Holly Grove Stream Restoration Site MONITORING REPORT

Report 2 Downloads 152 Views
Holly Grove Stream Restoration Site Guilford County, North Carolina Cataloging Unit: 03030002 EEP Contract #: D06028-B November 11, 2010

MONITORING REPORT 2010 (YEAR 2)

Submitted to: North Carolina Department of Environment and Natural Resources North Carolina Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699-1652

Submitted by: Restoration Systems, LLC 1101 Haynes Street, Suite 211 Raleigh, North Carolina 27604 Point of Contact: Tara Disy Allden Phone: 919-755-9490

Holly Grove Stream Restoration Site

MONITORING REPORT 2010 (YEAR 2) Prepared for:

Restoration Systems, LLC 1101 Haynes Street, Suite 211 Raleigh, North Carolina 27604

Prepared by:

Wolf Creek Engineering, pllc 51 North Knob Lane Weaverville, NC 28787

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

TABLE OF CONTENTS EXECUTIVE SUMMARY ........................................................................................................... iii 1.0 project goals, background, and attributes ........................................................................... 1 1.1 General Project Description............................................................................................ 1 1.1.1 USGS and NCDWQ River Basin Designations...................................................... 1 1.1.2 NCDWQ Surface Water Classification .................................................................. 1 1.2 Project Goals and Objectives .......................................................................................... 2 1.3 Project Structure.............................................................................................................. 2 1.4 Restoration Type and Approach ..................................................................................... 2 1.5 Project History, Contacts and Attribute Data ................................................................. 3 2.0 Project condition and monitoring results .......................................................................... 21 2.1 Vegetation Assessment ................................................................................................. 21 2.1.1 Stem Counts .......................................................................................................... 21 2.1.2 Vegetative Problem............................................................................................... 22 2.1.3 Vegetation Plot Photos.......................................................................................... 22 2.2 Stream Assessment ....................................................................................................... 22 2.2.1 Hydrology ............................................................................................................. 22 2.2.2 Geomorphology .................................................................................................... 23 2.2.3 Problem Areas....................................................................................................... 24 2.2.4 Photo Reference Stations ...................................................................................... 24 2.2.5 Stability Assessment Table ................................................................................... 24

LIST OF TABLES Table I. Table II. Table III. Table IV. Table V. Table VI. Table VII. Table VIII. Table IX. Table X.

Project Components …………………………………….…….…..………………...Page 7 Project Activity and Reporting History …………………………….…..…………..Page 8 Project Contacts ………………………………………………….….…..………….Page 8 Project Attributes …………………………………………….….….....…………....Page 9 Vegetation Summary……………………………………………………………….Page 21 Verification of Bankfull Events ………………………………...………………....Page 22 BEHI and Sediment Export Estimates……………………………………………..Page 23 Categorical Stream Feature Visual Stability Assessment……………………..Page 24 - 25 Baseline Morphology and Hydraulic Summary………………………………Page 26 - 31 Morphology and Hydraulic Monitoring Summary……………………………Page 32 - 39

LIST OF FIGURES Figure 1. Vicinity Map……………………………………………………………………..Page 5 Figure 2. Vicinity Map……………………………………………………………………..Page 6 Figure 3. Monitoring Plans…………………………………………………………..Page 11 - 20

APPENDIX A: Vegetative Raw Data APPENDIX B: Geomorphic Raw Data

Holly Grove / Restoration Systems

i

Monitoring Year 2 (Nov. 2010)

HOLLY GROVE RESTORATION SITE

Holly Grove / Restoration Systems

MONITORING REPORT

ii

Monitoring Year 2 (Nov. 2010)

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

EXECUTIVE SUMMARY The Holly Grove Site is located in Guilford County, North Carolina within the Cape Fear River Basin, Cataloging Unit 03030002. The project consisted of restoring, enhancing, and preserving approximately 21,000 linear feet of stream, restoring approximately 42 acres of riparian buffers, and preserving approximately 1.11 acres of wetlands. The Site is in a rural setting in the Southern Outer Piedmont hydrophysiographic ecoregion and was previously used to grow row crops with woody vegetation confined to isolated areas. Prior to restoration, the channels were highly degraded due to unrestricted livestock access, channelization activities, and lack of riparian vegetation. The restoration design was based on a Priority Level 1 and 2 approach to restore proper channel dimension and allow for appropriate sediment transport. Restoration practices on this project were implemented with the intent of minimizing unnecessary disturbance to adjacent land and to protect mature riparian vegetation where it existed. The constructed stream profile has restored stable bed morphology including appropriate riffle-pool sequencing. Cross-vanes, J-Hook vanes, and in-stream log structures have been integrated into the channel to provide grade control, maintain stable streambanks while the riparian vegetation establishes, and provide in-stream habitat. Biodegradable fiber matting was used to provide temporary stabilization on the newly graded streambanks. Excavated materials from the existing channel were used to backfill around in-stream structures and to build riffles with a natural substrate and function. Hydrology Following completion of the construction in October of 2008, the Site has been subjected to one greater-than-bankfull event and at least three bankfull or near-bankfull events. It should be noted that, prior to completion of construction, Tropical Storm Fay (August 2008) produced a highflow event in which floodwaters crested 2.5 feet above bankfull. Approximately seventy percent (70%) of the project was complete at that time and subjected to this high water event. In late September, 2010, Tropical Storm Nicole resulted in 3 and 4.5 inches of rain on the site and overbankfull flows. Stream The restored stream reaches have successfully managed the high-flow events of the first two years. Visual inspection of the Site following the greater-than-bankfull event in August of 2008, the bankfull event in June of 2009, and the near-bankfull event in September of 2010 revealed no noticeable adjustments in the bed or banks. The overall grade of the channel has been maintained and the banks of the channels are intact throughout the Site. Vegetation Native woody and herbaceous species were used to establish, at minimum, a fifty-foot riparian buffer on each side of the restored reach. Herbaceous species have successfully established throughout the entire site. The riparian buffer bare-root planting had an overall survival rate of 67% through the second year and showed significant evidence of additional volunteer species becoming established. In general, herbaceous planting resulted in vigorous growth throughout the site.

Holly Grove / Restoration Systems

iii

Monitoring Year 2 (Nov. 2010)

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

Planned Action Continued visual monitoring is planned for the few stream areas that have been identified as “Areas of Concern”. Repair work is not warranted at this time on any of the areas. This is based on the judgment that these issues have not risen to the level of posing a threat to channel or structure stability and are not resulting in excessive erosion. It is recommended that natural stream processes and natural re-vegetation be allowed the opportunity to mend these areas and then re-assess their condition in the next monitoring cycle.

Holly Grove / Restoration Systems

iv

Monitoring Year 2 (Nov. 2010)

HOLLY GROVE RESTORATION SITE

1.0

MONITORING REPORT

PROJECT GOALS, BACKGROUND, AND ATTRIBUTES

The purpose of the Holly Grove Stream Restoration Site (Site) was to restore degraded sections of Buckhorn Creek and several of its tributaries located in Guilford County, North Carolina. This monitoring report presents information regarding the site and watershed conditions, the restoration approach for the project, the monitoring results, remedial action plan and detailed monitoring drawings of the site. 1.1

General Project Description

Buckhorn Creek is located approximately 15 miles northeast of the City of Greensboro in rural Guilford County, North Carolina (Figure 1: Vicinity Map). The site consists of approximately 42 acres of floodplain, approximately 21,000 linear feet of stream designated as Buckhorn Creek and its tributaries, and 1.11 acres of existing wetlands (Figure 2: Project Map). The stream reaches consist of perennial, first and second order streams that have historically been impacted by riparian and bank vegetation removal, channel straightening, unrestricted livestock access, and agricultural land-use practices. Existing land use within the site consists of forested areas and row crops. The site is located within moderately sloping colluvial valleys and elevations range from approximately 615 to 720 feet above sea level. Past land management activities have consisted of timber harvesting with subsequent land clearing for agricultural uses including cattle and row crop farming. The land outside of the conservation easement remains in active agricultural production. 1.1.1 USGS and NCDWQ River Basin Designations The project reach is located in the Haw River watershed of the Cape Fear River Basin (United States Geological Survey (USGS) 14-digit Hydrologic Unit 03030002020070) within North Carolina Division of Water Quality (NCDWQ) sub-basin 03-06-02. This sub-basin is primarily rural agriculture, although residential land use accounts for a significant portion. Buckhorn Creek drains into Reedy Fork Creek approximately ¾ miles downstream of the Site, which in turn flows to the Haw River eight miles downstream. 1.1.2

NCDWQ Surface Water Classification

Reedy Fork Creek in the vicinity of the Site is assigned a best usage classification of C, NSW by the NCDWQ and as such there are no restrictions on watershed development or types of discharge. These waters are suitable for aquatic life propagation and survival, fishing, wildlife, secondary recreation, and agriculture. Secondary recreation includes wading, boating, and other uses not involving human body contact with water on an organized or frequent basis. The supplemental classification, NSW (Nutrient Sensitive Waters) includes areas with water quality problems associated with excessive plant growth resulting from nutrient enrichment. The portion of Reedy Fork Creek to which Buckhorn Creek drains and the portion of the Haw River that is approximately two miles east of the Site are listed on the DWQ final

Holly Grove / Restoration Systems

1

Monitoring Year 2 (Nov. 2010)

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

2004 and draft 2006 303(d) lists. Streams which are included in the 303(d) list do not meet water quality standards or have impaired uses. 1.2

Project Goals and Objectives

The primary goals of the Holly Grove Stream Restoration Project are to: • Restore aquatic and riparian habitat within the on-site portions of the Buckhorn Creek watershed. • Restore geomorphic stability to the subject stream reaches. These goals will be accomplished through the following objectives: • Restoration of approximately forty-two acres of Mesic Mixed Hardwood Forest along both sides of Buckhorn Creek and its tributaries. • Removing nonpoint sources of pollution associated with agricultural activities including the establishment of a native woody riparian buffer (at least 50’ wide) adjacent to streams and wetlands to treat surface runoff which may be laden with sediment and/or agricultural pollutants from the adjacent landscape. • Reestablishing stream stability and the capacity to transport watershed flows and sediment loads by restoring a stable dimension, pattern, and profile supported by natural in-stream habitat and grade/bank stabilization structures. • Promoting floodwater attenuation through a) conveying bankfull stream flows through construction of bankfull bench, b) restoring secondary, entrenched tributaries thereby reducing floodwater velocities, and c) re-vegetating floodplains to increase frictional resistance on floodwaters crossing the Site. • Improving aquatic habitat by enhancing stream bed variability and the use of instream structures. • Providing wildlife habitat including fringe and forest edge. These accomplishments will result in: • Restoration and enhancement of 15,822 Stream Mitigation Units. • Protecting the Site with a perpetual conservation easement. 1.3

Project Structure

The project is composed of seven distinct reaches; the main channel, Buckhorn Creek, and each of its tributaries, Middle Branch, West Branch, East Branch, Lower East Branch, Southeast Creek, and Southwest Creek. The project structure is tabulated in the corresponding Table 1 (See Below). 1.4

Restoration Type and Approach

Restoration and enhancement practices implemented on this project were designed to minimize unnecessary disturbance to adjacent land and to protect mature riparian vegetation where it exists. Consideration was given to the potential functional lift provided by restoration activities in comparison to the functional lift that could be realized through the natural process of channel evolution. Included in this consideration was an attempt to determine the disturbance and sedimentation that could occur as a result of this natural process. Where restoration was determined to be warranted,

Holly Grove / Restoration Systems

2

Monitoring Year 2 (Nov. 2010)

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

consideration was given to which reaches could best be served by maintaining as much of the existing channel pattern as possible. The proposed channels of Buckhorn Creek and its tributaries were designed as Type B4c streams with the exception of the lower reach of Middle Branch. This channel configuration provides the most stable and natural form in the moderately sloping colluvial valleys that are found throughout the Site. Not only does it effectively convey bankfull discharge and sediment load but also conforms to the natural conveyance of flood flows. Additionally, since broad alluvial valleys are generally not found within the Site, the lower sinuosity of the Type B4c streams allowed for minimization grading and earthwork activities. The constructed channel dimensions, patterns, and profiles were based on hydraulic relationships and morphologic dimensionless ratios of the reference reaches. Restoration activities included restoring stable channel morphology supported by natural in-stream habitat and grade/bank stabilization structures, the elimination of accelerated bank erosion, and reestablishment of native riparian buffers at least 50 feet in width. Exotic riparian vegetation was removed in areas of the project to allow for replanting of native riparian species. In-stream structures were installed to provide for enhanced aquatic habitat, protection of the newly constructed stream banks, and grade control for the newly constructed channel. 1.5

Project History, Contacts and Attribute Data

The summary of the project history, contacts, and attribute data is tabulated in Tables II, III, and IV (See Below).

Holly Grove / Restoration Systems

3

Monitoring Year 2 (Nov. 2010)

5

6

HOLLY GROVE RESTORATION SITE

MITIGATION PLAN Table I Project Components

Restoration Reach/Area

Restoration Level

Approach

PreRestoration LF or AC

PostRestoration LF or AC

Holly Grove Stream Restoration Site / EEP Contact #D06028-B

Station Range/Location

Buckhorn Creek West Branch West Branch Middle Branch Middle Branch Middle Branch Middle Branch East Branch East Branch East Branch East Branch Little Branch SW Creek SW Creek UT to SW Creek SE Creek SE Creek UT to SE Creek Wetland A

R E2 R E2 R E2 R P E2 R R E2 R E2 P R P P E

P2 E2 P2 E2 P1 E2 P1 E2 P1 P1 E2 P1 E2 P1 -

8,757 870 390 240 1,549 472 90 960 920 300 739 553 723 2,229 325 342 881 528 1.11

8,848 870 391 240 1,561 472 194 960 920 329 761 553 723 2,229 325 363 881 528 1.11

100+00 - 194+50 300+00 - 308+00 300+00 - 303+91 398+91 - 401+31 401+31 - 417+37 417+37 - 422+09 423+00 - 425+40 480+00 - 498+80 480+00 - 498+80 490+00 - 493+29 500+00 - 507+61 19+945 - 205+54 600+00 - 607+34 608+26 - 630+55 650+00 - 653+50 700+00 - 704+36 706+25 - 715+06 750+00 - 755+28 Middle Branch

Comments

Component Summation Restoration Level

Stream (LF)

Riparian Wetland (Ac) Riverine

Restoration Enhancement Enhancement I Enhancement II Creation Preservation HQ Preservation

13,170

Totals

21,148

Non-Riparian (Ac) Upland (Ac)

Buffer (Ac)

BMP

42

BMP Count

Non-Riverine

1.11 5,284 2,694 1.11 1.11

= Non-Applicable

Holly Grove / Restoration Systems

7

Monitoring Year 2 (Nov 2010)

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

Table II Project Activity and Reporting History Holly Grove Restoration Project Data Collection Activity or Report Complete Restoration Plan Apr 2007 Final Design - Construction Plans N/A Construction N/A Temporary S&E mix applied to entire project area N/A Permanent seed mix applied to entire site N/A Bare-root plantings for floodplain and uplands N/A Mitigation Plan / As-Built (Year 0 Monitoring - baseline) Oct 2008 Year 1 Monitoring Oct 2009 Year 2 Monitoring Oct 2010 Year 3 Monitoring Year 4 Monitoring Year 5 Monitoring

Completion or Delivery Jun 2007 Oct 2007 Oct 2008 Sep 2008 Sep 2008 Dec 2008 Dec 2008 Dec 2009 Nov 2010

Table III Project Contact Table Holly Grove Restoration Project Designer Wolf Creek Engineering, pllc

51 North Knob Lane Weaverville NC, 28787 828-658-3649

S. Grant Ginn Construction Contractor North State Environmental, Inc

2889 Lowery St. Winston-Salem, NC 27101 336-725-2010

Darrell Westmoreland Planting & Seeding Contractor North State Environmental, Inc

2889 Lowery St. Winston-Salem, NC 27101 336-725-2010

Stephen Joyce Monitoring Performers Stream Monitoring - Wolf Creek Engineering, pllc Vegetation Monitoring - Catena Group

Holly Grove / Restoration Systems

S. Grant Ginn Mike Wood

8

828-658-3649 919-732-1300

Monitoring Year 2 (Nov 2010)

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

Table IV Project Attribute Table Holly Grove Restoration Project Guilford Piedmont Southern Outer Piedmont Cape Fear River Basin 03030002020070 03-06-02

Project County Physiographic Region Ecoregion Project River Basin USGS HUC for Project (14 digit) NCDWQ Sub-basin for Project Within extent of EEP Watershed Plan? WRC Class (Warm, Cool, Cold) % of project esaement fenced or demarcated Beaver activity observed during design phase?

100% Demarcated Easement Corners Yes, on Buckhorn Creek upstream of bridge

Restoration Component Attribute Table Buckhorn West Middle 4.27 0.2 0.2 Second First First 8757 390 1639 Perennial Perennial Perennial Rural Rural Rural

Drainage area (mi2) Stream order Restored length (feet) Perennial or Intermittent Watershed type Watershed LULC Distribution (e.g.)

Residential Ag-Row Crop Ag-Livestock Forested Watershed impervious cover (%) NCDWQ AU/Index number NCDWQ classification 303d listed? Upstream of a 303d listed segment? Reasons for 303d listing or stressor Total acreage of easement Total vegetated acreage within easement Total planted acreage as part of the restoration Rosgen classification of pre-existing Rosgen classification of As-Built Valley type Valley slope Valley side slope range Valley toe slope range Cowardin classification Trout waters designation Species of concern, endangered? Dominant soil series and characteristics Series Depth (in) Clay % K T

Holly Grove / Restoration Systems

East 0.2 First 1039 Perennial Rural

20% 10% 5% 10% 40% 60% 50% 10% 10% 5% 10% 0% 30% 25% 35% 80% 10 5 5 5 16-(1)a C, NSW C, NSW C, NSW C, NSW No Yes non-point urban and agricultural runoff 64.87 47.06 45.3 F, G G G G B4c B4c B4c B4c II II II II 0.0051 0.0239 0.0165 0.0119 4% - 40% 0.4% - 2% N/A N/A Yes, Bald Eagle & Carolina Darter Ch , Co CcD Ch CcD , Ch Congaree Cecil Chewacla Chewacla 0-80 0-80 0-70 0-70 5-35 5-70 5-35 5-35 Moderate Moderate Moderate Moderate -

9

Southeast Southwest 0.14 0.19 First First 342 723 Perennial Perennial Rural Rural 5% 90% 0% 5% 2

10% 10% 0% 80% 2

C, NSW

C, NSW

G B4c II 0.0159

G B4c II 0.0169

CcD Cecil 0-80 5-70 Moderate -

CcD Cecil 0-80 5-70 Moderate -

Monitoring Year 2 (Nov. 2010)

11

12

13

14

15

16

17

18

19

20

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

2.0

PROJECT CONDITION AND MONITORING RESULTS

2.1

Vegetation Assessment

The Carolina Vegetation Survey – Ecosystem Enhancement Program (CVS-EEP) 2008 protocol for recording vegetation (Lee et. al 2008) was used to determine the planting pattern of woody stems with respect to species, spacing, and density as well as to forecast survivability and growth of planted stems in subsequent monitoring years. Eleven (11) randomly placed 10 meter by 10 meter vegetative sampling plots were established within the project easement area. The corners of each monitoring plot have been marked in the field and their position documented by GPS survey. Plots were placed within the applicable planting zones to capture the heterogeneity of the designed vegetative communities. Plot corners were permanently marked with rebar and recorded during the baseline survey. All planted stems and plot corners were marked with orange flagging tape to facilitate relocation during subsequent monitoring years. A reference photograph was taken for each plot at the origin looking diagonally across the plot to the opposite corner. Year 2 vegetation for the Site occurred on September 13-14, 2010. The project has an average of 320 planted stems per acre. The interim success criterion is 320 steams per acre at the end of the Year 3 monitoring period. The riparian buffer planting had an overall survival rate of 67% but showed significant evidence of additional volunteer species taking root. 2.1.1

Stem Counts

Across all vegetation monitoring plots (VP), Year 2 monitoring documented a moderate survivability range of 121 to 526 planted stems per acre. VP7 had the lowest average stem density whereas VPC had the highest. VP2, 5, & 8 did not meet the interim success criterion. Approximately 31% of total planted stems were missing and 2% were dead. Of these, eastern redbud, silky willow, and common witchhazel had the highest mortality rates. Twenty-one (21) species were documented among the vegetation plots, a 19.2% reduction in the total species planted. Several species such as sugarberry, American beech, possum haw, willow oak, and black gum were represented by only one individual. Table V: Vegetation Summary

Plot 1 2 3 4 5 6

Date Sampled 9/13/2010 9/13/2010 9/13/2010 9/13/2010 9/13/2010 9/14/2010

Planted Living Stems 8 4 8 10 7 11

Holly Grove / Restoration Systems

Dead or Missing Volunteer Stems Stems 13 32 2 70 2 38 2 51 4 19 2 2

21

Total Living Stems 40 74 46 61 26 13

Average Stems Per Acre 323.75 161.87 323.75 404.69 283.28 445.15

# species 7 3 6 9 6 5

Monitoring Year 2 (Nov. 2010)

HOLLY GROVE RESTORATION SITE

7 8 A B C

9/14/2010 9/14/2010 9/13/2010 9/13/2010 9/14/2010

3 6 12 8 13

MONITORING REPORT

0 0 3 13 3

1 56 33 31 35

4 62 45 39 48

121.41 242.81 364.22 323.75 526.09

2 3 6 7 5

Approximately 62% of planted stems had a vigor code of good or excellent. High numbers of natural stems were found in seven of the eleven vegetation monitoring plots. Volunteer stems were also found in vegetation plots VP5, 6, & 7 but in significantly lower numbers. It is expected that recruitment will continue to contribute to the total stem density for the restoration site. 2.1.2

Vegetative Problem

No significant vegetation problem areas were noted within the vegetation monitoring plots on-site although some damage and mortality was recorded. Of all damaged, missing, or dead stems within the vegetation monitoring plots 42.5% of the damage has been attributed to insects. Expansion of invasive exotic plant populations should be monitored both within the vegetation plots in which they occur and within the larger restoration area. 2.1.3 Vegetation Plot Photos A photo point was established in each vegetation plot. Photo points are positioned for each plot at the origin facing diagonally across the plot to the opposite corner. The photographs were captured on the same day as the vegetation plot surveys (Appendix A). 2.2

Stream Assessment

Monitoring protocol follows that outlined within the EEP Site Specific Mitigation Plan and detailed in the U.S. Army Corps of Engineers (USACE) Stream Mitigation Guidelines for Monitoring Level I. Specifically, stream monitoring included measurements of stream dimension, profile, pattern, bed materials, photo documentation, and stream bankfull return interval. The restored stream reaches have managed the extreme flow events of the first year. Streambanks remain intact and stable and fully vegetated throughout the site. Vegetation has grown into many riffles on the main channel due to a lack of shade and mature buffer. This has limited the mobility of bed material but has not had noticeable effects on overall stability. All in-stream structures remain intact and fully functional with the exception of a few minor piping issues. 2.2.1 Hydrology Since completion of construction in October of 2008, the site has been subjected to at least one greater-than-bankfull event and several bankfull or near-bankfull events. In August of 2008, Tropical Storm Fay crossed central North Carolina resulting in eight (8) inches of rainfall on-site and water elevations 2.5 feet above bankfull on Buckhorn Creek. Approximately seventy percent (70%) of the project was complete at that time

Holly Grove / Restoration Systems

22

Monitoring Year 2 (Nov. 2010)

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

and subjected to this estimated fifty-year storm event. In October of 2008, locally heavy rainfall produced a bankfull event at the Site during the final stages of construction. In June of 2009, heavy rainfall resulted in water elevations 0.2 to 0.3 feet above bankfull. Heavy rainfall associated with remnants of Hurricane Ida produced one additional event in November of 2009, after Year 1 monitoring was completed which again resulted in an elevated flow event. In late September of 2010, Tropical Storm Nicole moved north across central and eastern North Carolina and produced approximately 4.5 inches of rain over 48 hours resulting in flood waters which crested 0.4 feet above bankfull. Table VI Verification of Bankfull Events – Lick Creek Stream Restoration Site (D04013-1) Date of Data Collection 9/3/08 8/13/09 10/11/10

Date of Occurrence of Bankfull Event 8/27/08 June 2009 September 2010

Height above Bankfull (ft) 2.5 0.2 0.4

Method of Data Collection Debris Evidence Crest Gauge Crest Gauge

2.2.2 Geomorphology Following the procedures established in the USDA Forest Service Manual (Harrelson et al 1994) and the methodologies utilized in the Rosgen stream assessment and classification system (Rosgen 1994, 1996), data collected consisted of detailed dimension and pattern measurements, longitudinal profiles, and bed materials sampling. Re-survey of the permanent cross sections and profile reaches have shown only minimal alterations in local bed elevations with the bed form and the channel pattern remaining consistent with the As-built condition. All eight riffle cross sections exhibit consistent maximum depth while six of the eight retain nearly the same cross-sectional area as documented in the baseline monitoring. Six of the eight pool cross-sections have maintained their depth and cross-sectional area and two show only slight adjustments relative to the As-built condition. Location of bed features relative to the pattern is consistent with the As-built survey. Pebble counts were conducted at each riffle cross-section, as well as across the overall study reaches. Pebble count data was plotted by size distribution in order to assess the D50 and D84 size class. On Buckhorn Creek the material size generally decreased from the Year 1 condition with the D50 on Reaches 2 and 3 decreasing from 67mm to 49mm and from 61mm to 32mm. The D84 on Reaches 2 and 3 decreased from 184mm to 144mm and from 118mm to 101mm. The D50 and D84 remained approximately the same on Reach 1 at 28mm and 68mm. This may be due in part to significant growth of vegetation in the riffles that may be trapping finer particles in the bed. All of the tributaries, with the exception of Southeast Creek, showed a decrease in the D50 over the Year 1 condition, although generally the decreases were not appreciable. The D50 on Middle Branch decreased from 21mm to 11mm and from 15mm to 9mm. On Lower East Branch the D50 decreased from 10mm to 0.5mm and Southwest Creek

Holly Grove / Restoration Systems

23

Monitoring Year 2 (Nov. 2010)

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

decreased from 7mm to 5mm. The D50 on Southeast Creek increased from 0.1mm to 5mm. Table VII. BEHI and Sediment Export Estimates – (Only Required in Year 5) 2.2.3 Problem Areas In the year following construction of the Holly Grove Stream Restoration Site, a few minor problem areas have been documented. 1.) Several riffles on Buckhorn Creek and Southeast Branch exhibit excessive vegetation in the channel bed. 2.) There were four (4) locations of minor piping identified at log vanes. 3.) There were five (5) areas of local bank scour identified. 4.) There were two (2) areas of minor riffle scour identified. Inadequate shade due to lack of mature riparian buffer has allowed vegetation to take root in the bed matrix. It is anticipated that this vegetation will die back during the winter but will reestablish during each growing season until sufficient shading is provided by the canopy of the buffer. This has affected bedload transport by limiting bed mobility, but it is not expected to have any significant impact on the overall stability or integrity of the channel bed. Continued visual monitoring is planned for the stream areas that have been identified as “Areas of Concern”. Repair work is not warranted at this time on any of the areas. This is based on the judgment that these issues have not risen to the level of posing a threat to channel or structure stability and are not resulting in excessive erosion. It is recommended that natural stream processes and natural re-vegetation be allowed the opportunity to mend these areas and then reassess their condition in the next monitoring cycle. 2.2.4 Photo Reference Stations Photograph reference Stations (PRSs) have been established to assist in characterizing the site and to allow qualitative evaluation of the site conditions. The location of each photo station has been permanently marked in the field and the bearing/orientation of the photograph is indicated on the As-built plans to allow for consistent repetition. A total of twenty-eight (28) PRSs have been established along the restored stream (Appendix B). Sixteen (16) of these PRSs have been located upstream of the permanent monitoring cross sections. These photographs are taken facing downstream looking at the section, and show as much of the banks and channel as possible.

Holly Grove / Restoration Systems

24

Monitoring Year 2 (Nov. 2010)

HOLLY GROVE RESTORATION SITE

2.2.5

MONITORING REPORT

Stability Assessment Table

Table VIII. Categorical Stream Feature Visual Stability Assessment

Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders

Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders

Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders

Initial 100% 100% 100% 100% 100% 100% 100%

Performance Percentage Buckhorn Creek (8,848 ft) MY-01 MY-02 MY-03 MY-04 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 99% 100% 100% 100%

Initial 100% 100% 100% 100% 100% 100% 100%

Performance Percentage Middle Branch (1,755 ft) MY-01 MY-02 MY-03 MY-04 97% 99% 100% 100% 100% 100% 100% 99% 100% 100% 98% 99% 83% 83%

Initial 100% 100% 100% 100% 100% 100% 100%

Performance Percentage East Branch (1,090 ft) MY-01 MY-02 MY-03 MY-04 100% 99% 100% 100% 100% 100% 100% 100% 100% 100% 100% 99% 100% 100%

Holly Grove / Restoration Systems

25

MY-05

MY-05

MY-05

Monitoring Year 2 (Nov. 2010)

HOLLY GROVE RESTORATION SITE

Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders

Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders

MONITORING REPORT

Initial 100% 100% 100% 100% 100% 100% 100%

Performance Percentage Southeast Creek (363 ft) MY-01 MY-02 MY-03 MY-04 96% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Initial 100% 100% 100% 100% 100% 100% 100%

Performance Percentage Southwest Creek (723 ft) MY-01 MY-02 MY-03 MY-04 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Holly Grove / Restoration Systems

26

MY-05

MY-05

Monitoring Year 2 (Nov. 2010)

3.76

Mean

0.013

28

1.2

2.9

12

34.8

2

1.73

63

20.1

Med

2.2

134

3.1

Max

Reference Reach(es) Data SD

n

1.4

37

2.3

1.69

30

22

Min

40 50 1.9 110 1.7

Radius of Curvature Ratio (ft/ft)

Meander Wavelength (ft)

Meander Width Ratio (ft/ft)

Ri% / Ru% / P% / G% / S%

36.5

40

2

172

16

318

1.5

44

2

44

33

2.25

134.5

2.5

59.5

54

119

Stream Power (transport capacity) W/m2

Drainage Area (sq mi)

3.3 186

Bankfull discharge (cfs)

6

8

Proportion Overwide (%)

Incision Class (BHR Ranch)

Entrenchment Class (ER Range)

Biological or Other

Channel Stability or Habitat Metric

BEHI VL% / L% / M% / H% / VH% / E%

7

Bankfull Floodplain Area (acres)

0.005

BF slope (ft/ft)

5

0.0054

1.17

Sinuosity (ft)

Water Surface Slope (channel) (ft/ft)

8756

Channel Thalweg length (ft)

Valley length (ft)

F4 & G4

Rosgen Classification

Bankfull Velocity (fps)

Impervious cover estimate (%)

0.006

0.0079

1.05

B4c

0.006

0.005

1.2

8777

4.5

B4c

144

1.8

104.5

9.15

182.5

88

0.66

27

1.6

37

2.3

47

33

102.5

Reach Shear Stress (competency) lb/ft2

4.6

340

10

240

120

160

3.6

25

0.005

40

1

2.28

13

40.9

2.4

1.78

52.5

23

Med

Design

Max part size (mm) mobilized at bankfull

d16 / d35 / d50 / d84 / d95 / dip / disp (mm)

SC% / Sa% / G% / C% / B% / Be%

3.15

225

5.95

145

80

110

60

Pool Volume (ft3)

Pool Spacing (ft)

2

2.6

21 3.9

3.4

3.35

2.8

Pool Length (ft)

Pool Max Depth (ft)

Channel Beltwidth (ft)

4

71

2.7

Min

23

n

0.004

0.008

SD

Riffle Length (ft)

Radius of Curvature (ft)

Additional Reach Parameters

4

4

0.007

14

2.3

1.3

3

Baseline Stream Data Summary

Riffle Slope (ft/ft)

0.006

2 14

d50 (mm)

10 1.2

Width/Depth Ratio

Entrenchment Ratio

Bank Height Ratio

16

42

1

55

2.3

2.3

Bankfull Max Depth (ft)

1

Substrate, bed and transport parameters

Pattern

Profile

Max

32

Med

Pre-Existing Condition

26

Mean

24

Min

Bankfull Cross-Sectional Area (ft2)

Eq.

32

UL

Regional Curve

1.6

LL

Floodprone Width (ft)

Gauge

Bankfull Mean Depth (ft)

Bankfull Width (ft)

Simension and Substrate - Riffle

Parameter

Table IX-a Holly Grove Restoration Site - Buckhorn Creek (8848 ft)

3

225

3

75

75

150

3.8

54

0.006

64

3

48

2.6

1.91

75

25

Max

0.0042

35

7.82

140

1.7

41

183

56

1.08

55

0.0026

38

13.4

30.3

1.9

1.3

50

23.4

Min

18

Mean

0.0047

1.17

8848

B4c

9.27

221

3.72

87

217

119

2.89

67

0.0069

58

2.5

16

34.3

2.1

1.5

50

23.4

Med

29

0.0051

10.7

380

7

167

250

136

3.51

87

0.017

74

18.1

48.3

2.6

1.9

70

25.4

Max

As-Built / Baseline

17

SD

n

40 45 7 55 6

Channel Beltwidth (ft)

Radius of Curvature (ft)

Radius of Curvature Ratio (ft/ft)

Meander Wavelength (ft)

Meander Width Ratio (ft/ft)

4

Ri% / Ru% / P% / G% / S%

50

0.2

60

36.5

1.8

104.5

9.15

182.5

2.2

2

172

16

318

40

40

1.5

18

2

18

13

36

7

13

1.4

12

Min

2.25

49.5

2.5

22.5

20

45

1.4

14

0.013

16

1

1.7

13

6.3

0.95

0.7

19.5

9

Med

Design

Stream Power (transport capacity) W/m2

Drainage Area (sq mi)

28

Bankfull discharge (cfs)

0.015

Water Surface Slope (channel) (ft/ft)

BF slope (ft/ft)

6

8

Proportion Overwide (%)

Incision Class (BHR Ranch)

Entrenchment Class (ER Range)

Biological or Other

Channel Stability or Habitat Metric

BEHI VL% / L% / M% / H% / VH% / E%

7

Bankfull Floodplain Area (acres)

0.014

Sinuosity (ft)

5

400 1.06

Channel Thalweg length (ft)

Valley length (ft)

G4 3.9

Rosgen Classification

Bankfull Velocity (fps)

Impervious cover estimate (%)

-

0.0079

1.05

B4c

0.015

0.013

1.2

386

4.5

B4c

96

28

1.6

37

2.3

47

33

36.5

3.1

n

0.53

10

100

23

150

33

2.6

0.013

28

1.2

2.9

12

SD

Reach Shear Stress (competency) lb/ft2

8

77.5

15

97.5

100

2.7

2 34.8

Max

Max part size (mm) mobilized at bankfull

d16 / d35 / d50 / d84 / d95 / dip / disp (mm)

SC% / Sa% / G% / C% / B% / Be%

Additional Reach Parameters

4

4

30

65

Pool Volume (ft3)

Pool Spacing (ft)

2

1.4

Pool Max Depth (ft)

Pool Length (ft)

Riffle Slope (ft/ft)

0.02

28

d50 (mm)

Riffle Length (ft)

1.7

Bank Height Ratio

Substrate, bed and transport parameters

Pattern

Profile

1

1.2

1

1.73

Entrenchment Ratio

Med

Reference Reach(es) Data

7

Mean

Width/Depth Ratio

Min

5.5

n

1.2

SD

Bankfull Max Depth (ft)

Max

Bankfull Cross-Sectional Area (ft2)

Med

Pre-Existing Condition

63

Mean

0.9

Min

7.5

Eq.

Floodprone Width (ft)

UL

Regional Curve

Bankfull Mean Depth (ft)

LL 20.1

Gauge

Baseline Stream Data Summary

6.3

Bankfull Width (ft)

Simension and Substrate - Riffle

Parameter

Table IX-b Holly Grove Restoration Site - West Branch (391 ft)

3

81

3

27

27

54

20

19

3

27

Max

2.3

23

40

9

Min

Mean

1.17

391

B4c

89

4.2

41.5

80

46

10.5

Med

6

60

52

12

Max

As-Built / Baseline SD

n

7 55 6

Meander Wavelength (ft)

Meander Width Ratio (ft/ft)

45

Radius of Curvature Ratio (ft/ft)

40

Channel Beltwidth (ft)

Radius of Curvature (ft)

4

Ri% / Ru% / P% / G% / S%

50

0.2

60

36.5

1.8

104.5

9.15

182.5

2.2

2

172

16

318

40

40

1.5

18

2

18

13

36

6

10

1.4

12

Min

2.25

49.5

2.5

22.5

20

45

1.4

13

0.013

15

1

1.7

13

6.3

0.95

0.7

19.5

9

Med

Design

Stream Power (transport capacity) W/m2

Drainage Area (sq mi)

28

Bankfull discharge (cfs)

0.014 0.015

Water Surface Slope (channel) (ft/ft)

BF slope (ft/ft)

6

8

Proportion Overwide (%)

Incision Class (BHR Ranch)

Entrenchment Class (ER Range)

Biological or Other

Channel Stability or Habitat Metric

BEHI VL% / L% / M% / H% / VH% / E%

7

Bankfull Floodplain Area (acres)

1.06

Sinuosity (ft)

5

1778

Channel Thalweg length (ft)

Valley length (ft)

G4 3.9

Rosgen Classification

Bankfull Velocity (fps)

Impervious cover estimate (%)

-

0.0079

1.05

B4c

0.015

0.013

1.2

1790

4.5

B4c

115

29

1.6

37

2.3

47

33

36.5

3.1

n

0.58

10

100

23

150

33

2.6

0.013

28

1.2

2.9

12

SD

Reach Shear Stress (competency) lb/ft2

8

77.5

15

97.5

100

2.7

2 34.8

Max

Max part size (mm) mobilized at bankfull

d16 / d35 / d50 / d84 / d95 / dip / disp (mm)

SC% / Sa% / G% / C% / B% / Be%

Additional Reach Parameters

4

4

30

65

Pool Volume (ft3)

Pool Spacing (ft)

2

1.4

Pool Max Depth (ft)

Pool Length (ft)

Riffle Slope (ft/ft)

0.02

28

d50 (mm)

Riffle Length (ft)

1.7

Bank Height Ratio

Substrate, bed and transport parameters

Pattern

Profile

1

1.2

1

1.73

Entrenchment Ratio

Med

Reference Reach(es) Data

7

Mean

Width/Depth Ratio

Min

5.5

n

1.2

SD

Bankfull Max Depth (ft)

Max

Bankfull Cross-Sectional Area (ft2)

Med

Pre-Existing Condition

63

Mean

0.9

Min

7.5

Eq.

Floodprone Width (ft)

UL

Regional Curve

Bankfull Mean Depth (ft)

LL 20.1

Gauge

Baseline Stream Data Summary

6.3

Bankfull Width (ft)

Simension and Substrate - Riffle

Parameter

Table IX-c Holly Grove Restoration Site - Middle Branch (1796 ft)

3

81

3

27

27

54

16

32

3

27

Max

0.016

0.0164

34

3

60

2.4

16

30

44

0.9

17

0.0148

17

7.6

10

3.7

1

0.6

55

6.2

Min

25

Mean

1.07

1796

B4c

82.5

Med

29

0.019

0.0187

8.8

105

19.4

130

88

75

1.32

29

0.0184

38

13

10.4

5.2

1.1

0.7

80

7.2

Max

As-Built / Baseline

12

SD

n

7 55 6

Meander Wavelength (ft)

Meander Width Ratio (ft/ft)

45

Radius of Curvature Ratio (ft/ft)

40

Channel Beltwidth (ft)

Radius of Curvature (ft)

4

Ri% / Ru% / P% / G% / S%

50

0.2

60

36.5

1.8

104.5

9.15

182.5

2.2

2

172

16

318

40

40

1.5

18

2

18

13

36

12

12

1.4

12

Min

2.25

49.5

2.5

22.5

20

45

1.4

15

0.013

17

1

1.7

13

6.3

0.95

0.7

19.5

9

Med

Design

Stream Power (transport capacity) W/m2

Drainage Area (sq mi)

28

Bankfull discharge (cfs)

0.014 0.015

Water Surface Slope (channel) (ft/ft)

BF slope (ft/ft)

6

8

Proportion Overwide (%)

Incision Class (BHR Ranch)

Entrenchment Class (ER Range)

Biological or Other

Channel Stability or Habitat Metric

BEHI VL% / L% / M% / H% / VH% / E%

7

Bankfull Floodplain Area (acres)

1.06

Sinuosity (ft)

5

1039

Channel Thalweg length (ft)

Valley length (ft)

G4 3.9

Rosgen Classification

Bankfull Velocity (fps)

Impervious cover estimate (%)

-

0.0079

1.05

B4c

0.015

0.013

1.2

1058

4.5

B4c

102

30

1.6

37

2.3

47

33

36.5

n

0.54

10

100

23

150

33

3.1

SD

Reach Shear Stress (competency) lb/ft2

8

77.5

15

97.5

100

2.6

0.013

28

1.2

2.9

2

Max

Max part size (mm) mobilized at bankfull

d16 / d35 / d50 / d84 / d95 / dip / disp (mm)

SC% / Sa% / G% / C% / B% / Be%

Additional Reach Parameters

4

4

30

65

Pool Volume (ft3)

Pool Spacing (ft)

2

1.4

0.02

Pool Max Depth (ft)

Pool Length (ft)

Riffle Slope (ft/ft)

Riffle Length (ft)

28

d50 (mm)

Substrate, bed and transport parameters

Pattern

Profile

1.7

Bank Height Ratio

12 2.7

7

1

1.2

1

1.73

Width/Depth Ratio

Med

Reference Reach(es) Data

Entrenchment Ratio

Mean

34.8

Min

5.5

n

1.2

SD

Bankfull Max Depth (ft)

Max

Bankfull Cross-Sectional Area (ft2)

Med

Pre-Existing Condition

63

Mean

0.9

Min

7.5

Eq.

Floodprone Width (ft)

UL

Regional Curve

Bankfull Mean Depth (ft)

LL 20.1

Gauge

Baseline Stream Data Summary

6.3

Bankfull Width (ft)

Simension and Substrate - Riffle

Parameter

Table IX-d Holly Grove Restoration Site - East Branch (1073 ft)

3

81

3

27

27

54

18

21

3

27

Max

41

3.25

76

3.8

33

28

34

0.5

13

0.0071

22

Min

16

Mean

0.011

0.011

1.04

1073

B4c

9.4

81

5.1

44

36

35

0.8

14

0.0104

23

2.1

11.4

6.5

1

0.8

18

8.6

Med

24

5.25

91

7

60

45

44

0.9

17

0.0132

26

Max

As-Built / Baseline

19

SD

n

7 55 6

Meander Wavelength (ft)

Meander Width Ratio (ft/ft)

45

Radius of Curvature Ratio (ft/ft)

40

Channel Beltwidth (ft)

Radius of Curvature (ft)

4

Ri% / Ru% / P% / G% / S%

50

0.2

60

36.5

1.8

104.5

9.15

182.5

2.2

2

172

16

318

40

40

1.5

15

2

15

11

30

10

10

1.4

10

Min

2.25

41.5

2.5

19

17

37.5

1.1

13

0.016

12

1

2.2

13

4.2

0.75

0.6

16.5

7.5

Med

Design

Stream Power (transport capacity) W/m2

Drainage Area (sq mi)

28

Bankfull discharge (cfs)

0.015

Water Surface Slope (channel) (ft/ft)

BF slope (ft/ft)

6

8

Proportion Overwide (%)

Incision Class (BHR Ranch)

Entrenchment Class (ER Range)

Biological or Other

Channel Stability or Habitat Metric

BEHI VL% / L% / M% / H% / VH% / E%

7

Bankfull Floodplain Area (acres)

0.014

Sinuosity (ft)

5

342 1.06

Channel Thalweg length (ft)

Valley length (ft)

G4 3.9

Rosgen Classification

Bankfull Velocity (fps)

Impervious cover estimate (%)

-

0.0079

1.05

B4c

0.019

0.016

1.2

359

4.5

B4c

96

31

1.6

37

2.3

47

33

36.5

3.1

n

0.53

10

100

23

150

33

2.6

0.013

28

1.2

2.9

12

SD

Reach Shear Stress (competency) lb/ft2

8

77.5

15

97.5

100

2.7

2 34.8

Max

Max part size (mm) mobilized at bankfull

d16 / d35 / d50 / d84 / d95 / dip / disp (mm)

SC% / Sa% / G% / C% / B% / Be%

Additional Reach Parameters

4

4

30

65

Pool Volume (ft3)

Pool Spacing (ft)

2

1.4

Pool Max Depth (ft)

Pool Length (ft)

Riffle Slope (ft/ft)

0.02

28

d50 (mm)

Riffle Length (ft)

1.7

Bank Height Ratio

Substrate, bed and transport parameters

Pattern

Profile

1

1.2

1

1.73

Entrenchment Ratio

Med

Reference Reach(es) Data

7

Mean

Width/Depth Ratio

Min

5.5

n

1.2

SD

Bankfull Max Depth (ft)

Max

Bankfull Cross-Sectional Area (ft2)

Med

Pre-Existing Condition

63

Mean

0.9

Min

7.5

Eq.

Floodprone Width (ft)

UL

Regional Curve

Bankfull Mean Depth (ft)

LL 20.1

Gauge

Baseline Stream Data Summary

6.3

Bankfull Width (ft)

Simension and Substrate - Riffle

Parameter

Table IX-e Holly Grove Restoration Site - Southeast Creek (363 ft)

3

68

3

23

23

45

20

19

3

23

Max

40

3.4

81

5

40

27

20

0.49

18

14

Min

15

Mean

0.0106

0.0106

1.05

363

B4c

38.5

86

8

64

30.5

22

0.52

19

0.0067

15

3.1

15

4.3

0.8

0.5

25

8

Med

30

4.3

91

11

88

34

40

1.4

21

18

Max

As-Built / Baseline

15

SD

n

40 45 7 55 6

Channel Beltwidth (ft)

Radius of Curvature (ft)

Radius of Curvature Ratio (ft/ft)

Meander Wavelength (ft)

Meander Width Ratio (ft/ft)

4

Ri% / Ru% / P% / G% / S%

50

0.2

SD

n

60

Mean

Med

36.5

1.8

104.5

9.15

182.5

2.2

2

172

16

318

40

40

3.1

SD

n

1.5

16

2

16

12

32

6

10

1.4

11

Min

2.25

44

2.5

20

18

40

1.3

10

0.007

14

1

2.2

13

4.9

0.85

0.6

17.5

8

Med

Design

Stream Power (transport capacity) W/m2

Drainage Area (sq mi)

28

Bankfull discharge (cfs)

8

Proportion Overwide (%)

Incision Class (BHR Ranch)

Entrenchment Class (ER Range)

6

Bankfull Floodplain Area (acres)

Biological or Other

Channel Stability or Habitat Metric

BEHI VL% / L% / M% / H% / VH% / E%

7

5

-

0.008

0.0122

0.0122

0.015

BF slope (ft/ft)

0.007

0.014

Water Surface Slope (channel) (ft/ft)

0.0079

723

B4c

6.88

93

3.55

28.5

55

25

1.45

8

0.0018

11

1.95

18.6

3.4

0.7

0.4

15.6

8

Med

30

7.5

126

4.6

37

60

32

1.65

12

0.032

18

Max

As-Built / Baseline

1.17 1.2

19

Mean

1.06

33

6.25

60

2.5

20

50

19

1.15

5

0.0012

9

Min

Sinuosity (ft)

1.05

4.5

B4c

3

72

3

24

24

48

13

19

3

24

Max

Channel Thalweg length (ft)

Valley length (ft)

G4 3.9

Rosgen Classification

Bankfull Velocity (fps)

Impervious cover estimate (%) B4c

50

32

1.6

37

2.3

47

33

36.5

2.6

0.013

28

1.2

2.9

12

34.8

2

1.73

Max

Reference Reach(es) Data

0.25

10

100

23

150

33

2.7

Min

Reach Shear Stress (competency) lb/ft2

8

77.5

15

97.5

100

Max

Max part size (mm) mobilized at bankfull

d16 / d35 / d50 / d84 / d95 / dip / disp (mm)

SC% / Sa% / G% / C% / B% / Be%

Additional Reach Parameters

4

4

30

65

Pool Volume (ft3)

Pool Spacing (ft)

2

1.4

0.02

Pool Max Depth (ft)

Pool Length (ft)

Riffle Slope (ft/ft)

Riffle Length (ft)

28

d50 (mm)

1.2

Entrenchment Ratio 1.7

7

Width/Depth Ratio

Bank Height Ratio

5.5

Bankfull Cross-Sectional Area (ft2)

1

1.2

Bankfull Max Depth (ft)

1

Substrate, bed and transport parameters

Pattern

Profile

Med

Pre-Existing Condition

63

Mean

0.9

Min

7.5

Eq.

Floodprone Width (ft)

UL

Regional Curve

Bankfull Mean Depth (ft)

LL 20.1

Gauge

Baseline Stream Data Summary

6.3

Bankfull Width (ft)

Simension and Substrate - Riffle

Parameter

Table IX-f Holly Grove Restoration Site - Southwest Creek (723 ft)

18

SD

n

Bkf Width (ft) Floodprone Width (ft)

Min 40 29 125 2

Max 115 371 320 5.75

Med 65 105 180 3.25

Riffle Length (ft) 28 81 47 Riffle Slope (ft/ft) 0.0024 0.0126 0.0094 Pool length (ft) 24.4 38 29.5 Pool Spacing (ft) 37 130 82

Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio

4.7 55

26.5 64

MY3

MY-1 (2006)

35.3 1.5 2.6 15.9 >3 1

MY2 23.7 82

35.4 1.5 2.1 15.3 >3 1

MY1 20 70

MY5

MY+

20.5 0 59.5

Min 40 29 125 2

Med 65 105 180 3.25

80.2 37.5 0.0212 0.0071 164 93

Max 115 371 320 5.75

MY-2 (2007)

MY4

Cross Section 1 Riffle

Additional Reach Parameters Valley Length (ft) 967 967 Channel Length (ft) 1085 1085 Sinuosity 1.1 1.1 Water Surface Slope (ft/ft) 0.0024 0.0126 0.0094 0.0039 0.0081 Bkf Slope (ft/ft) 0.006 0.0056 Rosgen Classification B4c B4c Habitat Index Macrobenthos

Profile

Pattern

Parameter

Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)

Dimension

Parameter

46.8 2 4.2 -

MY2 23.4 -

MY3

Min

33

Max

Med

MY-3 (2008)

48 2.2 3.9 -

MY1 22 -

MY5

MY+

Min

Max

Med

MY-4 (2009)

MY4

Cross Section 2 Pool

Table X-a Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 1: Buckhorn Creek

MY2

MY3

Min

Max

Med

MY-5 (2010)

MY1

MY5

MY+

Min

Max

Med

MY+ (2011)

MY4

Cross Section

Bkf Width (ft) Floodprone Width (ft)

Min 55 61 182 2.5

Max 162 245 225 7.5

Med 60 130 195 2.8

MY5

MY+

Min 55 61 182 2.5

Max 162 245 225 7.5

Med 60 130 195 2.8

MY-2 (2007)

MY4

Riffle Length (ft) 25 87 34 39 90 50.3 Riffle Slope (ft) 0.0012 0.0228 0.0099 0.0023 0.0172 0.0083 Pool length (ft) 16.2 36.8 31.8 Pool Spacing (ft) 26 151 56 39 159 68

Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio

32 116

67.2 184

MY3

MY-1 (2006)

27.6 1.4 1.9 14.8 1.6 1.7

MY2 20.2 34

25.4 1.2 1.7 16.4 1.6 1.7

MY1 20.4 34

Cross Section 3 Riffle

Additional Reach Parameters Valley Length (ft) 882 882 Channel Length (ft) 968 968 Sinuosity 1.18 1.18 Water Surface Slope (ft/ft) 0.0012 0.0228 0.0099 0.0015 0.0046 0.0069 Bkf Slope (ft/ft) 0.0057 0.0055 Rosgen Classification B4c B4c Habitat Index Macrobenthos

Profile

Pattern

Parameter

Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)

Dimension

Parameter

49.1 2.2 3.1 -

MY2 22 -

MY3

Min

34

Max

Med

MY-3 (2008)

45.1 2 3 -

MY1 22.2 -

MY5

MY+

Min

Max

Med

MY-4 (2009)

MY4

Cross Section 4 Pool

Table X-b Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 2: Buckhorn Creek

MY2

MY3

Min

Max

Med

MY-5 (2010)

MY1

MY5

MY+

Min

Max

Med

MY+ (2011)

MY4

Cross Section

Bkf Width (ft) Floodprone Width (ft)

Min 45 177 243 1.8

Riffle Length (ft) 17 Riffle Slope (ft) 0.0032 Pool length (ft) 19.9 Pool Spacing (ft) 31

Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio

15.4 109

60.6 118

MY3

0.014 -

103 0.014 49.6 167

Max 87 284 288 3.4

1009 1040 1.03 0.0066 0.0047 B4c

49 0.007 24.7 75

Med 50 222 274 2

MY5

MY+

Max 87 284 288 3.4

Med 50 222 274 2

-

-

1009 1040 1.03 0.0044 0.0051 B4c

18 85 51.6 0.0029 0.0217 0.0076 19.5 164 78

Min 45 177 243 1.8

MY-2 (2007)

MY4

Cross Section 5 Riffle

MY-1 (2006)

47.7 1.7 2.8 15.9 2.5 1

MY2 27.5 65

48 1.9 2.6 13.5 2.5 1

MY1 25.5 65

Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) 0.0032 Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos

Profile

Pattern

Parameter

Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)

Dimension

Parameter

66.2 2.9 4.9 -

MY2 22.8 -

MY3

Min

35

Max

Med

MY-3 (2008)

62.8 2.8 4.7 -

MY1 22.5 -

MY5

MY+

Min

Max

Med

MY-4 (2009)

MY4

Cross Section 6 Pool

Table X-c Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 3: Buckhorn Creek

MY2

MY3

Min

Max

Med

MY-5 (2010)

MY1

MY5

MY+

Min

Max

Med

MY+ (2011)

MY4

Cross Section

Bkf Width (ft) Floodprone Width (ft)

2.2 53

20.6 58

MY3

Min 14 25 66 2.8

Max 21 59 100 4.2

Med 18 40 88 3.6

MY-1 (2006)

3.8 0.5 1 12.6 >3 1.45

MY2 6.9 40

3.5 0.6 1 11.8 >3 1.45

MY1 6.4 40

-

-

220 236 1.1 0.0205 B4c

8.3 0 12

Min 14 25 66 2.8

-

MY5

MY+

Med 18 40 88 3.6

-

220 236 1.07 0.0197 B4c

18.1 14.5 0.0348 0.0348 52 35

Max 21 59 100 4.2

MY-2 (2007)

MY4

Cross Section 1 Riffle

Riffle Length (ft) 9 23 15.8 Riffle Slope (ft/ft) 0.0155 0.0409 0.0271 Pool length (ft) 5 11.9 8.7 Pool Spacing (ft) 20 41 23

Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio

Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos

Profile

Pattern

Parameter

Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)

Dimension

Parameter

18.2 1 2.8 -

MY2 17.7 -

MY3

Min

36

Max

Med

MY-3 (2008)

17 1 2.5 -

MY1 17 -

MY5

MY+

Min

Max

Med

MY-4 (2009)

MY4

Cross Section 2 Pool

Table X-d Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 4: Middle Branch

MY2

MY3

Min

Max

Med

MY-5 (2010)

MY1

MY5

MY+

Min

Max

Med

MY+ (2011)

MY4

Cross Section

Bkf Width (ft) Floodprone Width (ft)

10.8 49

15.3 44

Min 22 52 91 237

-

MY3

Med 23 62 108 2.8

MY+

Min 22 52 91 237

Max 24 71 133 2.9

Med 23 62 108 2.8

-

197 211 1.1 0.0117 B4c

-

-

197 211 1.07 0.0166 B4c

43 18 13.5 41.5 22 0.0093 0.0092 0.0044 0.0123 0.0064 16.2 16.2 74.6 48.5 13.5 61 43

Max 24 71 133 2.9

MY5

MY-2 (2007)

MY4

Cross Section 3 Riffle

MY-1 (2006)

5.6 0.7 1.2 11.1 >3 1.3

MY2 7.9 40

5.9 0.7 1.2 11.5 >3 1.3

MY1 8.2 40

Riffle Length (ft) 16 Riffle Slope (ft) 0.009 Pool length (ft) 11.7 Pool Spacing (ft) 44

Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio

Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos

Profile

Pattern

Parameter

Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)

Dimension

Parameter

10.1 1.2 1.9 -

MY2 8.4 -

MY3

Min

37

Max

Med

MY-3 (2008)

9.7 1.1 2 -

MY1 8.6 -

MY5

MY+

Min

Max

Med

MY-4 (2009)

MY4

Cross Section 4 Pool

Table X-e Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 5: Middle Branch

MY2

MY3

Min

Max

Med

MY-5 (2010)

MY1

MY5

MY+

Min

Max

Med

MY+ (2011)

MY4

Cross Section

Bkf Width (ft) Floodprone Width (ft)

0.1 23

9.8 29

Min 16 2.3

-

MY3

Max 17 2.4

-

207.4 209.7 1.0 0.0104 B4c

18.8 0.012 9.5 38.4

Med 16 193 87 2.3

MY5

MY+

Max 17 2.4

Med 16 193 87 2.3

-

-

207.4 209.7 1.01 0.0141 B4c

11.7 22.5 16.9 0.0107 0.0222 0.0107 28.6 39.5 33.6

Min 16 2.3

MY-2 (2007)

MY4

Cross Section 5 Riffle

MY-1 (2006)

3 0.4 0.7 21.6 >3 1.6

MY2 8 30

2.7 0.4 0.6 18.6 >3 1.6

MY1 7.1 30

Riffle Length (ft) 17.5 27 Riffle Slope (ft) 0.0037 0.0176 Pool length (ft) 6.5 12.5 Pool Spacing (ft) 30 44

Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio

Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos

Profile

Pattern

Parameter

Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)

Dimension

Parameter

10.2 1.1 2 -

MY2 9.2 -

MY3

Min

38

Max

Med

MY-3 (2008)

11.5 1 2.5 -

MY1 12.1 -

MY5

MY+

Min

Max

Med

MY-4 (2009)

MY4

Cross Section 6 Pool

Table X-f Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 6: Lower East Branch

MY2

MY3

Min

Max

Med

MY-5 (2010)

MY1

MY5

MY+

Min

Max

Med

MY+ (2011)

MY4

Cross Section

Bkf Width (ft) Floodprone Width (ft)

2.4 21

0.1 43

MY3

Min 21 37 70 1.4

Max 26 48 80 1.7

Med 23 44 77 1.5

MY-1 (2006)

7.6 0.05 1.2 27.7 2.3 2.1

MY2 14.5 35

9.5 0.6 1.2 23.8 2.3 2.1

MY1 15 35

-

-

157.6 167 1.1 0.0106 B4c

Min 21 37 70 1.4

-

MY5

MY+

-

24.9 0.004 44.2

Max 26 48 80 1.7

157.6 167 1.06 0.0096 B4c

18.8 0.0032 36.8

Med 23 44 77 1.5

MY-2 (2007)

MY4

Cross Section 1 Riffle

Riffle Length (ft) 12 20.5 19 12.6 Riffle Slope (ft/ft) 0.0017 0.0052 0.0029 0.0024 Pool length (ft) 5 8.1 6 Pool Spacing (ft) 29.6 43.5 40.5 29.3

Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio

Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos

Profile

Pattern

Parameter

Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)

Dimension

Parameter

9.6 1 1.9 -

MY2 9.8 -

MY3

Min

39

Max

Med

MY-3 (2008)

9.7 0.9 1.8 -

MY1 10.5 -

MY5

MY+

Min

Max

Med

MY-4 (2009)

MY4

Cross Section 2 Pool

Table X-g Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 7: Southeast Creek

MY2

MY3

Min

Max

Med

MY-5 (2010)

MY1

MY5

MY+

Min

Max

Med

MY+ (2011)

MY4

Cross Section

Bkf Width (ft) Floodprone Width (ft)

13.3 42

7.3 56

Min 19 19 59 2.3

-

MY3

Med 25 25 66 3

-

174.4 198.2 1.1 0.0123 B4c

15 9 0.0092 0.0056 19.5 11.4 38.5 27.5

Max 42 26 99 5.1 5.1 0 9.9

Min 19 19 59 2.3

-

MY5

MY+

Med 25 25 66 3

-

174.4 198.2 1.14 0.0128 B4c

14.3 8.5 0.0373 0.0056 32.6 23.9

Max 42 26 99 5.1

MY-2 (2007)

MY4

Cross Section 3 Riffle

MY-1 (2006)

4.9 0.6 0.8 14.5 1.83 2.3

MY2 8.4 15

4.4 0.5 0.7 15.2 1.83 2.3

MY1 8.2 15

Riffle Length (ft) 4 Riffle Slope (ft) 0.002 Pool length (ft) 7 Pool Spacing (ft) 21

Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio

Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos

Profile

Pattern

Parameter

Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)

Dimension

Parameter

9.1 1.3 1.8 -

MY2 7.2 -

MY3

Min

40

Max

Med

MY-3 (2008)

7.4 1.1 1.7 -

MY1 6.6 -

MY5

MY+

Min

Max

Med

MY-4 (2009)

MY4

Cross Section 4 Pool

Table X-h Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 8: Southwest Creek

MY2

MY3

Min

Max

Med

MY-5 (2010)

MY1

MY5

MY+

Min

Max

Med

MY+ (2011)

MY4

Cross Section

APPENDIX A VEGETATION RAW DATA

Vegetation Monitoring Plot 1 – 10/28/09

Vegetation Monitoring Plot 1 – 9/13/10

Holly Grove Stream Restoration Site

November 2010

Vegetation Monitoring Plot 2 – 10/28/09

Vegetation Monitoring Plot 2 – 9/13/10

Holly Grove Stream Restoration Site

November 2010

Vegetation Monitoring Plot 3 – 10/28/09

Vegetation Monitoring Plot 3 – 9/13/10

Holly Grove Stream Restoration Site

November 2010

Vegetation Monitoring Plot 4 – 10/28/09

Vegetation Monitoring Plot 4 – 9/13/10

Holly Grove Stream Restoration Site

November 2010

Vegetation Monitoring Plot 5 – 10/28/09

Vegetation Monitoring Plot 5 – 9/13/10

Holly Grove Stream Restoration Site

November 2010

Vegetation Monitoring Plot 6 – 10/28/09

Vegetation Monitoring Plot 6 – 9/14/10

Holly Grove Stream Restoration Site

November 2010

Vegetation Monitoring Plot 7 – 10/28/09

Vegetation Monitoring Plot 7 – 9/14/10

Holly Grove Stream Restoration Site

November 2010

Vegetation Monitoring Plot 8 – 10/28/09

Vegetation Monitoring Plot 8 – 9/14/10

Holly Grove Stream Restoration Site

November 2010

Vegetation Monitoring Plot A – 10/28/09

Vegetation Monitoring Plot A – 9/13/10

Holly Grove Stream Restoration Site

November 2010

Vegetation Monitoring Plot B – 10/28/09

Vegetation Monitoring Plot B – 9/13/10

Holly Grove Stream Restoration Site

November 2010

Vegetation Monitoring Plot C – 10/28/09

Vegetation Monitoring Plot C – 9/14/10

Holly Grove Stream Restoration Site

November 2010

APPENDIX B GEOMORPHIC RAW DATA

Photo Point 1

Buckhorn Creek facing upstream – Year 0

Photo No. 1

Buckhorn Creek facing upstream – Year 1

Photo No. 2

Buckhorn Creek facing upstream – Year 2

Photo No. 3

Holly Grove Stream Restoration Site

Nov. 2010

Photo Point 2

Buckhorn Creek facing upstream – Year 0

Photo No. 4

Buckhorn Creek facing upstream – Year 1

Photo No. 5

Buckhorn Creek facing upstream – Year 2

Photo No. 6

Holly Grove Stream Restoration Site

Nov. 2010

Photo Point 3

Buckhorn Creek facing upstream – Year 0

Photo No. 7

Buckhorn Creek facing upstream – Year 1

Photo No. 8

Buckhorn Creek facing upstream – Year 2

Photo No. 9

Holly Grove Stream Restoration Site

Nov. 2010

Photo Point 4

West Branch facing downstream – Year 0

Photo No. 10

West Branch facing downstream – Year 1

Photo No. 11

West Branch facing downstream – Year 2

Photo No. 12

Holly Grove Stream Restoration Site

Nov. 2010

Photo Point 5

Buckhorn Creek facing upstream – Year 0

Photo No. 13

Buckhorn Creek facing upstream – Year 1

Photo No. 14

Buckhorn Creek facing upstream – Year 2

Photo No. 15

Holly Grove Stream Restoration Site

Nov. 2010

Photo Point 6

Buckhorn Creek at bridge, facing upstream – Year 0

Photo No. 16

Buckhorn Creek at bridge, facing upstream – Year 1

Photo No. 17

Buckhorn Creek at bridge, facing upstream – Year 2

Photo No. 18

Holly Grove Stream Restoration Site

Nov. 2010

Photo Point 7

Buckhorn Creek at bridge, facing downstream – Year 0

Photo No. 19

Buckhorn Creek at bridge, facing downstream – Year 1

Photo No. 20

Buckhorn Creek at bridge, facing downstream – Year 2

Photo No. 21

Holly Grove Stream Restoration Site

Nov. 2010

Photo Point 8

Buckhorn Creek facing upstream – Year 0

Photo No. 22

Buckhorn Creek facing upstream – Year 1

Photo No. 23

Buckhorn Creek facing upstream – Year 2

Photo No. 24

Holly Grove Stream Restoration Site

Nov. 2010

Photo Point 9

Buckhorn Creek facing upstream – Year 0

Photo No. 25

Buckhorn Creek facing upstream – Year 1

Photo No. 26

Buckhorn Creek facing upstream – Year 2

Photo No. 27

Holly Grove Stream Restoration Site

Nov. 2010

Photo Point 10

Buckhorn Creek facing upstream – Year 0

Photo No. 28

Buckhorn Creek facing upstream – Year 1

Photo No. 29

Buckhorn Creek facing upstream – Year 2

Photo No. 30

Holly Grove Stream Restoration Site

Nov. 2010

Photo Point 11

Southwest Creek facing downstream – Year 0

Photo No. 31

Southwest Creek facing downstream - Year 1

Photo No. 32

Southwest Creek facing downstream - Year 2

Photo No. 33

Holly Grove Stream Restoration Site

Nov. 2010

Photo Point 12

Southwest Creek facing upstream – Year 0

Photo No. 34

Southwest Creek facing upstream – Year 1

Photo No. 35

Southwest Creek facing upstream – Year 2

Photo No. 36

Holly Grove Stream Restoration Site

Nov. 2010

Table B2. Visual Morphological Stability Assessment Holly Grove Stream Restoration Site (D06028-B) Buckhorn Creek 8,848 ft (# Stable) Total Total Number Number Number / Performing per As- feet in Metric as built unstable Intended state

Feature Category

% Performing in Stable Condition

Feature Performing Mean or Total

A. Riffles

1. Present 2. Armor stable 3. Facet grade appears stable 4. Minimal evidence of embedding/fining 5. Length appropriate

86 86 86 86 86

86 86 86 86 86

N/A N/A N/A N/A N/A

100% 100% 100% 100% 100%

100%

B. Pools

1. Present 2. Sufficently deep 3. Length appropriate

88 88 88

88 88 88

0 N/A N/A

100% 100% 100%

100%

C. Thalweg

1. Upstream of meander bend centered 2. Downstream of meander bend centered

86 86

86 86

N/A N/A

100% 100%

100%

D. Meanders

1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief

85 0 88 88

88 N/A 88 88

N/A N/A N/A N/A

97% 100% 100% 100%

100%

E. Bed General

1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting

N/A

N/A

0/0

100%

N/A

N/A

0/200

100%

100%

F. Vanes

1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures

108 108 108 106

108 108 108 108

N/A N/A N/A N/A

100% 100% 100% 98%

100%

1. Free of scour 2. Footing stable

23 23

23 23

N/A N/A

100% 100%

100%

% Performing in Stable Condition

Feature Performing Mean or Total

100% 98% 98% 100% 100%

99%

G. Wads/Boulders

Table B2. Visual Morphological Stability Assessment

Feature Category

A. Riffles

B. Pools

Holly Grove Stream Restoration Site (D06028-B) Middle Branch 1,755 ft (# Stable) Total Total Number / Number Number Metric Performing per As- feet in built unstable as state Intended 1. Present 44 44 N/A 2. Armor stable 43 44 N/A 3. Facet grade appears stable 43 44 N/A 4. Minimal evidence of embedding/fining 44 44 N/A 5. Length appropriate 44 44 N/A 1. Present 2. Sufficently deep 3. Length appropriate

46 46 46

46 46 46

N/A N/A N/A

100% 100% 100%

100%

1. Upstream of meander bend centered 2. Downstream of meander bend centered

44 44

44 44

N/A N/A

100% 100%

100%

D. Meanders

1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief

44 0 46 46

46 N/A 46 46

N/A N/A N/A N/A

96% 100% 100% 100%

99%

E. Bed General

1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting

N/A

N/A

0/0

100%

N/A

N/A

0/0

100%

100%

F. Vanes

1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures

68 69 69 68

69 69 69 69

N/A N/A N/A N/A

99% 100% 100% 99%

99%

G. Wads/Boulders

1. Free of scour 2. Footing stable

3 2

3 3

N/A N/A

100% 67%

83%

C. Thalweg

Table B2. Visual Morphological Stability Assessment

Feature Category

A. Riffles

Holly Grove Stream Restoration Site (D06028-B) East Branch 1,090 ft Total (# Stable) Total Number / Number Number Metric Performing per As- feet in built unstable as state Intended 1. Present 25 25 N/A 2. Armor stable 24 25 N/A 3. Facet grade appears stable 25 25 N/A 4. Minimal evidence of embedding/fining 25 25 N/A 5. Length appropriate 25 25 N/A

% Performing in Stable Condition

Feature Performing Mean or Total

100% 96% 100% 100% 100%

99%

B. Pools

1. Present 2. Sufficently deep 3. Length appropriate

25 25 25

25 25 25

N/A N/A N/A

100% 100% 100%

100%

C. Thalweg

1. Upstream of meander bend centered 2. Downstream of meander bend centered

25 25

25 25

N/A N/A

100% 100%

100%

D. Meanders

1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief

25 0 25 25

25 N/A 25 25

N/A N/A N/A N/A

100% 100% 100% 100%

100%

E. Bed General

1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting

N/A

N/A

0/0

100%

N/A

N/A

0/0

100%

100%

F. Vanes

1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures

37 38 38 37

38 38 38 38

N/A N/A N/A N/A

97% 100% 100% 97%

99%

1. Free of scour 2. Footing stable

1 1

1 1

N/A N/A

100% 100%

100%

% Performing in Stable Condition

Feature Performing Mean or Total

100% 100% 100% 100% 100%

100%

G. Wads/Boulders

Table B2. Visual Morphological Stability Assessment

Feature Category

A. Riffles

B. Pools

Holly Grove Stream Restoration Site (D06028-B) Southeast Creek 363 ft (# Stable) Total Total Number Number Number / Metric Performing per As- feet in as built unstable Intended state 1. Present 10 10 N/A 2. Armor stable 10 10 N/A 3. Facet grade appears stable 10 10 N/A 4. Minimal evidence of embedding/fining 10 10 N/A 5. Length appropriate 10 10 N/A 1. Present 2. Sufficently deep 3. Length appropriate

10 10 10

10 10 10

N/A N/A N/A

100% 100% 100%

100%

C. Thalweg

1. Upstream of meander bend centered 2. Downstream of meander bend centered

10 10

10 10

N/A N/A

100% 100%

100%

D. Meanders

1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief

9 0 9 9

9 N/A 9 9

N/A N/A N/A N/A

100% 100% 100% 100%

100%

1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting

N/A

N/A

0/0

100%

N/A

N/A

0/0

100%

100%

F. Vanes

1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures

11 11 11 11

11 11 11 11

N/A N/A N/A N/A

100% 100% 100% 100%

100%

G. Wads/Boulders

1. Free of scour 2. Footing stable

2 2

2 2

N/A N/A

100% 100%

100%

E. Bed General

Table B2. Visual Morphological Stability Assessment

Feature Category

A. Riffles

B. Pools

C. Thalweg

D. Meanders

E. Bed General

F. Vanes

G. Wads/Boulders

Holly Grove Stream Restoration Site (D06028-B) Southwest Creek 723 ft Total (# Stable) Total Number / Number Number Metric Performing per As- feet in built unstable as state Intended 1. Present 23 23 N/A 2. Armor stable 23 23 N/A 3. Facet grade appears stable 23 23 N/A 4. Minimal evidence of embedding/fining 23 23 N/A 5. Length appropriate 23 23 N/A

% Performing in Stable Condition

Feature Performing Mean or Total

100% 100% 100% 100% 100%

100%

1. Present 2. Sufficently deep 3. Length appropriate

25 25 25

25 25 25

N/A N/A N/A

100% 100% 100%

100%

1. Upstream of meander bend centered 2. Downstream of meander bend centered

23 23

23 23

N/A N/A

100% 100%

100%

1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief

25 0 25 25

25 N/A 25 25

N/A N/A N/A N/A

100% 100% 100% 100%

100%

1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting

N/A

N/A

0/0

100%

N/A

N/A

0/0

100%

100%

1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures

9 9 9 9

9 9 9 9

N/A N/A N/A N/A

100% 100% 100% 100%

100%

1. Free of scour 2. Footing stable

34 34

34 34

N/A N/A

100% 100%

100%

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF1 Reach 1 - Buckhorn Creek - Sta 11+78.6

Year 2 Facing Downstream

Riffle Cross Section

104 102

Elevation (ft)

100 98

As-built Year 1 Year 2 Year 3 Year 4 Year 5

▼ BKF

96 94 92 90 -20

-10

0

10

20

30

40

50

60

70

Station (ft)

As-Built Date 1/8/09 Area 34.3 Bkf W 23.4 Dmean 1.5 Dmax 2.1 W/d 16.0

Year 1 Date 10/20/09 Area 35.4 Bkf W 23.3 Dmean 1.5 Dmax 2.1 W/d 15.3

Year 2 Date 10/11/10 Area 35.3 Bkf W 23.7 Dmean 1.5 Dmax 2.6 W/d 15.9

Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF1 Reach 1 - Buckhorn Creek - Sta 11+78.6 Station BM HI -20 -10 -5 0 5 10 15.5 18.4 21.3 25.5 26.5 29 32.2 34.4 35.3 38.9 46 49.4 52.5 57 62

As-Built FS/BS Elev. 6.36 97.34 103.70 3.11 100.59 3.60 100.10 4.71 98.99 5.26 98.44 5.61 98.09 6.07 97.63 6.46 97.24 7.25 96.45 8.19 95.51 8.45 95.25 8.59 95.11 8.46 95.24 8.25 95.45 8.36 95.34 8.01 95.69 6.46 97.24 6.41 97.29 6.49 97.21 5.99 97.71 4.78 98.92 3.00 100.70

Desc. PL1 IR Lt GRND

GRND

BKF TOE EOW THL

EOW TOE BKF

GRND

Station BM HI 0 2 7 13 15.6 17.5 18.5 20 20.4 20.9 21.7 22.5 24 26 28 29.5 30.9 32 33.8 34.6 34.8 35.3 36 36.7 37.4 38.9 42 46 48 50 51.6 52.6

FS/BS 3.78 4.02 4.15 4.58 4.94 5.20 5.65 5.96 6.37 6.48 6.71 6.98 7.29 7.33 7.23 7.17 7.19 7.33 7.33 7.26 7.10 6.89 6.75 6.45 6.21 5.83 5.18 5.22 5.27 5.37 5.04 4.82 4.7

25

Station BM HI

Year 3 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt

Station BM HI

Year 1 Elev. 98.67 102.45 98.43 98.30 97.87 97.51 97.25 96.80 96.49 96.08 95.97 95.74 95.47 95.16 95.12 95.22 95.28 95.26 95.12 95.12 95.19 95.35 95.56 95.70 96.00 96.24 96.62 97.27 97.23 97.18 97.08 97.41 97.63 97.75

Desc. RF1 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BNK BNK EOW BED BED BED BED BED BED BED BED BED EOW BNK BNK BNK BKF RT GRND GRND GRND GRND GRND GRND GRND

Station BM HI 0 2.8 6.8 11.8 13.8 15.4 16.8 18.8 20.3 21.3 21.9 23.8 25.8 26.8 27.7 28.8 30.8 31.3 32.8 33.1 33.7 34.8 35.8 36.8 37.8 39.1 40.8 44.8 49.8 52.6

Year 2 FS/BS Elev. 4.81 98.73 103.54 5.01 98.53 5.26 98.28 5.62 97.92 5.86 97.68 6.06 97.48 6.09 97.45 6.36 97.18 6.83 96.71 7.06 96.48 7.65 95.89 7.80 95.74 7.77 95.77 7.92 95.62 8.20 95.34 8.29 95.25 8.56 94.98 8.50 95.04 8.71 94.83 8.52 95.02 8.32 95.22 8.05 95.49 7.86 95.68 7.33 96.21 6.85 96.69 6.50 97.04 6.14 97.40 6.15 97.39 6.10 97.44 5.95 97.59 5.65 97.89

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BNK BNK BNK BED BED BED BED EOW BED BED THL BED EOW BED BED BNK BNK BNK BKF GRND GRND GRND GRND

97.14

FS/BS 0.00

Year 4 Elev. 100.00 100.00

Desc. IR Lt

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL1 Reach 1 - Buckhorn Creek - Sta 12+28.7

Year 2 Facing Downstream

Pool Cross Section

100

98 Elevation (ft)

▼ BKF

As-built Year 1 Year 2 Year 3 Year 4 Year 5

96

94

92

90 -25

-15

-5

5

15

25

35

45

55

65

75

Station (ft)

As-Built Date 1/8/09 Area 52.7 Bkf W 23.2 Dmean 2.3 Dmax 4.0 W/d 10.2

Year 1 Date 10/20/09 Area 48.0 Bkf W 22.1 Dmean 2.2 Dmax 3.9 W/d 10.2

Year 2 Date 10/11/10 Area 46.8 Bkf W 23.4 Dmean 2.0 Dmax 4.2 W/d 11.7

Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL1 Reach 1 - Buckhorn Creek - Sta 12+28.7 Station BM HI -25 -10 -3 0 4 10.5 14.1 18.4 19.9 20.5 20.8 23.1 24.7 27.6 29.2 30.6 31.2 31.5 33.7 37.3 42.3 44.9 48.7 52 55 58.4 62.6 67.5

As-Built FS/BS Elev. 6.36 97.34 103.70 3.35 100.35 4.12 99.58 4.91 98.79 5.51 98.19 6.37 97.33 6.85 96.85 6.71 96.99 8.35 95.35 8.45 95.25 8.80 94.90 9.83 93.87 10.54 93.16 10.73 92.97 10.59 93.11 10.49 93.21 9.75 93.95 8.84 94.86 8.40 95.30 7.97 95.73 6.95 96.75 7.41 96.29 6.92 96.78 6.59 97.11 6.76 96.94 7.16 96.54 5.95 97.75 4.57 99.13 3.17 100.53

Desc. PL1 IR Rt

GRND

BKF

EOW

EOW

BKF

Station BM HI 0 1.1 3.6 6.6 10.1 13.1 14.7 16.8 17.9 19.6 20.2 20.8 22.2 24.1 24.1 28.7 29.5 29.9 31.3 31.7 32.2 34.5 34.6 35.5 36.8 39.1 40.1 43.1 44.1 47.9 25

Station BM HI

Year 3 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt

Station BM HI

Year 1 FS/BS Elev. 3.78 98.67 102.45 4.17 98.28 4.41 98.04 5.12 97.33 5.40 97.05 5.54 96.91 5.49 96.96 5.62 96.83 6.46 95.99 6.89 95.56 7.14 95.31 7.43 95.02 8.44 94.01 8.96 93.49 9.51 92.94 9.55 92.9 9.01 93.44 8.92 93.53 8.53 93.92 8.26 94.19 7.43 95.02 6.87 95.58 6.75 95.7 6.28 96.17 6.04 96.41 5.77 96.68 5.76 96.69 5.88 96.57 6 96.45 5.71 96.74 5.64 96.81

Desc. RF1 IR Lt GRND GRND GRND GRND GRND GRND GRND GRND BKF LT BNK LOG EOW BED BED BED BED BED BED BED BED EOW BNK BNK BNK BKF RT GRND GRND GRND GRND GRND

Station BM HI 0 1.5 4.5 7.5 11.5 14.1 15.5 17.5 18.5 19.5 20.5 20.7 21 22 24 25.5 27.5 29.5 30 31 31.2 31.5 32.5 33.5 34.5 35.5 37.5 42.5 46.5 48.7

Year 2 FS/BS Elev. 5.91 98.55 104.46 6.15 98.31 6.44 98.02 7.10 97.36 7.31 97.15 7.49 96.97 7.37 97.09 7.89 96.57 8.38 96.08 8.61 95.85 8.70 95.76 9.28 95.18 9.59 94.87 10.44 94.02 10.96 93.50 11.61 92.85 11.70 92.76 11.06 93.40 11.01 93.45 11.50 92.96 10.35 94.11 9.62 94.84 8.99 95.47 8.45 96.01 8.24 96.22 8.05 96.41 7.82 96.64 7.55 96.91 7.96 96.50 7.55 96.91 7.28 97.18

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BNK BNK BNK BNK EOW BED BED BED BED BED BED BED BED EOW BNK BNK BNK BNK BKF GRND GRND GRND GRND

97.14

Year 4 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt

Desc. IR Lt

Elevation (ft)

87 1000

88

89

90

91

92

93

94

95

96

97

98

99

1050

1100

1150

1200

1250

1300

1350

1400

1450

1500

Station (ft)

1550

Profile

1600

1650

Guilford County, NC Profile Reach 1 - Buckhorn Creek

Holly Grove Stream Restoration Site

1750

1800

Year 1 Bed As-Built Bed Year 1 Bankfull Year 2 Water

1700

1850

1900

2000

Year 1 Water hw mark Year 2 Bed Year 2 BKF

1950

2050

2100

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 1 - Buckhorn Creek

HI 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 102.95 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 100.04 99.31 99.31 99.31 99.31 99.31 99.31 99.31 99.31 99.31 102.09 102.09 102.09 102.09 102.09 102.09 102.09

Station 1000 1009.5 1022 1026 1052 1092 1106 1118 1137.8 1158 1178.6 1218 1228.7 1241 1267 1304.5 1322 1336 1354 1406.2 1424 1444 1474 1484.5 1502 1525.5 1544 1552 1566 1580 1610.5 1624.5 1645 1670 1695 1710 1719 1738 1767 1787.5 1803 1837 1856 1869 1891 1909 1953 1967 1988 1997 2012 2034 2056 2072

Bed FS 6.67 6.85 9.51 10.11 7.27 7.68 8.45 8.26 7.74 8.17 8.11 8.37 10.20 9.71 8.50 8.40 11.13 9.01 9.12 9.29 8.55 7.50 7.33 8.29 7.22 6.98 9.74 9.00 7.71 7.59 7.63 9.46 8.75 7.67 8.07 9.68 9.48 8.27 7.55 7.72 9.49 7.70 8.93 7.88 10.33 8.42 8.23 13.55 11.20 13.50 12.41 11.67 11.37 11.54

Water Depth 0.06 0.09 2.50 3.09 0.23 0.24 1.00 0.80 0.20 0.55 0.35 0.26 2.06 1.56 0.28 0.07 2.38 0.22 0.25 0.04 1.68 0.63 0.46 1.43 0.36 0.08 2.50 1.75 0.46 0.32 0.28 2.10 1.21 0.28 0.15 1.74 1.53 0.33 0.30 0.17 1.94 0.11 1.32 0.15 2.37 0.47 0.21 2.45 0.04 2.39 1.31 0.56 0.23 0.22

Year 1 Bankfull FS

Description

4.60

5.22 alt bkf HOR

5.47 5.69

6.05 alt bkf HOR THL

6.04

6.43 alt bkf HOR

6.90

7.02 alt bkf HOR

4.59

THL

5.42

5.89 alt bkf HOR

6.04 5.44

THL HOR

6.03

HOR

9.28 9.01

THL HOR

Bed Elev. 96.28 96.10 93.44 92.84 95.68 95.27 94.50 94.69 95.21 94.78 94.84 94.58 92.75 93.24 94.45 94.55 91.82 93.94 93.83 93.66 91.49 92.54 92.71 91.75 92.82 93.06 90.30 91.04 92.33 92.45 92.41 90.58 91.29 92.37 91.97 90.36 90.56 91.77 91.76 91.59 89.82 91.61 90.38 91.43 88.98 90.89 91.08 88.54 90.89 88.59 89.68 90.42 90.72 90.55

Water Elev. 96.34 96.19 95.94 95.93 95.91 95.51 95.50 95.49 95.41 95.33 95.19 94.84 94.81 94.80 94.73 94.62 94.20 94.16 94.08 93.70 93.17 93.17 93.17 93.18 93.18 93.14 92.80 92.79 92.79 92.77 92.69 92.68 92.50 92.65 92.12 92.10 92.09 92.10 92.06 91.76 91.76 91.72 91.70 91.58 91.35 91.36 91.29 90.99 90.93 90.98 90.99 90.98 90.95 90.77

Bankfull Elev.

98.35

97.48 97.26

96.91

96.05

95.45

94.62

94.00 93.87

93.28

92.81 93.08

artificial 100

0.0 0.0

detritus/wood

weighted total count:

6.9 0.0

clay hardpan

93.1

bedrock

weighted particle count:

Pebble Count Weighted by Channel Feature Percent Riffle: 33.7 Percent Run: Percent Pool: 26.7 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 0.0 # very fine sand 0.062 0.13 3.0 # 0.13 0.25 5.0 # fine sand medium sand 0.25 0.5 0.0 # 0.5 1 1.0 # coarse sand 1 2 17.8 # very coarse sand 2 4 0.0 # very fine gravel 4 6 1.0 # fine gravel 6 8 1.0 # fine gravel 8 11 1.0 # medium gravel 11 16 0.0 # medium gravel 16 22 9.9 # coarse gravel 22 32 9.9 # coarse gravel very coarse gravel 32 45 10.9 # very coarse gravel 45 64 13.9 # small cobble 64 90 11.9 # medium cobble 90 128 4.0 # large cobble 128 180 1.0 # very large cobble 180 256 2.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder 0.1

silt/clay 0%

1.262

D16

10

28.6

D50

45

D65

sand 27%

gravel 48%

cobble 19%

percent by substrate type

17.55

D35

size percent less than (mm)

weighted percent

1

72

D84

pool

boulder 0%

riffle

100

bedrock 7%

110

D95

run

Pebble Count, Holly Grove Stream Restoration Site

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 1 Note: Reach Data 1

particle size (mm)

0.01

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

based on sediment particles only based on total count

percent finer than

28.7 10.9

glide

0%

hardpan 0%

12.6

wood/det 0%

9.5

gradation geo mean

artificial 0%

7.5

std dev

particle size distribution

1000

0% 3% 25% 5% 0% 1% 19% 20% 0% 1% 1% 1% 15% 0% 11% 11% 10% 12% 15% 13% 4% 5% 1% 2% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range

artificial

bedrock clay hardpan detritus/wood total count:

Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:

106

9

97

3 2 3 6 12 6 8 4 1

6

Count 5 9 20 3 3 6 ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## percent finer than

based on sediment particles only based on total count

0% 0.01

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

1

10

0.25

0.132

4.7

D50

27

D65

sand 39%

silt/clay 5%

36%

gravel

12%

cobble

percent by substrate type

D35

0%

boulder

55

D84

particle size (mm)

size percent less than (mm) D16

0.1

1000

8%

bedrock

91

# of particles

0 10000

5

10

15

20

25

0%

hardpan

23.8

0%

wood/det

2.7

gradation geo mean

0%

artificial

20.5

std dev

particle size distribution

cumulative %

D95

100

Pebble Count, Holly Grove Stream Restoration Site

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 1 Note: Riffle RF1

number of particles

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF2 Reach 2 - Buckhorn Creek - Sta 15+89.6

Year 2 Facing Downstream

Riffle Cross Section

648

Elevation (ft)

646 As-built Year 1 Year 2 Year 3 Year 4 Year 5

644

▼ BKF

642

640

638 -20

-10

0

10

20

30

40

50

60

70

Station (ft)

As-Built Date 1/8/09 Area 26.3 Bkf W 19.9 Dmean 1.3 Dmax 1.7 W/d 15.1

Year 1 Date 10/20/09 Area 25.4 Bkf W 20.4 Dmean 1.2 Dmax 1.7 W/d 16.4

Year 2 Date 10/12/10 Area 27.6 Bkf W 20.2 Dmean 1.4 Dmax 1.9 W/d 14.8

Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF2 Reach 2 - Buckhorn Creek - Sta 15+89.6 Station BM HI -20 -10 -5 -2 0 2 4.5 7 9.6 10.6 11.3 12 14 16 19 21 24 26 27.3 27.8 29.5 30.4 31.2 34 37 41 43.6 48

As-Built FS/BS Elev. 6.90 644.39 651.29 5.33 645.96 5.45 645.84 5.66 645.63 6.27 645.02 7.04 644.25 7.85 643.44 8.95 642.34 9.38 641.91 9.46 641.83 9.90 641.39 10.00 641.29 11.18 640.11 11.06 640.23 11.08 640.21 11.20 640.09 11.12 640.17 10.75 640.54 10.71 640.58 10.83 640.46 10.27 641.02 9.50 641.79 9.28 642.01 8.23 643.06 7.73 643.56 6.70 644.59 6.04 645.25 4.96 646.33 2.38 648.91

Station BM HI

Year 3 FS/BS Elev. 0.00 100.00 100.00

Desc. RF2 IR Lt

GRND

BKF EOW

EOW

BKF

Station BM HI 0 4.5 6 8.5 9.6 10.7 11.3 12.3 13 15 17 19 21 23.1 25 27.5 28.4 30 31.2 33 35 37 41 43.7

FS/BS 6.55

Station BM HI

FS/BS 0.00

7.06 8.89 9.24 9.42 9.50 9.98 10.67 10.88 11.11 11.04 11.12 11.18 11.13 10.90 10.55 10.71 9.95 9.42 8.31 8.08 7.54 6.73 6.05 5.04

Year 1 Elev. 644.77 651.32 644.26 642.43 642.08 641.90 641.82 641.34 640.65 640.44 640.21 640.28 640.20 640.14 640.19 640.42 640.77 640.61 641.37 641.90 643.01 643.24 643.78 644.59 645.27 646.28

Desc. PL2 IR Lt GRND GRND GRND GRND BKF LT BNK BNK EOW BED BED BED BED BED EOW BED BED BANK BANK BKF RT GRND GRND GRND GRND GRND

Station BM HI 0 1.5 4.5 6 7.5 9.3 10.5 11.5 12.3 13.1 14 15.5 17.5 19.5 21.5 23.5 24 25.5 26.5 27.6 29.5 31 32.5 34.5 38.5 43.6

Year 2 FS/BS Elev. 6.50 644.77 651.27 7.00 644.27 7.63 643.64 8.81 642.46 9.23 642.04 9.34 641.93 9.30 641.97 9.73 641.54 10.38 640.89 10.68 640.59 10.82 640.45 11.18 640.09 11.15 640.12 11.15 640.12 11.09 640.18 10.99 640.28 10.84 640.43 10.25 641.02 10.45 640.82 10.52 640.75 10.50 640.77 9.55 641.72 8.31 642.96 8.10 643.17 7.60 643.67 6.44 644.83 5.00 646.27

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BNK BNK EOW BED BED BED BED BED EOW BED BED BED BED BNK BKF GRND GRND GRND GRND

GRND

Desc. IR Lt

Year 4 Elev. 100.00 100.00

Desc. IR Lt

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL2 Reach 2 - Buckhorn Creek - Sta 15+30.7

Year 2 Facing Downstream

Pool Cross Section

648

Elevation (ft)

646 As-built Year 1 Year 2 Year 3 Year 4 Year 5

644 ▼ BKF

642

640

638 -25

-15

-5

5

15

25

35

45

55

65

75

Station (ft)

As-Built Date 1/8/09 Area 45.6 Bkf W 23.3 Dmean 2.0 Dmax 2.8 W/d 11.9

Year 1 Date 10/20/09 Area 43.8 Bkf W 22.2 Dmean 2.0 Dmax 2.9 W/d 11.2

Year 2 Date 10/12/10 Area 49.1 Bkf W 22 Dmean 2.2 Dmax 3.1 W/d 9.9

Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL2 Reach 2 - Buckhorn Creek - Sta 15+30.7 Station BM HI -20 -10 -3 0 5 7 8.8 10 11.7 14.2 15.5 18 20.5 23 26 29 31 32.3 35 38 39 40.8

As-Built FS/BS Elev. 6.90 644.39 651.29 5.09 646.20 5.13 646.16 5.30 645.99 6.68 644.61 8.65 642.64 8.60 642.69 8.91 642.38 8.75 642.54 8.95 642.34 10.22 641.07 10.80 640.49 11.25 640.04 11.70 639.59 11.73 639.56 11.65 639.64 11.58 639.71 10.90 640.39 10.22 641.07 8.15 643.14 5.98 645.31 5.27 646.02 3.10 648.19

Station BM HI

Year 3 FS/BS Elev. 0.00 100.00 100.00

Desc. RF2 IR Lt

GRND

BKF

BR BR

EOW

Desc. IR Lt

Station BM HI 0 4.2 5.7 8.7 10.7 11.9 12.7 14.2 15.2 16.7 18.7 21.7 24.7 27.7 29.3 30.9 32.2 34.1 36.7 39

Year 1 FS/BS Elev. 6.55 644.77 651.32 6.75 644.57 8.54 642.78 8.75 642.57 8.92 642.4 8.84 642.48 8.96 642.36 9.16 642.16 10.17 641.15 10.69 640.63 10.82 640.5 11.47 639.85 11.86 639.46 11.63 639.69 11.59 639.73 11.37 639.95 11.01 640.31 10.14 641.18 9.03 642.29 7.01 644.31 5.32 646

Station BM HI

Year 4 FS/BS Elev. 0.00 100.00 100.00

Desc. PL2 IT Lt GRND GRND GRND GRND GRND BKF LT BNK EOW BED BED BED BED BED BED BED BED EOW BNK BNK GRND

Desc. IR Lt

Station BM HI 0 1.8 3.8 5.3 7.3 9.8 10.8 11.8 12.8 13.8 14.8 15 15.7 16.8 18.8 20.8 22.8 24.8 26.8 28.8 29.8 30.8 31.3 32.3 33.8 34.8 36.8 39

Year 2 FS/BS Elev. 6.50 644.77 651.27 6.62 644.65 7.37 643.90 8.23 643.04 8.64 642.63 8.45 642.82 8.60 642.67 8.58 642.69 8.67 642.60 8.90 642.37 9.43 641.84 10.10 641.17 10.16 641.11 10.74 640.53 10.90 640.37 11.43 639.84 11.65 639.62 11.72 639.55 11.53 639.74 11.43 639.84 11.51 639.76 11.28 639.99 11.04 640.23 10.81 640.46 10.15 641.12 9.06 642.21 8.05 643.22 7.00 644.27 5.31 645.96

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND GRND GRND BKF BNK BNK BNK EOW BED BED BED BED BED BED BED BED BED BED BED EOW BNK BNK BNK GRND

Desc. IR Lt

Elevation (ft)

650 649 648 647 646 645 644 643 642 641 640 639 638 637 636 635 1000

1050

1100

1150

1200

1250

1300

1350

1400

1450

Station (ft)

1500

Profile

1550

Guilford County, NC Profile Reach 2 - Buckhorn Creek

1600

Holly Grove Stream Restoration Site

1700

Year 1 Bed As-Built Bed Year 2 Bed Year 2 BKF

1650

1750

1800

1900

1950

Year 1 Water Year 1 Bankfull Year 2 Water

1850

2000

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 2 - Buckhorn Creek

HI 653.56 653.56 653.56 653.56 653.56 653.56 653.56 653.56 653.56 653.56 653.56 653.56 653.56 653.56 653.56 651.03 651.03 651.03 651.03 651.03 651.03 651.03 651.03 651.03 651.03 651.03 647.52 647.52 647.52 647.52 647.52 647.52 647.52 647.52 647.52 647.52 647.52 647.52 647.52 647.52 647.52 647.52 648.41 648.41

Station 1000 1016 1027 1083.5 1144.5 1157.5 1183.5 1210 1237.5 1266.5 1282 1290 1320 1345 1359 1388 1430 1441 1456 1469 1498.2 1509 1530.7 1551 1589.6 1601 1641 1655 1670 1698 1712 1737 1776.5 1786 1815 1825 1837 1849 1868.5 1883 1912.5 1926 1950 1958.7

Bed FS 9.61 12.90 10.72 10.10 10.19 12.50 10.32 12.81 10.55 11.13 13.10 11.27 12.02 12.76 12.21 10.09 10.02 12.19 12.09 10.68 10.19 11.38 11.40 10.20 10.90 10.86 7.45 9.86 7.80 8.00 10.12 8.40 8.28 9.42 8.31 10.29 10.69 8.61 8.33 11.00 9.03 11.30 9.71 9.49

Water Depth 0.21 3.23 0.96 0.32 0.05 2.37 0.07 2.47 0.07 0.15 2.01 0.16 0.27 0.84 0.20 0.27 0.17 2.30 2.22 0.82 0.32 1.52 1.54 0.29 0.35 0.25 0.09 2.46 0.41 0.31 2.29 0.55 0.34 1.45 0.30 2.27 2.68 0.60 0.24 2.83 0.88 3.14 0.65 0.46

Year 1 Bankfull FS

Description

8.30

8.32

7.88

8.53 alt bkf THL

8.56

5.26

5.18

6.1 alt bkf HOR

Bed Elev. 643.95 640.66 642.84 643.46 643.37 641.06 643.24 640.75 643.01 642.43 640.46 642.29 641.54 640.80 641.35 640.94 641.01 638.84 638.94 640.35 640.84 639.65 639.63 640.83 640.13 640.17 640.07 637.66 639.72 639.52 637.40 639.12 639.24 638.10 639.21 637.23 636.83 638.91 639.19 636.52 638.49 636.22 638.70 638.92

Water Elev. 644.16 643.89 643.80 643.78 643.42 643.43 643.31 643.22 643.08 642.58 642.47 642.45 641.81 641.64 641.55 641.21 641.18 641.14 641.16 641.17 641.16 641.17 641.17 641.12 640.48 640.42 640.16 640.12 640.13 639.83 639.69 639.67 639.58 639.55 639.51 639.50 639.51 639.51 639.43 639.35 639.37 639.36 639.35 639.38

Bankfull Elev.

645.26

645.24

643.15

642.47

642.26

642.34

0.0 0.0

detritus/wood

artificial 100

0.0

weighted total count:

15.5

clay hardpan

84.5

bedrock

weighted particle count:

Pebble Count Weighted by Channel Feature Percent Riffle: 41.7 Percent Run: Percent Pool: 19.4 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 13.6 # very fine sand 0.062 0.13 1.0 # 0.13 0.25 0.0 # fine sand medium sand 0.25 0.5 1.9 # 0.5 1 1.0 # coarse sand 1 2 0.0 # very coarse sand 2 4 0.0 # very fine gravel 4 6 1.0 # fine gravel 6 8 1.0 # fine gravel 8 11 3.9 # medium gravel 11 16 3.9 # medium gravel 16 22 3.9 # coarse gravel 22 32 2.9 # coarse gravel very coarse gravel 32 45 6.8 # very coarse gravel 45 64 6.8 # small cobble 64 90 4.9 # medium cobble 90 128 13.6 # large cobble 128 180 14.6 # very large cobble 180 256 2.9 # small boulder 256 362 1.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder 0.1

silt/clay 14%

0.062

D16

10

48.5

D50

96

D65

sand 4%

gravel 30%

cobble 36%

percent by substrate type

19.44

D35

size percent less than (mm)

weighted percent

1

144

D84

pool

boulder 1%

riffle

100

bedrock 16%

179

D95

run

Pebble Count, Holly Grove Stream Restoration Site

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 2 Note: Reach Data 2

particle size (mm)

0.01

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

based on sediment particles only based on total count

percent finer than

21.4 17.5

glide

0%

hardpan 0%

392.8

wood/det 0%

3.0

gradation geo mean

artificial 0%

48.1

std dev

particle size distribution

1000

16% 1% 20% 0% 2% 18% 1% 0% 16% 0% 1% 14% 1% 5% 12% 5% 10% 5% 3% 8% 8% 8% 6% 6% 16% 4% 17% 3% 2% 1% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range

artificial

bedrock clay hardpan detritus/wood total count:

Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:

102

14

Count 21 ## ## ## 1 ## 2 ## ## 1 ## 1 ## 1 ## 2 ## 5 ## 5 ## 5 ## 4 ## 8 ## 10 ## 11 ## 11 ## ## ## ## ## ## ## 88 percent finer than

based on sediment particles only based on total count

0% 0.01

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

1

10

12.59

0.062

32.0

D50

67

D65

sand 3%

silt/clay 21%

31%

gravel

31%

cobble

percent by substrate type

D35

0%

boulder

116

D84

particle size (mm)

size percent less than (mm) D16

0.1

1000

14%

bedrock

157

# of particles

0 10000

5

10

15

20

25

0%

hardpan

259.9

0%

wood/det

2.7

gradation geo mean

0%

artificial

43.3

std dev

particle size distribution

cumulative %

D95

100

Pebble Count, Holly Grove Stream Restoration Site

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 2 Note: Riffle RF2

number of particles

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF3 Reach 3 - Buckhorn Creek - Sta 12+50.7

Year 2 Facing Downstream

Riffle Cross Section

642

Elevation (ft)

640 As-built Year 1 Year 2 Year 3 Year 4 Year 5

638 ▼ BKF

636

634

632 -20

-10

0

10

20

30

40

50

60

70

Station (ft)

As-Built Date 1/8/09 Area 48.3 Bkf W 25.4 Dmean 1.9 Dmax 2.6 W/d 13.4

Year 1 Date 10/20/09 Area 47.5 Bkf W 25.5 Dmean 1.9 Dmax 2.6 W/d 13.7

Year 2 Date 10/12/10 Area 47.7 Bkf W 27.5 Dmean 1.7 Dmax 2.8 W/d 15.9

Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF3 Reach 3 - Buckhorn Creek - Sta 12+50.7 Station BM HI -20 -10 -1 0 0.8 2.3 5 8.3 10.6 12 13.5 14 15.5 15.8 16.9 17.9 20 22 23 25 27 30 32.1 32.6 33.2 34.1 36.2 37.4 41.5 45.1 46 47.8 49.5 50.4 51.2 54.7 61 68

As-Built FS/BS Elev. 5.88 638.55 644.43 4.71 639.72 5.33 639.10 5.61 638.82 6.12 638.31 6.53 637.90 7.08 637.35 8.14 636.29 7.86 636.57 7.85 636.58 8.14 636.29 8.70 635.73 9.23 635.20 9.87 634.56 10.22 634.21 10.35 634.08 10.47 633.96 10.48 633.95 10.64 633.79 10.78 633.65 10.70 633.73 10.68 633.75 10.48 633.95 10.43 634.00 10.33 634.10 9.78 634.65 9.49 634.94 8.35 636.08 8.07 636.36 8.21 636.22 7.89 636.54 7.49 636.94 6.43 638.00 5.56 638.87 5.17 639.26 4.85 639.58 3.67 640.76 3.18 641.25 2.85 641.58

Station BM HI

Year 3 FS/BS Elev. 0.00 100.00 100.00

Desc. RF3 IR Lt

GRND

BKF

EOW

EOW

BKF

GRND

Desc. IR Lt

Station BM HI 0 2 4 7 9 11 11.6 12.2 12.8 13.6 14.8 15.4 16 18 19.6 21 22 24 26 28 30 32 32.7 33.5 34.8 35.8 36.5 37.1 40 43.5 45.6 47 49 50.4

FS/BS 3.92

Station BM HI

FS/BS 0.00

4.27 5.04 5.93 6.19 5.95 6.03 6.14 6.29 6.60 6.85 7.69 7.86 8.27 8.50 8.49 8.60 8.65 8.81 8.66 8.51 8.48 8.27 8.27 7.61 7.16 6.56 6.37 6.17 6.17 6.1 5.77 4.97 3.87 3.22

Year 1 Elev. 638.55 642.47 638.20 637.43 636.54 636.28 636.52 636.44 636.33 636.18 635.87 635.62 634.78 634.61 634.20 633.97 633.98 633.87 633.82 633.66 633.81 633.96 633.99 634.20 634.20 634.86 635.31 635.91 636.10 636.30 636.30 636.37 636.70 637.50 638.60 639.25

Year 4 Elev. 100.00 100.00

Desc. RF3 IR Lt GRND GRND GRND GRND GRND BKF LT? BKF LT BKF LT BANK BANK BANK BANK EOW BED BED BED BED BED BED BED BED BED TOE BNK BNK BNK BNK BKF GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 0 2.9 3.9 5.9 7.9 10.4 12.9 13.5 14.9 16.4 17.9 19.9 20.4 21.4 22.9 23.9 24.9 26.9 27.9 29.7 30.7 32.7 33.9 34.9 35.9 36.9 37.9 39.9 44.9 45.9 50.4

Year 2 FS/BS Elev. 3.11 638.55 641.66 3.34 638.32 4.50 637.16 5.01 636.65 5.30 636.36 5.04 636.62 5.12 636.54 5.78 635.88 6.00 635.66 6.77 634.89 7.33 634.33 7.37 634.29 7.51 634.15 7.55 634.11 7.71 633.95 8.05 633.61 8.01 633.65 7.92 633.74 7.73 633.93 7.52 634.14 7.11 634.55 7.57 634.09 7.37 634.29 6.62 635.04 6.19 635.47 5.64 636.02 5.40 636.26 5.25 636.41 5.32 636.34 5.15 636.51 4.73 636.93 2.40 639.26

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND GRND GRND BKF BNK BED BED BED EOW BED BED BED BED BED BED BED BED BED BNK BNK BKF GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL3 Reach 3 - Buckhorn Creek - Sta 13+33.1

Year 2 Facing Downstream

Pool Cross Section

640

Elevation (ft)

638 As-built Year 1 Year 2 Year 3 Year 4 Year 5

▼ BKF

636

634

632

630 -25

-15

-5

5

15

25

35

45

55

65

75

Station (ft)

As-Built Date 1/8/09 Area 62.7 Bkf W 22.2 Dmean 2.8 Dmax 4.6 W/d 7.9

Year 1 Date 10/20/09 Area 62.8 Bkf W 22.5 Dmean 2.8 Dmax 4.7 W/d 8.1

Year 2 Date 10/12/10 Area 66.2 Bkf W 22.8 Dmean 2.9 Dmax 4.9 W/d 7.9

Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL3 Reach 3 - Buckhorn Creek - Sta 13+33.1 Station BM HI -20 -14.5 -12 -2.5 0 3.6 7 12 15 16 18.2 18.7 18.8 20.3 21 23 25 27 29 30.6 31 32 34.2 38.2 42 45.7 49 56 66

As-Built FS/BS Elev. 5.88 638.55 644.43 4.23 640.20 4.60 639.83 5.23 639.20 5.62 638.81 6.61 637.82 8.09 636.34 8.39 636.04 8.61 635.82 10.03 634.40 10.56 633.87 10.49 633.94 11.09 633.34 11.83 632.60 12.60 631.83 13.20 631.23 13.10 631.33 12.87 631.56 12.68 631.75 12.20 632.23 11.89 632.54 11.09 633.34 10.14 634.29 9.23 635.20 8.64 635.79 7.65 636.78 6.39 638.04 5.49 638.94 5.14 639.29 4.82 639.61

Station BM HI

Year 3 FS/BS Elev. 0.00 100.00 100.00

Desc. RF3 IR Lt

BKF

LOG EOW

EOW BKF

GRND

Desc. IR Lt

Station BM HI 0 2 3.5 6 7.5 10 12 13.5 16 17.7 18.3 18.8 19 21 23 25 27 29 31 31.3 31.8 33.2 34.5 36 38 40 43 44.3 45.7

Year 1 FS/BS Elev. 3.92 638.55 642.47 4.62 637.85 5.48 636.99 6.06 636.41 6.42 636.05 6.68 635.79 6.57 635.9 6.70 635.77 7.55 634.92 8.35 634.12 8.66 633.81 8.54 633.93 9.17 633.3 10.03 632.44 11.06 631.41 11.38 631.09 11.06 631.41 10.84 631.63 10.44 632.03 9.38 633.09 9.14 633.33 8.44 634.03 7.61 634.86 7.22 635.25 7.10 635.37 6.76 635.71 6.19 636.28 5.42 637.05 5.13 637.34 4.42 638.05

Station BM HI

Year 4 FS/BS Elev. 0.00 100.00 100.00

Desc. PL2 IT Lt GRND GRND GRND GRND GRND GRND BKF LT BNK BNK BNK LOG EOW BED BED BED BED BED BED BED EOW BNK BNK BKF RT GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 0 2.4 4.4 6.4 7.4 9.4 11.6 13.4 14.4 15.4 16.4 18.1 18.6 18.7 19.9 21.4 23.4 25.4 27.4 29.4 31.1 31.5 32 33.4 34.4 36.4 39.4 42.4 45.6

Year 2 FS/BS Elev. 3.11 638.55 641.66 3.82 637.84 4.86 636.80 5.49 636.17 5.55 636.11 5.83 635.83 5.75 635.91 5.78 635.88 6.64 635.02 7.05 634.61 7.34 634.32 7.78 633.88 7.74 633.92 8.29 633.37 8.90 632.76 9.34 632.32 10.09 631.57 10.47 631.19 10.64 631.02 10.31 631.35 9.70 631.96 8.61 633.05 8.25 633.41 7.39 634.27 6.48 635.18 6.32 635.34 6.08 635.58 5.42 636.24 4.70 636.96 3.52 638.14

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND GRND BKF BNK BNK BNK BED LOG EOW BED BED BED BED BED BED BED BED EOW BNK BNK BKF GRND GRND GRND GRND

Desc. IR Lt

Elevation (ft)

640 639 638 637 636 635 634 633 632 631 630 629 628 627 626 625 1000

1050

1100

1150

1200

1250

1300

1350

1400

1450

1500

Station (ft)

1550

Profile

1600

1650

Guilford County, NC Profile Reach 3 - Buckhorn Creek

1850

1900

Year 2 BKF

Year 2 Bed

1800

Year 1 BKF

1750

Year 1 Water

1700

Year 1 Bed

Holly Grove Stream Restoration Site

1950

2050

Year 2 Water

As-Built Bed

2000

2100

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 3 - Buckhorn Creek

HI 644.20 644.20 644.20 644.20 644.20 644.20 644.20 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 640.89 639.13 639.13 639.13 639.13 639.13 639.13 639.13 639.13 639.13 639.13 639.13 639.13 637.23 637.23 637.23 637.23 637.23 637.23

Station 1000 1031 1074 1091 1112 1167.8 1178 1202 1212 1224 1239 1250.7 1271.4 1287 1304 1322 1333.1 1360 1388 1402 1427 1438 1453 1470 1490 1503.5 1519 1538.5 1555 1572 1584 1601 1629 1664 1713 1749 1765 1782 1792 1818 1844 1890 1904 1923 1951 1975.5 1985 2016 2036.7

Bed FS 9.76 9.80 9.79 11.46 10.29 10.58 12.80 6.91 9.98 8.85 7.12 7.21 7.13 9.06 7.36 7.70 9.71 8.25 8.50 7.93 8.30 10.39 10.16 8.54 8.27 8.27 11.40 8.26 10.40 8.74 8.73 10.84 10.55 7.38 7.39 7.61 9.59 7.91 10.04 8.03 8.49 8.80 11.50 7.87 7.18 7.16 8.26 7.61 7.40

Water Depth 0.56 0.43 0.36 1.73 0.52 0.65 2.86 0.26 3.31 2.19 0.46 0.51 0.24 2.16 0.39 0.34 2.25 0.74 0.95 0.39 0.49 2.56 2.35 0.72 0.38 0.19 3.28 0.14 2.07 0.39 0.28 4.15 3.85 0.63 0.32 0.16 2.07 0.28 2.34 0.29 0.32 0.12 2.79 1.02 0.35 0.15 1.25 0.58 0.31

Year 1 Bankfull FS Description 6.46 6.5 alt bkf HOR

7.09

7.72 alt bkf HOR

4.25

4.82 alt bkf HOR

4.89

5.11 alt bkf HOR

4.86

5.58 alt bkf HOR

5.60 6.12

4.69

5.42

5.72 alt bkf HOR

4.70

5.44 alt bkf HOR

Bed Elev. 634.44 634.40 634.41 632.74 633.91 633.62 631.40 633.98 630.91 632.04 633.77 633.68 633.76 631.83 633.53 633.19 631.18 632.64 632.39 632.96 632.59 630.50 630.73 632.35 632.62 632.62 629.49 632.63 630.49 632.15 632.16 628.29 628.58 631.75 631.74 631.52 629.54 631.22 629.09 631.10 630.64 630.33 627.63 629.36 630.05 630.07 628.97 629.62 629.83

Water Elev. 635.00 634.83 634.77 634.47 634.43 634.27 634.26 634.24 634.22 634.23 634.23 634.19 634.00 633.99 633.92 633.53 633.43 633.38 633.34 633.35 633.08 633.06 633.08 633.07 633.00 632.81 632.77 632.77 632.56 632.54 632.44 632.44 632.43 632.38 632.06 631.68 631.61 631.50 631.43 631.39 630.96 630.45 630.42 630.38 630.40 630.22 630.22 630.20 630.14

Bankfull Elev. 637.74

637.11

636.64

636.00

636.03

635.29 634.77

634.44

633.71

632.53

0.0 0.0

detritus/wood

artificial 100

0.0

weighted total count:

12.0

clay hardpan

88.0

bedrock

weighted particle count:

Pebble Count Weighted by Channel Feature Percent Riffle: 33 Percent Run: Percent Pool: 32 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 19.0 # very fine sand 0.062 0.13 1.0 # 0.13 0.25 0.0 # fine sand medium sand 0.25 0.5 0.0 # 0.5 1 0.0 # coarse sand 1 2 4.0 # very coarse sand 2 4 0.0 # very fine gravel 4 6 2.0 # fine gravel 6 8 1.0 # fine gravel 8 11 3.0 # medium gravel 11 16 4.0 # medium gravel 16 22 6.0 # coarse gravel 22 32 4.0 # coarse gravel very coarse gravel 32 45 6.0 # very coarse gravel 45 64 10.0 # small cobble 64 90 12.0 # medium cobble 90 128 6.0 # large cobble 128 180 6.0 # very large cobble 180 256 4.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder 0.1

silt/clay 19%

0.062

D16

10

32.0

D50

58

D65

sand 5%

gravel 36%

cobble 28%

percent by substrate type

11.86

D35

size percent less than (mm)

weighted percent

1

101

D84

pool

boulder 0%

riffle

100

bedrock 12%

176

D95

run

Pebble Count, Holly Grove Stream Restoration Site

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 3 Note: Reach Data 3

particle size (mm)

0.01

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

based on sediment particles only based on total count

percent finer than

22 13

glide

0%

hardpan 0%

259.6

wood/det 0%

2.5

gradation geo mean

artificial 0%

40.3

std dev

particle size distribution

1000

22% 1% 25% 0% 0% 0% 5% 20% 0% 2% 1% 3% 15% 5% 7% 5% 10% 7% 11% 14% 7% 5% 7% 5% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range

artificial

bedrock clay hardpan detritus/wood total count:

Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:

100

9

Count 24 ## 1 ## 1 ## ## ## 8 ## ## 1 ## ## 6 ## 5 ## 4 ## 5 ## 7 ## 4 ## 4 ## 12 ## 3 ## 5 ## 1 ## ## ## ## ## 91 percent finer than

based on sediment particles only based on total count

0% 0.01

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

1

10

1.66

0.062

15.4

D50

39

D65

sand 10%

silt/clay 24%

32%

gravel

24%

cobble

percent by substrate type

D35

1%

boulder

109

D84

particle size (mm)

size percent less than (mm) D16

0.1

1000

9%

bedrock

199

D95

# of particles

0 10000

5

10

15

20

25

30

0%

hardpan

127.8

0%

wood/det

2.6

gradation geo mean

0%

artificial

41.9

std dev

particle size distribution

cumulative %

100

Pebble Count, Holly Grove Stream Restoration Site

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 3 Note: Riffle RF3

number of particles

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF4 Reach 4 - Middle Branch - Sta 10+89.9

Year 2 Facing Downstream

Riffle Cross Section

675

Elevation (ft)

674 As-built Year 1 Year 2 Year 3 Year 4 Year 5

673 ▼ BKF

672

671

670 -15

-10

-5

0

5

10

15

20

25

30

35

Station (ft)

As-Built Date 1/8/09 Area 3.7 Bkf W 6.2 Dmean 0.6 Dmax 1.0 W/d 10.4

Year 1 Date 10/20/09 Area 3.5 Bkf W 6.4 Dmean 0.5 Dmax 1.0 W/d 11.8

Year 2 Date 10/11/10 Area 3.8 Bkf W 6.9 Dmean 0.5 Dmax 1.0 W/d 12.6

Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF4 Reach 4 - Middle Branch - Sta 10+89.9 Station BM HI -15 -6 0 3.6 7.1 8.1 8.8 9.4 9.9 10.5 11.2 11.9 12.4 12.8 13.5 14.3 16 19 21 22.4 24.5 29 34

As-Built FS/BS Elev. 3.96 674.94 678.90 5.26 673.64 6.00 672.90 6.21 672.69 6.10 672.80 6.24 672.66 6.54 672.36 6.89 672.01 7.03 671.87 7.50 671.40 7.53 671.37 7.44 671.46 7.50 671.40 7.42 671.48 7.04 671.86 6.72 672.18 6.54 672.36 6.56 672.34 6.52 672.38 6.50 672.40 6.20 672.70 6.00 672.90 5.27 673.63 4.44 674.46

Station BM HI

Year 3 FS/BS Elev. 0.00 100.00 100.00

Desc. BP4 IR Lt

bkf

bkf

Desc. IR Lt

Station BM HI 0 2.7 4.7 6.7 7.7 7.9 8.3 9.3 9.6 10.2 10.8 11.4 12.3 12.5 12.9 13.3 13.7 14.3 16.7 17.7 19.7 21.3 21.8 22.3

FS/BS 4.31

Station BM HI

FS/BS 0.00

6.40 6.29 6.29 6.45 6.65 6.74 6.99 7.21 7.66 7.71 7.67 7.63 7.60 7.24 7.01 6.88 6.73 6.68 6.73 6.80 6.63 6.66 6.43 6.36

Year 1 Elev. 674.77 679.08 672.68 672.79 672.79 672.63 672.43 672.34 672.09 671.87 671.42 671.37 671.41 671.45 671.48 671.84 672.07 672.20 672.35 672.40 672.35 672.28 672.45 672.42 672.65 672.72

Year 4 Elev. 100.00 100.00

Desc. BP4 IR Rt GRND GRND GRND GRND GRND BKF LT BNK BNK BED BED BED BED BED BNK BKF GRND GRND GRND GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 2 4 6 7.1 7.6 8.3 9.4 10.2 10.7 11.5 12 12.4 13.1 14 15.6 17 19.5 21 22.5

Year 2 FS/BS Elev. 4.75 674.77 679.52 6.77 672.75 6.76 672.76 6.79 672.73 6.86 672.66 7.03 672.49 7.40 672.12 7.86 671.66 8.12 671.40 8.14 671.38 8.09 671.43 8.12 671.40 7.58 671.94 7.23 672.29 7.09 672.43 7.09 672.43 7.06 672.46 7.01 672.51 7.03 672.49 6.77 672.75

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Rt GRND GRND GRND BKF BNK BNK BNK BED BED BED BED BNK BNK BKF GRND GRND GRND GRND GRND

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL4 Reach 4 - Middle Branch - Sta 11+14.3

Year 2 Facing Downstream

Pool Cross Section

674 673 ▼ BKF

Elevation (ft)

672

As-built Year 1 Year 2 Year 3 Year 4 Year 5

671 670 669 668 -15

-10

-5

0

5

10

15

20

25

30

35

Station (ft)

As-Built Date 1/8/09 Area 20.5 Bkf W 18.9 Dmean 1.1 Dmax 3.0 W/d 17.4

Year 1 Date 10/20/09 Area 17.0 Bkf W 17 Dmean 1.0 Dmax 2.5 W/d 17.0

Year 2 Date 10/11/10 Area 18.2 Bkf W 17.7 Dmean 1.0 Dmax 2.8 W/d 17.2

Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL4 Reach 4 - Middle Branch - Sta 11+14.3 Station BM HI -20 -10 -3 0 4 6 8 9.2 9.8 9.9 11.4 12.4 13.4 14 15.1 15.3 16.5 18 20.5 22.2 22.9 25.5 27.3 31 36

As-Built FS/BS Elev. 3.20 674.94 678.14 5.17 672.97 5.55 672.59 5.95 672.19 5.94 672.20 5.84 672.30 6.08 672.06 6.58 671.56 6.51 671.63 7.24 670.90 8.87 669.27 8.60 669.54 8.50 669.64 8.37 669.77 8.12 670.02 7.25 670.89 7.02 671.12 6.62 671.52 6.45 671.69 6.38 671.76 5.95 672.19 5.84 672.30 5.73 672.41 5.80 672.34 4.68 673.46 4.70 673.44

Station BM HI

Year 3 FS/BS Elev. 0.00 100.00 100.00

Desc. BP4 IR Lt

EOW

EOW

Desc. IR Lt

Station BM HI 0 2 4 5.3 6.8 8 9 9.9 10 10.5 11.3 11.9 12.5 13 13.6 14 14.8 15.4 16 18 21.4 22.3 22.9

Year 1 FS/BS Elev. 4.31 674.77 679.08 6.92 672.16 6.95 672.13 6.90 672.18 6.91 672.17 7.23 671.85 7.51 671.57 7.49 671.59 7.80 671.28 8.84 670.24 8.66 670.42 9.44 669.64 9.40 669.68 9.44 669.64 9.41 669.67 9.21 669.87 8.94 670.14 8.44 670.64 7.81 671.27 7.64 671.44 7.42 671.66 7.32 671.76 6.92 672.16 6.85 672.23

Station BM HI

Year 4 FS/BS Elev. 0.00 100.00 100.00

Desc. BP4 IR Rt GRND GRND GRND GRND GRND GRND LOG LOG BED BLDR BED BED BED BED BED BED BED BNK BKF RT GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 0 0.6 2.2 3.6 5 5.1 6.1 6.9 8.2 9.1 9.7 9.8 10.6 11.6 12.2 12.8 13.6 14.35 14.8 16.1 17.6 18.6 20 21.6 22.8

Year 2 FS/BS Elev. 4.75 674.77 679.52 7.32 672.20 7.31 672.21 7.30 672.22 7.21 672.31 7.32 672.20 7.32 672.20 7.51 672.01 7.78 671.74 8.06 671.46 7.92 671.60 8.21 671.31 9.26 670.26 9.79 669.73 10.05 669.47 10.07 669.45 10.02 669.50 9.80 669.72 9.18 670.34 8.72 670.80 7.90 671.62 7.79 671.73 7.73 671.79 7.76 671.76 7.55 671.97 7.30 672.22

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BNK BNK LOG LOG EOW BED BED THL BED BED EOW BNK BNK BKF GRND GRND GRND GRND

Desc. IR Lt

Elevation (ft)

665 1000

666

667

668

669

670

671

672

673

674

675

1025

1050

1075

1100

Station (ft)

1125

Profile

Guilford County, NC Profile Reach 4 - Middle Branch

1150

Holly Grove Stream Restoration Site

Year 1 Bed As-Built Bed Year 2 Bed Year 2 Water

1175

1200

Year 1 Water Year 1 Bankfull Year 2 BKF

1225

1250

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 4 - Middle Branch

HI 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97 679.97

Station 1000 1014.5 1026 1034 1039 1047 1055 1065 1075 1082 1085 1089.9 1097 1106 1112 1114.3 1123 1131 1141 1154.7 1159.1 1164 1170 1176 1181 1189 1195 1203 1210 1218.3 1228 1236.8

Bed FS 6.62 7.34 8.42 7.98 7.66 8.64 7.97 8.30 8.85 8.45 8.85 8.67 9.20 8.78 10.07 10.52 9.13 10.21 9.50 10.29 9.81 11.25 10.34 11.52 11.22 10.63 11.67 11.39 10.83 10.86 12.25 11.11

Water Depth

Year 1 Bankfull FS Description 5.43 5.57 alt bkf HOR

0.48

0.71 7.20

7.37 alt bkf HOR

8.62

8.79 alt bkf HOR

0.41 0.24 0.12 0.63 1.10 0.74 0.44 0.77 0.71 0.39 0.74 0.46 10.25

0.01

Bed Elev. 673.35 672.63 671.55 671.99 672.31 671.33 672.00 671.67 671.12 671.52 671.12 671.30 670.77 671.19 669.90 669.45 670.84 669.76 670.47 669.68 670.16 668.72 669.63 668.45 668.75 669.34 668.30 668.58 669.14 669.11 667.72 668.86

Water Elev. 672.03 672.03 672.03 672.04 672.04 672.04 671.53 671.53 671.53 671.36 671.36 670.89 670.89 670.53 670.53 670.55 670.50 670.50 670.12 670.12 669.49 669.49 669.16 669.16 669.14 669.04 669.04 669.04 668.87 668.87 668.87 668.87

Bankfull Elev. 674.54

672.77

671.35

669.72

artificial 100

0.0 0.0

detritus/wood

weighted total count:

1.0 0.0

clay hardpan

99.0

bedrock

weighted particle count:

Pebble Count Weighted by Channel Feature Percent Riffle: 40 Percent Run: Percent Pool: 23 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 31.5 # very fine sand 0.062 0.13 0.0 # 0.13 0.25 0.0 # fine sand medium sand 0.25 0.5 0.0 # 0.5 1 0.0 # coarse sand 1 2 2.0 # very coarse sand 2 4 2.0 # very fine gravel 4 6 3.0 # fine gravel 6 8 3.9 # fine gravel 8 11 6.9 # medium gravel 11 16 8.9 # medium gravel 16 22 6.0 # coarse gravel 22 32 5.0 # coarse gravel very coarse gravel 32 45 7.0 # very coarse gravel 45 64 9.0 # small cobble 64 90 7.0 # medium cobble 90 128 6.0 # large cobble 128 180 1.0 # very large cobble 180 256 0.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder 0.1

silt/clay 31%

0.062

D16

10

11.1

D50

22

D65

sand 2%

gravel 52%

cobble 14%

percent by substrate type

3.04

D35

size percent less than (mm)

weighted percent

1

59

D84

pool

boulder 0%

riffle

100

bedrock 1%

101

D95

run

Pebble Count, Holly Grove Stream Restoration Site

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 4 Note: Reach Data 4

particle size (mm)

0.01

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

based on sediment particles only based on total count

percent finer than

26 11

glide

0%

hardpan 0%

92.4

wood/det 0%

1.9

gradation geo mean

artificial 0%

31.0

std dev

particle size distribution

1000

32% 0% 35% 0% 0% 0% 30% 2% 2% 3% 25% 4% 7% 20% 9% 6% 5% 15% 7% 9% 10% 7% 6% 1% 5% 0% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range

artificial

bedrock clay hardpan detritus/wood total count:

Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:

101

Count 30 ## 20 ## ## ## ## ## 4 ## 3 ## 4 ## 6 ## 7 ## 4 ## 3 ## 2 ## 4 ## 7 ## 5 ## 2 ## ## ## ## ## ## ## 101 percent finer than

based on sediment particles only based on total count

0% 0.01

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

1

10

0.07

0.062

2.2

D50

10

D65

sand 20%

silt/clay 30%

37%

gravel

14%

cobble

percent by substrate type

D35

0%

boulder

53

D84

particle size (mm)

size percent less than (mm) D16

0.1

1000

0%

bedrock

103

# of particles

0 10000

5

10

15

20

25

30

35

0%

hardpan

29.7

0%

wood/det

1.8

gradation geo mean

0%

artificial

29.2

std dev

particle size distribution

cumulative %

D95

100

Pebble Count, Holly Grove Stream Restoration Site

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 4 Note: Riffle RF4

number of particles

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF5 Reach 5 - Middle Branch - Sta 11+68.1

Year 2 Facing Downstream

Riffle Cross Section

665 664 As-built Year 1 Year 2 Year 3 Year 4 Year 5

Elevation (ft)

663 ▼ BKF

662 661 660 659 -15

-10

-5

0

5

10

15

20

25

30

35

Station (ft)

As-Built Date 1/8/09 Area 6.0 Bkf W 8.9 Dmean 0.7 Dmax 1.2 W/d 13.2

Year 1 Date 10/20/09 Area 5.9 Bkf W 8.2 Dmean 0.7 Dmax 1.2 W/d 11.5

Year 2 Date 10/11/10 Area 5.6 Bkf W 7.9 Dmean 0.7 Dmax 1.2 W/d 11.1

Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF5 Reach 5 - Middle Branch - Sta 11+68.1 Station BM HI -18 -9 -5 -1 0 2 6 9 10.3 11 11.7 12 12.5 13.4 14.3 15.3 16 16.6 17.5 17.9 19.5 22 24 28 32.1 37 42 52

As-Built FS/BS Elev. 2.82 665.59 668.41 5.60 662.81 5.80 662.61 6.05 662.36 6.15 662.26 6.15 662.26 6.63 661.78 6.55 661.86 6.42 661.99 6.50 661.91 6.68 661.73 6.90 661.51 7.29 661.12 7.59 660.82 7.49 660.92 7.56 660.85 7.50 660.91 7.39 661.02 7.14 661.27 6.47 661.94 6.40 662.01 6.18 662.23 6.02 662.39 5.98 662.43 5.57 662.84 5.45 662.96 5.24 663.17 5.42 662.99 5.3 663.11

Station BM HI

Year 3 FS/BS Elev. 0.00 100.00 100.00

Desc. BP5 IR Lt

Desc. IR Lt

Station BM HI 0 2.7 5.7 8.7 9.3 9.9 10.6 11.7 12.4 13.2 13.9 14.9 16.2 16.5 17.2 17.7 18.1 19 20.7 23.7 27.7 32.2

FS/BS 3.98

Station BM HI

FS/BS 0.00

7.22 7.75 7.64 7.52 7.55 7.51 7.67 8.14 8.59 8.64 8.58 8.67 8.48 8.19 7.71 7.54 7.48 7.35 7.11 7.14 6.76 6.53

Year 1 Elev. 665.59 669.57 662.35 661.82 661.93 662.05 662.02 662.06 661.90 661.43 660.98 660.93 660.99 660.90 661.09 661.38 661.86 662.03 662.09 662.22 662.46 662.43 662.81 663.04

Year 4 Elev. 100.00 100.00

Desc. BP5 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BED BED BED BED BED BANK BANK BANK BKF RT GRND GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 0 2.6 4.6 9.8 10.5 11.6 12.5 12.9 14 15.1 15.7 16.6 17.7 18.6 20.6 24.6 28.6 32.2

Year 2 FS/BS Elev. 5.57 662.74 668.31 5.98 662.33 6.49 661.82 6.42 661.89 6.32 661.99 6.38 661.93 6.64 661.67 7.27 661.04 7.43 660.88 7.43 660.88 7.50 660.81 7.34 660.97 6.92 661.39 6.29 662.02 6.16 662.15 5.91 662.40 5.76 662.55 5.33 662.98 5.28 663.03

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND BKF BNK BED BED BED BED TOE BNK BNK BKF GRND GRND GRND GRND

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL5 Reach 5 - Middle Branch - Sta 10+63.1

Year 2 Facing Downstream

Pool Cross Section

666 665 As-built Year 1 Year 2 Year 3 Year 4 Year 5

Elevation (ft)

664 ▼ BKF

663 662 661 660 -15

-10

-5

0

5

10

15

20

25

30

35

Station (ft)

As-Built Date 1/8/09 Area 8.4 Bkf W 7.9 Dmean 1.1 Dmax 1.7 W/d 7.4

Year 1 Date 10/20/09 Area 9.7 Bkf W 8.6 Dmean 1.1 Dmax 2.0 W/d 7.6

Year 2 Date 10/11/10 Area 10.1 Bkf W 8.4 Dmean 1.2 Dmax 1.9 W/d 7.0

Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL5 Reach 5 - Middle Branch - Sta 10+63.1 Station BM HI -20 -10 -7 0 5 9 11 12.4 13.6 15 16 17 18 19 19.7 19.9 20.3 21.4 22.8 24 27 28.4 31 36

Station BM HI

As-Built FS/BS Elev. 2.82 665.59 668.41 4.65 663.76 4.35 664.06 4.12 664.29 4.52 663.89 4.89 663.52 5.09 663.32 5.25 663.16 5.41 663.00 6.01 662.40 6.52 661.89 6.93 661.48 7.15 661.26 7.05 661.36 6.62 661.79 6.27 662.14 5.51 662.90 5.33 663.08 5.26 663.15 5.30 663.11 5.02 663.39 4.61 663.80 4.25 664.16 3.90 664.51 3.42 664.99 668.41

Year 3 FS/BS Elev. 0.00 100.00 100.00

Desc. BP5 IR Lt

Desc. IR Lt

Station BM HI 0 3 7 10 12 12.4 13.1 14 14.6 15 15.9 16.6 17.3 18.1 18.8 19.7 20 20.3 21 22.5 23 24 26 28.5

Year 1 FS/BS Elev. 3.98 665.59 669.57 5.57 664 5.81 663.76 6.16 663.41 6.29 663.28 6.55 663.02 6.55 663.02 6.80 662.77 7.32 662.25 7.60 661.97 7.85 661.72 8.22 661.35 8.49 661.08 8.54 661.03 8.45 661.12 8.19 661.38 7.54 662.03 6.72 662.85 6.51 663.06 6.52 663.05 6.51 663.06 6.45 663.12 6.13 663.44 5.98 663.59 5.53 664.04

Station BM HI

Year 4 FS/BS Elev. 0.00 100.00 100.00

Desc. BP5 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BNK BED BED BED BED BED BED BNK LOG LOG BNK GRND GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 0 3 5 8 10 12 12.4 13 13.6 14.2 14.8 15.5 16 16.4 17.2 18 18.5 19.7 20 20.8 22.6 23.9 26 28.4

Year 2 FS/BS Elev. 3.55 665.59 669.14 5.22 663.92 5.40 663.74 5.60 663.54 5.80 663.34 5.87 663.27 6.12 663.02 6.14 663.00 6.32 662.82 6.81 662.33 7.60 661.54 7.54 661.60 7.86 661.28 7.96 661.18 8.05 661.09 8.08 661.06 7.90 661.24 7.66 661.48 7.20 661.94 6.21 662.93 6.15 662.99 6.00 663.14 5.72 663.42 5.56 663.58 5.10 664.04

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND GRND BKF BNK BNK BNK BNK TOE BED BED BED BED BED BED BNK BNK BNK TOB GRND GRND

Desc. IR Lt

Elevation (ft)

655 1000

656

657

658

659

660

661

662

663

664

665

1025

1050

1075

1100

Station (ft)

1125

Profile

Guilford County, NC Profile Reach 5 - Middle Branch

1150

Holly Grove Stream Restoration Site

Year 1 Bankfull Year 2 BKF

As-Built Bed Year 2 Bed

1225

Year 1 Water

1200

Year 1 Bed

1175

1250

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 5 - Middle Branch

HI 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47 669.47

Station 1000 1008 1014 1018.5 1026 1031 1035.5 1042 1051 1055.5 1061.5 1063.1 1069.3 1075 1085 1091 1102 1112 1121 1124 1132.5 1136 1144.5 1155 1159 1168.1 1175 1181

Bed FS 5.53 5.72 5.80 7.68 7.28 6.25 7.05 6.72 6.88 6.78 8.30 8.36 6.88 8.51 7.55 7.35 7.70 8.08 8.08 8.36 7.86 9.80 9.81 8.22 8.54 8.68 8.65 8.68

Water Depth 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

Year 1 Bankfull FS Description 4.30 4.62 alt bkf THL

5.58

5.9 alt bkf HOR

6.03

6.51 alt bkf HOR

7.09

7.35 alt bkf HOR

Bed Elev. 663.94 663.75 663.67 661.79 662.19 663.22 662.42 662.75 662.59 662.69 661.17 661.11 662.59 660.96 661.92 662.12 661.77 661.39 661.39 661.11 661.61 659.67 659.66 661.25 660.93 660.79 660.82 660.79

Water Elev. 663.95 663.76 663.68 661.80 662.20 663.23 662.43 662.76 662.60 662.70 661.18 661.12 662.60 660.97 661.93 662.13 661.78 661.40 661.40 661.12 661.62 659.68 659.67 661.26 660.94 660.80 660.83 660.80

Bankfull Elev. 665.17

663.89

663.44

662.38

artificial 100

0.0 0.0

detritus/wood

weighted total count:

4.9 0.0

clay hardpan

95.1

bedrock

weighted particle count:

Pebble Count Weighted by Channel Feature Percent Riffle: 52 Percent Run: Percent Pool: 22.5 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 16.7 # very fine sand 0.062 0.13 0.0 # 0.13 0.25 2.0 # fine sand medium sand 0.25 0.5 4.9 # 0.5 1 5.9 # coarse sand 1 2 5.9 # very coarse sand 2 4 2.0 # very fine gravel 4 6 3.9 # fine gravel 6 8 3.9 # fine gravel 8 11 9.8 # medium gravel 11 16 4.9 # medium gravel 16 22 7.8 # coarse gravel 22 32 2.9 # coarse gravel very coarse gravel 32 45 4.9 # very coarse gravel 45 64 12.7 # small cobble 64 90 3.9 # medium cobble 90 128 2.0 # large cobble 128 180 1.0 # very large cobble 180 256 0.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder 0.1

silt/clay 17%

0.062

D16

10

8.7

D50

17

D65

sand 19%

gravel 53%

cobble 7%

percent by substrate type

1.58

D35

size percent less than (mm)

weighted percent

1

51

D84

pool

boulder 0%

riffle

100

bedrock 5%

77

D95

run

Pebble Count, Holly Grove Stream Restoration Site

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 5 Note: Reach Data 5

particle size (mm)

0.01

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

based on sediment particles only based on total count

percent finer than

15.7 9.8

glide

0%

hardpan 0%

72.8

wood/det 0%

1.8

gradation geo mean

artificial 0%

28.6

std dev

particle size distribution

1000

18% 0% 20% 2% 5% 18% 6% 6% 16% 2% 4% 14% 4% 10% 12% 5% 10% 8% 3% 8% 5% 13% 6% 4% 2% 4% 1% 0% 2% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range

artificial

bedrock clay hardpan detritus/wood total count:

Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:

105

Count 17 ## ## ## ## 9 ## 2 ## 3 ## 8 ## 5 ## 9 ## 10 ## 7 ## 9 ## 8 ## 5 ## 9 ## 4 ## ## ## ## ## ## ## ## 105 percent finer than

based on sediment particles only based on total count

0% 0.01

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

1

10

5.35

0.062

10.8

D50

20

D65

sand 10%

silt/clay 16%

61%

gravel

12%

cobble

percent by substrate type

D35

0%

boulder

49

D84

particle size (mm)

size percent less than (mm) D16

0.1

1000

0%

bedrock

86

# of particles

0 10000

2

4

6

8

10

12

14

16

18

0%

hardpan

89.4

0%

wood/det

1.7

gradation geo mean

0%

artificial

28.1

std dev

particle size distribution

cumulative %

D95

100

Pebble Count, Holly Grove Stream Restoration Site

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 5 Note: Riffle RF5

number of particles

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF6 Reach 6 - Lower East Branch - Sta 11+07.2

Year 2 Facing Downstream

Riffle Cross Section

644 643 As-built Year 1 Year 2 Year 3 Year 4 Year 5

Elevation (ft)

642 641 640

▼ BKF

639 638 -10

-5

0

5

10

15

20

25

30

35

40

Station (ft)

As-Built Date 1/8/09 Area 4.0 Bkf W 10.7 Dmean 0.4 Dmax 0.6 W/d 28.5

Year 1 Date 10/20/09 Area 2.8 Bkf W 8 Dmean 0.4 Dmax 0.6 W/d 22.7

Year 2 Date 10/12/10 Area 3.0 Bkf W 8 Dmean 0.4 Dmax 0.7 W/d 21.6

Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF6 Reach 6 - Lower East Branch - Sta 11+07.2 Station BM HI -10 -5 -2 0 3.5 6 7.6 8.8 10 11 12 13 14 15 15.7 16.2 18 19.5 21 23.5 25.5 27.5 28.2 35

As-Built FS/BS Elev. 5.02 643.14 648.16 5.28 642.88 5.76 642.40 6.05 642.11 6.62 641.54 7.92 640.24 8.04 640.12 8.19 639.97 8.75 639.41 8.88 639.28 9.07 639.09 9.05 639.11 9.07 639.09 9.17 638.99 9.16 639.00 9.00 639.16 8.74 639.42 8.71 639.45 8.54 639.62 8.68 639.48 8.39 639.77 7.78 640.38 7.00 641.16 6.77 641.39 5.05 643.11

Station BM HI

Year 3 FS/BS Elev. 0.00 100.00 100.00

Desc. BP6 IR Lt

Desc. IR Lt

Station BM HI 0 1.5 3.5 5.5 7.5 7.8 8.7 9.6 10.2 11 11.7 12.3 12.8 13.7 14.3 15.5 16.7 19.5 21.5 23.3 24.5 26.3 28.2

FS/BS 6.06

Station BM HI

FS/BS 0.00

7.67 8.16 8.87 9.09 9.25 9.27 9.60 9.81 9.95 10.06 10.05 10.14 10.23 10.21 10.09 10.03 9.65 9.58 9.70 9.48 9.14 8.46 7.77

Year 1 Elev. 643.14 649.20 641.53 641.04 640.33 640.11 639.95 639.93 639.60 639.39 639.25 639.14 639.15 639.06 638.97 638.99 639.11 639.17 639.55 639.62 639.50 639.72 640.06 640.74 641.43

Year 4 Elev. 100.00 100.00

Desc. BP6 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BED BED BED BED BED BED BED BNK BKF RT GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 0 1.7 3.7 6.2 7.7 8.7 9.5 10.3 11 11.7 12.9 13.5 13.9 14.7 15.7 16.7 17.7 19.7 21.7 23.2 24.7 26.7 28.2

Year 2 FS/BS Elev. 4.08 641.78 645.86 4.23 641.63 4.87 640.99 5.56 640.30 5.62 640.24 5.82 640.04 6.20 639.66 6.12 639.74 6.53 639.33 6.77 639.09 6.76 639.10 6.88 638.98 6.84 639.02 6.67 639.19 6.59 639.27 6.51 639.35 6.15 639.71 6.28 639.58 6.17 639.69 6.25 639.61 6.06 639.80 5.57 640.29 4.94 640.92 4.38 641.48

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BED BED BED BED BED BED BNK BNK BKF GRND GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL6 Reach 6 - Lower East Branch - Sta 11+33.0

Year 2 Facing Downstream

Pool Cross Section

643 642 As-built Year 1 Year 2 Year 3 Year 4 Year 5

Elevation (ft)

641 ▼ BKF

640 639 638 637 -10

-5

0

5

10

15

20

25

30

35

40

Station (ft)

As-Built Date 1/8/09 Area 10.2 Bkf W 8.5 Dmean 1.2 Dmax 1.9 W/d 7.1

Year 1 Date 10/20/09 Area 10.0 Bkf W 9.2 Dmean 1.1 Dmax 2.0 W/d 8.5

Year 2 Date 10/12/10 Area 10.2 Bkf W 9.2 Dmean 1.1 Dmax 2.0 W/d 8.3

Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL6 Reach 6 - Lower East Branch - Sta 11+33.0 Station BM HI -10 -8.5 -2 0 3 5 6.5 8 9 10.5 11 12 13 14 15 15.5 16.5 18 21 23 24 26 27.5 32

As-Built FS/BS Elev. 5.02 643.14 648.16 5.68 642.48 5.57 642.59 6.38 641.78 7.10 641.06 7.99 640.17 7.82 640.34 8.22 639.94 8.19 639.97 8.57 639.59 9.60 638.56 9.87 638.29 10.03 638.13 10.10 638.06 9.94 638.22 9.78 638.38 8.71 639.45 8.05 640.11 8.10 640.06 9.07 639.09 9.21 638.95 9.00 639.16 8.12 640.04 7.35 640.81 6.45 641.71

Station BM HI

Year 3 FS/BS Elev. 0.00 100.00 100.00

Desc. BP6 IR Lt

Desc. IR Lt

Station BM HI 0 0.8 2 4 6 7.9 9 9.8 10.7 11.3 12 13.2 14.7 15.6 17.1 20 21 22.8 24 26

Year 1 FS/BS Elev. 6.06 643.14 649.20 8.13 641.07 8.20 641 8.71 640.49 8.85 640.35 9.13 640.07 9.23 639.97 9.74 639.46 10.02 639.18 10.68 638.52 10.97 638.23 11.10 638.1 11.18 638.02 10.72 638.48 9.63 639.57 9.18 640.02 9.49 639.71 10.11 639.09 10.22 638.98 9.94 639.26 9.21 639.99

Station BM HI

Year 4 FS/BS Elev. 0.00 100.00 100.00

Desc. BP6 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BNK BED BED BED BED BED BED BNK LOG LOG BNK GRND

Desc. IR Lt

Station BM HI 0 2.6 5.5 6.3 7.9 9.3 9.9 10.2 10.6 10.9 11.3 12 12.3 12.8 13.3 13.8 14.3 14.9 15.3 15.8 16.6 17.1 18.3 20 20.7 22.3 23.8 25.9 27.3

Year 2 FS/BS Elev. 3.25 641.75 645.00 3.88 641.12 4.66 640.34 4.60 640.40 4.99 640.01 4.98 640.02 5.50 639.50 5.88 639.12 6.29 638.71 6.46 638.54 6.70 638.30 6.79 638.21 6.93 638.07 7.00 638.00 6.99 638.01 6.91 638.09 6.72 638.28 6.52 638.48 6.32 638.68 5.82 639.18 5.26 639.74 5.01 639.99 4.91 640.09 5.03 639.97 5.29 639.71 5.84 639.16 5.88 639.12 5.78 639.22 4.99 640.01 4.10 640.90

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND BKF BNK BNK BNK BED TOE BED BED BED BED BED BED BED BED ROOTWAD ROOTWAD BNK BKF GRND GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Elevation (ft)

635 1000

636

637

638

639

640

641

642

643

644

645

1025

1050

1075

1100

Station (ft)

1125

Profile

1150

Guilford County, NC Profile Reach 6 - Lower East Branch

Holly Grove Stream Restoration Site

Year 1 Bankfull Year 2 BKF

As-Built Bed Year 2 Bed

1225

Year 1 Water

1200

Year 1 Bed

1175

1250

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 6 - Lower East Branch

HI 646.54 646.54 646.54 646.54 646.54 646.54 646.54 646.54 646.54 646.54 646.54 646.54 645.00 645.00 645.00 645.00 645.00 645.00 645.00 645.00 645.00 645.00 645.00 645.00

Station 1000 1018 1029.1 1033 1043 1056.5 1061.6 1079 1090.7 1095.2 1105 1107.2 1125 1132.3 1133 1140.3 1150.2 1157.2 1161 1173 1185.5 1195.5 1200.5 1209.2

Bed FS 6.26 6.06 6.13 7.04 6.82 6.70 7.38 7.00 7.26 8.13 7.44 7.46 6.24 7.03 7.00 6.38 6.83 6.18 6.85 6.40 6.79 6.64 7.51 7.05

Water Depth 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

Year 1 Bankfull FS Description 4.45 5.29 alt bkf HOR

5.60

6.19

6.29

5.33

5.40

Bed Elev. 640.28 640.48 640.41 639.50 639.72 639.84 639.16 639.54 639.28 638.41 639.10 639.08 638.76 637.97 638.00 638.62 638.17 638.82 638.15 638.60 638.21 638.36 637.49 637.95

Water Elev. 640.29 640.49 640.42 639.51 639.73 639.85 639.17 639.55 639.29 638.42 639.11 639.09 638.77 637.98 638.01 638.63 638.18 638.83 638.16 638.61 638.22 638.37 637.50 637.96

Bankfull Elev. 642.09

640.94

640.35

640.25

639.67

639.60

artificial 100

0.0 0.0

detritus/wood

weighted total count:

1.9 0.0

clay hardpan

98.1

bedrock

weighted particle count:

Pebble Count Weighted by Channel Feature Percent Riffle: 38.7 Percent Run: Percent Pool: 37.7 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 44.4 # very fine sand 0.062 0.13 3.8 # 0.13 0.25 0.0 # fine sand medium sand 0.25 0.5 0.9 # 0.5 1 0.0 # coarse sand 1 2 3.8 # very coarse sand 2 4 2.8 # very fine gravel 4 6 4.7 # fine gravel 6 8 0.0 # fine gravel 8 11 2.8 # medium gravel 11 16 6.6 # medium gravel 16 22 6.6 # coarse gravel 22 32 7.5 # coarse gravel very coarse gravel 32 45 5.7 # very coarse gravel 45 64 5.7 # small cobble 64 90 0.9 # medium cobble 90 128 1.9 # large cobble 128 180 0.0 # very large cobble 180 256 0.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder 0.1

silt/clay 44%

0.062

D16

10

0.5

D50

11

D65

sand 8%

gravel 42%

cobble 3%

percent by substrate type

0.06

D35

size percent less than (mm)

weighted percent

1

30

D84

56

D95

run

bedrock 2%

pool

boulder 0%

riffle

100

Pebble Count, Holly Grove Stream Restoration Site

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC East Branch: Reach 6 Note: Reach Data 6

particle size (mm)

0.01

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

based on sediment particles only based on total count

percent finer than

13.2 10.4

glide

0%

hardpan 0%

33.9

wood/det 0%

1.4

gradation geo mean

artificial 0%

21.9

std dev

particle size distribution

1000

45% 4% 50% 0% 1% 45% 0% 4% 40% 3% 5% 35% 0% 3% 30% 7% 25% 7% 8% 20% 6% 6% 15% 1% 2% 10% 0% 0% 5% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range

artificial

bedrock clay hardpan detritus/wood total count:

Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:

105

2

Count 35 ## 19 ## ## ## ## 1 ## 6 ## 2 ## 1 ## 4 ## 8 ## 10 ## 6 ## 7 ## 2 ## 1 ## 1 ## ## ## ## ## ## ## ## 103 percent finer than

based on sediment particles only based on total count

0% 0.01

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

1

10

0.06

0.062

0.1

D50

10

D65

sand 19%

silt/clay 33%

44%

gravel

2%

cobble

percent by substrate type

D35

0%

boulder

23

D84

particle size (mm)

size percent less than (mm) D16

0.1

1000

2%

bedrock

43

D95

# of particles

0 10000

5

10

15

20

25

30

35

40

0%

hardpan

100.6

0%

wood/det

1.2

gradation geo mean

0%

artificial

19.1

std dev

particle size distribution

cumulative %

100

Pebble Count, Holly Grove Stream Restoration Site

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC East Branch: Reach 6 Note: Riffle RF6

number of particles

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF7 Reach 7 - Southeast Creek - Sta 11+20.6

Year 2 Facing Downstream

Riffle Cross Section

655 654 As-built Year 1 Year 2 Year 3 Year 4 Year 5

Elevation (ft)

653 652 ▼ BKF

651 650 649 -10

-5

0

5

10

15

20

25

30

35

40

Station (ft)

As-Built Date 1/8/09 Area 9.4 Bkf W 14.5 Dmean 0.6 Dmax 1.2 W/d 22.3

Year 1 Date 10/20/09 Area 9.5 Bkf W 15 Dmean 0.6 Dmax 1.2 W/d 23.8

Year 2 Date 10/12/10 Area 7.6 Bkf W 14.5 Dmean 0.5 Dmax 1.2 W/d 27.7

Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF7 Reach 7 - Southeast Creek - Sta 11+20.6 Station BM HI -8 0 1 4 5 7 8 9 10 11 12 13.3 13.9 14.5 15.5 16 17 18.5 20 22 24 27.3 33 36

As-Built FS/BS Elev. 7.17 653.43 660.60 6.40 654.20 7.68 652.92 7.75 652.85 9.04 651.56 9.36 651.24 9.72 650.88 9.82 650.78 10.07 650.53 10.20 650.40 10.23 650.37 10.12 650.48 10.33 650.27 10.10 650.50 9.94 650.66 9.65 650.95 9.53 651.07 9.42 651.18 9.14 651.46 9.42 651.18 9.19 651.41 9.07 651.53 8.51 652.09 7.85 652.75 7.40 653.20

Station BM HI

Year 3 FS/BS Elev. 0.00 100.00 100.00

Desc. BP7 IR Lt

Desc. IR Lt

Station BM HI 0 1.8 3.8 5.1 6.6 7 8.8 10.1 10.9 12.5 13.2 13.7 14.4 15.3 16.8 18.8 21.8 23.8 25.8 27.3

FS/BS 5.15

Station BM HI

FS/BS 0.00

5.77 6.22 6.92 7.37 7.72 7.83 7.95 8.06 8.32 8.23 8.33 8.23 7.88 7.66 7.35 7.13 7.17 7.01 6.91 6.50

Year 1 Elev. 653.43 658.58 652.81 652.36 651.66 651.21 650.86 650.75 650.63 650.52 650.26 650.35 650.25 650.35 650.70 650.92 651.23 651.45 651.41 651.57 651.67 652.08

Year 4 Elev. 100.00 100.00

Desc. BP7 IR Lt GRND GRND GRND GRND BKF LT

BKF RT GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 0 1.8 3.8 5.8 7.8 8.8 9.6 10.5 10.9 11.4 12.1 12.6 13.4 13.7 14.1 14.6 15.3 16.3 17.3 18.3 19.8 21.3 23.8 25.8 27.3

Year 2 FS/BS Elev. 5.27 653.16 658.43 5.54 652.89 6.04 652.39 6.73 651.70 7.31 651.12 7.64 650.79 7.68 650.75 7.67 650.76 7.95 650.48 8.13 650.30 8.24 650.19 8.07 650.36 8.07 650.36 8.13 650.30 8.10 650.33 7.88 650.55 7.52 650.91 7.50 650.93 7.40 651.03 7.20 651.23 7.06 651.37 7.24 651.19 7.16 651.27 6.84 651.59 6.94 651.49 6.29 652.14

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND GRND BKF BNK EOW BED BED BED BED EOW BNK BKF GRND GRND GRND GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL7 Reach 7 - Southeast Creek - Sta 11+32.3

Year 2 Facing Downstream

Pool Cross Section

654 653 As-built Year 1 Year 2 Year 3 Year 4 Year 5

Elevation (ft)

652 ▼ BKF

651 650 649 648 -10

-5

0

5

10

15

20

25

30

35

40

Station (ft)

As-Built Date 1/8/09 Area 10.5 Bkf W 9.5 Dmean 1.1 Dmax 2.0 W/d 8.6

Year 1 Date 10/20/09 Area 9.6 Bkf W 9.7 Dmean 1.0 Dmax 1.8 W/d 9.8

Year 2 Date 10/12/10 Area 9.6 Bkf W 9.8 Dmean 1.0 Dmax 1.9 W/d 10.0

Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL7 Reach 7 - Southeast Creek - Sta 11+32.3 Station BM HI -4 0 2 5 7.5 8.2 8.5 9 10 11 12 13 14 14.3 14.6 15.4 16.5 17.8 20 24 27 29 34 40

Station BM HI

As-Built FS/BS Elev. 7.17 653.43 660.60 6.17 654.43 7.20 653.40 7.92 652.68 9.03 651.57 9.77 650.83 9.81 650.79 10.45 650.15 10.80 649.80 11.26 649.34 11.59 649.01 11.56 649.04 11.31 649.29 10.94 649.66 10.41 650.19 10.22 650.38 10.05 650.55 9.61 650.99 9.46 651.14 9.45 651.15 9.33 651.27 8.95 651.65 8.69 651.91 8.15 652.45 7.55 653.05 660.60

Year 3 FS/BS Elev. 0.00 100.00 100.00

Desc. BP7 IR Lt

Desc. IR Lt

Station BM HI 0 1.5 2.5 4 6.2 8 8.7 9.3 10 11 12 13 14 14.1 14.6 15.5 16.7 19 22 24 27 29.1

Year 1 FS/BS Elev. 5.15 653.43 658.58 5.21 653.37 5.62 652.96 6.19 652.39 6.66 651.92 7.51 651.07 7.81 650.77 8.48 650.1 9.01 649.57 9.25 649.33 9.41 649.17 9.34 649.24 9.16 649.42 8.85 649.73 8.52 650.06 8.22 650.36 7.91 650.67 7.62 650.96 7.39 651.19 7.38 651.2 7.27 651.31 6.85 651.73 6.67 651.91

Station BM HI

Year 4 FS/BS Elev. 0.00 100.00 100.00

Desc. BP7 IR Lt GRND GRND GRND GRND GRND LOG EOW

EOW BKF RT GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 0 0.9 3.4 4.5 5.4 7.1 8 8.4 8.9 9.4 10.1 11 12 12.7 13.8 13.9 14.2 15.2 16.1 16.9 20.1 21.5 24.1 27 28.9

Year 2 FS/BS Elev. 4.94 652.34 657.28 3.84 653.44 4.09 653.19 5.19 652.09 5.55 651.73 5.93 651.35 6.35 650.93 6.49 650.79 7.19 650.09 7.71 649.57 7.89 649.39 8.11 649.17 8.26 649.02 8.10 649.18 7.89 649.39 7.61 649.67 7.16 650.12 6.76 650.52 6.67 650.61 6.35 650.93 6.23 651.05 6.05 651.23 6.07 651.21 5.90 651.38 5.50 651.78 5.39 651.89

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND GRND LOG LOG/EOW BED BED BED BED BED BED BED EOW BNK BNK BNK BKF GRND GRND GRND GRND GRND

Desc. IR Lt

Elevation (ft)

645 1000

646

647

648

649

650

651

652

653

654

655

1025

1050

1075

Station (ft)

1100

Profile

Guilford County, NC Profile Reach 7 - Southeast Creek

Holly Grove Stream Restoration Site

Year 1 Bed As-Built Bed Year 2 Bed Year 2 BKF

1125

1150

Year 1 Water Year 1 Bankfull Year 2 Water

1175

1200

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 7 - Southeast Creek

HI 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28 657.28

Station 1039 1047 1056.2 1058.8 1073.4 1090 1098.3 1103 1111 1116.1 1120.6 1128.7 1132.3 1138 1144 1150 1167.1

Bed FS 6.13 6.44 6.26 6.91 6.85 6.90 6.50 7.36 7.43 7.09 7.00 6.96 8.13 8.00 7.40 7.80 7.84

Water Depth 0.16 0.37 0.01 0.59 0.42 0.39 0.01 0.65 0.54 0.19 0.07 0.01 0.96 0.85 0.17 0.54 0.30

Year 1 Bankfull FS 5.13

Description

6.02

6.14

6.25

6.54 alt bkf HOR

Bed Elev. 651.15 650.84 651.02 650.37 650.43 650.38 650.78 649.92 649.85 650.19 650.28 650.32 649.15 649.28 649.88 649.48 649.44

Water Elev. 651.31 651.21 651.03 650.96 650.85 650.77 650.79 650.57 650.39 650.38 650.35 650.33 650.11 650.13 650.05 650.02 649.74

Bankfull Elev. 652.15

651.26

651.14

651.03

artificial 100

0.0 0.0

detritus/wood

weighted total count:

1.0 0.0

clay hardpan

99.0

bedrock

weighted particle count:

Pebble Count Weighted by Channel Feature Percent Riffle: 46 Percent Run: Percent Pool: 31 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 37.0 # very fine sand 0.062 0.13 6.0 # 0.13 0.25 0.0 # fine sand medium sand 0.25 0.5 0.0 # 0.5 1 0.0 # coarse sand 1 2 1.0 # very coarse sand 2 4 2.0 # very fine gravel 4 6 6.0 # fine gravel 6 8 2.0 # fine gravel 8 11 5.0 # medium gravel 11 16 8.0 # medium gravel 16 22 6.0 # coarse gravel 22 32 6.0 # coarse gravel very coarse gravel 32 45 2.0 # very coarse gravel 45 64 6.0 # small cobble 64 90 7.0 # medium cobble 90 128 3.0 # large cobble 128 180 0.0 # very large cobble 180 256 2.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder 0.1

silt/clay 37%

0.062

D16

10

5.1

D50

14

D65

sand 7%

gravel 43%

cobble 12%

percent by substrate type

0.06

D35

size percent less than (mm)

weighted percent

1

51

D84

pool

boulder 0%

riffle

100

bedrock 1%

91

D95

run

Pebble Count, Holly Grove Stream Restoration Site

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southeast Creek: Reach 7 Note: Reach Data 7

particle size (mm)

0.01

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

based on sediment particles only based on total count

percent finer than

12 11

glide

0%

hardpan 0%

45.9

wood/det 0%

1.8

gradation geo mean

artificial 0%

28.7

std dev

particle size distribution

1000

37% 6% 40% 0% 0% 0% 35% 1% 2% 30% 6% 2% 25% 5% 8% 20% 6% 6% 2% 15% 6% 7% 10% 3% 0% 5% 2% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range

artificial

bedrock clay hardpan detritus/wood total count:

Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:

104

1

Count 50 ## ## ## ## ## ## 6 ## 5 ## 7 ## 5 ## 7 ## 8 ## 8 ## 3 ## 1 ## 2 ## 1 ## ## ## ## ## ## ## ## 103 percent finer than

based on sediment particles only based on total count

0% 0.01

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

1

10

0.06

0.062

2.4

D50

8

D65

sand 0%

silt/clay 48%

48%

gravel

3%

cobble

percent by substrate type

D35

0%

boulder

21

D84

particle size (mm)

size percent less than (mm) D16

0.1

1000

1%

bedrock

39

# of particles

0 10000

10

20

30

40

50

60

0%

hardpan

23.5

0%

wood/det

1.1

gradation geo mean

0%

artificial

18.3

std dev

particle size distribution

cumulative %

D95

100

Pebble Count, Holly Grove Stream Restoration Site

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southeast Creek: Reach 7 Note: Riffle RF7

number of particles

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF8 Reach 8 - Southwest Creek - Sta 11+49.9

Year 2 Facing Downstream

Riffle Cross Section

100 99 As-built Year 1 Year 2 Year 3 Year 4 Year 5

Elevation (ft)

98 97 ▼ BKF

96 95 94 -10

-5

0

5

10

15

20

25

30

35

40

Station (ft)

As-Built Date 1/8/09 Area 3.4 Bkf W 8 Dmean 0.4 Dmax 0.7 W/d 18.6

Year 1 Date 10/20/09 Area 4.4 Bkf W 8.2 Dmean 0.5 Dmax 0.7 W/d 15.2

Year 2 Date 10/12/10 Area 4.9 Bkf W 8.4 Dmean 0.6 Dmax 0.8 W/d 14.5

Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF8 Reach 8 - Southwest Creek - Sta 11+49.9 Station BM HI -15 -8 -3 0 3 7 9.3 10.6 11.9 12.3 12.6 12.8 14 15 16 17 18 18.7 19.4 19.9 21.2 22.4 24.9 26.9 28 28.9 30 33 37 40

As-Built FS/BS Elev. 2.51 98.99 101.50 3.36 98.14 3.67 97.83 3.94 97.56 4.05 97.45 4.10 97.40 4.04 97.46 4.24 97.26 4.56 96.94 5.04 96.46 5.26 96.24 5.41 96.09 5.58 95.92 5.56 95.94 5.76 95.74 5.56 95.94 5.46 96.04 5.43 96.07 5.34 96.16 5.23 96.27 5.04 96.46 4.91 96.59 4.71 96.79 4.23 97.27 3.99 97.51 4.03 97.47 3.86 97.64 3.92 97.58 3.64 97.86 2.72 98.78 2.35 99.15

Station BM HI

Year 3 FS/BS Elev. 0.00 100.00 100.00

Desc. Stump

Desc. IR Lt

Station BM HI 0 2 6 8 9 10 11 11.9 12.5 13.6 15 16.6 18 19 20.1 21 23 26

FS/BS 3.78

Station BM HI

FS/BS 0.00

6.68 6.77 6.71 6.70 6.83 7.05 7.33 7.63 8.15 8.29 8.37 8.34 8.18 7.93 7.63 7.59 7.22 6.77

Year 1 Elev. 100.42 104.20 97.52 97.43 97.49 97.50 97.37 97.15 96.87 96.57 96.05 95.91 95.83 95.86 96.02 96.27 96.57 96.61 96.98 97.43

Year 4 Elev. 100.00 100.00

Desc. BP8 IR Rt GRND GRND GRND GRND GRND GRND BKF BNK BED BED BED BED BED BNK BKF GRND GRND GRND

Desc. IR Lt

Station BM HI 0 1.8 4.5 6.5 8.5 9.5 11.1 11.5 11.9 12.1 12.4 13.4 14.5 14.9 15.5 16.8 17.7 18.5 19.3 19.8 20.3 20.8 21.7 23.2 24.5 26.2 27 28.3 29

Year 2 FS/BS Elev. 5.42 97.59 103.01 5.52 97.49 5.75 97.26 5.60 97.41 5.56 97.45 5.70 97.31 5.82 97.19 6.21 96.80 6.36 96.65 6.46 96.55 6.54 96.47 7.20 95.81 7.23 95.78 7.12 95.89 7.28 95.73 7.12 95.89 7.11 95.90 7.11 95.90 7.00 96.01 6.84 96.17 6.63 96.38 6.44 96.57 6.38 96.63 6.33 96.68 6.01 97.00 5.80 97.21 5.64 97.37 5.53 97.48 5.52 97.49 5.45 97.56

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND GRND GRND GRND BKF BNK TOE BED BED BED BED BED BED BED BED BNK BNK BKF GRND GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL8 Reach 8 - Middle Branch - Sta 100+78.5

Year 2 Facing Downstream

Pool Cross Section

102 101 100 As-built Year 1 Year 2 Year 3 Year 4 Year 5

Elevation (ft)

99 98 ▼ BKF

97 96 95 94 -15

-10

-5

0

5

10

15

20

25

30

35

Station (ft)

As-Built Date 1/8/09 Area 7.9 Bkf W 7.1 Dmean 1.1 Dmax 1.6 W/d 6.4

Year 1 Date 10/20/09 Area 7.4 Bkf W 6.6 Dmean 1.1 Dmax 1.7 W/d 5.9

Year 2 Date 10/12/10 Area 9.1 Bkf W 7.2 Dmean 1.3 Dmax 1.8 W/d 5.7

Year 3 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL8 Reach 8 - Middle Branch - Sta 100+78.5 Station BM HI -17 -10.5 -4 -1 0 1.5 3.6 5.2 6 9 11 11.7 12.2 12.5 12.8 13 13.5 14.3 15 16 17 17.7 18.3 18.8 19 19.9 21 22.8 25.4 26.9 30 34 36 40

As-Built FS/BS Elev. 5.31 98.99 104.30 3.29 101.01 4.42 99.88 5.09 99.21 5.26 99.04 5.30 99.00 5.47 98.83 5.83 98.47 5.72 98.58 5.93 98.37 6.76 97.54 7.00 97.30 7.11 97.19 7.28 97.02 7.48 96.82 7.64 96.66 8.00 96.30 8.42 95.88 8.62 95.68 8.63 95.67 8.66 95.64 8.61 95.69 8.37 95.93 7.63 96.67 7.41 96.89 5.87 98.43 5.65 98.65 5.30 99.00 4.9 99.40 5 99.30 5.03 99.27 4.73 99.57 4.64 99.66 4.17 100.13 4.06 100.24

Station BM HI

Year 3 FS/BS Elev. 0.00 100.00 100.00

Desc. Stump

Desc. IR Lt

Station BM HI 0 2.4 4.9 8.4 9.4 10.9 11.9 12.9 13.9 14.5 15.3 16.3 17.6 17.9 18.5 19.1 19.9 21.4 23.4 25.4

Year 1 FS/BS Elev. 3.78 100.42 104.20 5.15 99.05 5.37 98.83 5.50 98.7 6.45 97.75 6.66 97.54 6.85 97.35 7.03 97.17 7.86 96.34 8.33 95.87 8.65 95.55 8.74 95.46 8.58 95.62 8.09 96.11 7.48 96.72 7.10 97.1 5.73 98.47 5.53 98.67 5.13 99.07 4.86 99.34 4.89 99.31

Station BM HI

Year 4 FS/BS Elev. 0.00 100.00 100.00

Desc. BP8 IR Rt GRND GRND GRND GRND GRND GRND BKF BNK BED BED BED BED BED ROOTWAD ROOT TOB GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 0 2.7 4.7 5.5 5.8 8.7 9.7 10.7 11.7 12.2 12.4 12.8 13.3 14.2 15.2 16.7 17.6 18 18.6 18.9 19.1 19.7 20.7 23 25.45

Year 2 FS/BS Elev. 5.61 99.09 104.70 5.69 99.01 5.94 98.76 6.04 98.66 5.74 98.96 6.24 98.46 7.12 97.58 7.20 97.50 7.33 97.37 7.54 97.16 7.64 97.06 8.23 96.47 8.66 96.04 8.98 95.72 9.26 95.44 9.33 95.37 9.33 95.37 9.06 95.64 8.01 96.69 7.75 96.95 7.47 97.23 6.32 98.38 6.15 98.55 5.82 98.88 5.33 99.37 5.41 99.29

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND LOG GRND GRND BKF BNK BNK BNK BED EOW BED BED BED BED BED BNK BNK BNK GRND GRND GRND GRND GRND

Desc. IR Lt

Elevation (ft)

105 104 103 102 101 100 99 98 97 96 95 94 93 92 91 90 1000

1025

1050

1075

1100

Station (ft)

1125

Profile

Guilford County, NC Profile Reach 8 - Southwest Creek

1150

Holly Grove Stream Restoration Site

Year 1 Bed As-Built Bed Year 2 Bed Year 2 BKF

1175

1200

Year 1 Water Year 1 Bankfull Year 2 Water

1225

1250

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 8 - Southwest Creek

HI 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 104.82 103.01 103.01 103.01 103.01

Station 1000 1012 1021 1027 1037 1051.3 1056.5 1064 1072.5 1078.5 1088.4 1092.2 1097.9 1104.3 1114.5 1120.5 1130.4 1139 1149.9 1155 1163 1173 1186.3 1189.4 1198.6 1200.3

Bed FS 7.47 7.31 8.93 8.63 7.80 7.88 9.25 8.29 8.00 9.43 8.65 8.55 8.40 9.80 8.85 9.78 8.91 10.10 9.01 9.20 10.19 9.60 8.13 9.04 8.07 8.19

Water Depth 0.09

Year 2 Bankfull FS

Description

0.90 0.59 6.70

7.18 alt bkf HOR

0.75 7.10 0.71 7.40

7.44 alt bkf HOR

0.50 0.40 0.66 8.16 0.49 8.46 0.53 6.85

8.57 alt bkf HOR

Bed Elev. 97.35 97.51 95.89 96.19 97.02 96.94 95.57 96.53 96.82 95.39 96.17 96.27 96.42 95.02 95.97 95.04 95.91 94.72 95.81 95.62 94.63 95.22 94.88 93.97 94.94 94.82

Water Elev. 97.44 96.79 96.79 96.78 96.32 96.32 96.32 96.10 96.10 96.10 95.52 95.52 95.52 95.52 95.44 95.44 95.38 95.38 95.12 95.12 95.12 94.50 94.50 94.50

Bankfull Elev.

98.12

97.72

97.42

96.66

96.36

96.16

artificial 100.1

0.0 0.0

detritus/wood

weighted total count:

0.0 0.0

clay hardpan

100.1

bedrock

weighted particle count:

Pebble Count Weighted by Channel Feature Percent Riffle: 34.7 Percent Run: Percent Pool: 37.6 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 13.9 # very fine sand 0.062 0.13 12.9 # 0.13 0.25 1.0 # fine sand medium sand 0.25 0.5 2.0 # 0.5 1 1.0 # coarse sand 1 2 10.9 # very coarse sand 2 4 4.0 # very fine gravel 4 6 11.9 # fine gravel 6 8 3.0 # fine gravel 8 11 9.9 # medium gravel 11 16 13.9 # medium gravel 16 22 8.9 # coarse gravel 22 32 2.0 # coarse gravel very coarse gravel 32 45 0.0 # very coarse gravel 45 64 2.0 # small cobble 64 90 2.0 # medium cobble 90 128 0.0 # large cobble 128 180 1.0 # very large cobble 180 256 0.0 # small boulder 256 362 0.0 # small boulder 362 512 0.0 # medium boulder 512 1024 0.0 # large boulder 1024 2048 0.0 # 2048 4096 0.0 # very large boulder 0.1

silt/clay 14%

0.070

D16

10

4.7

D50

9

D65

sand 28%

gravel 55%

cobble 3%

percent by substrate type

1.32

D35

size percent less than (mm)

weighted percent

1

16

D84

32

D95

run

bedrock 0%

pool

boulder 0%

riffle

100

Pebble Count, Holly Grove Stream Restoration Site

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southwest Creek: Reach 8 Note: Reach Data 8

particle size (mm)

0.01

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

based on sediment particles only based on total count

percent finer than

13.9 13.9

glide

0%

hardpan 0%

35.2

wood/det 0%

1.1

gradation geo mean

artificial 0%

15.1

std dev

particle size distribution

1000

14% 13% 16% 1% 2% 1% 14% 11% 4% 12% 12% 3% 10% 10% 14% 9% 8% 2% 0% 6% 2% 2% 4% 0% 1% 2% 0% 0% 0% 0% 10000 0% % of particles 0% weighted percent of particles in range

artificial

bedrock clay hardpan detritus/wood total count:

Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:

100

100

2 7 8 16 15 7 5 5 2 2 6

Count 12 2 2 1 4 4 ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## percent finer than

based on sediment particles only based on total count

0% 0.01

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

1

10

8.32

0.250

13.3

D50

19

D65

sand 13%

silt/clay 12%

65%

gravel

10%

cobble

percent by substrate type

D35

0%

boulder

42

D84

particle size (mm)

size percent less than (mm) D16

0.1

1000

0%

bedrock

135

# of particles

0 10000

2

4

6

8

10

12

14

16

18

0%

hardpan

28.1

0%

wood/det

3.2

gradation geo mean

0%

artificial

13.0

std dev

particle size distribution

cumulative %

D95

100

Pebble Count, Holly Grove Stream Restoration Site

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southwest Creek: Reach 8 Note: Riffle RF8

number of particles