Holly Grove Stream Restoration Site MONITORING REPORT 2011 ...

Report 2 Downloads 113 Views
Holly Grove Stream Restoration Site Guilford County, North Carolina Cataloging Unit: 03030002 EEP Contract #: D06028-B October 13, 2011

MONITORING REPORT 2011 (YEAR 3)

Submitted to: North Carolina Department of Environment and Natural Resources North Carolina Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699-1652

Submitted by: Restoration Systems, LLC 1101 Haynes Street, Suite 211 Raleigh, North Carolina 27604 Point of Contact: Tara Disy Allden Phone: 919-755-9490

Holly Grove Stream Restoration Site

MONITORING REPORT 2011 (YEAR 3) Prepared for:

Restoration Systems, LLC 1101 Haynes Street, Suite 211 Raleigh, North Carolina 27604

Prepared by:

Wolf Creek Engineering, pllc 7 Florida Avenue Weaverville, NC 28787

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

TABLE OF CONTENTS EXECUTIVE SUMMARY ........................................................................................................... iii 1.0 Project Goals, Background, and Attributes......................................................................... 1 1.1 General Project Description ............................................................................................ 1 1.1.1 USGS and NCDWQ River Basin Designations...................................................... 1 1.1.2 NCDWQ Surface Water Classification .................................................................. 1 1.2 Project Goals and Objectives .......................................................................................... 2 1.3 Project Structure.............................................................................................................. 2 1.4 Restoration Type and Approach ..................................................................................... 2 1.5 Project History, Contacts and Attribute Data ................................................................. 3 2.0 Project condition and monitoring results .......................................................................... 21 2.1 Vegetation Assessment ................................................................................................. 21 2.1.1 Vegetative Problem ............................................................................................... 22 2.1.2 Vegetation Plot Photos.......................................................................................... 22 2.2 Stream Assessment ....................................................................................................... 22 2.2.1 Hydrology ............................................................................................................. 23 2.2.2 Geomorphology .................................................................................................... 23 2.2.3 Problem Areas ....................................................................................................... 24 2.2.4 Photo Reference Stations ...................................................................................... 24 2.2.5 Stability Assessment Table ................................................................................... 25

LIST OF TABLES Table I. Table II. Table III. Table IV. Table V. Table VI. Table VII. Table VIII. Table IX. Table X.

Project Components …………………………………….…….…..………………...Page 7 Project Activity and Reporting History …………………………….…..…………..Page 8 Project Contacts ………………………………………………….….…..………….Page 8 Project Attributes …………………………………………….….….....…………....Page 9 Vegetation Summary……………………………………………………………….Page 21 Verification of Bankfull Events ………………………………...………………....Page 23 BEHI and Sediment Export Estimates……………………………………………..Page 24 Categorical Stream Feature Visual Stability Assessment……………………..Page 25 - 26 Baseline Morphology and Hydraulic Summary………………………………Page 27 - 32 Morphology and Hydraulic Monitoring Summary……………………………Page 33 - 40

LIST OF FIGURES Figure 1. Vicinity Map……………………………………………………………………..Page 5 Figure 2. Vicinity Map……………………………………………………………………..Page 6 Figure 3. Monitoring Plans…………………………………………………………..Page 11 - 20

APPENDIX A: Vegetative Raw Data APPENDIX B: Geomorphic Raw Data

Holly Grove / Restoration Systems

i

Monitoring Year 3 (Oct. 2011)

HOLLY GROVE RESTORATION SITE

Holly Grove / Restoration Systems

MONITORING REPORT

ii

Monitoring Year 3 (Oct. 2011)

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

EXECUTIVE SUMMARY The Holly Grove Site is located in Guilford County, North Carolina within the Cape Fear River Basin, Cataloging Unit 03030002. The project consisted of restoring, enhancing, and preserving approximately 21,000 linear feet of stream, restoring approximately 42 acres of riparian buffers, and preserving approximately 1.11 acres of wetlands. The Site is in a rural setting in the Southern Outer Piedmont hydrophysiographic ecoregion and was previously used to grow row crops with woody vegetation confined to isolated areas. Prior to restoration, the channels were highly degraded due to unrestricted livestock access, channelization activities, and lack of riparian vegetation. The restoration design was based on a Priority Level 1 and 2 approach to restore proper channel dimension and allow for appropriate sediment transport. Restoration practices on this project were implemented with the intent of minimizing unnecessary disturbance to adjacent land and to protect mature riparian vegetation where it existed. The constructed stream profile has restored stable bed morphology including appropriate riffle-pool sequencing. Cross-vanes, J-Hook vanes, and in-stream log structures have been integrated into the channel to provide grade control, maintain stable streambanks while the riparian vegetation establishes, and provide in-stream habitat. Biodegradable fiber matting was used to provide temporary stabilization on the newly graded streambanks. Excavated materials from the existing channel were used to backfill around in-stream structures and to build riffles with a natural substrate and function. Hydrology Following completion of the construction in October of 2008, the Site has been subjected to one greater-than-bankfull event and at least four bankfull or near-bankfull events. It should be noted that, prior to completion of construction, Tropical Storm Fay (August 2008) produced a highflow event in which floodwaters crested 2.5 feet above bankfull. Approximately seventy percent (70%) of the project was complete at that time and subjected to this high water event. In late September, 2010, Tropical Storm Nicole resulted in 3 and 4.5 inches of rain on the site and overbankfull flows. There has been at least one bankfull event in the past year since the last monitoring visit. Stream The restored stream reaches have successfully managed the bankfull and above bankfull flow events of the first three years. The overall grade of the channel has been maintained and the banks of the channels are stable throughout the Site. Three beaver dams were identified on upper Buckhorn Creek that are impounding water to the top of bank. Vegetation Native woody and herbaceous species were used to establish, at minimum, a fifty-foot riparian buffer on each side of the restored reach. Herbaceous species have established throughout the site and there is significant evidence of additional volunteer species becoming established within the buffer. The riparian buffer bare-root planting had an average survival rate of 324 stems per acre through the third year. There is an average density of 2,185 stems per acre including planted stems and natural volunteers.

Holly Grove / Restoration Systems

iii

Monitoring Year 3 (Oct. 2011)

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

Planned Action Continued visual monitoring is planned for the few stream areas that have been identified as “Areas of Concern”. Repair work is not warranted at this time on any of the areas. This is based on the judgment that these issues are not a threat to channel or structure stability and are not resulting in excessive erosion. It is recommended that natural stream processes and natural revegetation be allowed the opportunity to mend these areas and then re-assess their condition in the next monitoring cycle. However, the beaver dams will be removed manually in order to restore proper baseflow conditions.

Holly Grove / Restoration Systems

iv

Monitoring Year 3 (Oct. 2011)

HOLLY GROVE RESTORATION SITE

1.0

MONITORING REPORT

PROJECT GOALS, BACKGROUND, AND ATTRIBUTES

The purpose of the Holly Grove Stream Restoration Site (Site) was to restore degraded sections of Buckhorn Creek and several of its tributaries located in Guilford County, North Carolina. This monitoring report presents information regarding the site and watershed conditions, the restoration approach for the project, the monitoring results, remedial action plan and detailed monitoring drawings of the site. 1.1

General Project Description

Buckhorn Creek is located approximately 15 miles northeast of the City of Greensboro in rural Guilford County, North Carolina (Figure 1: Vicinity Map). The site consists of approximately 42 acres of floodplain, approximately 21,000 linear feet of stream designated as Buckhorn Creek and its tributaries, and 1.11 acres of existing wetlands (Figure 2: Project Map). The stream reaches consist of perennial, first and second order streams that have historically been impacted by riparian and bank vegetation removal, channel straightening, unrestricted livestock access, and agricultural land-use practices. Existing land use within the site consists of forested areas and row crops. The site is located within moderately sloping colluvial valleys and elevations range from approximately 615 to 720 feet above sea level. Past land management activities have consisted of timber harvesting with subsequent land clearing for agricultural uses including cattle and row crop farming. The land outside of the conservation easement remains in active agricultural production. 1.1.1

USGS and NCDWQ River Basin Designations

The project reach is located in the Haw River watershed of the Cape Fear River Basin (United States Geological Survey (USGS) 14-digit Hydrologic Unit 03030002020070) within North Carolina Division of Water Quality (NCDWQ) sub-basin 03-06-02. This sub-basin is primarily rural agriculture, although residential land use accounts for a significant portion. Buckhorn Creek drains into Reedy Fork Creek approximately ¾ miles downstream of the Site, which in turn flows to the Haw River eight miles downstream. 1.1.2

NCDWQ Surface Water Classification

Reedy Fork Creek in the vicinity of the Site is assigned a best usage classification of C, NSW by the NCDWQ and as such there are no restrictions on watershed development or types of discharge. These waters are suitable for aquatic life propagation and survival, fishing, wildlife, secondary recreation, and agriculture. Secondary recreation includes wading, boating, and other uses not involving human body contact with water on an organized or frequent basis. The supplemental classification, NSW (Nutrient Sensitive Waters) includes areas with water quality problems associated with excessive plant growth resulting from nutrient enrichment. The portion of Reedy Fork Creek to which Buckhorn Creek drains and the portion of the Haw River that is approximately two miles east of the Site are listed on the DWQ final

Holly Grove / Restoration Systems

1

Monitoring Year 3 (Oct. 2011)

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

2004 and draft 2006 303(d) lists. Streams which are included in the 303(d) list do not meet water quality standards or have impaired uses. 1.2

Project Goals and Objectives

The primary goals of the Holly Grove Stream Restoration Project are to: • Restore aquatic and riparian habitat within the on-site portions of the Buckhorn Creek watershed. • Restore geomorphic stability to the subject stream reaches. These goals will be accomplished through the following objectives: • Restoration of approximately forty-two acres of Mesic Mixed Hardwood Forest along both sides of Buckhorn Creek and its tributaries. • Removing nonpoint sources of pollution associated with agricultural activities including the establishment of a native woody riparian buffer (at least 50’ wide) adjacent to streams and wetlands to treat surface runoff which may be laden with sediment and/or agricultural pollutants from the adjacent landscape. • Reestablishing stream stability and the capacity to transport watershed flows and sediment loads by restoring a stable dimension, pattern, and profile supported by natural in-stream habitat and grade/bank stabilization structures. • Promoting floodwater attenuation through a) conveying bankfull stream flows through construction of bankfull bench, b) restoring secondary, entrenched tributaries thereby reducing floodwater velocities, and c) re-vegetating floodplains to increase frictional resistance on floodwaters crossing the Site. • Improving aquatic habitat by enhancing stream bed variability and the use of instream structures. • Providing wildlife habitat including fringe and forest edge. These accomplishments will result in: • Restoration and enhancement of 15,822 Stream Mitigation Units. • Protecting the Site with a perpetual conservation easement. 1.3

Project Structure

The project is composed of seven distinct reaches; the main channel, Buckhorn Creek, and each of its tributaries, Middle Branch, West Branch, East Branch, Lower East Branch, Southeast Creek, and Southwest Creek. The project structure is tabulated in the corresponding Table 1 (See Below). 1.4

Restoration Type and Approach

Restoration and enhancement practices implemented on this project were designed to minimize unnecessary disturbance to adjacent land and to protect mature riparian vegetation where it exists. Consideration was given to the potential functional lift provided by restoration activities in comparison to the functional lift that could be realized through the natural process of channel evolution. Included in this consideration was an attempt to determine the disturbance and sedimentation that could occur as a result of this natural process. Where restoration was determined to be warranted,

Holly Grove / Restoration Systems

2

Monitoring Year 3 (Oct. 2011)

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

consideration was given to which reaches could best be served by maintaining as much of the existing channel pattern as possible. The proposed channels of Buckhorn Creek and its tributaries were designed as Type B4c streams with the exception of the lower reach of Middle Branch. This channel configuration provides the most stable and natural form in the moderately sloping colluvial valleys that are found throughout the Site. Not only does it effectively convey bankfull discharge and sediment load but also conforms to the natural conveyance of flood flows. Additionally, since broad alluvial valleys are generally not found within the Site, the lower sinuosity of the Type B4c streams allowed for minimization grading and earthwork activities. The constructed channel dimensions, patterns, and profiles were based on hydraulic relationships and morphologic dimensionless ratios of the reference reaches. Restoration activities included restoring stable channel morphology supported by natural in-stream habitat and grade/bank stabilization structures, the elimination of accelerated bank erosion, and reestablishment of native riparian buffers at least 50 feet in width. Exotic riparian vegetation was removed in areas of the project to allow for replanting of native riparian species. In-stream structures were installed to provide for enhanced aquatic habitat, protection of the newly constructed stream banks, and grade control for the newly constructed channel. 1.5

Project History, Contacts and Attribute Data

The summary of the project history, contacts, and attribute data is tabulated in Tables II, III, and IV (See Below).

Holly Grove / Restoration Systems

3

Monitoring Year 3 (Oct. 2011)

HOLLY GROVE RESTORATION SITE

MITIGATION PLAN Table I Project Components

Restoration Reach/Area

Restoration Level

Approach

PreRestoration LF or AC

PostRestoration LF or AC

Holly Grove Stream Restoration Site / EEP Contact #D06028-B

Station Range/Location

Buckhorn Creek West Branch West Branch Middle Branch Middle Branch Middle Branch Middle Branch East Branch East Branch East Branch East Branch Little Branch SW Creek SW Creek UT to SW Creek SE Creek SE Creek UT to SE Creek Wetland A

R E2 R E2 R E2 R P E2 R R E2 R E2 P R P P E

P2 E2 P2 E2 P1 E2 P1 E2 P1 P1 E2 P1 E2 P1 -

8,757 870 390 240 1,549 472 90 960 920 300 739 553 723 2,229 325 342 881 528 1.11

8,848 870 391 240 1,561 472 194 960 920 329 761 553 723 2,229 325 363 881 528 1.11

100+00 - 194+50 300+00 - 308+00 300+00 - 303+91 398+91 - 401+31 401+31 - 417+37 417+37 - 422+09 423+00 - 425+40 480+00 - 498+80 480+00 - 498+80 490+00 - 493+29 500+00 - 507+61 19+945 - 205+54 600+00 - 607+34 608+26 - 630+55 650+00 - 653+50 700+00 - 704+36 706+25 - 715+06 750+00 - 755+28 Middle Branch

Comments

Component Summation Restoration Level

Stream (LF)

Riparian Wetland (Ac) Riverine

Restoration Enhancement Enhancement I Enhancement II Creation Preservation HQ Preservation

13,170

Totals

21,148

Non-Riparian (Ac) Upland (Ac)

Buffer (Ac)

BMP

42

BMP Count

Non-Riverine

1.11 5,284 2,694 1.11 1.11

= Non-Applicable

Holly Grove / Restoration Systems

7

Monitoring Year 3 (Oct. 2011)

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

Table II Project Activity and Reporting History Holly Grove Restoration Project Data Collection Activity or Report Complete Restoration Plan Apr 2007 Final Design - Construction Plans N/A Construction N/A Temporary S&E mix applied to entire project area N/A Permanent seed mix applied to entire site N/A Bare-root plantings for floodplain and uplands N/A Mitigation Plan / As-Built (Year 0 Monitoring - baseline) Oct 2008 Year 1 Monitoring Oct 2009 Year 2 Monitoring Oct 2010 Year 3 Monitoring Oct 2011 Year 4 Monitoring Year 5 Monitoring

Completion or Delivery Jun 2007 Oct 2007 Oct 2008 Sep 2008 Sep 2008 Dec 2008 Dec 2008 Dec 2009 Nov 2010 Oct 2011

Table III Project Contact Table Holly Grove Restoration Project Designer Wolf Creek Engineering, pllc

7 Florida Avenue Weaverville NC, 28787 828-658-3649

S. Grant Ginn Construction Contractor North State Environmental, Inc

2889 Lowery St. Winston-Salem, NC 27101 336-725-2010

Darrell Westmoreland Planting & Seeding Contractor North State Environmental, Inc

2889 Lowery St. Winston-Salem, NC 27101 336-725-2010

Stephen Joyce Monitoring Performers Stream Monitoring - Wolf Creek Engineering, pllc Vegetation Monitoring - Catena Group

Holly Grove / Restoration Systems

S. Grant Ginn Mike Wood

8

828-658-3649 919-732-1300

Monitoring Year 3 (Oct 2011)

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

Table IV Project Attribute Table Holly Grove Restoration Project Guilford Piedmont Southern Outer Piedmont Cape Fear River Basin 03030002020070 03-06-02

Project County Physiographic Region Ecoregion Project River Basin USGS HUC for Project (14 digit) NCDWQ Sub-basin for Project Within extent of EEP Watershed Plan? WRC Class (Warm, Cool, Cold) % of project esaement fenced or demarcated Beaver activity observed during design phase?

100% Demarcated Easement Corners Yes, on Buckhorn Creek upstream of bridge

Restoration Component Attribute Table Buckhorn West Middle 4.27 0.2 0.2 Second First First 8757 390 1639 Perennial Perennial Perennial Rural Rural Rural

Drainage area (mi2) Stream order Restored length (feet) Perennial or Intermittent Watershed type Watershed LULC Distribution (e.g.)

Residential Ag-Row Crop Ag-Livestock Forested Watershed impervious cover (%) NCDWQ AU/Index number NCDWQ classification 303d listed? Upstream of a 303d listed segment? Reasons for 303d listing or stressor Total acreage of easement Total vegetated acreage within easement Total planted acreage as part of the restoration Rosgen classification of pre-existing Rosgen classification of As-Built Valley type Valley slope Valley side slope range Valley toe slope range Cowardin classification Trout waters designation Species of concern, endangered? Dominant soil series and characteristics Series Depth (in) Clay % K T

Holly Grove / Restoration Systems

East 0.2 First 1039 Perennial Rural

20% 10% 5% 10% 40% 60% 50% 10% 10% 5% 10% 0% 30% 25% 35% 80% 10 5 5 5 16-(1)a C, NSW C, NSW C, NSW C, NSW No Yes non-point urban and agricultural runoff 64.87 47.06 45.3 F, G G G G B4c B4c B4c B4c II II II II 0.0051 0.0239 0.0165 0.0119 4% - 40% 0.4% - 2% N/A N/A Yes, Bald Eagle & Carolina Darter Ch , Co CcD Ch CcD , Ch Congaree Cecil Chewacla Chewacla 0-80 0-80 0-70 0-70 5-35 5-70 5-35 5-35 Moderate Moderate Moderate Moderate -

9

Southeast Southwest 0.14 0.19 First First 342 723 Perennial Perennial Rural Rural 5% 90% 0% 5% 2

10% 10% 0% 80% 2

C, NSW

C, NSW

G B4c II 0.0159

G B4c II 0.0169

CcD Cecil 0-80 5-70 Moderate -

CcD Cecil 0-80 5-70 Moderate -

Monitoring Year 3 (Oct.2011)

11

12

13

14

15

16

17

18

19

20

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

2.0

Project condition and monitoring results

2.1

Vegetation Assessment

The Carolina Vegetation Survey – Ecosystem Enhancement Program (CVS-EEP) 2008 protocol for recording vegetation (Lee et. al 2008) was used to determine the planting pattern of woody stems with respect to species, spacing, and density as well as to forecast survivability and growth of planted stems in subsequent monitoring years. Eleven (11) randomly placed 10 meter by 10 meter vegetative sampling plots were established within the project easement area. The corners of each monitoring plot have been marked in the field and their position documented by GPS survey. Plots were placed within the applicable planting zones to capture the heterogeneity of the designed vegetative communities. Plot corners were permanently marked with rebar and recorded during the baseline survey. All planted stems and plot corners were marked with orange flagging tape to facilitate relocation during subsequent monitoring years. A reference photograph was taken for each plot at the origin looking diagonally across the plot to the opposite corner. Year 3 vegetation monitoring for the Site occurred on September 13, 2011. There are eleven vegetation plots that were monitored using the CVS-EEP vegetation monitoring protocol, which was implemented for monitoring year MY-01, MY-02, and MY-03. Vegetation Plot 7 was relocated during MY-02 to avoid disturbance from gas line easement maintenance. Including Plots 1-8, and A-C, there is an average of 324 planted stems/acre. There is a total of 2,185 stems/acre, including planted stems and natural volunteers. The success criterion for planted woody species is 320 stems/acre after MY03. Vegetation plots 1, 4, 6, A, B, and C contain planted stem counts above the success criteria. Across all vegetation monitoring plots (VP), Year 3 monitoring documented a moderate survivability range of 162 to 526 planted stems per acre. VP2 and VP7 had the lowest average stem density whereas VPC had the highest. VP2, 3, 5, 7, & 8 did not meet the interim success criterion. Twenty-one (21) species were documented among the vegetation plots, a 19.2% reduction in the total species planted. Several species such as sugarberry, possum haw, willow oak, cherrybark oak, winged elm and black willow were represented by only one individual. Table V: Vegetation Summary Plot 1

Date Sampled 9/13/2011

2

Planted Living Stems

Dead or Missing Stems

Volunteer Stems

Total Living Stems

Average Stems Per Acre

# Species

9

13

57

66

364.22

8

9/13/2011

4

2

88

92

161.87

3

3

9/13/2011

7

3

28

35

283.28

6

4

9/13/2011

9

4

90

99

364.22

7

5

9/13/2011

5

3

34

39

202.34

4

6

9/13/2011

10

3

7

17

404.69

5

Holly Grove / Restoration Systems

21

Monitoring Year 3 (Oct. 2011)

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

7

9/13/2011

4

0

0

4

161.87

3

8

9/13/2011

6

0

95

101

242.81

3

A

9/13/2011

11

4

15

26

445.15

6

B

9/13/2011

10

4

34

44

404.69

3

C

9/13/2011

13

3

58

71

526.09

5

Approximately 60% of planted stems had a vigor code of good or excellent. High numbers of natural stems were found in five of the eleven vegetation monitoring plots. It is expected that recruitment will continue to contribute to the total stem density for the restoration site. 2.1.1

Vegetative Problems

The vegetation problem areas are composed of areas of low planted stem density in the vicinity of plots, 2, 3, 5, 7, and 8, due to the CVS data results. Invasive exotics observed throughout the conservation easement that are a threat to native vegetation include tree of heaven (Ailanthus altissima), princess tree (Paulownia tomentosa), and Johnson grass (Sorghum halapense). Other invasive exotics infrequently observed that did not appear to present a threat include tall fescue (Schedonurus arundinaceus), Japanese honeysuckle (Lonicera japonica), Multiflora rose (Rosa multiflora), and Chinese privet (Ligustrum sinense). According to the EEP Invasives of Concern/Interest List, tree of heaven, princess tree, mulitflora rose, Chinese privet, and Japanese honeysuckle are all classified as “High Concern” species and fescue is classified as a “Low/Moderate Concern” species. 2.1.2 Vegetation Plot Photos A photo point was established in each vegetation plot. Photo points are positioned for each plot at the origin facing diagonally across the plot to the opposite corner. The photographs were captured on the same day as the vegetation plot surveys (Appendix A). 2.2

Stream Assessment

Monitoring protocol follows that outlined within the EEP Site Specific Mitigation Plan and detailed in the U.S. Army Corps of Engineers (USACE) Stream Mitigation Guidelines for Monitoring Level I. Specifically, stream monitoring included measurements of stream dimension, profile, pattern, bed materials, photo documentation, and stream bankfull return interval. Streambanks remain intact and stable and fully vegetated throughout the site. Vegetation has grown into many riffles on the main channel due to a lack of shade and mature buffer. This has limited the mobility of bed material but has not had noticeable effects on overall stability. All in-stream structures remain intact and fully functional with the exception of a few minor piping issues previously identified during Year 2. These piping issues appear to have remained stable during Year 3.

Holly Grove / Restoration Systems

22

Monitoring Year 3 (Oct. 2011)

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

2.2.1 Hydrology Since completion of construction in October of 2008, the site has been subjected to at least one greater-than-bankfull event and several bankfull or near-bankfull events. In August of 2008, Tropical Storm Fay crossed central North Carolina resulting in eight (8) inches of rainfall on-site and water elevations 2.5 feet above bankfull on Buckhorn Creek. Approximately seventy percent (70%) of the project was complete at that time and subjected to this estimated fifty-year storm event. In October of 2008, locally heavy rainfall produced a bankfull event at the Site during the final stages of construction. In June of 2009, heavy rainfall resulted in water elevations 0.2 to 0.3 feet above bankfull. Heavy rainfall associated with remnants of Hurricane Ida produced one additional event in November of 2009, after Year 1 monitoring was completed which again resulted in an elevated flow event. In late September of 2010, Tropical Storm Nicole moved north across central and eastern North Carolina and produced approximately 4.5 inches of rain over 48 hours resulting in flood waters which crested 0.4 feet above bankfull. During Year 3, at least one rainfall event occurred resulting in water which crested 0.1 feet above bankfull. Table VI Verification of Bankfull Events – Lick Creek Stream Restoration Site (D04013-1) Date of Data Collection 9/3/08 8/13/09 10/11/10 9/26/11

Date of Occurrence of Bankfull Event 8/27/08 June 2009 September 2010 2011

Height above Bankfull (ft) 2.5 0.2 0.4 0.1

Method of Data Collection Debris Evidence Crest Gauge Crest Gauge Crest Gauge

2.2.2 Geomorphology Following the procedures established in the USDA Forest Service Manual (Harrelson et al 1994) and the methodologies utilized in the Rosgen stream assessment and classification system (Rosgen 1994, 1996), data collected consisted of detailed dimension and pattern measurements, longitudinal profiles, and bed materials sampling. Re-survey of the permanent cross sections and profile reaches have shown only minimal alterations in local bed elevations with the bed form and the channel pattern remaining consistent with the As-built condition. There is evidence of minimal aggradation in some of the channel reaches with four of eight riffle cross sections and three of eight pool cross sections showing a reduction in cross-sectional area while maintaining nearly the same maximum depth as the As-built. This slight aggradation may be related to vegetation growth in the channel bed. Location of bed features relative to the pattern is consistent with the As-built survey. Pebble counts were conducted at each riffle cross-section, as well as across the overall study reaches. Pebble count data was plotted by size distribution in order to assess the D50 and D84 size class. Pebble count data from Reaches 1,2,3,5 and 6 the D50 values reflect a general increase of in bed material size. On Reaches 4 and 8 the D50 decreased

Holly Grove / Restoration Systems

23

Monitoring Year 3 (Oct. 2011)

HOLLY GROVE RESTORATION SITE

MONITORING REPORT

from small gravel to sand, while the D84 increased from gravel to coarse gravel. On Reach 7, the material size generally decreased from the Year 2 condition with the D50 decreasing from small gravel to sand and the D84 decreasing from coarse gravel to medium gravel. This may be due in part to significant growth of vegetation in the riffles that may be trapping finer particles in the bed. Table VII. BEHI and Sediment Export Estimates – (Only Required in Year 5) 2.2.3 Problem Areas In Year 3 Monitoring of the Holly Grove Stream Restoration Site, some minor problem areas remain that were identified during Year 2. 1.) Several riffles on Buckhorn Creek and Southeast Branch still exhibit excessive vegetation in the channel bed. 2.) There were three (3) locations of minor piping at log vanes. 3.) There were five (5) areas of local bank scour. 4.) There were three (3) areas of minor riffle scour. Inadequate shade due to lack of mature riparian buffer has allowed vegetation to take root in the bed matrix. It is anticipated that this vegetation will die back during the winter but will reestablish during each growing season until sufficient shading is provided by the canopy of the buffer. This has affected bedload transport by limiting bed mobility, but it is not expected to have any significant impact on the overall stability or integrity of the channel bed. Continued visual monitoring is planned for the stream areas that have been identified as “Areas of Concern”. Repair work is not warranted at this time on any of the areas. This is based on the judgment that these issues have not risen to the level of posing a threat to channel or structure stability and are not resulting in excessive erosion. It is recommended that natural stream processes and natural re-vegetation be allowed the opportunity to mend these areas and then reassess their condition in the next monitoring cycle. Additionally, three beaver dams were identified on upper Buckhorn Creek that are impounding water up to the top of bank elevation. These dams will be manually removed in order to restore base flow conditions. 2.2.4 Photo Reference Stations Photograph reference Stations (PRSs) have been established to assist in characterizing the site and to allow qualitative evaluation of the site conditions. The location of each photo station has been permanently marked in the field and the bearing/orientation of the photograph is indicated on the As-built plans to allow for consistent repetition. A total of twenty-eight (28) PRSs have been established along the restored stream (Appendix B). Sixteen (16) of these PRSs have been located upstream of the permanent monitoring cross sections. These photographs are taken facing downstream looking at the section, and show as much of the banks and channel as possible.

Holly Grove / Restoration Systems

24

Monitoring Year 3 (Oct. 2011)

HOLLY GROVE RESTORATION SITE

2.2.5

MONITORING REPORT

Stability Assessment Table

Table VIII. Categorical Stream Feature Visual Stability Assessment

Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders

Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders

Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders

Initial 100% 100% 100% 100% 100% 100% 100%

Performance Percentage Buckhorn Creek (8,848 ft) MY-01 MY-02 MY-03 MY-04 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 99% 100% 100% 100% 100% 100%

Initial 100% 100% 100% 100% 100% 100% 100%

Performance Percentage Middle Branch (1,755 ft) MY-01 MY-02 MY-03 MY-04 97% 99% 100% 100% 100% 100% 100% 100% 100% 100% 99% 100% 100% 100% 100% 98% 99% 100% 83% 83% 100%

Initial 100% 100% 100% 100% 100% 100% 100%

Performance Percentage East Branch (1,090 ft) MY-01 MY-02 MY-03 MY-04 100% 99% 99% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 99% 99% 100% 100% 100%

Holly Grove / Restoration Systems

25

MY-05

MY-05

MY-05

Monitoring Year 3 (Oct. 2011)

HOLLY GROVE RESTORATION SITE

Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders

Feature Riffles Pools Thalweg Meanders Bed General Vanes / J Hooks etc. Wads and Boulders

MONITORING REPORT

Initial 100% 100% 100% 100% 100% 100% 100%

Performance Percentage Southeast Creek (363 ft) MY-01 MY-02 MY-03 MY-04 96% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Initial 100% 100% 100% 100% 100% 100% 100%

Performance Percentage Southwest Creek (723 ft) MY-01 MY-02 MY-03 MY-04 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Holly Grove / Restoration Systems

26

MY-05

MY-05

Monitoring Year 3 (Oct. 2011)

Table IX-f

Baseline Stream Data Summary

Holly Grove Restoration Site - Southwest Creek (723 ft) Parameter

Regional Curve

Gauge

Simension and Substrate - Riffle

LL

UL

Pre-Existing Condition Eq.

Min

Mean

Med

Max

Reference Reach(es) Data SD

n

Min

Mean

Med

Max

Design SD

n

Min

As-Built / Baseline Max

Min

Mean

6.3

Floodprone Width (ft)

7.5

63

Bankfull Mean Depth (ft)

0.9

1.73

0.6

0.4

Bankfull Max Depth (ft)

1.2

2

0.85

0.7

Bankfull Cross-Sectional Area (ft2)

5.5

34.8

4.9

3.4

7

12

13

18.6

Width/Depth Ratio Entrenchment Ratio 1

1.2

2.7

8

Med

Bankfull Width (ft)

1

20.1

Med

11

2.9

3.1

Bank Height Ratio

1.7

1.2

d50 (mm)

28

28

0.02

0.013

1.4

2.6

1.4

17.5

2.2

Max

SD

8 24

15.6

3

1.95

1

Profile Riffle Length (ft)

10

Riffle Slope (ft/ft) Pool Length (ft)

6

Pool Max Depth (ft) Pool Spacing (ft) 2

30

65

100

33

14

19

0.007 10

13

1.3

36.5

40

32

40

48

9

11

18

0.0012

0.0018

0.032

5

8

12

1.15

1.45

1.65

19

25

32

Pool Volume (ft3)

Pattern Channel Beltwidth (ft)

40

50

60

33

36.5

40

12

18

24

50

55

60

Radius of Curvature (ft)

45

97.5

150

47

182.5

318

16

20

24

20

28.5

37

Radius of Curvature Ratio (ft/ft)

7

15

23

2.3

9.15

16

2

2.5

3

2.5

3.55

4.6

Meander Wavelength (ft)

55

77.5

100

37

104.5

172

16

44

72

60

93

126

Meander Width Ratio (ft/ft)

6

8

10

1.6

1.8

2

1.5

2.25

3

6.25

6.88

7.5

Substrate, bed and transport parameters 4 4 4

Ri% / Ru% / P% / G% / S%

33

19

30

SC% / Sa% / G% / C% / B% / Be%

d16 / d35 / d50 / d84 / d95 / dip / disp (mm) Reach Shear Stress (competency) lb/ft2

0.25

Max part size (mm) mobilized at bankfull

50

Stream Power (transport capacity) W/m2 Additional Reach Parameters Drainage Area (sq mi)

0.2

2.2

B4c

Impervious cover estimate (%) Rosgen Classification

G4

Bankfull Velocity (fps)

3.9

Bankfull discharge (cfs)

28

B4c

B4c

4.5

Valley length (ft) Channel Thalweg length (ft)

723

Sinuosity (ft)

1.06

1.05

1.2

1.17

Water Surface Slope (channel) (ft/ft)

0.014

0.0079

0.007

0.0122

BF slope (ft/ft)

0.015

-

0.008

0.0122

5

Bankfull Floodplain Area (acres) 6

7

Proportion Overwide (%)

Entrenchment Class (ER Range) 8

Incision Class (BHR Ranch)

BEHI VL% / L% / M% / H% / VH% / E% Channel Stability or Habitat Metric Biological or Other

27

18

n

Table IX-e

Baseline Stream Data Summary

Holly Grove Restoration Site - Southeast Creek (363 ft) Parameter

Regional Curve

Gauge

Simension and Substrate - Riffle

LL

UL

Pre-Existing Condition Eq.

Min

Mean

Med

Max

Reference Reach(es) Data SD

n

Min

Mean

Med

Max

Design SD

n

Min

As-Built / Baseline Max

Min

Mean

7.5

Med

Bankfull Width (ft)

6.3

Floodprone Width (ft)

7.5

63

Bankfull Mean Depth (ft)

0.9

1.73

0.6

0.5

1

20.1

Med

10

16.5

23

Bankfull Max Depth (ft)

1.2

2

0.75

0.8

5.5

34.8

4.2

4.3

7

12

13

Entrenchment Ratio 1

1.2

2.7

2.9

3.1

Bank Height Ratio

1.7

1.2

d50 (mm)

28

28

0.02

0.013

1.4

2.6

1.4

2.2

SD

25

Bankfull Cross-Sectional Area (ft2) Width/Depth Ratio

Max

8

15 3

3.1

1

Profile Riffle Length (ft)

10

Riffle Slope (ft/ft) Pool Length (ft)

10

Pool Max Depth (ft) Pool Spacing (ft) 2

30

65

100

33

12

19

14

15

0.016 13

20

1.1

36.5

40

30

37.5

18

0.0067

45

18

19

21

0.49

0.52

1.4

20

22

40

Pool Volume (ft3)

Pattern Channel Beltwidth (ft)

40

50

60

33

36.5

40

11

17

23

27

30.5

34

Radius of Curvature (ft)

45

97.5

150

47

182.5

318

15

19

23

40

64

88

Radius of Curvature Ratio (ft/ft)

7

15

23

2.3

9.15

16

2

2.5

3

5

8

11

Meander Wavelength (ft)

55

77.5

100

37

104.5

172

15

41.5

68

81

86

91

Meander Width Ratio (ft/ft)

6

8

10

1.6

1.8

2

1.5

2.25

3

3.4

38.5

4.3

Substrate, bed and transport parameters 4 4 4

Ri% / Ru% / P% / G% / S%

40

15

30

SC% / Sa% / G% / C% / B% / Be%

d16 / d35 / d50 / d84 / d95 / dip / disp (mm) Reach Shear Stress (competency) lb/ft2

0.53

Max part size (mm) mobilized at bankfull

96

Stream Power (transport capacity) W/m2 Additional Reach Parameters Drainage Area (sq mi)

0.2

2.2

B4c

Impervious cover estimate (%) Rosgen Classification

G4

Bankfull Velocity (fps)

3.9

Bankfull discharge (cfs)

28

B4c

B4c

4.5

Valley length (ft) Channel Thalweg length (ft)

342

359

363

Sinuosity (ft)

1.06

1.05

1.2

1.05

Water Surface Slope (channel) (ft/ft)

0.014

0.0079

0.016

0.0106

BF slope (ft/ft)

0.015

-

0.019

0.0106

5

Bankfull Floodplain Area (acres) 6

7

Proportion Overwide (%)

Entrenchment Class (ER Range) 8

Incision Class (BHR Ranch)

BEHI VL% / L% / M% / H% / VH% / E% Channel Stability or Habitat Metric Biological or Other

28

15

n

Table IX-d

Baseline Stream Data Summary

Holly Grove Restoration Site - East Branch (1073 ft) Parameter

Regional Curve

Gauge

Simension and Substrate - Riffle

LL

UL

Pre-Existing Condition Eq.

Min

Mean

Med

Max

Reference Reach(es) Data SD

n

Min

Mean

Med

Max

Design SD

n

Min

Bankfull Width (ft)

6.3

Floodprone Width (ft)

7.5

63

Bankfull Mean Depth (ft)

0.9

1.73

0.7

1

20.1

Med

As-Built / Baseline Max

Min

Mean

9 12

19.5

Med

27

18

Bankfull Max Depth (ft)

1.2

2

0.95

1

5.5

34.8

6.3

6.5

Width/Depth Ratio

1

7

12

1.2

2.7

13

2.9

3.1

Bank Height Ratio

1.7

1.2

d50 (mm)

28

28

0.02

0.013

1.4

2.6

1.4

1.7

SD

0.8

Bankfull Cross-Sectional Area (ft2)

Entrenchment Ratio

Max

8.6

11.4 3

2.1

1

Profile Riffle Length (ft)

12

Riffle Slope (ft/ft) Pool Length (ft)

12

Pool Max Depth (ft) Pool Spacing (ft) 2

30

65

100

33

17

21

0.013 15

18

1.4

36.5

40

36

45

54

22

23

26

0.0071

0.0104

0.0132

13

14

17

0.5

0.8

0.9

34

35

44

Pool Volume (ft3)

Pattern Channel Beltwidth (ft)

40

50

60

33

36.5

40

13

20

27

28

36

45

Radius of Curvature (ft)

45

97.5

150

47

182.5

318

18

22.5

27

33

44

60

Radius of Curvature Ratio (ft/ft)

7

15

23

2.3

9.15

16

2

2.5

3

3.8

5.1

7

Meander Wavelength (ft)

55

77.5

100

37

104.5

172

18

49.5

81

76

81

91

Meander Width Ratio (ft/ft)

6

8

10

1.6

1.8

2

1.5

2.25

3

3.25

9.4

5.25

Substrate, bed and transport parameters 4 4 4

Ri% / Ru% / P% / G% / S%

41

16

24

SC% / Sa% / G% / C% / B% / Be%

d16 / d35 / d50 / d84 / d95 / dip / disp (mm) Reach Shear Stress (competency) lb/ft2

0.54

Max part size (mm) mobilized at bankfull

102

Stream Power (transport capacity) W/m2 Additional Reach Parameters Drainage Area (sq mi)

0.2

2.2

B4c

Impervious cover estimate (%) Rosgen Classification

G4

Bankfull Velocity (fps)

3.9

Bankfull discharge (cfs)

28

B4c

B4c

4.5

Valley length (ft) Channel Thalweg length (ft)

1039

Sinuosity (ft)

1.06

1.05

1.2

1.04

Water Surface Slope (channel) (ft/ft)

0.014

0.0079

0.013

0.011

BF slope (ft/ft)

0.015

-

0.015

0.011

5

Bankfull Floodplain Area (acres) 6

7

1058

Proportion Overwide (%)

Entrenchment Class (ER Range) 8

Incision Class (BHR Ranch)

BEHI VL% / L% / M% / H% / VH% / E% Channel Stability or Habitat Metric Biological or Other

29

1073

19

n

Table IX-c

Baseline Stream Data Summary

Holly Grove Restoration Site - Middle Branch (1796 ft) Parameter

Regional Curve

Gauge

Simension and Substrate - Riffle

LL

UL

Pre-Existing Condition Eq.

Min

Mean

Med

Max

Reference Reach(es) Data SD

n

Min

Mean

Med

Max

Design SD

n

Min

Bankfull Width (ft)

6.3

Floodprone Width (ft)

7.5

63

Bankfull Mean Depth (ft)

0.9

1.73

0.7

1

20.1

Med

As-Built / Baseline Max

9 12

19.5

Min

Mean

Med

Max

6.2 27

55

80

0.6

0.7 1.1

Bankfull Max Depth (ft)

1.2

2

0.95

1

Bankfull Cross-Sectional Area (ft2)

5.5

34.8

6.3

3.7

5.2

7

12

13

10

10.4

7.6

13

Width/Depth Ratio Entrenchment Ratio 1

1.2

2.7

2.9

3.1

Bank Height Ratio

1.7

1.2

d50 (mm)

28

28

0.02

0.013

1.4

2.6

1.4

1.7

3

SD

7.2

1

Profile Riffle Length (ft)

10

Riffle Slope (ft/ft) Pool Length (ft)

6

Pool Max Depth (ft) Pool Spacing (ft) 2

30

65

100

33

15

32

0.013 13

16

1.4

36.5

40

36

45

54

17

38

0.0148

0.0184

17

29

0.9

1.32

44

75

Pool Volume (ft3)

Pattern Channel Beltwidth (ft)

40

50

60

33

36.5

40

13

20

27

30

88

Radius of Curvature (ft)

45

97.5

150

47

182.5

318

18

22.5

27

16

130 19.4

Radius of Curvature Ratio (ft/ft)

7

15

23

2.3

9.15

16

2

2.5

3

2.4

Meander Wavelength (ft)

55

77.5

100

37

104.5

172

18

49.5

81

60

Meander Width Ratio (ft/ft)

6

8

10

1.6

1.8

2

1.5

2.25

3

3

105 8.8

82.5

Substrate, bed and transport parameters 4 4 4

Ri% / Ru% / P% / G% / S%

34

25

29

12

SC% / Sa% / G% / C% / B% / Be%

d16 / d35 / d50 / d84 / d95 / dip / disp (mm) Reach Shear Stress (competency) lb/ft2

0.58

Max part size (mm) mobilized at bankfull

115

Stream Power (transport capacity) W/m2 Additional Reach Parameters Drainage Area (sq mi)

0.2

2.2

B4c

Impervious cover estimate (%) Rosgen Classification

G4

Bankfull Velocity (fps)

3.9

Bankfull discharge (cfs)

28

B4c

B4c

4.5

Valley length (ft) Channel Thalweg length (ft)

1778

Sinuosity (ft)

1.06

1.05

1.2

Water Surface Slope (channel) (ft/ft)

0.014

0.0079

0.013

0.0164

0.0187

BF slope (ft/ft)

0.015

-

0.015

0.016

0.019

5

Bankfull Floodplain Area (acres) 6

7

1790

Proportion Overwide (%)

Entrenchment Class (ER Range) 8

Incision Class (BHR Ranch)

BEHI VL% / L% / M% / H% / VH% / E% Channel Stability or Habitat Metric Biological or Other

30

1796 1.07

n

Table IX-b

Baseline Stream Data Summary

Holly Grove Restoration Site - West Branch (391 ft) Parameter

Regional Curve

Gauge

Simension and Substrate - Riffle

LL

UL

Pre-Existing Condition Eq.

Min

Mean

Med

Max

Reference Reach(es) Data SD

n

Min

Mean

Med

Max

Design SD

n

Min

Bankfull Width (ft)

6.3

Floodprone Width (ft)

7.5

63

Bankfull Mean Depth (ft)

0.9

1.73

0.7

1

20.1

Med 9

12

19.5

Bankfull Max Depth (ft)

1.2

2

0.95

Bankfull Cross-Sectional Area (ft2)

5.5

34.8

6.3

7

12

Width/Depth Ratio Entrenchment Ratio 1

1.2

2.7

As-Built / Baseline Max

Min

Mean

Med

Max

9

10.5

12

40

46

52

27

13

2.9

3.1

Bank Height Ratio

1.7

1.2

d50 (mm)

28

28

0.02

0.013

1.4

2.6

1.4

1.7

3

1

Profile Riffle Length (ft)

13

Riffle Slope (ft/ft) Pool Length (ft)

7

Pool Max Depth (ft) Pool Spacing (ft) 2

30

65

100

33

16

19

0.013 14

20

1.4

36.5

40

36

45

54

Pool Volume (ft3)

Pattern Channel Beltwidth (ft)

40

50

60

33

36.5

40

13

20

27

Radius of Curvature (ft)

45

97.5

150

47

182.5

318

18

22.5

27

23

41.5

80 60

Radius of Curvature Ratio (ft/ft)

7

15

23

2.3

9.15

16

2

2.5

3

2.3

4.2

6

Meander Wavelength (ft)

55

77.5

100

37

104.5

172

18

49.5

81

Meander Width Ratio (ft/ft)

6

8

10

1.6

1.8

2

1.5

2.25

3

89

Substrate, bed and transport parameters 4 4 4

Ri% / Ru% / P% / G% / S%

SC% / Sa% / G% / C% / B% / Be%

d16 / d35 / d50 / d84 / d95 / dip / disp (mm) Reach Shear Stress (competency) lb/ft2

0.53

Max part size (mm) mobilized at bankfull

96

Stream Power (transport capacity) W/m2 Additional Reach Parameters Drainage Area (sq mi)

0.2

2.2

B4c

Impervious cover estimate (%) Rosgen Classification

G4

Bankfull Velocity (fps)

3.9

Bankfull discharge (cfs)

28

B4c

B4c

4.5

Valley length (ft) Channel Thalweg length (ft)

400

386

391

Sinuosity (ft)

1.06

1.05

1.2

1.17

Water Surface Slope (channel) (ft/ft)

0.014

0.0079

0.013

BF slope (ft/ft)

0.015

-

0.015

5

Bankfull Floodplain Area (acres) 6

7

Proportion Overwide (%)

Entrenchment Class (ER Range) 8

Incision Class (BHR Ranch)

BEHI VL% / L% / M% / H% / VH% / E% Channel Stability or Habitat Metric Biological or Other

31

SD

n

Table IX-a

Baseline Stream Data Summary

Holly Grove Restoration Site - Buckhorn Creek (8848 ft) Parameter

Regional Curve

Gauge

Simension and Substrate - Riffle

LL

Bankfull Width (ft)

UL

Pre-Existing Condition Eq.

Min

Mean

Med

Max

24

Reference Reach(es) Data SD

n

Min

26

Mean

Med

Max

20.1

Design SD

n

As-Built / Baseline

Min

Med

Max

Min

22

23

25

23.4

Mean

Med

Max

23.4

25.4

Floodprone Width (ft)

32

32

63

30

52.5

75

50

50

70

Bankfull Mean Depth (ft)

1.6

2.3

1.73

1.69

1.78

1.91

1.3

1.5

1.9

1

Bankfull Max Depth (ft)

2.3

3

2

2.3

2.4

2.6

1.9

2.1

2.6

Bankfull Cross-Sectional Area (ft2)

42

55

34.8

37

40.9

48

30.3

34.3

48.3

16

18.1

1.4

2.28

Width/Depth Ratio

10

16

Entrenchment Ratio

1.2

1.3

Bank Height Ratio

2

2.3

1.2

d50 (mm)

14

14

28

1

12 2.7

13

2.9

3.1

13.4 3

SD

2.5

1

Profile Riffle Length (ft)

23

40

64

38

58

74

0.006

0.007

0.008

0.013

0.004

0.005

0.006

0.0026

0.0069

0.017

21

25

54

55

67

87

Pool Max Depth (ft)

2.8

3.35

3.9

2.6

3.4

3.6

3.8

1.08

2.89

3.51

Pool Spacing (ft)

60

110

160

88

119

150

56

119

136

Riffle Slope (ft/ft) Pool Length (ft)

2

71

102.5

134

Pool Volume (ft3)

Pattern Channel Beltwidth (ft)

40

80

120

33

36.5

40

33

54

75

183

217

250

Radius of Curvature (ft)

50

145

240

47

182.5

318

44

59.5

75

41

87

167

Radius of Curvature Ratio (ft/ft)

1.9

5.95

10

2.3

9.15

16

2

2.5

3

1.7

3.72

7

Meander Wavelength (ft)

110

225

340

37

104.5

172

44

134.5

225

140

221

380

Meander Width Ratio (ft/ft)

1.7

3.15

4.6

1.6

1.8

2

1.5

2.25

3

7.82

9.27

10.7

Substrate, bed and transport parameters 4 4 4

Ri% / Ru% / P% / G% / S%

35

18

29

17

SC% / Sa% / G% / C% / B% / Be%

d16 / d35 / d50 / d84 / d95 / dip / disp (mm) Reach Shear Stress (competency) lb/ft2

0.66

Max part size (mm) mobilized at bankfull

144

Stream Power (transport capacity) W/m2 Additional Reach Parameters Drainage Area (sq mi)

3.76

2.2

B4c

Impervious cover estimate (%) Rosgen Classification

F4 & G4

Bankfull Velocity (fps)

3.3

Bankfull discharge (cfs)

186

B4c

B4c

4.5

Valley length (ft) Channel Thalweg length (ft)

8756

Sinuosity (ft)

1.17

1.05

1.2

Water Surface Slope (channel) (ft/ft)

0.0054

0.0079

0.005

BF slope (ft/ft)

0.005

0.006

0.006

5

Bankfull Floodplain Area (acres) 6

7

8777

Proportion Overwide (%)

Entrenchment Class (ER Range) 8

Incision Class (BHR Ranch)

BEHI VL% / L% / M% / H% / VH% / E% Channel Stability or Habitat Metric Biological or Other

32

8848 1.17 0.0042

0.0051 0.0047

n

Table X-a Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 1: Buckhorn Creek Cross Section 1 Riffle

Parameter Dimension Bkf Width (ft) Floodprone Width (ft) Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)

Parameter

MY1 20 70

MY2 23.7 82

MY3 23.7 82

35.4 1.5 2.1 15.3 >3 1

35.3 1.5 2.6 15.9 >3 1

31.3 1.3 2.3 18 >3 1

26.5 64

4.7 55

36.6 77

MY-1 (2006)

Pattern Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio

Min 40 29 125 2

Max 115 371 320 5.75

Med 65 105 180 3.25

MY4

Cross Section 2 Pool MY5

MY+

MY-2 (2007) Min 40 29 125 2

Max 115 371 320 5.75

MY1 22 -

MY2 23.4 -

MY3 23.5 -

48 2.2 3.9 -

46.8 2 4.2 -

48.4 2.1 4.3 -

MY-3 (2008)

Med 65 105 180 3.25

Min 40 29 125 2

Max 115 371 320 5.75

Med 65 105 180 3.25

Profile Riffle Length (ft) 28 81 47 Riffle Slope (ft/ft) 0.0024 0.0126 0.0094 Pool length (ft) 24.4 38 29.5 Pool Spacing (ft) 37 130 82

20.5 0 59.5

80.2 37.5 23 51 38 0.0212 0.0071 0.0004 0.0138 0.0042 164 93 20 123.8 85.8

Additional Reach Parameters Valley Length (ft) 967 967 967 Channel Length (ft) 1085 1085 1085 Sinuosity 1.1 1.1 1.1 Water Surface Slope (ft/ft) 0.0024 0.0126 0.0094 0.0039 0.0081 0.0036 0.0042 Bkf Slope (ft/ft) 0.006 0.0056 0.0047 Rosgen Classification B4c B4c B4c Habitat Index Macrobenthos

33

MY4

Cross Section MY5

MY+

MY-4 (2009) Min

Max

Med

MY1

MY2

MY3

MY-5 (2010) Min

Max

Med

MY4

MY5

MY+

MY+ (2011) Min

Max

Med

Table X-b Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 2: Buckhorn Creek Cross Section 3 Riffle

Parameter Dimension Bkf Width (ft) Floodprone Width (ft) Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)

Parameter

MY1 20.4 34

MY2 20.2 34

MY3 19.7 34

25.4 1.2 1.7 16.4 1.6 1.7

27.6 1.4 1.9 14.8 1.6 1.7

21.1 1.1 1.6 18.4 1.7 1.7

67.2 184

32 116

22 140

MY-1 (2006)

Pattern Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio

Min 55 61 182 2.5

Max 162 245 225 7.5

Med 60 130 195 2.8

MY4

Cross Section 4 Pool MY5

MY+

MY-2 (2007) Min 55 61 182 2.5

Max 162 245 225 7.5

MY1 22.2 -

MY2 22 -

MY3 22.8 -

45.1 2 3 -

49.1 2.2 3.1 -

47.6 2.1 2.9 -

MY-3 (2008)

Med 60 130 195 2.8

Min 55 61 182 2.5

Max 162 245 225 7.5

Med 60 130 195 2.8

Profile Riffle Length (ft) 25 87 34 39 90 50.3 28 90 50.3 Riffle Slope (ft) 0.0012 0.0228 0.0099 0.0023 0.0172 0.0083 0.0023 0.0172 0.0083 Pool length (ft) 16.2 36.8 31.8 Pool Spacing (ft) 26 151 56 39 159 68 39 159 68 Additional Reach Parameters Valley Length (ft) 882 882 882 Channel Length (ft) 968 968 968 Sinuosity 1.18 1.18 1.18 Water Surface Slope (ft/ft) 0.0012 0.0228 0.0099 0.0015 0.0046 0.0069 0.0046 0.0069 Bkf Slope (ft/ft) 0.0057 0.0055 0.0062 Rosgen Classification B4c B4c B4c Habitat Index Macrobenthos

34

MY4

Cross Section

MY5

MY+

MY-4 (2009) Min

Max

Med

MY1

MY2

MY3

MY-5 (2010) Min

Max

Med

MY4

MY5

MY+

MY+ (2011) Min

Max

Med

Table X-c Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 3: Buckhorn Creek Cross Section 5 Riffle

Parameter Dimension Bkf Width (ft) Floodprone Width (ft) Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)

Parameter

MY1 25.5 65

MY2 27.5 65

MY3 26.8 65

48 1.9 2.6 13.5 2.5 1

47.7 1.7 2.8 15.9 2.5 1

45.2 1.7 2.7 15.9 2.4 1

60.6 118

15.4 109

17.3 127

MY4

MY-1 (2006)

Pattern Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio

Min 45 177 243 1.8

Max 87 284 288 3.4

Med 50 222 274 2

103 0.014 49.6 167

49 0.007 24.7 75

0.014 -

1009 1040 1.03 0.0066 0.0047 B4c

Cross Section 6 Pool MY5

MY+

MY-2 (2007) Min 45 177 243 1.8

Max 87 284 288 3.4

MY1 22.5 -

MY2 22.8 -

MY3 22.9 -

62.8 2.8 4.7 -

66.2 2.9 4.9 -

66.2 2.9 4.8 -

MY-3 (2008)

Med 50 222 274 2

Min 45 177 243 1.8

Max 87 284 288 3.4

Med 50 222 274 2

Profile Riffle Length (ft) 17 Riffle Slope (ft) 0.0032 Pool length (ft) 19.9 Pool Spacing (ft) 31 Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) 0.0032 Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos

18 85 51.6 4 72 35 0.0029 0.0217 0.0076 0.0025 0.0148 0.0082 19.5 164 78 31 112 64.9

-

-

1009 1009 1040 1040 1.03 1.03 0.0044 0.0045 0.0045 0.0045 0.0051 0.0047 B4c B4c

35

MY4

Cross Section

MY5

MY+

MY-4 (2009) Min

Max

Med

MY1

MY2

MY3

MY-5 (2010) Min

Max

Med

MY4

MY5

MY+

MY+ (2011) Min

Max

Med

Table X-d Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 4: Middle Branch Cross Section 1 Riffle

Parameter Dimension Bkf Width (ft) Floodprone Width (ft) Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)

MY1 6.4 40

MY2 6.9 40

MY3 6 40

3.5 0.6 1 11.8 >3 1.45

3.8 0.5 1 12.6 >3 1.45

3.7 0.6 1.1 9.9 >3 1.45

20.6 58

2.2 53

0.1 95

Parameter

MY4

MY-1 (2006)

Pattern Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio

Min 14 25 66 2.8

Max 21 59 100 4.2

Med 18 40 88 3.6

Cross Section 2 Pool MY5

MY+

MY1 10.5 -

MY2 10.7 -

MY3 10 -

9.4 0.9 2.4 -

11.1 1 2 -

10.4 1 2.3 -

MY-2 (2007) Min 14 25 66 2.8

Max 21 59 100 4.2

MY-3 (2008)

Med 18 40 88 3.6

Min 14 25 66 2.8

Max 21 59 100 4.2

Med 18 40 88 3.6

Profile Riffle Length (ft) 9 23 15.8 Riffle Slope (ft/ft) 0.0155 0.0409 0.0271 Pool length (ft) 5 11.9 8.7 Pool Spacing (ft) 20 41 23 Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos

-

-

220 236 1.1 0.0205 B4c

8.3 0 12 -

18.1 14.5 4 16 11.5 0.0348 0.0348 0.0100 0.0481 0.0131 52 35 10 41.9 21.5 -

220 236 1.07 0.0197 B4c

36

-

-

220 236 1.07 0.0209 B4c

MY4

Cross Section MY5

MY+

MY-4 (2009) Min

Max

Med

MY1

MY2

MY3

MY-5 (2010) Min

Max

Med

MY4

MY5

MY+

MY+ (2011) Min

Max

Med

Table X-e Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 5: Middle Branch Cross Section 3 Riffle

Parameter Dimension Bkf Width (ft) Floodprone Width (ft) Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)

MY1 8.2 40

MY2 7.9 40

MY3 7.2 40

5.9 0.7 1.2 11.5 >3 1.3

5.6 0.7 1.2 11.1 >3 1.3

4.9 0.7 1.1 10.5 >3 1.3

15.3 44

10.8 49

4.5 46

Parameter

MY4

MY-1 (2006)

Pattern Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio

Min 22 52 91 237

Max 24 71 133 2.9

Med 23 62 108 2.8

Cross Section 4 Pool MY5

MY+

MY1 8.6 -

MY2 8.4 -

MY3 8.5 -

9.7 1.1 2 -

10.1 1.2 1.9 -

8.5 1.2 1.8 -

MY-2 (2007) Min 22 52 91 237

Max 24 71 133 2.9

MY-3 (2008)

Med 23 62 108 2.8

Min 22 52 91 237

Max 24 71 133 2.9

Med 23 62 108 2.8

Profile Riffle Length (ft) 16 Riffle Slope (ft) 0.009 Pool length (ft) 11.7 Pool Spacing (ft) 44 Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos

-

43 18 13.5 41.5 22 13 46 19.3 0.0093 0.0092 0.0044 0.0123 0.0064 0.0096 0.0277 0.0104 16.2 16.2 74.6 48.5 13.5 61 43 49.5 64.5 54

-

197 211 1.1 0.0117 B4c

-

-

197 211 1.07 0.0166 B4c

37

-

-

197 211 1.07 0.0177 B4c

MY4

Cross Section

MY5

MY+

MY-4 (2009) Min

Max

Med

MY1

MY2

MY3

MY-5 (2010) Min

Max

Med

MY4

MY5

MY+

MY+ (2011) Min

Max

Med

Table X-f Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 6: Lower East Branch Cross Section 5 Riffle

Parameter Dimension Bkf Width (ft) Floodprone Width (ft) Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)

MY1 7.1 30

MY2 8 30

MY3 7.7 30

2.7 0.4 0.6 18.6 >3 1.6

3 0.4 0.7 21.6 >3 1.6

2.9 0.4 0.7 20.3 >3 1.6

9.8 29

0.1 23

0.1 19

Parameter

MY4

MY-1 (2006)

Pattern Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio

Min 16 2.3

Max 17 2.4

Med 16 193 87 2.3

Cross Section 6 Pool MY5

MY+

MY1 12.1 -

MY2 9.2 -

MY3 10 -

11.5 1 2.5 -

10.2 1.1 2 -

10.3 1 2.1 -

MY-2 (2007) Min 16 2.3

Max 17 2.4

MY-3 (2008)

Med 16 193 87 2.3

Min 16 2.3

Max 17 2.4

Med 16 193 87 2.3

Profile Riffle Length (ft) 17.5 27 Riffle Slope (ft) 0.0037 0.0176 Pool length (ft) 6.5 12.5 Pool Spacing (ft) 30 44 Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos

-

-

18.8 0.012 9.5 38.4

207.4 209.7 1.0 0.0104 B4c

11.7 22.5 16.9 4 24 12 0.0107 0.0222 0.0107 0.0125 0.0825 0.0149 28.6 39.5 33.6 25 39 31.3

-

-

207.4 209.7 1.01 0.0141 B4c

38

-

-

207.4 209.7 1.01 0.0134 B4c

MY4

Cross Section

MY5

MY+

MY-4 (2009) Min

Max

Med

MY1

MY2

MY3

MY-5 (2010) Min

Max

Med

MY4

MY5

MY+

MY+ (2011) Min

Max

Med

Table X-g Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 7: Southeast Creek Cross Section 1 Riffle

Parameter Dimension Bkf Width (ft) Floodprone Width (ft) Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)

MY1 15 35

MY2 14.5 35

MY3 13.3 35

9.5 0.6 1.2 23.8 2.3 2.1

7.6 0.05 1.2 27.7 2.3 2.1

8.8 0.7 1.1 20.2 2.41 2.1

0.1 43

2.4 21

Parameter

MY4

MY-1 (2006)

Pattern Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio

Min 21 37 70 1.4

Max 26 48 80 1.7

Med 23 44 77 1.5

Cross Section 2 Pool MY5

MY+

MY1 10.5 -

MY2 9.8 -

MY3 9.3 -

9.7 0.9 1.8 -

9.6 1 1.9 -

9.9 1.1 1.9 -

MY-2 (2007) Min 21 37 70 1.4

Max 26 48 80 1.7

MY-3 (2008)

Med 23 44 77 1.5

Min 21 37 70 1.4

Max 26 48 80 1.7

Med 23 44 77 1.5

Profile Riffle Length (ft) 12 20.5 19 12.6 Riffle Slope (ft/ft) 0.0017 0.0052 0.0029 0.0024 Pool length (ft) 5 8.1 6 Pool Spacing (ft) 29.6 43.5 40.5 29.3 Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos

-

-

157.6 167 1.1 0.0106 B4c

-

24.9 0.004 44.2 -

18.8 7.8 29.5 0.0032 0.0044 0.0167 36.8 7 45

18.8 0.016 21.3

157.6 167 1.06 0.0096 B4c

157.6 167 1.06 0.0134 B4c

39

-

-

MY4

Cross Section MY5

MY+

MY-4 (2009) Min

Max

Med

MY1

MY2

MY3

MY-5 (2010) Min

Max

Med

MY4

MY5

MY+

MY+ (2011) Min

Max

Med

Table X-h Morphology and Hydraulic Monitoring Summary Holly Grove Stream Restoration Site (D06028-B) Reach 8: Southwest Creek Cross Section 3 Riffle

Parameter Dimension Bkf Width (ft) Floodprone Width (ft) Bkf Cross Sectional Area (ft2) Bkf Mean Depth (ft) Bkf Max Depth (ft) Width/Depth Ratio Entrenchment Ratio Bank Height Ratio Wetted Perimeter (ft) Hydraulic Radius (ft) Substrate D50 (mm) D84 (mm)

MY1 8.2 15

MY2 8.4 15

MY3 9 15

4.4 0.5 0.7 15.2 1.83 2.3

4.9 0.6 0.8 14.5 1.83 2.3

5.3 0.6 0.9 15.2 1.67 2.3

7.3 56

13.3 42

Parameter

MY4

MY-1 (2006)

Pattern Beltwidth (ft) Radius of Curvature (ft) Meander Wavelength (ft) Meander Width Ratio

Min 19 19 59 2.3

Max 42 26 99 5.1

Med 25 25 66 3

Cross Section 4 Pool MY5

MY+

MY1 6.6 -

MY2 7.2 -

MY3 7.5 -

7.4 1.1 1.7 -

9.1 1.3 1.8 -

8.6 1.1 1.8 -

MY-2 (2007) Min 19 19 59 2.3

Max 42 26 99 5.1

MY-3 (2008)

Med 25 25 66 3

Min 19 19 59 2.3

Max 42 26 99 5.1

Med 25 25 66 3

6.6 0 19.5

16.3 0.0055 33

12 0.005 26.7

-

-

174.4 198.2 1.14 0.0107 B4c

Profile Riffle Length (ft) 4 Riffle Slope (ft) 0.002 Pool length (ft) 7 Pool Spacing (ft) 21 Additional Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) Bkf Slope (ft/ft) Rosgen Classification Habitat Index Macrobenthos

-

15 9 0.0092 0.0056 19.5 11.4 38.5 27.5

-

174.4 198.2 1.1 0.0123 B4c

5.1 0 9.9

-

14.3 8.5 0.0373 0.0056 32.6 23.9

-

174.4 198.2 1.14 0.0128 B4c

40

MY4

Cross Section

MY5

MY+

MY-4 (2009) Min

Max

Med

MY1

MY2

MY3

MY-5 (2010) Min

Max

Med

MY4

MY5

MY+

MY+ (2011) Min

Max

Med

APPENDIX A VEGETATION RAW DATA

Vegetation Plot 1 – Year 3

Vegetation Plot 2– Year 3

Holly Grove Restoration Site

October 2011

Vegetation Plot 3– Year 3

Vegetation Plot 4– Year 3

Holly Grove Restoration Site

October 2011

Vegetation Plot 5– Year 3

Vegetation Plot 6– Year 3

Holly Grove Restoration Site

October 2011

Vegetation Plot 7– Year 3

Vegetation Plot 8– Year 3

Holly Grove Restoration Site

October 2011

Vegetation Plot A– Year 3

Vegetation Plot B– Year 3

Holly Grove Restoration Site

October 2011

Vegetation Plot C– Year 3

Holly Grove Restoration Site

October 2011

APPENDIX B GEOMORPHIC RAW DATA

REPRESENTATIVE PROBLEM AREA PHOTOS

Representative Problem Area Photos

Beaver Dam , Sta 118+50

9/26/11

Buckhorn Creek, minor bank scour , Sta 152+90

Holly Grove Stream Restoration Site

Photo No. 47

9/26/11

Photo No. 48

Oct. 2011

Buckhorn Creek, minor bank scour, Sta 183+40

Buckhorn Creek, minor scour , Sta 187+70

Holly Grove Stream Restoration Site

9/26/11

9/26/11

Photo No. 49

Photo No. 50

Oct. 2011

PHOTOPOINTS

Photo Point 1

Buckhorn Creek facing upstream Year 0 Photo No. 1

Buckhorn Creek facing upstream Year 2 Photo No. 3

Buckhorn Creek facing upstream Year 1 Photo No. 2

Buckhorn Creek facing upstream Year 3 Photo No. 4

Holly Grove Stream Restoration Site

October 2011

Photo Point 2

Buckhorn Creek facing upstream Year 0 Photo No. 5

Buckhorn Creek facing upstream Year 2 Photo No. 7

Buckhorn Creek facing upstream Year 1 Photo No. 6

Buckhorn Creek facing upstream Year 3 Photo No. 8

Holly Grove Stream Restoration Site

October 2011

Photo Point 3

Buckhorn Creek facing upstream Year 0 Photo No. 9

Buckhorn Creek facing upstream Year 2 Photo No. 11

Buckhorn Creek facing upstream Year 1 Photo No. 10

Buckhorn Creek facing upstream Year 3 Photo No. 12

Holly Grove Stream Restoration Site

October 2011

Photo Point 4

West Branch facing downstream Year 0 Photo No. 13

West Branch facing downstream Year 2 Photo No. 15

West Branch facing downstream Year 1 Photo No. 14

West Branch facing downstream Year 3 Photo No. 16

Holly Grove Stream Restoration Site

October 2011

Photo Point 5

Buckhorn Creek facing upstream Year 0 Photo No. 17

Buckhorn Creek facing upstream Year 2 Photo No. 19

Buckhorn Creek facing upstream Year 1 Photo No. 18

Buckhorn Creek facing upstream Year 3 Photo No. 20

Holly Grove Stream Restoration Site

October 2011

Photo Point 6

Buckhorn Creek at bridge, facing upstream Year 0 Photo No. 21

Buckhorn Creek at bridge, facing upstream Year 2 Photo No. 23

Buckhorn Creek at bridge, facing upstream Year 1 Photo No. 22

Buckhorn Creek at bridge, facing upstream Year 3 Photo No. 24

Holly Grove Stream Restoration Site

October 2011

Photo Point 7

Buckhorn Creek at bridge, facing downstream Year 0 Photo No. 25

Buckhorn Creek at bridge, facing downstream Year 2 Photo No. 27

Buckhorn Creek at bridge, facing downstream Year 1 Photo No. 26

Buckhorn Creek at bridge, facing downstream Year 3 Photo No. 28

Holly Grove Stream Restoration Site

October 2011

Photo Point 8

Buckhorn Creek facing upstream Year 0 Photo No. 29

Buckhorn Creek facing upstream Year 2 Photo No. 31

Buckhorn Creek facing upstream Year 1 Photo No. 30

Buckhorn Creek facing upstream Year 3 Photo No. 32

Holly Grove Stream Restoration Site

October 2011

Photo Point 9

Buckhorn Creek facing upstream Year 0 Photo No. 33

Buckhorn Creek facing upstream Year 2 Photo No. 35

Buckhorn Creek facing upstream Year 1 Photo No. 34

Buckhorn Creek facing upstream Year 3 Photo No. 36

Holly Grove Stream Restoration Site

October 2011

Photo Point 10

Buckhorn Creek facing upstream Year 0 Photo No. 37

Buckhorn Creek facing upstream Year 2 Photo No. 39

Buckhorn Creek facing upstream Year 1 Photo No. 38

Buckhorn Creek facing upstream Year 3 Photo No. 40

Holly Grove Stream Restoration Site

October 2011

Photo Point 11

Southwest Creek facing downstream Year 0 Photo No. 41

Southwest Creek facing downstream Year 2 Photo No. 43

Southwest Creek facing downstream Year 1 Photo No. 42

Southwest Creek facing downstream Year 3 Photo No. 44

Holly Grove Stream Restoration Site

October 2011

Photo Point 12

Southwest Creek facing upstream Year 0 Photo No. 45

Southwest Creek facing upstream Year 2 Photo No. 47

Southwest Creek facing upstream Year 1 Photo No. 46

Southwest Creek facing upstream Year 3 Photo No. 48

Holly Grove Stream Restoration Site

October 2011

GEOMORPHIC DATA

Table B2. Visual Morphological Stability Assessment Holly Grove Stream Restoration Site (D06028-B) Buckhorn Creek 8,848 ft (# Stable) Total Total Number Number Number / Performing per As- feet in Metric as built unstable Intended state

Feature Category

% Performing in Stable Condition

Feature Performing Mean or Total

A. Riffles

1. Present 2. Armor stable 3. Facet grade appears stable 4. Minimal evidence of embedding/fining 5. Length appropriate

86 86 86 86 86

86 86 86 86 86

N/A N/A N/A N/A N/A

100% 100% 100% 100% 100%

100%

B. Pools

1. Present 2. Sufficently deep 3. Length appropriate

88 88 88

88 88 88

0 N/A N/A

100% 100% 100%

100%

C. Thalweg

1. Upstream of meander bend centered 2. Downstream of meander bend centered

86 86

86 86

N/A N/A

100% 100%

100%

D. Meanders

1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief

84 0 88 88

88 N/A 88 88

N/A N/A N/A N/A

95% 100% 100% 100%

100%

E. Bed General

1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting

N/A

N/A

0/0

100%

N/A

N/A

0/200

100%

100%

F. Vanes

1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures

108 108 108 108

108 108 108 108

N/A N/A N/A N/A

100% 100% 100% 100%

100%

1. Free of scour 2. Footing stable

23 23

23 23

N/A N/A

100% 100%

100%

% Performing in Stable Condition

Feature Performing Mean or Total

100% 100% 98% 100% 100%

100%

G. Wads/Boulders

Table B2. Visual Morphological Stability Assessment

Feature Category

A. Riffles

B. Pools

Holly Grove Stream Restoration Site (D06028-B) Middle Branch 1,755 ft (# Stable) Total Total Number Number Number / Metric Performing per As- feet in as built unstable Intended state 1. Present 44 44 N/A 2. Armor stable 44 44 N/A 3. Facet grade appears stable 43 44 N/A 4. Minimal evidence of embedding/fining 44 44 N/A 5. Length appropriate 44 44 N/A 1. Present 2. Sufficently deep 3. Length appropriate

46 46 46

46 46 46

N/A N/A N/A

100% 100% 100%

100%

1. Upstream of meander bend centered 2. Downstream of meander bend centered

44 44

44 44

N/A N/A

100% 100%

100%

D. Meanders

1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief

45 0 46 46

46 N/A 46 46

N/A N/A N/A N/A

98% 100% 100% 100%

99%

E. Bed General

1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting

N/A

N/A

0/0

100%

N/A

N/A

0/0

100%

100%

F. Vanes

1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures

69 69 69 69

69 69 69 69

N/A N/A N/A N/A

100% 100% 100% 100%

100%

G. Wads/Boulders

1. Free of scour 2. Footing stable

3 3

3 3

N/A N/A

100% 100%

100%

C. Thalweg

Table B2. Visual Morphological Stability Assessment

Feature Category

A. Riffles

Holly Grove Stream Restoration Site (D06028-B) East Branch 1,090 ft (# Stable) Total Total Number Number / Number Metric Performing per As- feet in as built unstable Intended state 1. Present 25 25 N/A 2. Armor stable 24 25 N/A 3. Facet grade appears stable 25 25 N/A 4. Minimal evidence of embedding/fining 25 25 N/A 5. Length appropriate 25 25 N/A

% Performing in Stable Condition

Feature Performing Mean or Total

100% 96% 100% 100% 100%

99%

B. Pools

1. Present 2. Sufficently deep 3. Length appropriate

25 25 25

25 25 25

N/A N/A N/A

100% 100% 100%

100%

C. Thalweg

1. Upstream of meander bend centered 2. Downstream of meander bend centered

25 25

25 25

N/A N/A

100% 100%

100%

D. Meanders

1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief

25 0 25 25

25 N/A 25 25

N/A N/A N/A N/A

100% 100% 100% 100%

100%

E. Bed General

1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting

N/A

N/A

0/0

100%

N/A

N/A

0/0

100%

100%

F. Vanes

1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures

37 38 38 37

38 38 38 38

N/A N/A N/A N/A

97% 100% 100% 97%

99%

1. Free of scour 2. Footing stable

1 1

1 1

N/A N/A

100% 100%

100%

% Performing in Stable Condition

Feature Performing Mean or Total

100% 100% 100% 100% 100%

100%

G. Wads/Boulders

Table B2. Visual Morphological Stability Assessment

Feature Category

A. Riffles

B. Pools

Holly Grove Stream Restoration Site (D06028-B) Southeast Creek 363 ft (# Stable) Total Total Number Number Number / Metric Performing per As- feet in as built unstable Intended state 1. Present 10 10 N/A 2. Armor stable 10 10 N/A 3. Facet grade appears stable 10 10 N/A 4. Minimal evidence of embedding/fining 10 10 N/A 5. Length appropriate 10 10 N/A 1. Present 2. Sufficently deep 3. Length appropriate

10 10 10

10 10 10

N/A N/A N/A

100% 100% 100%

100%

C. Thalweg

1. Upstream of meander bend centered 2. Downstream of meander bend centered

10 10

10 10

N/A N/A

100% 100%

100%

D. Meanders

1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief

9 0 9 9

9 N/A 9 9

N/A N/A N/A N/A

100% 100% 100% 100%

100%

1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting

N/A

N/A

0/0

100%

N/A

N/A

0/0

100%

100%

F. Vanes

1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures

11 11 11 11

11 11 11 11

N/A N/A N/A N/A

100% 100% 100% 100%

100%

G. Wads/Boulders

1. Free of scour 2. Footing stable

2 2

2 2

N/A N/A

100% 100%

100%

E. Bed General

Table B2. Visual Morphological Stability Assessment

Feature Category

A. Riffles

B. Pools

C. Thalweg

D. Meanders

E. Bed General

F. Vanes

G. Wads/Boulders

Holly Grove Stream Restoration Site (D06028-B) Southwest Creek 723 ft (# Stable) Total Total Number Number / Number Metric Performing per As- feet in as built unstable Intended state 1. Present 23 23 N/A 2. Armor stable 23 23 N/A 3. Facet grade appears stable 23 23 N/A 4. Minimal evidence of embedding/fining 23 23 N/A 5. Length appropriate 23 23 N/A

% Performing in Stable Condition

Feature Performing Mean or Total

100% 100% 100% 100% 100%

100%

1. Present 2. Sufficently deep 3. Length appropriate

25 25 25

25 25 25

N/A N/A N/A

100% 100% 100%

100%

1. Upstream of meander bend centered 2. Downstream of meander bend centered

23 23

23 23

N/A N/A

100% 100%

100%

1. Outer bend in state of limited erosion 2. Of those eroding, # w/ concomitant point bar formation 3. Apparent Rc within specification 4. Sufficient floodplain access and relief

23 0 25 25

25 N/A 25 25

N/A N/A N/A N/A

92% 100% 100% 100%

100%

1. General channel bed agradation areas 2. Channel bed degradation - areas of increasing downcutting or head-cutting

N/A

N/A

0/0

100%

N/A

N/A

0/0

100%

100%

1. Free of back or arm scour 2. Height appropriate 3. Angle and geometry appear appropriate 4. Free of piping or other structural failures

9 9 9 9

9 9 9 9

N/A N/A N/A N/A

100% 100% 100% 100%

100%

1. Free of scour 2. Footing stable

34 34

34 34

N/A N/A

100% 100%

100%

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 1 - Buckhorn Creek

Profile 99 98 97 96 Elevation (ft)

95 94 93 92 91 90 89 88 87 1000

1050

1100

1150

1200

1250

1300

1350

1400

1450

1500

1550

1600

1650

1700

1750

1800

1850

1900

1950

2000

2050

Station (ft)

Year 1 Bed

As-Built Bed

Year 2 Bed

Year 3 Bed

Year 3 Water

Year 3 BKF

2100

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 1 - Buckhorn Creek

HI 103.31 103.31 103.31 103.31 103.31 103.31 102.54 102.54 102.54 104.05 102.20 102.20 102.20 102.20 102.20 99.51 99.51 99.51 99.51 99.51 99.51 99.51 98.05 98.05 98.05 98.05 98.05 98.05 98.05 98.05 98.05 97.64 97.64 97.64 97.64 97.64 97.64 97.64 97.64 97.64 99.24 99.24 99.24 99.24 99.24 100.66 100.66 100.66 100.66 100.66 100.66 100.66 100.66 100.66 100.66 101.60 101.60

Station 1000 1009 1021.5 1025 1061 1094 1106 1115 1136 1179.6 1229.8 1238 1260 1269 1307 1322 1331 1340 1348 1369 1407 1427 1435 1453 1476 1491 1500 1532 1548 1556 1574 1616.5 1628 1637 1667 1681 1701 1715 1721 1746 1797 1809 1823 1829 1846 1862 1878 1888 1898 1916 1962.5 1972 1985 1999 2012.5 2062 2083

Bed FS 7.03 7.27 9.81 10.28 7.59 8.06 8.08 7.9 7.57 9.11 9.35 9.31 7.6 7.53 7.63 7.18 7.5 5.52 5.91 5.61 5.96 8.15 6.51 5.62 5.3 6.25 5.35 5.03 7.9 7.55 5.75 5.31 6.93 6.45 5.35 5.38 5.55 7.21 7.57 5.92 7.89 9.43 8.83 8.99 7.75 10.57 9.15 11.19 11.9 9.82 9.51 11.86 12.25 9.6 12.01 10.78 10.92

Year 3 Water Bankfull Bed Water Bankfull Depth FS Description Elev. Elev. Elev. 0.12 96.28 96.40 0.11 96.04 96.15 2.5 93.50 96.00 2.95 93.03 95.98 0.16 6.2 HOR 95.72 95.88 97.11 0.2 95.25 95.45 0.94 94.46 95.40 0.76 94.64 95.40 0.39 94.97 95.36 94.94 94.85 2 92.85 94.85 1.96 92.89 94.85 0.28 94.60 94.88 0.15 5.08 94.67 94.82 97.12 0.09 94.57 94.66 1.89 92.33 94.22 2.21 92.01 94.22 0.19 93.99 94.18 0.57 93.60 94.17 0.22 3.63 93.90 94.12 95.88 0.16 93.55 93.71 1.79 91.36 93.15 1.65 91.54 93.19 0.76 92.43 93.19 0.43 92.75 93.18 1.39 91.80 93.19 0.48 3.03 92.70 93.18 95.02 0.1 93.02 93.12 90.15 92.87 2.37 90.50 92.87 0.55 3.48 92.30 92.85 94.57 0.42 92.33 92.75 2.04 90.71 92.75 1.57 91.19 92.76 0.45 92.29 92.74 0.19 92.26 92.45 0.18 92.09 92.27 1.79 90.43 92.22 2.15 90.07 92.22 0.48 3.56 91.72 92.20 94.08 0.44 91.35 91.79 1.95 89.81 91.76 1.36 90.41 91.77 1.54 90.25 91.79 0.28 91.49 91.77 1.7 90.09 91.79 0.16 91.51 91.67 2.09 89.47 91.56 2.81 88.76 91.57 0.73 7.35 90.84 91.57 93.31 0.25 91.15 91.40 2.5 88.80 91.30 2.87 88.41 91.28 0.19 91.06 91.25 2.6 88.65 91.25 0.47 8.6 90.82 91.29 93.00 0.39 90.68 91.07

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 2 - Buckhorn Creek

Profile 650 649 648 647 646 Elevation (ft)

645 644 643 642 641 640 639 638 637 636 635 1000

1050

1100

1150

1200

1250

1300

1350

1400

1450

1500

1550

1600

1650

1700

1750

1800

1850

1900

1950

Station (ft)

As-Built Bed

Year 1 Bed

Year 2 Bed

Year 3 Bed

Year 3 Water

Year 3 BKF

2000

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 2 - Buckhorn Creek

HI 653.62 653.62 653.62 653.62 653.62 653.62 653.62 653.62 653.62 653.62 648.04 648.04 648.04 648.04 648.04 648.04 648.04 648.04 648.04 648.04 648.04 648.04 648.04 648.04 651.03 651.03 651.03 648.36 648.36 648.36 648.36 648.36 648.36 648.36 648.36 648.36 648.36 648.36 648.36 648.36 648.36 648.36 648.36 648.36 648.36 646.19

Station 1000 1017 1033 1069 1084 1147 1161 1186 1208 1230 1266.5 1283 1291 1355 1359 1380 1388 1426 1448 1470 1486 1499 1515 1533.5 1554 1591.8 1641 1656 1676 1701.5 1711 1740 1780.5 1794 1817 1822.5 1832 1843 1859 1874 1886 1898 1919 1931 1942 1964

Bed FS 9.55 13.16 11.10 11.73 10.12 10.33 12.39 10.45 13.09 10.78 5.31 7.47 5.76 6.62 6.71 7.93 6.93 7.15 9.38 7.48 8.73 7.19 8.63 8.30 10.20 10.93 10.99 10.71 8.53 8.88 11.08 9.16 8.91 10.37 9.57 9.16 11.20 11.84 9.40 9.15 11.40 10.56 9.68 11.90 11.15 7.39

Water Depth 0.11 3.40 1.32 1.94 0.34 0.13 2.21 0.20 2.70 0.40 0.00 1.90 0.11 0.19 0.23 1.16 0.12 0.29 2.54 0.65 1.91 0.35 1.80 1.49 0.34 0.70 0.36 2.67 0.47 0.57 2.75 0.84 0.53 1.92 1.12 0.67 2.70 3.33 0.89 0.51 2.65 0.93 3.16 2.42

Year 3 Bankfull FS

7.73

8.43

8.01

6.20

6.17

7.18

Description

Bed Elev. 644.07 640.46 642.52 641.89 643.50 643.29 641.23 643.17 640.53 642.84 642.73 640.57 642.28 641.42 641.33 640.11 641.11 640.89 638.66 640.56 639.31 640.85 639.41 639.74 640.83 640.10 640.04 637.65 639.83 639.48 637.28 639.20 639.45 637.99 638.79 639.20 637.16 636.52 638.96 639.21 636.96 637.80 638.68 636.46 637.21 638.80

Water Elev. 644.18 643.86 643.84 643.83 643.84 643.42 643.44 643.37 643.23 643.24 642.73 642.47 642.39 641.61 641.56 641.27 641.23 641.18 641.20 641.21 641.22 641.20 641.21 641.23 641.17 640.80 640.40 640.32 640.30 640.05 640.03 640.04 639.98 639.91 639.91 639.87 639.86 639.85 639.85 639.72 639.61 639.61 639.61 639.62 639.63

Bankfull Elev.

645.89

645.19

643.02

642.16

642.19

641.18

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 2 - Buckhorn Creek

HI

Station

Bed FS

Water Depth

Year 3 Bankfull FS

Description

Bed Elev.

Water Elev.

Bankfull Elev.

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 3 - Buckhorn Creek

Profile 640 639 638 637 636 Elevation (ft)

635 634 633 632 631 630 629 628 627 626 625 1000

1050

1100

1150

1200

1250

1300

1350

1400

1450

1500

1550

1600

1650

1700

1750

1800

1850

1900

1950

2000

2050

Station (ft)

Year 1 Bed

As-Built Bed

Year 2 Bed

Year 3 Bed

Year 3 Water

Year 3 BKF

2100

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 3 - Buckhorn Creek

HI 643.77 643.77 643.77 644.43 644.43 644.43 644.43 644.43 644.43 644.43 644.43 644.43 645.96 645.96 645.96 645.96 645.96 645.96 645.96 645.96 645.96 645.96 645.96 645.96 645.96 642.65 642.65 642.65 642.65 642.65 642.65 642.65 642.65 642.65 642.65 641.14 641.14 641.14 641.14 641.14 641.14 641.14 641.14 641.14 641.14 641.14 641.14 641.14 638.18 641.50 641.50 641.50 643.10

Station 1000 1014 1080 1094 1115 1117 1140 1166 1170 1180 1200 1223 1241 1255.3 1276 1292 1306 1328 1337.2 1360 1391 1398 1413 1434 1443 1469 1510 1526 1547 1551 1564 1584 1596 1609 1641 1666 1691 1704 1717 1761 1778 1795 1809 1817 1828 1883 1900 1921 1954 1990 2002 2003 2053

Bed FS 9.17 9.07 9.25 11.68 10.4 9.83 9.85 10.7 10.7 13.11 10.62 13.08 12.08 12.2 12.17 13.97 12.4 12.42 14.8 12.64 13.23 13.36 12.98 13.47 15.36 9.97 10.02 13.15 10.24 10.01 12.24 10.5 10.49 14.08 13.93 9.23 9.3 9.93 9.42 9.5 11.6 9.73 12.12 11.39 10 10.73 10.91 13.47 8.34 11.25 12.43 11.71 13.4

Water Depth 1 0.82 0.78 2.48 1.08 0.6 0.4 1.08 1.1 3.45 0.8 3.43 0.85 0.85 0.58 2.31 0.7 0.47 2.72 0.5 1.02 0.78 1.1 3 0.9 0.72 3.8 0.88 0.6 2.79 1 0.87 4.44 4.29 1.1 0.8 1.38 0.8 0.52 2.51 0.58 2.91 2.18 0.77 0.8 0.84 3.29 1.08 0.58 0.8 0.87

Year 3 Bankfull FS 6.15

7.85

9.92

10.75

10.75

7.56

8.12

6.77

7.15

7.61

Description

Bed Elev. 634.60 634.70 634.52 632.75 634.03 634.60 634.58 633.73 633.73 631.32 633.81 631.35 633.88 633.76 633.79 631.99 633.56 633.54 631.16 633.32 632.73 632.60 632.98 632.49 630.60 632.68 632.63 629.50 632.41 632.64 630.41 632.15 632.16 628.57 628.72 631.91 631.84 631.21 631.72 631.64 629.54 631.41 629.02 629.75 631.14 630.41 630.23 627.67 629.84 630.25 629.07 629.79 629.70

Water Elev. 635.60 635.52 635.30 635.23 635.11 635.20 634.98 634.81 634.83 634.77 634.61 634.78 634.73 634.61 634.37 634.30 634.26 634.01 633.88 633.82 633.62 633.62 633.76 633.59 633.60 633.58 633.35 633.30 633.29 633.24 633.20 633.15 633.03 633.01 633.01 633.01 632.64 632.59 632.52 632.16 632.05 631.99 631.93 631.93 631.91 631.21 631.07 630.96 630.92 630.83 630.59 630.59 630.57

Bankfull Elev. 637.62

636.58

636.04

635.21

635.21

635.09

634.53

634.37

633.99

633.53

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 4 - Middle Branch

Profile 675 674 673

Elevation (ft)

672 671 670 669 668 667 666 665 1000

1025

1050

1075

1100

1125

1150

1175

1200

1225

Station (ft)

Year 1 Bed

As-Built Bed

Year 2 Bed

Year 3 Bed

Year 3 BKF

Year 3 Water

1250

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 4 - Middle Branch

HI 679.79 679.79 679.79 679.79 679.79 679.79 679.79 679.79 679.79 679.79 679.79 679.79 679.79 679.79 679.79 679.79 679.79 679.79 679.79 679.79 679.79 679.79 679.79 679.79 674.64 674.64 674.64 674.64

Station 1000 1007 1016 1028.5 1038 1047 1057 1065 1074 1089 1091 1106 1115.9 1124 1131 1142 1146 1155 1160.5 1165 1171 1179 1191.5 1197 1208.5 1220 1228 1237.6

Bed FS 6.29 6.98 7.06 8.19 7.52 8.4 7.73 7.81 8.73 8.44 8.41 8.58 10.21 8.93 9.92 9.33 9.3 10.03 9.63 10.98 10.21 11.33 10.36 11.44 5.58 5.75 6.97 5.78

Water Depth 0.001 0.001 0.15 0.001 0.36 0.001 0.001

Year 3 Bankfull FS

6.68

0.001 0.001 0.24

7.26

0.001 0.001

8.67

0.25

0.001 0.001

4.72

Description

Bed Elev. 673.50 672.81 672.73 671.60 672.27 671.39 672.06 671.98 671.06 671.35 671.38 671.21 669.58 670.86 669.87 670.46 670.49 669.76 670.16 668.81 669.58 668.46 669.43 668.35 669.06 668.89 667.67 668.86

Water Elev. 673.50 672.73 672.73 671.75 672.27 671.75 672.06 671.98 671.38 671.38 671.38 671.21 669.82 670.46 670.46 670.46 670.49 669.06 669.06 669.06 669.06 669.06 669.06 669.06 669.06 668.89

Bankfull Elev.

673.11

672.53

671.12

669.92

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 5 - Middle Branch

Profile 665 664 663

Elevation (ft)

662 661 660 659 658 657 656 655 1000

1025

1050

1075

1100

1125

1150

1175

1200

1225

Station (ft)

As-Built Bed

Year 1 Bed

Year 3 Bed

Year 3 BKF

Year 2 Bed

1250

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 5 - Middle Branch

HI 669.59 669.59 669.59 669.59 669.59 669.59 669.59 669.59 669.59 669.59 669.59 669.59 669.59 669.59 669.59 669.59 669.59 669.59 669.59 669.59 669.59

Station 1000 1013 1020 1031 1039.5 1055 1062.9 1069 1074 1085 1102 1117 1131 1138.5 1154 1157 1167.3 1180 1188 1198 1209

Bed FS 5.56 5.92 7.91 6.31 6.79 6.75 8.36 6.90 8.46 7.52 7.77 8.19 8.00 9.89 8.30 8.49 8.59 8.71 10.20 8.94 9.17

Water Depth 0.00 0.00 0.32

Year 3 Bankfull FS 4.52

0.00 0.00

5.51

0.00

6.52

0.00

0.00

7.71

0.00 0.00

8.06

Description

Bed Elev. 664.03 663.67 661.68 663.28 662.80 662.84 661.23 662.69 661.13 662.07 661.82 661.40 661.59 659.70 661.29 661.10 661.00 660.88 659.39 660.65 660.42

Water Elev. 664.03 663.67 662.00 662.80 662.80 662.84 662.07 662.07 662.07 662.07 661.59 661.59 661.59 661.10 661.10 661.10 660.88 660.88 660.65 660.65

Bankfull Elev. 665.07

664.08

663.07

661.88

661.53

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 6 - Lower East Branch

Profile 645 644 643

Elevation (ft)

642 641 640 639 638 637 636 635 1000

1025

1050

1075

1100

1125

1150

1175

1200

1225

Station (ft)

As-Built Bed

Year 1 Bed

Year 3 Bed

Year 3 BKF

Year 2 Bed

1250

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 6 - Lower East Branch

HI 649.38 649.38 649.38 649.38 649.38 649.38 649.38 649.38 649.38 649.38 649.38 649.38 649.38 649.38 649.38 649.38 646.15 646.15 646.15 646.15 646.15 646.15 646.15 646.15 646.15 646.15 646.15 646.15

Station 1000 1003 1007 1010 1017 1029 1035 1047 1052 1057 1062 1079 1088 1096 1104 1107.6 1125 1133.5 1140.5 1151 1156 1162 1171 1185 1195 1201 1203 1210

Bed FS 8.94 8.78 8.83 9.18 8.91 8.90 9.91 9.38 9.89 9.53 10.19 9.80 10.06 10.92 10.31 10.39 7.39 8.11 7.38 7.92 7.37 7.94 7.42 7.83 7.77 8.62 8.72 7.90

Water Depth 0.11 0.00 0.00 0.05 0.00 0.00 0.34 0.00 0.00 0.09 0.00 0.00

Year 3 Bankfull FS

8.69

9.10

0.00 0.00 0.00 0.00 0.00 0.00

6.79

Description

Bed Elev. 640.44 640.60 640.55 640.20 640.47 640.48 639.47 640.00 639.49 639.85 639.19 639.58 639.32 638.46 639.07 638.99 638.76 638.04 638.77 638.23 638.78 638.21 638.73 638.32 638.38 637.53 637.43 638.25

Water Elev. 640.55 640.60 640.55 640.25 640.47 640.48 639.81 640.00 639.85 639.85 639.28 639.58 639.32 639.07 639.07 638.76 638.76 638.77 638.77 638.78 638.78 638.73 638.73 638.38 638.38

Bankfull Elev.

640.69

640.28

639.36

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 7 - Southeast Creek

Profile 655 654 653

Elevation (ft)

652 651 650 649 648 647 646 645 1000

1025

1050

1075

1100

1125

1150

1175

1200

Station (ft)

As-Built Bed

Year 1 Bed

Year 2 Bed

Year 3 Bed

Year 3 Water

Year 3 BKF

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 7 - Southeast Creek

HI 660.15 660.15 660.15 660.15 660.15 660.15 660.15 660.15 660.15 660.15 660.15 660.15 660.15 660.15 660.15 660.15

Station 1000 1012.5 1020 1027.5 1034.5 1057 1065 1068.5 1072 1079 1081.9 1086.8 1093.3 1101 1109 1127.8

Bed FS 8.87 9.01 9.74 9.29 9.74 9.33 10.22 9.65 10.31 9.92 9.91 9.88 11 10.05 10.44 10.78

Water Depth

0.71 0.17 0.62 0.08 0.7 0.08 0.69 0.27 0.19 0.1 1.05 0.1 0.4 0.44

Year 3 Bankfull FS

8.52

9.63

Description

Bed Elev. 651.28 651.14 650.41 650.86 650.41 650.82 649.93 650.50 649.84 650.23 650.24 650.27 649.15 650.10 649.71 649.37

Water Elev. 651.12 651.12 651.12 651.03 651.03 650.90 650.63 650.58 650.53 650.50 650.43 650.37 650.20 650.20 650.11 649.81

Bankfull Elev.

651.63

650.52

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 8 - Southwest Creek

Profile 105 104 103 102 101 Elevation (ft)

100 99 98 97 96 95 94 93 92 91 90 1000

1025

1050

1075

1100

1125

1150

1175

1200

1225

Station (ft)

As-Built Bed

Year 1 Bed

Year 3 Bed

Year 3 BKF

Year 2 Bed

1250

Holly Grove Stream Restoration Site Guilford County, NC Profile Reach 8 - Southwest Creek

HI 104.72 104.72 104.72 104.72 104.72 104.72 104.72 104.72 104.72 104.72 104.72 104.72 104.72 104.72 104.72 104.72 102.92 102.92 102.92 102.92 102.92 102.92 102.52 102.52 102.52 102.52

Station 1000 1012 1022.5 1037 1051.5 1056 1063 1072.5 1079.3 1091 1099 1106 1116 1121 1131.5 1139 1148.9 1155.5 1158.5 1163 1168.5 1176 1184.8 1189 1197 1199

Bed FS 7.90 7.24 8.82 7.69 7.77 9.08 8.10 8.03 9.31 8.43 8.47 9.63 8.70 9.61 8.70 9.99 7.20 7.16 8.08 8.17 7.71 7.66 7.29 8.55 7.64 7.69

Water Depth 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Year 3 Bankfull FS 6.44

7.00

7.34

7.83

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

6.53

6.40

Description

Bed Elev. 96.82 97.48 95.90 97.03 96.95 95.64 96.62 96.69 95.41 96.29 96.25 95.09 96.02 95.11 96.02 94.73 95.72 95.76 94.84 94.75 95.21 95.26 95.23 93.97 94.88 94.83

Water Elev. 96.82 97.48 95.90 97.03 96.95 95.64 96.62 96.69 95.41 96.29 96.25 95.09 96.02 95.11 96.02 95.72 95.72 95.76 94.75 94.75 95.21 95.26 95.23 94.88 94.88 94.83

Bankfull Elev. 98.28

97.72

97.38

96.89

96.39

96.12

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF1 Reach 1 - Buckhorn Creek - Sta 11+78.6

Year 3 Facing Downstream

Riffle Cross Section

104 102

Elevation (ft)

100

As-built Year 1

98

▼ BKF

Year 2 Year 3

96

Year 4 Year 5

94

BKF

92 90 -20

-10

0

10

20

30

40

50

60

70

Station (ft)

As-Built Date 1/8/09 Area 34.3 Bkf W 23.4 Dmean 1.5 Dmax 2.1 W/d 16.0

Year 1 Date 10/20/09 Area 35.4 Bkf W 23.3 Dmean 1.5 Dmax 2.1 W/d 15.3

Year 2 Date 10/11/10 Area 35.3 Bkf W 23.7 Dmean 1.5 Dmax 2.6 W/d 15.9

Year 3 Date 10/5/11 Area 31.3 Bkf W 23.7 Dmean 1.3 Dmax 2.3 W/d 18.0

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF1 Reach 1 - Buckhorn Creek - Sta 11+78.6 Station BM HI -20 -10 -5 0 5 10 15.5 18.4 21.3 25.5 26.5 29 32.2 34.4 35.3 38.9 46 49.4 52.5 57 62

As-Built FS/BS Elev. 6.36 97.34 103.70 3.11 100.59 3.60 100.10 4.71 98.99 5.26 98.44 5.61 98.09 6.07 97.63 6.46 97.24 7.25 96.45 8.19 95.51 8.45 95.25 8.59 95.11 8.46 95.24 8.25 95.45 8.36 95.34 8.01 95.69 6.46 97.24 6.41 97.29 6.49 97.21 5.99 97.71 4.78 98.92 3.00 100.70

Desc. PL1 IR Lt GRND

GRND

BKF TOE EOW THL

EOW TOE BKF

GRND

Station BM HI 0 2 7 13 15.6 17.5 18.5 20 20.4 20.9 21.7 22.5 24 26 28 29.5 30.9 32 33.8 34.6 34.8 35.3 36 36.7 37.4 38.9 42 46 48 50 51.6 52.6

FS/BS 3.78 4.02 4.15 4.58 4.94 5.20 5.65 5.96 6.37 6.48 6.71 6.98 7.29 7.33 7.23 7.17 7.19 7.33 7.33 7.26 7.10 6.89 6.75 6.45 6.21 5.83 5.18 5.22 5.27 5.37 5.04 4.82 4.7

25

Station BM HI 0 2 4 8 11 14 15.2 17 18.5 20.4 21.3 24 25.2 26.5 26.6 28 29.2 30.5 32 32.9 33 34.2 34.5 35.2 36.1 38 38.9 41 46 51 52.6

Year 3 FS/BS Elev. 5.82 98.66 104.48 5.85 98.63 6.13 98.35 6.42 98.06 6.68 97.80 6.88 97.60 7.07 97.41 7.09 97.39 7.43 97.05 7.75 96.73 8.02 96.46 8.46 96.02 8.71 95.77 9.01 95.47 9.30 95.18 9.36 95.12 9.46 95.02 9.55 94.93 9.55 94.93 9.48 95.00 9.42 95.06 9.31 95.17 9.16 95.32 8.93 95.55 8.62 95.86 8.16 96.32 7.59 96.89 7.26 97.22 7.15 97.33 7.21 97.27 7 97.48 6.72 97.76

Desc. IR Lt GRND

BKF BNK

BED

EOW BED THL BED

EOW BNK

BKF GRND

Station BM HI

Year 1 Elev. 98.67 102.45 98.43 98.30 97.87 97.51 97.25 96.80 96.49 96.08 95.97 95.74 95.47 95.16 95.12 95.22 95.28 95.26 95.12 95.12 95.19 95.35 95.56 95.70 96.00 96.24 96.62 97.27 97.23 97.18 97.08 97.41 97.63 97.75

Desc. RF1 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BNK BNK EOW BED BED BED BED BED BED BED BED BED EOW BNK BNK BNK BKF RT GRND GRND GRND GRND GRND GRND GRND

Station BM HI 0 2.8 6.8 11.8 13.8 15.4 16.8 18.8 20.3 21.3 21.9 23.8 25.8 26.8 27.7 28.8 30.8 31.3 32.8 33.1 33.7 34.8 35.8 36.8 37.8 39.1 40.8 44.8 49.8 52.6

Year 2 FS/BS Elev. 4.81 98.73 103.54 5.01 98.53 5.26 98.28 5.62 97.92 5.86 97.68 6.06 97.48 6.09 97.45 6.36 97.18 6.83 96.71 7.06 96.48 7.65 95.89 7.80 95.74 7.77 95.77 7.92 95.62 8.20 95.34 8.29 95.25 8.56 94.98 8.50 95.04 8.71 94.83 8.52 95.02 8.32 95.22 8.05 95.49 7.86 95.68 7.33 96.21 6.85 96.69 6.50 97.04 6.14 97.40 6.15 97.39 6.10 97.44 5.95 97.59 5.65 97.89

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BNK BNK BNK BED BED BED BED EOW BED BED THL BED EOW BED BED BNK BNK BNK BKF GRND GRND GRND GRND

97.14

FS/BS 0.00

Year 4 Elev. 100.00 100.00

Desc. IR Lt

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL1 Reach 1 - Buckhorn Creek - Sta 12+28.7

Year 3 Facing Downstream

Pool Cross Section

100

98 As-built

▼ BKF

Elevation (ft)

Year 1

96

Year 2 Year 3 Year 4

94

Year 5 high flow BKF

92

90 -25

-15

-5

5

15

25

35

45

55

65

75

Station (ft)

As-Built Date 1/8/09 Area 52.7 Bkf W 23.2 Dmean 2.3 Dmax 4.0 W/d 10.2

Year 1 Date 10/20/09 Area 48.0 Bkf W 22.1 Dmean 2.2 Dmax 3.9 W/d 10.2

Year 2 Date 10/11/10 Area 46.8 Bkf W 23.4 Dmean 2.0 Dmax 4.2 W/d 11.7

Year 3 Date 10/5/11 Area 48.4 Bkf W 23.5 Dmean 2.1 Dmax 4.3 W/d 11.4

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL1 Reach 1 - Buckhorn Creek - Sta 12+28.7 Station BM HI -25 -10 -3 0 4 10.5 14.1 18.4 19.9 20.5 20.8 23.1 24.7 27.6 29.2 30.6 31.2 31.5 33.7 37.3 42.3 44.9 48.7 52 55 58.4 62.6 67.5

As-Built FS/BS Elev. 6.36 97.34 103.70 3.35 100.35 4.12 99.58 4.91 98.79 5.51 98.19 6.37 97.33 6.85 96.85 6.71 96.99 8.35 95.35 8.45 95.25 8.80 94.90 9.83 93.87 10.54 93.16 10.73 92.97 10.59 93.11 10.49 93.21 9.75 93.95 8.84 94.86 8.40 95.30 7.97 95.73 6.95 96.75 7.41 96.29 6.92 96.78 6.59 97.11 6.76 96.94 7.16 96.54 5.95 97.75 4.57 99.13 3.17 100.53

Desc. PL1 IR Rt

GRND

BKF

EOW

EOW

BKF

Station BM HI 0 1.1 3.6 6.6 10.1 13.1 14.7 16.8 17.9 19.6 20.2 20.8 22.2 24.1 24.1 28.7 29.5 29.9 31.3 31.7 32.2 34.5 34.6 35.5 36.8 39.1 40.1 43.1 44.1 47.9 25

Station BM HI 0 3.9 7.9 11.9 14.4 15.4 17.4 19.3 20 20.4 20.5 20.8 21.4 22.5 23.7 25.4 26.6 27.4 28.6 29.5 30.5 30.9 31.1 31.4 32.2 33.4 34.4 35.2 35.9 37.9 39.9 41.9 48.7

Year 3 FS/BS Elev. 5.71 98.46 104.17 5.91 98.26 6.83 97.34 7.12 97.05 7.19 96.98 7.27 96.90 7.77 96.40 8.14 96.03 8.40 95.77 8.74 95.43 9.12 95.05 9.38 94.79 10.14 94.03 10.53 93.64 11.01 93.16 11.38 92.79 11.52 92.65 11.46 92.71 10.83 93.34 10.78 93.39 10.83 93.34 10.31 93.86 10.13 94.04 9.37 94.80 8.69 95.48 8.19 95.98 7.96 96.21 7.80 96.37 7.78 96.39 7.64 96.53 7.39 96.78 7.54 96.63 7.78 96.39 7.08 97.09

Desc. IR Lt GRND

BKF BNK

EOW TOE BED

THL BED

EOW BNK

BKF GRND

Station BM HI

Year 1 FS/BS Elev. 3.78 98.67 102.45 4.17 98.28 4.41 98.04 5.12 97.33 5.40 97.05 5.54 96.91 5.49 96.96 5.62 96.83 6.46 95.99 6.89 95.56 7.14 95.31 7.43 95.02 8.44 94.01 8.96 93.49 9.51 92.94 9.55 92.9 9.01 93.44 8.92 93.53 8.53 93.92 8.26 94.19 7.43 95.02 6.87 95.58 6.75 95.7 6.28 96.17 6.04 96.41 5.77 96.68 5.76 96.69 5.88 96.57 6 96.45 5.71 96.74 5.64 96.81

Desc. RF1 IR Lt GRND GRND GRND GRND GRND GRND GRND GRND BKF LT BNK LOG EOW BED BED BED BED BED BED BED BED EOW BNK BNK BNK BKF RT GRND GRND GRND GRND GRND

Station BM HI 0 1.5 4.5 7.5 11.5 14.1 15.5 17.5 18.5 19.5 20.5 20.7 21 22 24 25.5 27.5 29.5 30 31 31.2 31.5 32.5 33.5 34.5 35.5 37.5 42.5 46.5 48.7

Year 2 FS/BS Elev. 5.91 98.55 104.46 6.15 98.31 6.44 98.02 7.10 97.36 7.31 97.15 7.49 96.97 7.37 97.09 7.89 96.57 8.38 96.08 8.61 95.85 8.70 95.76 9.28 95.18 9.59 94.87 10.44 94.02 10.96 93.50 11.61 92.85 11.70 92.76 11.06 93.40 11.01 93.45 11.50 92.96 10.35 94.11 9.62 94.84 8.99 95.47 8.45 96.01 8.24 96.22 8.05 96.41 7.82 96.64 7.55 96.91 7.96 96.50 7.55 96.91 7.28 97.18

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BNK BNK BNK BNK EOW BED BED BED BED BED BED BED BED EOW BNK BNK BNK BNK BKF GRND GRND GRND GRND

97.14

Year 4 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF2 Reach 2 - Buckhorn Creek - Sta 15+89.6

Year 3 Facing Downstream

Riffle Cross Section

648

646

Elevation (ft)

As-built Year 1

644

Year 2 Year 3

▼ BKF

642

Year 4 Year 5 BKF

640

638 -20

-10

0

10

20

30

40

50

60

70

Station (ft)

As-Built Date 1/8/09 Area 26.3 Bkf W 19.9 Dmean 1.3 Dmax 1.7 W/d 15.1

Year 1 Date 10/20/09 Area 25.4 Bkf W 20.4 Dmean 1.2 Dmax 1.7 W/d 16.4

Year 2 Date 10/12/10 Area 27.6 Bkf W 20.2 Dmean 1.4 Dmax 1.9 W/d 14.8

Year 3 Date 10/5/11 Area 21.1 Bkf W 19.7 Dmean 1.1 Dmax 1.6 W/d 18.4

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF2 Reach 2 - Buckhorn Creek - Sta 15+89.6 Station BM HI -20 -10 -5 -2 0 2 4.5 7 9.6 10.6 11.3 12 14 16 19 21 24 26 27.3 27.8 29.5 30.4 31.2 34 37 41 43.6 48

As-Built FS/BS Elev. 6.90 644.39 651.29 5.33 645.96 5.45 645.84 5.66 645.63 6.27 645.02 7.04 644.25 7.85 643.44 8.95 642.34 9.38 641.91 9.46 641.83 9.90 641.39 10.00 641.29 11.18 640.11 11.06 640.23 11.08 640.21 11.20 640.09 11.12 640.17 10.75 640.54 10.71 640.58 10.83 640.46 10.27 641.02 9.50 641.79 9.28 642.01 8.23 643.06 7.73 643.56 6.70 644.59 6.04 645.25 4.96 646.33 2.38 648.91

Station BM HI 0 1.8 2.8 5.8 8.8 9.1 10.8 11.8 12.8 13.6 13.7 14.6 15.8 16.8 17.8 18.9 19.9 22.5 22.6 24.3 25.7 28.8 29.8 31.4 34.8 37.8 40.8 42.8 43.5

Year 3 FS/BS Elev. 6.59 644.39 650.98 6.70 644.28 7.42 643.56 7.85 643.13 8.91 642.07 9.00 641.98 9.20 641.78 9.45 641.53 10.19 640.79 10.38 640.60 10.35 640.63 10.62 640.36 10.68 640.30 10.85 640.13 10.83 640.15 10.85 640.13 10.81 640.17 10.84 640.14 10.58 640.40 10.33 640.65 9.92 641.06 10.03 640.95 9.35 641.63 8.89 642.09 7.93 643.05 7.14 643.84 6.26 644.72 5.75 645.23 5 645.98 4.73 646.25

Desc. RF2 IR Lt

GRND

BKF EOW

EOW

BKF

Station BM HI 0 4.5 6 8.5 9.6 10.7 11.3 12.3 13 15 17 19 21 23.1 25 27.5 28.4 30 31.2 33 35 37 41 43.7

FS/BS 6.55

Station BM HI

FS/BS 0.00

7.06 8.89 9.24 9.42 9.50 9.98 10.67 10.88 11.11 11.04 11.12 11.18 11.13 10.90 10.55 10.71 9.95 9.42 8.31 8.08 7.54 6.73 6.05 5.04

Year 1 Elev. 644.77 651.32 644.26 642.43 642.08 641.90 641.82 641.34 640.65 640.44 640.21 640.28 640.20 640.14 640.19 640.42 640.77 640.61 641.37 641.90 643.01 643.24 643.78 644.59 645.27 646.28

Desc. PL2 IR Lt GRND GRND GRND GRND BKF LT BNK BNK EOW BED BED BED BED BED EOW BED BED BANK BANK BKF RT GRND GRND GRND GRND GRND

Station BM HI 0 1.5 4.5 6 7.5 9.3 10.5 11.5 12.3 13.1 14 15.5 17.5 19.5 21.5 23.5 24 25.5 26.5 27.6 29.5 31 32.5 34.5 38.5 43.6

Year 2 FS/BS Elev. 6.50 644.77 651.27 7.00 644.27 7.63 643.64 8.81 642.46 9.23 642.04 9.34 641.93 9.30 641.97 9.73 641.54 10.38 640.89 10.68 640.59 10.82 640.45 11.18 640.09 11.15 640.12 11.15 640.12 11.09 640.18 10.99 640.28 10.84 640.43 10.25 641.02 10.45 640.82 10.52 640.75 10.50 640.77 9.55 641.72 8.31 642.96 8.10 643.17 7.60 643.67 6.44 644.83 5.00 646.27

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BNK BNK EOW BED BED BED BED BED EOW BED BED BED BED BNK BKF GRND GRND GRND GRND

GRND

Desc. IR Lt GRND

BKF BNK

EOW BED

EOW BNK

GRND

Year 4 Elev. 100.00 100.00

Desc. IR Lt

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL2 Reach 2 - Buckhorn Creek - Sta 15+30.7

Year 3 Facing Downstream

Pool Cross Section

648

646

Elevation (ft)

As-built Year 1

644

Year 2 ▼ BKF

Year 3

642

Year 4 Year 5 BKF

640

638 -25

-15

-5

5

15

25

35

45

55

65

75

Station (ft)

As-Built Date 1/8/09 Area 45.6 Bkf W 23.3 Dmean 2.0 Dmax 2.8 W/d 11.9

Year 1 Date 10/20/09 Area 43.8 Bkf W 22.2 Dmean 2.0 Dmax 2.9 W/d 11.2

Year 2 Date 10/12/10 Area 49.1 Bkf W 22 Dmean 2.2 Dmax 3.1 W/d 9.9

Year 3 Date 10/5/11 Area 47.6 Bkf W 22.8 Dmean 2.1 Dmax 2.9 W/d 10.9

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL2 Reach 2 - Buckhorn Creek - Sta 15+30.7 Station BM HI -20 -10 -3 0 5 7 8.8 10 11.7 14.2 15.5 18 20.5 23 26 29 31 32.3 35 38 39 40.8

As-Built FS/BS Elev. 6.90 644.39 651.29 5.09 646.20 5.13 646.16 5.30 645.99 6.68 644.61 8.65 642.64 8.60 642.69 8.91 642.38 8.75 642.54 8.95 642.34 10.22 641.07 10.80 640.49 11.25 640.04 11.70 639.59 11.73 639.56 11.65 639.64 11.58 639.71 10.90 640.39 10.22 641.07 8.15 643.14 5.98 645.31 5.27 646.02 3.10 648.19

Station BM HI 0 3.3 5.3 8.8 10.8 12 13.2 14.3 14.7 15.3 16.3 18.3 20.8 21.8 24.3 27.3 28.8 31.3 32.1 32.6 33 33.8 34.8 36.3 39

Year 3 FS/BS Elev. 6.41 644.77 651.18 6.51 644.67 7.92 643.26 8.50 642.68 8.62 642.56 8.51 642.67 8.63 642.55 8.92 642.26 9.64 641.54 10.01 641.17 10.66 640.52 10.67 640.51 11.22 639.96 11.55 639.63 11.54 639.64 11.34 639.84 11.46 639.72 11.41 639.77 10.82 640.36 10.41 640.77 10.03 641.15 9.22 641.96 8.91 642.27 8.12 643.06 7.13 644.05 5.24 645.94

Desc. RF2 IR Lt

GRND

BKF

BR BR

EOW

Desc. IR Lt GRND

BKF BNK EOW BED

THL BED

EOW BNK

GRND

Station BM HI 0 4.2 5.7 8.7 10.7 11.9 12.7 14.2 15.2 16.7 18.7 21.7 24.7 27.7 29.3 30.9 32.2 34.1 36.7 39

Year 1 FS/BS Elev. 6.55 644.77 651.32 6.75 644.57 8.54 642.78 8.75 642.57 8.92 642.4 8.84 642.48 8.96 642.36 9.16 642.16 10.17 641.15 10.69 640.63 10.82 640.5 11.47 639.85 11.86 639.46 11.63 639.69 11.59 639.73 11.37 639.95 11.01 640.31 10.14 641.18 9.03 642.29 7.01 644.31 5.32 646

Station BM HI

Year 4 FS/BS Elev. 0.00 100.00 100.00

Desc. PL2 IT Lt GRND GRND GRND GRND GRND BKF LT BNK EOW BED BED BED BED BED BED BED BED EOW BNK BNK GRND

Desc. IR Lt

Station BM HI 0 1.8 3.8 5.3 7.3 9.8 10.8 11.8 12.8 13.8 14.8 15 15.7 16.8 18.8 20.8 22.8 24.8 26.8 28.8 29.8 30.8 31.3 32.3 33.8 34.8 36.8 39

Year 2 FS/BS Elev. 6.50 644.77 651.27 6.62 644.65 7.37 643.90 8.23 643.04 8.64 642.63 8.45 642.82 8.60 642.67 8.58 642.69 8.67 642.60 8.90 642.37 9.43 641.84 10.10 641.17 10.16 641.11 10.74 640.53 10.90 640.37 11.43 639.84 11.65 639.62 11.72 639.55 11.53 639.74 11.43 639.84 11.51 639.76 11.28 639.99 11.04 640.23 10.81 640.46 10.15 641.12 9.06 642.21 8.05 643.22 7.00 644.27 5.31 645.96

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND GRND GRND BKF BNK BNK BNK EOW BED BED BED BED BED BED BED BED BED BED BED EOW BNK BNK BNK GRND

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF3 Reach 3 - Buckhorn Creek - Sta 12+50.7

Year 3 Facing Downstream

Riffle Cross Section

642

640

Elevation (ft)

As-built Year 1

638

Year 2 ▼ BKF

Year 3

636

Year 4 Year 5 BKF

634

632 -20

-10

0

10

20

30

40

50

60

70

Station (ft)

As-Built Date 1/8/09 Area 48.3 Bkf W 25.4 Dmean 1.9 Dmax 2.6 W/d 13.4

Year 1 Date 10/20/09 Area 47.5 Bkf W 25.5 Dmean 1.9 Dmax 2.6 W/d 13.7

Year 2 Date 10/12/10 Area 47.7 Bkf W 27.5 Dmean 1.7 Dmax 2.8 W/d 15.9

Year 3 Date 10/5/11 Area 45.2 Bkf W 26.8 Dmean 1.7 Dmax 2.7 W/d 15.9

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF3 Reach 3 - Buckhorn Creek - Sta 12+50.7 Station BM HI -20 -10 -1 0 0.8 2.3 5 8.3 10.6 12 13.5 14 15.5 15.8 16.9 17.9 20 22 23 25 27 30 32.1 32.6 33.2 34.1 36.2 37.4 41.5 45.1 46 47.8 49.5 50.4 51.2 54.7 61 68

As-Built FS/BS Elev. 5.88 638.55 644.43 4.71 639.72 5.33 639.10 5.61 638.82 6.12 638.31 6.53 637.90 7.08 637.35 8.14 636.29 7.86 636.57 7.85 636.58 8.14 636.29 8.70 635.73 9.23 635.20 9.87 634.56 10.22 634.21 10.35 634.08 10.47 633.96 10.48 633.95 10.64 633.79 10.78 633.65 10.70 633.73 10.68 633.75 10.48 633.95 10.43 634.00 10.33 634.10 9.78 634.65 9.49 634.94 8.35 636.08 8.07 636.36 8.21 636.22 7.89 636.54 7.49 636.94 6.43 638.00 5.56 638.87 5.17 639.26 4.85 639.58 3.67 640.76 3.18 641.25 2.85 641.58

Station BM HI 0 2.3 5.3 9.3 11 12.3 13.4 14.3 15.8 16.4 16.5 17.3 19.3 21.1 22.9 24 24.8 26 26.9 27.8 30.3 32.4 32.6 33.3 34.7 36.2 36.8 37.8 41.2 44.6 46.1 47.3 50.3

Year 3 FS/BS Elev. 3.29 638.55 641.84 3.58 638.26 4.48 637.36 5.43 636.41 5.27 636.57 5.38 636.46 5.75 636.09 6.15 635.69 6.76 635.08 7.24 634.60 7.29 634.55 7.38 634.46 7.49 634.35 7.63 634.21 7.70 634.14 8.16 633.68 8.04 633.80 8.20 633.64 7.76 634.08 7.92 633.92 7.49 634.35 7.73 634.11 7.46 634.38 7.32 634.52 6.86 634.98 6.52 635.32 5.78 636.06 5.63 636.21 5.49 636.35 5.5 636.34 5.29 636.55 4.87 636.97 4.23 637.61 2.62 639.22

Desc. RF3 IR Lt

GRND

BKF

EOW

EOW

BKF

GRND

Desc. IR Lt GRND

BKF BNK

EOW BED

THL BED

EOW BNK BKF GRND

Station BM HI 0 2 4 7 9 11 11.6 12.2 12.8 13.6 14.8 15.4 16 18 19.6 21 22 24 26 28 30 32 32.7 33.5 34.8 35.8 36.5 37.1 40 43.5 45.6 47 49 50.4

FS/BS 3.92

Station BM HI

FS/BS 0.00

4.27 5.04 5.93 6.19 5.95 6.03 6.14 6.29 6.60 6.85 7.69 7.86 8.27 8.50 8.49 8.60 8.65 8.81 8.66 8.51 8.48 8.27 8.27 7.61 7.16 6.56 6.37 6.17 6.17 6.1 5.77 4.97 3.87 3.22

Year 1 Elev. 638.55 642.47 638.20 637.43 636.54 636.28 636.52 636.44 636.33 636.18 635.87 635.62 634.78 634.61 634.20 633.97 633.98 633.87 633.82 633.66 633.81 633.96 633.99 634.20 634.20 634.86 635.31 635.91 636.10 636.30 636.30 636.37 636.70 637.50 638.60 639.25

Year 4 Elev. 100.00 100.00

Desc. RF3 IR Lt GRND GRND GRND GRND GRND BKF LT? BKF LT BKF LT BANK BANK BANK BANK EOW BED BED BED BED BED BED BED BED BED TOE BNK BNK BNK BNK BKF GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 0 2.9 3.9 5.9 7.9 10.4 12.9 13.5 14.9 16.4 17.9 19.9 20.4 21.4 22.9 23.9 24.9 26.9 27.9 29.7 30.7 32.7 33.9 34.9 35.9 36.9 37.9 39.9 44.9 45.9 50.4

Year 2 FS/BS Elev. 3.11 638.55 641.66 3.34 638.32 4.50 637.16 5.01 636.65 5.30 636.36 5.04 636.62 5.12 636.54 5.78 635.88 6.00 635.66 6.77 634.89 7.33 634.33 7.37 634.29 7.51 634.15 7.55 634.11 7.71 633.95 8.05 633.61 8.01 633.65 7.92 633.74 7.73 633.93 7.52 634.14 7.11 634.55 7.57 634.09 7.37 634.29 6.62 635.04 6.19 635.47 5.64 636.02 5.40 636.26 5.25 636.41 5.32 636.34 5.15 636.51 4.73 636.93 2.40 639.26

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND GRND GRND BKF BNK BED BED BED EOW BED BED BED BED BED BED BED BED BED BNK BNK BKF GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL3 Reach 3 - Buckhorn Creek - Sta 13+33.1

Year 3 Facing Downstream

Pool Cross Section

640

638

Elevation (ft)

As-built Year 1

▼ BKF

636

Year 2 Year 3

634

Year 4 Year 5 BKF

632

630 -25

-15

-5

5

15

25

35

45

55

65

75

Station (ft)

As-Built Date 1/8/09 Area 62.7 Bkf W 22.2 Dmean 2.8 Dmax 4.6 W/d 7.9

Year 1 Date 10/20/09 Area 62.8 Bkf W 22.5 Dmean 2.8 Dmax 4.7 W/d 8.1

Year 2 Date 10/12/10 Area 66.2 Bkf W 22.8 Dmean 2.9 Dmax 4.9 W/d 7.9

Year 3 Date 10/5/11 Area 66.2 Bkf W 22.9 Dmean 2.9 Dmax 4.8 W/d 7.9

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL3 Reach 3 - Buckhorn Creek - Sta 13+33.1 Station BM HI -20 -14.5 -12 -2.5 0 3.6 7 12 15 16 18.2 18.7 18.8 20.3 21 23 25 27 29 30.6 31 32 34.2 38.2 42 45.7 49 56 66

As-Built FS/BS Elev. 5.88 638.55 644.43 4.23 640.20 4.60 639.83 5.23 639.20 5.62 638.81 6.61 637.82 8.09 636.34 8.39 636.04 8.61 635.82 10.03 634.40 10.56 633.87 10.49 633.94 11.09 633.34 11.83 632.60 12.60 631.83 13.20 631.23 13.10 631.33 12.87 631.56 12.68 631.75 12.20 632.23 11.89 632.54 11.09 633.34 10.14 634.29 9.23 635.20 8.64 635.79 7.65 636.78 6.39 638.04 5.49 638.94 5.14 639.29 4.82 639.61

Station BM HI 0 1.9 4.9 7.9 10.9 11.4 11.9 12.9 14.3 15.9 17.7 18.4 18.7 19.7 20.9 22.5 23.8 25.9 28.2 29.7 31.2 31.9 32.8 33.9 34.8 35.4 35.9 36.9 38.9 41.9 45.5

Year 3 FS/BS Elev. 5.64 638.14 643.78 5.35 638.43 6.80 636.98 7.56 636.22 7.81 635.97 7.74 636.04 7.80 635.98 7.87 635.91 8.41 635.37 9.03 634.75 9.54 634.24 9.77 634.01 9.89 633.89 11.25 632.53 11.62 632.16 12.14 631.64 12.33 631.45 12.64 631.14 12.41 631.37 12.28 631.50 11.65 632.13 10.71 633.07 9.90 633.88 9.01 634.77 8.48 635.30 8.34 635.44 8.29 635.49 8.25 635.53 8.08 635.7 7.63 636.15 6.88 636.9 5.55 638.23

Desc. RF3 IR Lt

BKF

LOG EOW

EOW BKF

GRND

Desc. IR Lt GRND

BKF BNK

EOW BED

THL BED

EOW BNK

BKF GRND

Station BM HI 0 2 3.5 6 7.5 10 12 13.5 16 17.7 18.3 18.8 19 21 23 25 27 29 31 31.3 31.8 33.2 34.5 36 38 40 43 44.3 45.7

Year 1 FS/BS Elev. 3.92 638.55 642.47 4.62 637.85 5.48 636.99 6.06 636.41 6.42 636.05 6.68 635.79 6.57 635.9 6.70 635.77 7.55 634.92 8.35 634.12 8.66 633.81 8.54 633.93 9.17 633.3 10.03 632.44 11.06 631.41 11.38 631.09 11.06 631.41 10.84 631.63 10.44 632.03 9.38 633.09 9.14 633.33 8.44 634.03 7.61 634.86 7.22 635.25 7.10 635.37 6.76 635.71 6.19 636.28 5.42 637.05 5.13 637.34 4.42 638.05

Station BM HI

Year 4 FS/BS Elev. 0.00 100.00 100.00

Desc. PL2 IT Lt GRND GRND GRND GRND GRND GRND BKF LT BNK BNK BNK LOG EOW BED BED BED BED BED BED BED EOW BNK BNK BKF RT GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 0 2.4 4.4 6.4 7.4 9.4 11.6 13.4 14.4 15.4 16.4 18.1 18.6 18.7 19.9 21.4 23.4 25.4 27.4 29.4 31.1 31.5 32 33.4 34.4 36.4 39.4 42.4 45.6

Year 2 FS/BS Elev. 3.11 638.55 641.66 3.82 637.84 4.86 636.80 5.49 636.17 5.55 636.11 5.83 635.83 5.75 635.91 5.78 635.88 6.64 635.02 7.05 634.61 7.34 634.32 7.78 633.88 7.74 633.92 8.29 633.37 8.90 632.76 9.34 632.32 10.09 631.57 10.47 631.19 10.64 631.02 10.31 631.35 9.70 631.96 8.61 633.05 8.25 633.41 7.39 634.27 6.48 635.18 6.32 635.34 6.08 635.58 5.42 636.24 4.70 636.96 3.52 638.14

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND GRND BKF BNK BNK BNK BED LOG EOW BED BED BED BED BED BED BED BED EOW BNK BNK BKF GRND GRND GRND GRND

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF4 Reach 4 - Middle Branch - Sta 10+89.9

Year 3 Facing Downstream

Riffle Cross Section

675

674

Elevation (ft)

As-built Year 1

673

Year 2

▼ BKF

Year 3

672

Year 4 Year 5 BKF

671

670 -15

-10

-5

0

5

10

15

20

25

30

35

Station (ft)

As-Built Date 1/8/09 Area 3.7 Bkf W 6.2 Dmean 0.6 Dmax 1.0 W/d 10.4

Year 1 Date 10/20/09 Area 3.5 Bkf W 6.4 Dmean 0.5 Dmax 1.0 W/d 11.8

Year 2 Date 10/11/10 Area 3.8 Bkf W 6.9 Dmean 0.5 Dmax 1.0 W/d 12.6

Year 3 Date 10/5/11 Area 3.7 Bkf W 6 Dmean 0.6 Dmax 1.1 W/d 9.9

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF4 Reach 4 - Middle Branch - Sta 10+89.9 Station BM HI -15 -6 0 3.6 7.1 8.1 8.8 9.4 9.9 10.5 11.2 11.9 12.4 12.8 13.5 14.3 16 19 21 22.4 24.5 29 34

As-Built FS/BS Elev. 3.96 674.94 678.90 5.26 673.64 6.00 672.90 6.21 672.69 6.10 672.80 6.24 672.66 6.54 672.36 6.89 672.01 7.03 671.87 7.50 671.40 7.53 671.37 7.44 671.46 7.50 671.40 7.42 671.48 7.04 671.86 6.72 672.18 6.54 672.36 6.56 672.34 6.52 672.38 6.50 672.40 6.20 672.70 6.00 672.90 5.27 673.63 4.44 674.46

Station BM HI 0 2 4 6 7 7.6 8 8.5 9 9.5 10 10.5 11 11.5 12.1 12.6 13 13.5 14 16 18 20 22 22.4

Year 3 FS/BS Elev. 6.00 673.10 679.10 6.33 672.77 6.26 672.84 6.32 672.78 6.36 672.74 6.40 672.70 6.55 672.55 6.72 672.38 6.97 672.13 7.05 672.05 7.28 671.82 7.60 671.50 7.72 671.38 7.69 671.41 7.79 671.31 7.69 671.41 7.06 672.04 6.98 672.12 6.79 672.31 6.68 672.42 6.65 672.45 6.77 672.33 6.58 672.52 6.36 672.74 6.33 672.77

Desc. BP4 IR Lt

bkf

bkf

Desc. IR Lt GRND

BKF BNK

TOE BED THL BED BNK BNK BKF GRND

Station BM HI 0 2.7 4.7 6.7 7.7 7.9 8.3 9.3 9.6 10.2 10.8 11.4 12.3 12.5 12.9 13.3 13.7 14.3 16.7 17.7 19.7 21.3 21.8 22.3

FS/BS 4.31

Station BM HI

FS/BS 0.00

6.40 6.29 6.29 6.45 6.65 6.74 6.99 7.21 7.66 7.71 7.67 7.63 7.60 7.24 7.01 6.88 6.73 6.68 6.73 6.80 6.63 6.66 6.43 6.36

Year 1 Elev. 674.77 679.08 672.68 672.79 672.79 672.63 672.43 672.34 672.09 671.87 671.42 671.37 671.41 671.45 671.48 671.84 672.07 672.20 672.35 672.40 672.35 672.28 672.45 672.42 672.65 672.72

Year 4 Elev. 100.00 100.00

Desc. BP4 IR Rt GRND GRND GRND GRND GRND BKF LT BNK BNK BED BED BED BED BED BNK BKF GRND GRND GRND GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 2 4 6 7.1 7.6 8.3 9.4 10.2 10.7 11.5 12 12.4 13.1 14 15.6 17 19.5 21 22.5

Year 2 FS/BS Elev. 4.75 674.77 679.52 6.77 672.75 6.76 672.76 6.79 672.73 6.86 672.66 7.03 672.49 7.40 672.12 7.86 671.66 8.12 671.40 8.14 671.38 8.09 671.43 8.12 671.40 7.58 671.94 7.23 672.29 7.09 672.43 7.09 672.43 7.06 672.46 7.01 672.51 7.03 672.49 6.77 672.75

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Rt GRND GRND GRND BKF BNK BNK BNK BED BED BED BED BNK BNK BKF GRND GRND GRND GRND GRND

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL4 Reach 4 - Middle Branch - Sta 11+14.3

Year 3 Facing Downstream

Pool Cross Section

674 673 ▼ BKF

Elevation (ft)

672

As-built Year 1 Year 2

671

Year 3 Year 4

670

Year 5 BKF

669 668 -15

-10

-5

0

5

10

15

20

25

30

35

Station (ft)

As-Built Date 1/8/09 Area 11.2 Bkf W 10.5 Dmean 1.1 Dmax 2.4 W/d 9.9

Year 1 Date 10/20/09 Area 9.4 Bkf W 10.5 Dmean 0.9 Dmax 2.0 W/d 11.8

Year 2 Date 10/11/10 Area 11.1 Bkf W 10.7 Dmean 1.0 Dmax 2.3 W/d 10.3

Year 3 Date 10/5/11 Area 10.4 Bkf W 10 Dmean 1.0 Dmax 2.2 W/d 9.6

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL4 Reach 4 - Middle Branch - Sta 11+14.3 Station BM HI -20 -10 -3 0 4 6 8 9.2 9.8 9.9 11.4 12.4 13.4 14 15.1 15.3 16.5 18 20.5 22.2 22.9 25.5 27.3 31 36

As-Built FS/BS Elev. 3.20 674.94 678.14 5.17 672.97 5.55 672.59 5.95 672.19 5.94 672.20 5.84 672.30 6.08 672.06 6.58 671.56 6.51 671.63 7.24 670.90 8.87 669.27 8.60 669.54 8.50 669.64 8.37 669.77 8.12 670.02 7.25 670.89 7.02 671.12 6.62 671.52 6.45 671.69 6.38 671.76 5.95 672.19 5.84 672.30 5.73 672.41 5.80 672.34 4.68 673.46 4.70 673.44

Station BM HI 0 1.9 3.9 5.9 6.3 6.9 7.4 7.9 8.4 8.9 9.6 9.8 10.5 11.1 11.9 12.7 13.5 14.1 14.8 15.5 16.9 18.9 20.9 21.9

Year 3 FS/BS Elev. 6.71 672.37 679.08 6.90 672.18 6.85 672.23 6.77 672.31 7.06 672.02 7.10 671.98 7.33 671.75 7.35 671.73 7.58 671.50 7.46 671.62 7.75 671.33 8.72 670.36 8.79 670.29 9.46 669.62 9.48 669.60 9.44 669.64 9.31 669.77 9.03 670.05 8.22 670.86 7.58 671.50 7.44 671.64 7.28 671.80 7.23 671.85 6.97 672.11 6.84 672.24

Desc. BP4 IR Lt

EOW

EOW

Desc. IR Lt GRND

BKF BNK

LOG LOG ROCK BED THL BED BED BNK BNK BKF GRND

Station BM HI 0 2 4 5.3 6.8 8 9 9.9 10 10.5 11.3 11.9 12.5 13 13.6 14 14.8 15.4 16 18 21.4 22.3 22.9

Year 1 FS/BS Elev. 4.31 674.77 679.08 6.92 672.16 6.95 672.13 6.90 672.18 6.91 672.17 7.23 671.85 7.51 671.57 7.49 671.59 7.80 671.28 8.84 670.24 8.66 670.42 9.44 669.64 9.40 669.68 9.44 669.64 9.41 669.67 9.21 669.87 8.94 670.14 8.44 670.64 7.81 671.27 7.64 671.44 7.42 671.66 7.32 671.76 6.92 672.16 6.85 672.23

Station BM HI

Year 4 FS/BS Elev. 0.00 100.00 100.00

Desc. BP4 IR Rt GRND GRND GRND GRND GRND GRND LOG LOG BED BLDR BED BED BED BED BED BED BED BNK BKF RT GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 0 0.6 2.2 3.6 5 5.1 6.1 6.9 8.2 9.1 9.7 9.8 10.6 11.6 12.2 12.8 13.6 14.35 14.8 16.1 17.6 18.6 20 21.6 22.8

Year 2 FS/BS Elev. 4.75 674.77 679.52 7.32 672.20 7.31 672.21 7.30 672.22 7.21 672.31 7.32 672.20 7.32 672.20 7.51 672.01 7.78 671.74 8.06 671.46 7.92 671.60 8.21 671.31 9.26 670.26 9.79 669.73 10.05 669.47 10.07 669.45 10.02 669.50 9.80 669.72 9.18 670.34 8.72 670.80 7.90 671.62 7.79 671.73 7.73 671.79 7.76 671.76 7.55 671.97 7.30 672.22

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BNK BNK LOG LOG EOW BED BED THL BED BED EOW BNK BNK BKF GRND GRND GRND GRND

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF5 Reach 5 - Middle Branch - Sta 11+68.1

Year 3 Facing Downstream

Riffle Cross Section

665 664 As-built

Elevation (ft)

663

Year 1 Year 2

▼ BKF

662

Year 3 Year 4

661

Year 5 BKF

660 659 -15

-10

-5

0

5

10

15

20

25

30

35

Station (ft)

As-Built Date 1/8/09 Area 6.0 Bkf W 8.9 Dmean 0.7 Dmax 1.2 W/d 13.2

Year 1 Date 10/20/09 Area 5.9 Bkf W 8.2 Dmean 0.7 Dmax 1.2 W/d 11.5

Year 2 Date 10/11/10 Area 5.6 Bkf W 7.9 Dmean 0.7 Dmax 1.2 W/d 11.1

Year 3 Date 10/5/11 Area 4.9 Bkf W 7.2 Dmean 0.7 Dmax 1.1 W/d 10.5

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF5 Reach 5 - Middle Branch - Sta 11+68.1 Station BM HI -18 -9 -5 -1 0 2 6 9 10.3 11 11.7 12 12.5 13.4 14.3 15.3 16 16.6 17.5 17.9 19.5 22 24 28 32.1 37 42 52

As-Built FS/BS Elev. 2.82 665.59 668.41 5.60 662.81 5.80 662.61 6.05 662.36 6.15 662.26 6.15 662.26 6.63 661.78 6.55 661.86 6.42 661.99 6.50 661.91 6.68 661.73 6.90 661.51 7.29 661.12 7.59 660.82 7.49 660.92 7.56 660.85 7.50 660.91 7.39 661.02 7.14 661.27 6.47 661.94 6.40 662.01 6.18 662.23 6.02 662.39 5.98 662.43 5.57 662.84 5.45 662.96 5.24 663.17 5.42 662.99 5.3 663.11

Station BM HI 0 1.9 3.9 5.9 7.9 10.2 10.9 11.5 12 12.6 13.2 14.3 15.2 16.3 16.9 17.4 18.1 19.9 21.9 23.9 25.9 27.9 29.9 31.9 32.1

Year 3 FS/BS Elev. 5.66 662.65 668.31 5.92 662.39 6.13 662.18 6.35 661.96 6.35 661.96 6.37 661.94 6.32 661.99 6.45 661.86 6.71 661.60 7.01 661.30 7.26 661.05 7.38 660.93 7.38 660.93 7.37 660.94 6.90 661.41 6.67 661.64 6.31 662.00 6.14 662.17 5.92 662.39 5.78 662.53 5.82 662.49 5.57 662.74 5.33 662.98 5.27 663.04 5.15 663.16 5.18 663.13

Desc. BP5 IR Lt

Desc. IR Lt GRND

BKF BNK TOE

BANK BNK BNK BNK BKF GRND

Station BM HI 0 2.7 5.7 8.7 9.3 9.9 10.6 11.7 12.4 13.2 13.9 14.9 16.2 16.5 17.2 17.7 18.1 19 20.7 23.7 27.7 32.2

FS/BS 3.98

Station BM HI

FS/BS 0.00

7.22 7.75 7.64 7.52 7.55 7.51 7.67 8.14 8.59 8.64 8.58 8.67 8.48 8.19 7.71 7.54 7.48 7.35 7.11 7.14 6.76 6.53

Year 1 Elev. 665.59 669.57 662.35 661.82 661.93 662.05 662.02 662.06 661.90 661.43 660.98 660.93 660.99 660.90 661.09 661.38 661.86 662.03 662.09 662.22 662.46 662.43 662.81 663.04

Year 4 Elev. 100.00 100.00

Desc. BP5 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BED BED BED BED BED BANK BANK BANK BKF RT GRND GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 0 2.6 4.6 9.8 10.5 11.6 12.5 12.9 14 15.1 15.7 16.6 17.7 18.6 20.6 24.6 28.6 32.2

Year 2 FS/BS Elev. 5.57 662.74 668.31 5.98 662.33 6.49 661.82 6.42 661.89 6.32 661.99 6.38 661.93 6.64 661.67 7.27 661.04 7.43 660.88 7.43 660.88 7.50 660.81 7.34 660.97 6.92 661.39 6.29 662.02 6.16 662.15 5.91 662.40 5.76 662.55 5.33 662.98 5.28 663.03

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND BKF BNK BED BED BED BED TOE BNK BNK BKF GRND GRND GRND GRND

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL5 Reach 5 - Middle Branch - Sta 10+63.1

Year 3 Facing Downstream

Pool Cross Section

666 665 As-built

Elevation (ft)

664

Year 1 Year 2

▼ BKF

663

Year 3 Year 4

662

Year 5 BKF

661 660 -15

-10

-5

0

5

10

15

20

25

30

35

Station (ft)

As-Built Date 1/8/09 Area 8.4 Bkf W 7.9 Dmean 1.1 Dmax 1.7 W/d 7.4

Year 1 Date 10/20/09 Area 9.7 Bkf W 8.6 Dmean 1.1 Dmax 2.0 W/d 7.6

Year 2 Date 10/11/10 Area 10.1 Bkf W 8.4 Dmean 1.2 Dmax 1.9 W/d 7.0

Year 3 Date 10/5/11 Area 8.5 Bkf W 7.3 Dmean 1.2 Dmax 1.8 W/d 6.3

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL5 Reach 5 - Middle Branch - Sta 10+63.1 Station BM HI -20 -10 -7 0 5 9 11 12.4 13.6 15 16 17 18 19 19.7 19.9 20.3 21.4 22.8 24 27 28.4 31 36

Station BM HI 0 2 3.4 5.4 7.4 9.4 11.4 12.7 13 13.4 13.9 14.4 14.9 15.4 15.9 16.4 16.9 17.4 18.1 18.7 19.5 20 20.4 21.1 21.7 22.4 24.4 26.4 27.9 28.4

As-Built FS/BS Elev. 2.82 665.59 668.41 4.65 663.76 4.35 664.06 4.12 664.29 4.52 663.89 4.89 663.52 5.09 663.32 5.25 663.16 5.41 663.00 6.01 662.40 6.52 661.89 6.93 661.48 7.15 661.26 7.05 661.36 6.62 661.79 6.27 662.14 5.51 662.90 5.33 663.08 5.26 663.15 5.30 663.11 5.02 663.39 4.61 663.80 4.25 664.16 3.90 664.51 3.42 664.99 668.41

Year 3 FS/BS Elev. 4.18 664.40 668.58 4.59 663.99 4.65 663.93 4.72 663.86 5.01 663.57 5.02 663.56 5.19 663.39 5.34 663.24 5.61 662.97 5.64 662.94 5.73 662.85 6.20 662.38 6.67 661.91 6.89 661.69 7.02 661.56 7.28 661.30 7.33 661.25 7.43 661.15 7.40 661.18 7.17 661.41 6.88 661.70 6.67 661.91 5.62 662.96 5.57 663.01 5.50 663.08 5.42 663.16 5.45 663.13 5.09 663.49 4.77 663.81 4.45 664.13 4.42 664.16

Desc. BP5 IR Lt

Desc. IR Lt GRND

BKF BNK

TOE BED

TOE BNK

BKF GRND

Station BM HI 0 3 7 10 12 12.4 13.1 14 14.6 15 15.9 16.6 17.3 18.1 18.8 19.7 20 20.3 21 22.5 23 24 26 28.5

Year 1 FS/BS Elev. 3.98 665.59 669.57 5.57 664 5.81 663.76 6.16 663.41 6.29 663.28 6.55 663.02 6.55 663.02 6.80 662.77 7.32 662.25 7.60 661.97 7.85 661.72 8.22 661.35 8.49 661.08 8.54 661.03 8.45 661.12 8.19 661.38 7.54 662.03 6.72 662.85 6.51 663.06 6.52 663.05 6.51 663.06 6.45 663.12 6.13 663.44 5.98 663.59 5.53 664.04

Station BM HI

Year 4 FS/BS Elev. 0.00 100.00 100.00

Desc. BP5 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BNK BED BED BED BED BED BED BNK LOG LOG BNK GRND GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 0 3 5 8 10 12 12.4 13 13.6 14.2 14.8 15.5 16 16.4 17.2 18 18.5 19.7 20 20.8 22.6 23.9 26 28.4

Year 2 FS/BS Elev. 3.55 665.59 669.14 5.22 663.92 5.40 663.74 5.60 663.54 5.80 663.34 5.87 663.27 6.12 663.02 6.14 663.00 6.32 662.82 6.81 662.33 7.60 661.54 7.54 661.60 7.86 661.28 7.96 661.18 8.05 661.09 8.08 661.06 7.90 661.24 7.66 661.48 7.20 661.94 6.21 662.93 6.15 662.99 6.00 663.14 5.72 663.42 5.56 663.58 5.10 664.04

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND GRND BKF BNK BNK BNK BNK TOE BED BED BED BED BED BED BNK BNK BNK TOB GRND GRND

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF6 Reach 6 - Lower East Branch - Sta 11+07.2

Year 3 Facing Downstream

Riffle Cross Section

644 643 As-built

Elevation (ft)

642

Year 1 Year 2

641

Year 3 Year 4

640

Year 5

▼ BKF

BKF

639 638 -10

-5

0

5

10

15

20

25

30

35

40

Station (ft)

As-Built Date 1/8/09 Area 4.0 Bkf W 10.7 Dmean 0.4 Dmax 0.6 W/d 28.5

Year 1 Date 10/20/09 Area 2.8 Bkf W 8 Dmean 0.4 Dmax 0.6 W/d 22.7

Year 2 Date 10/12/10 Area 3.0 Bkf W 8 Dmean 0.4 Dmax 0.7 W/d 21.6

Year 3 Date 10/5/11 Area 2.9 Bkf W 7.7 Dmean 0.4 Dmax 0.7 W/d 20.3

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF6 Reach 6 - Lower East Branch - Sta 11+07.2 Station BM HI -10 -5 -2 0 3.5 6 7.6 8.8 10 11 12 13 14 15 15.7 16.2 18 19.5 21 23.5 25.5 27.5 28.2 35

As-Built FS/BS Elev. 5.02 643.14 648.16 5.28 642.88 5.76 642.40 6.05 642.11 6.62 641.54 7.92 640.24 8.04 640.12 8.19 639.97 8.75 639.41 8.88 639.28 9.07 639.09 9.05 639.11 9.07 639.09 9.17 638.99 9.16 639.00 9.00 639.16 8.74 639.42 8.71 639.45 8.54 639.62 8.68 639.48 8.39 639.77 7.78 640.38 7.00 641.16 6.77 641.39 5.05 643.11

Station BM HI 0 2.7 4.7 6.2 7.2 7.9 8.8 9.5 10.2 10.6 11.3 12 12.8 13.5 14.1 15.4 16.7 17.2 18.7 19.4 21.2 23.2 24.7 28.2

Year 3 FS/BS Elev. 6.17 641.78 647.95 6.34 641.61 7.38 640.57 7.71 640.24 7.73 640.22 7.81 640.14 8.02 639.93 8.24 639.71 8.19 639.76 8.43 639.52 8.75 639.20 8.93 639.02 8.98 638.97 8.97 638.98 8.94 639.01 8.64 639.31 8.64 639.31 8.30 639.65 8.30 639.65 8.32 639.63 8.21 639.74 8.40 639.55 8.13 639.82 7.77 640.18 6.47 641.48

Desc. BP6 IR Lt

Desc. IR Lt GRND

BKF BNK

TOE BED THL BED TOE BNK

BKF GRND

Station BM HI 0 1.5 3.5 5.5 7.5 7.8 8.7 9.6 10.2 11 11.7 12.3 12.8 13.7 14.3 15.5 16.7 19.5 21.5 23.3 24.5 26.3 28.2

FS/BS 6.06

Station BM HI

FS/BS 0.00

7.67 8.16 8.87 9.09 9.25 9.27 9.60 9.81 9.95 10.06 10.05 10.14 10.23 10.21 10.09 10.03 9.65 9.58 9.70 9.48 9.14 8.46 7.77

Year 1 Elev. 643.14 649.20 641.53 641.04 640.33 640.11 639.95 639.93 639.60 639.39 639.25 639.14 639.15 639.06 638.97 638.99 639.11 639.17 639.55 639.62 639.50 639.72 640.06 640.74 641.43

Year 4 Elev. 100.00 100.00

Desc. BP6 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BED BED BED BED BED BED BED BNK BKF RT GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 0 1.7 3.7 6.2 7.7 8.7 9.5 10.3 11 11.7 12.9 13.5 13.9 14.7 15.7 16.7 17.7 19.7 21.7 23.2 24.7 26.7 28.2

Year 2 FS/BS Elev. 4.08 641.78 645.86 4.23 641.63 4.87 640.99 5.56 640.30 5.62 640.24 5.82 640.04 6.20 639.66 6.12 639.74 6.53 639.33 6.77 639.09 6.76 639.10 6.88 638.98 6.84 639.02 6.67 639.19 6.59 639.27 6.51 639.35 6.15 639.71 6.28 639.58 6.17 639.69 6.25 639.61 6.06 639.80 5.57 640.29 4.94 640.92 4.38 641.48

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND BKF BNK BED BED BED BED BED BED BNK BNK BKF GRND GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL6 Reach 6 - Lower East Branch - Sta 11+33.0

Year 3 Facing Downstream

Pool Cross Section

643 642 As-built

Elevation (ft)

641

Year 1 ▼ BKF

Year 2

640

Year 3 Year 4

639

Year 5 BKF

638 637 -10

-5

0

5

10

15

20

25

30

35

40

Station (ft)

As-Built Date 1/8/09 Area 10.2 Bkf W 8.5 Dmean 1.2 Dmax 1.9 W/d 7.1

Year 1 Date 10/20/09 Area 10.0 Bkf W 9.2 Dmean 1.1 Dmax 2.0 W/d 8.5

Year 2 Date 10/12/10 Area 10.2 Bkf W 9.2 Dmean 1.1 Dmax 2.0 W/d 8.3

Year 3 Date 10/5/11 Area 10.3 Bkf W 10 Dmean 1.0 Dmax 2.1 W/d 9.7

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL6 Reach 6 - Lower East Branch - Sta 11+33.0 Station BM HI -10 -8.5 -2 0 3 5 6.5 8 9 10.5 11 12 13 14 15 15.5 16.5 18 21 23 24 26 27.5 32

As-Built FS/BS Elev. 5.02 643.14 648.16 5.68 642.48 5.57 642.59 6.38 641.78 7.10 641.06 7.99 640.17 7.82 640.34 8.22 639.94 8.19 639.97 8.57 639.59 9.60 638.56 9.87 638.29 10.03 638.13 10.10 638.06 9.94 638.22 9.78 638.38 8.71 639.45 8.05 640.11 8.10 640.06 9.07 639.09 9.21 638.95 9.00 639.16 8.12 640.04 7.35 640.81 6.45 641.71

Station BM HI 0 1.6 4.3 5.6 6.6 7.6 8.6 9.6 10.1 10.6 11.1 11.7 12.4 12.8 13.4 14.2 14.7 15.2 15.5 16.1 17.6 18.8 20.1 21.1 23.1 25.3 27.4

Year 3 FS/BS Elev. 6.00 641.31 647.31 6.12 641.19 6.67 640.64 6.93 640.38 6.86 640.45 7.27 640.04 7.17 640.14 7.44 639.87 7.94 639.37 8.44 638.87 8.74 638.57 8.96 638.35 9.11 638.20 9.23 638.08 9.24 638.07 9.11 638.20 8.80 638.51 8.67 638.64 7.75 639.56 7.62 639.69 7.16 640.15 7.16 640.15 7.42 639.89 7.55 639.76 8.04 639.27 8.17 639.14 7.49 639.82 6.42 640.89

Desc. BP6 IR Lt

Desc. IR Lt GRND

BKF BNK BNK TOE BED EOW THL BED EOW BED TOE BNK BKF GRND

Station BM HI 0 0.8 2 4 6 7.9 9 9.8 10.7 11.3 12 13.2 14.7 15.6 17.1 20 21 22.8 24 26

Year 1 FS/BS Elev. 6.06 643.14 649.20 8.13 641.07 8.20 641 8.71 640.49 8.85 640.35 9.13 640.07 9.23 639.97 9.74 639.46 10.02 639.18 10.68 638.52 10.97 638.23 11.10 638.1 11.18 638.02 10.72 638.48 9.63 639.57 9.18 640.02 9.49 639.71 10.11 639.09 10.22 638.98 9.94 639.26 9.21 639.99

Station BM HI

Year 4 FS/BS Elev. 0.00 100.00 100.00

Desc. BP6 IR Lt GRND GRND GRND GRND GRND BKF LT BNK BNK BNK BED BED BED BED BED BED BNK LOG LOG BNK GRND

Desc. IR Lt

Station BM HI 0 2.6 5.5 6.3 7.9 9.3 9.9 10.2 10.6 10.9 11.3 12 12.3 12.8 13.3 13.8 14.3 14.9 15.3 15.8 16.6 17.1 18.3 20 20.7 22.3 23.8 25.9 27.3

Year 2 FS/BS Elev. 3.25 641.75 645.00 3.88 641.12 4.66 640.34 4.60 640.40 4.99 640.01 4.98 640.02 5.50 639.50 5.88 639.12 6.29 638.71 6.46 638.54 6.70 638.30 6.79 638.21 6.93 638.07 7.00 638.00 6.99 638.01 6.91 638.09 6.72 638.28 6.52 638.48 6.32 638.68 5.82 639.18 5.26 639.74 5.01 639.99 4.91 640.09 5.03 639.97 5.29 639.71 5.84 639.16 5.88 639.12 5.78 639.22 4.99 640.01 4.10 640.90

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND BKF BNK BNK BNK BED TOE BED BED BED BED BED BED BED BED ROOTWAD ROOTWAD BNK BKF GRND GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF7 Reach 7 - Southeast Creek - Sta 11+20.6

Year 3 Facing Downstream

Riffle Cross Section

655 654 As-built

Elevation (ft)

653

Year 1 Year 2

652

Year 3 ▼ BKF

Year 4

651

Year 5 BKF

650 649 -10

-5

0

5

10

15

20

25

30

35

40

Station (ft)

As-Built Date 1/8/09 Area 9.4 Bkf W 14.5 Dmean 0.6 Dmax 1.2 W/d 22.3

Year 1 Date 10/20/09 Area 9.5 Bkf W 15 Dmean 0.6 Dmax 1.2 W/d 23.8

Year 2 Date 10/12/10 Area 7.6 Bkf W 14.5 Dmean 0.5 Dmax 1.2 W/d 27.7

Year 3 Date 10/5/11 Area 8.8 Bkf W 13.3 Dmean 0.7 Dmax 1.1 W/d 20.2

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF7 Reach 7 - Southeast Creek - Sta 11+20.6 Station BM HI -8 0 1 4 5 7 8 9 10 11 12 13.3 13.9 14.5 15.5 16 17 18.5 20 22 24 27.3 33 36

As-Built FS/BS Elev. 7.17 653.43 660.60 6.40 654.20 7.68 652.92 7.75 652.85 9.04 651.56 9.36 651.24 9.72 650.88 9.82 650.78 10.07 650.53 10.20 650.40 10.23 650.37 10.12 650.48 10.33 650.27 10.10 650.50 9.94 650.66 9.65 650.95 9.53 651.07 9.42 651.18 9.14 651.46 9.42 651.18 9.19 651.41 9.07 651.53 8.51 652.09 7.85 652.75 7.40 653.20

Station BM HI 0 1.1 2.9 4.9 6.4 6.9 8.4 9.4 10.9 11.9 13.1 13.8 14.9 16.3 17.2 18.2 19.9 21.9 25.9 27.3

Year 3 FS/BS Elev. 2.97 653.16 656.13 3.21 652.92 3.32 652.81 4.11 652.02 4.80 651.33 5.19 650.94 5.18 650.95 5.34 650.79 5.55 650.58 5.71 650.42 5.80 650.33 5.83 650.30 5.72 650.41 5.28 650.85 5.11 651.02 4.92 651.21 4.70 651.43 4.90 651.23 4.66 651.47 4.50 651.63 4.02 652.11

Desc. BP7 IR Lt

Desc. IR Lt GRND

BKF BNK EOW BED THL EOW BNK/BKF GRND

Station BM HI 0 1.8 3.8 5.1 6.6 7 8.8 10.1 10.9 12.5 13.2 13.7 14.4 15.3 16.8 18.8 21.8 23.8 25.8 27.3

FS/BS 5.15

Station BM HI

FS/BS 0.00

5.77 6.22 6.92 7.37 7.72 7.83 7.95 8.06 8.32 8.23 8.33 8.23 7.88 7.66 7.35 7.13 7.17 7.01 6.91 6.50

Year 1 Elev. 653.43 658.58 652.81 652.36 651.66 651.21 650.86 650.75 650.63 650.52 650.26 650.35 650.25 650.35 650.70 650.92 651.23 651.45 651.41 651.57 651.67 652.08

Year 4 Elev. 100.00 100.00

Desc. BP7 IR Lt GRND GRND GRND GRND BKF LT

BKF RT GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 0 1.8 3.8 5.8 7.8 8.8 9.6 10.5 10.9 11.4 12.1 12.6 13.4 13.7 14.1 14.6 15.3 16.3 17.3 18.3 19.8 21.3 23.8 25.8 27.3

Year 2 FS/BS Elev. 5.27 653.16 658.43 5.54 652.89 6.04 652.39 6.73 651.70 7.31 651.12 7.64 650.79 7.68 650.75 7.67 650.76 7.95 650.48 8.13 650.30 8.24 650.19 8.07 650.36 8.07 650.36 8.13 650.30 8.10 650.33 7.88 650.55 7.52 650.91 7.50 650.93 7.40 651.03 7.20 651.23 7.06 651.37 7.24 651.19 7.16 651.27 6.84 651.59 6.94 651.49 6.29 652.14

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND GRND BKF BNK EOW BED BED BED BED EOW BNK BKF GRND GRND GRND GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL7 Reach 7 - Southeast Creek - Sta 11+32.3

Year 3 Facing Downstream

Pool Cross Section

654 653 As-built

Elevation (ft)

652

Year 1 Year 2

▼ BKF

651

Year 3 Year 4

650

Year 5 BKF

649 648 -10

-5

0

5

10

15

20

25

30

35

40

Station (ft)

As-Built Date 1/8/09 Area 10.5 Bkf W 9.5 Dmean 1.1 Dmax 2.0 W/d 8.6

Year 1 Date 10/20/09 Area 9.6 Bkf W 9.7 Dmean 1.0 Dmax 1.8 W/d 9.8

Year 2 Date 10/12/10 Area 9.6 Bkf W 9.8 Dmean 1.0 Dmax 1.9 W/d 10.0

Year 3 Date 10/5/11 Area 9.9 Bkf W 9.3 Dmean 1.1 Dmax 1.9 W/d 8.7

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL7 Reach 7 - Southeast Creek - Sta 11+32.3 Station BM HI -4 0 2 5 7.5 8.2 8.5 9 10 11 12 13 14 14.3 14.6 15.4 16.5 17.8 20 24 27 29 34 40

Station BM HI 0 2 3.5 5.5 7 8.3 8.4 8.9 10 10.6 11.2 12 12.7 13.6 13.6 14.3 15.3 16.3 18.1 19.5 21.1 23.8 26 28 29

As-Built FS/BS Elev. 7.17 653.43 660.60 6.17 654.43 7.20 653.40 7.92 652.68 9.03 651.57 9.77 650.83 9.81 650.79 10.45 650.15 10.80 649.80 11.26 649.34 11.59 649.01 11.56 649.04 11.31 649.29 10.94 649.66 10.41 650.19 10.22 650.38 10.05 650.55 9.61 650.99 9.46 651.14 9.45 651.15 9.33 651.27 8.95 651.65 8.69 651.91 8.15 652.45 7.55 653.05 660.60

Year 3 FS/BS Elev. 6.60 653.53 660.13 6.71 653.42 7.53 652.60 8.09 652.04 8.81 651.32 9.21 650.92 9.58 650.55 9.87 650.26 10.53 649.60 10.83 649.30 10.97 649.16 10.99 649.14 10.79 649.34 10.56 649.57 10.38 649.75 9.92 650.21 9.74 650.39 9.45 650.68 9.10 651.03 8.94 651.19 8.92 651.21 8.87 651.26 8.85 651.28 8.56 651.57 8.39 651.74 8.29 651.84

Desc. BP7 IR Lt

Desc. IR Lt GRND

BKF WS TOE BED THAL BED BED BED BED WS BNK BNK BKF GRND

Station BM HI 0 1.5 2.5 4 6.2 8 8.7 9.3 10 11 12 13 14 14.1 14.6 15.5 16.7 19 22 24 27 29.1

Year 1 FS/BS Elev. 5.15 653.43 658.58 5.21 653.37 5.62 652.96 6.19 652.39 6.66 651.92 7.51 651.07 7.81 650.77 8.48 650.1 9.01 649.57 9.25 649.33 9.41 649.17 9.34 649.24 9.16 649.42 8.85 649.73 8.52 650.06 8.22 650.36 7.91 650.67 7.62 650.96 7.39 651.19 7.38 651.2 7.27 651.31 6.85 651.73 6.67 651.91

Station BM HI

Year 4 FS/BS Elev. 0.00 100.00 100.00

Desc. BP7 IR Lt GRND GRND GRND GRND GRND LOG EOW

EOW BKF RT GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 0 0.9 3.4 4.5 5.4 7.1 8 8.4 8.9 9.4 10.1 11 12 12.7 13.8 13.9 14.2 15.2 16.1 16.9 20.1 21.5 24.1 27 28.9

Year 2 FS/BS Elev. 4.94 652.34 657.28 3.84 653.44 4.09 653.19 5.19 652.09 5.55 651.73 5.93 651.35 6.35 650.93 6.49 650.79 7.19 650.09 7.71 649.57 7.89 649.39 8.11 649.17 8.26 649.02 8.10 649.18 7.89 649.39 7.61 649.67 7.16 650.12 6.76 650.52 6.67 650.61 6.35 650.93 6.23 651.05 6.05 651.23 6.07 651.21 5.90 651.38 5.50 651.78 5.39 651.89

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND GRND LOG LOG/EOW BED BED BED BED BED BED BED EOW BNK BNK BNK BKF GRND GRND GRND GRND GRND

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF8 Reach 8 - Southwest Creek - Sta 11+49.9

Year 3 Facing Downstream

Riffle Cross Section

100 99 As-built

Elevation (ft)

98

Year 1 Year 2

97

Year 3

▼ BKF

Year 4

96

Year 5 BKF

95 94 -10

-5

0

5

10

15

20

25

30

35

40

Station (ft)

As-Built Date 1/8/09 Area 3.4 Bkf W 8 Dmean 0.4 Dmax 0.7 W/d 18.6

Year 1 Date 10/20/09 Area 4.4 Bkf W 8.2 Dmean 0.5 Dmax 0.7 W/d 15.2

Year 2 Date 10/12/10 Area 4.9 Bkf W 8.4 Dmean 0.6 Dmax 0.8 W/d 14.5

Year 3 Date 10/5/11 Area 5.3 Bkf W 9 Dmean 0.6 Dmax 0.9 W/d 15.2

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Riffle Cross Section RF8 Reach 8 - Southwest Creek - Sta 11+49.9 Station BM HI -15 -8 -3 0 3 7 9.3 10.6 11.9 12.3 12.6 12.8 14 15 16 17 18 18.7 19.4 19.9 21.2 22.4 24.9 26.9 28 28.9 30 33 37 40

As-Built FS/BS Elev. 2.51 98.99 101.50 3.36 98.14 3.67 97.83 3.94 97.56 4.05 97.45 4.10 97.40 4.04 97.46 4.24 97.26 4.56 96.94 5.04 96.46 5.26 96.24 5.41 96.09 5.58 95.92 5.56 95.94 5.76 95.74 5.56 95.94 5.46 96.04 5.43 96.07 5.34 96.16 5.23 96.27 5.04 96.46 4.91 96.59 4.71 96.79 4.23 97.27 3.99 97.51 4.03 97.47 3.86 97.64 3.92 97.58 3.64 97.86 2.72 98.78 2.35 99.15

Station BM HI 0.1 1.2 3.6 5.6 8.1 10 10.9 11.6 12.2 12.5 13.4 14.7 16 16.9 18.25 19.3 20.6 21.1 22.7 25 26.6 29.05

Year 3 FS/BS Elev. 5.11 97.60 102.71 5.19 97.52 5.30 97.41 5.29 97.42 5.19 97.52 5.33 97.38 5.64 97.07 5.84 96.87 6.08 96.63 6.24 96.47 6.88 95.83 6.93 95.78 7.00 95.71 6.88 95.83 6.81 95.90 6.75 95.96 6.57 96.14 6.13 96.58 6.05 96.66 5.84 96.87 5.46 97.25 5.29 97.42 5.01 97.70

Desc. Stump

Desc. IR Lt GRND

BKF BNK TOE BED THL BED TOE BNK BKF GRND

Station BM HI 0 2 6 8 9 10 11 11.9 12.5 13.6 15 16.6 18 19 20.1 21 23 26

FS/BS 3.78

Station BM HI

FS/BS 0.00

6.68 6.77 6.71 6.70 6.83 7.05 7.33 7.63 8.15 8.29 8.37 8.34 8.18 7.93 7.63 7.59 7.22 6.77

Year 1 Elev. 100.42 104.20 97.52 97.43 97.49 97.50 97.37 97.15 96.87 96.57 96.05 95.91 95.83 95.86 96.02 96.27 96.57 96.61 96.98 97.43

Year 4 Elev. 100.00 100.00

Desc. BP8 IR Rt GRND GRND GRND GRND GRND GRND BKF BNK BED BED BED BED BED BNK BKF GRND GRND GRND

Desc. IR Lt

Station BM HI 0 1.8 4.5 6.5 8.5 9.5 11.1 11.5 11.9 12.1 12.4 13.4 14.5 14.9 15.5 16.8 17.7 18.5 19.3 19.8 20.3 20.8 21.7 23.2 24.5 26.2 27 28.3 29

Year 2 FS/BS Elev. 5.42 97.59 103.01 5.52 97.49 5.75 97.26 5.60 97.41 5.56 97.45 5.70 97.31 5.82 97.19 6.21 96.80 6.36 96.65 6.46 96.55 6.54 96.47 7.20 95.81 7.23 95.78 7.12 95.89 7.28 95.73 7.12 95.89 7.11 95.90 7.11 95.90 7.00 96.01 6.84 96.17 6.63 96.38 6.44 96.57 6.38 96.63 6.33 96.68 6.01 97.00 5.80 97.21 5.64 97.37 5.53 97.48 5.52 97.49 5.45 97.56

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND GRND GRND GRND GRND GRND BKF BNK TOE BED BED BED BED BED BED BED BED BNK BNK BKF GRND GRND GRND GRND GRND GRND GRND

Desc. IR Lt

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL8 Reach 8 - Middle Branch - Sta 100+78.5

Year 3 Facing Downstream

Pool Cross Section

102 101 100 As-built

Elevation (ft)

99

Year 1 Year 2

98

Year 3

▼ BKF

Year 4

97

Year 5

96

BKF

95 94 -15

-10

-5

0

5

10

15

20

25

30

35

Station (ft)

As-Built Date 1/8/09 Area 7.9 Bkf W 7.1 Dmean 1.1 Dmax 1.6 W/d 6.4

Year 1 Date 10/20/09 Area 7.4 Bkf W 6.6 Dmean 1.1 Dmax 1.7 W/d 5.9

Year 2 Date 10/12/10 Area 9.1 Bkf W 7.2 Dmean 1.3 Dmax 1.8 W/d 5.7

Year 3 Date 10/5/11 Area 8.6 Bkf W 7.5 Dmean 1.1 Dmax 1.8 W/d 6.5

Year 4 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Year 5 Date 0/0/0 Area 0.0 Bkf W 10 Dmean 0.0 Dmax 0.0 W/d 0.0

Holly Grove Stream Restoration Site Guilford County, NC Pool Cross Section PL8 Reach 8 - Middle Branch - Sta 100+78.5 Station BM HI -17 -10.5 -4 -1 0 1.5 3.6 5.2 6 9 11 11.7 12.2 12.5 12.8 13 13.5 14.3 15 16 17 17.7 18.3 18.8 19 19.9 21 22.8 25.4 26.9 30 34 36 40

As-Built FS/BS Elev. 5.31 98.99 104.30 3.29 101.01 4.42 99.88 5.09 99.21 5.26 99.04 5.30 99.00 5.47 98.83 5.83 98.47 5.72 98.58 5.93 98.37 6.76 97.54 7.00 97.30 7.11 97.19 7.28 97.02 7.48 96.82 7.64 96.66 8.00 96.30 8.42 95.88 8.62 95.68 8.63 95.67 8.66 95.64 8.61 95.69 8.37 95.93 7.63 96.67 7.41 96.89 5.87 98.43 5.65 98.65 5.30 99.00 4.9 99.40 5 99.30 5.03 99.27 4.73 99.57 4.64 99.66 4.17 100.13 4.06 100.24

Station BM HI 0 3 5.9 8.7 9.5 9.9 10.6 11.4 12.3 13 13.6 14.7 15.5 16.3 17.4 18 18.9 19.9 21.1 23 25.4

Year 3 FS/BS Elev. 5.13 99.09 104.22 5.20 99.02 5.55 98.67 5.79 98.43 6.57 97.65 6.72 97.50 6.75 97.47 6.83 97.39 7.01 97.21 7.14 97.08 8.10 96.12 8.57 95.65 8.82 95.40 8.82 95.40 8.78 95.44 8.53 95.69 7.54 96.68 6.86 97.36 5.57 98.65 5.25 98.97 4.86 99.36 4.92 99.30

Desc. Stump

Desc. IR Lt GRND

BKF BNK

TOE BED THL BED TOE BNK

GRND

Station BM HI 0 2.4 4.9 8.4 9.4 10.9 11.9 12.9 13.9 14.5 15.3 16.3 17.6 17.9 18.5 19.1 19.9 21.4 23.4 25.4

Year 1 FS/BS Elev. 3.78 100.42 104.20 5.15 99.05 5.37 98.83 5.50 98.7 6.45 97.75 6.66 97.54 6.85 97.35 7.03 97.17 7.86 96.34 8.33 95.87 8.65 95.55 8.74 95.46 8.58 95.62 8.09 96.11 7.48 96.72 7.10 97.1 5.73 98.47 5.53 98.67 5.13 99.07 4.86 99.34 4.89 99.31

Station BM HI

Year 4 FS/BS Elev. 0.00 100.00 100.00

Desc. BP8 IR Rt GRND GRND GRND GRND GRND GRND BKF BNK BED BED BED BED BED ROOTWAD ROOT TOB GRND GRND GRND GRND

Desc. IR Lt

Station BM HI 0 2.7 4.7 5.5 5.8 8.7 9.7 10.7 11.7 12.2 12.4 12.8 13.3 14.2 15.2 16.7 17.6 18 18.6 18.9 19.1 19.7 20.7 23 25.45

Year 2 FS/BS Elev. 5.61 99.09 104.70 5.69 99.01 5.94 98.76 6.04 98.66 5.74 98.96 6.24 98.46 7.12 97.58 7.20 97.50 7.33 97.37 7.54 97.16 7.64 97.06 8.23 96.47 8.66 96.04 8.98 95.72 9.26 95.44 9.33 95.37 9.33 95.37 9.06 95.64 8.01 96.69 7.75 96.95 7.47 97.23 6.32 98.38 6.15 98.55 5.82 98.88 5.33 99.37 5.41 99.29

Station BM HI

Year 5 FS/BS Elev. 0.00 100.00 100.00

Desc. IR Lt GRND GRND GRND LOG GRND GRND BKF BNK BNK BNK BED EOW BED BED BED BED BED BNK BNK BNK GRND GRND GRND GRND GRND

Desc. IR Lt

bedrock clay hardpan detritus/wood

1 1 6 2 2 1 3 3 9 12 19 17 8 6 2 2 2

Pebble Count, Holly Grove Stream Restoration Site

100%

artificial 100

20

90%

18

80%

16

70%

14

60%

12

50%

10

40%

8

30%

6

20%

4

10%

2

0% 0.01

0.1

1

10

100

1000

0 10000

particle size (mm)

97 3

total count:

# # # # # # # # # # # # # # # # # # # # # # # #

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 1 Note: Riffle RF1

percent finer than

Count 1

number of particles

Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:

cumulative %

based on sediment particles only based on total count

size percent less than (mm)

# of particles

particle size distribution gradation geo mean

std dev

D16

D35

D50

D65

D84

D95

9.401

25.68

36.6

48

77

156

3.0

27.0

2.9

percent by substrate type silt/clay

sand

gravel

cobble

boulder

bedrock

hardpan

wood/det

artificial

1%

8%

68%

18%

2%

3%

0%

0%

0%

bedrock clay hardpan detritus/wood

1 1 6 2 2 1 3 3 9 12 19 17 8 6 2 2 2

Pebble Count, Holly Grove Stream Restoration Site

100%

artificial 100

20

90%

18

80%

16

70%

14

60%

12

50%

10

40%

8

30%

6

20%

4

10%

2

0% 0.01

0.1

1

10

100

1000

0 10000

particle size (mm)

97 3

total count:

# # # # # # # # # # # # # # # # # # # # # # # #

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 1 Note: Riffle RF1

percent finer than

Count 1

number of particles

Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:

cumulative %

based on sediment particles only based on total count

size percent less than (mm)

# of particles

particle size distribution gradation geo mean

std dev

D16

D35

D50

D65

D84

D95

9.401

25.68

36.6

48

77

156

3.0

27.0

2.9

percent by substrate type silt/clay

sand

gravel

cobble

boulder

bedrock

hardpan

wood/det

artificial

1%

8%

68%

18%

2%

3%

0%

0%

0%

weighted particle count:

86.2

20.7 18.9

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 2 Note: Reach Data 2 Pebble Count, Holly Grove Stream Restoration Site

100%

30%

90% 25%

80% 70%

20%

percent finer than

60% 50%

15%

40% 10%

30% 20%

5%

10% 0% 0.01

0.1

1

10

weighted percent

particle size (mm)

100

riffle

pool

0% 10000

1000

run

glide

7% 0% 0% 0% 0% 2% 0% 0% 1% 2% 3% 4% 9% 5% 16% 28% 15% 6% 1% 0% 0% 0%

weighted percent of particles in range

Pebble Count Weighted by Channel Feature Percent Riffle: 37.8 Percent Run: Percent Pool: 22.5 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 5.6 very fine sand 0.062 0.13 0.0 0.13 0.25 0.0 fine sand medium sand 0.25 0.5 0.0 0.5 1 0.0 coarse sand 1 2 1.7 very coarse sand 2 4 0.0 very fine gravel 4 6 0.0 fine gravel 6 8 0.9 fine gravel 8 11 1.8 medium gravel 11 16 2.6 medium gravel 16 22 3.5 coarse gravel 22 32 8.0 coarse gravel very coarse gravel 32 45 4.6 very coarse gravel 45 64 13.8 small cobble 64 90 24.2 medium cobble 90 128 13.3 large cobble 128 180 5.4 very large cobble 180 256 0.8 small boulder 256 362 0.0 small boulder 362 512 0.0 medium boulder 512 1024 0.0 large boulder 1024 2048 0.0 very large boulder 2048 4096 0.0

% of particles 0%

0% bedrock

13.7

clay hardpan

0.0

detritus/wood

0.0

artificial

0.0

weighted total count:

99.9

based on sediment particles only based on total count

size percent less than (mm)

particle size distribution gradation geo mean

std dev

D16

D35

D50

D65

D84

D95

17.768

46.70

64.6

77

105

144

2.6

43.1

2.4

boulder 0%

bedrock 14%

hardpan 0%

wood/det 0%

artificial 0%

percent by substrate type silt/clay 6%

sand 2%

gravel 35%

cobble 44%

bedrock clay hardpan detritus/wood

1 1 1 2 3 2 4 6 14 16 4

Pebble Count, Holly Grove Stream Restoration Site

100%

artificial 100

50

90%

45

80%

40

70%

35

60%

30

50%

25

40%

20

30%

15

20%

10

10%

5

0% 0.01

0.1

1

10

100

1000

0 10000

particle size (mm)

98 2

total count:

# # # # # # # # # # # # # # # # # # # # # # # #

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 2 Note: Riffle RF2

percent finer than

Count 44

number of particles

Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:

cumulative %

based on sediment particles only based on total count

size percent less than (mm)

# of particles

particle size distribution gradation geo mean

std dev

D16

D35

D50

D65

D84

D95

0.062

0.06

22.0

88

140

177

180.6

2.9

47.6

percent by substrate type silt/clay

sand

gravel

cobble

boulder

bedrock

hardpan

wood/det

artificial

44%

0%

14%

40%

0%

2%

0%

0%

0%

weighted particle count:

89.1

19.8 22.8

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 3 Note: Reach Data 3 Pebble Count, Holly Grove Stream Restoration Site

100%

25%

90% 20%

80% 70%

percent finer than

60%

15%

50% 40%

10%

30% 5%

20% 10% 0% 0.01

0.1

1

10

weighted percent

particle size (mm)

100

riffle

pool

0% 10000

1000

run

glide

23% 0% 0% 0% 1% 0% 1% 2% 1% 0% 4% 7% 2% 4% 13% 13% 14% 8% 3% 1% 0% 0%

weighted percent of particles in range

Pebble Count Weighted by Channel Feature Percent Riffle: 36.6 Percent Run: Percent Pool: 20.8 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 20.8 very fine sand 0.062 0.13 0.0 0.13 0.25 0.0 fine sand medium sand 0.25 0.5 0.0 0.5 1 1.0 coarse sand 1 2 0.0 very coarse sand 2 4 1.0 very fine gravel 4 6 2.0 fine gravel 6 8 1.0 fine gravel 8 11 0.0 medium gravel 11 16 4.0 medium gravel 16 22 5.9 coarse gravel 22 32 2.0 coarse gravel very coarse gravel 32 45 4.0 very coarse gravel 45 64 11.9 small cobble 64 90 11.9 medium cobble 90 128 12.9 large cobble 128 180 6.9 very large cobble 180 256 3.0 small boulder 256 362 1.0 small boulder 362 512 0.0 medium boulder 512 1024 0.0 large boulder 1024 2048 0.0 very large boulder 2048 4096 0.0

% of particles 0%

0% bedrock

10.9

clay hardpan

0.0

detritus/wood

0.0

artificial

0.0

weighted total count:

100

based on sediment particles only based on total count

size percent less than (mm)

particle size distribution gradation geo mean

std dev

D16

D35

D50

D65

D84

D95

0.062

17.32

49.1

73

117

176

397.5

2.7

43.4

boulder 1%

bedrock 11%

hardpan 0%

wood/det 0%

artificial 0%

percent by substrate type silt/clay 21%

sand 1%

gravel 32%

cobble 35%

bedrock clay hardpan detritus/wood

1 1 1 1 2 4 3 7 9 11 12 2 1

Pebble Count, Holly Grove Stream Restoration Site

100%

artificial 100

45

90%

40

80%

35

70%

30

60%

25

50% 20

40%

15

30% 20%

10

10%

5

0% 0.01

0.1

1

10

100

1000

0 10000

particle size (mm)

96 4

total count:

# # # # # # # # # # # # # # # # # # # # # # # #

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Buckhorn Creek: Reach 3 Note: Riffle RF3

percent finer than

Count 41

number of particles

Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:

cumulative %

based on sediment particles only based on total count

size percent less than (mm)

# of particles

particle size distribution gradation geo mean

std dev

D16

D35

D50

D65

D84

D95

0.062

0.06

17.3

67

127

171

143.4

2.8

45.2

percent by substrate type silt/clay

sand

gravel

cobble

boulder

bedrock

hardpan

wood/det

artificial

41%

1%

19%

34%

1%

4%

0%

0%

0%

weighted particle count:

100.1

21.4 11.7

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 4 Note: Reach Data 4 Pebble Count, Holly Grove Stream Restoration Site

100%

60%

90% 50%

80% 70%

40%

percent finer than

60% 50%

30%

40% 20%

30% 20%

10%

10% 0% 0.01

0.1

1

10

weighted percent

particle size (mm)

100

riffle

pool

0% 10000

1000

run

glide

54% 0% 0% 0% 0% 0% 0% 1% 1% 4% 2% 3% 8% 4% 8% 4% 8% 2% 1% 1% 0% 0%

weighted percent of particles in range

Pebble Count Weighted by Channel Feature Percent Riffle: 45.6 Percent Run: Percent Pool: 21.4 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 54.4 very fine sand 0.062 0.13 0.0 0.13 0.25 0.0 fine sand medium sand 0.25 0.5 0.0 0.5 1 0.0 coarse sand 1 2 0.0 very coarse sand 2 4 0.0 very fine gravel 4 6 1.0 fine gravel 6 8 1.0 fine gravel 8 11 3.9 medium gravel 11 16 1.9 medium gravel 16 22 2.9 coarse gravel 22 32 7.8 coarse gravel very coarse gravel 32 45 3.9 very coarse gravel 45 64 7.8 small cobble 64 90 3.9 medium cobble 90 128 7.8 large cobble 128 180 1.9 very large cobble 180 256 1.0 small boulder 256 362 1.0 small boulder 362 512 0.0 medium boulder 512 1024 0.0 large boulder 1024 2048 0.0 very large boulder 2048 4096 0.0

% of particles 0%

0% bedrock

0.0

clay hardpan

0.0

detritus/wood

0.0

artificial

0.0

weighted total count:

100.1

based on sediment particles only based on total count

size percent less than (mm) D16 0.062

particle size distribution gradation geo mean

std dev

D35

D50

D65

D84

D95

0.06

0.1

22

63

122

505.7

2.0

31.8

boulder 1%

bedrock 0%

hardpan 0%

wood/det 0%

artificial 0%

percent by substrate type silt/clay 54%

sand 0%

gravel 30%

cobble 15%

3 3 4 2 12 4 11 7

Pebble Count, Holly Grove Stream Restoration Site

100%

artificial 102

60

90% 50

80% 70%

40

60% 50%

30

40% 20

30% 20%

10

10% 0% 0.01

0.1

1

10

100

1000

0 10000

particle size (mm)

102

bedrock clay hardpan detritus/wood total count:

# # # # # # # # # # # # # # # # # # # # # # # #

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 4 Note: Riffle RF4

percent finer than

Count 56

number of particles

Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:

cumulative %

based on sediment particles only based on total count

size percent less than (mm)

# of particles

particle size distribution gradation geo mean

std dev

D16

D35

D50

D65

D84

D95

0.062

0.06

0.1

34

95

140

766.4

2.4

39.1

percent by substrate type silt/clay

sand

gravel

cobble

boulder

bedrock

hardpan

wood/det

artificial

55%

0%

24%

22%

0%

0%

0%

0%

0%

weighted particle count:

100.0

23.2 13.1

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 5 Note: Reach Data 5 Pebble Count, Holly Grove Stream Restoration Site

100%

45%

90%

40%

80%

35%

70%

30%

60%

percent finer than

25% 50% 20% 40% 15%

30%

10%

20%

5%

10% 0% 0.01

0.1

1

10

weighted percent

particle size (mm)

100

riffle

pool

0% 10000

1000

run

glide

41% 0% 0% 0% 0% 0% 2% 3% 3% 3% 5% 7% 7% 7% 6% 5% 6% 3% 1% 0% 0% 0%

weighted percent of particles in range

Pebble Count Weighted by Channel Feature Percent Riffle: 35.4 Percent Run: Percent Pool: 28.3 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 40.8 very fine sand 0.062 0.13 0.0 0.13 0.25 0.0 fine sand medium sand 0.25 0.5 0.0 0.5 1 0.0 coarse sand 1 2 0.0 very coarse sand 2 4 2.0 very fine gravel 4 6 3.0 fine gravel 6 8 3.1 fine gravel 8 11 3.1 medium gravel 11 16 5.1 medium gravel 16 22 7.1 coarse gravel 22 32 7.1 coarse gravel very coarse gravel 32 45 7.1 very coarse gravel 45 64 6.1 small cobble 64 90 5.1 medium cobble 90 128 6.2 large cobble 128 180 3.1 very large cobble 180 256 1.0 small boulder 256 362 0.0 small boulder 362 512 0.0 medium boulder 512 1024 0.0 large boulder 1024 2048 0.0 very large boulder 2048 4096 0.0

% of particles 0%

0% bedrock

0.0

clay hardpan

0.0

detritus/wood

0.0

artificial

0.0

weighted total count:

100

based on sediment particles only based on total count

size percent less than (mm) D16 0.062

particle size distribution gradation geo mean

std dev

D35

D50

D65

D84

D95

0.06

8.9

23

62

122

75.4

2.0

31.6

boulder 0%

bedrock 0%

hardpan 0%

wood/det 0%

artificial 0%

percent by substrate type silt/clay 41%

sand 0%

gravel 44%

cobble 15%

4 2 4 9 1 9 7 2 7 5 6 7 3 2

Pebble Count, Holly Grove Stream Restoration Site

100%

artificial 111

50

90%

45

80%

40

70%

35

60%

30

50%

25

40%

20

30%

15

20%

10

10%

5

0% 0.01

0.1

1

10

100

1000

0 10000

particle size (mm)

111

bedrock clay hardpan detritus/wood total count:

# # # # # # # # # # # # # # # # # # # # # # # #

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Middle Branch: Reach 5 Note: Riffle RF5

percent finer than

Count 43

number of particles

Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:

cumulative %

based on sediment particles only based on total count

size percent less than (mm)

# of particles

particle size distribution gradation geo mean

std dev

D16

D35

D50

D65

D84

D95

0.062

0.06

4.5

11

46

88

41.2

1.7

27.1

percent by substrate type silt/clay

sand

gravel

cobble

boulder

bedrock

hardpan

wood/det

artificial

39%

5%

45%

11%

0%

0%

0%

0%

0%

weighted particle count:

99.9

18.6 12.7

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC East Branch: Reach 6 Note: Reach Data 6

percent finer than

Pebble Count, Holly Grove Stream Restoration Site 100%

50%

90%

45%

80%

40%

70%

35%

60%

30%

50%

25%

40%

20%

30%

15%

20%

10%

10%

5%

0% 0.01

0.1

1

10

weighted percent

particle size (mm)

100

riffle

pool

0% 10000

1000

run

glide

43% 1% 0% 0% 0% 1% 2% 6% 5% 8% 4% 4% 7% 8% 6% 0% 2% 2% 0% 0% 2% 0%

weighted percent of particles in range

Pebble Count Weighted by Channel Feature Percent Riffle: 39.2 Percent Run: Percent Pool: 29.4 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 43.1 very fine sand 0.062 0.13 1.0 0.13 0.25 0.0 fine sand medium sand 0.25 0.5 0.0 0.5 1 0.0 coarse sand 1 2 1.0 very coarse sand 2 4 2.0 very fine gravel 4 6 5.9 fine gravel 6 8 4.9 fine gravel 8 11 7.8 medium gravel 11 16 3.9 medium gravel 16 22 3.9 coarse gravel 22 32 6.9 coarse gravel very coarse gravel 32 45 7.8 very coarse gravel 45 64 5.9 small cobble 64 90 0.0 medium cobble 90 128 2.0 large cobble 128 180 2.0 very large cobble 180 256 0.0 small boulder 256 362 0.0 small boulder 362 512 2.0 medium boulder 512 1024 0.0 large boulder 1024 2048 0.0 very large boulder 2048 4096 0.0

% of particles 0%

0% bedrock

0.0

clay hardpan

0.0

detritus/wood

0.0

artificial

0.0

weighted total count:

99.9

based on sediment particles only based on total count

size percent less than (mm) D16 0.062

particle size distribution gradation geo mean

std dev

D35

D50

D65

D84

D95

0.06

4.9

11

37

105

43.3

1.5

24.6

boulder 2%

bedrock 0%

hardpan 0%

wood/det 0%

artificial 0%

percent by substrate type silt/clay 43%

sand 2%

gravel 49%

cobble 4%

1

6 3 3 5 4 5 3 3 2 1

Pebble Count, Holly Grove Stream Restoration Site

100%

artificial 101

70

90%

60

80% 50

70% 60%

40

50% 30

40% 30%

20

20% 10

10% 0% 0.01

0.1

1

10

100

1000

0 10000

particle size (mm)

101

bedrock clay hardpan detritus/wood total count:

# # # # # # # # # # # # # # # # # # # # # # # #

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC East Branch: Reach 6 Note: Riffle RF6

percent finer than

Count 65

number of particles

Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:

cumulative %

based on sediment particles only based on total count

size percent less than (mm)

# of particles

particle size distribution gradation geo mean

std dev

D16

D35

D50

D65

D84

D95

0.062

0.06

0.1

0

19

50

149.9

1.1

17.3

percent by substrate type silt/clay

sand

gravel

cobble

boulder

bedrock

hardpan

wood/det

artificial

64%

1%

32%

3%

0%

0%

0%

0%

0%

weighted particle count:

100.0

20.4 11.1

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southeast Creek: Reach 7 Note: Reach Data 7 Pebble Count, Holly Grove Stream Restoration Site

100%

80%

90%

70%

80% 60% 70% 50%

percent finer than

60% 50%

40%

40%

30%

30% 20% 20% 10%

10% 0% 0.01

0.1

1

10

100

weighted percent

particle size (mm)

riffle

pool

0% 10000

1000

run

glide

71% 1% 2% 0% 0% 3% 2% 1% 0% 3% 3% 0% 2% 0% 5% 4% 3% 1% 1% 0% 0% 0%

weighted percent of particles in range

Pebble Count Weighted by Channel Feature Percent Riffle: 29.6 Percent Run: Percent Pool: 38.9 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 71.3 very fine sand 0.062 0.13 0.9 0.13 0.25 1.9 fine sand medium sand 0.25 0.5 0.0 0.5 1 0.0 coarse sand 1 2 2.8 very coarse sand 2 4 1.9 very fine gravel 4 6 0.9 fine gravel 6 8 0.0 fine gravel 8 11 2.8 medium gravel 11 16 2.8 medium gravel 16 22 0.0 coarse gravel 22 32 1.9 coarse gravel very coarse gravel 32 45 0.0 very coarse gravel 45 64 4.6 small cobble 64 90 3.7 medium cobble 90 128 2.8 large cobble 128 180 0.9 very large cobble 180 256 0.9 small boulder 256 362 0.0 small boulder 362 512 0.0 medium boulder 512 1024 0.0 large boulder 1024 2048 0.0 very large boulder 2048 4096 0.0

% of particles 0%

0% bedrock

0.0

clay hardpan

0.0

detritus/wood

0.0

artificial

0.0

weighted total count:

100

based on sediment particles only based on total count

size percent less than (mm) D16 0.062

particle size distribution gradation geo mean

std dev

D35

D50

D65

D84

D95

0.06

0.1

0

14

87

110.4

0.9

14.8

boulder 0%

bedrock 0%

hardpan 0%

wood/det 0%

artificial 0%

percent by substrate type silt/clay 71%

sand 6%

gravel 15%

cobble 8%

2 1 9 3 3 3 5 5 1 1

Pebble Count, Holly Grove Stream Restoration Site

100%

artificial 104

80

90%

70

80% 60 70% 50

60% 50%

40

40%

30

30% 20 20% 10

10% 0% 0.01

0.1

1

10

100

1000

0 10000

particle size (mm)

104

bedrock clay hardpan detritus/wood total count:

# # # # # # # # # # # # # # # # # # # # # # # #

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southeast Creek: Reach 7 Note: Riffle RF7

percent finer than

Count 70 1

number of particles

Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:

cumulative %

based on sediment particles only based on total count

size percent less than (mm)

# of particles

particle size distribution gradation geo mean

std dev

D16

D35

D50

D65

D84

D95

0.062

0.06

0.1

0

9

51

75.0

0.8

12.2

percent by substrate type silt/clay

sand

gravel

cobble

boulder

bedrock

hardpan

wood/det

artificial

67%

3%

28%

2%

0%

0%

0%

0%

0%

weighted particle count:

99.9

19.4 18.4

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southwest Creek: Reach 8 Note: Reach Data 8 Pebble Count, Holly Grove Stream Restoration Site

100%

35%

90% 30% 80% 25%

70%

percent finer than

60%

20%

50% 15%

40% 30%

10%

20% 5% 10% 0% 0.01

0.1

1

10

weighted percent

particle size (mm)

100

riffle

pool

0% 10000

1000

run

glide

31% 0% 17% 0% 3% 0% 3% 1% 3% 3% 10% 5% 3% 5% 4% 3% 7% 2% 1% 0% 0% 0%

weighted percent of particles in range

Pebble Count Weighted by Channel Feature Percent Riffle: 32 Percent Run: Percent Pool: 30.1 Percent Glide: Material Size Range (mm) weighted silt/clay 0 0.062 31.0 very fine sand 0.062 0.13 0.0 0.13 0.25 17.5 fine sand medium sand 0.25 0.5 0.0 0.5 1 2.9 coarse sand 1 2 0.0 very coarse sand 2 4 2.9 very fine gravel 4 6 1.0 fine gravel 6 8 2.9 fine gravel 8 11 2.9 medium gravel 11 16 9.7 medium gravel 16 22 4.8 coarse gravel 22 32 2.9 coarse gravel very coarse gravel 32 45 4.8 very coarse gravel 45 64 3.9 small cobble 64 90 2.9 medium cobble 90 128 6.8 large cobble 128 180 1.9 very large cobble 180 256 1.0 small boulder 256 362 0.0 small boulder 362 512 0.0 medium boulder 512 1024 0.0 large boulder 1024 2048 0.0 very large boulder 2048 4096 0.0

% of particles 0%

0% bedrock

0.0

clay hardpan

0.0

detritus/wood

0.0

artificial

0.0

weighted total count:

99.9

based on sediment particles only based on total count

size percent less than (mm) D16 0.062

particle size distribution gradation geo mean

std dev

D35

D50

D65

D84

D95

0.15

0.7

13

47

115

39.0

1.7

27.6

boulder 0%

bedrock 0%

hardpan 0%

wood/det 0%

artificial 0%

percent by substrate type silt/clay 31%

sand 20%

gravel 36%

cobble 13%

1 4 5 4 3 10 9 11 8 6 3 7 3 1 1

Pebble Count, Holly Grove Stream Restoration Site

100%

artificial 101

14

90%

12

80% 10

70% 60%

8

50% 6

40% 30%

4

20% 2

10% 0% 0.01

0.1

1

10

100

1000

0 10000

particle size (mm)

101

bedrock clay hardpan detritus/wood total count:

# # # # # # # # # # # # # # # # # # # # # # # #

Pebble Count, Holly Grove Stream Restoration Site Guilford County, NC Southwest Creek: Reach 8 Note: Riffle RF8

percent finer than

Count 13 1 11

number of particles

Pebble Count of Channel Reach Material Size Range (mm) silt/clay 0 0.062 very fine sand 0.062 0.13 0.13 0.25 fine sand medium sand 0.25 0.5 0.5 1 coarse sand very coarse sand 1 2 2 4 very fine gravel 4 6 fine gravel 6 8 fine gravel 8 11 medium gravel 11 16 medium gravel 16 22 coarse gravel 22 32 coarse gravel very coarse gravel 32 45 very coarse gravel 45 64 small cobble 64 90 medium cobble 90 128 large cobble 128 180 very large cobble 180 256 small boulder 256 362 small boulder 362 512 medium boulder 512 1024 large boulder 1024 2048 very large boulder 2048 4096 total particle count:

cumulative %

based on sediment particles only based on total count

size percent less than (mm)

# of particles

particle size distribution gradation geo mean

std dev

D16

D35

D50

D65

D84

D95

0.143

6.15

15.1

26

60

128

54.8

2.9

20.4

percent by substrate type silt/clay

sand

gravel

cobble

boulder

bedrock

hardpan

wood/det

artificial

13%

13%

59%

14%

1%

0%

0%

0%

0%