Holly Grove Stream Restoration Site Guilford County, North Carolina Cataloging Unit: 03030002 EEP Contract #: D06028-B November 11, 2010
MONITORING REPORT 2010 (YEAR 2)
Submitted to: North Carolina Department of Environment and Natural Resources North Carolina Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699-1652
Submitted by: Restoration Systems, LLC 1101 Haynes Street, Suite 211 Raleigh, North Carolina 27604 Point of Contact: Tara Disy Allden Phone: 919-755-9490
Holly Grove Stream Restoration Site
MONITORING REPORT 2010 (YEAR 2) Prepared for:
Restoration Systems, LLC 1101 Haynes Street, Suite 211 Raleigh, North Carolina 27604
Prepared by:
Wolf Creek Engineering, pllc 51 North Knob Lane Weaverville, NC 28787
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
TABLE OF CONTENTS EXECUTIVE SUMMARY ........................................................................................................... iii 1.0 project goals, background, and attributes ........................................................................... 1 1.1 General Project Description............................................................................................ 1 1.1.1 USGS and NCDWQ River Basin Designations...................................................... 1 1.1.2 NCDWQ Surface Water Classification .................................................................. 1 1.2 Project Goals and Objectives .......................................................................................... 2 1.3 Project Structure.............................................................................................................. 2 1.4 Restoration Type and Approach ..................................................................................... 2 1.5 Project History, Contacts and Attribute Data ................................................................. 3 2.0 Project condition and monitoring results .......................................................................... 21 2.1 Vegetation Assessment ................................................................................................. 21 2.1.1 Stem Counts .......................................................................................................... 21 2.1.2 Vegetative Problem............................................................................................... 22 2.1.3 Vegetation Plot Photos.......................................................................................... 22 2.2 Stream Assessment ....................................................................................................... 22 2.2.1 Hydrology ............................................................................................................. 22 2.2.2 Geomorphology .................................................................................................... 23 2.2.3 Problem Areas....................................................................................................... 24 2.2.4 Photo Reference Stations ...................................................................................... 24 2.2.5 Stability Assessment Table ................................................................................... 24
LIST OF TABLES Table I. Table II. Table III. Table IV. Table V. Table VI. Table VII. Table VIII. Table IX. Table X.
Project Components …………………………………….…….…..………………...Page 7 Project Activity and Reporting History …………………………….…..…………..Page 8 Project Contacts ………………………………………………….….…..………….Page 8 Project Attributes …………………………………………….….….....…………....Page 9 Vegetation Summary……………………………………………………………….Page 21 Verification of Bankfull Events ………………………………...………………....Page 22 BEHI and Sediment Export Estimates……………………………………………..Page 23 Categorical Stream Feature Visual Stability Assessment……………………..Page 24 - 25 Baseline Morphology and Hydraulic Summary………………………………Page 26 - 31 Morphology and Hydraulic Monitoring Summary……………………………Page 32 - 39
LIST OF FIGURES Figure 1. Vicinity Map……………………………………………………………………..Page 5 Figure 2. Vicinity Map……………………………………………………………………..Page 6 Figure 3. Monitoring Plans…………………………………………………………..Page 11 - 20
APPENDIX A: Vegetative Raw Data APPENDIX B: Geomorphic Raw Data
Holly Grove / Restoration Systems
i
Monitoring Year 2 (Nov. 2010)
HOLLY GROVE RESTORATION SITE
Holly Grove / Restoration Systems
MONITORING REPORT
ii
Monitoring Year 2 (Nov. 2010)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
EXECUTIVE SUMMARY The Holly Grove Site is located in Guilford County, North Carolina within the Cape Fear River Basin, Cataloging Unit 03030002. The project consisted of restoring, enhancing, and preserving approximately 21,000 linear feet of stream, restoring approximately 42 acres of riparian buffers, and preserving approximately 1.11 acres of wetlands. The Site is in a rural setting in the Southern Outer Piedmont hydrophysiographic ecoregion and was previously used to grow row crops with woody vegetation confined to isolated areas. Prior to restoration, the channels were highly degraded due to unrestricted livestock access, channelization activities, and lack of riparian vegetation. The restoration design was based on a Priority Level 1 and 2 approach to restore proper channel dimension and allow for appropriate sediment transport. Restoration practices on this project were implemented with the intent of minimizing unnecessary disturbance to adjacent land and to protect mature riparian vegetation where it existed. The constructed stream profile has restored stable bed morphology including appropriate riffle-pool sequencing. Cross-vanes, J-Hook vanes, and in-stream log structures have been integrated into the channel to provide grade control, maintain stable streambanks while the riparian vegetation establishes, and provide in-stream habitat. Biodegradable fiber matting was used to provide temporary stabilization on the newly graded streambanks. Excavated materials from the existing channel were used to backfill around in-stream structures and to build riffles with a natural substrate and function. Hydrology Following completion of the construction in October of 2008, the Site has been subjected to one greater-than-bankfull event and at least three bankfull or near-bankfull events. It should be noted that, prior to completion of construction, Tropical Storm Fay (August 2008) produced a highflow event in which floodwaters crested 2.5 feet above bankfull. Approximately seventy percent (70%) of the project was complete at that time and subjected to this high water event. In late September, 2010, Tropical Storm Nicole resulted in 3 and 4.5 inches of rain on the site and overbankfull flows. Stream The restored stream reaches have successfully managed the high-flow events of the first two years. Visual inspection of the Site following the greater-than-bankfull event in August of 2008, the bankfull event in June of 2009, and the near-bankfull event in September of 2010 revealed no noticeable adjustments in the bed or banks. The overall grade of the channel has been maintained and the banks of the channels are intact throughout the Site. Vegetation Native woody and herbaceous species were used to establish, at minimum, a fifty-foot riparian buffer on each side of the restored reach. Herbaceous species have successfully established throughout the entire site. The riparian buffer bare-root planting had an overall survival rate of 67% through the second year and showed significant evidence of additional volunteer species becoming established. In general, herbaceous planting resulted in vigorous growth throughout the site.
Holly Grove / Restoration Systems
iii
Monitoring Year 2 (Nov. 2010)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
Planned Action Continued visual monitoring is planned for the few stream areas that have been identified as “Areas of Concern”. Repair work is not warranted at this time on any of the areas. This is based on the judgment that these issues have not risen to the level of posing a threat to channel or structure stability and are not resulting in excessive erosion. It is recommended that natural stream processes and natural re-vegetation be allowed the opportunity to mend these areas and then re-assess their condition in the next monitoring cycle.
Holly Grove / Restoration Systems
iv
Monitoring Year 2 (Nov. 2010)
HOLLY GROVE RESTORATION SITE
1.0
MONITORING REPORT
PROJECT GOALS, BACKGROUND, AND ATTRIBUTES
The purpose of the Holly Grove Stream Restoration Site (Site) was to restore degraded sections of Buckhorn Creek and several of its tributaries located in Guilford County, North Carolina. This monitoring report presents information regarding the site and watershed conditions, the restoration approach for the project, the monitoring results, remedial action plan and detailed monitoring drawings of the site. 1.1
General Project Description
Buckhorn Creek is located approximately 15 miles northeast of the City of Greensboro in rural Guilford County, North Carolina (Figure 1: Vicinity Map). The site consists of approximately 42 acres of floodplain, approximately 21,000 linear feet of stream designated as Buckhorn Creek and its tributaries, and 1.11 acres of existing wetlands (Figure 2: Project Map). The stream reaches consist of perennial, first and second order streams that have historically been impacted by riparian and bank vegetation removal, channel straightening, unrestricted livestock access, and agricultural land-use practices. Existing land use within the site consists of forested areas and row crops. The site is located within moderately sloping colluvial valleys and elevations range from approximately 615 to 720 feet above sea level. Past land management activities have consisted of timber harvesting with subsequent land clearing for agricultural uses including cattle and row crop farming. The land outside of the conservation easement remains in active agricultural production. 1.1.1 USGS and NCDWQ River Basin Designations The project reach is located in the Haw River watershed of the Cape Fear River Basin (United States Geological Survey (USGS) 14-digit Hydrologic Unit 03030002020070) within North Carolina Division of Water Quality (NCDWQ) sub-basin 03-06-02. This sub-basin is primarily rural agriculture, although residential land use accounts for a significant portion. Buckhorn Creek drains into Reedy Fork Creek approximately ¾ miles downstream of the Site, which in turn flows to the Haw River eight miles downstream. 1.1.2
NCDWQ Surface Water Classification
Reedy Fork Creek in the vicinity of the Site is assigned a best usage classification of C, NSW by the NCDWQ and as such there are no restrictions on watershed development or types of discharge. These waters are suitable for aquatic life propagation and survival, fishing, wildlife, secondary recreation, and agriculture. Secondary recreation includes wading, boating, and other uses not involving human body contact with water on an organized or frequent basis. The supplemental classification, NSW (Nutrient Sensitive Waters) includes areas with water quality problems associated with excessive plant growth resulting from nutrient enrichment. The portion of Reedy Fork Creek to which Buckhorn Creek drains and the portion of the Haw River that is approximately two miles east of the Site are listed on the DWQ final
Holly Grove / Restoration Systems
1
Monitoring Year 2 (Nov. 2010)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
2004 and draft 2006 303(d) lists. Streams which are included in the 303(d) list do not meet water quality standards or have impaired uses. 1.2
Project Goals and Objectives
The primary goals of the Holly Grove Stream Restoration Project are to: • Restore aquatic and riparian habitat within the on-site portions of the Buckhorn Creek watershed. • Restore geomorphic stability to the subject stream reaches. These goals will be accomplished through the following objectives: • Restoration of approximately forty-two acres of Mesic Mixed Hardwood Forest along both sides of Buckhorn Creek and its tributaries. • Removing nonpoint sources of pollution associated with agricultural activities including the establishment of a native woody riparian buffer (at least 50’ wide) adjacent to streams and wetlands to treat surface runoff which may be laden with sediment and/or agricultural pollutants from the adjacent landscape. • Reestablishing stream stability and the capacity to transport watershed flows and sediment loads by restoring a stable dimension, pattern, and profile supported by natural in-stream habitat and grade/bank stabilization structures. • Promoting floodwater attenuation through a) conveying bankfull stream flows through construction of bankfull bench, b) restoring secondary, entrenched tributaries thereby reducing floodwater velocities, and c) re-vegetating floodplains to increase frictional resistance on floodwaters crossing the Site. • Improving aquatic habitat by enhancing stream bed variability and the use of instream structures. • Providing wildlife habitat including fringe and forest edge. These accomplishments will result in: • Restoration and enhancement of 15,822 Stream Mitigation Units. • Protecting the Site with a perpetual conservation easement. 1.3
Project Structure
The project is composed of seven distinct reaches; the main channel, Buckhorn Creek, and each of its tributaries, Middle Branch, West Branch, East Branch, Lower East Branch, Southeast Creek, and Southwest Creek. The project structure is tabulated in the corresponding Table 1 (See Below). 1.4
Restoration Type and Approach
Restoration and enhancement practices implemented on this project were designed to minimize unnecessary disturbance to adjacent land and to protect mature riparian vegetation where it exists. Consideration was given to the potential functional lift provided by restoration activities in comparison to the functional lift that could be realized through the natural process of channel evolution. Included in this consideration was an attempt to determine the disturbance and sedimentation that could occur as a result of this natural process. Where restoration was determined to be warranted,
Holly Grove / Restoration Systems
2
Monitoring Year 2 (Nov. 2010)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
consideration was given to which reaches could best be served by maintaining as much of the existing channel pattern as possible. The proposed channels of Buckhorn Creek and its tributaries were designed as Type B4c streams with the exception of the lower reach of Middle Branch. This channel configuration provides the most stable and natural form in the moderately sloping colluvial valleys that are found throughout the Site. Not only does it effectively convey bankfull discharge and sediment load but also conforms to the natural conveyance of flood flows. Additionally, since broad alluvial valleys are generally not found within the Site, the lower sinuosity of the Type B4c streams allowed for minimization grading and earthwork activities. The constructed channel dimensions, patterns, and profiles were based on hydraulic relationships and morphologic dimensionless ratios of the reference reaches. Restoration activities included restoring stable channel morphology supported by natural in-stream habitat and grade/bank stabilization structures, the elimination of accelerated bank erosion, and reestablishment of native riparian buffers at least 50 feet in width. Exotic riparian vegetation was removed in areas of the project to allow for replanting of native riparian species. In-stream structures were installed to provide for enhanced aquatic habitat, protection of the newly constructed stream banks, and grade control for the newly constructed channel. 1.5
Project History, Contacts and Attribute Data
The summary of the project history, contacts, and attribute data is tabulated in Tables II, III, and IV (See Below).
Holly Grove / Restoration Systems
3
Monitoring Year 2 (Nov. 2010)
5
6
HOLLY GROVE RESTORATION SITE
MITIGATION PLAN Table I Project Components
Restoration Reach/Area
Restoration Level
Approach
PreRestoration LF or AC
PostRestoration LF or AC
Holly Grove Stream Restoration Site / EEP Contact #D06028-B
Station Range/Location
Buckhorn Creek West Branch West Branch Middle Branch Middle Branch Middle Branch Middle Branch East Branch East Branch East Branch East Branch Little Branch SW Creek SW Creek UT to SW Creek SE Creek SE Creek UT to SE Creek Wetland A
R E2 R E2 R E2 R P E2 R R E2 R E2 P R P P E
P2 E2 P2 E2 P1 E2 P1 E2 P1 P1 E2 P1 E2 P1 -
8,757 870 390 240 1,549 472 90 960 920 300 739 553 723 2,229 325 342 881 528 1.11
8,848 870 391 240 1,561 472 194 960 920 329 761 553 723 2,229 325 363 881 528 1.11
100+00 - 194+50 300+00 - 308+00 300+00 - 303+91 398+91 - 401+31 401+31 - 417+37 417+37 - 422+09 423+00 - 425+40 480+00 - 498+80 480+00 - 498+80 490+00 - 493+29 500+00 - 507+61 19+945 - 205+54 600+00 - 607+34 608+26 - 630+55 650+00 - 653+50 700+00 - 704+36 706+25 - 715+06 750+00 - 755+28 Middle Branch
Comments
Component Summation Restoration Level
Stream (LF)
Riparian Wetland (Ac) Riverine
Restoration Enhancement Enhancement I Enhancement II Creation Preservation HQ Preservation
13,170
Totals
21,148
Non-Riparian (Ac) Upland (Ac)
Buffer (Ac)
BMP
42
BMP Count
Non-Riverine
1.11 5,284 2,694 1.11 1.11
= Non-Applicable
Holly Grove / Restoration Systems
7
Monitoring Year 2 (Nov 2010)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
Table II Project Activity and Reporting History Holly Grove Restoration Project Data Collection Activity or Report Complete Restoration Plan Apr 2007 Final Design - Construction Plans N/A Construction N/A Temporary S&E mix applied to entire project area N/A Permanent seed mix applied to entire site N/A Bare-root plantings for floodplain and uplands N/A Mitigation Plan / As-Built (Year 0 Monitoring - baseline) Oct 2008 Year 1 Monitoring Oct 2009 Year 2 Monitoring Oct 2010 Year 3 Monitoring Year 4 Monitoring Year 5 Monitoring
Completion or Delivery Jun 2007 Oct 2007 Oct 2008 Sep 2008 Sep 2008 Dec 2008 Dec 2008 Dec 2009 Nov 2010
Table III Project Contact Table Holly Grove Restoration Project Designer Wolf Creek Engineering, pllc
51 North Knob Lane Weaverville NC, 28787 828-658-3649
S. Grant Ginn Construction Contractor North State Environmental, Inc
2889 Lowery St. Winston-Salem, NC 27101 336-725-2010
Darrell Westmoreland Planting & Seeding Contractor North State Environmental, Inc
2889 Lowery St. Winston-Salem, NC 27101 336-725-2010
Stephen Joyce Monitoring Performers Stream Monitoring - Wolf Creek Engineering, pllc Vegetation Monitoring - Catena Group
Holly Grove / Restoration Systems
S. Grant Ginn Mike Wood
8
828-658-3649 919-732-1300
Monitoring Year 2 (Nov 2010)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
Table IV Project Attribute Table Holly Grove Restoration Project Guilford Piedmont Southern Outer Piedmont Cape Fear River Basin 03030002020070 03-06-02
Project County Physiographic Region Ecoregion Project River Basin USGS HUC for Project (14 digit) NCDWQ Sub-basin for Project Within extent of EEP Watershed Plan? WRC Class (Warm, Cool, Cold) % of project esaement fenced or demarcated Beaver activity observed during design phase?
100% Demarcated Easement Corners Yes, on Buckhorn Creek upstream of bridge
Restoration Component Attribute Table Buckhorn West Middle 4.27 0.2 0.2 Second First First 8757 390 1639 Perennial Perennial Perennial Rural Rural Rural
Drainage area (mi2) Stream order Restored length (feet) Perennial or Intermittent Watershed type Watershed LULC Distribution (e.g.)
Residential Ag-Row Crop Ag-Livestock Forested Watershed impervious cover (%) NCDWQ AU/Index number NCDWQ classification 303d listed? Upstream of a 303d listed segment? Reasons for 303d listing or stressor Total acreage of easement Total vegetated acreage within easement Total planted acreage as part of the restoration Rosgen classification of pre-existing Rosgen classification of As-Built Valley type Valley slope Valley side slope range Valley toe slope range Cowardin classification Trout waters designation Species of concern, endangered? Dominant soil series and characteristics Series Depth (in) Clay % K T
Holly Grove / Restoration Systems
East 0.2 First 1039 Perennial Rural
20% 10% 5% 10% 40% 60% 50% 10% 10% 5% 10% 0% 30% 25% 35% 80% 10 5 5 5 16-(1)a C, NSW C, NSW C, NSW C, NSW No Yes non-point urban and agricultural runoff 64.87 47.06 45.3 F, G G G G B4c B4c B4c B4c II II II II 0.0051 0.0239 0.0165 0.0119 4% - 40% 0.4% - 2% N/A N/A Yes, Bald Eagle & Carolina Darter Ch , Co CcD Ch CcD , Ch Congaree Cecil Chewacla Chewacla 0-80 0-80 0-70 0-70 5-35 5-70 5-35 5-35 Moderate Moderate Moderate Moderate -
9
Southeast Southwest 0.14 0.19 First First 342 723 Perennial Perennial Rural Rural 5% 90% 0% 5% 2
10% 10% 0% 80% 2
C, NSW
C, NSW
G B4c II 0.0159
G B4c II 0.0169
CcD Cecil 0-80 5-70 Moderate -
CcD Cecil 0-80 5-70 Moderate -
Monitoring Year 2 (Nov. 2010)
11
12
13
14
15
16
17
18
19
20
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
2.0
PROJECT CONDITION AND MONITORING RESULTS
2.1
Vegetation Assessment
The Carolina Vegetation Survey – Ecosystem Enhancement Program (CVS-EEP) 2008 protocol for recording vegetation (Lee et. al 2008) was used to determine the planting pattern of woody stems with respect to species, spacing, and density as well as to forecast survivability and growth of planted stems in subsequent monitoring years. Eleven (11) randomly placed 10 meter by 10 meter vegetative sampling plots were established within the project easement area. The corners of each monitoring plot have been marked in the field and their position documented by GPS survey. Plots were placed within the applicable planting zones to capture the heterogeneity of the designed vegetative communities. Plot corners were permanently marked with rebar and recorded during the baseline survey. All planted stems and plot corners were marked with orange flagging tape to facilitate relocation during subsequent monitoring years. A reference photograph was taken for each plot at the origin looking diagonally across the plot to the opposite corner. Year 2 vegetation for the Site occurred on September 13-14, 2010. The project has an average of 320 planted stems per acre. The interim success criterion is 320 steams per acre at the end of the Year 3 monitoring period. The riparian buffer planting had an overall survival rate of 67% but showed significant evidence of additional volunteer species taking root. 2.1.1
Stem Counts
Across all vegetation monitoring plots (VP), Year 2 monitoring documented a moderate survivability range of 121 to 526 planted stems per acre. VP7 had the lowest average stem density whereas VPC had the highest. VP2, 5, & 8 did not meet the interim success criterion. Approximately 31% of total planted stems were missing and 2% were dead. Of these, eastern redbud, silky willow, and common witchhazel had the highest mortality rates. Twenty-one (21) species were documented among the vegetation plots, a 19.2% reduction in the total species planted. Several species such as sugarberry, American beech, possum haw, willow oak, and black gum were represented by only one individual. Table V: Vegetation Summary
Plot 1 2 3 4 5 6
Date Sampled 9/13/2010 9/13/2010 9/13/2010 9/13/2010 9/13/2010 9/14/2010
Planted Living Stems 8 4 8 10 7 11
Holly Grove / Restoration Systems
Dead or Missing Volunteer Stems Stems 13 32 2 70 2 38 2 51 4 19 2 2
21
Total Living Stems 40 74 46 61 26 13
Average Stems Per Acre 323.75 161.87 323.75 404.69 283.28 445.15
# species 7 3 6 9 6 5
Monitoring Year 2 (Nov. 2010)
HOLLY GROVE RESTORATION SITE
7 8 A B C
9/14/2010 9/14/2010 9/13/2010 9/13/2010 9/14/2010
3 6 12 8 13
MONITORING REPORT
0 0 3 13 3
1 56 33 31 35
4 62 45 39 48
121.41 242.81 364.22 323.75 526.09
2 3 6 7 5
Approximately 62% of planted stems had a vigor code of good or excellent. High numbers of natural stems were found in seven of the eleven vegetation monitoring plots. Volunteer stems were also found in vegetation plots VP5, 6, & 7 but in significantly lower numbers. It is expected that recruitment will continue to contribute to the total stem density for the restoration site. 2.1.2
Vegetative Problem
No significant vegetation problem areas were noted within the vegetation monitoring plots on-site although some damage and mortality was recorded. Of all damaged, missing, or dead stems within the vegetation monitoring plots 42.5% of the damage has been attributed to insects. Expansion of invasive exotic plant populations should be monitored both within the vegetation plots in which they occur and within the larger restoration area. 2.1.3 Vegetation Plot Photos A photo point was established in each vegetation plot. Photo points are positioned for each plot at the origin facing diagonally across the plot to the opposite corner. The photographs were captured on the same day as the vegetation plot surveys (Appendix A). 2.2
Stream Assessment
Monitoring protocol follows that outlined within the EEP Site Specific Mitigation Plan and detailed in the U.S. Army Corps of Engineers (USACE) Stream Mitigation Guidelines for Monitoring Level I. Specifically, stream monitoring included measurements of stream dimension, profile, pattern, bed materials, photo documentation, and stream bankfull return interval. The restored stream reaches have managed the extreme flow events of the first year. Streambanks remain intact and stable and fully vegetated throughout the site. Vegetation has grown into many riffles on the main channel due to a lack of shade and mature buffer. This has limited the mobility of bed material but has not had noticeable effects on overall stability. All in-stream structures remain intact and fully functional with the exception of a few minor piping issues. 2.2.1 Hydrology Since completion of construction in October of 2008, the site has been subjected to at least one greater-than-bankfull event and several bankfull or near-bankfull events. In August of 2008, Tropical Storm Fay crossed central North Carolina resulting in eight (8) inches of rainfall on-site and water elevations 2.5 feet above bankfull on Buckhorn Creek. Approximately seventy percent (70%) of the project was complete at that time
Holly Grove / Restoration Systems
22
Monitoring Year 2 (Nov. 2010)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
and subjected to this estimated fifty-year storm event. In October of 2008, locally heavy rainfall produced a bankfull event at the Site during the final stages of construction. In June of 2009, heavy rainfall resulted in water elevations 0.2 to 0.3 feet above bankfull. Heavy rainfall associated with remnants of Hurricane Ida produced one additional event in November of 2009, after Year 1 monitoring was completed which again resulted in an elevated flow event. In late September of 2010, Tropical Storm Nicole moved north across central and eastern North Carolina and produced approximately 4.5 inches of rain over 48 hours resulting in flood waters which crested 0.4 feet above bankfull. Table VI Verification of Bankfull Events – Lick Creek Stream Restoration Site (D04013-1) Date of Data Collection 9/3/08 8/13/09 10/11/10
Date of Occurrence of Bankfull Event 8/27/08 June 2009 September 2010
Height above Bankfull (ft) 2.5 0.2 0.4
Method of Data Collection Debris Evidence Crest Gauge Crest Gauge
2.2.2 Geomorphology Following the procedures established in the USDA Forest Service Manual (Harrelson et al 1994) and the methodologies utilized in the Rosgen stream assessment and classification system (Rosgen 1994, 1996), data collected consisted of detailed dimension and pattern measurements, longitudinal profiles, and bed materials sampling. Re-survey of the permanent cross sections and profile reaches have shown only minimal alterations in local bed elevations with the bed form and the channel pattern remaining consistent with the As-built condition. All eight riffle cross sections exhibit consistent maximum depth while six of the eight retain nearly the same cross-sectional area as documented in the baseline monitoring. Six of the eight pool cross-sections have maintained their depth and cross-sectional area and two show only slight adjustments relative to the As-built condition. Location of bed features relative to the pattern is consistent with the As-built survey. Pebble counts were conducted at each riffle cross-section, as well as across the overall study reaches. Pebble count data was plotted by size distribution in order to assess the D50 and D84 size class. On Buckhorn Creek the material size generally decreased from the Year 1 condition with the D50 on Reaches 2 and 3 decreasing from 67mm to 49mm and from 61mm to 32mm. The D84 on Reaches 2 and 3 decreased from 184mm to 144mm and from 118mm to 101mm. The D50 and D84 remained approximately the same on Reach 1 at 28mm and 68mm. This may be due in part to significant growth of vegetation in the riffles that may be trapping finer particles in the bed. All of the tributaries, with the exception of Southeast Creek, showed a decrease in the D50 over the Year 1 condition, although generally the decreases were not appreciable. The D50 on Middle Branch decreased from 21mm to 11mm and from 15mm to 9mm. On Lower East Branch the D50 decreased from 10mm to 0.5mm and Southwest Creek
Holly Grove / Restoration Systems
23
Monitoring Year 2 (Nov. 2010)
HOLLY GROVE RESTORATION SITE
MONITORING REPORT
decreased from 7mm to 5mm. The D50 on Southeast Creek increased from 0.1mm to 5mm. Table VII. BEHI and Sediment Export Estimates – (Only Required in Year 5) 2.2.3 Problem Areas In the year following construction of the Holly Grove Stream Restoration Site, a few minor problem areas have been documented. 1.) Several riffles on Buckhorn Creek and Southeast Branch exhibit excessive vegetation in the channel bed. 2.) There were four (4) locations of minor piping identified at log vanes. 3.) There were five (5) areas of local bank scour identified. 4.) There were two (2) areas of minor riffle scour identified. Inadequate shade due to lack of mature riparian buffer has allowed vegetation to take root in the bed matrix. It is anticipated that this vegetation will die back during the winter but will reestablish during each growing season until sufficient shading is provided by the canopy of the buffer. This has affected bedload transport by limiting bed mobility, but it is not expected to have any significant impact on the overall stability or integrity of the channel bed. Continued visual monitoring is planned for the stream areas that have been identified as “Areas of Concern”. Repair work is not warranted at this time on any of the areas. This is based on the judgment that these issues have not risen to the level of posing a threat to channel or structure stability and are not resulting in excessive erosion. It is recommended that natural stream processes and natural re-vegetation be allowed the opportunity to mend these areas and then reassess their condition in the next monitoring cycle. 2.2.4 Photo Reference Stations Photograph reference Stations (PRSs) have been established to assist in characterizing the site and to allow qualitative evaluation of the site conditions. The location of each photo station has been permanently marked in the field and the bearing/orientation of the photograph is indicated on the As-built plans to allow for consistent repetition. A total of twenty-eight (28) PRSs have been established along the restored stream (Appendix B). Sixteen (16) of these PRSs have been located upstream of the permanent monitoring cross sections. These photographs are taken facing downstream looking at the section, and show as much of the banks and channel as possible.
Holly Grove / Restoration Systems
24
Monitoring Year 2 (Nov. 2010)
HOLLY GROVE RESTORATION SITE
2.2.5
MONITORING REPORT
Stability Assessment Table
Table VIII. Categorical Stream Feature Visual Stability Assessment
Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders
Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders
Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders
Initial 100% 100% 100% 100% 100% 100% 100%
Performance Percentage Buckhorn Creek (8,848 ft) MY-01 MY-02 MY-03 MY-04 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 99% 100% 100% 100%
Initial 100% 100% 100% 100% 100% 100% 100%
Performance Percentage Middle Branch (1,755 ft) MY-01 MY-02 MY-03 MY-04 97% 99% 100% 100% 100% 100% 100% 99% 100% 100% 98% 99% 83% 83%
Initial 100% 100% 100% 100% 100% 100% 100%
Performance Percentage East Branch (1,090 ft) MY-01 MY-02 MY-03 MY-04 100% 99% 100% 100% 100% 100% 100% 100% 100% 100% 100% 99% 100% 100%
Holly Grove / Restoration Systems
25
MY-05
MY-05
MY-05
Monitoring Year 2 (Nov. 2010)
HOLLY GROVE RESTORATION SITE
Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders
Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders
MONITORING REPORT
Initial 100% 100% 100% 100% 100% 100% 100%
Performance Percentage Southeast Creek (363 ft) MY-01 MY-02 MY-03 MY-04 96% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Initial 100% 100% 100% 100% 100% 100% 100%
Performance Percentage Southwest Creek (723 ft) MY-01 MY-02 MY-03 MY-04 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Holly Grove / Restoration Systems
26
MY-05
MY-05
Monitoring Year 2 (Nov. 2010)
3.76
Mean
0.013
28
1.2
2.9
12
34.8
2
1.73
63
20.1
Med
2.2
134
3.1
Max
Reference Reach(es) Data SD
n
1.4
37
2.3
1.69
30
22
Min
40 50 1.9 110 1.7
Radius of Curvature Ratio (ft/ft)
Meander Wavelength (ft)
Meander Width Ratio (ft/ft)
Ri% / Ru% / P% / G% / S%
36.5
40
2
172
16
318
1.5
44
2
44
33
2.25
134.5
2.5
59.5
54
119
Stream Power (transport capacity) W/m2
Drainage Area (sq mi)
3.3 186
Bankfull discharge (cfs)
6
8
Proportion Overwide (%)
Incision Class (BHR Ranch)
Entrenchment Class (ER Range)
Biological or Other
Channel Stability or Habitat Metric
BEHI VL% / L% / M% / H% / VH% / E%
7
Bankfull Floodplain Area (acres)
0.005
BF slope (ft/ft)
5
0.0054
1.17
Sinuosity (ft)
Water Surface Slope (channel) (ft/ft)
8756
Channel Thalweg length (ft)
Valley length (ft)
F4 & G4
Rosgen Classification
Bankfull Velocity (fps)
Impervious cover estimate (%)
0.006
0.0079
1.05
B4c
0.006
0.005
1.2
8777
4.5
B4c
144
1.8
104.5
9.15
182.5
88
0.66
27
1.6
37
2.3
47
33
102.5
Reach Shear Stress (competency) lb/ft2
4.6
340
10
240
120
160
3.6
25
0.005
40
1
2.28
13
40.9
2.4
1.78
52.5
23
Med
Design
Max part size (mm) mobilized at bankfull
d16 / d35 / d50 / d84 / d95 / dip / disp (mm)
SC% / Sa% / G% / C% / B% / Be%
3.15
225
5.95
145
80
110
60
Pool Volume (ft3)
Pool Spacing (ft)
2
2.6
21 3.9
3.4
3.35
2.8
Pool Length (ft)
Pool Max Depth (ft)
Channel Beltwidth (ft)
4
71
2.7
Min
23
n
0.004
0.008
SD
Riffle Length (ft)
Radius of Curvature (ft)
Additional Reach Parameters
4
4
0.007
14
2.3
1.3
3
Baseline Stream Data Summary
Riffle Slope (ft/ft)
0.006
2 14
d50 (mm)
10 1.2
Width/Depth Ratio
Entrenchment Ratio
Bank Height Ratio
16
42
1
55
2.3
2.3
Bankfull Max Depth (ft)
1
Substrate, bed and transport parameters
Pattern
Profile
Max
32
Med
Pre-Existing Condition
26
Mean
24
Min
Bankfull Cross-Sectional Area (ft2)
Eq.
32
UL
Regional Curve
1.6
LL
Floodprone Width (ft)
Gauge
Bankfull Mean Depth (ft)
Bankfull Width (ft)
Simension and Substrate - Riffle
Parameter
Table IX-a Holly Grove Restoration Site - Buckhorn Creek (8848 ft)
3
225
3
75
75
150
3.8
54
0.006
64
3
48
2.6
1.91
75
25
Max
0.0042
35
7.82
140
1.7
41
183
56
1.08
55
0.0026
38
13.4
30.3
1.9
1.3
50
23.4
Min
18
Mean
0.0047
1.17
8848
B4c
9.27
221
3.72
87
217
119
2.89
67
0.0069
58
2.5
16
34.3
2.1
1.5
50
23.4
Med
29
0.0051
10.7
380
7
167
250
136
3.51
87
0.017
74
18.1
48.3
2.6
1.9
70
25.4
Max
As-Built / Baseline
17
SD
n
40 45 7 55 6
Channel Beltwidth (ft)
Radius of Curvature (ft)
Radius of Curvature Ratio (ft/ft)
Meander Wavelength (ft)
Meander Width Ratio (ft/ft)
4
Ri% / Ru% / P% / G% / S%
50
0.2
60
36.5
1.8
104.5
9.15
182.5
2.2
2
172
16
318
40
40
1.5
18
2
18
13
36
7
13
1.4
12
Min
2.25
49.5
2.5
22.5
20
45
1.4
14
0.013
16
1
1.7
13
6.3
0.95
0.7
19.5
9
Med
Design
Stream Power (transport capacity) W/m2
Drainage Area (sq mi)
28
Bankfull discharge (cfs)
0.015
Water Surface Slope (channel) (ft/ft)
BF slope (ft/ft)
6
8
Proportion Overwide (%)
Incision Class (BHR Ranch)
Entrenchment Class (ER Range)
Biological or Other
Channel Stability or Habitat Metric
BEHI VL% / L% / M% / H% / VH% / E%
7
Bankfull Floodplain Area (acres)
0.014
Sinuosity (ft)
5
400 1.06
Channel Thalweg length (ft)
Valley length (ft)
G4 3.9
Rosgen Classification
Bankfull Velocity (fps)
Impervious cover estimate (%)
-
0.0079
1.05
B4c
0.015
0.013
1.2
386
4.5
B4c
96
28
1.6
37
2.3
47
33
36.5
3.1
n
0.53
10
100
23
150
33
2.6
0.013
28
1.2
2.9
12
SD
Reach Shear Stress (competency) lb/ft2
8
77.5
15
97.5
100
2.7
2 34.8
Max
Max part size (mm) mobilized at bankfull
d16 / d35 / d50 / d84 / d95 / dip / disp (mm)
SC% / Sa% / G% / C% / B% / Be%
Additional Reach Parameters
4
4
30
65
Pool Volume (ft3)
Pool Spacing (ft)
2
1.4
Pool Max Depth (ft)
Pool Length (ft)
Riffle Slope (ft/ft)
0.02
28
d50 (mm)
Riffle Length (ft)
1.7
Bank Height Ratio
Substrate, bed and transport parameters
Pattern
Profile
1
1.2
1
1.73
Entrenchment Ratio
Med
Reference Reach(es) Data
7
Mean
Width/Depth Ratio
Min
5.5
n
1.2
SD
Bankfull Max Depth (ft)
Max
Bankfull Cross-Sectional Area (ft2)
Med
Pre-Existing Condition
63
Mean
0.9
Min
7.5
Eq.
Floodprone Width (ft)
UL
Regional Curve
Bankfull Mean Depth (ft)
LL 20.1
Gauge
Baseline Stream Data Summary
6.3
Bankfull Width (ft)
Simension and Substrate - Riffle
Parameter
Table IX-b Holly Grove Restoration Site - West Branch (391 ft)
3
81
3
27
27
54
20
19
3
27
Max
2.3
23
40
9
Min
Mean
1.17
391
B4c
89
4.2
41.5
80
46
10.5
Med
6
60
52
12
Max
As-Built / Baseline SD
n
7 55 6
Meander Wavelength (ft)
Meander Width Ratio (ft/ft)
45
Radius of Curvature Ratio (ft/ft)
40
Channel Beltwidth (ft)
Radius of Curvature (ft)
4
Ri% / Ru% / P% / G% / S%
50
0.2
60
36.5
1.8
104.5
9.15
182.5
2.2
2
172
16
318
40
40
1.5
18
2
18
13
36
6
10
1.4
12
Min
2.25
49.5
2.5
22.5
20
45
1.4
13
0.013
15
1
1.7
13
6.3
0.95
0.7
19.5
9
Med
Design
Stream Power (transport capacity) W/m2
Drainage Area (sq mi)
28
Bankfull discharge (cfs)
0.014 0.015
Water Surface Slope (channel) (ft/ft)
BF slope (ft/ft)
6
8
Proportion Overwide (%)
Incision Class (BHR Ranch)
Entrenchment Class (ER Range)
Biological or Other
Channel Stability or Habitat Metric
BEHI VL% / L% / M% / H% / VH% / E%
7
Bankfull Floodplain Area (acres)
1.06
Sinuosity (ft)
5
1778
Channel Thalweg length (ft)
Valley length (ft)
G4 3.9
Rosgen Classification
Bankfull Velocity (fps)
Impervious cover estimate (%)
-
0.0079
1.05
B4c
0.015
0.013
1.2
1790
4.5
B4c
115
29
1.6
37
2.3
47
33
36.5
3.1
n
0.58
10
100
23
150
33
2.6
0.013
28
1.2
2.9
12
SD
Reach Shear Stress (competency) lb/ft2
8
77.5
15
97.5
100
2.7
2 34.8
Max
Max part size (mm) mobilized at bankfull
d16 / d35 / d50 / d84 / d95 / dip / disp (mm)
SC% / Sa% / G% / C% / B% / Be%
Additional Reach Parameters
4
4
30
65
Pool Volume (ft3)
Pool Spacing (ft)
2
1.4
Pool Max Depth (ft)
Pool Length (ft)
Riffle Slope (ft/ft)
0.02
28
d50 (mm)
Riffle Length (ft)
1.7
Bank Height Ratio
Substrate, bed and transport parameters
Pattern
Profile
1
1.2
1
1.73
Entrenchment Ratio
Med
Reference Reach(es) Data
7
Mean
Width/Depth Ratio
Min
5.5
n
1.2
SD
Bankfull Max Depth (ft)
Max
Bankfull Cross-Sectional Area (ft2)
Med
Pre-Existing Condition
63
Mean
0.9
Min
7.5
Eq.
Floodprone Width (ft)
UL
Regional Curve
Bankfull Mean Depth (ft)
LL 20.1
Gauge
Baseline Stream Data Summary
6.3
Bankfull Width (ft)
Simension and Substrate - Riffle
Parameter
Table IX-c Holly Grove Restoration Site - Middle Branch (1796 ft)
3
81
3
27
27
54
16
32
3
27
Max
0.016
0.0164
34
3
60
2.4
16
30
44
0.9
17
0.0148
17
7.6
10
3.7
1
0.6
55
6.2
Min
25
Mean
1.07
1796
B4c
82.5
Med
29
0.019
0.0187
8.8
105
19.4
130
88
75
1.32
29
0.0184
38
13
10.4
5.2
1.1
0.7
80
7.2
Max
As-Built / Baseline
12
SD
n
7 55 6
Meander Wavelength (ft)
Meander Width Ratio (ft/ft)
45
Radius of Curvature Ratio (ft/ft)
40
Channel Beltwidth (ft)
Radius of Curvature (ft)
4
Ri% / Ru% / P% / G% / S%
50
0.2
60
36.5
1.8
104.5
9.15
182.5
2.2
2
172
16
318
40
40
1.5
18
2
18
13
36
12
12
1.4
12
Min
2.25
49.5
2.5
22.5
20
45
1.4
15
0.013
17
1
1.7
13
6.3
0.95
0.7
19.5
9
Med
Design
Stream Power (transport capacity) W/m2
Drainage Area (sq mi)
28
Bankfull discharge (cfs)
0.014 0.015
Water Surface Slope (channel) (ft/ft)
BF slope (ft/ft)
6
8
Proportion Overwide (%)
Incision Class (BHR Ranch)
Entrenchment Class (ER Range)
Biological or Other
Channel Stability or Habitat Metric
BEHI VL% / L% / M% / H% / VH% / E%
7
Bankfull Floodplain Area (acres)
1.06
Sinuosity (ft)
5
1039
Channel Thalweg length (ft)
Valley length (ft)
G4 3.9
Rosgen Classification
Bankfull Velocity (fps)
Impervious cover estimate (%)
-
0.0079
1.05
B4c
0.015
0.013
1.2
1058
4.5
B4c
102
30
1.6
37
2.3
47
33
36.5
n
0.54
10
100
23
150
33
3.1
SD
Reach Shear Stress (competency) lb/ft2
8
77.5
15
97.5
100
2.6
0.013
28
1.2
2.9
2
Max
Max part size (mm) mobilized at bankfull
d16 / d35 / d50 / d84 / d95 / dip / disp (mm)
SC% / Sa% / G% / C% / B% / Be%
Additional Reach Parameters
4
4
30
65
Pool Volume (ft3)
Pool Spacing (ft)
2
1.4
0.02
Pool Max Depth (ft)
Pool Length (ft)
Riffle Slope (ft/ft)
Riffle Length (ft)
28
d50 (mm)
Substrate, bed and transport parameters
Pattern
Profile
1.7
Bank Height Ratio
12 2.7
7
1
1.2
1
1.73
Width/Depth Ratio
Med
Reference Reach(es) Data
Entrenchment Ratio
Mean
34.8
Min
5.5
n
1.2
SD
Bankfull Max Depth (ft)
Max
Bankfull Cross-Sectional Area (ft2)
Med
Pre-Existing Condition
63
Mean
0.9
Min
7.5
Eq.
Floodprone Width (ft)
UL
Regional Curve
Bankfull Mean Depth (ft)
LL 20.1
Gauge
Baseline Stream Data Summary
6.3
Bankfull Width (ft)
Simension and Substrate - Riffle
Parameter
Table IX-d Holly Grove Restoration Site - East Branch (1073 ft)
3
81
3
27
27
54
18
21
3
27
Max
41
3.25
76
3.8
33
28
34
0.5
13
0.0071
22
Min
16
Mean
0.011
0.011
1.04
1073
B4c
9.4
81
5.1
44
36
35
0.8
14
0.0104
23
2.1
11.4
6.5
1
0.8
18
8.6
Med
24
5.25
91
7
60
45
44
0.9
17
0.0132
26
Max
As-Built / Baseline
19
SD
n
7 55 6
Meander Wavelength (ft)
Meander Width Ratio (ft/ft)
45
Radius of Curvature Ratio (ft/ft)
40
Channel Beltwidth (ft)
Radius of Curvature (ft)
4
Ri% / Ru% / P% / G% / S%
50
0.2
60
36.5
1.8
104.5
9.15
182.5
2.2
2
172
16
318
40
40
1.5
15
2
15
11
30
10
10
1.4
10
Min
2.25
41.5
2.5
19
17
37.5
1.1
13
0.016
12
1
2.2
13
4.2
0.75
0.6
16.5
7.5
Med
Design
Stream Power (transport capacity) W/m2
Drainage Area (sq mi)
28
Bankfull discharge (cfs)
0.015
Water Surface Slope (channel) (ft/ft)
BF slope (ft/ft)
6
8
Proportion Overwide (%)
Incision Class (BHR Ranch)
Entrenchment Class (ER Range)
Biological or Other
Channel Stability or Habitat Metric
BEHI VL% / L% / M% / H% / VH% / E%
7
Bankfull Floodplain Area (acres)
0.014
Sinuosity (ft)
5
342 1.06
Channel Thalweg length (ft)
Valley length (ft)
G4 3.9
Rosgen Classification
Bankfull Velocity (fps)
Impervious cover estimate (%)
-
0.0079
1.05
B4c
0.019
0.016
1.2
359
4.5
B4c
96
31
1.6
37
2.3
47
33
36.5
3.1
n
0.53
10
100
23
150
33
2.6
0.013
28
1.2
2.9
12
SD
Reach Shear Stress (competency) lb/ft2
8
77.5
15
97.5
100
2.7
2 34.8
Max
Max part size (mm) mobilized at bankfull
d16 / d35 / d50 / d84 / d95 / dip / disp (mm)
SC% / Sa% / G% / C% / B% / Be%
Additional Reach Parameters
4
4
30
65
Pool Volume (ft3)
Pool Spacing (ft)
2
1.4
Pool Max Depth (ft)
Pool Length (ft)
Riffle Slope (ft/ft)
0.02
28
d50 (mm)
Riffle Length (ft)
1.7
Bank Height Ratio
Substrate, bed and transport parameters
Pattern
Profile
1
1.2
1
1.73
Entrenchment Ratio
Med
Reference Reach(es) Data
7
Mean
Width/Depth Ratio
Min
5.5
n
1.2
SD
Bankfull Max Depth (ft)
Max
Bankfull Cross-Sectional Area (ft2)
Med
Pre-Existing Condition
63
Mean
0.9
Min
7.5
Eq.
Floodprone Width (ft)
UL
Regional Curve
Bankfull Mean Depth (ft)
LL 20.1
Gauge
Baseline Stream Data Summary
6.3
Bankfull Width (ft)
Simension and Substrate - Riffle
Parameter
Table IX-e Holly Grove Restoration Site - Southeast Creek (363 ft)
3
68
3
23
23
45
20
19
3
23
Max
40
3.4
81
5
40
27
20
0.49
18
14
Min
15
Mean
0.0106
0.0106
1.05
363
B4c
38.5
86
8
64
30.5
22
0.52
19
0.0067
15
3.1
15
4.3
0.8
0.5
25
8
Med
30
4.3
91
11
88
34
40
1.4
21
18
Max
As-Built / Baseline
15
SD
n
40 45 7 55 6
Channel Beltwidth (ft)
Radius of Curvature (ft)
Radius of Curvature Ratio (ft/ft)
Meander Wavelength (ft)
Meander Width Ratio (ft/ft)
4
Ri% / Ru% / P% / G% / S%
50
0.2
SD
n
60
Mean
Med
36.5
1.8
104.5
9.15
182.5
2.2
2
172
16
318
40
40
3.1
SD
n
1.5
16
2
16
12
32
6
10
1.4
11
Min
2.25
44
2.5
20
18
40
1.3
10
0.007
14
1
2.2
13
4.9
0.85
0.6
17.5
8
Med
Design
Stream Power (transport capacity) W/m2
Drainage Area (sq mi)
28
Bankfull discharge (cfs)
8
Proportion Overwide (%)
Incision Class (BHR Ranch)
Entrenchment Class (ER Range)
6
Bankfull Floodplain Area (acres)
Biological or Other
Channel Stability or Habitat Metric
BEHI VL% / L% / M% / H% / VH% / E%
7
5
-
0.008
0.0122
0.0122
0.015
BF slope (ft/ft)
0.007
0.014
Water Surface Slope (channel) (ft/ft)
0.0079
723
B4c
6.88
93
3.55
28.5
55
25
1.45
8
0.0018
11
1.95
18.6
3.4
0.7
0.4
15.6
8
Med
30
7.5
126
4.6
37
60
32
1.65
12
0.032
18
Max
As-Built / Baseline
1.17 1.2
19
Mean
1.06
33
6.25
60
2.5
20
50
19
1.15
5
0.0012
9
Min
Sinuosity (ft)
1.05
4.5
B4c
3
72
3
24
24
48
13
19
3
24
Max
Channel Thalweg length (ft)
Valley length (ft)
G4 3.9
Rosgen Classification
Bankfull Velocity (fps)
Impervious cover estimate (%) B4c
50
32
1.6
37
2.3
47
33
36.5
2.6
0.013
28
1.2
2.9
12
34.8
2
1.73
Max
Reference Reach(es) Data
0.25
10
100
23
150
33
2.7
Min
Reach Shear Stress (competency) lb/ft2
8
77.5
15
97.5
100
Max
Max part size (mm) mobilized at bankfull
d16 / d35 / d50 / d84 / d95 / dip / disp (mm)
SC% / Sa% / G% / C% / B% / Be%
Additional Reach Parameters
4
4
30
65
Pool Volume (ft3)
Pool Spacing (ft)
2
1.4
0.02
Pool Max Depth (ft)
Pool Length (ft)
Riffle Slope (ft/ft)
Riffle Length (ft)
28
d50 (mm)
1.2
Entrenchment Ratio 1.7
7
Width/Depth Ratio
Bank Height Ratio
5.5
Bankfull Cross-Sectional Area (ft2)
1
1.2
Bankfull Max Depth (ft)
1
Substrate, bed and transport parameters
Pattern
Profile
Med
Pre-Existing Condition
63
Mean
0.9
Min
7.5
Eq.
Floodprone Width (ft)
UL
Regional Curve
Bankfull Mean Depth (ft)
LL 20.1
Gauge
Baseline Stream Data Summary
6.3
Bankfull Width (ft)
Simension and Substrate - Riffle
Parameter
Table IX-f Holly Grove Restoration Site - Southwest Creek (723 ft)
18
SD
n
Bkf Width (ft) Floodprone Width (ft)
Min 40 29 125 2
Max 115 371 320 5.75
Med 65 105 180 3.25
Riffle Length (ft) 28 81 47 Riffle Slope (ft/ft) 0.0024 0.0126 0.0094 Pool length (ft) 24.4 38 29.5 Pool Spacing (ft) 37 130 82
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
4.7 55
26.5 64
MY3
MY-1 (2006)
35.3 1.5 2.6 15.9 >3 1
MY2 23.7 82
35.4 1.5 2.1 15.3 >3 1
MY1 20 70
MY5
MY+
20.5 0 59.5
Min 40 29 125 2
Med 65 105 180 3.25
80.2 37.5 0.0212 0.0071 164 93
Max 115 371 320 5.75
MY-2 (2007)
MY4
Cross Section 1 Riffle
Additional Reach Parameters Valley Length (ft) 967 967 Channel Length (ft) 1085 1085 Sinuosity 1.1 1.1 Water Surface Slope (ft/ft) 0.0024 0.0126 0.0094 0.0039 0.0081 Bkf Slope (ft/ft) 0.006 0.0056 Rosgen Classification B4c B4c Habitat Index Macrobenthos
Profile
Pattern
Parameter
Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Dimension
Parameter
46.8 2 4.2 -
MY2 23.4 -
MY3
Min
33
Max
Med
MY-3 (2008)
48 2.2 3.9 -
MY1 22 -
MY5
MY+
Min
Max
Med
MY-4 (2009)
MY4
Cross Section 2 Pool
Table X-a Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 1: Buckhorn Creek
MY2
MY3
Min
Max
Med
MY-5 (2010)
MY1
MY5
MY+
Min
Max
Med
MY+ (2011)
MY4
Cross Section
Bkf Width (ft) Floodprone Width (ft)
Min 55 61 182 2.5
Max 162 245 225 7.5
Med 60 130 195 2.8
MY5
MY+
Min 55 61 182 2.5
Max 162 245 225 7.5
Med 60 130 195 2.8
MY-2 (2007)
MY4
Riffle Length (ft) 25 87 34 39 90 50.3 Riffle Slope (ft) 0.0012 0.0228 0.0099 0.0023 0.0172 0.0083 Pool length (ft) 16.2 36.8 31.8 Pool Spacing (ft) 26 151 56 39 159 68
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
32 116
67.2 184
MY3
MY-1 (2006)
27.6 1.4 1.9 14.8 1.6 1.7
MY2 20.2 34
25.4 1.2 1.7 16.4 1.6 1.7
MY1 20.4 34
Cross Section 3 Riffle
Additional Reach Parameters Valley Length (ft) 882 882 Channel Length (ft) 968 968 Sinuosity 1.18 1.18 Water Surface Slope (ft/ft) 0.0012 0.0228 0.0099 0.0015 0.0046 0.0069 Bkf Slope (ft/ft) 0.0057 0.0055 Rosgen Classification B4c B4c Habitat Index Macrobenthos
Profile
Pattern
Parameter
Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Dimension
Parameter
49.1 2.2 3.1 -
MY2 22 -
MY3
Min
34
Max
Med
MY-3 (2008)
45.1 2 3 -
MY1 22.2 -
MY5
MY+
Min
Max
Med
MY-4 (2009)
MY4
Cross Section 4 Pool
Table X-b Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 2: Buckhorn Creek
MY2
MY3
Min
Max
Med
MY-5 (2010)
MY1
MY5
MY+
Min
Max
Med
MY+ (2011)
MY4
Cross Section
Bkf Width (ft) Floodprone Width (ft)
Min 45 177 243 1.8
Riffle Length (ft) 17 Riffle Slope (ft) 0.0032 Pool length (ft) 19.9 Pool Spacing (ft) 31
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
15.4 109
60.6 118
MY3
0.014 -
103 0.014 49.6 167
Max 87 284 288 3.4
1009 1040 1.03 0.0066 0.0047 B4c
49 0.007 24.7 75
Med 50 222 274 2
MY5
MY+
Max 87 284 288 3.4
Med 50 222 274 2
-
-
1009 1040 1.03 0.0044 0.0051 B4c
18 85 51.6 0.0029 0.0217 0.0076 19.5 164 78
Min 45 177 243 1.8
MY-2 (2007)
MY4
Cross Section 5 Riffle
MY-1 (2006)
47.7 1.7 2.8 15.9 2.5 1
MY2 27.5 65
48 1.9 2.6 13.5 2.5 1
MY1 25.5 65
Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) 0.0032 Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos
Profile
Pattern
Parameter
Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Dimension
Parameter
66.2 2.9 4.9 -
MY2 22.8 -
MY3
Min
35
Max
Med
MY-3 (2008)
62.8 2.8 4.7 -
MY1 22.5 -
MY5
MY+
Min
Max
Med
MY-4 (2009)
MY4
Cross Section 6 Pool
Table X-c Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 3: Buckhorn Creek
MY2
MY3
Min
Max
Med
MY-5 (2010)
MY1
MY5
MY+
Min
Max
Med
MY+ (2011)
MY4
Cross Section
Bkf Width (ft) Floodprone Width (ft)
2.2 53
20.6 58
MY3
Min 14 25 66 2.8
Max 21 59 100 4.2
Med 18 40 88 3.6
MY-1 (2006)
3.8 0.5 1 12.6 >3 1.45
MY2 6.9 40
3.5 0.6 1 11.8 >3 1.45
MY1 6.4 40
-
-
220 236 1.1 0.0205 B4c
8.3 0 12
Min 14 25 66 2.8
-
MY5
MY+
Med 18 40 88 3.6
-
220 236 1.07 0.0197 B4c
18.1 14.5 0.0348 0.0348 52 35
Max 21 59 100 4.2
MY-2 (2007)
MY4
Cross Section 1 Riffle
Riffle Length (ft) 9 23 15.8 Riffle Slope (ft/ft) 0.0155 0.0409 0.0271 Pool length (ft) 5 11.9 8.7 Pool Spacing (ft) 20 41 23
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos
Profile
Pattern
Parameter
Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Dimension
Parameter
18.2 1 2.8 -
MY2 17.7 -
MY3
Min
36
Max
Med
MY-3 (2008)
17 1 2.5 -
MY1 17 -
MY5
MY+
Min
Max
Med
MY-4 (2009)
MY4
Cross Section 2 Pool
Table X-d Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 4: Middle Branch
MY2
MY3
Min
Max
Med
MY-5 (2010)
MY1
MY5
MY+
Min
Max
Med
MY+ (2011)
MY4
Cross Section
Bkf Width (ft) Floodprone Width (ft)
10.8 49
15.3 44
Min 22 52 91 237
-
MY3
Med 23 62 108 2.8
MY+
Min 22 52 91 237
Max 24 71 133 2.9
Med 23 62 108 2.8
-
197 211 1.1 0.0117 B4c
-
-
197 211 1.07 0.0166 B4c
43 18 13.5 41.5 22 0.0093 0.0092 0.0044 0.0123 0.0064 16.2 16.2 74.6 48.5 13.5 61 43
Max 24 71 133 2.9
MY5
MY-2 (2007)
MY4
Cross Section 3 Riffle
MY-1 (2006)
5.6 0.7 1.2 11.1 >3 1.3
MY2 7.9 40
5.9 0.7 1.2 11.5 >3 1.3
MY1 8.2 40
Riffle Length (ft) 16 Riffle Slope (ft) 0.009 Pool length (ft) 11.7 Pool Spacing (ft) 44
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos
Profile
Pattern
Parameter
Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Dimension
Parameter
10.1 1.2 1.9 -
MY2 8.4 -
MY3
Min
37
Max
Med
MY-3 (2008)
9.7 1.1 2 -
MY1 8.6 -
MY5
MY+
Min
Max
Med
MY-4 (2009)
MY4
Cross Section 4 Pool
Table X-e Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 5: Middle Branch
MY2
MY3
Min
Max
Med
MY-5 (2010)
MY1
MY5
MY+
Min
Max
Med
MY+ (2011)
MY4
Cross Section
Bkf Width (ft) Floodprone Width (ft)
0.1 23
9.8 29
Min 16 2.3
-
MY3
Max 17 2.4
-
207.4 209.7 1.0 0.0104 B4c
18.8 0.012 9.5 38.4
Med 16 193 87 2.3
MY5
MY+
Max 17 2.4
Med 16 193 87 2.3
-
-
207.4 209.7 1.01 0.0141 B4c
11.7 22.5 16.9 0.0107 0.0222 0.0107 28.6 39.5 33.6
Min 16 2.3
MY-2 (2007)
MY4
Cross Section 5 Riffle
MY-1 (2006)
3 0.4 0.7 21.6 >3 1.6
MY2 8 30
2.7 0.4 0.6 18.6 >3 1.6
MY1 7.1 30
Riffle Length (ft) 17.5 27 Riffle Slope (ft) 0.0037 0.0176 Pool length (ft) 6.5 12.5 Pool Spacing (ft) 30 44
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos
Profile
Pattern
Parameter
Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Dimension
Parameter
10.2 1.1 2 -
MY2 9.2 -
MY3
Min
38
Max
Med
MY-3 (2008)
11.5 1 2.5 -
MY1 12.1 -
MY5
MY+
Min
Max
Med
MY-4 (2009)
MY4
Cross Section 6 Pool
Table X-f Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 6: Lower East Branch
MY2
MY3
Min
Max
Med
MY-5 (2010)
MY1
MY5
MY+
Min
Max
Med
MY+ (2011)
MY4
Cross Section
Bkf Width (ft) Floodprone Width (ft)
2.4 21
0.1 43
MY3
Min 21 37 70 1.4
Max 26 48 80 1.7
Med 23 44 77 1.5
MY-1 (2006)
7.6 0.05 1.2 27.7 2.3 2.1
MY2 14.5 35
9.5 0.6 1.2 23.8 2.3 2.1
MY1 15 35
-
-
157.6 167 1.1 0.0106 B4c
Min 21 37 70 1.4
-
MY5
MY+
-
24.9 0.004 44.2
Max 26 48 80 1.7
157.6 167 1.06 0.0096 B4c
18.8 0.0032 36.8
Med 23 44 77 1.5
MY-2 (2007)
MY4
Cross Section 1 Riffle
Riffle Length (ft) 12 20.5 19 12.6 Riffle Slope (ft/ft) 0.0017 0.0052 0.0029 0.0024 Pool length (ft) 5 8.1 6 Pool Spacing (ft) 29.6 43.5 40.5 29.3
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos
Profile
Pattern
Parameter
Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Dimension
Parameter
9.6 1 1.9 -
MY2 9.8 -
MY3
Min
39
Max
Med
MY-3 (2008)
9.7 0.9 1.8 -
MY1 10.5 -
MY5
MY+
Min
Max
Med
MY-4 (2009)
MY4
Cross Section 2 Pool
Table X-g Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 7: Southeast Creek
MY2
MY3
Min
Max
Med
MY-5 (2010)
MY1
MY5
MY+
Min
Max
Med
MY+ (2011)
MY4
Cross Section
Bkf Width (ft) Floodprone Width (ft)
13.3 42
7.3 56
Min 19 19 59 2.3
-
MY3
Med 25 25 66 3
-
174.4 198.2 1.1 0.0123 B4c
15 9 0.0092 0.0056 19.5 11.4 38.5 27.5
Max 42 26 99 5.1 5.1 0 9.9
Min 19 19 59 2.3
-
MY5
MY+
Med 25 25 66 3
-
174.4 198.2 1.14 0.0128 B4c
14.3 8.5 0.0373 0.0056 32.6 23.9
Max 42 26 99 5.1
MY-2 (2007)
MY4
Cross Section 3 Riffle
MY-1 (2006)
4.9 0.6 0.8 14.5 1.83 2.3
MY2 8.4 15
4.4 0.5 0.7 15.2 1.83 2.3
MY1 8.2 15
Riffle Length (ft) 4 Riffle Slope (ft) 0.002 Pool length (ft) 7 Pool Spacing (ft) 21
Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio
Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos
Profile
Pattern
Parameter
Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)
Dimension
Parameter
9.1 1.3 1.8 -
MY2 7.2 -
MY3
Min
40
Max
Med
MY-3 (2008)
7.4 1.1 1.7 -
MY1 6.6 -
MY5
MY+
Min
Max
Med
MY-4 (2009)
MY4
Cross Section 4 Pool
Table X-h Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 8: Southwest Creek
MY2
MY3
Min
Max
Med
MY-5 (2010)
MY1
MY5
MY+
Min
Max
Med
MY+ (2011)
MY4
Cross Section
APPENDIX A VEGETATION RAW DATA
Vegetation Monitoring Plot 1 – 10/28/09
Vegetation Monitoring Plot 1 – 9/13/10
Holly Grove Stream Restoration Site
November 2010
Vegetation Monitoring Plot 2 – 10/28/09
Vegetation Monitoring Plot 2 – 9/13/10
Holly Grove Stream Restoration Site
November 2010
Vegetation Monitoring Plot 3 – 10/28/09
Vegetation Monitoring Plot 3 – 9/13/10
Holly Grove Stream Restoration Site
November 2010
Vegetation Monitoring Plot 4 – 10/28/09
Vegetation Monitoring Plot 4 – 9/13/10
Holly Grove Stream Restoration Site
November 2010
Vegetation Monitoring Plot 5 – 10/28/09
Vegetation Monitoring Plot 5 – 9/13/10
Holly Grove Stream Restoration Site
November 2010
Vegetation Monitoring Plot 6 – 10/28/09
Vegetation Monitoring Plot 6 – 9/14/10
Holly Grove Stream Restoration Site
November 2010
Vegetation Monitoring Plot 7 – 10/28/09
Vegetation Monitoring Plot 7 – 9/14/10
Holly Grove Stream Restoration Site
November 2010
Vegetation Monitoring Plot 8 – 10/28/09
Vegetation Monitoring Plot 8 – 9/14/10
Holly Grove Stream Restoration Site
November 2010
Vegetation Monitoring Plot A – 10/28/09
Vegetation Monitoring Plot A – 9/13/10
Holly Grove Stream Restoration Site
November 2010
Vegetation Monitoring Plot B – 10/28/09
Vegetation Monitoring Plot B – 9/13/10
Holly Grove Stream Restoration Site
November 2010
Vegetation Monitoring Plot C – 10/28/09
Vegetation Monitoring Plot C – 9/14/10
Holly Grove Stream Restoration Site
November 2010
APPENDIX B GEOMORPHIC RAW DATA
Photo Point 1
Buckhorn Creek facing upstream – Year 0
Photo No. 1
Buckhorn Creek facing upstream – Year 1
Photo No. 2
Buckhorn Creek facing upstream – Year 2
Photo No. 3
Holly Grove Stream Restoration Site
Nov. 2010
Photo Point 2
Buckhorn Creek facing upstream – Year 0
Photo No. 4
Buckhorn Creek facing upstream – Year 1
Photo No. 5
Buckhorn Creek facing upstream – Year 2
Photo No. 6
Holly Grove Stream Restoration Site
Nov. 2010
Photo Point 3
Buckhorn Creek facing upstream – Year 0
Photo No. 7
Buckhorn Creek facing upstream – Year 1
Photo No. 8
Buckhorn Creek facing upstream – Year 2
Photo No. 9
Holly Grove Stream Restoration Site
Nov. 2010
Photo Point 4
West Branch facing downstream – Year 0
Photo No. 10
West Branch facing downstream – Year 1
Photo No. 11
West Branch facing downstream – Year 2
Photo No. 12
Holly Grove Stream Restoration Site
Nov. 2010
Photo Point 5
Buckhorn Creek facing upstream – Year 0
Photo No. 13
Buckhorn Creek facing upstream – Year 1
Photo No. 14
Buckhorn Creek facing upstream – Year 2
Photo No. 15
Holly Grove Stream Restoration Site
Nov. 2010
Photo Point 6
Buckhorn Creek at bridge, facing upstream – Year 0
Photo No. 16
Buckhorn Creek at bridge, facing upstream – Year 1
Photo No. 17
Buckhorn Creek at bridge, facing upstream – Year 2
Photo No. 18
Holly Grove Stream Restoration Site
Nov. 2010
Photo Point 7
Buckhorn Creek at bridge, facing downstream – Year 0
Photo No. 19
Buckhorn Creek at bridge, facing downstream – Year 1
Photo No. 20
Buckhorn Creek at bridge, facing downstream – Year 2
Photo No. 21
Holly Grove Stream Restoration Site
Nov. 2010
Photo Point 8
Buckhorn Creek facing upstream – Year 0
Photo No. 22
Buckhorn Creek facing upstream – Year 1
Photo No. 23
Buckhorn Creek facing upstream – Year 2
Photo No. 24
Holly Grove Stream Restoration Site
Nov. 2010
Photo Point 9
Buckhorn Creek facing upstream – Year 0
Photo No. 25
Buckhorn Creek facing upstream – Year 1
Photo No. 26
Buckhorn Creek facing upstream – Year 2
Photo No. 27
Holly Grove Stream Restoration Site
Nov. 2010
Photo Point 10
Buckhorn Creek facing upstream – Year 0
Photo No. 28
Buckhorn Creek facing upstream – Year 1
Photo No. 29
Buckhorn Creek facing upstream – Year 2
Photo No. 30
Holly Grove Stream Restoration Site
Nov. 2010
Photo Point 11
Southwest Creek facing downstream – Year 0
Photo No. 31
Southwest Creek facing downstream - Year 1
Photo No. 32
Southwest Creek facing downstream - Year 2
Photo No. 33
Holly Grove Stream Restoration Site
Nov. 2010
Photo Point 12
Southwest Creek facing upstream – Year 0
Photo No. 34
Southwest Creek facing upstream – Year 1
Photo No. 35
Southwest Creek facing upstream – Year 2
Photo No. 36
Holly Grove Stream Restoration Site
Nov. 2010
Table B2. Visual Morphological Stability Assessment Holly Grove Stream Restoration Site (D06028-B) Buckhorn Creek 8,848 ft (# Stable) Total Total Number Number Number / Performing per As- feet in Metric as built unstable Intended state
Feature Category
% Performing in Stable Condition
Feature Performing Mean or Total
A. Riffles
1. Present 2. Armor stable 3. Facet grade appears stable 4. Minimal evidence of embedding/fining 5. Length appropriate
86 86 86 86 86
86 86 86 86 86
N/A N/A N/A N/A N/A
100% 100% 100% 100% 100%
100%
B. Pools
1. Present 2. Sufficently deep 3. Length appropriate
88 88 88
88 88 88
0 N/A N/A
100% 100% 100%
100%
C. Thalweg
1. Upstream of meander bend centered 2. Downstream of meander bend centered
86 86
86 86
N/A N/A
100% 100%
100%
D. Meanders
1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief
85 0 88 88
88 N/A 88 88
N/A N/A N/A N/A
97% 100% 100% 100%
100%
E. Bed General
1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting
N/A
N/A
0/0
100%
N/A
N/A
0/200
100%
100%
F. Vanes
1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures
108 108 108 106
108 108 108 108
N/A N/A N/A N/A
100% 100% 100% 98%
100%
1. Free of scour 2. Footing stable
23 23
23 23
N/A N/A
100% 100%
100%
% Performing in Stable Condition
Feature Performing Mean or Total
100% 98% 98% 100% 100%
99%
G. Wads/Boulders
Table B2. Visual Morphological Stability Assessment
Feature Category
A. Riffles
B. Pools
Holly Grove Stream Restoration Site (D06028-B) Middle Branch 1,755 ft (# Stable) Total Total Number / Number Number Metric Performing per As- feet in built unstable as state Intended 1. Present 44 44 N/A 2. Armor stable 43 44 N/A 3. Facet grade appears stable 43 44 N/A 4. Minimal evidence of embedding/fining 44 44 N/A 5. Length appropriate 44 44 N/A 1. Present 2. Sufficently deep 3. Length appropriate
46 46 46
46 46 46
N/A N/A N/A
100% 100% 100%
100%
1. Upstream of meander bend centered 2. Downstream of meander bend centered
44 44
44 44
N/A N/A
100% 100%
100%
D. Meanders
1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief
44 0 46 46
46 N/A 46 46
N/A N/A N/A N/A
96% 100% 100% 100%
99%
E. Bed General
1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting
N/A
N/A
0/0
100%
N/A
N/A
0/0
100%
100%
F. Vanes
1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures
68 69 69 68
69 69 69 69
N/A N/A N/A N/A
99% 100% 100% 99%
99%
G. Wads/Boulders
1. Free of scour 2. Footing stable
3 2
3 3
N/A N/A
100% 67%
83%
C. Thalweg
Table B2. Visual Morphological Stability Assessment
Feature Category
A. Riffles
Holly Grove Stream Restoration Site (D06028-B) East Branch 1,090 ft Total (# Stable) Total Number / Number Number Metric Performing per As- feet in built unstable as state Intended 1. Present 25 25 N/A 2. Armor stable 24 25 N/A 3. Facet grade appears stable 25 25 N/A 4. Minimal evidence of embedding/fining 25 25 N/A 5. Length appropriate 25 25 N/A
% Performing in Stable Condition
Feature Performing Mean or Total
100% 96% 100% 100% 100%
99%
B. Pools
1. Present 2. Sufficently deep 3. Length appropriate
25 25 25
25 25 25
N/A N/A N/A
100% 100% 100%
100%
C. Thalweg
1. Upstream of meander bend centered 2. Downstream of meander bend centered
25 25
25 25
N/A N/A
100% 100%
100%
D. Meanders
1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief
25 0 25 25
25 N/A 25 25
N/A N/A N/A N/A
100% 100% 100% 100%
100%
E. Bed General
1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting
N/A
N/A
0/0
100%
N/A
N/A
0/0
100%
100%
F. Vanes
1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures
37 38 38 37
38 38 38 38
N/A N/A N/A N/A
97% 100% 100% 97%
99%
1. Free of scour 2. Footing stable
1 1
1 1
N/A N/A
100% 100%
100%
% Performing in Stable Condition
Feature Performing Mean or Total
100% 100% 100% 100% 100%
100%
G. Wads/Boulders
Table B2. Visual Morphological Stability Assessment
Feature Category
A. Riffles
B. Pools
Holly Grove Stream Restoration Site (D06028-B) Southeast Creek 363 ft (# Stable) Total Total Number Number Number / Metric Performing per As- feet in as built unstable Intended state 1. Present 10 10 N/A 2. Armor stable 10 10 N/A 3. Facet grade appears stable 10 10 N/A 4. Minimal evidence of embedding/fining 10 10 N/A 5. Length appropriate 10 10 N/A 1. Present 2. Sufficently deep 3. Length appropriate
10 10 10
10 10 10
N/A N/A N/A
100% 100% 100%
100%
C. Thalweg
1. Upstream of meander bend centered 2. Downstream of meander bend centered
10 10
10 10
N/A N/A
100% 100%
100%
D. Meanders
1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief
9 0 9 9
9 N/A 9 9
N/A N/A N/A N/A
100% 100% 100% 100%
100%
1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting
N/A
N/A
0/0
100%
N/A
N/A
0/0
100%
100%
F. Vanes
1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures
11 11 11 11
11 11 11 11
N/A N/A N/A N/A
100% 100% 100% 100%
100%
G. Wads/Boulders
1. Free of scour 2. Footing stable
2 2
2 2
N/A N/A
100% 100%
100%
E. Bed General
Table B2. Visual Morphological Stability Assessment
Feature Category
A. Riffles
B. Pools
C. Thalweg
D. Meanders
E. Bed General
F. Vanes
G. Wads/Boulders
Holly Grove Stream Restoration Site (D06028-B) Southwest Creek 723 ft Total (# Stable) Total Number / Number Number Metric Performing per As- feet in built unstable as state Intended 1. Present 23 23 N/A 2. Armor stable 23 23 N/A 3. Facet grade appears stable 23 23 N/A 4. Minimal evidence of embedding/fining 23 23 N/A 5. Length appropriate 23 23 N/A
% Performing in Stable Condition
Feature Performing Mean or Total
100% 100% 100% 100% 100%
100%
1. Present 2. Sufficently deep 3. Length appropriate
25 25 25
25 25 25
N/A N/A N/A
100% 100% 100%
100%
1. Upstream of meander bend centered 2. Downstream of meander bend centered
23 23
23 23
N/A N/A
100% 100%
100%
1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief
25 0 25 25
25 N/A 25 25
N/A N/A N/A N/A
100% 100% 100% 100%
100%
1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting
N/A
N/A
0/0
100%
N/A
N/A
0/0
100%
100%
1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures
9 9 9 9
9 9 9 9
N/A N/A N/A N/A
100% 100% 100% 100%
100%
1. Free of scour 2. Footing stable
34 34
34 34
N/A N/A
100% 100%
100%
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF1 Reach 1 - Buckhorn Creek - Sta 11+78.6
Year 2 Facing Downstream
Riffle Cross Section
104 102
Elevation (ft)
100 98
As-built Year 1 Year 2 Year 3 Year 4 Year 5
▼ BKF
96 94 92 90 -20
-10
0
10
20
30
40
50
60
70
Station (ft)
As-Built Date 1/8/09 Area 34.3 Bkf W 23.4 Dmean 1.5 Dmax 2.1 W/d 16.0
Year 1 Date 10/20/09 Area 35.4 Bkf W 23.3 Dmean 1.5 Dmax 2.1 W/d 15.3
Year 2 Date 10/11/10 Area 35.3 Bkf W 23.7 Dmean 1.5 Dmax 2.6 W/d 15.9
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF1 Reach 1 - Buckhorn Creek - Sta 11+78.6 Station BM HI -20 -10 -5 0 5 10 15.5 18.4 21.3 25.5 26.5 29 32.2 34.4 35.3 38.9 46 49.4 52.5 57 62
As-Built FS/BS Elev. 6.36 97.34 103.70 3.11 100.59 3.60 100.10 4.71 98.99 5.26 98.44 5.61 98.09 6.07 97.63 6.46 97.24 7.25 96.45 8.19 95.51 8.45 95.25 8.59 95.11 8.46 95.24 8.25 95.45 8.36 95.34 8.01 95.69 6.46 97.24 6.41 97.29 6.49 97.21 5.99 97.71 4.78 98.92 3.00 100.70
Desc. PL1 IR Lt GRND
GRND
BKF TOE EOW THL
EOW TOE BKF
GRND
Station BM HI 0 2 7 13 15.6 17.5 18.5 20 20.4 20.9 21.7 22.5 24 26 28 29.5 30.9 32 33.8 34.6 34.8 35.3 36 36.7 37.4 38.9 42 46 48 50 51.6 52.6
FS/BS 3.78 4.02 4.15 4.58 4.94 5.20 5.65 5.96 6.37 6.48 6.71 6.98 7.29 7.33 7.23 7.17 7.19 7.33 7.33 7.26 7.10 6.89 6.75 6.45 6.21 5.83 5.18 5.22 5.27 5.37 5.04 4.82 4.7
25
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Station BM HI
Year 1 Elev. 98.67 102.45 98.43 98.30 97.87 97.51 97.25 96.80 96.49 96.08 95.97 95.74 95.47 95.16 95.12 95.22 95.28 95.26 95.12 95.12 95.19 95.35 95.56 95.70 96.00 96.24 96.62 97.27 97.23 97.18 97.08 97.41 97.63 97.75
Desc. RF1 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BNK BNK EOW BED BED BED BED BED BED BED BED BED EOW BNK BNK BNK BKF RT GRND GRND GRND GRND GRND GRND GRND
Station BM HI 0 2.8 6.8 11.8 13.8 15.4 16.8 18.8 20.3 21.3 21.9 23.8 25.8 26.8 27.7 28.8 30.8 31.3 32.8 33.1 33.7 34.8 35.8 36.8 37.8 39.1 40.8 44.8 49.8 52.6
Year 2 FS/BS Elev. 4.81 98.73 103.54 5.01 98.53 5.26 98.28 5.62 97.92 5.86 97.68 6.06 97.48 6.09 97.45 6.36 97.18 6.83 96.71 7.06 96.48 7.65 95.89 7.80 95.74 7.77 95.77 7.92 95.62 8.20 95.34 8.29 95.25 8.56 94.98 8.50 95.04 8.71 94.83 8.52 95.02 8.32 95.22 8.05 95.49 7.86 95.68 7.33 96.21 6.85 96.69 6.50 97.04 6.14 97.40 6.15 97.39 6.10 97.44 5.95 97.59 5.65 97.89
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BNK BNK BNK BED BED BED BED EOW BED BED THL BED EOW BED BED BNK BNK BNK BKF GRND GRND GRND GRND
97.14
FS/BS 0.00
Year 4 Elev. 100.00 100.00
Desc. IR Lt
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL1 Reach 1 - Buckhorn Creek - Sta 12+28.7
Year 2 Facing Downstream
Pool Cross Section
100
98 Elevation (ft)
▼ BKF
As-built Year 1 Year 2 Year 3 Year 4 Year 5
96
94
92
90 -25
-15
-5
5
15
25
35
45
55
65
75
Station (ft)
As-Built Date 1/8/09 Area 52.7 Bkf W 23.2 Dmean 2.3 Dmax 4.0 W/d 10.2
Year 1 Date 10/20/09 Area 48.0 Bkf W 22.1 Dmean 2.2 Dmax 3.9 W/d 10.2
Year 2 Date 10/11/10 Area 46.8 Bkf W 23.4 Dmean 2.0 Dmax 4.2 W/d 11.7
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL1 Reach 1 - Buckhorn Creek - Sta 12+28.7 Station BM HI -25 -10 -3 0 4 10.5 14.1 18.4 19.9 20.5 20.8 23.1 24.7 27.6 29.2 30.6 31.2 31.5 33.7 37.3 42.3 44.9 48.7 52 55 58.4 62.6 67.5
As-Built FS/BS Elev. 6.36 97.34 103.70 3.35 100.35 4.12 99.58 4.91 98.79 5.51 98.19 6.37 97.33 6.85 96.85 6.71 96.99 8.35 95.35 8.45 95.25 8.80 94.90 9.83 93.87 10.54 93.16 10.73 92.97 10.59 93.11 10.49 93.21 9.75 93.95 8.84 94.86 8.40 95.30 7.97 95.73 6.95 96.75 7.41 96.29 6.92 96.78 6.59 97.11 6.76 96.94 7.16 96.54 5.95 97.75 4.57 99.13 3.17 100.53
Desc. PL1 IR Rt
GRND
BKF
EOW
EOW
BKF
Station BM HI 0 1.1 3.6 6.6 10.1 13.1 14.7 16.8 17.9 19.6 20.2 20.8 22.2 24.1 24.1 28.7 29.5 29.9 31.3 31.7 32.2 34.5 34.6 35.5 36.8 39.1 40.1 43.1 44.1 47.9 25
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Station BM HI
Year 1 FS/BS Elev. 3.78 98.67 102.45 4.17 98.28 4.41 98.04 5.12 97.33 5.40 97.05 5.54 96.91 5.49 96.96 5.62 96.83 6.46 95.99 6.89 95.56 7.14 95.31 7.43 95.02 8.44 94.01 8.96 93.49 9.51 92.94 9.55 92.9 9.01 93.44 8.92 93.53 8.53 93.92 8.26 94.19 7.43 95.02 6.87 95.58 6.75 95.7 6.28 96.17 6.04 96.41 5.77 96.68 5.76 96.69 5.88 96.57 6 96.45 5.71 96.74 5.64 96.81
Desc. RF1 IR Lt GRND GRND GRND GRND GRND GRND GRND GRND BKF LT BNK LOG EOW BED BED BED BED BED BED BED BED EOW BNK BNK BNK BKF RT GRND GRND GRND GRND GRND
Station BM HI 0 1.5 4.5 7.5 11.5 14.1 15.5 17.5 18.5 19.5 20.5 20.7 21 22 24 25.5 27.5 29.5 30 31 31.2 31.5 32.5 33.5 34.5 35.5 37.5 42.5 46.5 48.7
Year 2 FS/BS Elev. 5.91 98.55 104.46 6.15 98.31 6.44 98.02 7.10 97.36 7.31 97.15 7.49 96.97 7.37 97.09 7.89 96.57 8.38 96.08 8.61 95.85 8.70 95.76 9.28 95.18 9.59 94.87 10.44 94.02 10.96 93.50 11.61 92.85 11.70 92.76 11.06 93.40 11.01 93.45 11.50 92.96 10.35 94.11 9.62 94.84 8.99 95.47 8.45 96.01 8.24 96.22 8.05 96.41 7.82 96.64 7.55 96.91 7.96 96.50 7.55 96.91 7.28 97.18
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BNK BNK BNK BNK EOW BED BED BED BED BED BED BED BED EOW BNK BNK BNK BNK BKF GRND GRND GRND GRND
97.14
Year 4 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt
Desc. IR Lt
Elevation (ft)
87 1000
88
89
90
91
92
93
94
95
96
97
98
99
1050
1100
1150
1200
1250
1300
1350
1400
1450
1500
Station (ft)
1550
Profile
1600
1650
Guilford County, NC Profile Reach 1 - Buckhorn Creek
Holly Grove Stream Restoration Site
1750
1800
Year 1 Bed As-Built Bed Year 1 Bankfull Year 2 Water
1700
1850
1900
2000
Year 1 Water hw mark Year 2 Bed Year 2 BKF
1950
2050
2100
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 1 - Buckhorn Creek
HI 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 99.31 99.31 99.31 99.31 99.31 99.31 99.31 99.31 99.31 102.09 102.09 102.09 102.09 102.09 102.09 102.09
Station 1000 1009.5 1022 1026 1052 1092 1106 1118 1137.8 1158 1178.6 1218 1228.7 1241 1267 1304.5 1322 1336 1354 1406.2 1424 1444 1474 1484.5 1502 1525.5 1544 1552 1566 1580 1610.5 1624.5 1645 1670 1695 1710 1719 1738 1767 1787.5 1803 1837 1856 1869 1891 1909 1953 1967 1988 1997 2012 2034 2056 2072
Bed FS 6.67 6.85 9.51 10.11 7.27 7.68 8.45 8.26 7.74 8.17 8.11 8.37 10.20 9.71 8.50 8.40 11.13 9.01 9.12 9.29 8.55 7.50 7.33 8.29 7.22 6.98 9.74 9.00 7.71 7.59 7.63 9.46 8.75 7.67 8.07 9.68 9.48 8.27 7.55 7.72 9.49 7.70 8.93 7.88 10.33 8.42 8.23 13.55 11.20 13.50 12.41 11.67 11.37 11.54
Water Depth 0.06 0.09 2.50 3.09 0.23 0.24 1.00 0.80 0.20 0.55 0.35 0.26 2.06 1.56 0.28 0.07 2.38 0.22 0.25 0.04 1.68 0.63 0.46 1.43 0.36 0.08 2.50 1.75 0.46 0.32 0.28 2.10 1.21 0.28 0.15 1.74 1.53 0.33 0.30 0.17 1.94 0.11 1.32 0.15 2.37 0.47 0.21 2.45 0.04 2.39 1.31 0.56 0.23 0.22
Year 1 Bankfull FS
Description
4.60
5.22 alt bkf HOR
5.47 5.69
6.05 alt bkf HOR THL
6.04
6.43 alt bkf HOR
6.90
7.02 alt bkf HOR
4.59
THL
5.42
5.89 alt bkf HOR
6.04 5.44
THL HOR
6.03
HOR
9.28 9.01
THL HOR
Bed Elev. 96.28 96.10 93.44 92.84 95.68 95.27 94.50 94.69 95.21 94.78 94.84 94.58 92.75 93.24 94.45 94.55 91.82 93.94 93.83 93.66 91.49 92.54 92.71 91.75 92.82 93.06 90.30 91.04 92.33 92.45 92.41 90.58 91.29 92.37 91.97 90.36 90.56 91.77 91.76 91.59 89.82 91.61 90.38 91.43 88.98 90.89 91.08 88.54 90.89 88.59 89.68 90.42 90.72 90.55
Water Elev. 96.34 96.19 95.94 95.93 95.91 95.51 95.50 95.49 95.41 95.33 95.19 94.84 94.81 94.80 94.73 94.62 94.20 94.16 94.08 93.70 93.17 93.17 93.17 93.18 93.18 93.14 92.80 92.79 92.79 92.77 92.69 92.68 92.50 92.65 92.12 92.10 92.09 92.10 92.06 91.76 91.76 91.72 91.70 91.58 91.35 91.36 91.29 90.99 90.93 90.98 90.99 90.98 90.95 90.77
Bankfull Elev.
98.35
97.48 97.26
96.91
96.05
95.45
94.62
94.00 93.87
93.28
92.81 93.08
artificial 100
0.0 0.0
detritus/wood
weighted total count:
6.9 0.0
clay hardpan
93.1
bedrock
weighted particle count:
Pebble Count Weighted by Channel Feature Percent Riffle: 33.7 Percent Run: Percent Pool: 26.7 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 0.0 # very fine sand 0.062 0.13 3.0 # 0.13 0.25 5.0 # fine sand medium sand 0.25 0.5 0.0 # 0.5 1 1.0 # coarse sand 1 2 17.8 # very coarse sand 2 4 0.0 # very fine gravel 4 6 1.0 # fine gravel 6 8 1.0 # fine gravel 8 11 1.0 # medium gravel 11 16 0.0 # medium gravel 16 22 9.9 # coarse gravel 22 32 9.9 # coarse gravel very coarse gravel 32 45 10.9 # very coarse gravel 45 64 13.9 # small cobble 64 90 11.9 # medium cobble 90 128 4.0 # large cobble 128 180 1.0 # very large cobble 180 256 2.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder 0.1
silt/clay 0%
1.262
D16
10
28.6
D50
45
D65
sand 27%
gravel 48%
cobble 19%
percent by substrate type
17.55
D35
size percent less than (mm)
weighted percent
1
72
D84
pool
boulder 0%
riffle
100
bedrock 7%
110
D95
run
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 1 Note: Reach Data 1
particle size (mm)
0.01
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
based on sediment particles only based on total count
percent finer than
28.7 10.9
glide
0%
hardpan 0%
12.6
wood/det 0%
9.5
gradation geo mean
artificial 0%
7.5
std dev
particle size distribution
1000
0% 3% 25% 5% 0% 1% 19% 20% 0% 1% 1% 1% 15% 0% 11% 11% 10% 12% 15% 13% 4% 5% 1% 2% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range
artificial
bedrock clay hardpan detritus/wood total count:
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
106
9
97
3 2 3 6 12 6 8 4 1
6
Count 5 9 20 3 3 6 ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## percent finer than
based on sediment particles only based on total count
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1
10
0.25
0.132
4.7
D50
27
D65
sand 39%
silt/clay 5%
36%
gravel
12%
cobble
percent by substrate type
D35
0%
boulder
55
D84
particle size (mm)
size percent less than (mm) D16
0.1
1000
8%
bedrock
91
# of particles
0 10000
5
10
15
20
25
0%
hardpan
23.8
0%
wood/det
2.7
gradation geo mean
0%
artificial
20.5
std dev
particle size distribution
cumulative %
D95
100
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 1 Note: Riffle RF1
number of particles
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF2 Reach 2 - Buckhorn Creek - Sta 15+89.6
Year 2 Facing Downstream
Riffle Cross Section
648
Elevation (ft)
646 As-built Year 1 Year 2 Year 3 Year 4 Year 5
644
▼ BKF
642
640
638 -20
-10
0
10
20
30
40
50
60
70
Station (ft)
As-Built Date 1/8/09 Area 26.3 Bkf W 19.9 Dmean 1.3 Dmax 1.7 W/d 15.1
Year 1 Date 10/20/09 Area 25.4 Bkf W 20.4 Dmean 1.2 Dmax 1.7 W/d 16.4
Year 2 Date 10/12/10 Area 27.6 Bkf W 20.2 Dmean 1.4 Dmax 1.9 W/d 14.8
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF2 Reach 2 - Buckhorn Creek - Sta 15+89.6 Station BM HI -20 -10 -5 -2 0 2 4.5 7 9.6 10.6 11.3 12 14 16 19 21 24 26 27.3 27.8 29.5 30.4 31.2 34 37 41 43.6 48
As-Built FS/BS Elev. 6.90 644.39 651.29 5.33 645.96 5.45 645.84 5.66 645.63 6.27 645.02 7.04 644.25 7.85 643.44 8.95 642.34 9.38 641.91 9.46 641.83 9.90 641.39 10.00 641.29 11.18 640.11 11.06 640.23 11.08 640.21 11.20 640.09 11.12 640.17 10.75 640.54 10.71 640.58 10.83 640.46 10.27 641.02 9.50 641.79 9.28 642.01 8.23 643.06 7.73 643.56 6.70 644.59 6.04 645.25 4.96 646.33 2.38 648.91
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. RF2 IR Lt
GRND
BKF EOW
EOW
BKF
Station BM HI 0 4.5 6 8.5 9.6 10.7 11.3 12.3 13 15 17 19 21 23.1 25 27.5 28.4 30 31.2 33 35 37 41 43.7
FS/BS 6.55
Station BM HI
FS/BS 0.00
7.06 8.89 9.24 9.42 9.50 9.98 10.67 10.88 11.11 11.04 11.12 11.18 11.13 10.90 10.55 10.71 9.95 9.42 8.31 8.08 7.54 6.73 6.05 5.04
Year 1 Elev. 644.77 651.32 644.26 642.43 642.08 641.90 641.82 641.34 640.65 640.44 640.21 640.28 640.20 640.14 640.19 640.42 640.77 640.61 641.37 641.90 643.01 643.24 643.78 644.59 645.27 646.28
Desc. PL2 IR Lt GRND GRND GRND GRND BKF LT BNK BNK EOW BED BED BED BED BED EOW BED BED BANK BANK BKF RT GRND GRND GRND GRND GRND
Station BM HI 0 1.5 4.5 6 7.5 9.3 10.5 11.5 12.3 13.1 14 15.5 17.5 19.5 21.5 23.5 24 25.5 26.5 27.6 29.5 31 32.5 34.5 38.5 43.6
Year 2 FS/BS Elev. 6.50 644.77 651.27 7.00 644.27 7.63 643.64 8.81 642.46 9.23 642.04 9.34 641.93 9.30 641.97 9.73 641.54 10.38 640.89 10.68 640.59 10.82 640.45 11.18 640.09 11.15 640.12 11.15 640.12 11.09 640.18 10.99 640.28 10.84 640.43 10.25 641.02 10.45 640.82 10.52 640.75 10.50 640.77 9.55 641.72 8.31 642.96 8.10 643.17 7.60 643.67 6.44 644.83 5.00 646.27
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BNK BNK EOW BED BED BED BED BED EOW BED BED BED BED BNK BKF GRND GRND GRND GRND
GRND
Desc. IR Lt
Year 4 Elev. 100.00 100.00
Desc. IR Lt
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL2 Reach 2 - Buckhorn Creek - Sta 15+30.7
Year 2 Facing Downstream
Pool Cross Section
648
Elevation (ft)
646 As-built Year 1 Year 2 Year 3 Year 4 Year 5
644 ▼ BKF
642
640
638 -25
-15
-5
5
15
25
35
45
55
65
75
Station (ft)
As-Built Date 1/8/09 Area 45.6 Bkf W 23.3 Dmean 2.0 Dmax 2.8 W/d 11.9
Year 1 Date 10/20/09 Area 43.8 Bkf W 22.2 Dmean 2.0 Dmax 2.9 W/d 11.2
Year 2 Date 10/12/10 Area 49.1 Bkf W 22 Dmean 2.2 Dmax 3.1 W/d 9.9
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL2 Reach 2 - Buckhorn Creek - Sta 15+30.7 Station BM HI -20 -10 -3 0 5 7 8.8 10 11.7 14.2 15.5 18 20.5 23 26 29 31 32.3 35 38 39 40.8
As-Built FS/BS Elev. 6.90 644.39 651.29 5.09 646.20 5.13 646.16 5.30 645.99 6.68 644.61 8.65 642.64 8.60 642.69 8.91 642.38 8.75 642.54 8.95 642.34 10.22 641.07 10.80 640.49 11.25 640.04 11.70 639.59 11.73 639.56 11.65 639.64 11.58 639.71 10.90 640.39 10.22 641.07 8.15 643.14 5.98 645.31 5.27 646.02 3.10 648.19
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. RF2 IR Lt
GRND
BKF
BR BR
EOW
Desc. IR Lt
Station BM HI 0 4.2 5.7 8.7 10.7 11.9 12.7 14.2 15.2 16.7 18.7 21.7 24.7 27.7 29.3 30.9 32.2 34.1 36.7 39
Year 1 FS/BS Elev. 6.55 644.77 651.32 6.75 644.57 8.54 642.78 8.75 642.57 8.92 642.4 8.84 642.48 8.96 642.36 9.16 642.16 10.17 641.15 10.69 640.63 10.82 640.5 11.47 639.85 11.86 639.46 11.63 639.69 11.59 639.73 11.37 639.95 11.01 640.31 10.14 641.18 9.03 642.29 7.01 644.31 5.32 646
Station BM HI
Year 4 FS/BS Elev. 0.00 100.00 100.00
Desc. PL2 IT Lt GRND GRND GRND GRND GRND BKF LT BNK EOW BED BED BED BED BED BED BED BED EOW BNK BNK GRND
Desc. IR Lt
Station BM HI 0 1.8 3.8 5.3 7.3 9.8 10.8 11.8 12.8 13.8 14.8 15 15.7 16.8 18.8 20.8 22.8 24.8 26.8 28.8 29.8 30.8 31.3 32.3 33.8 34.8 36.8 39
Year 2 FS/BS Elev. 6.50 644.77 651.27 6.62 644.65 7.37 643.90 8.23 643.04 8.64 642.63 8.45 642.82 8.60 642.67 8.58 642.69 8.67 642.60 8.90 642.37 9.43 641.84 10.10 641.17 10.16 641.11 10.74 640.53 10.90 640.37 11.43 639.84 11.65 639.62 11.72 639.55 11.53 639.74 11.43 639.84 11.51 639.76 11.28 639.99 11.04 640.23 10.81 640.46 10.15 641.12 9.06 642.21 8.05 643.22 7.00 644.27 5.31 645.96
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND GRND GRND BKF BNK BNK BNK EOW BED BED BED BED BED BED BED BED BED BED BED EOW BNK BNK BNK GRND
Desc. IR Lt
Elevation (ft)
650 649 648 647 646 645 644 643 642 641 640 639 638 637 636 635 1000
1050
1100
1150
1200
1250
1300
1350
1400
1450
Station (ft)
1500
Profile
1550
Guilford County, NC Profile Reach 2 - Buckhorn Creek
1600
Holly Grove Stream Restoration Site
1700
Year 1 Bed As-Built Bed Year 2 Bed Year 2 BKF
1650
1750
1800
1900
1950
Year 1 Water Year 1 Bankfull Year 2 Water
1850
2000
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 2 - Buckhorn Creek
HI 653.56 653.56 653.56 653.56 653.56 653.56 653.56 653.56 653.56 653.56 653.56 653.56 653.56 653.56 653.56 651.03 651.03 651.03 651.03 651.03 651.03 651.03 651.03 651.03 651.03 651.03 647.52 647.52 647.52 647.52 647.52 647.52 647.52 647.52 647.52 647.52 647.52 647.52 647.52 647.52 647.52 647.52 648.41 648.41
Station 1000 1016 1027 1083.5 1144.5 1157.5 1183.5 1210 1237.5 1266.5 1282 1290 1320 1345 1359 1388 1430 1441 1456 1469 1498.2 1509 1530.7 1551 1589.6 1601 1641 1655 1670 1698 1712 1737 1776.5 1786 1815 1825 1837 1849 1868.5 1883 1912.5 1926 1950 1958.7
Bed FS 9.61 12.90 10.72 10.10 10.19 12.50 10.32 12.81 10.55 11.13 13.10 11.27 12.02 12.76 12.21 10.09 10.02 12.19 12.09 10.68 10.19 11.38 11.40 10.20 10.90 10.86 7.45 9.86 7.80 8.00 10.12 8.40 8.28 9.42 8.31 10.29 10.69 8.61 8.33 11.00 9.03 11.30 9.71 9.49
Water Depth 0.21 3.23 0.96 0.32 0.05 2.37 0.07 2.47 0.07 0.15 2.01 0.16 0.27 0.84 0.20 0.27 0.17 2.30 2.22 0.82 0.32 1.52 1.54 0.29 0.35 0.25 0.09 2.46 0.41 0.31 2.29 0.55 0.34 1.45 0.30 2.27 2.68 0.60 0.24 2.83 0.88 3.14 0.65 0.46
Year 1 Bankfull FS
Description
8.30
8.32
7.88
8.53 alt bkf THL
8.56
5.26
5.18
6.1 alt bkf HOR
Bed Elev. 643.95 640.66 642.84 643.46 643.37 641.06 643.24 640.75 643.01 642.43 640.46 642.29 641.54 640.80 641.35 640.94 641.01 638.84 638.94 640.35 640.84 639.65 639.63 640.83 640.13 640.17 640.07 637.66 639.72 639.52 637.40 639.12 639.24 638.10 639.21 637.23 636.83 638.91 639.19 636.52 638.49 636.22 638.70 638.92
Water Elev. 644.16 643.89 643.80 643.78 643.42 643.43 643.31 643.22 643.08 642.58 642.47 642.45 641.81 641.64 641.55 641.21 641.18 641.14 641.16 641.17 641.16 641.17 641.17 641.12 640.48 640.42 640.16 640.12 640.13 639.83 639.69 639.67 639.58 639.55 639.51 639.50 639.51 639.51 639.43 639.35 639.37 639.36 639.35 639.38
Bankfull Elev.
645.26
645.24
643.15
642.47
642.26
642.34
0.0 0.0
detritus/wood
artificial 100
0.0
weighted total count:
15.5
clay hardpan
84.5
bedrock
weighted particle count:
Pebble Count Weighted by Channel Feature Percent Riffle: 41.7 Percent Run: Percent Pool: 19.4 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 13.6 # very fine sand 0.062 0.13 1.0 # 0.13 0.25 0.0 # fine sand medium sand 0.25 0.5 1.9 # 0.5 1 1.0 # coarse sand 1 2 0.0 # very coarse sand 2 4 0.0 # very fine gravel 4 6 1.0 # fine gravel 6 8 1.0 # fine gravel 8 11 3.9 # medium gravel 11 16 3.9 # medium gravel 16 22 3.9 # coarse gravel 22 32 2.9 # coarse gravel very coarse gravel 32 45 6.8 # very coarse gravel 45 64 6.8 # small cobble 64 90 4.9 # medium cobble 90 128 13.6 # large cobble 128 180 14.6 # very large cobble 180 256 2.9 # small boulder 256 362 1.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder 0.1
silt/clay 14%
0.062
D16
10
48.5
D50
96
D65
sand 4%
gravel 30%
cobble 36%
percent by substrate type
19.44
D35
size percent less than (mm)
weighted percent
1
144
D84
pool
boulder 1%
riffle
100
bedrock 16%
179
D95
run
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 2 Note: Reach Data 2
particle size (mm)
0.01
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
based on sediment particles only based on total count
percent finer than
21.4 17.5
glide
0%
hardpan 0%
392.8
wood/det 0%
3.0
gradation geo mean
artificial 0%
48.1
std dev
particle size distribution
1000
16% 1% 20% 0% 2% 18% 1% 0% 16% 0% 1% 14% 1% 5% 12% 5% 10% 5% 3% 8% 8% 8% 6% 6% 16% 4% 17% 3% 2% 1% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range
artificial
bedrock clay hardpan detritus/wood total count:
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
102
14
Count 21 ## ## ## 1 ## 2 ## ## 1 ## 1 ## 1 ## 2 ## 5 ## 5 ## 5 ## 4 ## 8 ## 10 ## 11 ## 11 ## ## ## ## ## ## ## 88 percent finer than
based on sediment particles only based on total count
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1
10
12.59
0.062
32.0
D50
67
D65
sand 3%
silt/clay 21%
31%
gravel
31%
cobble
percent by substrate type
D35
0%
boulder
116
D84
particle size (mm)
size percent less than (mm) D16
0.1
1000
14%
bedrock
157
# of particles
0 10000
5
10
15
20
25
0%
hardpan
259.9
0%
wood/det
2.7
gradation geo mean
0%
artificial
43.3
std dev
particle size distribution
cumulative %
D95
100
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 2 Note: Riffle RF2
number of particles
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF3 Reach 3 - Buckhorn Creek - Sta 12+50.7
Year 2 Facing Downstream
Riffle Cross Section
642
Elevation (ft)
640 As-built Year 1 Year 2 Year 3 Year 4 Year 5
638 ▼ BKF
636
634
632 -20
-10
0
10
20
30
40
50
60
70
Station (ft)
As-Built Date 1/8/09 Area 48.3 Bkf W 25.4 Dmean 1.9 Dmax 2.6 W/d 13.4
Year 1 Date 10/20/09 Area 47.5 Bkf W 25.5 Dmean 1.9 Dmax 2.6 W/d 13.7
Year 2 Date 10/12/10 Area 47.7 Bkf W 27.5 Dmean 1.7 Dmax 2.8 W/d 15.9
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF3 Reach 3 - Buckhorn Creek - Sta 12+50.7 Station BM HI -20 -10 -1 0 0.8 2.3 5 8.3 10.6 12 13.5 14 15.5 15.8 16.9 17.9 20 22 23 25 27 30 32.1 32.6 33.2 34.1 36.2 37.4 41.5 45.1 46 47.8 49.5 50.4 51.2 54.7 61 68
As-Built FS/BS Elev. 5.88 638.55 644.43 4.71 639.72 5.33 639.10 5.61 638.82 6.12 638.31 6.53 637.90 7.08 637.35 8.14 636.29 7.86 636.57 7.85 636.58 8.14 636.29 8.70 635.73 9.23 635.20 9.87 634.56 10.22 634.21 10.35 634.08 10.47 633.96 10.48 633.95 10.64 633.79 10.78 633.65 10.70 633.73 10.68 633.75 10.48 633.95 10.43 634.00 10.33 634.10 9.78 634.65 9.49 634.94 8.35 636.08 8.07 636.36 8.21 636.22 7.89 636.54 7.49 636.94 6.43 638.00 5.56 638.87 5.17 639.26 4.85 639.58 3.67 640.76 3.18 641.25 2.85 641.58
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. RF3 IR Lt
GRND
BKF
EOW
EOW
BKF
GRND
Desc. IR Lt
Station BM HI 0 2 4 7 9 11 11.6 12.2 12.8 13.6 14.8 15.4 16 18 19.6 21 22 24 26 28 30 32 32.7 33.5 34.8 35.8 36.5 37.1 40 43.5 45.6 47 49 50.4
FS/BS 3.92
Station BM HI
FS/BS 0.00
4.27 5.04 5.93 6.19 5.95 6.03 6.14 6.29 6.60 6.85 7.69 7.86 8.27 8.50 8.49 8.60 8.65 8.81 8.66 8.51 8.48 8.27 8.27 7.61 7.16 6.56 6.37 6.17 6.17 6.1 5.77 4.97 3.87 3.22
Year 1 Elev. 638.55 642.47 638.20 637.43 636.54 636.28 636.52 636.44 636.33 636.18 635.87 635.62 634.78 634.61 634.20 633.97 633.98 633.87 633.82 633.66 633.81 633.96 633.99 634.20 634.20 634.86 635.31 635.91 636.10 636.30 636.30 636.37 636.70 637.50 638.60 639.25
Year 4 Elev. 100.00 100.00
Desc. RF3 IR Lt GRND GRND GRND GRND GRND BKF LT? BKF LT BKF LT BANK BANK BANK BANK EOW BED BED BED BED BED BED BED BED BED TOE BNK BNK BNK BNK BKF GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Station BM HI 0 2.9 3.9 5.9 7.9 10.4 12.9 13.5 14.9 16.4 17.9 19.9 20.4 21.4 22.9 23.9 24.9 26.9 27.9 29.7 30.7 32.7 33.9 34.9 35.9 36.9 37.9 39.9 44.9 45.9 50.4
Year 2 FS/BS Elev. 3.11 638.55 641.66 3.34 638.32 4.50 637.16 5.01 636.65 5.30 636.36 5.04 636.62 5.12 636.54 5.78 635.88 6.00 635.66 6.77 634.89 7.33 634.33 7.37 634.29 7.51 634.15 7.55 634.11 7.71 633.95 8.05 633.61 8.01 633.65 7.92 633.74 7.73 633.93 7.52 634.14 7.11 634.55 7.57 634.09 7.37 634.29 6.62 635.04 6.19 635.47 5.64 636.02 5.40 636.26 5.25 636.41 5.32 636.34 5.15 636.51 4.73 636.93 2.40 639.26
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND GRND GRND BKF BNK BED BED BED EOW BED BED BED BED BED BED BED BED BED BNK BNK BKF GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL3 Reach 3 - Buckhorn Creek - Sta 13+33.1
Year 2 Facing Downstream
Pool Cross Section
640
Elevation (ft)
638 As-built Year 1 Year 2 Year 3 Year 4 Year 5
▼ BKF
636
634
632
630 -25
-15
-5
5
15
25
35
45
55
65
75
Station (ft)
As-Built Date 1/8/09 Area 62.7 Bkf W 22.2 Dmean 2.8 Dmax 4.6 W/d 7.9
Year 1 Date 10/20/09 Area 62.8 Bkf W 22.5 Dmean 2.8 Dmax 4.7 W/d 8.1
Year 2 Date 10/12/10 Area 66.2 Bkf W 22.8 Dmean 2.9 Dmax 4.9 W/d 7.9
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL3 Reach 3 - Buckhorn Creek - Sta 13+33.1 Station BM HI -20 -14.5 -12 -2.5 0 3.6 7 12 15 16 18.2 18.7 18.8 20.3 21 23 25 27 29 30.6 31 32 34.2 38.2 42 45.7 49 56 66
As-Built FS/BS Elev. 5.88 638.55 644.43 4.23 640.20 4.60 639.83 5.23 639.20 5.62 638.81 6.61 637.82 8.09 636.34 8.39 636.04 8.61 635.82 10.03 634.40 10.56 633.87 10.49 633.94 11.09 633.34 11.83 632.60 12.60 631.83 13.20 631.23 13.10 631.33 12.87 631.56 12.68 631.75 12.20 632.23 11.89 632.54 11.09 633.34 10.14 634.29 9.23 635.20 8.64 635.79 7.65 636.78 6.39 638.04 5.49 638.94 5.14 639.29 4.82 639.61
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. RF3 IR Lt
BKF
LOG EOW
EOW BKF
GRND
Desc. IR Lt
Station BM HI 0 2 3.5 6 7.5 10 12 13.5 16 17.7 18.3 18.8 19 21 23 25 27 29 31 31.3 31.8 33.2 34.5 36 38 40 43 44.3 45.7
Year 1 FS/BS Elev. 3.92 638.55 642.47 4.62 637.85 5.48 636.99 6.06 636.41 6.42 636.05 6.68 635.79 6.57 635.9 6.70 635.77 7.55 634.92 8.35 634.12 8.66 633.81 8.54 633.93 9.17 633.3 10.03 632.44 11.06 631.41 11.38 631.09 11.06 631.41 10.84 631.63 10.44 632.03 9.38 633.09 9.14 633.33 8.44 634.03 7.61 634.86 7.22 635.25 7.10 635.37 6.76 635.71 6.19 636.28 5.42 637.05 5.13 637.34 4.42 638.05
Station BM HI
Year 4 FS/BS Elev. 0.00 100.00 100.00
Desc. PL2 IT Lt GRND GRND GRND GRND GRND GRND BKF LT BNK BNK BNK LOG EOW BED BED BED BED BED BED BED EOW BNK BNK BKF RT GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Station BM HI 0 2.4 4.4 6.4 7.4 9.4 11.6 13.4 14.4 15.4 16.4 18.1 18.6 18.7 19.9 21.4 23.4 25.4 27.4 29.4 31.1 31.5 32 33.4 34.4 36.4 39.4 42.4 45.6
Year 2 FS/BS Elev. 3.11 638.55 641.66 3.82 637.84 4.86 636.80 5.49 636.17 5.55 636.11 5.83 635.83 5.75 635.91 5.78 635.88 6.64 635.02 7.05 634.61 7.34 634.32 7.78 633.88 7.74 633.92 8.29 633.37 8.90 632.76 9.34 632.32 10.09 631.57 10.47 631.19 10.64 631.02 10.31 631.35 9.70 631.96 8.61 633.05 8.25 633.41 7.39 634.27 6.48 635.18 6.32 635.34 6.08 635.58 5.42 636.24 4.70 636.96 3.52 638.14
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND GRND BKF BNK BNK BNK BED LOG EOW BED BED BED BED BED BED BED BED EOW BNK BNK BKF GRND GRND GRND GRND
Desc. IR Lt
Elevation (ft)
640 639 638 637 636 635 634 633 632 631 630 629 628 627 626 625 1000
1050
1100
1150
1200
1250
1300
1350
1400
1450
1500
Station (ft)
1550
Profile
1600
1650
Guilford County, NC Profile Reach 3 - Buckhorn Creek
1850
1900
Year 2 BKF
Year 2 Bed
1800
Year 1 BKF
1750
Year 1 Water
1700
Year 1 Bed
Holly Grove Stream Restoration Site
1950
2050
Year 2 Water
As-Built Bed
2000
2100
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 3 - Buckhorn Creek
HI 644.20 644.20 644.20 644.20 644.20 644.20 644.20 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 639.13 639.13 639.13 639.13 639.13 639.13 639.13 639.13 639.13 639.13 639.13 639.13 637.23 637.23 637.23 637.23 637.23 637.23
Station 1000 1031 1074 1091 1112 1167.8 1178 1202 1212 1224 1239 1250.7 1271.4 1287 1304 1322 1333.1 1360 1388 1402 1427 1438 1453 1470 1490 1503.5 1519 1538.5 1555 1572 1584 1601 1629 1664 1713 1749 1765 1782 1792 1818 1844 1890 1904 1923 1951 1975.5 1985 2016 2036.7
Bed FS 9.76 9.80 9.79 11.46 10.29 10.58 12.80 6.91 9.98 8.85 7.12 7.21 7.13 9.06 7.36 7.70 9.71 8.25 8.50 7.93 8.30 10.39 10.16 8.54 8.27 8.27 11.40 8.26 10.40 8.74 8.73 10.84 10.55 7.38 7.39 7.61 9.59 7.91 10.04 8.03 8.49 8.80 11.50 7.87 7.18 7.16 8.26 7.61 7.40
Water Depth 0.56 0.43 0.36 1.73 0.52 0.65 2.86 0.26 3.31 2.19 0.46 0.51 0.24 2.16 0.39 0.34 2.25 0.74 0.95 0.39 0.49 2.56 2.35 0.72 0.38 0.19 3.28 0.14 2.07 0.39 0.28 4.15 3.85 0.63 0.32 0.16 2.07 0.28 2.34 0.29 0.32 0.12 2.79 1.02 0.35 0.15 1.25 0.58 0.31
Year 1 Bankfull FS Description 6.46 6.5 alt bkf HOR
7.09
7.72 alt bkf HOR
4.25
4.82 alt bkf HOR
4.89
5.11 alt bkf HOR
4.86
5.58 alt bkf HOR
5.60 6.12
4.69
5.42
5.72 alt bkf HOR
4.70
5.44 alt bkf HOR
Bed Elev. 634.44 634.40 634.41 632.74 633.91 633.62 631.40 633.98 630.91 632.04 633.77 633.68 633.76 631.83 633.53 633.19 631.18 632.64 632.39 632.96 632.59 630.50 630.73 632.35 632.62 632.62 629.49 632.63 630.49 632.15 632.16 628.29 628.58 631.75 631.74 631.52 629.54 631.22 629.09 631.10 630.64 630.33 627.63 629.36 630.05 630.07 628.97 629.62 629.83
Water Elev. 635.00 634.83 634.77 634.47 634.43 634.27 634.26 634.24 634.22 634.23 634.23 634.19 634.00 633.99 633.92 633.53 633.43 633.38 633.34 633.35 633.08 633.06 633.08 633.07 633.00 632.81 632.77 632.77 632.56 632.54 632.44 632.44 632.43 632.38 632.06 631.68 631.61 631.50 631.43 631.39 630.96 630.45 630.42 630.38 630.40 630.22 630.22 630.20 630.14
Bankfull Elev. 637.74
637.11
636.64
636.00
636.03
635.29 634.77
634.44
633.71
632.53
0.0 0.0
detritus/wood
artificial 100
0.0
weighted total count:
12.0
clay hardpan
88.0
bedrock
weighted particle count:
Pebble Count Weighted by Channel Feature Percent Riffle: 33 Percent Run: Percent Pool: 32 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 19.0 # very fine sand 0.062 0.13 1.0 # 0.13 0.25 0.0 # fine sand medium sand 0.25 0.5 0.0 # 0.5 1 0.0 # coarse sand 1 2 4.0 # very coarse sand 2 4 0.0 # very fine gravel 4 6 2.0 # fine gravel 6 8 1.0 # fine gravel 8 11 3.0 # medium gravel 11 16 4.0 # medium gravel 16 22 6.0 # coarse gravel 22 32 4.0 # coarse gravel very coarse gravel 32 45 6.0 # very coarse gravel 45 64 10.0 # small cobble 64 90 12.0 # medium cobble 90 128 6.0 # large cobble 128 180 6.0 # very large cobble 180 256 4.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder 0.1
silt/clay 19%
0.062
D16
10
32.0
D50
58
D65
sand 5%
gravel 36%
cobble 28%
percent by substrate type
11.86
D35
size percent less than (mm)
weighted percent
1
101
D84
pool
boulder 0%
riffle
100
bedrock 12%
176
D95
run
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 3 Note: Reach Data 3
particle size (mm)
0.01
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
based on sediment particles only based on total count
percent finer than
22 13
glide
0%
hardpan 0%
259.6
wood/det 0%
2.5
gradation geo mean
artificial 0%
40.3
std dev
particle size distribution
1000
22% 1% 25% 0% 0% 0% 5% 20% 0% 2% 1% 3% 15% 5% 7% 5% 10% 7% 11% 14% 7% 5% 7% 5% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range
artificial
bedrock clay hardpan detritus/wood total count:
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
100
9
Count 24 ## 1 ## 1 ## ## ## 8 ## ## 1 ## ## 6 ## 5 ## 4 ## 5 ## 7 ## 4 ## 4 ## 12 ## 3 ## 5 ## 1 ## ## ## ## ## 91 percent finer than
based on sediment particles only based on total count
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1
10
1.66
0.062
15.4
D50
39
D65
sand 10%
silt/clay 24%
32%
gravel
24%
cobble
percent by substrate type
D35
1%
boulder
109
D84
particle size (mm)
size percent less than (mm) D16
0.1
1000
9%
bedrock
199
D95
# of particles
0 10000
5
10
15
20
25
30
0%
hardpan
127.8
0%
wood/det
2.6
gradation geo mean
0%
artificial
41.9
std dev
particle size distribution
cumulative %
100
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 3 Note: Riffle RF3
number of particles
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF4 Reach 4 - Middle Branch - Sta 10+89.9
Year 2 Facing Downstream
Riffle Cross Section
675
Elevation (ft)
674 As-built Year 1 Year 2 Year 3 Year 4 Year 5
673 ▼ BKF
672
671
670 -15
-10
-5
0
5
10
15
20
25
30
35
Station (ft)
As-Built Date 1/8/09 Area 3.7 Bkf W 6.2 Dmean 0.6 Dmax 1.0 W/d 10.4
Year 1 Date 10/20/09 Area 3.5 Bkf W 6.4 Dmean 0.5 Dmax 1.0 W/d 11.8
Year 2 Date 10/11/10 Area 3.8 Bkf W 6.9 Dmean 0.5 Dmax 1.0 W/d 12.6
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF4 Reach 4 - Middle Branch - Sta 10+89.9 Station BM HI -15 -6 0 3.6 7.1 8.1 8.8 9.4 9.9 10.5 11.2 11.9 12.4 12.8 13.5 14.3 16 19 21 22.4 24.5 29 34
As-Built FS/BS Elev. 3.96 674.94 678.90 5.26 673.64 6.00 672.90 6.21 672.69 6.10 672.80 6.24 672.66 6.54 672.36 6.89 672.01 7.03 671.87 7.50 671.40 7.53 671.37 7.44 671.46 7.50 671.40 7.42 671.48 7.04 671.86 6.72 672.18 6.54 672.36 6.56 672.34 6.52 672.38 6.50 672.40 6.20 672.70 6.00 672.90 5.27 673.63 4.44 674.46
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. BP4 IR Lt
bkf
bkf
Desc. IR Lt
Station BM HI 0 2.7 4.7 6.7 7.7 7.9 8.3 9.3 9.6 10.2 10.8 11.4 12.3 12.5 12.9 13.3 13.7 14.3 16.7 17.7 19.7 21.3 21.8 22.3
FS/BS 4.31
Station BM HI
FS/BS 0.00
6.40 6.29 6.29 6.45 6.65 6.74 6.99 7.21 7.66 7.71 7.67 7.63 7.60 7.24 7.01 6.88 6.73 6.68 6.73 6.80 6.63 6.66 6.43 6.36
Year 1 Elev. 674.77 679.08 672.68 672.79 672.79 672.63 672.43 672.34 672.09 671.87 671.42 671.37 671.41 671.45 671.48 671.84 672.07 672.20 672.35 672.40 672.35 672.28 672.45 672.42 672.65 672.72
Year 4 Elev. 100.00 100.00
Desc. BP4 IR Rt GRND GRND GRND GRND GRND BKF LT BNK BNK BED BED BED BED BED BNK BKF GRND GRND GRND GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Station BM HI 2 4 6 7.1 7.6 8.3 9.4 10.2 10.7 11.5 12 12.4 13.1 14 15.6 17 19.5 21 22.5
Year 2 FS/BS Elev. 4.75 674.77 679.52 6.77 672.75 6.76 672.76 6.79 672.73 6.86 672.66 7.03 672.49 7.40 672.12 7.86 671.66 8.12 671.40 8.14 671.38 8.09 671.43 8.12 671.40 7.58 671.94 7.23 672.29 7.09 672.43 7.09 672.43 7.06 672.46 7.01 672.51 7.03 672.49 6.77 672.75
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Rt GRND GRND GRND BKF BNK BNK BNK BED BED BED BED BNK BNK BKF GRND GRND GRND GRND GRND
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL4 Reach 4 - Middle Branch - Sta 11+14.3
Year 2 Facing Downstream
Pool Cross Section
674 673 ▼ BKF
Elevation (ft)
672
As-built Year 1 Year 2 Year 3 Year 4 Year 5
671 670 669 668 -15
-10
-5
0
5
10
15
20
25
30
35
Station (ft)
As-Built Date 1/8/09 Area 20.5 Bkf W 18.9 Dmean 1.1 Dmax 3.0 W/d 17.4
Year 1 Date 10/20/09 Area 17.0 Bkf W 17 Dmean 1.0 Dmax 2.5 W/d 17.0
Year 2 Date 10/11/10 Area 18.2 Bkf W 17.7 Dmean 1.0 Dmax 2.8 W/d 17.2
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL4 Reach 4 - Middle Branch - Sta 11+14.3 Station BM HI -20 -10 -3 0 4 6 8 9.2 9.8 9.9 11.4 12.4 13.4 14 15.1 15.3 16.5 18 20.5 22.2 22.9 25.5 27.3 31 36
As-Built FS/BS Elev. 3.20 674.94 678.14 5.17 672.97 5.55 672.59 5.95 672.19 5.94 672.20 5.84 672.30 6.08 672.06 6.58 671.56 6.51 671.63 7.24 670.90 8.87 669.27 8.60 669.54 8.50 669.64 8.37 669.77 8.12 670.02 7.25 670.89 7.02 671.12 6.62 671.52 6.45 671.69 6.38 671.76 5.95 672.19 5.84 672.30 5.73 672.41 5.80 672.34 4.68 673.46 4.70 673.44
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. BP4 IR Lt
EOW
EOW
Desc. IR Lt
Station BM HI 0 2 4 5.3 6.8 8 9 9.9 10 10.5 11.3 11.9 12.5 13 13.6 14 14.8 15.4 16 18 21.4 22.3 22.9
Year 1 FS/BS Elev. 4.31 674.77 679.08 6.92 672.16 6.95 672.13 6.90 672.18 6.91 672.17 7.23 671.85 7.51 671.57 7.49 671.59 7.80 671.28 8.84 670.24 8.66 670.42 9.44 669.64 9.40 669.68 9.44 669.64 9.41 669.67 9.21 669.87 8.94 670.14 8.44 670.64 7.81 671.27 7.64 671.44 7.42 671.66 7.32 671.76 6.92 672.16 6.85 672.23
Station BM HI
Year 4 FS/BS Elev. 0.00 100.00 100.00
Desc. BP4 IR Rt GRND GRND GRND GRND GRND GRND LOG LOG BED BLDR BED BED BED BED BED BED BED BNK BKF RT GRND GRND GRND GRND
Desc. IR Lt
Station BM HI 0 0.6 2.2 3.6 5 5.1 6.1 6.9 8.2 9.1 9.7 9.8 10.6 11.6 12.2 12.8 13.6 14.35 14.8 16.1 17.6 18.6 20 21.6 22.8
Year 2 FS/BS Elev. 4.75 674.77 679.52 7.32 672.20 7.31 672.21 7.30 672.22 7.21 672.31 7.32 672.20 7.32 672.20 7.51 672.01 7.78 671.74 8.06 671.46 7.92 671.60 8.21 671.31 9.26 670.26 9.79 669.73 10.05 669.47 10.07 669.45 10.02 669.50 9.80 669.72 9.18 670.34 8.72 670.80 7.90 671.62 7.79 671.73 7.73 671.79 7.76 671.76 7.55 671.97 7.30 672.22
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BNK BNK LOG LOG EOW BED BED THL BED BED EOW BNK BNK BKF GRND GRND GRND GRND
Desc. IR Lt
Elevation (ft)
665 1000
666
667
668
669
670
671
672
673
674
675
1025
1050
1075
1100
Station (ft)
1125
Profile
Guilford County, NC Profile Reach 4 - Middle Branch
1150
Holly Grove Stream Restoration Site
Year 1 Bed As-Built Bed Year 2 Bed Year 2 Water
1175
1200
Year 1 Water Year 1 Bankfull Year 2 BKF
1225
1250
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 4 - Middle Branch
HI 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97
Station 1000 1014.5 1026 1034 1039 1047 1055 1065 1075 1082 1085 1089.9 1097 1106 1112 1114.3 1123 1131 1141 1154.7 1159.1 1164 1170 1176 1181 1189 1195 1203 1210 1218.3 1228 1236.8
Bed FS 6.62 7.34 8.42 7.98 7.66 8.64 7.97 8.30 8.85 8.45 8.85 8.67 9.20 8.78 10.07 10.52 9.13 10.21 9.50 10.29 9.81 11.25 10.34 11.52 11.22 10.63 11.67 11.39 10.83 10.86 12.25 11.11
Water Depth
Year 1 Bankfull FS Description 5.43 5.57 alt bkf HOR
0.48
0.71 7.20
7.37 alt bkf HOR
8.62
8.79 alt bkf HOR
0.41 0.24 0.12 0.63 1.10 0.74 0.44 0.77 0.71 0.39 0.74 0.46 10.25
0.01
Bed Elev. 673.35 672.63 671.55 671.99 672.31 671.33 672.00 671.67 671.12 671.52 671.12 671.30 670.77 671.19 669.90 669.45 670.84 669.76 670.47 669.68 670.16 668.72 669.63 668.45 668.75 669.34 668.30 668.58 669.14 669.11 667.72 668.86
Water Elev. 672.03 672.03 672.03 672.04 672.04 672.04 671.53 671.53 671.53 671.36 671.36 670.89 670.89 670.53 670.53 670.55 670.50 670.50 670.12 670.12 669.49 669.49 669.16 669.16 669.14 669.04 669.04 669.04 668.87 668.87 668.87 668.87
Bankfull Elev. 674.54
672.77
671.35
669.72
artificial 100
0.0 0.0
detritus/wood
weighted total count:
1.0 0.0
clay hardpan
99.0
bedrock
weighted particle count:
Pebble Count Weighted by Channel Feature Percent Riffle: 40 Percent Run: Percent Pool: 23 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 31.5 # very fine sand 0.062 0.13 0.0 # 0.13 0.25 0.0 # fine sand medium sand 0.25 0.5 0.0 # 0.5 1 0.0 # coarse sand 1 2 2.0 # very coarse sand 2 4 2.0 # very fine gravel 4 6 3.0 # fine gravel 6 8 3.9 # fine gravel 8 11 6.9 # medium gravel 11 16 8.9 # medium gravel 16 22 6.0 # coarse gravel 22 32 5.0 # coarse gravel very coarse gravel 32 45 7.0 # very coarse gravel 45 64 9.0 # small cobble 64 90 7.0 # medium cobble 90 128 6.0 # large cobble 128 180 1.0 # very large cobble 180 256 0.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder 0.1
silt/clay 31%
0.062
D16
10
11.1
D50
22
D65
sand 2%
gravel 52%
cobble 14%
percent by substrate type
3.04
D35
size percent less than (mm)
weighted percent
1
59
D84
pool
boulder 0%
riffle
100
bedrock 1%
101
D95
run
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 4 Note: Reach Data 4
particle size (mm)
0.01
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
based on sediment particles only based on total count
percent finer than
26 11
glide
0%
hardpan 0%
92.4
wood/det 0%
1.9
gradation geo mean
artificial 0%
31.0
std dev
particle size distribution
1000
32% 0% 35% 0% 0% 0% 30% 2% 2% 3% 25% 4% 7% 20% 9% 6% 5% 15% 7% 9% 10% 7% 6% 1% 5% 0% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range
artificial
bedrock clay hardpan detritus/wood total count:
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
101
Count 30 ## 20 ## ## ## ## ## 4 ## 3 ## 4 ## 6 ## 7 ## 4 ## 3 ## 2 ## 4 ## 7 ## 5 ## 2 ## ## ## ## ## ## ## 101 percent finer than
based on sediment particles only based on total count
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1
10
0.07
0.062
2.2
D50
10
D65
sand 20%
silt/clay 30%
37%
gravel
14%
cobble
percent by substrate type
D35
0%
boulder
53
D84
particle size (mm)
size percent less than (mm) D16
0.1
1000
0%
bedrock
103
# of particles
0 10000
5
10
15
20
25
30
35
0%
hardpan
29.7
0%
wood/det
1.8
gradation geo mean
0%
artificial
29.2
std dev
particle size distribution
cumulative %
D95
100
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 4 Note: Riffle RF4
number of particles
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF5 Reach 5 - Middle Branch - Sta 11+68.1
Year 2 Facing Downstream
Riffle Cross Section
665 664 As-built Year 1 Year 2 Year 3 Year 4 Year 5
Elevation (ft)
663 ▼ BKF
662 661 660 659 -15
-10
-5
0
5
10
15
20
25
30
35
Station (ft)
As-Built Date 1/8/09 Area 6.0 Bkf W 8.9 Dmean 0.7 Dmax 1.2 W/d 13.2
Year 1 Date 10/20/09 Area 5.9 Bkf W 8.2 Dmean 0.7 Dmax 1.2 W/d 11.5
Year 2 Date 10/11/10 Area 5.6 Bkf W 7.9 Dmean 0.7 Dmax 1.2 W/d 11.1
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF5 Reach 5 - Middle Branch - Sta 11+68.1 Station BM HI -18 -9 -5 -1 0 2 6 9 10.3 11 11.7 12 12.5 13.4 14.3 15.3 16 16.6 17.5 17.9 19.5 22 24 28 32.1 37 42 52
As-Built FS/BS Elev. 2.82 665.59 668.41 5.60 662.81 5.80 662.61 6.05 662.36 6.15 662.26 6.15 662.26 6.63 661.78 6.55 661.86 6.42 661.99 6.50 661.91 6.68 661.73 6.90 661.51 7.29 661.12 7.59 660.82 7.49 660.92 7.56 660.85 7.50 660.91 7.39 661.02 7.14 661.27 6.47 661.94 6.40 662.01 6.18 662.23 6.02 662.39 5.98 662.43 5.57 662.84 5.45 662.96 5.24 663.17 5.42 662.99 5.3 663.11
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. BP5 IR Lt
Desc. IR Lt
Station BM HI 0 2.7 5.7 8.7 9.3 9.9 10.6 11.7 12.4 13.2 13.9 14.9 16.2 16.5 17.2 17.7 18.1 19 20.7 23.7 27.7 32.2
FS/BS 3.98
Station BM HI
FS/BS 0.00
7.22 7.75 7.64 7.52 7.55 7.51 7.67 8.14 8.59 8.64 8.58 8.67 8.48 8.19 7.71 7.54 7.48 7.35 7.11 7.14 6.76 6.53
Year 1 Elev. 665.59 669.57 662.35 661.82 661.93 662.05 662.02 662.06 661.90 661.43 660.98 660.93 660.99 660.90 661.09 661.38 661.86 662.03 662.09 662.22 662.46 662.43 662.81 663.04
Year 4 Elev. 100.00 100.00
Desc. BP5 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BED BED BED BED BED BANK BANK BANK BKF RT GRND GRND GRND GRND GRND
Desc. IR Lt
Station BM HI 0 2.6 4.6 9.8 10.5 11.6 12.5 12.9 14 15.1 15.7 16.6 17.7 18.6 20.6 24.6 28.6 32.2
Year 2 FS/BS Elev. 5.57 662.74 668.31 5.98 662.33 6.49 661.82 6.42 661.89 6.32 661.99 6.38 661.93 6.64 661.67 7.27 661.04 7.43 660.88 7.43 660.88 7.50 660.81 7.34 660.97 6.92 661.39 6.29 662.02 6.16 662.15 5.91 662.40 5.76 662.55 5.33 662.98 5.28 663.03
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND BKF BNK BED BED BED BED TOE BNK BNK BKF GRND GRND GRND GRND
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL5 Reach 5 - Middle Branch - Sta 10+63.1
Year 2 Facing Downstream
Pool Cross Section
666 665 As-built Year 1 Year 2 Year 3 Year 4 Year 5
Elevation (ft)
664 ▼ BKF
663 662 661 660 -15
-10
-5
0
5
10
15
20
25
30
35
Station (ft)
As-Built Date 1/8/09 Area 8.4 Bkf W 7.9 Dmean 1.1 Dmax 1.7 W/d 7.4
Year 1 Date 10/20/09 Area 9.7 Bkf W 8.6 Dmean 1.1 Dmax 2.0 W/d 7.6
Year 2 Date 10/11/10 Area 10.1 Bkf W 8.4 Dmean 1.2 Dmax 1.9 W/d 7.0
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL5 Reach 5 - Middle Branch - Sta 10+63.1 Station BM HI -20 -10 -7 0 5 9 11 12.4 13.6 15 16 17 18 19 19.7 19.9 20.3 21.4 22.8 24 27 28.4 31 36
Station BM HI
As-Built FS/BS Elev. 2.82 665.59 668.41 4.65 663.76 4.35 664.06 4.12 664.29 4.52 663.89 4.89 663.52 5.09 663.32 5.25 663.16 5.41 663.00 6.01 662.40 6.52 661.89 6.93 661.48 7.15 661.26 7.05 661.36 6.62 661.79 6.27 662.14 5.51 662.90 5.33 663.08 5.26 663.15 5.30 663.11 5.02 663.39 4.61 663.80 4.25 664.16 3.90 664.51 3.42 664.99 668.41
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. BP5 IR Lt
Desc. IR Lt
Station BM HI 0 3 7 10 12 12.4 13.1 14 14.6 15 15.9 16.6 17.3 18.1 18.8 19.7 20 20.3 21 22.5 23 24 26 28.5
Year 1 FS/BS Elev. 3.98 665.59 669.57 5.57 664 5.81 663.76 6.16 663.41 6.29 663.28 6.55 663.02 6.55 663.02 6.80 662.77 7.32 662.25 7.60 661.97 7.85 661.72 8.22 661.35 8.49 661.08 8.54 661.03 8.45 661.12 8.19 661.38 7.54 662.03 6.72 662.85 6.51 663.06 6.52 663.05 6.51 663.06 6.45 663.12 6.13 663.44 5.98 663.59 5.53 664.04
Station BM HI
Year 4 FS/BS Elev. 0.00 100.00 100.00
Desc. BP5 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BNK BED BED BED BED BED BED BNK LOG LOG BNK GRND GRND GRND GRND GRND
Desc. IR Lt
Station BM HI 0 3 5 8 10 12 12.4 13 13.6 14.2 14.8 15.5 16 16.4 17.2 18 18.5 19.7 20 20.8 22.6 23.9 26 28.4
Year 2 FS/BS Elev. 3.55 665.59 669.14 5.22 663.92 5.40 663.74 5.60 663.54 5.80 663.34 5.87 663.27 6.12 663.02 6.14 663.00 6.32 662.82 6.81 662.33 7.60 661.54 7.54 661.60 7.86 661.28 7.96 661.18 8.05 661.09 8.08 661.06 7.90 661.24 7.66 661.48 7.20 661.94 6.21 662.93 6.15 662.99 6.00 663.14 5.72 663.42 5.56 663.58 5.10 664.04
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND GRND BKF BNK BNK BNK BNK TOE BED BED BED BED BED BED BNK BNK BNK TOB GRND GRND
Desc. IR Lt
Elevation (ft)
655 1000
656
657
658
659
660
661
662
663
664
665
1025
1050
1075
1100
Station (ft)
1125
Profile
Guilford County, NC Profile Reach 5 - Middle Branch
1150
Holly Grove Stream Restoration Site
Year 1 Bankfull Year 2 BKF
As-Built Bed Year 2 Bed
1225
Year 1 Water
1200
Year 1 Bed
1175
1250
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 5 - Middle Branch
HI 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47
Station 1000 1008 1014 1018.5 1026 1031 1035.5 1042 1051 1055.5 1061.5 1063.1 1069.3 1075 1085 1091 1102 1112 1121 1124 1132.5 1136 1144.5 1155 1159 1168.1 1175 1181
Bed FS 5.53 5.72 5.80 7.68 7.28 6.25 7.05 6.72 6.88 6.78 8.30 8.36 6.88 8.51 7.55 7.35 7.70 8.08 8.08 8.36 7.86 9.80 9.81 8.22 8.54 8.68 8.65 8.68
Water Depth 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Year 1 Bankfull FS Description 4.30 4.62 alt bkf THL
5.58
5.9 alt bkf HOR
6.03
6.51 alt bkf HOR
7.09
7.35 alt bkf HOR
Bed Elev. 663.94 663.75 663.67 661.79 662.19 663.22 662.42 662.75 662.59 662.69 661.17 661.11 662.59 660.96 661.92 662.12 661.77 661.39 661.39 661.11 661.61 659.67 659.66 661.25 660.93 660.79 660.82 660.79
Water Elev. 663.95 663.76 663.68 661.80 662.20 663.23 662.43 662.76 662.60 662.70 661.18 661.12 662.60 660.97 661.93 662.13 661.78 661.40 661.40 661.12 661.62 659.68 659.67 661.26 660.94 660.80 660.83 660.80
Bankfull Elev. 665.17
663.89
663.44
662.38
artificial 100
0.0 0.0
detritus/wood
weighted total count:
4.9 0.0
clay hardpan
95.1
bedrock
weighted particle count:
Pebble Count Weighted by Channel Feature Percent Riffle: 52 Percent Run: Percent Pool: 22.5 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 16.7 # very fine sand 0.062 0.13 0.0 # 0.13 0.25 2.0 # fine sand medium sand 0.25 0.5 4.9 # 0.5 1 5.9 # coarse sand 1 2 5.9 # very coarse sand 2 4 2.0 # very fine gravel 4 6 3.9 # fine gravel 6 8 3.9 # fine gravel 8 11 9.8 # medium gravel 11 16 4.9 # medium gravel 16 22 7.8 # coarse gravel 22 32 2.9 # coarse gravel very coarse gravel 32 45 4.9 # very coarse gravel 45 64 12.7 # small cobble 64 90 3.9 # medium cobble 90 128 2.0 # large cobble 128 180 1.0 # very large cobble 180 256 0.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder 0.1
silt/clay 17%
0.062
D16
10
8.7
D50
17
D65
sand 19%
gravel 53%
cobble 7%
percent by substrate type
1.58
D35
size percent less than (mm)
weighted percent
1
51
D84
pool
boulder 0%
riffle
100
bedrock 5%
77
D95
run
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 5 Note: Reach Data 5
particle size (mm)
0.01
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
based on sediment particles only based on total count
percent finer than
15.7 9.8
glide
0%
hardpan 0%
72.8
wood/det 0%
1.8
gradation geo mean
artificial 0%
28.6
std dev
particle size distribution
1000
18% 0% 20% 2% 5% 18% 6% 6% 16% 2% 4% 14% 4% 10% 12% 5% 10% 8% 3% 8% 5% 13% 6% 4% 2% 4% 1% 0% 2% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range
artificial
bedrock clay hardpan detritus/wood total count:
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
105
Count 17 ## ## ## ## 9 ## 2 ## 3 ## 8 ## 5 ## 9 ## 10 ## 7 ## 9 ## 8 ## 5 ## 9 ## 4 ## ## ## ## ## ## ## ## 105 percent finer than
based on sediment particles only based on total count
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1
10
5.35
0.062
10.8
D50
20
D65
sand 10%
silt/clay 16%
61%
gravel
12%
cobble
percent by substrate type
D35
0%
boulder
49
D84
particle size (mm)
size percent less than (mm) D16
0.1
1000
0%
bedrock
86
# of particles
0 10000
2
4
6
8
10
12
14
16
18
0%
hardpan
89.4
0%
wood/det
1.7
gradation geo mean
0%
artificial
28.1
std dev
particle size distribution
cumulative %
D95
100
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 5 Note: Riffle RF5
number of particles
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF6 Reach 6 - Lower East Branch - Sta 11+07.2
Year 2 Facing Downstream
Riffle Cross Section
644 643 As-built Year 1 Year 2 Year 3 Year 4 Year 5
Elevation (ft)
642 641 640
▼ BKF
639 638 -10
-5
0
5
10
15
20
25
30
35
40
Station (ft)
As-Built Date 1/8/09 Area 4.0 Bkf W 10.7 Dmean 0.4 Dmax 0.6 W/d 28.5
Year 1 Date 10/20/09 Area 2.8 Bkf W 8 Dmean 0.4 Dmax 0.6 W/d 22.7
Year 2 Date 10/12/10 Area 3.0 Bkf W 8 Dmean 0.4 Dmax 0.7 W/d 21.6
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF6 Reach 6 - Lower East Branch - Sta 11+07.2 Station BM HI -10 -5 -2 0 3.5 6 7.6 8.8 10 11 12 13 14 15 15.7 16.2 18 19.5 21 23.5 25.5 27.5 28.2 35
As-Built FS/BS Elev. 5.02 643.14 648.16 5.28 642.88 5.76 642.40 6.05 642.11 6.62 641.54 7.92 640.24 8.04 640.12 8.19 639.97 8.75 639.41 8.88 639.28 9.07 639.09 9.05 639.11 9.07 639.09 9.17 638.99 9.16 639.00 9.00 639.16 8.74 639.42 8.71 639.45 8.54 639.62 8.68 639.48 8.39 639.77 7.78 640.38 7.00 641.16 6.77 641.39 5.05 643.11
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. BP6 IR Lt
Desc. IR Lt
Station BM HI 0 1.5 3.5 5.5 7.5 7.8 8.7 9.6 10.2 11 11.7 12.3 12.8 13.7 14.3 15.5 16.7 19.5 21.5 23.3 24.5 26.3 28.2
FS/BS 6.06
Station BM HI
FS/BS 0.00
7.67 8.16 8.87 9.09 9.25 9.27 9.60 9.81 9.95 10.06 10.05 10.14 10.23 10.21 10.09 10.03 9.65 9.58 9.70 9.48 9.14 8.46 7.77
Year 1 Elev. 643.14 649.20 641.53 641.04 640.33 640.11 639.95 639.93 639.60 639.39 639.25 639.14 639.15 639.06 638.97 638.99 639.11 639.17 639.55 639.62 639.50 639.72 640.06 640.74 641.43
Year 4 Elev. 100.00 100.00
Desc. BP6 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BED BED BED BED BED BED BED BNK BKF RT GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Station BM HI 0 1.7 3.7 6.2 7.7 8.7 9.5 10.3 11 11.7 12.9 13.5 13.9 14.7 15.7 16.7 17.7 19.7 21.7 23.2 24.7 26.7 28.2
Year 2 FS/BS Elev. 4.08 641.78 645.86 4.23 641.63 4.87 640.99 5.56 640.30 5.62 640.24 5.82 640.04 6.20 639.66 6.12 639.74 6.53 639.33 6.77 639.09 6.76 639.10 6.88 638.98 6.84 639.02 6.67 639.19 6.59 639.27 6.51 639.35 6.15 639.71 6.28 639.58 6.17 639.69 6.25 639.61 6.06 639.80 5.57 640.29 4.94 640.92 4.38 641.48
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BED BED BED BED BED BED BNK BNK BKF GRND GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL6 Reach 6 - Lower East Branch - Sta 11+33.0
Year 2 Facing Downstream
Pool Cross Section
643 642 As-built Year 1 Year 2 Year 3 Year 4 Year 5
Elevation (ft)
641 ▼ BKF
640 639 638 637 -10
-5
0
5
10
15
20
25
30
35
40
Station (ft)
As-Built Date 1/8/09 Area 10.2 Bkf W 8.5 Dmean 1.2 Dmax 1.9 W/d 7.1
Year 1 Date 10/20/09 Area 10.0 Bkf W 9.2 Dmean 1.1 Dmax 2.0 W/d 8.5
Year 2 Date 10/12/10 Area 10.2 Bkf W 9.2 Dmean 1.1 Dmax 2.0 W/d 8.3
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL6 Reach 6 - Lower East Branch - Sta 11+33.0 Station BM HI -10 -8.5 -2 0 3 5 6.5 8 9 10.5 11 12 13 14 15 15.5 16.5 18 21 23 24 26 27.5 32
As-Built FS/BS Elev. 5.02 643.14 648.16 5.68 642.48 5.57 642.59 6.38 641.78 7.10 641.06 7.99 640.17 7.82 640.34 8.22 639.94 8.19 639.97 8.57 639.59 9.60 638.56 9.87 638.29 10.03 638.13 10.10 638.06 9.94 638.22 9.78 638.38 8.71 639.45 8.05 640.11 8.10 640.06 9.07 639.09 9.21 638.95 9.00 639.16 8.12 640.04 7.35 640.81 6.45 641.71
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. BP6 IR Lt
Desc. IR Lt
Station BM HI 0 0.8 2 4 6 7.9 9 9.8 10.7 11.3 12 13.2 14.7 15.6 17.1 20 21 22.8 24 26
Year 1 FS/BS Elev. 6.06 643.14 649.20 8.13 641.07 8.20 641 8.71 640.49 8.85 640.35 9.13 640.07 9.23 639.97 9.74 639.46 10.02 639.18 10.68 638.52 10.97 638.23 11.10 638.1 11.18 638.02 10.72 638.48 9.63 639.57 9.18 640.02 9.49 639.71 10.11 639.09 10.22 638.98 9.94 639.26 9.21 639.99
Station BM HI
Year 4 FS/BS Elev. 0.00 100.00 100.00
Desc. BP6 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BNK BED BED BED BED BED BED BNK LOG LOG BNK GRND
Desc. IR Lt
Station BM HI 0 2.6 5.5 6.3 7.9 9.3 9.9 10.2 10.6 10.9 11.3 12 12.3 12.8 13.3 13.8 14.3 14.9 15.3 15.8 16.6 17.1 18.3 20 20.7 22.3 23.8 25.9 27.3
Year 2 FS/BS Elev. 3.25 641.75 645.00 3.88 641.12 4.66 640.34 4.60 640.40 4.99 640.01 4.98 640.02 5.50 639.50 5.88 639.12 6.29 638.71 6.46 638.54 6.70 638.30 6.79 638.21 6.93 638.07 7.00 638.00 6.99 638.01 6.91 638.09 6.72 638.28 6.52 638.48 6.32 638.68 5.82 639.18 5.26 639.74 5.01 639.99 4.91 640.09 5.03 639.97 5.29 639.71 5.84 639.16 5.88 639.12 5.78 639.22 4.99 640.01 4.10 640.90
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND BKF BNK BNK BNK BED TOE BED BED BED BED BED BED BED BED ROOTWAD ROOTWAD BNK BKF GRND GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Elevation (ft)
635 1000
636
637
638
639
640
641
642
643
644
645
1025
1050
1075
1100
Station (ft)
1125
Profile
1150
Guilford County, NC Profile Reach 6 - Lower East Branch
Holly Grove Stream Restoration Site
Year 1 Bankfull Year 2 BKF
As-Built Bed Year 2 Bed
1225
Year 1 Water
1200
Year 1 Bed
1175
1250
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 6 - Lower East Branch
HI 646.54 646.54 646.54 646.54 646.54 646.54 646.54 646.54 646.54 646.54 646.54 646.54 645.00 645.00 645.00 645.00 645.00 645.00 645.00 645.00 645.00 645.00 645.00 645.00
Station 1000 1018 1029.1 1033 1043 1056.5 1061.6 1079 1090.7 1095.2 1105 1107.2 1125 1132.3 1133 1140.3 1150.2 1157.2 1161 1173 1185.5 1195.5 1200.5 1209.2
Bed FS 6.26 6.06 6.13 7.04 6.82 6.70 7.38 7.00 7.26 8.13 7.44 7.46 6.24 7.03 7.00 6.38 6.83 6.18 6.85 6.40 6.79 6.64 7.51 7.05
Water Depth 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Year 1 Bankfull FS Description 4.45 5.29 alt bkf HOR
5.60
6.19
6.29
5.33
5.40
Bed Elev. 640.28 640.48 640.41 639.50 639.72 639.84 639.16 639.54 639.28 638.41 639.10 639.08 638.76 637.97 638.00 638.62 638.17 638.82 638.15 638.60 638.21 638.36 637.49 637.95
Water Elev. 640.29 640.49 640.42 639.51 639.73 639.85 639.17 639.55 639.29 638.42 639.11 639.09 638.77 637.98 638.01 638.63 638.18 638.83 638.16 638.61 638.22 638.37 637.50 637.96
Bankfull Elev. 642.09
640.94
640.35
640.25
639.67
639.60
artificial 100
0.0 0.0
detritus/wood
weighted total count:
1.9 0.0
clay hardpan
98.1
bedrock
weighted particle count:
Pebble Count Weighted by Channel Feature Percent Riffle: 38.7 Percent Run: Percent Pool: 37.7 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 44.4 # very fine sand 0.062 0.13 3.8 # 0.13 0.25 0.0 # fine sand medium sand 0.25 0.5 0.9 # 0.5 1 0.0 # coarse sand 1 2 3.8 # very coarse sand 2 4 2.8 # very fine gravel 4 6 4.7 # fine gravel 6 8 0.0 # fine gravel 8 11 2.8 # medium gravel 11 16 6.6 # medium gravel 16 22 6.6 # coarse gravel 22 32 7.5 # coarse gravel very coarse gravel 32 45 5.7 # very coarse gravel 45 64 5.7 # small cobble 64 90 0.9 # medium cobble 90 128 1.9 # large cobble 128 180 0.0 # very large cobble 180 256 0.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder 0.1
silt/clay 44%
0.062
D16
10
0.5
D50
11
D65
sand 8%
gravel 42%
cobble 3%
percent by substrate type
0.06
D35
size percent less than (mm)
weighted percent
1
30
D84
56
D95
run
bedrock 2%
pool
boulder 0%
riffle
100
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC East Branch: Reach 6 Note: Reach Data 6
particle size (mm)
0.01
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
based on sediment particles only based on total count
percent finer than
13.2 10.4
glide
0%
hardpan 0%
33.9
wood/det 0%
1.4
gradation geo mean
artificial 0%
21.9
std dev
particle size distribution
1000
45% 4% 50% 0% 1% 45% 0% 4% 40% 3% 5% 35% 0% 3% 30% 7% 25% 7% 8% 20% 6% 6% 15% 1% 2% 10% 0% 0% 5% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range
artificial
bedrock clay hardpan detritus/wood total count:
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
105
2
Count 35 ## 19 ## ## ## ## 1 ## 6 ## 2 ## 1 ## 4 ## 8 ## 10 ## 6 ## 7 ## 2 ## 1 ## 1 ## ## ## ## ## ## ## ## 103 percent finer than
based on sediment particles only based on total count
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1
10
0.06
0.062
0.1
D50
10
D65
sand 19%
silt/clay 33%
44%
gravel
2%
cobble
percent by substrate type
D35
0%
boulder
23
D84
particle size (mm)
size percent less than (mm) D16
0.1
1000
2%
bedrock
43
D95
# of particles
0 10000
5
10
15
20
25
30
35
40
0%
hardpan
100.6
0%
wood/det
1.2
gradation geo mean
0%
artificial
19.1
std dev
particle size distribution
cumulative %
100
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC East Branch: Reach 6 Note: Riffle RF6
number of particles
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF7 Reach 7 - Southeast Creek - Sta 11+20.6
Year 2 Facing Downstream
Riffle Cross Section
655 654 As-built Year 1 Year 2 Year 3 Year 4 Year 5
Elevation (ft)
653 652 ▼ BKF
651 650 649 -10
-5
0
5
10
15
20
25
30
35
40
Station (ft)
As-Built Date 1/8/09 Area 9.4 Bkf W 14.5 Dmean 0.6 Dmax 1.2 W/d 22.3
Year 1 Date 10/20/09 Area 9.5 Bkf W 15 Dmean 0.6 Dmax 1.2 W/d 23.8
Year 2 Date 10/12/10 Area 7.6 Bkf W 14.5 Dmean 0.5 Dmax 1.2 W/d 27.7
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF7 Reach 7 - Southeast Creek - Sta 11+20.6 Station BM HI -8 0 1 4 5 7 8 9 10 11 12 13.3 13.9 14.5 15.5 16 17 18.5 20 22 24 27.3 33 36
As-Built FS/BS Elev. 7.17 653.43 660.60 6.40 654.20 7.68 652.92 7.75 652.85 9.04 651.56 9.36 651.24 9.72 650.88 9.82 650.78 10.07 650.53 10.20 650.40 10.23 650.37 10.12 650.48 10.33 650.27 10.10 650.50 9.94 650.66 9.65 650.95 9.53 651.07 9.42 651.18 9.14 651.46 9.42 651.18 9.19 651.41 9.07 651.53 8.51 652.09 7.85 652.75 7.40 653.20
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. BP7 IR Lt
Desc. IR Lt
Station BM HI 0 1.8 3.8 5.1 6.6 7 8.8 10.1 10.9 12.5 13.2 13.7 14.4 15.3 16.8 18.8 21.8 23.8 25.8 27.3
FS/BS 5.15
Station BM HI
FS/BS 0.00
5.77 6.22 6.92 7.37 7.72 7.83 7.95 8.06 8.32 8.23 8.33 8.23 7.88 7.66 7.35 7.13 7.17 7.01 6.91 6.50
Year 1 Elev. 653.43 658.58 652.81 652.36 651.66 651.21 650.86 650.75 650.63 650.52 650.26 650.35 650.25 650.35 650.70 650.92 651.23 651.45 651.41 651.57 651.67 652.08
Year 4 Elev. 100.00 100.00
Desc. BP7 IR Lt GRND GRND GRND GRND BKF LT
BKF RT GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Station BM HI 0 1.8 3.8 5.8 7.8 8.8 9.6 10.5 10.9 11.4 12.1 12.6 13.4 13.7 14.1 14.6 15.3 16.3 17.3 18.3 19.8 21.3 23.8 25.8 27.3
Year 2 FS/BS Elev. 5.27 653.16 658.43 5.54 652.89 6.04 652.39 6.73 651.70 7.31 651.12 7.64 650.79 7.68 650.75 7.67 650.76 7.95 650.48 8.13 650.30 8.24 650.19 8.07 650.36 8.07 650.36 8.13 650.30 8.10 650.33 7.88 650.55 7.52 650.91 7.50 650.93 7.40 651.03 7.20 651.23 7.06 651.37 7.24 651.19 7.16 651.27 6.84 651.59 6.94 651.49 6.29 652.14
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND GRND BKF BNK EOW BED BED BED BED EOW BNK BKF GRND GRND GRND GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL7 Reach 7 - Southeast Creek - Sta 11+32.3
Year 2 Facing Downstream
Pool Cross Section
654 653 As-built Year 1 Year 2 Year 3 Year 4 Year 5
Elevation (ft)
652 ▼ BKF
651 650 649 648 -10
-5
0
5
10
15
20
25
30
35
40
Station (ft)
As-Built Date 1/8/09 Area 10.5 Bkf W 9.5 Dmean 1.1 Dmax 2.0 W/d 8.6
Year 1 Date 10/20/09 Area 9.6 Bkf W 9.7 Dmean 1.0 Dmax 1.8 W/d 9.8
Year 2 Date 10/12/10 Area 9.6 Bkf W 9.8 Dmean 1.0 Dmax 1.9 W/d 10.0
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL7 Reach 7 - Southeast Creek - Sta 11+32.3 Station BM HI -4 0 2 5 7.5 8.2 8.5 9 10 11 12 13 14 14.3 14.6 15.4 16.5 17.8 20 24 27 29 34 40
Station BM HI
As-Built FS/BS Elev. 7.17 653.43 660.60 6.17 654.43 7.20 653.40 7.92 652.68 9.03 651.57 9.77 650.83 9.81 650.79 10.45 650.15 10.80 649.80 11.26 649.34 11.59 649.01 11.56 649.04 11.31 649.29 10.94 649.66 10.41 650.19 10.22 650.38 10.05 650.55 9.61 650.99 9.46 651.14 9.45 651.15 9.33 651.27 8.95 651.65 8.69 651.91 8.15 652.45 7.55 653.05 660.60
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. BP7 IR Lt
Desc. IR Lt
Station BM HI 0 1.5 2.5 4 6.2 8 8.7 9.3 10 11 12 13 14 14.1 14.6 15.5 16.7 19 22 24 27 29.1
Year 1 FS/BS Elev. 5.15 653.43 658.58 5.21 653.37 5.62 652.96 6.19 652.39 6.66 651.92 7.51 651.07 7.81 650.77 8.48 650.1 9.01 649.57 9.25 649.33 9.41 649.17 9.34 649.24 9.16 649.42 8.85 649.73 8.52 650.06 8.22 650.36 7.91 650.67 7.62 650.96 7.39 651.19 7.38 651.2 7.27 651.31 6.85 651.73 6.67 651.91
Station BM HI
Year 4 FS/BS Elev. 0.00 100.00 100.00
Desc. BP7 IR Lt GRND GRND GRND GRND GRND LOG EOW
EOW BKF RT GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Station BM HI 0 0.9 3.4 4.5 5.4 7.1 8 8.4 8.9 9.4 10.1 11 12 12.7 13.8 13.9 14.2 15.2 16.1 16.9 20.1 21.5 24.1 27 28.9
Year 2 FS/BS Elev. 4.94 652.34 657.28 3.84 653.44 4.09 653.19 5.19 652.09 5.55 651.73 5.93 651.35 6.35 650.93 6.49 650.79 7.19 650.09 7.71 649.57 7.89 649.39 8.11 649.17 8.26 649.02 8.10 649.18 7.89 649.39 7.61 649.67 7.16 650.12 6.76 650.52 6.67 650.61 6.35 650.93 6.23 651.05 6.05 651.23 6.07 651.21 5.90 651.38 5.50 651.78 5.39 651.89
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND GRND LOG LOG/EOW BED BED BED BED BED BED BED EOW BNK BNK BNK BKF GRND GRND GRND GRND GRND
Desc. IR Lt
Elevation (ft)
645 1000
646
647
648
649
650
651
652
653
654
655
1025
1050
1075
Station (ft)
1100
Profile
Guilford County, NC Profile Reach 7 - Southeast Creek
Holly Grove Stream Restoration Site
Year 1 Bed As-Built Bed Year 2 Bed Year 2 BKF
1125
1150
Year 1 Water Year 1 Bankfull Year 2 Water
1175
1200
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 7 - Southeast Creek
HI 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28
Station 1039 1047 1056.2 1058.8 1073.4 1090 1098.3 1103 1111 1116.1 1120.6 1128.7 1132.3 1138 1144 1150 1167.1
Bed FS 6.13 6.44 6.26 6.91 6.85 6.90 6.50 7.36 7.43 7.09 7.00 6.96 8.13 8.00 7.40 7.80 7.84
Water Depth 0.16 0.37 0.01 0.59 0.42 0.39 0.01 0.65 0.54 0.19 0.07 0.01 0.96 0.85 0.17 0.54 0.30
Year 1 Bankfull FS 5.13
Description
6.02
6.14
6.25
6.54 alt bkf HOR
Bed Elev. 651.15 650.84 651.02 650.37 650.43 650.38 650.78 649.92 649.85 650.19 650.28 650.32 649.15 649.28 649.88 649.48 649.44
Water Elev. 651.31 651.21 651.03 650.96 650.85 650.77 650.79 650.57 650.39 650.38 650.35 650.33 650.11 650.13 650.05 650.02 649.74
Bankfull Elev. 652.15
651.26
651.14
651.03
artificial 100
0.0 0.0
detritus/wood
weighted total count:
1.0 0.0
clay hardpan
99.0
bedrock
weighted particle count:
Pebble Count Weighted by Channel Feature Percent Riffle: 46 Percent Run: Percent Pool: 31 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 37.0 # very fine sand 0.062 0.13 6.0 # 0.13 0.25 0.0 # fine sand medium sand 0.25 0.5 0.0 # 0.5 1 0.0 # coarse sand 1 2 1.0 # very coarse sand 2 4 2.0 # very fine gravel 4 6 6.0 # fine gravel 6 8 2.0 # fine gravel 8 11 5.0 # medium gravel 11 16 8.0 # medium gravel 16 22 6.0 # coarse gravel 22 32 6.0 # coarse gravel very coarse gravel 32 45 2.0 # very coarse gravel 45 64 6.0 # small cobble 64 90 7.0 # medium cobble 90 128 3.0 # large cobble 128 180 0.0 # very large cobble 180 256 2.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder 0.1
silt/clay 37%
0.062
D16
10
5.1
D50
14
D65
sand 7%
gravel 43%
cobble 12%
percent by substrate type
0.06
D35
size percent less than (mm)
weighted percent
1
51
D84
pool
boulder 0%
riffle
100
bedrock 1%
91
D95
run
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southeast Creek: Reach 7 Note: Reach Data 7
particle size (mm)
0.01
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
based on sediment particles only based on total count
percent finer than
12 11
glide
0%
hardpan 0%
45.9
wood/det 0%
1.8
gradation geo mean
artificial 0%
28.7
std dev
particle size distribution
1000
37% 6% 40% 0% 0% 0% 35% 1% 2% 30% 6% 2% 25% 5% 8% 20% 6% 6% 2% 15% 6% 7% 10% 3% 0% 5% 2% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range
artificial
bedrock clay hardpan detritus/wood total count:
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
104
1
Count 50 ## ## ## ## ## ## 6 ## 5 ## 7 ## 5 ## 7 ## 8 ## 8 ## 3 ## 1 ## 2 ## 1 ## ## ## ## ## ## ## ## 103 percent finer than
based on sediment particles only based on total count
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1
10
0.06
0.062
2.4
D50
8
D65
sand 0%
silt/clay 48%
48%
gravel
3%
cobble
percent by substrate type
D35
0%
boulder
21
D84
particle size (mm)
size percent less than (mm) D16
0.1
1000
1%
bedrock
39
# of particles
0 10000
10
20
30
40
50
60
0%
hardpan
23.5
0%
wood/det
1.1
gradation geo mean
0%
artificial
18.3
std dev
particle size distribution
cumulative %
D95
100
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southeast Creek: Reach 7 Note: Riffle RF7
number of particles
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF8 Reach 8 - Southwest Creek - Sta 11+49.9
Year 2 Facing Downstream
Riffle Cross Section
100 99 As-built Year 1 Year 2 Year 3 Year 4 Year 5
Elevation (ft)
98 97 ▼ BKF
96 95 94 -10
-5
0
5
10
15
20
25
30
35
40
Station (ft)
As-Built Date 1/8/09 Area 3.4 Bkf W 8 Dmean 0.4 Dmax 0.7 W/d 18.6
Year 1 Date 10/20/09 Area 4.4 Bkf W 8.2 Dmean 0.5 Dmax 0.7 W/d 15.2
Year 2 Date 10/12/10 Area 4.9 Bkf W 8.4 Dmean 0.6 Dmax 0.8 W/d 14.5
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF8 Reach 8 - Southwest Creek - Sta 11+49.9 Station BM HI -15 -8 -3 0 3 7 9.3 10.6 11.9 12.3 12.6 12.8 14 15 16 17 18 18.7 19.4 19.9 21.2 22.4 24.9 26.9 28 28.9 30 33 37 40
As-Built FS/BS Elev. 2.51 98.99 101.50 3.36 98.14 3.67 97.83 3.94 97.56 4.05 97.45 4.10 97.40 4.04 97.46 4.24 97.26 4.56 96.94 5.04 96.46 5.26 96.24 5.41 96.09 5.58 95.92 5.56 95.94 5.76 95.74 5.56 95.94 5.46 96.04 5.43 96.07 5.34 96.16 5.23 96.27 5.04 96.46 4.91 96.59 4.71 96.79 4.23 97.27 3.99 97.51 4.03 97.47 3.86 97.64 3.92 97.58 3.64 97.86 2.72 98.78 2.35 99.15
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. Stump
Desc. IR Lt
Station BM HI 0 2 6 8 9 10 11 11.9 12.5 13.6 15 16.6 18 19 20.1 21 23 26
FS/BS 3.78
Station BM HI
FS/BS 0.00
6.68 6.77 6.71 6.70 6.83 7.05 7.33 7.63 8.15 8.29 8.37 8.34 8.18 7.93 7.63 7.59 7.22 6.77
Year 1 Elev. 100.42 104.20 97.52 97.43 97.49 97.50 97.37 97.15 96.87 96.57 96.05 95.91 95.83 95.86 96.02 96.27 96.57 96.61 96.98 97.43
Year 4 Elev. 100.00 100.00
Desc. BP8 IR Rt GRND GRND GRND GRND GRND GRND BKF BNK BED BED BED BED BED BNK BKF GRND GRND GRND
Desc. IR Lt
Station BM HI 0 1.8 4.5 6.5 8.5 9.5 11.1 11.5 11.9 12.1 12.4 13.4 14.5 14.9 15.5 16.8 17.7 18.5 19.3 19.8 20.3 20.8 21.7 23.2 24.5 26.2 27 28.3 29
Year 2 FS/BS Elev. 5.42 97.59 103.01 5.52 97.49 5.75 97.26 5.60 97.41 5.56 97.45 5.70 97.31 5.82 97.19 6.21 96.80 6.36 96.65 6.46 96.55 6.54 96.47 7.20 95.81 7.23 95.78 7.12 95.89 7.28 95.73 7.12 95.89 7.11 95.90 7.11 95.90 7.00 96.01 6.84 96.17 6.63 96.38 6.44 96.57 6.38 96.63 6.33 96.68 6.01 97.00 5.80 97.21 5.64 97.37 5.53 97.48 5.52 97.49 5.45 97.56
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND GRND GRND GRND GRND GRND BKF BNK TOE BED BED BED BED BED BED BED BED BNK BNK BKF GRND GRND GRND GRND GRND GRND GRND
Desc. IR Lt
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL8 Reach 8 - Middle Branch - Sta 100+78.5
Year 2 Facing Downstream
Pool Cross Section
102 101 100 As-built Year 1 Year 2 Year 3 Year 4 Year 5
Elevation (ft)
99 98 ▼ BKF
97 96 95 94 -15
-10
-5
0
5
10
15
20
25
30
35
Station (ft)
As-Built Date 1/8/09 Area 7.9 Bkf W 7.1 Dmean 1.1 Dmax 1.6 W/d 6.4
Year 1 Date 10/20/09 Area 7.4 Bkf W 6.6 Dmean 1.1 Dmax 1.7 W/d 5.9
Year 2 Date 10/12/10 Area 9.1 Bkf W 7.2 Dmean 1.3 Dmax 1.8 W/d 5.7
Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0
Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL8 Reach 8 - Middle Branch - Sta 100+78.5 Station BM HI -17 -10.5 -4 -1 0 1.5 3.6 5.2 6 9 11 11.7 12.2 12.5 12.8 13 13.5 14.3 15 16 17 17.7 18.3 18.8 19 19.9 21 22.8 25.4 26.9 30 34 36 40
As-Built FS/BS Elev. 5.31 98.99 104.30 3.29 101.01 4.42 99.88 5.09 99.21 5.26 99.04 5.30 99.00 5.47 98.83 5.83 98.47 5.72 98.58 5.93 98.37 6.76 97.54 7.00 97.30 7.11 97.19 7.28 97.02 7.48 96.82 7.64 96.66 8.00 96.30 8.42 95.88 8.62 95.68 8.63 95.67 8.66 95.64 8.61 95.69 8.37 95.93 7.63 96.67 7.41 96.89 5.87 98.43 5.65 98.65 5.30 99.00 4.9 99.40 5 99.30 5.03 99.27 4.73 99.57 4.64 99.66 4.17 100.13 4.06 100.24
Station BM HI
Year 3 FS/BS Elev. 0.00 100.00 100.00
Desc. Stump
Desc. IR Lt
Station BM HI 0 2.4 4.9 8.4 9.4 10.9 11.9 12.9 13.9 14.5 15.3 16.3 17.6 17.9 18.5 19.1 19.9 21.4 23.4 25.4
Year 1 FS/BS Elev. 3.78 100.42 104.20 5.15 99.05 5.37 98.83 5.50 98.7 6.45 97.75 6.66 97.54 6.85 97.35 7.03 97.17 7.86 96.34 8.33 95.87 8.65 95.55 8.74 95.46 8.58 95.62 8.09 96.11 7.48 96.72 7.10 97.1 5.73 98.47 5.53 98.67 5.13 99.07 4.86 99.34 4.89 99.31
Station BM HI
Year 4 FS/BS Elev. 0.00 100.00 100.00
Desc. BP8 IR Rt GRND GRND GRND GRND GRND GRND BKF BNK BED BED BED BED BED ROOTWAD ROOT TOB GRND GRND GRND GRND
Desc. IR Lt
Station BM HI 0 2.7 4.7 5.5 5.8 8.7 9.7 10.7 11.7 12.2 12.4 12.8 13.3 14.2 15.2 16.7 17.6 18 18.6 18.9 19.1 19.7 20.7 23 25.45
Year 2 FS/BS Elev. 5.61 99.09 104.70 5.69 99.01 5.94 98.76 6.04 98.66 5.74 98.96 6.24 98.46 7.12 97.58 7.20 97.50 7.33 97.37 7.54 97.16 7.64 97.06 8.23 96.47 8.66 96.04 8.98 95.72 9.26 95.44 9.33 95.37 9.33 95.37 9.06 95.64 8.01 96.69 7.75 96.95 7.47 97.23 6.32 98.38 6.15 98.55 5.82 98.88 5.33 99.37 5.41 99.29
Station BM HI
Year 5 FS/BS Elev. 0.00 100.00 100.00
Desc. IR Lt GRND GRND GRND LOG GRND GRND BKF BNK BNK BNK BED EOW BED BED BED BED BED BNK BNK BNK GRND GRND GRND GRND GRND
Desc. IR Lt
Elevation (ft)
105 104 103 102 101 100 99 98 97 96 95 94 93 92 91 90 1000
1025
1050
1075
1100
Station (ft)
1125
Profile
Guilford County, NC Profile Reach 8 - Southwest Creek
1150
Holly Grove Stream Restoration Site
Year 1 Bed As-Built Bed Year 2 Bed Year 2 BKF
1175
1200
Year 1 Water Year 1 Bankfull Year 2 Water
1225
1250
Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 8 - Southwest Creek
HI 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 103.01 103.01 103.01 103.01
Station 1000 1012 1021 1027 1037 1051.3 1056.5 1064 1072.5 1078.5 1088.4 1092.2 1097.9 1104.3 1114.5 1120.5 1130.4 1139 1149.9 1155 1163 1173 1186.3 1189.4 1198.6 1200.3
Bed FS 7.47 7.31 8.93 8.63 7.80 7.88 9.25 8.29 8.00 9.43 8.65 8.55 8.40 9.80 8.85 9.78 8.91 10.10 9.01 9.20 10.19 9.60 8.13 9.04 8.07 8.19
Water Depth 0.09
Year 2 Bankfull FS
Description
0.90 0.59 6.70
7.18 alt bkf HOR
0.75 7.10 0.71 7.40
7.44 alt bkf HOR
0.50 0.40 0.66 8.16 0.49 8.46 0.53 6.85
8.57 alt bkf HOR
Bed Elev. 97.35 97.51 95.89 96.19 97.02 96.94 95.57 96.53 96.82 95.39 96.17 96.27 96.42 95.02 95.97 95.04 95.91 94.72 95.81 95.62 94.63 95.22 94.88 93.97 94.94 94.82
Water Elev. 97.44 96.79 96.79 96.78 96.32 96.32 96.32 96.10 96.10 96.10 95.52 95.52 95.52 95.52 95.44 95.44 95.38 95.38 95.12 95.12 95.12 94.50 94.50 94.50
Bankfull Elev.
98.12
97.72
97.42
96.66
96.36
96.16
artificial 100.1
0.0 0.0
detritus/wood
weighted total count:
0.0 0.0
clay hardpan
100.1
bedrock
weighted particle count:
Pebble Count Weighted by Channel Feature Percent Riffle: 34.7 Percent Run: Percent Pool: 37.6 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 13.9 # very fine sand 0.062 0.13 12.9 # 0.13 0.25 1.0 # fine sand medium sand 0.25 0.5 2.0 # 0.5 1 1.0 # coarse sand 1 2 10.9 # very coarse sand 2 4 4.0 # very fine gravel 4 6 11.9 # fine gravel 6 8 3.0 # fine gravel 8 11 9.9 # medium gravel 11 16 13.9 # medium gravel 16 22 8.9 # coarse gravel 22 32 2.0 # coarse gravel very coarse gravel 32 45 0.0 # very coarse gravel 45 64 2.0 # small cobble 64 90 2.0 # medium cobble 90 128 0.0 # large cobble 128 180 1.0 # very large cobble 180 256 0.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder 0.1
silt/clay 14%
0.070
D16
10
4.7
D50
9
D65
sand 28%
gravel 55%
cobble 3%
percent by substrate type
1.32
D35
size percent less than (mm)
weighted percent
1
16
D84
32
D95
run
bedrock 0%
pool
boulder 0%
riffle
100
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southwest Creek: Reach 8 Note: Reach Data 8
particle size (mm)
0.01
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
based on sediment particles only based on total count
percent finer than
13.9 13.9
glide
0%
hardpan 0%
35.2
wood/det 0%
1.1
gradation geo mean
artificial 0%
15.1
std dev
particle size distribution
1000
14% 13% 16% 1% 2% 1% 14% 11% 4% 12% 12% 3% 10% 10% 14% 9% 8% 2% 0% 6% 2% 2% 4% 0% 1% 2% 0% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range
artificial
bedrock clay hardpan detritus/wood total count:
Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:
100
100
2 7 8 16 15 7 5 5 2 2 6
Count 12 2 2 1 4 4 ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## percent finer than
based on sediment particles only based on total count
0% 0.01
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1
10
8.32
0.250
13.3
D50
19
D65
sand 13%
silt/clay 12%
65%
gravel
10%
cobble
percent by substrate type
D35
0%
boulder
42
D84
particle size (mm)
size percent less than (mm) D16
0.1
1000
0%
bedrock
135
# of particles
0 10000
2
4
6
8
10
12
14
16
18
0%
hardpan
28.1
0%
wood/det
3.2
gradation geo mean
0%
artificial
13.0
std dev
particle size distribution
cumulative %
D95
100
Pebble Count, Holly Grove Stream Restoration Site
Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southwest Creek: Reach 8 Note: Riffle RF8
number of particles