1/8/09 Area 52.7 Bkf W 23.2 Dmean 2.3 Dmax 4.0 W/d 10.2
Year 1 Date 10/20/09 Area 48.0 Bkf W 22.1 Dmean 2.2 Dmax 3.9 W/d 10.2
Year 2 Date 10/11/10 Area 46.8 Bkf W 23.4 Dmean 2.0 Dmax 4.2 W/d 11.7
Year 3 Date 10/5/11 Area 48.4 Bkf W 23.5 Dmean 2.1 Dmax 4.3 W/d 11.4
Year 4 Date 9/17/12 Area 47.2 Bkf W 23.5 Dmean 2.0 Dmax 4.2 W/d 11.7
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL1 Reach 1 - Buckhorn Creek - Sta 12+28.7 Station BM HI -25 -10 -3 0 4 10.5 14.1 18.4 19.9 20.5 20.8 23.1 24.7 27.6 29.2 30.6 31.2 31.5 33.7 37.3 42.3 44.9 48.7 52 55 58.4 62.6 67.5
As-Built FS/BS Elev. 6.36 97.34 103.70 3.35 100.35 4.12 99.58 4.91 98.79 5.51 98.19 6.37 97.33 6.85 96.85 6.71 96.99 8.35 95.35 8.45 95.25 8.80 94.90 9.83 93.87 10.54 93.16 10.73 92.97 10.59 93.11 10.49 93.21 9.75 93.95 8.84 94.86 8.40 95.30 7.97 95.73 6.95 96.75 7.41 96.29 6.92 96.78 6.59 97.11 6.76 96.94 7.16 96.54 5.95 97.75 4.57 99.13 3.17 100.53
Desc. PL1 IR Rt
GRND
BKF
EOW
EOW
BKF
Station BM HI 0 1.1 3.6 6.6 10.1 13.1 14.7 16.8 17.9 19.6 20.2 20.8 22.2 24.1 24.1 28.7 29.5 29.9 31.3 31.7 32.2 34.5 34.6 35.5 36.8 39.1 40.1 43.1 44.1 47.9 25
Station BM HI 0 3.9 7.9 11.9 14.4 15.4 17.4 19.3 20 20.4 20.5 20.8 21.4 22.5 23.7 25.4 26.6 27.4 28.6 29.5 30.5 30.9 31.1 31.4 32.2 33.4 34.4 35.2 35.9 37.9 39.9 41.9 48.7
Year 3 FS/BS Elev. 5.71 98.46 104.17 5.91 98.26 6.83 97.34 7.12 97.05 7.19 96.98 7.27 96.90 7.77 96.40 8.14 96.03 8.40 95.77 8.74 95.43 9.12 95.05 9.38 94.79 10.14 94.03 10.53 93.64 11.01 93.16 11.38 92.79 11.52 92.65 11.46 92.71 10.83 93.34 10.78 93.39 10.83 93.34 10.31 93.86 10.13 94.04 9.37 94.80 8.69 95.48 8.19 95.98 7.96 96.21 7.80 96.37 7.78 96.39 7.64 96.53 7.39 96.78 7.54 96.63 7.78 96.39 7.08 97.09
Desc. IR Lt GRND
BKF BNK
EOW TOE BED
THL BED
EOW BNK
BKF GRND
Station BM HI 0.2 1.3 2.2 4.3 5.4 6.9 8.3 9.5 10.7 12.6 14.3 15.3 16.5 17.6 19.2 20.0 20.5 20.8 21.8 22.2 22.8 23.6 24.6 26.1 26.9 27.4 29.2 30.3 31.1 31.6 32.6 33.7 34.6 36.3 37.6
Year 1 FS/BS Elev. 3.78 98.67 102.45 4.17 98.28 4.41 98.04 5.12 97.33 5.40 97.05 5.54 96.91 5.49 96.96 5.62 96.83 6.46 95.99 6.89 95.56 7.14 95.31 7.43 95.02 8.44 94.01 8.96 93.49 9.51 92.94 9.55 92.9 9.01 93.44 8.92 93.53 8.53 93.92 8.26 94.19 7.43 95.02 6.87 95.58 6.75 95.7 6.28 96.17 6.04 96.41 5.77 96.68 5.76 96.69 5.88 96.57 6 96.45 5.71 96.74 5.64 96.81
Desc. RF1 IR Lt GRND GRND GRND GRND GRND GRND GRND GRND BKF LT BNK LOG EOW BED BED BED BED BED BED BED BED EOW BNK BNK BNK BKF RT GRND GRND GRND GRND GRND
Station BM HI 0 1.5 4.5 7.5 11.5 14.1 15.5 17.5 18.5 19.5 20.5 20.7 21 22 24 25.5 27.5 29.5 30 31 31.2 31.5 32.5 33.5 34.5 35.5 37.5 42.5 46.5 48.7
Year 2 FS/BS Elev. 5.91 98.55 104.46 6.15 98.31 6.44 98.02 7.10 97.36 7.31 97.15 7.49 96.97 7.37 97.09 7.89 96.57 8.38 96.08 8.61 95.85 8.70 95.76 9.28 95.18 9.59 94.87 10.44 94.02 10.96 93.50 11.61 92.85 11.70 92.76 11.06 93.40 11.01 93.45 11.50 92.96 10.35 94.11 9.62 94.84 8.99 95.47 8.45 96.01 8.24 96.22 8.05 96.41 7.82 96.64 7.55 96.91 7.96 96.50 7.55 96.91 7.28 97.18
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BNK BNK BNK BNK EOW BED BED BED BED BED BED BED BED EOW BNK BNK BNK BNK BKF GRND GRND GRND GRND
97.14
Year 4 FS/BS Elev. 0.00 100.00 100.00 98.23 97.92 97.80 97.37 97.22 97.11 97.07 97.06 96.94 96.99 97.05 96.71 96.47 96.21 95.96 95.37 94.92 93.86 93.44 93.46 93.05 92.85 92.85 92.69 92.78 93.31 93.31 93.95 94.23 94.93 96.03 96.32 96.45 96.71 97.00
Desc. IR Lt
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF2 Reach 2 - Buckhorn Creek - Sta 15+89.6
Year 4 Facing Downstream
Riffle Cross Section
648
646
Elevation (ft)
As-built Year 1
644
Year 2 Year 3
BKF
642
Year 4 Year 5 BKF
640
638 -20
-10
0
10
20
30
40
50
60
70
Station (ft)
As-Built Date 1/8/09 Area 26.3 Bkf W 19.9 Dmean 1.3 Dmax 1.7 W/d 15.1
Year 1 Date 10/20/09 Area 25.4 Bkf W 20.4 Dmean 1.2 Dmax 1.7 W/d 16.4
Year 2 Date 10/12/10 Area 27.6 Bkf W 20.2 Dmean 1.4 Dmax 1.9 W/d 14.8
Year 3 Date 10/5/11 Area 21.1 Bkf W 19.7 Dmean 1.1 Dmax 1.6 W/d 18.4
Year 4 Date 9/17/12 Area 22.7 Bkf W 20 Dmean 1.1 Dmax 1.9 W/d 17.6
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF2 Reach 2 - Buckhorn Creek - Sta 15+89.6 Station BM HI -20 -10 -5 -2 0 2 4.5 7 9.6 10.6 11.3 12 14 16 19 21 24 26 27.3 27.8 29.5 30.4 31.2 34 37 41 43.6 48
As-Built FS/BS Elev. 6.90 644.39 651.29 5.33 645.96 5.45 645.84 5.66 645.63 6.27 645.02 7.04 644.25 7.85 643.44 8.95 642.34 9.38 641.91 9.46 641.83 9.90 641.39 10.00 641.29 11.18 640.11 11.06 640.23 11.08 640.21 11.20 640.09 11.12 640.17 10.75 640.54 10.71 640.58 10.83 640.46 10.27 641.02 9.50 641.79 9.28 642.01 8.23 643.06 7.73 643.56 6.70 644.59 6.04 645.25 4.96 646.33 2.38 648.91
Station BM HI 0 1.8 2.8 5.8 8.8 9.1 10.8 11.8 12.8 13.6 13.7 14.6 15.8 16.8 17.8 18.9 19.9 22.5 22.6 24.3 25.7 28.8 29.8 31.4 34.8 37.8 40.8 42.8 43.5
Year 3 FS/BS Elev. 6.59 644.39 650.98 6.70 644.28 7.42 643.56 7.85 643.13 8.91 642.07 9.00 641.98 9.20 641.78 9.45 641.53 10.19 640.79 10.38 640.60 10.35 640.63 10.62 640.36 10.68 640.30 10.85 640.13 10.83 640.15 10.85 640.13 10.81 640.17 10.84 640.14 10.58 640.40 10.33 640.65 9.92 641.06 10.03 640.95 9.35 641.63 8.89 642.09 7.93 643.05 7.14 643.84 6.26 644.72 5.75 645.23 5 645.98 4.73 646.25
Desc. RF2 IR Lt
GRND
BKF EOW
EOW
BKF
Station BM HI 0 4.5 6 8.5 9.6 10.7 11.3 12.3 13 15 17 19 21 23.1 25 27.5 28.4 30 31.2 33 35 37 41 43.7
FS/BS 6.55
Station BM HI 1.9 3.1 4.4 5.8 6.9 7.7 8.7 9.3 10.9 12.0 13.5 14.8 16.2 16.8 17.3 17.8 18.8 20.2 21.7 23.1 24.9 25.9 27.4 29.3 30.4 31.3 32.6 34.0 35.8 37.4 39.0
FS/BS 0.00
7.06 8.89 9.24 9.42 9.50 9.98 10.67 10.88 11.11 11.04 11.12 11.18 11.13 10.90 10.55 10.71 9.95 9.42 8.31 8.08 7.54 6.73 6.05 5.04
Year 1 Elev. 644.77 651.32 644.26 642.43 642.08 641.90 641.82 641.34 640.65 640.44 640.21 640.28 640.20 640.14 640.19 640.42 640.77 640.61 641.37 641.90 643.01 643.24 643.78 644.59 645.27 646.28
Desc. PL2 IR Lt GRND GRND GRND GRND BKF LT BNK BNK EOW BED BED BED BED BED EOW BED BED BANK BANK BKF RT GRND GRND GRND GRND GRND
Station BM HI 0 1.5 4.5 6 7.5 9.3 10.5 11.5 12.3 13.1 14 15.5 17.5 19.5 21.5 23.5 24 25.5 26.5 27.6 29.5 31 32.5 34.5 38.5 43.6
Year 2 FS/BS Elev. 6.50 644.77 651.27 7.00 644.27 7.63 643.64 8.81 642.46 9.23 642.04 9.34 641.93 9.30 641.97 9.73 641.54 10.38 640.89 10.68 640.59 10.82 640.45 11.18 640.09 11.15 640.12 11.15 640.12 11.09 640.18 10.99 640.28 10.84 640.43 10.25 641.02 10.45 640.82 10.52 640.75 10.50 640.77 9.55 641.72 8.31 642.96 8.10 643.17 7.60 643.67 6.44 644.83 5.00 646.27
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BNK BNK EOW BED BED BED BED BED EOW BED BED BED BED BNK BKF GRND GRND GRND GRND
GRND
Desc. IR Lt GRND
BKF BNK
EOW BED
EOW BNK
GRND
Year 4 Elev. 100.00 100.00 643.59 643.02 642.57 642.17 642.07 642.02 642.05 641.98 641.33 640.80 640.65 640.45 640.35 640.16 640.13 640.65 640.12 640.33 640.37 640.81 641.06 641.14 641.09 641.70 642.32 643.02 643.26 643.50 644.22 644.63 644.90
Desc. IR Lt
BKF
BKF
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL2 Reach 2 - Buckhorn Creek - Sta 15+30.7
Year 4 Facing Downstream
Pool Cross Section
648
646
Elevation (ft)
As-built Year 1
644
Year 2 BKF
Year 3
642
Year 4 Year 5 BKF
640
638 -25
-15
-5
5
15
25
35
45
55
65
75
Station (ft)
As-Built Date 1/8/09 Area 45.6 Bkf W 23.3 Dmean 2.0 Dmax 2.8 W/d 11.9
Year 1 Date 10/20/09 Area 43.8 Bkf W 22.2 Dmean 2.0 Dmax 2.9 W/d 11.2
Year 2 Date 10/12/10 Area 49.1 Bkf W 22 Dmean 2.2 Dmax 3.1 W/d 9.9
Year 3 Date 10/5/11 Area 47.6 Bkf W 22.8 Dmean 2.1 Dmax 2.9 W/d 10.9
Year 4 Date 9/17/12 Area 43.2 Bkf W 20.6 Dmean 2.1 Dmax 2.8 W/d 9.8
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL2 Reach 2 - Buckhorn Creek - Sta 15+30.7 Station BM HI -20 -10 -3 0 5 7 8.8 10 11.7 14.2 15.5 18 20.5 23 26 29 31 32.3 35 38 39 40.8
As-Built FS/BS Elev. 6.90 644.39 651.29 5.09 646.20 5.13 646.16 5.30 645.99 6.68 644.61 8.65 642.64 8.60 642.69 8.91 642.38 8.75 642.54 8.95 642.34 10.22 641.07 10.80 640.49 11.25 640.04 11.70 639.59 11.73 639.56 11.65 639.64 11.58 639.71 10.90 640.39 10.22 641.07 8.15 643.14 5.98 645.31 5.27 646.02 3.10 648.19
Station BM HI 0 3.3 5.3 8.8 10.8 12 13.2 14.3 14.7 15.3 16.3 18.3 20.8 21.8 24.3 27.3 28.8 31.3 32.1 32.6 33 33.8 34.8 36.3 39
Year 3 FS/BS Elev. 6.41 644.77 651.18 6.51 644.67 7.92 643.26 8.50 642.68 8.62 642.56 8.51 642.67 8.63 642.55 8.92 642.26 9.64 641.54 10.01 641.17 10.66 640.52 10.67 640.51 11.22 639.96 11.55 639.63 11.54 639.64 11.34 639.84 11.46 639.72 11.41 639.77 10.82 640.36 10.41 640.77 10.03 641.15 9.22 641.96 8.91 642.27 8.12 643.06 7.13 644.05 5.24 645.94
Desc. RF2 IR Lt
GRND
BKF
BR BR
EOW
Desc. IR Lt GRND
BKF BNK EOW BED
THL BED
EOW BNK
GRND
Station BM HI 0 4.2 5.7 8.7 10.7 11.9 12.7 14.2 15.2 16.7 18.7 21.7 24.7 27.7 29.3 30.9 32.2 34.1 36.7 39
Year 1 FS/BS Elev. 6.55 644.77 651.32 6.75 644.57 8.54 642.78 8.75 642.57 8.92 642.4 8.84 642.48 8.96 642.36 9.16 642.16 10.17 641.15 10.69 640.63 10.82 640.5 11.47 639.85 11.86 639.46 11.63 639.69 11.59 639.73 11.37 639.95 11.01 640.31 10.14 641.18 9.03 642.29 7.01 644.31 5.32 646
Station BM HI 1.3 2.3 4.4 6.5 7.7 9.1 10.2 11.5 13.0 14.2 15.7 16.5 19.4 20.3 21.5 23.4 25.3 26.3 27.6 29.5 31.1 31.3 33.4 34.5 35.7 35.9 36.9 38.9
Year 4 FS/BS Elev. Desc. 0.00 100.00 IR Lt 100.00 644.17 643.67 642.89 642.77 642.75 642.72 642.77 642.71 642.42 BKF 641.26 640.52 640.36 639.91 639.63 639.64 639.75 639.79 639.88 639.79 640.10 640.37 640.60 642.13 642.96 643.71 644.50 645.62 646.103
Desc. PL2 IT Lt GRND GRND GRND GRND GRND BKF LT BNK EOW BED BED BED BED BED BED BED BED EOW BNK BNK GRND
Station BM HI 0 1.8 3.8 5.3 7.3 9.8 10.8 11.8 12.8 13.8 14.8 15 15.7 16.8 18.8 20.8 22.8 24.8 26.8 28.8 29.8 30.8 31.3 32.3 33.8 34.8 36.8 39
Year 2 FS/BS Elev. 6.50 644.77 651.27 6.62 644.65 7.37 643.90 8.23 643.04 8.64 642.63 8.45 642.82 8.60 642.67 8.58 642.69 8.67 642.60 8.90 642.37 9.43 641.84 10.10 641.17 10.16 641.11 10.74 640.53 10.90 640.37 11.43 639.84 11.65 639.62 11.72 639.55 11.53 639.74 11.43 639.84 11.51 639.76 11.28 639.99 11.04 640.23 10.81 640.46 10.15 641.12 9.06 642.21 8.05 643.22 7.00 644.27 5.31 645.96
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND GRND GRND BKF BNK BNK BNK EOW BED BED BED BED BED BED BED BED BED BED BED EOW BNK BNK BNK GRND
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF3 Reach 3 - Buckhorn Creek - Sta 12+50.7
Year 4 Facing Downstream
Riffle Cross Section
642
640
Elevation (ft)
As-built Year 1
638
Year 2 Year 3
BKF
636
Year 4 Year 5 BKF
634
632 -20
-10
0
10
20
30
40
50
60
70
Station (ft)
As-Built Date 1/8/09 Area 48.3 Bkf W 25.4 Dmean 1.9 Dmax 2.6 W/d 13.4
Year 1 Date 10/20/09 Area 47.5 Bkf W 25.5 Dmean 1.9 Dmax 2.6 W/d 13.7
Year 2 Date 10/12/10 Area 47.7 Bkf W 27.5 Dmean 1.7 Dmax 2.8 W/d 15.9
Year 3 Date 10/5/11 Area 45.2 Bkf W 26.8 Dmean 1.7 Dmax 2.7 W/d 15.9
Year 4 Date 9/17/12 Area 39.0 Bkf W 24.55 Dmean 1.6 Dmax 2.5 W/d 15.5
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF3 Reach 3 - Buckhorn Creek - Sta 12+50.7 Station BM HI -20 -10 -1 0 0.8 2.3 5 8.3 10.6 12 13.5 14 15.5 15.8 16.9 17.9 20 22 23 25 27 30 32.1 32.6 33.2 34.1 36.2 37.4 41.5 45.1 46 47.8 49.5 50.4 51.2 54.7 61 68
As-Built FS/BS Elev. 5.88 638.55 644.43 4.71 639.72 5.33 639.10 5.61 638.82 6.12 638.31 6.53 637.90 7.08 637.35 8.14 636.29 7.86 636.57 7.85 636.58 8.14 636.29 8.70 635.73 9.23 635.20 9.87 634.56 10.22 634.21 10.35 634.08 10.47 633.96 10.48 633.95 10.64 633.79 10.78 633.65 10.70 633.73 10.68 633.75 10.48 633.95 10.43 634.00 10.33 634.10 9.78 634.65 9.49 634.94 8.35 636.08 8.07 636.36 8.21 636.22 7.89 636.54 7.49 636.94 6.43 638.00 5.56 638.87 5.17 639.26 4.85 639.58 3.67 640.76 3.18 641.25 2.85 641.58
Station BM HI 0 2.3 5.3 9.3 11 12.3 13.4 14.3 15.8 16.4 16.5 17.3 19.3 21.1 22.9 24 24.8 26 26.9 27.8 30.3 32.4 32.6 33.3 34.7 36.2 36.8 37.8 41.2 44.6 46.1
Year 3 FS/BS Elev. 3.29 638.55 641.84 3.58 638.26 4.48 637.36 5.43 636.41 5.27 636.57 5.38 636.46 5.75 636.09 6.15 635.69 6.76 635.08 7.24 634.60 7.29 634.55 7.38 634.46 7.49 634.35 7.63 634.21 7.70 634.14 8.16 633.68 8.04 633.80 8.20 633.64 7.76 634.08 7.92 633.92 7.49 634.35 7.73 634.11 7.46 634.38 7.32 634.52 6.86 634.98 6.52 635.32 5.78 636.06 5.63 636.21 5.49 636.35 5.5 636.34 5.29 636.55 4.87 636.97
Desc. RF3 IR Lt
GRND
BKF
EOW
EOW
BKF
GRND
Desc. IR Lt GRND
BKF BNK
EOW BED
THL BED
EOW BNK BKF GRND
Station BM HI 0 2 4 7 9 11 11.6 12.2 12.8 13.6 14.8 15.4 16 18 19.6 21 22 24 26 28 30 32 32.7 33.5 34.8 35.8 36.5 37.1 40 43.5 45.6 47 49 50.4
FS/BS 3.92
Station BM HI 0.83 3.98 6.49 10.97 15.2 17.43 21.37 24.09 27.32 31.93 34.84 36.25 39.63 43.84 49.69
FS/BS 0.00
4.27 5.04 5.93 6.19 5.95 6.03 6.14 6.29 6.60 6.85 7.69 7.86 8.27 8.50 8.49 8.60 8.65 8.81 8.66 8.51 8.48 8.27 8.27 7.61 7.16 6.56 6.37 6.17 6.17 6.1 5.77 4.97 3.87 3.22
Year 1 Elev. 638.55 642.47 638.20 637.43 636.54 636.28 636.52 636.44 636.33 636.18 635.87 635.62 634.78 634.61 634.20 633.97 633.98 633.87 633.82 633.66 633.81 633.96 633.99 634.20 634.20 634.86 635.31 635.91 636.10 636.30 636.30 636.37 636.70 637.50 638.60 639.25
Year 4 Elev. 100.00 100.00 638.14 636.70 636.38 636.52 635.14 634.37 634.23 633.72 634.10 634.36 635.26 636.25 636.41 636.58 639.25
Desc. RF3 IR Lt GRND GRND GRND GRND GRND BKF LT? BKF LT BKF LT BANK BANK BANK BANK EOW BED BED BED BED BED BED BED BED BED TOE BNK BNK BNK BNK BKF GRND GRND GRND GRND GRND GRND
Desc. IR Lt
BKF
BKF
Station BM HI 0 2.9 3.9 5.9 7.9 10.4 12.9 13.5 14.9 16.4 17.9 19.9 20.4 21.4 22.9 23.9 24.9 26.9 27.9 29.7 30.7 32.7 33.9 34.9 35.9 36.9 37.9 39.9 44.9 45.9 50.4
Year 2 FS/BS Elev. 3.11 638.55 641.66 3.34 638.32 4.50 637.16 5.01 636.65 5.30 636.36 5.04 636.62 5.12 636.54 5.78 635.88 6.00 635.66 6.77 634.89 7.33 634.33 7.37 634.29 7.51 634.15 7.55 634.11 7.71 633.95 8.05 633.61 8.01 633.65 7.92 633.74 7.73 633.93 7.52 634.14 7.11 634.55 7.57 634.09 7.37 634.29 6.62 635.04 6.19 635.47 5.64 636.02 5.40 636.26 5.25 636.41 5.32 636.34 5.15 636.51 4.73 636.93 2.40 639.26
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND GRND GRND BKF BNK BED BED BED EOW BED BED BED BED BED BED BED BED BED BNK BNK BKF GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL3 Reach 3 - Buckhorn Creek - Sta 13+33.1
Year 4 Facing Downstream
Pool Cross Section
640
638
Elevation (ft)
As-built BKF
636
Year 1 Year 2 Year 3
634
Year 4 Year 5 BKF
632
630 -25
-15
-5
5
15
25
35
45
55
65
75
Station (ft)
As-Built Date 1/8/09 Area 62.7 Bkf W 22.2 Dmean 2.8 Dmax 4.6 W/d 7.9
Year 1 Date 10/20/09 Area 62.8 Bkf W 22.5 Dmean 2.8 Dmax 4.7 W/d 8.1
Year 2 Date 10/12/10 Area 66.2 Bkf W 22.8 Dmean 2.9 Dmax 4.9 W/d 7.9
Year 3 Date 10/5/11 Area 66.2 Bkf W 22.9 Dmean 2.9 Dmax 4.8 W/d 7.9
Year 4 Date 9/17/12 Area 64.9 Bkf W 29.9 Dmean 2.2 Dmax 4.8 W/d 13.8
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL3 Reach 3 - Buckhorn Creek - Sta 13+33.1 Station BM HI -20 -14.5 -12 -2.5 0 3.6 7 12 15 16 18.2 18.7 18.8 20.3 21 23 25 27 29 30.6 31 32 34.2 38.2 42 45.7 49 56 66
As-Built FS/BS Elev. 5.88 638.55 644.43 4.23 640.20 4.60 639.83 5.23 639.20 5.62 638.81 6.61 637.82 8.09 636.34 8.39 636.04 8.61 635.82 10.03 634.40 10.56 633.87 10.49 633.94 11.09 633.34 11.83 632.60 12.60 631.83 13.20 631.23 13.10 631.33 12.87 631.56 12.68 631.75 12.20 632.23 11.89 632.54 11.09 633.34 10.14 634.29 9.23 635.20 8.64 635.79 7.65 636.78 6.39 638.04 5.49 638.94 5.14 639.29 4.82 639.61
Station BM HI 0 1.9 4.9 7.9 10.9 11.4 11.9 12.9 14.3 15.9 17.7 18.4 18.7 19.7 20.9 22.5 23.8 25.9 28.2 29.7 31.2 31.9 32.8 33.9 34.8 35.4 35.9 36.9 38.9 41.9 45.5
Year 3 FS/BS Elev. 5.64 638.14 643.78 5.35 638.43 6.80 636.98 7.56 636.22 7.81 635.97 7.74 636.04 7.80 635.98 7.87 635.91 8.41 635.37 9.03 634.75 9.54 634.24 9.77 634.01 9.89 633.89 11.25 632.53 11.62 632.16 12.14 631.64 12.33 631.45 12.64 631.14 12.41 631.37 12.28 631.50 11.65 632.13 10.71 633.07 9.90 633.88 9.01 634.77 8.48 635.30 8.34 635.44 8.29 635.49 8.25 635.53 8.08 635.7 7.63 636.15 6.88 636.9 5.55 638.23
Desc. RF3 IR Lt
BKF
LOG EOW
EOW BKF
GRND
Desc. IR Lt GRND
BKF BNK
EOW BED
THL BED
EOW BNK
BKF GRND
Station BM HI 0 2 3.5 6 7.5 10 12 13.5 16 17.7 18.3 18.8 19 21 23 25 27 29 31 31.3 31.8 33.2 34.5 36 38 40 43 44.3 45.7
Station BM HI 0 2.48 6.17 8.12 11.52 15.82 18.48 19.6 20.62 23.12 27.85 29.4 32.13 32.14 34.13 38.02 43.27
Year 1 FS/BS Elev. 3.92 638.55 642.47 4.62 637.85 5.48 636.99 6.06 636.41 6.42 636.05 6.68 635.79 6.57 635.9 6.70 635.77 7.55 634.92 8.35 634.12 8.66 633.81 8.54 633.93 9.17 633.3 10.03 632.44 11.06 631.41 11.38 631.09 11.06 631.41 10.84 631.63 10.44 632.03 9.38 633.09 9.14 633.33 8.44 634.03 7.61 634.86 7.22 635.25 7.10 635.37 6.76 635.71 6.19 636.28 5.42 637.05 5.13 637.34 4.42 638.05
Desc. PL2 IT Lt GRND GRND GRND GRND GRND GRND BKF LT BNK BNK BNK LOG EOW BED BED BED BED BED BED BED EOW BNK BNK BKF RT GRND GRND GRND GRND GRND GRND
Year 4 FS/BS Elev. Desc. 0.00 IR Lt 0.00 637.88 636.76 636.16 635.92 635.97 634.30 632.35 633.40 631.42 630.98 631.22 631.81 633.43 633.13 635.36 BKF 635.86 636.97
Station BM HI 0 2.4 4.4 6.4 7.4 9.4 11.6 13.4 14.4 15.4 16.4 18.1 18.6 18.7 19.9 21.4 23.4 25.4 27.4 29.4 31.1 31.5 32 33.4 34.4 36.4 39.4 42.4 45.6
Year 2 FS/BS Elev. 3.11 638.55 641.66 3.82 637.84 4.86 636.80 5.49 636.17 5.55 636.11 5.83 635.83 5.75 635.91 5.78 635.88 6.64 635.02 7.05 634.61 7.34 634.32 7.78 633.88 7.74 633.92 8.29 633.37 8.90 632.76 9.34 632.32 10.09 631.57 10.47 631.19 10.64 631.02 10.31 631.35 9.70 631.96 8.61 633.05 8.25 633.41 7.39 634.27 6.48 635.18 6.32 635.34 6.08 635.58 5.42 636.24 4.70 636.96 3.52 638.14
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND GRND BKF BNK BNK BNK BED LOG EOW BED BED BED BED BED BED BED BED EOW BNK BNK BKF GRND GRND GRND GRND
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF4 Reach 4 - Middle Branch - Sta 10+89.9
Year 4 Facing Downstream
Riffle Cross Section
675
674
Elevation (ft)
As-built Year 1
673 BKF
Year 2 Year 3
672
Year 4 Year 5 BKF
671
670 -15
-10
-5
0
5
10
15
20
25
30
35
Station (ft)
As-Built Date 1/8/09 Area 3.7 Bkf W 6.2 Dmean 0.6 Dmax 1.0 W/d 10.4
Year 1 Date 10/20/09 Area 3.5 Bkf W 6.4 Dmean 0.5 Dmax 1.0 W/d 11.8
Year 2 Date 10/11/10 Area 3.8 Bkf W 6.9 Dmean 0.5 Dmax 1.0 W/d 12.6
Year 3 Date 10/5/11 Area 3.7 Bkf W 6 Dmean 0.6 Dmax 1.1 W/d 9.9
Year 4 Date 9/17/12 Area 3.7 Bkf W 6 Dmean 0.6 Dmax 1.4 W/d 9.6
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF4 Reach 4 - Middle Branch - Sta 10+89.9 Station BM HI -15 -6 0 3.6 7.1 8.1 8.8 9.4 9.9 10.5 11.2 11.9 12.4 12.8 13.5 14.3 16 19 21 22.4 24.5 29 34
As-Built FS/BS Elev. 3.96 674.94 678.90 5.26 673.64 6.00 672.90 6.21 672.69 6.10 672.80 6.24 672.66 6.54 672.36 6.89 672.01 7.03 671.87 7.50 671.40 7.53 671.37 7.44 671.46 7.50 671.40 7.42 671.48 7.04 671.86 6.72 672.18 6.54 672.36 6.56 672.34 6.52 672.38 6.50 672.40 6.20 672.70 6.00 672.90 5.27 673.63 4.44 674.46
Station BM HI 0 2 4 6 7 7.6 8 8.5 9 9.5 10 10.5 11 11.5 12.1 12.6 13 13.5 14 16 18 20 22 22.4
Year 3 FS/BS Elev. 6.00 673.10 679.10 6.33 672.77 6.26 672.84 6.32 672.78 6.36 672.74 6.40 672.70 6.55 672.55 6.72 672.38 6.97 672.13 7.05 672.05 7.28 671.82 7.60 671.50 7.72 671.38 7.69 671.41 7.79 671.31 7.69 671.41 7.06 672.04 6.98 672.12 6.79 672.31 6.68 672.42 6.65 672.45 6.77 672.33 6.58 672.52 6.36 672.74 6.33 672.77
Desc. BP4 IR Lt
bkf
bkf
Desc. IR Lt GRND
BKF BNK
TOE BED THL BED BNK BNK BKF GRND
Station BM HI 0 2.7 4.7 6.7 7.7 7.9 8.3 9.3 9.6 10.2 10.8 11.4 12.3 12.5 12.9 13.3 13.7 14.3 16.7 17.7 19.7 21.3 21.8 22.3
FS/BS 4.31
Station BM HI 0 4.48 7.23 10.47 11.43 12.27 13.93 17.8 21.92
FS/BS 0.00
6.40 6.29 6.29 6.45 6.65 6.74 6.99 7.21 7.66 7.71 7.67 7.63 7.60 7.24 7.01 6.88 6.73 6.68 6.73 6.80 6.63 6.66 6.43 6.36
Year 1 Elev. 674.77 679.08 672.68 672.79 672.79 672.63 672.43 672.34 672.09 671.87 671.42 671.37 671.41 671.45 671.48 671.84 672.07 672.20 672.35 672.40 672.35 672.28 672.45 672.42 672.65 672.72
Year 4 Elev. 100.00 100.00 672.69 672.72 672.54 671.20 671.15 671.24 672.27 672.25 672.64
Desc. BP4 IR Rt GRND GRND GRND GRND GRND BKF LT BNK BNK BED BED BED BED BED BNK BKF GRND GRND GRND GRND GRND GRND GRND GRND GRND
Desc. IR Lt
BKF
BKF
Station BM HI 2 4 6 7.1 7.6 8.3 9.4 10.2 10.7 11.5 12 12.4 13.1 14 15.6 17 19.5 21 22.5
Year 2 FS/BS Elev. 4.75 674.77 679.52 6.77 672.75 6.76 672.76 6.79 672.73 6.86 672.66 7.03 672.49 7.40 672.12 7.86 671.66 8.12 671.40 8.14 671.38 8.09 671.43 8.12 671.40 7.58 671.94 7.23 672.29 7.09 672.43 7.09 672.43 7.06 672.46 7.01 672.51 7.03 672.49 6.77 672.75
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Rt GRND GRND GRND BKF BNK BNK BNK BED BED BED BED BNK BNK BKF GRND GRND GRND GRND GRND
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL4 Reach 4 - Middle Branch - Sta 11+14.3
Year 4 Facing Downstream
Pool Cross Section
674 673
Elevation (ft)
672
As-built
BKF
Year 1 Year 2
671
Year 3 Year 4
670
Year 5 BKF
669 668 -15
-10
-5
0
5
10
15
20
25
30
35
Station (ft)
As-Built Date 1/8/09 Area 11.2 Bkf W 10.5 Dmean 1.1 Dmax 2.4 W/d 9.9
Year 1 Date 10/20/09 Area 9.4 Bkf W 10.5 Dmean 0.9 Dmax 2.0 W/d 11.8
Year 2 Date 10/11/10 Area 11.1 Bkf W 10.7 Dmean 1.0 Dmax 2.3 W/d 10.3
Year 3 Date 10/5/11 Area 10.2 Bkf W 10 Dmean 1.0 Dmax 2.2 W/d 9.8
Year 4 Date 9/17/12 Area 9.7 Bkf W 7.67 Dmean 1.3 Dmax 1.9 W/d 6.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL4 Reach 4 - Middle Branch - Sta 11+14.3 Station BM HI -20 -10 -3 0 4 6 8 9.2 9.8 9.9 11.4 12.4 13.4 14 15.1 15.3 16.5 18 20.5 22.2 22.9 25.5 27.3 31 36
As-Built FS/BS Elev. 3.20 674.94 678.14 5.17 672.97 5.55 672.59 5.95 672.19 5.94 672.20 5.84 672.30 6.08 672.06 6.58 671.56 6.51 671.63 7.24 670.90 8.87 669.27 8.60 669.54 8.50 669.64 8.37 669.77 8.12 670.02 7.25 670.89 7.02 671.12 6.62 671.52 6.45 671.69 6.38 671.76 5.95 672.19 5.84 672.30 5.73 672.41 5.80 672.34 4.68 673.46 4.70 673.44
Station BM HI 1 2.9 4.9 6.9 7.3 7.9 8.4 8.9 9.4 9.9 10.6 10.8 11.5 12.1 12.9 13.7 14.5 15.1 15.8 16.5 17.9 19.9 21.9 22.9
Year 3 FS/BS Elev. 6.71 672.37 679.08 6.90 672.18 6.85 672.23 6.77 672.31 7.06 672.02 7.10 671.98 7.33 671.75 7.35 671.73 7.58 671.50 7.46 671.62 7.75 671.33 8.72 670.36 8.79 670.29 9.46 669.62 9.48 669.60 9.44 669.64 9.31 669.77 9.03 670.05 8.22 670.86 7.58 671.50 7.44 671.64 7.28 671.80 7.23 671.85 6.97 672.11 6.84 672.24
Desc. BP4 IR Lt
EOW
EOW
Desc. IR Lt GRND
BKF BNK
LOG LOG ROCK BED THL BED BED BNK BNK BKF GRND
Station BM HI 0 2 4 5.3 6.8 8 9 9.9 10 10.5 11.3 11.9 12.5 13 13.6 14 14.8 15.4 16 18 21.4 22.3 22.9
Year 1 FS/BS Elev. 4.31 674.77 679.08 6.92 672.16 6.95 672.13 6.90 672.18 6.91 672.17 7.23 671.85 7.51 671.57 7.49 671.59 7.80 671.28 8.84 670.24 8.66 670.42 9.44 669.64 9.40 669.68 9.44 669.64 9.41 669.67 9.21 669.87 8.94 670.14 8.44 670.64 7.81 671.27 7.64 671.44 7.42 671.66 7.32 671.76 6.92 672.16 6.85 672.23
Station BM HI 4.83 6.91 9.33 11.16 12.33 14.75 16.4 19.58 22.83
Year 4 FS/BS Elev. 0.00 100.00 100.00 672.28 671.91 671.60 669.77 669.66 669.89 671.59 671.79 672.25
Desc. BP4 IR Rt GRND GRND GRND GRND GRND GRND LOG LOG BED BLDR BED BED BED BED BED BED BED BNK BKF RT GRND GRND GRND GRND
Desc. IR Lt
BKF
BKF
Station BM HI 0 0.6 2.2 3.6 5 5.1 6.1 6.9 8.2 9.1 9.7 9.8 10.6 11.6 12.2 12.8 13.6 14.35 14.8 16.1 17.6 18.6 20 21.6 22.8
Year 2 FS/BS Elev. 4.75 674.77 679.52 7.32 672.20 7.31 672.21 7.30 672.22 7.21 672.31 7.32 672.20 7.32 672.20 7.51 672.01 7.78 671.74 8.06 671.46 7.92 671.60 8.21 671.31 9.26 670.26 9.79 669.73 10.05 669.47 10.07 669.45 10.02 669.50 9.80 669.72 9.18 670.34 8.72 670.80 7.90 671.62 7.79 671.73 7.73 671.79 7.76 671.76 7.55 671.97 7.30 672.22
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BNK BNK LOG LOG EOW BED BED THL BED BED EOW BNK BNK BKF GRND GRND GRND GRND
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF5 Reach 5 - Middle Branch - Sta 11+68.1
Year 4 Facing Downstream
Riffle Cross Section
665 664 As-built
Elevation (ft)
663
Year 1 Year 2
BKF
662
Year 3 Year 4
661
Year 5 BKF
660 659 -15
-10
-5
0
5
10
15
20
25
30
35
Station (ft)
As-Built Date 1/8/09 Area 6.0 Bkf W 8.9 Dmean 0.7 Dmax 1.2 W/d 13.2
Year 1 Date 10/20/09 Area 5.9 Bkf W 8.2 Dmean 0.7 Dmax 1.2 W/d 11.5
Year 2 Date 10/11/10 Area 5.6 Bkf W 7.9 Dmean 0.7 Dmax 1.2 W/d 11.1
Year 3 Date 10/5/11 Area 4.9 Bkf W 7.2 Dmean 0.7 Dmax 1.1 W/d 10.5
Year 4 Date 9/17/12 Area 5.0 Bkf W 8.04 Dmean 0.6 Dmax 1.1 W/d 12.8
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF5 Reach 5 - Middle Branch - Sta 11+68.1 Station BM HI -18 -9 -5 -1 0 2 6 9 10.3 11 11.7 12 12.5 13.4 14.3 15.3 16 16.6 17.5 17.9 19.5 22 24 28 32.1 37 42 52
As-Built FS/BS Elev. 2.82 665.59 668.41 5.60 662.81 5.80 662.61 6.05 662.36 6.15 662.26 6.15 662.26 6.63 661.78 6.55 661.86 6.42 661.99 6.50 661.91 6.68 661.73 6.90 661.51 7.29 661.12 7.59 660.82 7.49 660.92 7.56 660.85 7.50 660.91 7.39 661.02 7.14 661.27 6.47 661.94 6.40 662.01 6.18 662.23 6.02 662.39 5.98 662.43 5.57 662.84 5.45 662.96 5.24 663.17 5.42 662.99 5.3 663.11
Station BM HI 0 1.9 3.9 5.9 7.9 10.2 10.9 11.5 12 12.6 13.2 14.3 15.2 16.3 16.9 17.4 18.1 19.9 21.9 23.9 25.9 27.9 29.9 31.9 32.1
Year 3 FS/BS Elev. 5.66 662.65 668.31 5.92 662.39 6.13 662.18 6.35 661.96 6.35 661.96 6.37 661.94 6.32 661.99 6.45 661.86 6.71 661.60 7.01 661.30 7.26 661.05 7.38 660.93 7.38 660.93 7.37 660.94 6.90 661.41 6.67 661.64 6.31 662.00 6.14 662.17 5.92 662.39 5.78 662.53 5.82 662.49 5.57 662.74 5.33 662.98 5.27 663.04 5.15 663.16 5.18 663.13
Desc. BP5 IR Lt
Desc. IR Lt GRND
BKF BNK TOE
BANK BNK BNK BNK BKF GRND
Station BM HI 0 2.7 5.7 8.7 9.3 9.9 10.6 11.7 12.4 13.2 13.9 14.9 16.2 16.5 17.2 17.7 18.1 19 20.7 23.7 27.7 32.2
FS/BS 3.98
Station BM HI 0 2.24 5.41 9.46 11.23 12.25 13.81 15.36 17.02 17.95 21.68 26.53 32.05
FS/BS 0.00
7.22 7.75 7.64 7.52 7.55 7.51 7.67 8.14 8.59 8.64 8.58 8.67 8.48 8.19 7.71 7.54 7.48 7.35 7.11 7.14 6.76 6.53
Year 1 Elev. 665.59 669.57 662.35 661.82 661.93 662.05 662.02 662.06 661.90 661.43 660.98 660.93 660.99 660.90 661.09 661.38 661.86 662.03 662.09 662.22 662.46 662.43 662.81 663.04
Year 4 Elev. 0.00 662.75 661.80 661.87 662.05 661.70 660.94 660.86 660.94 661.73 662.13 662.57 662.79 663.23
Desc. BP5 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BED BED BED BED BED BANK BANK BANK BKF RT GRND GRND GRND GRND GRND
Desc. IR Lt
BKF
BKF
Station BM HI 0 2.6 4.6 9.8 10.5 11.6 12.5 12.9 14 15.1 15.7 16.6 17.7 18.6 20.6 24.6 28.6 32.2
Year 2 FS/BS Elev. 5.57 662.74 668.31 5.98 662.33 6.49 661.82 6.42 661.89 6.32 661.99 6.38 661.93 6.64 661.67 7.27 661.04 7.43 660.88 7.43 660.88 7.50 660.81 7.34 660.97 6.92 661.39 6.29 662.02 6.16 662.15 5.91 662.40 5.76 662.55 5.33 662.98 5.28 663.03
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND BKF BNK BED BED BED BED TOE BNK BNK BKF GRND GRND GRND GRND
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL5 Reach 5 - Middle Branch - Sta 10+63.1
Year 4 Facing Downstream
Pool Cross Section
666 665 As-built
Elevation (ft)
664
Year 1 Year 2
BKF
663
Year 3 Year 4
662
Year 5 BKF
661 660 -15
-10
-5
0
5
10
15
20
25
30
35
Station (ft)
As-Built Date 1/8/09 Area 8.4 Bkf W 7.9 Dmean 1.1 Dmax 1.7 W/d 7.4
Year 1 Date 10/20/09 Area 9.7 Bkf W 8.6 Dmean 1.1 Dmax 2.0 W/d 7.6
Year 2 Date 10/11/10 Area 10.1 Bkf W 8.4 Dmean 1.2 Dmax 1.9 W/d 7.0
Year 3 Date 10/5/11 Area 8.5 Bkf W 7.3 Dmean 1.2 Dmax 1.8 W/d 6.3
Year 4 Date 9/17/12 Area 10.6 Bkf W 9.78 Dmean 1.1 Dmax 1.8 W/d 9.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL5 Reach 5 - Middle Branch - Sta 10+63.1 Station BM HI -20 -10 -7 0 5 9 11 12.4 13.6 15 16 17 18 19 19.7 19.9 20.3 21.4 22.8 24 27 28.4 31 36
Station BM HI 0 2 3.4 5.4 7.4 9.4 11.4 12.7 13 13.4 13.9 14.4 14.9 15.4 15.9 16.4 16.9 17.4 18.1 18.7 19.5 20 20.4 21.1 21.7 22.4 24.4 26.4 27.9 28.4
As-Built FS/BS Elev. 2.82 665.59 668.41 4.65 663.76 4.35 664.06 4.12 664.29 4.52 663.89 4.89 663.52 5.09 663.32 5.25 663.16 5.41 663.00 6.01 662.40 6.52 661.89 6.93 661.48 7.15 661.26 7.05 661.36 6.62 661.79 6.27 662.14 5.51 662.90 5.33 663.08 5.26 663.15 5.30 663.11 5.02 663.39 4.61 663.80 4.25 664.16 3.90 664.51 3.42 664.99 668.41
Year 3 FS/BS Elev. 4.18 664.40 668.58 4.59 663.99 4.65 663.93 4.72 663.86 5.01 663.57 5.02 663.56 5.19 663.39 5.34 663.24 5.61 662.97 5.64 662.94 5.73 662.85 6.20 662.38 6.67 661.91 6.89 661.69 7.02 661.56 7.28 661.30 7.33 661.25 7.43 661.15 7.40 661.18 7.17 661.41 6.88 661.70 6.67 661.91 5.62 662.96 5.57 663.01 5.50 663.08 5.42 663.16 5.45 663.13 5.09 663.49 4.77 663.81 4.45 664.13 4.42 664.16
Desc. BP5 IR Lt
Desc. IR Lt GRND
BKF BNK
TOE BED
TOE BNK
BKF GRND
Station BM HI 0 3 7 10 12 12.4 13.1 14 14.6 15 15.9 16.6 17.3 18.1 18.8 19.7 20 20.3 21 22.5 23 24 26 28.5
Year 1 FS/BS Elev. 3.98 665.59 669.57 5.57 664 5.81 663.76 6.16 663.41 6.29 663.28 6.55 663.02 6.55 663.02 6.80 662.77 7.32 662.25 7.60 661.97 7.85 661.72 8.22 661.35 8.49 661.08 8.54 661.03 8.45 661.12 8.19 661.38 7.54 662.03 6.72 662.85 6.51 663.06 6.52 663.05 6.51 663.06 6.45 663.12 6.13 663.44 5.98 663.59 5.53 664.04
Station BM HI 5.7 9.11 12.15 14.34 15.89 17.52 18.51 19.48 20.12 21.93 24.06
Year 4 FS/BS Elev. 0.00 0.00 663.41 663.28 663.00 661.57 661.17 661.15 661.27 661.72 662.81 662.96 663.37
Desc. BP5 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BNK BED BED BED BED BED BED BNK LOG LOG BNK GRND GRND GRND GRND GRND
Desc. IR Lt
BKF
Station BM HI 0 3 5 8 10 12 12.4 13 13.6 14.2 14.8 15.5 16 16.4 17.2 18 18.5 19.7 20 20.8 22.6 23.9 26 28.4
Year 2 FS/BS Elev. 3.55 665.59 669.14 5.22 663.92 5.40 663.74 5.60 663.54 5.80 663.34 5.87 663.27 6.12 663.02 6.14 663.00 6.32 662.82 6.81 662.33 7.60 661.54 7.54 661.60 7.86 661.28 7.96 661.18 8.05 661.09 8.08 661.06 7.90 661.24 7.66 661.48 7.20 661.94 6.21 662.93 6.15 662.99 6.00 663.14 5.72 663.42 5.56 663.58 5.10 664.04
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND GRND BKF BNK BNK BNK BNK TOE BED BED BED BED BED BED BNK BNK BNK TOB GRND GRND
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF6 Reach 6 - Lower East Branch - Sta 11+07.2
Year 4 Facing Downstream
Riffle Cross Section
644 643 As-built
Elevation (ft)
642
Year 1 Year 2
641
Year 3 Year 4
640
Year 5
BKF
BKF
639 638 -10
-5
0
5
10
15
20
25
30
35
40
Station (ft)
As-Built Date 1/8/09 Area 4.0 Bkf W 10.7 Dmean 0.4 Dmax 0.6 W/d 28.5
Year 1 Date 10/20/09 Area 2.8 Bkf W 8 Dmean 0.4 Dmax 0.6 W/d 22.7
Year 2 Date 10/12/10 Area 3.0 Bkf W 8 Dmean 0.4 Dmax 0.7 W/d 21.6
Year 3 Date 10/5/11 Area 2.9 Bkf W 7.7 Dmean 0.4 Dmax 0.7 W/d 20.3
Year 4 Date 9/17/12 Area 2.6 Bkf W 6.52 Dmean 0.4 Dmax 0.7 W/d 16.3
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF6 Reach 6 - Lower East Branch - Sta 11+07.2 Station BM HI -10 -5 -2 0 3.5 6 7.6 8.8 10 11 12 13 14 15 15.7 16.2 18 19.5 21 23.5 25.5 27.5 28.2 35
As-Built FS/BS Elev. 5.02 643.14 648.16 5.28 642.88 5.76 642.40 6.05 642.11 6.62 641.54 7.92 640.24 8.04 640.12 8.19 639.97 8.75 639.41 8.88 639.28 9.07 639.09 9.05 639.11 9.07 639.09 9.17 638.99 9.16 639.00 9.00 639.16 8.74 639.42 8.71 639.45 8.54 639.62 8.68 639.48 8.39 639.77 7.78 640.38 7.00 641.16 6.77 641.39 5.05 643.11
Station BM HI 0 2.7 4.7 6.2 7.2 7.9 8.8 9.5 10.2 10.6 11.3 12 12.8 13.5 14.1 15.4 16.7 17.2 18.7 19.4 21.2 23.2 24.7 28.2
Year 3 FS/BS Elev. 6.17 641.78 647.95 6.34 641.61 7.38 640.57 7.71 640.24 7.73 640.22 7.81 640.14 8.02 639.93 8.24 639.71 8.19 639.76 8.43 639.52 8.75 639.20 8.93 639.02 8.98 638.97 8.97 638.98 8.94 639.01 8.64 639.31 8.64 639.31 8.30 639.65 8.30 639.65 8.32 639.63 8.21 639.74 8.40 639.55 8.13 639.82 7.77 640.18 6.47 641.48
Desc. BP6 IR Lt
Desc. IR Lt GRND
BKF BNK
TOE BED THL BED TOE BNK
BKF GRND
Station BM HI 0 1.5 3.5 5.5 7.5 7.8 8.7 9.6 10.2 11 11.7 12.3 12.8 13.7 14.3 15.5 16.7 19.5 21.5 23.3 24.5 26.3 28.2
FS/BS 6.06
Station BM HI 1.69 3.3 5.95 8.56 9.47 10.69 11.96 13.67 16.52 19.21 21.92 23.35 25.96
FS/BS 0.00
7.67 8.16 8.87 9.09 9.25 9.27 9.60 9.81 9.95 10.06 10.05 10.14 10.23 10.21 10.09 10.03 9.65 9.58 9.70 9.48 9.14 8.46 7.77
Year 1 Elev. 643.14 649.20 641.53 641.04 640.33 640.11 639.95 639.93 639.60 639.39 639.25 639.14 639.15 639.06 638.97 638.99 639.11 639.17 639.55 639.62 639.50 639.72 640.06 640.74 641.43
Year 4 Elev. 0.00 640.95 640.38 640.11 639.65 639.72 638.93 638.87 638.96 639.52 639.61 639.49 639.67 640.42
Desc. BP6 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BED BED BED BED BED BED BED BNK BKF RT GRND GRND GRND GRND GRND GRND
Desc. IR Lt
BKF
BKF
Station BM HI 0 1.7 3.7 6.2 7.7 8.7 9.5 10.3 11 11.7 12.9 13.5 13.9 14.7 15.7 16.7 17.7 19.7 21.7 23.2 24.7 26.7 28.2
Year 2 FS/BS Elev. 4.08 641.78 645.86 4.23 641.63 4.87 640.99 5.56 640.30 5.62 640.24 5.82 640.04 6.20 639.66 6.12 639.74 6.53 639.33 6.77 639.09 6.76 639.10 6.88 638.98 6.84 639.02 6.67 639.19 6.59 639.27 6.51 639.35 6.15 639.71 6.28 639.58 6.17 639.69 6.25 639.61 6.06 639.80 5.57 640.29 4.94 640.92 4.38 641.48
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BED BED BED BED BED BED BNK BNK BKF GRND GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL6 Reach 6 - Lower East Branch - Sta 11+33.0
Year 4 Facing Downstream
Pool Cross Section
643 642 As-built
Elevation (ft)
641
Year 1 Year 2
BKF
640
Year 3 Year 4
639
Year 5 BKF
638 637 -10
-5
0
5
10
15
20
25
30
35
40
Station (ft)
As-Built Date 1/8/09 Area 10.2 Bkf W 8.5 Dmean 1.2 Dmax 1.9 W/d 7.1
Year 1 Date 10/20/09 Area 10.0 Bkf W 9.2 Dmean 1.1 Dmax 2.0 W/d 8.5
Year 2 Date 10/12/10 Area 10.2 Bkf W 9.2 Dmean 1.1 Dmax 2.0 W/d 8.3
Year 3 Date 10/5/11 Area 10.3 Bkf W 10 Dmean 1.0 Dmax 2.1 W/d 9.7
Year 4 Date 9/17/12 Area 10.5 Bkf W 10.82 Dmean 1.0 Dmax 1.9 W/d 11.1
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL6 Reach 6 - Lower East Branch - Sta 11+33.0 Station BM HI -10 -8.5 -2 0 3 5 6.5 8 9 10.5 11 12 13 14 15 15.5 16.5 18 21 23 24 26 27.5 32
As-Built FS/BS Elev. 5.02 643.14 648.16 5.68 642.48 5.57 642.59 6.38 641.78 7.10 641.06 7.99 640.17 7.82 640.34 8.22 639.94 8.19 639.97 8.57 639.59 9.60 638.56 9.87 638.29 10.03 638.13 10.10 638.06 9.94 638.22 9.78 638.38 8.71 639.45 8.05 640.11 8.10 640.06 9.07 639.09 9.21 638.95 9.00 639.16 8.12 640.04 7.35 640.81 6.45 641.71
Station BM HI 0 1.6 4.3 5.6 6.6 7.6 8.6 9.6 10.1 10.6 11.1 11.7 12.4 12.8 13.4 14.2 14.7 15.2 15.5 16.1 17.6 18.8 20.1 21.1 23.1 25.3 27.4
Year 3 FS/BS Elev. 6.00 641.31 647.31 6.12 641.19 6.67 640.64 6.93 640.38 6.86 640.45 7.27 640.04 7.17 640.14 7.44 639.87 7.94 639.37 8.44 638.87 8.74 638.57 8.96 638.35 9.11 638.20 9.23 638.08 9.24 638.07 9.11 638.20 8.80 638.51 8.67 638.64 7.75 639.56 7.62 639.69 7.16 640.15 7.16 640.15 7.42 639.89 7.55 639.76 8.04 639.27 8.17 639.14 7.49 639.82 6.42 640.89
Desc. BP6 IR Lt
Desc. IR Lt GRND
BKF BNK BNK TOE BED EOW THL BED EOW BED TOE BNK BKF GRND
Station BM HI 0 0.8 2 4 6 7.9 9 9.8 10.7 11.3 12 13.2 14.7 15.6 17.1 20 21 22.8 24 26
Year 1 FS/BS Elev. 6.06 643.14 649.20 8.13 641.07 8.20 641 8.71 640.49 8.85 640.35 9.13 640.07 9.23 639.97 9.74 639.46 10.02 639.18 10.68 638.52 10.97 638.23 11.10 638.1 11.18 638.02 10.72 638.48 9.63 639.57 9.18 640.02 9.49 639.71 10.11 639.09 10.22 638.98 9.94 639.26 9.21 639.99
Station BM HI 0 1.2 3.58 6.73 8.68 10.39 11.89 13.45 15.74 17.55 19.42 21.25 22.96 25.07 27.22
Year 4 FS/BS Elev. 0.00 0.00 641.03 640.63 640.21 639.96 639.57 638.33 638.06 638.07 639.61 640.01 639.70 639.24 638.94 639.62 640.69
Desc. BP6 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BNK BED BED BED BED BED BED BNK LOG LOG BNK GRND
Desc. IR Lt
BKF
Station BM HI 0 2.6 5.5 6.3 7.9 9.3 9.9 10.2 10.6 10.9 11.3 12 12.3 12.8 13.3 13.8 14.3 14.9 15.3 15.8 16.6 17.1 18.3 20 20.7 22.3 23.8 25.9 27.3
Year 2 FS/BS Elev. 3.25 641.75 645.00 3.88 641.12 4.66 640.34 4.60 640.40 4.99 640.01 4.98 640.02 5.50 639.50 5.88 639.12 6.29 638.71 6.46 638.54 6.70 638.30 6.79 638.21 6.93 638.07 7.00 638.00 6.99 638.01 6.91 638.09 6.72 638.28 6.52 638.48 6.32 638.68 5.82 639.18 5.26 639.74 5.01 639.99 4.91 640.09 5.03 639.97 5.29 639.71 5.84 639.16 5.88 639.12 5.78 639.22 4.99 640.01 4.10 640.90
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND BKF BNK BNK BNK BED TOE BED BED BED BED BED BED BED BED ROOTWAD ROOTWAD BNK BKF GRND GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF7 Reach 7 - Southeast Creek - Sta 11+20.6
Year 4 Facing Downstream
Riffle Cross Section
655 654 As-built
Elevation (ft)
653
Year 1 Year 2
652
Year 3
BKF
Year 4
651
Year 5 BKF
650 649 -10
-5
0
5
10
15
20
25
30
35
40
Station (ft)
As-Built Date 1/8/09 Area 9.4 Bkf W 14.5 Dmean 0.6 Dmax 1.2 W/d 22.3
Year 1 Date 10/20/09 Area 9.5 Bkf W 15 Dmean 0.6 Dmax 1.2 W/d 23.8
Year 2 Date 10/12/10 Area 7.6 Bkf W 14.5 Dmean 0.5 Dmax 1.2 W/d 27.7
Year 3 Date 10/5/11 Area 8.8 Bkf W 13.3 Dmean 0.7 Dmax 1.1 W/d 20.2
Year 4 Date 9/17/12 Area 7.3 Bkf W 12.9 Dmean 0.6 Dmax 1.1 W/d 22.8
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF7 Reach 7 - Southeast Creek - Sta 11+20.6 Station BM HI -8 0 1 4 5 7 8 9 10 11 12 13.3 13.9 14.5 15.5 16 17 18.5 20 22 24 27.3 33 36
As-Built FS/BS Elev. 7.17 653.43 660.60 6.40 654.20 7.68 652.92 7.75 652.85 9.04 651.56 9.36 651.24 9.72 650.88 9.82 650.78 10.07 650.53 10.20 650.40 10.23 650.37 10.12 650.48 10.33 650.27 10.10 650.50 9.94 650.66 9.65 650.95 9.53 651.07 9.42 651.18 9.14 651.46 9.42 651.18 9.19 651.41 9.07 651.53 8.51 652.09 7.85 652.75 7.40 653.20
Station BM HI 0 1.1 2.9 4.9 6.4 6.9 8.4 9.4 10.9 11.9 13.1 13.8 14.9 16.3 17.2 18.2 19.9 21.9 25.9 27.3
Year 3 FS/BS Elev. 2.97 653.16 656.13 3.21 652.92 3.32 652.81 4.11 652.02 4.80 651.33 5.19 650.94 5.18 650.95 5.34 650.79 5.55 650.58 5.71 650.42 5.80 650.33 5.83 650.30 5.72 650.41 5.28 650.85 5.11 651.02 4.92 651.21 4.70 651.43 4.90 651.23 4.66 651.47 4.50 651.63 4.02 652.11
Desc. BP7 IR Lt
Desc. IR Lt GRND
BKF BNK EOW BED THL EOW BNK/BKF GRND
Station BM HI 0 1.8 3.8 5.1 6.6 7 8.8 10.1 10.9 12.5 13.2 13.7 14.4 15.3 16.8 18.8 21.8 23.8 25.8 27.3
FS/BS 5.15
Station BM HI 1.2 2.1 3.0 5.2 5.4 8.3 9.3 10.5 11.6 13.3 13.8 14.5 15.7 16.5 17.4 18.1 18.9 19.9 21.0 21.9 22.8 23.8 24.8 26.0 26.9
FS/BS 0.00
5.77 6.22 6.92 7.37 7.72 7.83 7.95 8.06 8.32 8.23 8.33 8.23 7.88 7.66 7.35 7.13 7.17 7.01 6.91 6.50
Year 1 Elev. 653.43 658.58 652.81 652.36 651.66 651.21 650.86 650.75 650.63 650.52 650.26 650.35 650.25 650.35 650.70 650.92 651.23 651.45 651.41 651.57 651.67 652.08
Year 4 Elev. 100.00 100.00 652.44 652.05 651.92 651.12 651.15 650.66 650.64 650.56 650.18 650.19 650.50 650.77 650.84 650.93 651.19 651.27 651.27 651.10 651.16 651.35 651.39 651.46 651.58 651.41 651.86
Desc. BP7 IR Lt GRND GRND GRND GRND BKF LT
BKF RT GRND GRND GRND GRND GRND GRND
Desc. IR Lt
BKF
BKF
Station BM HI 0 1.8 3.8 5.8 7.8 8.8 9.6 10.5 10.9 11.4 12.1 12.6 13.4 13.7 14.1 14.6 15.3 16.3 17.3 18.3 19.8 21.3 23.8 25.8 27.3
Year 2 FS/BS Elev. 5.27 653.16 658.43 5.54 652.89 6.04 652.39 6.73 651.70 7.31 651.12 7.64 650.79 7.68 650.75 7.67 650.76 7.95 650.48 8.13 650.30 8.24 650.19 8.07 650.36 8.07 650.36 8.13 650.30 8.10 650.33 7.88 650.55 7.52 650.91 7.50 650.93 7.40 651.03 7.20 651.23 7.06 651.37 7.24 651.19 7.16 651.27 6.84 651.59 6.94 651.49 6.29 652.14
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND GRND BKF BNK EOW BED BED BED BED EOW BNK BKF GRND GRND GRND GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL7 Reach 7 - Southeast Creek - Sta 11+32.3
Year 4 Facing Downstream
Pool Cross Section
654 653 As-built
Elevation (ft)
652
Year 1 Year 2
BKF
651
Year 3 Year 4
650
Year 5 BKF
649 648 -10
-5
0
5
10
15
20
25
30
35
40
Station (ft)
As-Built Date 1/8/09 Area 10.5 Bkf W 9.5 Dmean 1.1 Dmax 2.0 W/d 8.6
Year 1 Date 10/20/09 Area 9.6 Bkf W 9.7 Dmean 1.0 Dmax 1.8 W/d 9.8
Year 2 Date 10/12/10 Area 9.6 Bkf W 9.8 Dmean 1.0 Dmax 1.9 W/d 10.0
Year 3 Date 10/5/11 Area 9.9 Bkf W 9.3 Dmean 1.1 Dmax 1.9 W/d 8.7
Year 4 Date 9/17/12 Area 10.0 Bkf W 9.4 Dmean 1.1 Dmax 2.1 W/d 8.8
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL7 Reach 7 - Southeast Creek - Sta 11+32.3 Station BM HI -4 0 2 5 7.5 8.2 8.5 9 10 11 12 13 14 14.3 14.6 15.4 16.5 17.8 20 24 27 29 34 40
Station BM HI 0 2 3.5 5.5 7 8.3 8.4 8.9 10 10.6 11.2 12 12.7 13.6 13.6 14.3 15.3 16.3 18.1 19.5 21.1 23.8 26 28 29
As-Built FS/BS Elev. 7.17 653.43 660.60 6.17 654.43 7.20 653.40 7.92 652.68 9.03 651.57 9.77 650.83 9.81 650.79 10.45 650.15 10.80 649.80 11.26 649.34 11.59 649.01 11.56 649.04 11.31 649.29 10.94 649.66 10.41 650.19 10.22 650.38 10.05 650.55 9.61 650.99 9.46 651.14 9.45 651.15 9.33 651.27 8.95 651.65 8.69 651.91 8.15 652.45 7.55 653.05 660.60
Year 3 FS/BS Elev. 6.60 653.53 660.13 6.71 653.42 7.53 652.60 8.09 652.04 8.81 651.32 9.21 650.92 9.58 650.55 9.87 650.26 10.53 649.60 10.83 649.30 10.97 649.16 10.99 649.14 10.79 649.34 10.56 649.57 10.38 649.75 9.92 650.21 9.74 650.39 9.45 650.68 9.10 651.03 8.94 651.19 8.92 651.21 8.87 651.26 8.85 651.28 8.56 651.57 8.39 651.74 8.29 651.84
Desc. BP7 IR Lt
Desc. IR Lt GRND
BKF WS TOE BED THAL BED BED BED BED WS BNK BNK BKF GRND
Station BM HI 0 1.5 2.5 4 6.2 8 8.7 9.3 10 11 12 13 14 14.1 14.6 15.5 16.7 19 22 24 27 29.1
Year 1 FS/BS Elev. 5.15 653.43 658.58 5.21 653.37 5.62 652.96 6.19 652.39 6.66 651.92 7.51 651.07 7.81 650.77 8.48 650.1 9.01 649.57 9.25 649.33 9.41 649.17 9.34 649.24 9.16 649.42 8.85 649.73 8.52 650.06 8.22 650.36 7.91 650.67 7.62 650.96 7.39 651.19 7.38 651.2 7.27 651.31 6.85 651.73 6.67 651.91
Station BM HI 0.0 0.6 1.8 2.7 3.9 5.1 6.2 7.1 7.1 8.0 8.5 9.2 10.9 13.3 14.0 14.4 15.5 16.5 16.8 17.7 18.8 19.8 20.9 22.1 23.3 24.5 25.7 26.8 27.4 28.0
Year 4 FS/BS Elev. 0.00 100.00 100.00 653.54 653.13 652.55 652.17 651.86 651.35 651.05 650.91 650.85 650.73 650.22 649.49 648.95 649.55 650.22 650.35 650.72 651.01 651.01 651.09 651.11 651.08 651.16 651.22 651.17 651.46 651.49 651.65 651.79 651.68
Desc. BP7 IR Lt GRND GRND GRND GRND GRND LOG EOW
EOW BKF RT GRND GRND GRND GRND GRND GRND
Desc. IR Lt
BKF
BKF
Station BM HI 0 0.9 3.4 4.5 5.4 7.1 8 8.4 8.9 9.4 10.1 11 12 12.7 13.8 13.9 14.2 15.2 16.1 16.9 20.1 21.5 24.1 27 28.9
Year 2 FS/BS Elev. 4.94 652.34 657.28 3.84 653.44 4.09 653.19 5.19 652.09 5.55 651.73 5.93 651.35 6.35 650.93 6.49 650.79 7.19 650.09 7.71 649.57 7.89 649.39 8.11 649.17 8.26 649.02 8.10 649.18 7.89 649.39 7.61 649.67 7.16 650.12 6.76 650.52 6.67 650.61 6.35 650.93 6.23 651.05 6.05 651.23 6.07 651.21 5.90 651.38 5.50 651.78 5.39 651.89
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND GRND LOG LOG/EOW BED BED BED BED BED BED BED EOW BNK BNK BNK BKF GRND GRND GRND GRND GRND
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF8 Reach 8 - Southwest Creek - Sta 11+49.9
Year 4 Facing Downstream
Riffle Cross Section
100 99 As-built
Elevation (ft)
98
Year 1 Year 2
97
Year 3
BKF
Year 4
96
Year 5 BKF
95 94 -10
-5
0
5
10
15
20
25
30
35
40
Station (ft)
As-Built Date 1/8/09 Area 3.4 Bkf W 8 Dmean 0.4 Dmax 0.7 W/d 18.6
Year 1 Date 10/20/09 Area 4.4 Bkf W 8.2 Dmean 0.5 Dmax 0.7 W/d 15.2
Year 2 Date 10/12/10 Area 4.9 Bkf W 8.4 Dmean 0.6 Dmax 0.8 W/d 14.5
Year 3 Date 10/5/11 Area 5.3 Bkf W 9 Dmean 0.6 Dmax 0.9 W/d 15.2
Year 4 Date 9/17/12 Area 5.1 Bkf W 8.87 Dmean 0.6 Dmax 0.9 W/d 15.5
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF8 Reach 8 - Southwest Creek - Sta 11+49.9 Station BM HI -15 -8 -3 0 3 7 9.3 10.6 11.9 12.3 12.6 12.8 14 15 16 17 18 18.7 19.4 19.9 21.2 22.4 24.9 26.9 28 28.9 30 33 37 40
As-Built FS/BS Elev. 2.51 98.99 101.50 3.36 98.14 3.67 97.83 3.94 97.56 4.05 97.45 4.10 97.40 4.04 97.46 4.24 97.26 4.56 96.94 5.04 96.46 5.26 96.24 5.41 96.09 5.58 95.92 5.56 95.94 5.76 95.74 5.56 95.94 5.46 96.04 5.43 96.07 5.34 96.16 5.23 96.27 5.04 96.46 4.91 96.59 4.71 96.79 4.23 97.27 3.99 97.51 4.03 97.47 3.86 97.64 3.92 97.58 3.64 97.86 2.72 98.78 2.35 99.15
Station BM HI 0.1 1.2 3.6 5.6 8.1 10 10.9 11.6 12.2 12.5 13.4 14.7 16 16.9 18.25 19.3 20.6 21.1 22.7 25 26.6 29.05
Year 3 FS/BS Elev. 5.11 97.60 102.71 5.19 97.52 5.30 97.41 5.29 97.42 5.19 97.52 5.33 97.38 5.64 97.07 5.84 96.87 6.08 96.63 6.24 96.47 6.88 95.83 6.93 95.78 7.00 95.71 6.88 95.83 6.81 95.90 6.75 95.96 6.57 96.14 6.13 96.58 6.05 96.66 5.84 96.87 5.46 97.25 5.29 97.42 5.01 97.70
Desc. Stump
Desc. IR Lt GRND
BKF BNK TOE BED THL BED TOE BNK BKF GRND
Station BM HI 0 2 6 8 9 10 11 11.9 12.5 13.6 15 16.6 18 19 20.1 21 23 26
FS/BS 3.78
Station BM HI 0.24 0.89 1.78 3.01 3.85 5.12 6.33 7.44 8.39 9.71 11.1 12.41 13.84 15.27 16.43 17.58 18.85 20.37 21.71 23.81 25 26.19 27.69
FS/BS 0.00
6.68 6.77 6.71 6.70 6.83 7.05 7.33 7.63 8.15 8.29 8.37 8.34 8.18 7.93 7.63 7.59 7.22 6.77
Year 1 Elev. 100.42 104.20 97.52 97.43 97.49 97.50 97.37 97.15 96.87 96.57 96.05 95.91 95.83 95.86 96.02 96.27 96.57 96.61 96.98 97.43
Year 4 Elev. 100.00 100.00 97.41 97.34 97.23 97.33 97.30 97.43 97.39 97.38 97.33 97.07 96.80 95.62 95.76 95.68 95.72 95.75 96.09 96.49 96.69 97.01 97.20 97.29 97.37
Desc. BP8 IR Rt GRND GRND GRND GRND GRND GRND BKF BNK BED BED BED BED BED BNK BKF GRND GRND GRND
Desc. IR Lt
BKF
BKF
Station BM HI 0 1.8 4.5 6.5 8.5 9.5 11.1 11.5 11.9 12.1 12.4 13.4 14.5 14.9 15.5 16.8 17.7 18.5 19.3 19.8 20.3 20.8 21.7 23.2 24.5 26.2 27 28.3 29
Year 2 FS/BS Elev. 5.42 97.59 103.01 5.52 97.49 5.75 97.26 5.60 97.41 5.56 97.45 5.70 97.31 5.82 97.19 6.21 96.80 6.36 96.65 6.46 96.55 6.54 96.47 7.20 95.81 7.23 95.78 7.12 95.89 7.28 95.73 7.12 95.89 7.11 95.90 7.11 95.90 7.00 96.01 6.84 96.17 6.63 96.38 6.44 96.57 6.38 96.63 6.33 96.68 6.01 97.00 5.80 97.21 5.64 97.37 5.53 97.48 5.52 97.49 5.45 97.56
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND GRND GRND GRND BKF BNK TOE BED BED BED BED BED BED BED BED BNK BNK BKF GRND GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL8 Reach 8 - Southwest Creek - Sta 100+78.5
Year 4 Facing Downstream
Pool Cross Section
102 101 100 As-built
Elevation (ft)
99
Year 1 Year 2
98
Year 3
BKF
Year 4
97
Year 5
96
BKF
95 94 -15
-10
-5
0
5
10
15
20
25
30
35
Station (ft)
As-Built Date 1/8/09 Area 7.9 Bkf W 7.1 Dmean 1.1 Dmax 1.6 W/d 6.4
Year 1 Date 10/20/09 Area 7.4 Bkf W 6.6 Dmean 1.1 Dmax 1.7 W/d 5.9
Year 2 Date 10/12/10 Area 9.1 Bkf W 7.2 Dmean 1.3 Dmax 1.8 W/d 5.7
Year 3 Date 10/5/11 Area 8.6 Bkf W 7.5 Dmean 1.1 Dmax 1.8 W/d 6.5
Year 4 Date 9/17/12 Area 9.2 Bkf W 7.08 Dmean 1.3 Dmax 1.7 W/d 5.5
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL8 Reach 8 - Southwest Creek - Sta 100+78.5 Station BM HI -17 -10.5 -4 -1 0 1.5 3.6 5.2 6 9 11 11.7 12.2 12.5 12.8 13 13.5 14.3 15 16 17 17.7 18.3 18.8 19 19.9 21 22.8 25.4 26.9 30 34 36 40
As-Built FS/BS Elev. 5.31 98.99 104.30 3.29 101.01 4.42 99.88 5.09 99.21 5.26 99.04 5.30 99.00 5.47 98.83 5.83 98.47 5.72 98.58 5.93 98.37 6.76 97.54 7.00 97.30 7.11 97.19 7.28 97.02 7.48 96.82 7.64 96.66 8.00 96.30 8.42 95.88 8.62 95.68 8.63 95.67 8.66 95.64 8.61 95.69 8.37 95.93 7.63 96.67 7.41 96.89 5.87 98.43 5.65 98.65 5.30 99.00 4.9 99.40 5 99.30 5.03 99.27 4.73 99.57 4.64 99.66 4.17 100.13 4.06 100.24
Station BM HI 0 3 5.9 8.7 9.5 9.9 10.6 11.4 12.3 13 13.6 14.7 15.5 16.3 17.4 18 18.9 19.9 21.1 23 25.4
Year 3 FS/BS Elev. 5.13 99.09 104.22 5.20 99.02 5.55 98.67 5.79 98.43 6.57 97.65 6.72 97.50 6.75 97.47 6.83 97.39 7.01 97.21 7.14 97.08 8.10 96.12 8.57 95.65 8.82 95.40 8.82 95.40 8.78 95.44 8.53 95.69 7.54 96.68 6.86 97.36 5.57 98.65 5.25 98.97 4.86 99.36 4.92 99.30
Desc. Stump
Desc. IR Lt GRND
BKF BNK
TOE BED THL BED TOE BNK
GRND
Station BM HI 0 2.4 4.9 8.4 9.4 10.9 11.9 12.9 13.9 14.5 15.3 16.3 17.6 17.9 18.5 19.1 19.9 21.4 23.4 25.4
Year 1 FS/BS Elev. 3.78 100.42 104.20 5.15 99.05 5.37 98.83 5.50 98.7 6.45 97.75 6.66 97.54 6.85 97.35 7.03 97.17 7.86 96.34 8.33 95.87 8.65 95.55 8.74 95.46 8.58 95.62 8.09 96.11 7.48 96.72 7.10 97.1 5.73 98.47 5.53 98.67 5.13 99.07 4.86 99.34 4.89 99.31
Station BM HI 0.0 0.3 1.3 2.3 3.4 4.6 5.2 5.9 6.9 8.4 9.6 10.7 12.1 12.8 14.1 15.4 16.7 17.5 19.2 19.5 20.8 21.9 23.0 24.4
Year 4 FS/BS Elev. 0.00 100.00 100.00 99.10 98.87 98.79 98.74 98.57 98.62 98.70 98.37 98.07 97.65 97.44 97.29 97.08 95.71 95.51 95.38 95.43 95.69 97.00 98.34 98.85 98.97 99.24 99.21
Desc. BP8 IR Rt GRND GRND GRND GRND GRND GRND BKF BNK BED BED BED BED BED ROOTWAD ROOT TOB GRND GRND GRND GRND
Desc. IR Lt
BKF
Station BM HI 0 2.7 4.7 5.5 5.8 8.7 9.7 10.7 11.7 12.2 12.4 12.8 13.3 14.2 15.2 16.7 17.6 18 18.6 18.9 19.1 19.7 20.7 23 25.45
Year 2 FS/BS Elev. 5.61 99.09 104.70 5.69 99.01 5.94 98.76 6.04 98.66 5.74 98.96 6.24 98.46 7.12 97.58 7.20 97.50 7.33 97.37 7.54 97.16 7.64 97.06 8.23 96.47 8.66 96.04 8.98 95.72 9.26 95.44 9.33 95.37 9.33 95.37 9.06 95.64 8.01 96.69 7.75 96.95 7.47 97.23 6.32 98.38 6.15 98.55 5.82 98.88 5.33 99.37 5.41 99.29
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND LOG GRND GRND BKF BNK BNK BNK BED EOW BED BED BED BED BED BNK BNK BNK GRND GRND GRND GRND GRND
Desc. IR Lt
0.0 0.0
detritus/wood
artificial 100.1
0.0
weighted total count:
5.0
clay hardpan
95.1
bedrock
weighted particle count:
Pebble Count Weighted by Channel Feature Percent Riffle: 22.8 Percent Run: Percent Pool: 33.7 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 13.7 very fine sand 0.062 0.13 0.0 0.13 0.25 0.0 fine sand medium sand 0.25 0.5 7.3 0.5 1 3.9 coarse sand 2 9.7 1 very coarse sand 2 4 0.0 very fine gravel 4 6 1.7 fine gravel 8 1.4 6 fine gravel 8 11 0.7 medium gravel 11 16 1.4 medium gravel 16 22 4.2 coarse gravel 32 2.3 22 coarse gravel very coarse gravel 32 45 3.5 very coarse gravel 45 64 18.1 small cobble 64 90 10.7 medium cobble 90 128 8.3 large cobble 128 180 7.6 very large cobble 180 256 0.7 small boulder 256 362 0.0 small boulder 362 512 0.0 medium boulder 512 1024 0.0 large boulder 1024 2048 0.0 very large boulder 2048 4096 0.0 0.1
silt/clay 14%
0.290
D16
10
riffle
36.8
D50
57
D65
sand 21%
gravel 33%
cobble 27%
percent by substrate type
1.84
D35
size percent less than (mm)
weighted percent
1
boulder 0%
96
D84
pool
100
bedrock 5%
150
D95
run
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 1 Note: Reach Data 1
particle size (mm)
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
based on sediment particles only based on total count
percent finer than
31.7 11.9
glide
0%
% of particles 0%
0% 10000
hardpan 0%
64.7
wood/det 0%
5.3
gradation geo mean
artificial 0%
18.1
std dev
particle size distribution
1000
5%
10%
15%
20%
25%
14% 0% 0% 8% 4% 10% 0% 2% 1% 1% 1% 4% 2% 4% 19% 11% 9% 8% 1% 0% 0% 0%
weighted percent of particles in range
artificial
bedrock clay hardpan detritus/wood total count:
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 4 2 very fine gravel 4 6 fine gravel 8 6 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
99
3
96
1 1 2 1 4 5 9 16 10 11 5 2
Count 13 1 4 3 4 4 # # # # # # # # # # # # # # # # # # # # # # # #
percent finer than
based on sediment particles only based on total count
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1
13.77
0.158
38.7
D50
57
D65
sand 16%
silt/clay 13%
39%
gravel
28%
cobble
percent by substrate type
D35
0%
boulder
98
D84
particle size (mm)
10
size percent less than (mm) D16
0.1
1000
149
D95
3%
# of particles
0 10000
2
4
6
8
10
12
14
16
18
0%
hardpan
123.5
0%
wood/det
3.9
gradation geo mean
0%
artificial
24.9
std dev
particle size distribution
cumulative %
bedrock
100
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 1 Note: Riffle RF1
number of particles
0.0 0.0
detritus/wood
artificial 99.9
0.0
weighted total count:
9.5
clay hardpan
90.4
bedrock
weighted particle count:
Pebble Count Weighted by Channel Feature Percent Riffle: 37.8 Percent Run: Percent Pool: 22.5 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 10.6 very fine sand 0.062 0.13 0.0 0.13 0.25 0.0 fine sand medium sand 0.25 0.5 0.0 0.5 1 0.6 coarse sand 2 2.1 1 very coarse sand 2 4 0.0 very fine gravel 4 6 1.1 fine gravel 8 0.6 6 fine gravel 8 11 0.6 medium gravel 11 16 2.7 medium gravel 16 22 3.9 coarse gravel 32 2.3 22 coarse gravel very coarse gravel 32 45 4.3 very coarse gravel 45 64 11.5 small cobble 64 90 16.7 medium cobble 90 128 14.7 large cobble 128 180 14.5 very large cobble 180 256 1.1 small boulder 256 362 3.3 small boulder 362 512 0.0 medium boulder 512 1024 0.0 large boulder 1024 2048 0.0 very large boulder 2048 4096 0.0
silt/clay 11%
6.229
D16
particle size (mm)
70.9
D50
94
D65
sand 3%
gravel 27%
cobble 47%
percent by substrate type
49.28
D35
size percent less than (mm)
boulder 3%
142
D84
pool
bedrock 9%
179
D95
run
glide
2%
10%
riffle
4%
20%
weighted percent
6%
30%
12% 0% 0% 0% 1% 2% 0% 1% 1% 1% 3% 4% 3% 5% 13% 18% 16% 16% 1% 4% 0% 0%
hardpan 0%
6.7
wood/det 0%
29.7
gradation geo mean
artificial 0%
4.8
std dev
particle size distribution
0%
% of particles 0%
0% 10000
8%
40%
1000
10%
50%
100
12%
60%
10
14%
70%
1
16%
80%
0.1
18%
90%
0% 0.01
20%
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 2 Note: Reach Data 2
100%
based on sediment particles only based on total count
percent finer than
20.7 18.9
weighted percent of particles in range
artificial
bedrock clay hardpan detritus/wood total count:
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 4 2 very fine gravel 4 6 fine gravel 8 6 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
100
4
96
4 5 13 18 9 5 2
1 3 1
1 2 5
Count 26 1 # # # # # # # # # # # # # # # # # # # # # # # #
percent finer than
based on sediment particles only based on total count
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1
1.65
0.062
59.6
D50
91
D65
sand 9%
silt/clay 26%
14%
gravel
45%
cobble
percent by substrate type
D35
2%
boulder
131
D84
particle size (mm)
10
size percent less than (mm) D16
0.1
1000
210
D95
4%
# of particles
0 10000
5
10
15
20
25
30
0%
hardpan
482.1
0%
wood/det
2.9
gradation geo mean
0%
artificial
46.0
std dev
particle size distribution
cumulative %
bedrock
100
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 2 Note: Riffle RF2
number of particles
0.0 0.0
detritus/wood
artificial 100
0.0
weighted total count:
5.8
clay hardpan
94.2
bedrock
weighted particle count:
Pebble Count Weighted by Channel Feature Percent Riffle: 36.6 Percent Run: Percent Pool: 20.8 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 9.2 very fine sand 0.062 0.13 0.0 0.13 0.25 0.0 fine sand medium sand 0.25 0.5 0.0 0.5 1 1.5 coarse sand 2 1.1 1 very coarse sand 2 4 0.0 very fine gravel 4 6 1.0 fine gravel 8 3.0 6 fine gravel 8 11 4.8 medium gravel 11 16 4.5 medium gravel 16 22 5.4 coarse gravel 32 2.2 22 coarse gravel very coarse gravel 32 45 4.0 very coarse gravel 45 64 8.3 small cobble 64 90 14.6 medium cobble 90 128 13.6 large cobble 128 180 5.4 very large cobble 180 256 4.8 small boulder 256 362 3.0 small boulder 362 512 6.1 medium boulder 512 1024 1.5 large boulder 1024 2048 0.0 very large boulder 2048 4096 0.0 0.1
silt/clay 9%
7.412
D16
particle size (mm)
0% 0.01
10%
20%
30%
40%
50%
60%
70%
10
riffle
67.0
D50
94
D65
sand 3%
gravel 33%
cobble 38%
percent by substrate type
32.58
D35
size percent less than (mm)
weighted percent
1
boulder 11%
185
D84
pool
100
bedrock 6%
427
D95
run
1000
glide
10% 0% 0% 0% 2% 1% 0% 1% 3% 5% 5% 6% 2% 4% 9% 16% 14% 6% 5% 3% 6% 2%
hardpan 0%
5.9
wood/det 0%
37.0
gradation geo mean
artificial 0%
5.0
std dev
particle size distribution
0%
% of particles 0%
0% 10000
2%
4%
6%
8%
10%
12%
14%
16%
90% 80%
18%
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 3 Note: Reach Data 3
100%
based on sediment particles only based on total count
percent finer than
19.8 22.8
weighted percent of particles in range
artificial
bedrock clay hardpan detritus/wood total count:
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 4 2 very fine gravel 4 6 fine gravel 8 6 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
102
3
99
2 2 2 2 2 3 1 2 3 7 12 7 4 1 1
2
Count 45 1 # # # # # # # # # # # # # # # # # # # # # # # #
1
10
100
1000
15 10 5
30% 20% 10%
percent finer than
based on sediment particles only based on total count
0.06
0.062
1.7
D50
33
D65
sand 5%
silt/clay 44%
24%
gravel
24%
cobble
percent by substrate type
D35
size percent less than (mm) D16
1%
boulder
83
D84
3%
bedrock
140
D95
# of particles
0%
hardpan
38.2
0%
wood/det
2.3
gradation geo mean
0%
artificial
36.6
std dev
particle size distribution
cumulative %
20
40%
particle size (mm)
25
50%
0 10000
30
60%
0% 0.01
35
70%
40
80%
50 45
0.1
Pebble Count, Holly Grove Stream Restoration Site
90%
100%
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 3 Note: Riffle RF3
number of particles
0.0 0.0
detritus/wood
artificial 100.1
0.0
weighted total count:
0.0
clay hardpan
100.1
bedrock
weighted particle count:
Pebble Count Weighted by Channel Feature Percent Riffle: 45.6 Percent Run: Percent Pool: 21.4 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 57.0 very fine sand 0.062 0.13 0.0 0.13 0.25 0.0 fine sand medium sand 0.25 0.5 0.0 0.5 1 0.0 coarse sand 2 0.0 1 very coarse sand 2 4 5.1 very fine gravel 4 6 5.5 fine gravel 8 0.0 6 fine gravel 8 11 4.1 medium gravel 11 16 4.5 medium gravel 16 22 5.8 coarse gravel 32 2.6 22 coarse gravel very coarse gravel 32 45 3.5 very coarse gravel 45 64 5.5 small cobble 64 90 2.6 medium cobble 90 128 2.9 large cobble 128 180 0.0 very large cobble 180 256 0.0 small boulder 256 362 1.1 small boulder 362 512 0.0 medium boulder 512 1024 0.0 large boulder 1024 2048 0.0 very large boulder 2048 4096 0.0 0.1
silt/clay 57%
0.062
D16
10
riffle
0.1
D50
5
D65
sand 0%
gravel 37%
cobble 5%
percent by substrate type
0.06
D35
size percent less than (mm)
weighted percent
1
boulder 1%
30
D84
pool
100
bedrock 0%
78
D95
run
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 4 Note: Reach Data 4
particle size (mm)
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
based on sediment particles only based on total count
percent finer than
21.4 11.7
glide
0%
% of particles 0%
0% 10000
hardpan 0%
240.6
wood/det 0%
1.4
gradation geo mean
artificial 0%
21.9
std dev
particle size distribution
1000
10%
20%
30%
40%
50%
60%
57% 0% 0% 0% 0% 0% 5% 6% 0% 4% 5% 6% 3% 3% 5% 3% 3% 0% 0% 1% 0% 0%
weighted percent of particles in range
artificial
bedrock clay hardpan detritus/wood total count:
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 4 2 very fine gravel 4 6 fine gravel 8 6 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
99
99
1 5 1 1 6 2 3 5 1 5 3 7
1
Count 58 # # # # # # # # # # # # # # # # # # # # # # # #
percent finer than
based on sediment particles only based on total count
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1
0.06
0.062
0.1
D50
6
D65
sand 1%
silt/clay 59%
25%
gravel
15%
cobble
percent by substrate type
D35
0%
boulder
48
D84
particle size (mm)
10
size percent less than (mm) D16
0.1
1000
141
D95
0%
# of particles
0 10000
10
20
30
40
50
60
70
0%
hardpan
384.4
0%
wood/det
1.7
gradation geo mean
0%
artificial
27.7
std dev
particle size distribution
cumulative %
bedrock
100
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 4 Note: Riffle RF4
number of particles
0.0 0.0
detritus/wood
artificial 100
0.0
weighted total count:
0.0
clay hardpan
100.0
bedrock
weighted particle count:
Pebble Count Weighted by Channel Feature Percent Riffle: 35.4 Percent Run: Percent Pool: 28.3 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 38.6 very fine sand 0.062 0.13 0.0 0.13 0.25 0.0 fine sand medium sand 0.25 0.5 0.0 0.5 1 0.0 coarse sand 2 0.0 1 very coarse sand 2 4 2.1 very fine gravel 4 6 3.6 fine gravel 8 1.1 6 fine gravel 8 11 4.6 medium gravel 11 16 9.3 medium gravel 16 22 4.7 coarse gravel 32 6.0 22 coarse gravel very coarse gravel 32 45 6.0 very coarse gravel 45 64 11.4 small cobble 64 90 8.3 medium cobble 90 128 3.2 large cobble 128 180 0.0 very large cobble 180 256 0.0 small boulder 256 362 0.0 small boulder 362 512 1.1 medium boulder 512 1024 0.0 large boulder 1024 2048 0.0 very large boulder 2048 4096 0.0 0.1
silt/clay 39%
0.062
D16
particle size (mm)
0% 0.01
10%
20%
30%
40%
50%
60%
70%
10
riffle
11.0
D50
23
D65
sand 0%
gravel 49%
cobble 11%
percent by substrate type
0.06
D35
size percent less than (mm)
weighted percent
1
boulder 1%
57
D84
pool
100
bedrock 0%
87
D95
run
1000
glide
39% 0% 0% 0% 0% 0% 2% 4% 1% 5% 9% 5% 6% 6% 11% 8% 3% 0% 0% 0% 1% 0%
hardpan 0%
91.2
wood/det 0%
1.9
gradation geo mean
artificial 0%
30.5
std dev
particle size distribution
0%
% of particles 0%
0% 10000
5%
10%
15%
20%
25%
30%
35%
40%
90% 80%
45%
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 5 Note: Reach Data 5
100%
based on sediment particles only based on total count
percent finer than
23.2 13.1
weighted percent of particles in range
artificial
bedrock clay hardpan detritus/wood total count:
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 4 2 very fine gravel 4 6 fine gravel 8 6 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
99
99
3 1 5 8 5 8 9 11 3 2
8
Count 36 # # # # # # # # # # # # # # # # # # # # # # # #
percent finer than
based on sediment particles only based on total count
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1
0.06
0.062
8.8
D50
20
D65
sand 8%
silt/clay 36%
51%
gravel
5%
cobble
percent by substrate type
D35
0%
boulder
45
D84
particle size (mm)
10
size percent less than (mm) D16
0.1
1000
64
D95
0%
# of particles
0 10000
5
10
15
20
25
30
35
40
0%
hardpan
73.6
0%
wood/det
1.7
gradation geo mean
0%
artificial
27.0
std dev
particle size distribution
cumulative %
bedrock
100
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 5 Note: Riffle RF5
number of particles
0.0 0.0
detritus/wood
artificial 99.9
0.0
weighted total count:
4.4
clay hardpan
95.5
bedrock
weighted particle count:
Pebble Count Weighted by Channel Feature Percent Riffle: 39.2 Percent Run: Percent Pool: 29.4 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 44.4 very fine sand 0.062 0.13 0.0 0.13 0.25 0.0 fine sand medium sand 0.25 0.5 0.0 0.5 1 0.0 coarse sand 2 0.0 1 very coarse sand 2 4 1.3 very fine gravel 4 6 1.3 fine gravel 8 0.0 6 fine gravel 8 11 4.8 medium gravel 11 16 5.0 medium gravel 16 22 7.0 coarse gravel 32 6.4 22 coarse gravel very coarse gravel 32 45 8.7 very coarse gravel 45 64 4.4 small cobble 64 90 8.7 medium cobble 90 128 2.0 large cobble 128 180 0.0 very large cobble 180 256 1.3 small boulder 256 362 0.0 small boulder 362 512 0.0 medium boulder 512 1024 0.0 large boulder 1024 2048 0.0 very large boulder 2048 4096 0.0
silt/clay 44%
0.062
D16
particle size (mm)
8.4
D50
20
D65
sand 0%
gravel 39%
cobble 12%
percent by substrate type
0.06
D35
size percent less than (mm)
boulder 0%
49
D84
pool
bedrock 4%
85
D95
run
glide
5%
10%
riffle
10%
20%
weighted percent
15%
30%
46% 0% 0% 0% 0% 0% 1% 1% 0% 5% 5% 7% 7% 9% 5% 9% 2% 0% 1% 0% 0% 0%
hardpan 0%
70.6
wood/det 0%
1.8
gradation geo mean
artificial 0%
28.3
std dev
particle size distribution
0%
% of particles 0%
0% 10000
20%
40%
1000
25%
50%
100
30%
60%
10
35%
70%
1
40%
80%
0.1
45%
90%
0% 0.01
50%
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC East Branch: Reach 6 Note: Reach Data 6
100%
based on sediment particles only based on total count
percent finer than
18.6 12.7
weighted percent of particles in range
artificial
bedrock clay hardpan detritus/wood total count:
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 4 2 very fine gravel 4 6 fine gravel 8 6 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
102
102
2
2 3 8 9 7 5 3
Count 63 # # # # # # # # # # # # # # # # # # # # # # # #
percent finer than
based on sediment particles only based on total count
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1
0.06
0.062
0.1
D50
9
D65
sand 0%
silt/clay 62%
36%
gravel
2%
cobble
percent by substrate type
D35
0%
boulder
23
D84
particle size (mm)
10
size percent less than (mm) D16
0.1
1000
45
D95
0%
# of particles
0 10000
10
20
30
40
50
60
70
0%
hardpan
184.5
0%
wood/det
1.2
gradation geo mean
0%
artificial
19.2
std dev
particle size distribution
cumulative %
bedrock
100
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC East Branch: Reach 6 Note: Riffle RF6
number of particles
0.0 0.0
detritus/wood
artificial 100
0.0
weighted total count:
0.0
clay hardpan
100.0
bedrock
weighted particle count:
Pebble Count Weighted by Channel Feature Percent Riffle: 29.6 Percent Run: Percent Pool: 38.9 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 71.3 very fine sand 0.062 0.13 0.9 0.13 0.25 1.9 fine sand medium sand 0.25 0.5 0.0 0.5 1 0.0 coarse sand 2 2.8 1 very coarse sand 2 4 1.9 very fine gravel 4 6 0.9 fine gravel 8 0.0 6 fine gravel 8 11 2.8 medium gravel 11 16 2.8 medium gravel 16 22 0.0 coarse gravel 32 1.9 22 coarse gravel very coarse gravel 32 45 0.0 very coarse gravel 45 64 4.6 small cobble 64 90 3.7 medium cobble 90 128 2.8 large cobble 128 180 0.9 very large cobble 180 256 0.9 small boulder 256 362 0.0 small boulder 362 512 0.0 medium boulder 512 1024 0.0 large boulder 1024 2048 0.0 very large boulder 2048 4096 0.0 0.1
silt/clay 71%
0.062
D16
10
riffle
0.1
D50
0
D65
sand 6%
gravel 15%
cobble 8%
percent by substrate type
0.06
D35
size percent less than (mm)
weighted percent
1
boulder 0%
14
D84
pool
100
bedrock 0%
87
D95
run
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southeast Creek: Reach 7 Note: Reach Data 7
particle size (mm)
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
based on sediment particles only based on total count
percent finer than
20.4 11.1
glide
0%
% of particles 0%
0% 10000
hardpan 0%
110.4
wood/det 0%
0.9
gradation geo mean
artificial 0%
14.8
std dev
particle size distribution
1000
10%
20%
30%
40%
50%
60%
70%
80%
71% 1% 2% 0% 0% 3% 2% 1% 0% 3% 3% 0% 2% 0% 5% 4% 3% 1% 1% 0% 0% 0%
weighted percent of particles in range
artificial
bedrock clay hardpan detritus/wood total count:
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 4 2 very fine gravel 4 6 fine gravel 8 6 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
104
104
5 1 1
5
2 1 9 3 3 3
Count 70 1 # # # # # # # # # # # # # # # # # # # # # # # #
percent finer than
based on sediment particles only based on total count
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1
0.06
0.062
0.1
D50
0
D65
sand 3%
silt/clay 67%
28%
gravel
2%
cobble
percent by substrate type
D35
0%
boulder
9
D84
particle size (mm)
10
size percent less than (mm) D16
0.1
1000
51
D95
0%
# of particles
0 10000
10
20
30
40
50
60
70
80
0%
hardpan
75.0
0%
wood/det
0.8
gradation geo mean
0%
artificial
12.2
std dev
particle size distribution
cumulative %
bedrock
100
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southeast Creek: Reach 7 Note: Riffle RF7
number of particles
0.0 0.0
detritus/wood
artificial 99.9
0.0
weighted total count:
8.6
clay hardpan
91.3
bedrock
weighted particle count:
Pebble Count Weighted by Channel Feature Percent Riffle: 32 Percent Run: Percent Pool: 30.1 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 8.3 very fine sand 0.062 0.13 3.3 0.13 0.25 9.1 fine sand medium sand 0.25 0.5 4.7 0.5 1 0.9 coarse sand 2 4.9 1 very coarse sand 2 4 7.1 very fine gravel 4 6 6.3 fine gravel 8 2.3 6 fine gravel 8 11 5.1 medium gravel 11 16 11.9 medium gravel 16 22 7.2 coarse gravel 32 5.5 22 coarse gravel very coarse gravel 32 45 3.4 very coarse gravel 45 64 4.4 small cobble 64 90 3.2 medium cobble 90 128 2.9 large cobble 128 180 0.9 very large cobble 180 256 0.0 small boulder 256 362 0.0 small boulder 362 512 0.0 medium boulder 512 1024 0.0 large boulder 1024 2048 0.0 very large boulder 2048 4096 0.0 0.1
silt/clay 8%
0.158
D16
10
riffle
6.9
D50
14
D65
sand 23%
gravel 53%
cobble 7%
percent by substrate type
2.16
D35
size percent less than (mm)
weighted percent
1
boulder 0%
32
D84
pool
100
bedrock 9%
83
D95
run
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southwest Creek: Reach 8 Note: Reach Data 8
particle size (mm)
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
based on sediment particles only based on total count
percent finer than
19.4 18.4
glide
0%
% of particles 0%
hardpan 0%
24.1
wood/det 0%
2.3
gradation geo mean
artificial 0%
14.3
std dev
particle size distribution
1000
9% 4% 14% 10% 5% 1% 12% 5% 8% 7% 10% 3% 6% 8% 13% 8% 6% 6% 4% 5% 4% 4% 3% 1% 2% 0% 0% 0% 0% 10000 0%
weighted percent of particles in range
artificial
bedrock clay hardpan detritus/wood total count:
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 4 2 very fine gravel 4 6 fine gravel 8 6 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
101
101
2 4 6 4 5 10 11 13 10 5 9 7 2
2
Count 11 # # # # # # # # # # # # # # # # # # # # # # # #
percent finer than
based on sediment particles only based on total count
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1
16.70
4.499
27.5
D50
42
D65
sand 2%
silt/clay 11%
64%
gravel
23%
cobble
percent by substrate type
D35
0%
boulder
97
D84
particle size (mm)
10
size percent less than (mm) D16
0.1
1000
155
D95
0%
# of particles
0 10000
2
4
6
8
10
12
14
0%
hardpan
4.8
0%
wood/det
20.9
gradation geo mean
0%
artificial
4.6
std dev
particle size distribution
cumulative %
bedrock
100
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southwest Creek: Reach 8 Note: Riffle RF8
number of particles